VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BR120A Observer: Ros, E. Project type: VLBA Obs filename: br120acrd.* Date/Day: 2007JAN14/014 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Jim Ogle. VCLOCK and gps delta checks okay. %Some light snow earlier in the day at HN and PT. %OV 1cm receiver cryo is cycling, may cause elevated 19696 system temperatures. 2326 Begin. 0000 Date is 2007JAN15/015. 0047-0050 *BR rotation position error. FRM 100 3 0121-0123 *BR rotation position error. FRM 100 2 0139-0140 *BR rotation position error. FRM 100 1 0214-0215 *KP rotation drive fault. FRM 100 1 0245 New Operator: Paul Padilla 0521 End. Downtime Summary: Total downtime : 7 min Percentage downtime of observing: 0.2% Average downtime per hour : 0.1 min Total scheduled observing time (# Antennas): 3550 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.