COVER INFORMATION Station: VLBA_KP (Code Kp ) Experiment: bw088 M87 movie. Walker, Ly, Junor, Hardee Exp. Code: bw088a Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: R.C. Walker Address: NRAO, P.O. Box O Socorro, NM 87801 USA Phone: +1-505-835-7247 (w) / +1-505-835-3972 (h) EMAIL: cwalker@nrao.edu Fax: +1-505-835-7027 Phone during observation: +1-505-835-7247 (w) / +1-505-835-3972 (h) Observing mode: VLBA Notes: COVER LETTER: This 18 session project is designed to provide a movie of jet component motions near the black hole in M87. Here is the key information from the time allocation email: PROPOSAL STATUS ( 01/10/2007 ): Approved for dynamic scheduling, high priority CURRENT TIME ALLOCATION: 18 times 10.0 hrs dynamically scheduled centered at LST 12.5 with 256 Mbits/sec recording Note request for 32 output spectral channels per baseband. ------------------------------------------------------------------------- Schedule for VLBA_KP (Code Kp ) Page 2 bw088 M87 movie. Walker, Ly, Junor, Hardee UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 27 Jan 2007 Day 27 --- Next scan frequencies: 43119.49 43119.49 43135.49 43135.49 Next BBC frequencies: 719.49 719.49 735.49 735.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 06 17 52 3C274 07 16 02 15.9 85.2 -5.3 -59.9 0 1 1 0 06 17 22 06 37 48 --- 07 36 02 20.2 87.7 -4.9 -60.2 1197 F 1 40 06 17 40 06 41 14 3C274 07 39 28 20.9 88.2 -4.9 -60.2 198 1 1 40 06 40 44 07 01 11 --- 07 59 28 25.1 90.8 -4.5 -60.3 1197 F 1 79 06 41 02 07 01 55 3C279 08 00 12 10.2 103.5 -4.9 -56.0 8 1 1 79 07 01 25 07 03 54 --- 08 02 12 10.6 103.8 -4.9 -55.9 120 F 1 84 07 01 43 07 06 06 OJ287 08 04 24 73.5 133.1 -0.8 -41.2 0 1 1 84 07 05 36 07 10 05 --- 08 08 24 74.2 135.7 -0.8 -39.1 239 F 1 93 07 05 54 07 12 08 3C274 08 10 27 27.5 92.3 -4.3 -60.2 23 1 1 93 07 11 38 07 32 05 --- 08 30 27 31.7 95.1 -4.0 -59.9 1197 F 1 132 07 11 56 07 32 49 3C279 08 31 11 16.6 108.1 -4.4 -54.2 8 1 1 132 07 32 19 07 34 49 --- 08 33 11 17.0 108.4 -4.4 -54.0 120 F 1 137 07 32 37 07 35 33 3C274 08 33 56 32.4 95.6 -4.0 -59.8 8 1 1 137 07 35 03 07 40 32 --- 08 38 56 33.5 96.3 -3.9 -59.7 299 F 1 148 07 35 21 07 40 32 M84 08 38 56 34.9 96.7 -3.8 -59.8 -9 1 1 148 07 40 32 07 41 12 --- 08 39 36 35.1 96.8 -3.8 -59.8 31 F 1 149 07 40 32 07 41 12 3C274 08 39 36 33.6 96.4 -3.9 -59.7 -9 1 1 149 07 41 12 07 41 42 --- 08 40 06 33.7 96.5 -3.9 -59.6 21 F 1 150 07 41 12 07 41 42 M84 08 40 06 35.2 96.8 -3.8 -59.8 -9 1 1 150 07 41 42 07 42 22 --- 08 40 46 35.3 96.9 -3.7 -59.8 31 F 1 151 07 41 42 07 42 22 3C274 08 40 46 33.9 96.6 -3.8 -59.6 -9 1 1 151 07 42 22 07 42 52 --- 08 41 16 34.0 96.7 -3.8 -59.6 21 F 1 152 07 42 22 07 42 52 M84 08 41 16 35.4 97.0 -3.7 -59.7 -9 1 1 152 07 42 52 07 43 32 --- 08 41 56 35.6 97.1 -3.7 -59.7 31 F 1 153 07 42 52 07 43 32 3C274 08 41 56 34.1 96.8 -3.8 -59.6 -9 1 1 153 07 43 32 07 44 02 --- 08 42 26 34.2 96.9 -3.8 -59.6 21 F 1 154 07 43 32 Schedule for VLBA_KP (Code Kp ) Page 3 bw088 M87 movie. Walker, Ly, Junor, Hardee UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 27 Jan 2007 Day 27 --- 07 44 02 M84 08 42 26 35.7 97.2 -3.7 -59.7 -9 1 1 154 07 44 02 07 44 42 --- 08 43 06 35.8 97.3 -3.7 -59.7 31 F 1 156 07 44 02 07 44 51 3C274 08 43 15 34.4 97.0 -3.8 -59.6 0 1 1 156 07 44 42 07 49 50 --- 08 48 15 35.4 97.7 -3.7 -59.4 299 F 1 166 07 44 42 07 49 54 3C274 08 48 19 35.5 97.7 -3.7 -59.4 0 1 1 166 07 49 50 08 09 51 --- 09 08 19 39.6 100.9 -3.4 -58.5 1197 F 1 204 07 49 50 08 10 35 3C279 09 09 04 24.0 114.2 -3.8 -51.1 7 1 1 204 08 10 05 08 12 35 --- 09 11 04 24.4 114.5 -3.8 -50.9 120 F 1 209 08 10 23 08 13 19 3C274 09 11 48 40.4 101.5 -3.3 -58.3 7 1 1 209 08 12 49 08 33 16 --- 09 31 48 44.5 105.0 -3.0 -57.0 1197 F 1 249 08 13 07 08 34 00 3C279 09 32 32 28.5 118.4 -3.4 -48.6 6 1 1 249 08 33 30 08 36 00 --- 09 34 32 28.9 118.7 -3.4 -48.4 120 F 1 254 08 33 48 08 37 59 OJ287 09 36 32 75.0 220.4 0.7 35.8 22 1 1 254 08 37 29 08 42 59 --- 09 41 32 74.2 223.9 0.8 38.8 299 F 1 264 08 37 47 08 44 40 3C274 09 43 14 46.8 107.2 -2.8 -56.0 18 1 1 264 08 44 10 09 04 37 --- 10 03 14 50.8 111.5 -2.5 -53.9 1197 F 1 304 08 44 28 09 05 21 3C279 10 03 59 34.2 124.7 -2.9 -44.5 5 1 1 304 09 04 51 09 07 21 --- 10 05 59 34.5 125.1 -2.8 -44.3 120 F 1 309 09 05 09 09 08 06 3C274 10 06 44 51.5 112.3 -2.4 -53.5 5 1 1 309 09 07 36 09 28 02 --- 10 26 44 55.4 117.4 -2.1 -50.5 1197 F 1 348 09 07 54 09 28 47 3C279 10 27 28 38.2 130.0 -2.5 -40.8 4 1 1 348 09 28 17 09 30 46 --- 10 29 28 38.5 130.5 -2.5 -40.5 120 F 1 353 09 28 35 09 31 31 3C274 10 30 13 56.0 118.3 -2.0 -49.9 3 1 1 353 09 31 01 09 36 30 --- 10 35 13 56.9 119.8 -1.9 -48.9 299 F 1 364 09 31 19 09 36 30 M84 10 35 13 58.3 120.8 -1.8 -48.4 -9 1 1 364 09 36 30 09 37 10 --- 10 35 53 58.4 121.0 -1.8 -48.2 31 F 1 365 09 36 30 09 37 10 3C274 10 35 53 57.1 120.0 -1.9 -48.8 -9 1 1 365 09 37 10 09 37 40 --- 10 36 23 57.2 120.1 -1.9 -48.7 21 F 1 366 09 37 10 Schedule for VLBA_KP (Code Kp ) Page 4 bw088 M87 movie. Walker, Ly, Junor, Hardee UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 27 Jan 2007 Day 27 --- 09 37 40 M84 10 36 23 58.5 121.2 -1.8 -48.1 -9 1 1 366 09 37 40 09 38 20 --- 10 37 03 58.7 121.4 -1.8 -48.0 31 F 1 367 09 37 40 09 38 20 3C274 10 37 03 57.3 120.3 -1.9 -48.6 -9 1 1 367 09 38 20 09 38 50 --- 10 37 33 57.4 120.5 -1.9 -48.5 21 F 1 368 09 38 20 09 38 50 M84 10 37 33 58.7 121.5 -1.8 -47.9 -9 1 1 368 09 38 50 09 39 30 --- 10 38 13 58.9 121.7 -1.8 -47.7 31 F 1 369 09 38 50 09 39 30 3C274 10 38 13 57.5 120.7 -1.9 -48.3 -9 1 1 369 09 39 30 09 40 00 --- 10 38 43 57.6 120.8 -1.9 -48.2 21 F 1 370 09 39 30 09 40 00 M84 10 38 43 59.0 121.9 -1.8 -47.6 -9 1 1 370 09 40 00 09 40 39 --- 10 39 23 59.1 122.1 -1.8 -47.5 31 F 1 372 09 40 00 09 40 48 3C274 10 39 32 57.7 121.1 -1.9 -48.1 0 1 1 372 09 40 39 09 45 47 --- 10 44 32 58.6 122.6 -1.8 -47.0 299 F 1 382 09 40 39 09 45 52 3C274 10 44 36 58.6 122.6 -1.8 -47.0 0 1 1 382 09 45 47 10 05 49 --- 11 04 36 62.1 129.7 -1.4 -41.9 1197 F 1 420 09 45 47 10 06 33 3C279 11 05 20 43.9 139.9 -1.9 -33.3 2 1 1 420 10 06 03 10 08 32 --- 11 07 20 44.1 140.5 -1.8 -32.8 120 F 1 425 10 06 21 10 09 17 3C274 11 08 05 62.6 131.1 -1.4 -40.9 1 1 1 425 10 08 47 10 29 13 --- 11 28 05 65.6 140.0 -1.1 -34.0 1197 F 1 465 10 09 05 10 29 58 3C279 11 28 49 46.8 147.1 -1.5 -27.6 1 1 1 465 10 29 28 10 31 57 --- 11 30 49 47.0 147.8 -1.4 -27.1 120 F 1 470 10 29 46 10 34 13 OJ287 11 33 05 52.8 261.2 2.6 63.2 54 1 1 470 10 33 43 10 38 13 --- 11 37 05 52.0 261.9 2.7 63.4 239 F 1 478 10 34 01 10 40 02 3C274 11 38 55 67.0 145.6 -0.9 -29.4 26 1 1 478 10 39 32 10 59 59 --- 11 58 55 69.0 157.5 -0.5 -19.4 1197 F 1 518 10 39 50 11 00 43 3C279 11 59 40 49.9 157.7 -0.9 -18.9 0 1 1 518 11 00 13 11 02 43 --- 12 01 40 50.0 158.4 -0.9 -18.3 120 F 1 523 11 00 31 11 03 28 3C274 12 02 24 69.3 159.7 -0.5 -17.5 0 1 1 523 11 02 58 11 23 24 --- 12 22 24 70.3 173.6 -0.1 -5.5 1197 F 1 562 11 03 16 Schedule for VLBA_KP (Code Kp ) Page 5 bw088 M87 movie. Walker, Ly, Junor, Hardee UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 27 Jan 2007 Day 27 --- 11 24 09 3C279 12 23 09 51.4 166.6 -0.6 -11.4 1 1 1 562 11 23 39 11 26 08 --- 12 25 09 51.5 167.4 -0.5 -10.7 120 F 1 567 11 23 57 11 26 53 3C274 12 25 53 70.4 176.1 -0.1 -3.4 1 1 1 567 11 26 23 11 31 52 --- 12 30 53 70.4 179.8 0.0 -0.2 299 F 1 578 11 26 41 11 31 52 M84 12 30 53 70.8 184.1 0.1 3.5 -9 1 1 578 11 31 52 11 32 32 --- 12 31 33 70.8 184.5 0.1 4.0 31 F 1 579 11 31 52 11 32 32 3C274 12 31 33 70.4 180.3 0.0 0.2 -9 1 1 579 11 32 32 11 33 02 --- 12 32 03 70.4 180.6 0.0 0.5 21 F 1 580 11 32 32 11 33 02 M84 12 32 03 70.8 184.9 0.1 4.3 -9 1 1 580 11 33 02 11 33 42 --- 12 32 43 70.8 185.4 0.1 4.7 31 F 1 581 11 33 02 11 33 42 3C274 12 32 43 70.4 181.1 0.0 1.0 -9 1 1 581 11 33 42 11 34 12 --- 12 33 13 70.4 181.5 0.0 1.3 21 F 1 582 11 33 42 11 34 12 M84 12 33 13 70.8 185.8 0.1 5.0 -9 1 1 582 11 34 12 11 34 52 --- 12 33 53 70.8 186.3 0.1 5.5 31 F 1 583 11 34 12 11 34 52 3C274 12 33 53 70.4 182.0 0.0 1.7 -9 1 1 583 11 34 52 11 35 21 --- 12 34 23 70.4 182.3 0.1 2.0 21 F 1 584 11 34 52 11 35 21 M84 12 34 23 70.8 186.6 0.1 5.8 -9 1 1 584 11 35 21 11 36 01 --- 12 35 03 70.8 187.1 0.2 6.2 31 F 1 586 11 35 21 11 36 10 3C274 12 35 12 70.4 182.9 0.1 2.5 0 1 1 586 11 36 01 11 41 09 --- 12 40 12 70.3 186.5 0.2 5.7 299 F 1 596 11 36 01 11 41 14 3C274 12 40 17 70.3 186.6 0.2 5.7 0 1 1 596 11 41 09 12 01 11 --- 13 00 17 69.3 200.5 0.5 17.7 1197 F 1 634 11 41 09 12 01 54 3C279 13 01 00 52.2 181.8 0.1 1.5 3 1 1 634 12 01 24 12 03 53 --- 13 03 00 52.2 182.6 0.1 2.2 120 F 1 639 12 01 42 12 04 36 3C274 13 03 43 69.0 202.7 0.5 19.6 3 1 1 639 12 04 06 12 24 33 --- 13 23 43 67.0 214.6 0.9 29.5 1197 F 1 679 12 04 24 12 25 15 3C279 13 24 25 51.6 191.2 0.5 9.5 5 1 1 679 12 24 45 12 27 15 --- 13 26 25 51.6 192.0 0.5 10.2 120 F 1 684 12 25 03 Schedule for VLBA_KP (Code Kp ) Page 6 bw088 M87 movie. Walker, Ly, Junor, Hardee UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 27 Jan 2007 Day 27 --- 12 29 16 J1635+3808 13 28 26 51.6 67.4 -3.1 -84.7 32 1 1 684 12 28 46 12 33 15 =1633+38 13 32 26 52.4 67.5 -3.1 -85.2 239 F 1 692 12 29 04 12 35 14 3C274 13 34 25 65.6 220.1 1.1 34.0 11 1 1 692 12 34 44 12 55 10 --- 13 54 25 62.6 229.0 1.4 40.9 1197 F 1 732 12 35 02 12 55 50 3C279 13 55 05 49.7 202.9 1.0 19.4 8 1 1 732 12 55 10 12 57 50 --- 13 57 05 49.6 203.6 1.0 20.0 120 F 1 737 12 55 10 12 58 29 3C274 13 57 45 62.1 230.3 1.4 41.9 9 1 1 737 12 57 50 13 18 26 --- 14 17 45 58.7 237.3 1.8 47.0 1197 F 1 777 12 57 50 13 19 05 3C279 14 18 24 47.5 211.0 1.4 26.0 10 1 1 777 13 18 26 13 21 04 --- 14 20 24 47.3 211.6 1.4 26.6 120 F 1 782 13 18 26 13 21 44 3C274 14 21 03 58.1 238.4 1.8 47.7 12 1 1 782 13 21 04 13 26 43 --- 14 26 03 57.1 239.9 1.9 48.7 299 F 1 793 13 21 04 13 26 43 M84 14 26 03 56.4 242.3 2.0 50.4 -8 1 1 793 13 26 43 13 27 23 --- 14 26 43 56.3 242.4 2.0 50.5 32 F 1 794 13 26 43 13 27 23 3C274 14 26 43 57.0 240.1 1.9 48.8 -8 1 1 794 13 27 23 13 27 53 --- 14 27 13 56.9 240.3 1.9 48.9 22 F 1 795 13 27 23 13 27 53 M84 14 27 13 56.2 242.6 2.0 50.6 -8 1 1 795 13 27 53 13 28 33 --- 14 27 53 56.1 242.8 2.0 50.7 32 F 1 797 13 27 53 13 28 33 3C274 14 27 53 56.8 240.4 1.9 49.1 -8 1 1 797 13 28 33 13 29 03 --- 14 28 23 56.7 240.6 2.0 49.2 22 F 1 797 13 28 33 13 29 03 M84 14 28 23 56.0 242.9 2.0 50.8 -8 1 1 797 13 29 03 13 29 43 --- 14 29 03 55.8 243.1 2.1 50.9 32 F 1 799 13 29 03 13 29 43 3C274 14 29 03 56.6 240.8 2.0 49.3 -8 1 1 799 13 29 43 13 30 12 --- 14 29 33 56.5 240.9 2.0 49.4 22 F 1 800 13 29 43 13 30 12 M84 14 29 33 55.7 243.2 2.1 51.0 -8 1 1 800 13 30 12 13 30 52 --- 14 30 13 55.6 243.4 2.1 51.1 32 F 1 801 13 30 12 13 31 01 3C274 14 30 22 56.4 241.2 2.0 49.5 1 1 1 801 13 30 52 13 36 00 --- 14 35 22 55.4 242.6 2.1 50.4 299 F 1 811 13 30 52 Schedule for VLBA_KP (Code Kp ) Page 7 bw088 M87 movie. Walker, Ly, Junor, Hardee UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 27 Jan 2007 Day 27 --- 13 36 05 3C274 14 35 27 55.4 242.6 2.1 50.4 0 1 1 811 13 36 00 13 56 02 --- 14 55 27 51.6 247.6 2.4 53.4 1197 F 1 850 13 36 00 13 56 45 3C279 14 56 10 42.7 222.4 2.0 35.1 19 1 1 850 13 56 15 13 58 44 --- 14 58 10 42.4 223.0 2.0 35.5 120 F 1 855 13 56 33 13 59 28 3C274 14 58 54 50.9 248.4 2.5 53.9 21 1 1 855 13 58 58 14 19 25 --- 15 18 54 46.9 252.7 2.8 56.0 1197 F 1 894 13 59 16 14 20 09 3C279 15 19 38 39.1 228.6 2.4 39.7 22 1 1 894 14 19 39 14 22 09 --- 15 21 38 38.8 229.0 2.4 40.1 120 F 1 899 14 19 57 14 24 26 J1635+3808 15 23 56 74.1 62.2 -1.2 -107.5 21 1 1 899 14 23 56 14 28 26 =1633+38 15 27 56 74.9 61.3 -1.1 -109.0 239 F 1 908 14 24 14 14 30 41 3C274 15 30 12 44.6 254.9 3.0 57.0 0 1 1 908 14 30 11 14 50 38 --- 15 50 12 40.4 258.4 3.3 58.3 1197 F 1 947 14 30 29 14 51 16 3C279 15 50 50 33.9 235.7 2.9 44.8 17 1 1 947 14 50 38 14 53 16 --- 15 52 50 33.6 236.1 2.9 45.1 120 F 1 952 14 50 38 14 53 53 3C274 15 53 28 39.8 259.0 3.4 58.5 16 1 1 952 14 53 16 15 13 50 --- 16 13 28 35.6 262.2 3.7 59.4 1197 F 1 992 14 53 16 15 14 27 3C279 16 14 05 29.7 240.4 3.3 47.9 16 1 1 992 15 13 50 15 16 26 --- 16 16 05 29.4 240.8 3.3 48.1 120 F 1 997 15 13 50 15 17 03 3C274 16 16 42 34.9 262.7 3.8 59.5 16 1 1 997 15 16 26 15 22 02 --- 16 21 42 33.8 263.4 3.8 59.6 299 F 1 1008 15 16 26 15 22 02 M84 16 21 42 32.9 264.8 3.9 60.1 -8 1 1 1008 15 22 02 15 22 42 --- 16 22 22 32.7 264.9 3.9 60.1 32 F 1 1009 15 22 02 15 22 42 3C274 16 22 22 33.7 263.5 3.9 59.7 -8 1 1 1009 15 22 42 15 23 12 --- 16 22 52 33.6 263.6 3.9 59.7 22 F 1 1010 15 22 42 15 23 12 M84 16 22 52 32.6 264.9 4.0 60.1 -8 1 1 1010 15 23 12 15 23 52 --- 16 23 32 32.5 265.0 4.0 60.1 32 F 1 1012 15 23 12 15 23 52 3C274 16 23 32 33.5 263.7 3.9 59.7 -8 1 1 1012 15 23 52 15 24 22 --- 16 24 02 33.4 263.7 3.9 59.7 22 F 1 1012 15 23 52 Schedule for VLBA_KP (Code Kp ) Page 8 bw088 M87 movie. Walker, Ly, Junor, Hardee UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 27 Jan 2007 Day 27 --- 15 24 22 M84 16 24 02 32.4 265.1 4.0 60.1 -8 1 1 1012 15 24 22 15 25 02 --- 16 24 42 32.2 265.2 4.0 60.1 32 F 1 1014 15 24 22 15 25 02 3C274 16 24 42 33.2 263.8 3.9 59.7 -8 1 1 1014 15 25 02 15 25 32 --- 16 25 12 33.1 263.9 3.9 59.7 22 F 1 1015 15 25 02 15 25 32 M84 16 25 12 32.1 265.3 4.0 60.1 -8 1 1 1015 15 25 32 15 26 12 --- 16 25 52 32.0 265.4 4.0 60.2 32 F 1 1016 15 25 32 15 26 20 3C274 16 26 00 32.9 264.0 3.9 59.8 1 1 1 1016 15 26 12 15 31 19 --- 16 31 00 31.9 264.8 4.0 59.9 299 F 1 1026 15 26 12 15 31 24 3C274 16 31 05 31.9 264.8 4.0 59.9 0 1 1 1026 15 31 19 15 51 21 --- 16 51 05 27.6 267.6 4.3 60.2 1197 F 1 1065 15 31 19 15 51 54 3C279 16 51 39 22.6 247.1 3.9 51.8 14 1 1 1065 15 51 21 15 53 54 --- 16 53 39 22.2 247.4 4.0 52.0 120 F 1 1070 15 51 21 15 54 28 3C274 16 54 12 27.0 268.0 4.4 60.2 14 1 1 1070 15 53 54 16 09 25 --- 17 09 12 23.8 270.0 4.6 60.3 898 F 1 1100 15 53 54 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: bw088.set Matches group v7mm_c8 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 7 Station: VLBA_KP Total bit rate: 256 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 4 Speedup factor: 1.00 Disk used to record data. 1st LO= 42400.00 42400.00 42400.00 42400.00 Net SB= U U U U Pol. = RCP LCP RCP LCP BBC = 1 2 3 4 BBC SB= U U U U IF = A C A C VLBA FE= 7mm omit 7mm omit VLBA Synth= 15.4 7.6 11.6 The following frequency sets based on this setup were used. Frequency Set: 7 Setup file default. Used pcal sets: 1 LO sum= 43119.49 43119.49 43135.49 43135.49 BBC fr= 719.49 719.49 735.49 735.49 Bandwd= 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S1 S3 S1 S2 S3 S4 PCALXB2= S2 S4 S2 S4 M1 M2 M3 M4 PCALFR1= 510 510 13510 13510 0 0 0 0 PCALFR2= 510 510 13510 13510 0 0 0 0 Track assignments are: track1= 2, 18, 3, 19 barrel=roll_off SOURCE LIST -- bw088 M87 movie. Walker, Ly, Junor, Hardee Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) J0854+2006 08 51 57.250618 * 08 54 48.874930 08 55 14.988113 0.21 0851+202 20 17 58.41741 * 20 06 30.64086 20 04 51.88642 0.40 J0854+20 /home/arana/cwalker/sched/catalogs/sources.vlba * OJ287 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.216 scan hours, 9.125 baseline hours above horizon. J1225+1253 12 22 31.582015 * 12 25 03.743331 12 25 26.303359 0.32 * M84 13 09 49.76862 * 12 53 13.13923 12 50 40.72650 0.31 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.222 scan hours, 6.947 baseline hours above horizon. J1230+1223 12 28 17.569279 * 12 30 49.423381 12 31 11.902851 0.31 1228+126 12 40 01.74901 * 12 23 28.04383 12 20 55.94713 0.20 * 3C274 /home/arana/cwalker/sched/catalogs/sources.vlba J1230+12 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 7.853 scan hours, 303.152 baseline hours above horizon. J1256-0547 12 53 35.831291 * 12 56 11.166559 12 56 33.833530 0.20 1253-055 -05 31 07.99586 *-05 47 21.52472 -05 49 45.84849 0.30 * 3C279 /home/arana/cwalker/sched/catalogs/sources.vlba J1256-05 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.665 scan hours, 23.336 baseline hours above horizon. * J1635+3808 16 33 30.625096 * 16 35 15.492971 16 35 29.701202 0.26 1633+38 38 14 10.08280 * 38 08 04.50057 38 06 50.41846 0.40 1633+382 /home/arana/cwalker/sched/catalogs/sources.vlba J1635+38 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.133 scan hours, 5.984 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) OJ287 175.7 M84 125.2 3C274 123.7 3C279 111.9 J1635+3808 80.2 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg