| Memo |
Title |
Author |
Date |
Size |
| 77 |
Kitt
Peak, Arizona VLBA Maintenance Visit, April 27 - May 7, 2009 |
E. Carlowe |
May 28, 2009 |
773k |
| 76 |
St.
Croix VLBA Antenna Painting and Surface Preparation |
J. Thunborg |
March 31, 2009 |
666k |
| 75 |
St. Croix Maintenance Trip Report,
October 27 - Nov. 14, 2008 |
J. Thunborg |
December, 2008 |
718k
|
| 74 |
Owens Valley,
California VLBA Maintenance
Visit,
August 18-25, 2008(pdf) |
E. Carlowe |
September, 2008 |
811k |
| 73 |
North Liberty,
Iowa VLBA Maintenance
Visit,
April 30 - May 7, 2008(pdf) |
E. Carlowe |
April, 2008 |
969k |
| 72 |
Saint Croix, VI
VLBA Electronics
Maintenance Visit,
March 11-20, 2008(pdf) |
E. Carlowe |
March, 2008 |
3346k |
| 71 |
Brewster
Washington VLBA Maintenance
Visit,
July 24-31, 2007(pdf) |
E. Carlowe |
August 2007 |
848k |
| 70 |
Fort Davis
Bearing Replacement-Trip
Report(pdf) |
J. Thunborg |
February 27, 2008 |
146k |
| 69 |
Fort Davis
Maintenance Visit, May 1-8,
2007(pdf) |
E. Carlowe |
June 14, 2007 |
736k |
| 68 |
St. Croix VLBA
Antenna Painting and
Surface
Preparation Requirements(pdf) |
J. Thunborg |
May 8, 2007 |
650k |
| 67 |
Fort Davis -
Drive #1 Wheel/Bearing
Assembly Replacement
January 3-6, 2007 Trip Report(pdf) |
J. Thunborg |
January 10, 2007 |
33k |
| 66 |
Hancock, NH
Maintenance Visit, Sept.
20-27,2006(pdf)
Tasklists(pdf) |
E. Carlowe |
November 10, 2006 |
1196k |
| 65 |
Mauna Kea Drive
#1 Wheel/Bearing
Replacement -
July 19 - August 6, 2006(pdf) |
E. Carlowe |
September 1, 2006 |
121k |
| 64 |
Mauna Kea
Maintenance Visit - July 19-Aug
6, 2006(pdf)
Tasklists(pdf) |
E. Carlowe |
August 31, 2006 |
1167k |
| 63 |
Kitt Peak
Maintenance Visit - May 16-22,
2006(pdf)
Tasklists(pdf) |
E. Carlowe |
June 27, 2006 |
1,111k |
| 62 |
St. Croix
Corrosion Report(pdf) |
J. Thunborg |
March 3, 2006 |
499k |
| 61 |
North Liberty
Maintenance Visit,
September 20-27, 2005(pdf)
Tasklists(pdf) |
E.Carlowe |
November 21, 2005 |
1309k |
| 60 |
Los Alamos
Maintenance Visit,
July 28 thru August 3, 2005(pdf)
Tasklists(pdf) |
E. Carlowe |
August 30, 2005 |
1234k |
| 59 |
St. Croix
Maintenance Visist, April 4
thru April 22, 2005(pdf)
Tasklists(pdf) |
E. Carlowe |
July 25, 2005 |
1104k |
| 58 |
Owens Valley
Drive Wheel #2 Replacement,
February 14 - 17, 2005 Trip Report(pdf) |
R. Gutierrez |
March 2, 2005 |
50k |
| 57 |
Owens Valley, CA
Maintenance Visit
Sept. 23- Oct. 1, 2004(pdf)
Tasklists(pdf) |
E. Carlowe |
October 15, 2004 |
895k |
| 56 |
Brewster, WA
VLBA Maintenance Visit
July 28-August 8, 2004(pdf)
Tasklists(pdf) |
E. Carlowe |
August 23, 2004 |
894k |
| 55 |
Fort Davis,
Texas Maintenance Visit
June 10-18, 2004(pdf)
Tasklists(pdf) |
E. Carlowe |
July 21, 2004 |
994k |
| 54 |
Mauna Kea Rail
Repair(pdf) |
J. Thunborg |
August 13, 2004 |
91k |
| 53 |
Pie Town Rail
Repair(pdf) |
J. Thunborg |
July 8, 2004 |
65k |
| 52 |
Pie Town Drive
#1 Wheel/Bearing
Replacement
May 14-18, 2004(pdf) |
E. Carlowe |
2004 May |
170k |
| 51 |
North Liberty,
Iowa VLBA Maintenance
Visit
September 10-16, 2003(pdf)
Task List(pdf) |
E. Carlowe |
2003 December |
1558k |
| 50 |
North Liberty
Drive #2 wheel/bearing
replacement (pdf) |
J. Thunborg |
2003 November |
45k |
| 49 |
Recommended
Strategy for VLBA Elevation
Bearing
Replacement(pdf) |
M. McKinnon, J.Thunborg, J. Ruff |
2003 October |
10k |
| 48 |
St. Croix
Elevation
Bearing Replacement - Trip Report, September 10, 2003(pdf) |
J.E. Thunborg |
2003 September |
192k |
| 47 |
Kitt Peak, Arizona
VLBA Maintenance Visit
June 5-12, 2003(pdf)
Task List (.doc)
|
E. Carlowe |
2003 August |
1930k |
| 46 |
St. Croix, Virgin
Islands Maintenance Visit
March 15-25
|
E. Carlowe |
2003 May 13 |
1656k |
| 45 |
Mauna Kea
Maintenance Visit
August 2002 |
J. Ruff |
2002 September 30 |
1mb |
| 44 |
Los Alamos Rail
Repair
August 2002 |
J.E. Thunborg |
2002 August 21 |
46k |
| 43 |
Lightning
Protection at
VLBA Pie Town
August 2002 |
B. Broilo,
P. Rhodes,
C. Janes |
2002 August 6 |
11k |
| 42 |
Los Alamos Az
Drive #1
July 2nd and 3rd, 2002 |
J. Ruff |
2002 July 8 |
79k |
| 41 |
Hancock
Maintenance
Visit
June 3 through 10, 2002 |
J. Ruff |
2002 June 25 |
927k |
| 40 |
St. Croix
Maintenance
Visit
April 8 through 25, 2002 |
J. Ruff |
2002 June 24 |
1.2M |
| 39 |
Los Alamos--Drive
#1
--Axle Repair, June 18-19, 2002 |
J. E. Thunborg |
2002 July 11 |
147k |
| 38 |
North Liberty Rail
Repair |
J. E. Thunborg |
2002 June 14 |
392k |
| 37 |
Owens Valley
Gearbox Repair |
J. Thunborg |
2002 April 26 |
351k |
| 36 |
Pie Town
Maintenance
Visit 2001 |
J. Ruff |
2002 January 04 |
653k |
| 35 |
VLBA Subreflector
Measurement and Repair (pdf) |
J. Thunborg |
2001 August 22 |
145k |
| 34 |
Brewster
Maintenance
Visit July 23-30, 2001 |
J. Ruff |
2001 August 2 |
733k |
| 33 |
Owens Valley
Maintenance Visit June 11-17, 2001 (pdf) |
J. Ruff |
2001 July 10 |
139k |
| 32 |
Los Alamos
Maintenance Visit April 17-23, 2001 (pdf) |
J. Ruff |
2001 May 1 |
102k |
| 31 |
Conversion from analog to digital
tachometer |
D. Whiton |
2000 December |
| 30 |
VLBA Azimuth Axle Failure - Follow up |
J. Thunborg |
2001 March |
| 29 |
Los Alamos Elevation Bearing Replacement |
J. Ruff |
2001 January |
| 28 |
Los Alamos Drive
#2 Wheel Replacement
|
J. Ruff |
2000 December 19 |
|
| 27 |
Fort Davis
Maintenance Visit August 14-19, 2000 (pdf)
|
J. Ruff |
2000 August 22 |
570k |
| 26 |
Kitt Peak
Maintenance Visit July 10-16, 2000 (pdf)
|
J. Ruff |
2000 August 7 |
583k |
| 25 |
North Liberty
Maintenance Visit April 14-19, 2000 (pdf)
|
J. Ruff |
2000 May 17 |
628k |
| 24 |
St. Croix Maintenance Visit, January
15-20, 2000 |
J. Thunborg |
2000 January |
| 23 |
Brewster, Washington - Wheel/Axle Repair,
Oct. 21-23, 1999 Trip Report |
J. Thunborg |
1999 October |
| 22 |
Hancock, New Hampshire-Maintenance Visit,
June 22-28, 1999 Trip Report |
J. Thunborg |
1999 September |
| 21 |
Leica Geosystems Equipment Demo |
J. Thunborg |
1999 August |
| 20 |
St. Croix Corrosion Report |
J. Thunborg |
1999 August |
| 19 |
Fall Protection for Inclined Ladders |
J. Ruff |
1999 July |
| 18 |
St. Croix Maintenance Visit,
June 22-28, 1999 Trip Report |
J. Thunborg |
1999 July |
| 17 |
VLBA Panel Repair |
R. Gutierrez, J. Thunbord, J. Wall |
1999 April |
| 16 |
Mauna Kea Maintenance Visit, March 22-27,
1999
Trip Report |
J. Thunborg |
1999 April |
| 15 |
Trip Report:
Wheel Changing in the Garden of Eden |
J. Ruff |
1998 October 5 |
|
| 14 |
Brewster Maintenance Visit,
August 17-22, 1998 Trip Report |
J. Thunborg |
September 1998 |
|
| 13 |
Measurement of VLBA Counterweight
Imbalance |
J. Thunborg |
September 1998 |
|
| 12 |
Brewster, WA VLBA Site Azimuth Rail
Maintenance |
B. Broilo |
August 1998 |
|
| 11 |
Los Alamos Maintenance Visit Trip Report
July 13-17, 1998 |
J. Thunborg |
July 1998 |
|
| 10 |
Trip Report - North Liberty |
C. Janes |
May 1998 |
|
| 9 |
Trip Report - Kitt Peak Bearing Lev |
G. Stanzione |
May 1998 |
|
| 8 |
Brewster, WA VLBA Site Azimuth Rail
Inspection
Feb. 19 |
B. Broilo |
February 1998 |
|
| 7 |
Los Alamos, NM VLBA Site Azimuth Rail
Inspection
Feb. 19 |
B. Broilo |
April 1998 |
|
| 6 |
Owens Valley Maintenance Visit
April 20-25, 1998 Trip Report |
J. Thunborg |
May 1998 |
|
| 5 |
VLBA Antenna Hard Stops |
J. Thunborg |
April 1983 |
|
| 4 |
Drive Design-VLBA Antennas |
B. Horne |
November 1983 |
|
| 3 |
Setting the VLBA Antennas |
B. Horne |
November 1983 |
|
| 2 |
TIW Antenna Panels |
T. Legg |
September 1983 |
|
| 1 |
VLBA Antenna Choice |
B. Horne |
October 1983 |
|