VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: RDV67 Observer: Gipson, John Project type: GEO Obs filename: rdv67crd.* Date/Day: 2008JAN23/023 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Heidi Gerhardt GPS delta, UT1-UTC (-0.29), vclock ok WEA: OV light snow, FD chance of rain, HN chance of snow, NL snow, SC chance of rain 1759 Begin 1759-1800 *SC 4cm is warming. Eventually levels out at 22114 50 720 ~41K. 1759-1800 %KP 13cm tsys high, might be due to RFI OTHER 25 360 1955 New Operator: Paul Padilla 2245 New Operator is Alan Kerr 2349-0233 %PT HC1 FIFO. cleared. 0000 Date is 2008JAN24/024. 0129 %NL precipitation starting. 0138 NL precipitation stopped. 0234-0239 %PT HC1 FIFO. cleared. 0257-0311 %OV AZ#1 armature over current. cleared. 0311-0314 %OV EL brake fault. cleared. 0459-0501 %PT HC1 FIFO. cleared. 0653 New operator is Betty Ragan. 0737-1800 *FD tsys high on channel 8. I initially thought 22115 12 74 this was probably due to RFI, but site tech suspects a problem with BBC 8, which has low power. 0748 KP high wind gusts. 0754-1800 %SC 13cm tsys sometimes high, may be due to RFI. OTHER 25 151 1012-1015 %PT HC1 FIFO errors. Cleared. 1131-1133 %PT HC1 FIFOs again. 1342 FD reports overcast, damp, light rain. 1446 New operator is Heidi Gerhardt 1527 *BR reports 30% snow coverage on dish, about 1 inch 1800 End. Downtime Summary: Total downtime : 1305 min Percentage downtime of observing: 9.1% Average downtime per hour : 5.4 min Total scheduled observing time (# Antennas): 14410 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.