| Memo |
Title |
Author |
Date |
Size |
| 26 |
Test Plan for the VLBA-DiFX
Correlator and
Other VLBA Sensitivity Upgrade Equipment |
J. D. Romney, W. F. Brisken, A. T. Deller, S. J. Durand,
& R. C. Walker |
2009 February 26 |
46k |
| 25 |
VLBA-DIFX Operations Plan |
W. Brisken |
2009 February 18 |
213k |
| 24 |
Mark 5C Hardware Test and Acceptance Plan Memo (pdf) |
C. Ruszczyk |
2008 October 22 |
103k |
| 23 |
A Guide to Software Correlation Using
NRAO-DiFX Version 1.1 (pdf) |
W. Brisken |
2008 September 3 |
364k |
| 22 |
The Evolution of Hard Drive Prices Over 2000
Days (pdf) |
W. Brisken, J. Romney |
2008 July 16 |
516k |
| 21 |
Final Report for the VLBA 22 GHZ Amplifier
Upgrade Project (pdf) |
C. Walker, S. Durand, C. Kutz
II, B. Hayward |
2008 May 22 |
375k |
| 20 |
Difx Operator Interface (DOI) Specification (pdf) |
W. Brisken |
2008 April 18 |
117k |
| 19 |
Mark 5C-, A Proposed Mark 5C Emulator (pdf) |
NRAO & MIT Haystack Obs. |
2008 January 9 |
109k |
| 18 |
Mark5C Software Interface Specification (pdf) |
NRAO & MIT Haystack Obs. |
2008 January 7 |
114k |
| 17 |
Benchmarking DiFX on the Mark5A Cluster and
Justification for an Upgrade
(pdf) |
W. Brisken |
2007 November 26 |
112k |
| 16 |
The Cost of Software Correlation(pdf) |
W. Brisken, A. Deller |
2007 October 9 |
131k |
| 15 |
Proposal to increase the sensitivity of the
VLBA(pdf) |
C.Walker, J. Romney, W. Brisken,
S. Durand |
2007 April 16 |
738k |
| 14 |
Impact of DBE Crossover Frequencies(pdf) |
C. Walker |
2007 April 14 |
143k |
| 13 |
Mark 5C Data-Frame Specification (pdf) |
Haystack/NRAO |
2008 February 19 |
107k |
| 12 |
Mark 5C Specification (pdf) |
Haystack/NRAO |
2008 February 19 |
120k |
| 11 |
Options for a VLBA 4-Gbps Upgrade(pdf) |
J. Romney |
2006 November 16 |
32k |
| 10 |
Proposal to Upgrade the 22 GHz Receivers on the
VLBA Antennas(pdf) |
C. Walker, S. Durand, C. Kutz
II, R.
Hayward |
2007 May 2 |
311k |
| 4 |
Mapping the Future of VLBI Science
in the U.S. (pdf) |
VLBI Future Committee |
2004, August 16 |
4463k |
| 3 |
VLBA Upgrade: Scientific, Observational, and
Technical Requirements (pdf) |
J. Romney |
2008 September 5 (re-issued) |
44k |
| 2 |
VLBA Upgrade Study (pdf) |
J. Romney |
2008 September 5 (re-issued) |
164k |
| 1 |
VLBA Sensitivity Upgrade Program
and Memo Series(pdf) |
J. Romney |
2007 April 1 |
22k |