COVER INFORMATION Station: VLBA_HN (Code Hn ) Experiment: Measuring the orbits of M81 and M82 Exp. Code: BB229B Schedule Version: 3.00 Processed by SCHED version: 6.05 June 2006 PI: Andreas Brunthaler Address: MPIfR Auf dem Huegel 69 53121 Bonn, Germany Phone: +49 228 525377 EMAIL: brunthal@mpifr-bonn.mpg.de Fax: +49 228 525229 Phone during observation: +49 228 525377 Observing mode: VLBA+GBT+Y27+EF 256-8-2 1.3cm Notes: Schedule for VLBA_HN (Code Hn ) Page 2 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- Next scan frequencies: 22010.49 22022.99 22047.99 22110.49 22272.99 22322.99 22422.99 22447.99 Next BBC frequencies: 510.49 522.99 547.99 610.49 772.99 822.99 922.99 947.99 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 02 00 00 0825+030 05 39 54 35.7 125.3 -2.8 -36.8 0 1 1 0 02 00 00 02 01 30 --- 05 41 25 36.0 125.6 -2.7 -36.6 90 F 1 3 02 00 18 02 05 41 0050-092 05 45 36 5.3 251.9 4.9 44.9 161 1 1 3 02 05 41 02 07 11 --- 05 47 06 5.0 252.2 4.9 45.0 90 F 1 6 02 05 59 02 08 26 0121+042 05 48 22 20.1 256.8 4.4 45.6 39 1 1 6 02 08 26 02 09 56 --- 05 49 52 19.8 257.1 4.5 45.7 90 F 1 9 02 08 44 02 11 04 0203+113 05 51 00 32.1 255.0 3.8 46.2 37 1 1 9 02 11 04 02 12 34 --- 05 52 30 31.8 255.3 3.8 46.3 90 F 1 12 02 11 22 02 13 11 0204+151 05 53 07 34.4 258.4 3.8 48.0 26 1 1 12 02 13 11 02 14 41 --- 05 54 37 34.1 258.7 3.8 48.1 90 F 1 15 02 13 29 02 15 30 0238+163 05 55 27 40.9 253.3 3.3 47.0 30 1 1 15 02 15 30 02 17 00 --- 05 56 57 40.6 253.6 3.3 47.1 90 F 1 17 02 15 48 02 19 52 0530+133 05 59 50 60.0 193.9 0.5 10.4 127 1 1 17 02 19 52 02 21 22 --- 06 01 20 59.9 194.6 0.5 11.0 90 F 1 20 02 20 10 02 24 55 0555+394 06 04 54 86.5 208.8 0.1 27.3 154 1 1 20 02 24 55 02 26 25 --- 06 06 24 86.3 212.8 0.2 31.1 90 F 1 23 02 25 13 02 28 05 0646+445 06 08 04 82.7 71.4 -0.7 -101.8 0 1 1 23 02 28 05 02 29 35 --- 06 09 35 83.0 71.0 -0.6 -102.5 90 F 1 26 02 28 23 02 32 11 0726+791 06 12 11 53.0 5.8 -1.3 -156.9 90 1 1 26 02 32 11 02 33 41 --- 06 13 41 53.1 5.7 -1.2 -157.3 90 F 1 29 02 32 29 02 36 57 0808+405 06 16 57 69.1 86.0 -1.9 -75.0 136 1 1 29 02 36 57 02 38 27 --- 06 18 27 69.3 86.3 -1.9 -75.0 90 F 1 32 02 37 15 02 40 18 0854+200 06 20 18 50.4 112.9 -2.6 -45.9 67 1 1 32 02 40 18 02 41 48 --- 06 21 49 50.6 113.2 -2.6 -45.7 90 F 1 35 02 40 36 Schedule for VLBA_HN (Code Hn ) Page 3 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 02 43 22 0927+390 06 23 24 55.5 80.5 -3.1 -68.3 67 1 1 35 02 43 22 02 44 52 --- 06 24 54 55.7 80.7 -3.0 -68.4 90 F 1 38 02 43 40 Next scan frequencies: 22198.17 22198.17 22206.15 22206.15 22214.13 22214.13 22222.12 22222.12 Next BBC frequencies: 698.17 698.17 706.15 706.15 714.13 714.13 722.12 722.12 02 45 36 M81 06 25 38 52.7 28.0 -3.5 -106.4 3 1 1 38 02 45 36 02 46 36 --- 06 26 38 52.7 27.9 -3.5 -106.6 60 F 1 40 02 45 54 02 46 43 M82 06 26 45 52.5 27.0 -3.5 -107.4 0 1 1 40 02 46 36 02 47 13 --- 06 27 15 52.6 26.9 -3.5 -107.5 30 F 1 41 02 46 36 02 47 20 M81 06 27 22 52.8 27.9 -3.5 -106.8 0 1 1 41 02 47 13 02 47 50 --- 06 27 52 52.8 27.9 -3.5 -107.0 30 F 1 42 02 47 13 02 47 56 M82 06 27 58 52.6 26.9 -3.5 -107.7 0 1 1 42 02 47 50 02 48 26 --- 06 28 29 52.7 26.9 -3.5 -107.8 30 F 1 43 02 47 50 02 48 33 M81 06 28 35 52.9 27.8 -3.5 -107.2 0 1 1 43 02 48 26 02 49 03 --- 06 29 05 53.0 27.8 -3.5 -107.3 30 F 1 44 02 48 26 02 49 10 M82 06 29 12 52.7 26.9 -3.5 -108.0 0 1 1 44 02 49 03 02 49 40 --- 06 29 42 52.8 26.8 -3.4 -108.1 30 F 1 46 02 49 03 02 49 46 M81 06 29 49 53.0 27.8 -3.4 -107.5 0 1 1 46 02 49 40 02 50 16 --- 06 30 19 53.1 27.8 -3.4 -107.6 30 F 1 47 02 49 40 02 50 23 M82 06 30 25 52.8 26.8 -3.4 -108.3 0 1 1 47 02 50 16 02 50 53 --- 06 30 56 52.9 26.8 -3.4 -108.5 30 F 1 48 02 50 16 02 51 00 M81 06 31 02 53.1 27.7 -3.4 -107.8 0 1 1 48 02 50 53 02 51 30 --- 06 31 32 53.2 27.7 -3.4 -108.0 30 F 1 49 02 50 53 02 51 36 M82 06 31 39 52.9 26.7 -3.4 -108.7 0 1 1 49 02 51 30 02 52 06 --- 06 32 09 53.0 26.7 -3.4 -108.8 30 F 1 50 02 51 30 02 52 13 M81 06 32 16 53.2 27.7 -3.4 -108.2 0 1 1 50 02 52 06 02 52 43 --- 06 32 46 53.3 27.7 -3.4 -108.3 30 F 1 51 02 52 06 02 52 49 M82 06 32 52 53.1 26.7 -3.4 -109.0 0 1 1 51 02 52 43 02 53 19 --- 06 33 22 53.1 26.7 -3.4 -109.1 30 F 1 53 02 52 43 Schedule for VLBA_HN (Code Hn ) Page 4 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 02 53 26 M81 06 33 29 53.3 27.6 -3.4 -108.5 0 1 1 53 02 53 19 02 53 56 --- 06 33 59 53.4 27.6 -3.4 -108.6 30 F 1 54 02 53 19 02 54 03 M82 06 34 06 53.2 26.6 -3.4 -109.3 0 1 1 54 02 53 56 02 54 33 --- 06 34 36 53.2 26.6 -3.4 -109.5 30 F 1 55 02 53 56 02 54 39 M81 06 34 43 53.4 27.6 -3.4 -108.8 0 1 1 55 02 54 33 02 55 09 --- 06 35 13 53.5 27.5 -3.4 -109.0 30 F 1 56 02 54 33 02 55 16 M82 06 35 19 53.3 26.6 -3.4 -109.7 0 1 1 56 02 55 09 02 55 46 --- 06 35 49 53.3 26.5 -3.3 -109.8 30 F 1 57 02 55 09 02 55 53 M81 06 35 56 53.5 27.5 -3.3 -109.2 0 1 1 57 02 55 46 02 56 23 --- 06 36 26 53.6 27.5 -3.3 -109.3 30 F 1 59 02 55 46 02 56 29 M82 06 36 33 53.4 26.5 -3.3 -110.0 0 1 1 59 02 56 23 02 56 59 --- 06 37 03 53.4 26.5 -3.3 -110.2 30 F 1 60 02 56 23 02 57 06 M81 06 37 09 53.6 27.4 -3.3 -109.5 0 1 1 60 02 56 59 02 57 36 --- 06 37 40 53.7 27.4 -3.3 -109.6 30 F 1 61 02 56 59 02 57 42 M82 06 37 46 53.5 26.5 -3.3 -110.3 0 1 1 61 02 57 36 02 58 12 --- 06 38 16 53.5 26.4 -3.3 -110.5 30 F 1 62 02 57 36 02 58 19 M81 06 38 23 53.7 27.4 -3.3 -109.8 0 1 1 62 02 58 12 02 58 49 --- 06 38 53 53.8 27.4 -3.3 -110.0 30 F 1 63 02 58 12 02 58 56 M82 06 39 00 53.6 26.4 -3.3 -110.7 0 1 1 63 02 58 49 02 59 26 --- 06 39 30 53.6 26.4 -3.3 -110.8 30 F 1 64 02 58 49 02 59 32 M81 06 39 36 53.8 27.3 -3.3 -110.2 0 1 1 64 02 59 26 03 00 02 --- 06 40 07 53.9 27.3 -3.3 -110.3 30 F 1 66 02 59 26 03 01 33 M81 06 41 37 54.0 27.2 -3.2 -110.7 85 1 1 66 03 01 33 03 02 23 --- 06 42 27 54.1 27.2 -3.2 -111.0 50 F 1 67 03 01 51 03 02 23 M82 06 42 27 53.8 26.2 -3.2 -111.6 -6 1 1 67 03 02 23 03 03 13 --- 06 43 17 53.9 26.2 -3.2 -111.9 44 F 1 69 03 02 23 03 03 13 M81 06 43 17 54.2 27.1 -3.2 -111.2 -6 1 1 69 03 03 13 03 04 03 --- 06 44 07 54.2 27.1 -3.2 -111.4 44 F 1 71 03 03 13 03 04 03 0945+6924 06 44 07 54.9 25.9 -3.0 -114.8 -7 1 1 71 03 04 03 03 04 53 --- 06 44 58 55.0 25.8 -3.0 -115.1 43 F 1 72 03 04 03 Schedule for VLBA_HN (Code Hn ) Page 5 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 03 04 53 M81 06 44 58 54.3 27.0 -3.2 -111.6 -7 1 1 72 03 04 53 03 05 43 --- 06 45 48 54.4 27.0 -3.2 -111.9 43 F 1 74 03 04 53 03 05 43 0948+6848 06 45 48 55.1 26.9 -3.1 -113.6 -7 1 1 74 03 05 43 03 06 33 --- 06 46 38 55.1 26.9 -3.0 -113.8 43 F 1 75 03 05 43 03 06 33 M81 06 46 38 54.4 26.9 -3.2 -112.1 -7 1 1 75 03 06 33 03 07 23 --- 06 47 28 54.5 26.9 -3.1 -112.4 43 F 1 77 03 06 33 03 07 23 M82 06 47 28 54.2 25.9 -3.2 -113.0 -6 1 1 77 03 07 23 03 08 13 --- 06 48 18 54.3 25.9 -3.1 -113.3 44 F 1 79 03 07 23 03 08 13 M81 06 48 18 54.6 26.8 -3.1 -112.6 -6 1 1 79 03 08 13 03 09 03 --- 06 49 08 54.6 26.8 -3.1 -112.8 44 F 1 80 03 08 13 03 09 03 1004+6936 06 49 08 53.7 26.5 -3.3 -110.9 -8 1 1 80 03 09 03 03 09 53 --- 06 49 58 53.7 26.4 -3.3 -111.1 42 F 1 82 03 09 03 03 09 53 M81 06 49 58 54.7 26.7 -3.1 -113.1 -8 1 1 82 03 09 53 03 10 43 --- 06 50 49 54.8 26.7 -3.1 -113.3 42 F 1 83 03 09 53 03 10 43 M82 06 50 49 54.5 25.7 -3.1 -114.0 -6 1 1 83 03 10 43 03 11 33 --- 06 51 39 54.6 25.7 -3.1 -114.2 44 F 1 85 03 10 43 03 11 33 M81 06 51 39 54.8 26.6 -3.1 -113.5 -6 1 1 85 03 11 33 03 12 23 --- 06 52 29 54.9 26.6 -3.1 -113.8 44 F 1 87 03 11 33 03 12 23 0945+6924 06 52 29 55.6 25.3 -2.9 -117.3 -7 1 1 87 03 12 23 03 13 13 --- 06 53 19 55.7 25.3 -2.9 -117.5 43 F 1 88 03 12 23 03 13 13 M81 06 53 19 55.0 26.5 -3.0 -114.0 -7 1 1 88 03 13 13 03 14 03 --- 06 54 09 55.0 26.5 -3.0 -114.2 43 F 1 90 03 13 13 03 14 03 0948+6848 06 54 09 55.7 26.4 -2.9 -116.0 -7 1 1 90 03 14 03 03 14 53 --- 06 54 59 55.8 26.3 -2.9 -116.2 43 F 1 91 03 14 03 03 14 53 M81 06 54 59 55.1 26.4 -3.0 -114.5 -7 1 1 91 03 14 53 03 15 43 --- 06 55 49 55.2 26.4 -3.0 -114.7 43 F 1 93 03 14 53 03 15 43 M82 06 55 49 54.9 25.4 -3.0 -115.4 -6 1 1 93 03 15 43 03 16 33 --- 06 56 39 55.0 25.4 -3.0 -115.7 44 F 1 95 03 15 43 03 16 33 M81 06 56 39 55.3 26.3 -3.0 -115.0 -6 1 1 95 03 16 33 03 17 23 --- 06 57 30 55.3 26.2 -3.0 -115.2 44 F 1 96 03 16 33 Schedule for VLBA_HN (Code Hn ) Page 6 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 03 17 23 1004+6936 06 57 30 54.3 26.0 -3.1 -113.2 -8 1 1 96 03 17 23 03 18 13 --- 06 58 20 54.4 25.9 -3.1 -113.5 42 F 1 98 03 17 23 03 18 13 M81 06 58 20 55.4 26.2 -3.0 -115.4 -8 1 1 98 03 18 13 03 19 03 --- 06 59 10 55.5 26.1 -3.0 -115.7 42 F 1 100 03 18 13 03 19 03 M82 06 59 10 55.2 25.2 -3.0 -116.4 -6 1 1 100 03 19 03 03 19 53 --- 07 00 00 55.2 25.1 -2.9 -116.6 44 F 1 101 03 19 03 03 19 53 M81 07 00 00 55.5 26.1 -2.9 -115.9 -6 1 1 101 03 19 53 03 20 43 --- 07 00 50 55.6 26.0 -2.9 -116.2 44 F 1 103 03 19 53 03 20 43 0945+6924 07 00 50 56.3 24.7 -2.7 -119.7 -7 1 1 103 03 20 43 03 21 33 --- 07 01 40 56.3 24.6 -2.7 -120.0 43 F 1 104 03 20 43 03 21 33 M81 07 01 40 55.7 26.0 -2.9 -116.4 -7 1 1 104 03 21 33 03 22 23 --- 07 02 30 55.7 25.9 -2.9 -116.7 43 F 1 106 03 21 33 03 22 23 0948+6848 07 02 30 56.4 25.8 -2.8 -118.4 -7 1 1 106 03 22 23 03 23 13 --- 07 03 21 56.5 25.7 -2.8 -118.7 43 F 1 108 03 22 23 03 23 13 M81 07 03 21 55.8 25.8 -2.9 -116.9 -7 1 1 108 03 23 13 03 24 03 --- 07 04 11 55.9 25.8 -2.9 -117.2 43 F 1 109 03 23 13 03 24 03 M82 07 04 11 55.5 24.8 -2.9 -117.9 -6 1 1 109 03 24 03 03 24 53 --- 07 05 01 55.6 24.8 -2.9 -118.1 44 F 1 111 03 24 03 03 24 53 M81 07 05 01 55.9 25.7 -2.9 -117.4 -6 1 1 111 03 24 53 03 25 43 --- 07 05 51 56.0 25.7 -2.8 -117.6 44 F 1 112 03 24 53 03 25 43 1004+6936 07 05 51 55.0 25.5 -3.0 -115.6 -8 1 1 112 03 25 43 03 26 33 --- 07 06 41 55.1 25.4 -3.0 -115.9 42 F 1 114 03 25 43 03 26 33 M81 07 06 41 56.1 25.6 -2.8 -117.9 -8 1 1 114 03 26 33 03 27 23 --- 07 07 31 56.1 25.5 -2.8 -118.1 42 F 1 116 03 26 33 03 27 44 M81 07 07 53 56.2 25.5 -2.8 -118.2 17 1 1 116 03 27 44 03 28 34 --- 07 08 43 56.2 25.4 -2.8 -118.5 50 F 1 117 03 28 02 03 29 02 M82 07 09 11 55.9 24.5 -2.8 -119.3 22 1 1 117 03 29 02 03 29 52 --- 07 10 02 56.0 24.4 -2.8 -119.6 50 F 1 119 03 29 20 03 30 21 M81 07 10 30 56.4 25.3 -2.8 -119.0 22 1 1 119 03 30 21 03 31 11 --- 07 11 20 56.4 25.2 -2.7 -119.3 50 F 1 121 03 30 39 Schedule for VLBA_HN (Code Hn ) Page 7 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 03 31 39 M82 07 11 48 56.1 24.3 -2.7 -120.1 22 1 1 121 03 31 39 03 32 29 --- 07 12 38 56.2 24.2 -2.7 -120.4 50 F 1 122 03 31 57 03 32 57 M81 07 13 07 56.6 25.1 -2.7 -119.8 22 1 1 122 03 32 57 03 33 47 --- 07 13 57 56.6 25.0 -2.7 -120.1 50 F 1 124 03 33 15 03 35 47 J1048+7143 07 15 57 51.6 23.9 -3.6 -109.0 104 1 1 124 03 35 47 03 38 47 =1044+719 07 18 58 51.9 23.8 -3.5 -109.8 180 F 1 130 03 36 05 03 39 17 M81 07 19 28 57.0 24.6 -2.6 -121.7 14 1 1 130 03 39 17 03 40 07 --- 07 20 18 57.1 24.5 -2.6 -122.0 50 F 1 131 03 39 35 03 40 07 M82 07 20 18 56.8 23.6 -2.6 -122.7 -6 1 1 131 03 40 07 03 40 57 --- 07 21 08 56.8 23.5 -2.6 -122.9 44 F 1 133 03 40 07 03 40 57 M81 07 21 08 57.2 24.4 -2.6 -122.2 -6 1 1 133 03 40 57 03 41 47 --- 07 21 58 57.2 24.3 -2.6 -122.5 44 F 1 134 03 40 57 03 41 47 0945+6924 07 21 58 57.8 22.8 -2.4 -126.2 -7 1 1 134 03 41 47 03 42 37 --- 07 22 48 57.9 22.8 -2.4 -126.5 43 F 1 136 03 41 47 03 42 37 M81 07 22 48 57.3 24.3 -2.6 -122.8 -7 1 1 136 03 42 37 03 43 27 --- 07 23 38 57.4 24.2 -2.5 -123.0 43 F 1 138 03 42 37 03 43 27 0948+6848 07 23 38 58.0 23.9 -2.4 -124.9 -7 1 1 138 03 43 27 03 44 17 --- 07 24 29 58.1 23.8 -2.4 -125.2 43 F 1 139 03 43 27 03 44 17 M81 07 24 29 57.4 24.1 -2.5 -123.3 -7 1 1 139 03 44 17 03 45 07 --- 07 25 19 57.5 24.0 -2.5 -123.5 43 F 1 141 03 44 17 03 45 07 M82 07 25 19 57.1 23.1 -2.5 -124.2 -6 1 1 141 03 45 07 03 45 57 --- 07 26 09 57.2 23.1 -2.5 -124.5 44 F 1 142 03 45 07 03 45 57 M81 07 26 09 57.6 24.0 -2.5 -123.8 -6 1 1 142 03 45 57 03 46 47 --- 07 26 59 57.6 23.9 -2.5 -124.1 44 F 1 144 03 45 57 03 46 47 1004+6936 07 26 59 56.6 23.9 -2.6 -121.9 -8 1 1 144 03 46 47 03 47 37 --- 07 27 49 56.7 23.8 -2.6 -122.1 42 F 1 146 03 46 47 03 47 37 M81 07 27 49 57.7 23.8 -2.5 -124.3 -8 1 1 146 03 47 37 03 48 27 --- 07 28 39 57.7 23.7 -2.5 -124.6 42 F 1 147 03 47 37 03 48 27 M82 07 28 39 57.4 22.8 -2.5 -125.3 -6 1 1 147 03 48 27 03 49 17 --- 07 29 29 57.4 22.7 -2.5 -125.5 44 F 1 149 03 48 27 Schedule for VLBA_HN (Code Hn ) Page 8 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 03 49 17 M81 07 29 29 57.8 23.7 -2.4 -124.8 -6 1 1 149 03 49 17 03 50 07 --- 07 30 19 57.9 23.6 -2.4 -125.1 44 F 1 151 03 49 17 03 50 07 0945+6924 07 30 19 58.4 22.0 -2.3 -128.9 -7 1 1 151 03 50 07 03 50 57 --- 07 31 10 58.5 21.9 -2.2 -129.2 43 F 1 152 03 50 07 03 50 57 M81 07 31 10 57.9 23.5 -2.4 -125.4 -7 1 1 152 03 50 57 03 51 47 --- 07 32 00 58.0 23.4 -2.4 -125.6 43 F 1 154 03 50 57 03 51 47 0948+6848 07 32 00 58.7 23.1 -2.3 -127.6 -7 1 1 154 03 51 47 03 52 37 --- 07 32 50 58.7 23.0 -2.3 -127.9 43 F 1 155 03 51 47 03 52 37 M81 07 32 50 58.0 23.3 -2.4 -125.9 -7 1 1 155 03 52 37 03 53 27 --- 07 33 40 58.1 23.2 -2.4 -126.2 43 F 1 157 03 52 37 03 53 27 M82 07 33 40 57.7 22.3 -2.4 -126.8 -6 1 1 157 03 53 27 03 54 17 --- 07 34 30 57.8 22.3 -2.4 -127.1 44 F 1 159 03 53 27 03 54 17 M81 07 34 30 58.2 23.2 -2.4 -126.4 -7 1 1 159 03 54 17 03 55 07 --- 07 35 20 58.2 23.1 -2.3 -126.7 43 F 1 160 03 54 17 03 55 07 1004+6936 07 35 20 57.2 23.2 -2.5 -124.5 -8 1 1 160 03 55 07 03 55 57 --- 07 36 10 57.3 23.1 -2.5 -124.7 42 F 1 162 03 55 07 03 55 57 M81 07 36 10 58.3 23.0 -2.3 -127.0 -8 1 1 162 03 55 57 03 56 47 --- 07 37 01 58.3 22.9 -2.3 -127.2 42 F 1 163 03 55 57 03 56 47 M82 07 37 01 57.9 22.0 -2.3 -127.9 -7 1 1 163 03 56 47 03 57 37 --- 07 37 51 58.0 21.9 -2.3 -128.2 43 F 1 165 03 56 47 03 57 37 M81 07 37 51 58.4 22.8 -2.3 -127.5 -7 1 1 165 03 57 37 03 58 27 --- 07 38 41 58.5 22.7 -2.3 -127.8 43 F 1 167 03 57 37 03 58 27 0945+6924 07 38 41 59.0 21.1 -2.1 -131.7 -7 1 1 167 03 58 27 03 59 17 --- 07 39 31 59.0 21.0 -2.1 -131.9 43 F 1 168 03 58 27 03 59 17 M81 07 39 31 58.5 22.6 -2.3 -128.0 -7 1 1 168 03 59 17 04 00 07 --- 07 40 21 58.6 22.6 -2.3 -128.3 43 F 1 170 03 59 17 04 00 07 0948+6848 07 40 21 59.2 22.1 -2.1 -130.3 -7 1 1 170 04 00 07 04 00 57 --- 07 41 11 59.3 22.0 -2.1 -130.6 43 F 1 171 04 00 07 04 00 57 M81 07 41 11 58.6 22.5 -2.3 -128.6 -7 1 1 171 04 00 57 04 01 47 --- 07 42 01 58.7 22.4 -2.2 -128.9 43 F 1 173 04 00 57 Schedule for VLBA_HN (Code Hn ) Page 9 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 04 01 47 M82 07 42 01 58.3 21.5 -2.2 -129.5 -7 1 1 173 04 01 47 04 02 37 --- 07 42 52 58.3 21.4 -2.2 -129.8 43 F 1 175 04 01 47 04 02 37 M81 07 42 52 58.8 22.3 -2.2 -129.1 -7 1 1 175 04 02 37 04 03 27 --- 07 43 42 58.8 22.2 -2.2 -129.4 43 F 1 176 04 02 37 04 03 27 1004+6936 07 43 42 57.8 22.4 -2.4 -127.1 -8 1 1 176 04 03 27 04 04 17 --- 07 44 32 57.9 22.3 -2.4 -127.3 42 F 1 178 04 03 27 04 04 17 M81 07 44 32 58.9 22.1 -2.2 -129.7 -8 1 1 178 04 04 17 04 05 07 --- 07 45 22 58.9 22.0 -2.2 -130.0 42 F 1 180 04 04 17 04 05 29 M81 07 45 43 59.0 22.0 -2.2 -130.1 17 1 1 180 04 05 29 04 06 19 --- 07 46 34 59.0 21.9 -2.2 -130.3 50 F 1 181 04 05 47 04 06 47 M82 07 47 02 58.6 21.0 -2.2 -131.2 22 1 1 181 04 06 47 04 07 37 --- 07 47 52 58.7 20.9 -2.1 -131.4 50 F 1 183 04 07 05 04 08 05 M81 07 48 20 59.1 21.7 -2.1 -130.9 21 1 1 183 04 08 05 04 08 55 --- 07 49 10 59.2 21.6 -2.1 -131.2 50 F 1 184 04 08 23 04 09 23 M82 07 49 38 58.8 20.7 -2.1 -132.0 22 1 1 184 04 09 23 04 10 13 --- 07 50 29 58.8 20.6 -2.1 -132.3 50 F 1 186 04 09 41 04 10 41 M81 07 50 56 59.3 21.4 -2.1 -131.8 21 1 1 186 04 10 41 04 11 31 --- 07 51 47 59.4 21.3 -2.1 -132.1 50 F 1 188 04 10 59 04 12 01 M81 07 52 17 59.4 21.2 -2.1 -132.2 25 1 1 188 04 12 01 04 12 51 --- 07 53 07 59.4 21.1 -2.1 -132.5 50 F 1 189 04 12 19 04 12 51 M82 07 53 07 59.0 20.3 -2.1 -133.2 -7 1 1 189 04 12 51 04 13 41 --- 07 53 57 59.1 20.2 -2.0 -133.5 43 F 1 191 04 12 51 04 13 41 M81 07 53 57 59.5 21.0 -2.0 -132.8 -7 1 1 191 04 13 41 04 14 31 --- 07 54 47 59.6 20.9 -2.0 -133.1 43 F 1 192 04 13 41 04 14 31 0945+6924 07 54 47 60.0 19.1 -1.8 -137.1 -7 1 1 192 04 14 31 04 15 21 --- 07 55 37 60.0 19.0 -1.8 -137.4 43 F 1 194 04 14 31 04 15 21 M81 07 55 37 59.6 20.8 -2.0 -133.4 -7 1 1 194 04 15 21 04 16 11 --- 07 56 27 59.7 20.7 -2.0 -133.7 43 F 1 196 04 15 21 04 16 11 0948+6848 07 56 27 60.3 20.2 -1.9 -135.8 -7 1 1 196 04 16 11 04 17 01 --- 07 57 17 60.4 20.1 -1.9 -136.1 43 F 1 197 04 16 11 Schedule for VLBA_HN (Code Hn ) Page 10 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 04 17 01 M81 07 57 17 59.7 20.6 -2.0 -133.9 -7 1 1 197 04 17 01 04 17 51 --- 07 58 08 59.8 20.5 -2.0 -134.2 43 F 1 199 04 17 01 04 17 51 M82 07 58 08 59.3 19.7 -2.0 -134.9 -7 1 1 199 04 17 51 04 18 41 --- 07 58 58 59.4 19.6 -2.0 -135.1 43 F 1 201 04 17 51 04 18 41 M81 07 58 58 59.8 20.4 -2.0 -134.5 -7 1 1 201 04 18 41 04 19 31 --- 07 59 48 59.9 20.3 -1.9 -134.8 43 F 1 202 04 18 41 04 19 31 1004+6936 07 59 48 58.9 20.6 -2.1 -132.3 -8 1 1 202 04 19 31 04 20 21 --- 08 00 38 59.0 20.6 -2.1 -132.6 42 F 1 204 04 19 31 04 20 21 M81 08 00 38 59.9 20.2 -1.9 -135.1 -8 1 1 204 04 20 21 04 21 11 --- 08 01 28 60.0 20.1 -1.9 -135.4 42 F 1 205 04 20 21 04 21 11 M82 08 01 28 59.5 19.3 -1.9 -136.0 -7 1 1 205 04 21 11 04 22 01 --- 08 02 18 59.6 19.2 -1.9 -136.3 43 F 1 207 04 21 11 04 22 01 M81 08 02 18 60.0 20.0 -1.9 -135.7 -7 1 1 207 04 22 01 04 22 51 --- 08 03 08 60.1 19.9 -1.9 -135.9 43 F 1 209 04 22 01 04 22 51 0945+6924 08 03 08 60.5 18.0 -1.7 -140.0 -7 1 1 209 04 22 51 04 23 41 --- 08 03 59 60.5 17.9 -1.7 -140.3 43 F 1 210 04 22 51 04 23 41 M81 08 03 59 60.1 19.8 -1.9 -136.2 -7 1 1 210 04 23 41 04 24 31 --- 08 04 49 60.2 19.7 -1.9 -136.5 43 F 1 212 04 23 41 04 24 31 0948+6848 08 04 49 60.8 19.0 -1.7 -138.7 -7 1 1 212 04 24 31 04 25 21 --- 08 05 39 60.9 18.9 -1.7 -139.0 43 F 1 213 04 24 31 04 25 21 M81 08 05 39 60.2 19.5 -1.8 -136.8 -7 1 1 213 04 25 21 04 26 11 --- 08 06 29 60.3 19.4 -1.8 -137.1 43 F 1 215 04 25 21 04 26 11 M82 08 06 29 59.8 18.6 -1.8 -137.7 -7 1 1 215 04 26 11 04 27 01 --- 08 07 19 59.9 18.5 -1.8 -138.0 43 F 1 217 04 26 11 04 27 01 M81 08 07 19 60.3 19.3 -1.8 -137.4 -7 1 1 217 04 27 01 04 27 51 --- 08 08 09 60.4 19.2 -1.8 -137.7 43 F 1 218 04 27 01 04 27 51 1004+6936 08 08 09 59.4 19.7 -2.0 -135.1 -8 1 1 218 04 27 51 04 28 41 --- 08 08 59 59.5 19.6 -1.9 -135.4 42 F 1 220 04 27 51 04 28 41 M81 08 08 59 60.4 19.1 -1.8 -138.0 -8 1 1 220 04 28 41 04 29 31 --- 08 09 50 60.5 19.0 -1.8 -138.3 42 F 1 221 04 28 41 Schedule for VLBA_HN (Code Hn ) Page 11 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 04 29 31 M82 08 09 50 60.0 18.2 -1.8 -138.9 -7 1 1 221 04 29 31 04 30 21 --- 08 10 40 60.1 18.1 -1.8 -139.2 43 F 1 223 04 29 31 04 30 21 M81 08 10 40 60.5 18.9 -1.8 -138.6 -7 1 1 223 04 30 21 04 31 11 --- 08 11 30 60.6 18.8 -1.7 -138.9 43 F 1 225 04 30 21 04 31 11 0945+6924 08 11 30 60.9 16.8 -1.6 -143.0 -7 1 1 225 04 31 11 04 32 01 --- 08 12 20 61.0 16.7 -1.6 -143.3 43 F 1 226 04 31 11 04 32 01 M81 08 12 20 60.6 18.6 -1.7 -139.2 -7 1 1 226 04 32 01 04 32 51 --- 08 13 10 60.7 18.5 -1.7 -139.5 43 F 1 228 04 32 01 04 32 51 0948+6848 08 13 10 61.3 17.8 -1.6 -141.7 -7 1 1 228 04 32 51 04 33 41 --- 08 14 00 61.3 17.7 -1.6 -142.0 43 F 1 230 04 32 51 04 33 41 M81 08 14 00 60.7 18.4 -1.7 -139.7 -7 1 1 230 04 33 41 04 34 31 --- 08 14 50 60.8 18.3 -1.7 -140.0 43 F 1 231 04 33 41 04 34 31 M82 08 14 50 60.3 17.5 -1.7 -140.6 -7 1 1 231 04 34 31 04 35 21 --- 08 15 41 60.3 17.4 -1.7 -140.9 43 F 1 233 04 34 31 04 35 21 M81 08 15 41 60.8 18.2 -1.7 -140.3 -7 1 1 233 04 35 21 04 36 11 --- 08 16 31 60.9 18.1 -1.7 -140.6 43 F 1 234 04 35 21 04 36 11 1004+6936 08 16 31 59.9 18.6 -1.8 -138.0 -8 1 1 234 04 36 11 04 37 01 --- 08 17 21 60.0 18.5 -1.8 -138.3 42 F 1 236 04 36 11 04 37 01 M81 08 17 21 60.9 17.9 -1.6 -140.9 -8 1 1 236 04 37 01 04 37 51 --- 08 18 11 61.0 17.8 -1.6 -141.2 42 F 1 238 04 37 01 04 38 51 M81 08 19 11 61.0 17.7 -1.6 -141.6 55 1 1 238 04 38 51 04 39 41 --- 08 20 01 61.1 17.6 -1.6 -141.9 50 F 1 239 04 39 09 04 39 48 M82 08 20 08 60.6 16.8 -1.6 -142.5 0 1 1 239 04 39 41 04 40 38 --- 08 20 58 60.6 16.7 -1.6 -142.8 50 F 1 241 04 39 41 04 40 45 M81 08 21 06 61.1 17.4 -1.6 -142.3 0 1 1 241 04 40 38 04 41 35 --- 08 21 56 61.2 17.3 -1.6 -142.6 50 F 1 243 04 40 38 04 41 42 M82 08 22 03 60.7 16.5 -1.6 -143.2 0 1 1 243 04 41 35 04 42 32 --- 08 22 53 60.7 16.4 -1.6 -143.5 50 F 1 245 04 41 35 04 42 39 M81 08 23 00 61.2 17.1 -1.6 -143.0 0 1 1 245 04 42 32 04 43 29 --- 08 23 50 61.3 17.0 -1.5 -143.3 50 F 1 247 04 42 32 Schedule for VLBA_HN (Code Hn ) Page 12 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 04 43 36 M82 08 23 57 60.8 16.3 -1.5 -143.9 0 1 1 247 04 43 29 04 44 26 --- 08 24 47 60.8 16.1 -1.5 -144.2 50 F 1 248 04 43 29 04 44 33 M81 08 24 54 61.3 16.8 -1.5 -143.7 0 1 1 248 04 44 26 04 45 23 --- 08 25 45 61.4 16.7 -1.5 -144.0 50 F 1 250 04 44 26 04 45 30 M82 08 25 52 60.9 16.0 -1.5 -144.6 0 1 1 250 04 45 23 04 46 20 --- 08 26 42 60.9 15.9 -1.5 -144.9 50 F 1 252 04 45 23 04 46 27 M81 08 26 49 61.4 16.5 -1.5 -144.4 0 1 1 252 04 46 20 04 47 17 --- 08 27 39 61.5 16.4 -1.5 -144.7 50 F 1 254 04 46 20 04 51 04 DA193 08 31 26 60.9 -82.7 2.6 71.0 155 1 1 254 04 51 04 04 56 04 --- 08 36 27 60.0 -82.1 2.7 70.8 300 F 1 264 04 51 22 04 57 33 M81 08 37 57 62.0 14.8 -1.3 -148.5 19 1 1 264 04 57 33 04 58 33 --- 08 38 57 62.0 14.6 -1.3 -148.9 60 F 1 266 04 57 51 04 58 40 M82 08 39 04 61.5 14.0 -1.3 -149.4 0 1 1 266 04 58 33 04 59 10 --- 08 39 34 61.5 13.9 -1.3 -149.6 30 F 1 267 04 58 33 04 59 17 M81 08 39 41 62.1 14.5 -1.3 -149.2 0 1 1 267 04 59 10 04 59 47 --- 08 40 11 62.1 14.4 -1.3 -149.4 30 F 1 268 04 59 10 04 59 55 M82 08 40 18 61.6 13.8 -1.3 -149.9 0 1 1 268 04 59 47 05 00 25 --- 08 40 48 61.6 13.7 -1.3 -150.1 30 F 1 269 04 59 47 05 00 32 M81 08 40 56 62.1 14.3 -1.3 -149.6 0 1 1 269 05 00 25 05 01 02 --- 08 41 26 62.2 14.2 -1.2 -149.8 30 F 1 270 05 00 25 05 01 09 M82 08 41 33 61.6 13.6 -1.3 -150.3 0 1 1 270 05 01 02 05 01 39 --- 08 42 03 61.6 13.5 -1.2 -150.5 30 F 1 272 05 01 02 05 01 46 M81 08 42 10 62.2 14.1 -1.2 -150.1 0 1 1 272 05 01 39 05 02 16 --- 08 42 40 62.2 14.0 -1.2 -150.3 30 F 1 273 05 01 39 05 02 23 M82 08 42 47 61.7 13.4 -1.2 -150.8 0 1 1 273 05 02 16 05 02 53 --- 08 43 17 61.7 13.3 -1.2 -151.0 30 F 1 274 05 02 16 05 03 00 M81 08 43 24 62.2 13.9 -1.2 -150.6 0 1 1 274 05 02 53 05 03 30 --- 08 43 55 62.3 13.8 -1.2 -150.8 30 F 1 275 05 02 53 05 03 37 M82 08 44 02 61.7 13.2 -1.2 -151.3 0 1 1 275 05 03 30 05 04 07 --- 08 44 32 61.7 13.1 -1.2 -151.4 30 F 1 276 05 03 30 Schedule for VLBA_HN (Code Hn ) Page 13 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 05 04 14 M81 08 44 39 62.3 13.7 -1.2 -151.1 0 1 1 276 05 04 07 05 04 44 --- 08 45 09 62.3 13.6 -1.2 -151.3 30 F 1 278 05 04 07 05 04 51 M82 08 45 16 61.8 13.0 -1.2 -151.7 0 1 1 278 05 04 44 05 05 21 --- 08 45 46 61.8 12.9 -1.2 -151.9 30 F 1 279 05 04 44 05 05 29 M81 08 45 53 62.4 13.5 -1.2 -151.5 0 1 1 279 05 05 21 05 05 59 --- 08 46 23 62.4 13.4 -1.2 -151.7 30 F 1 280 05 05 21 05 06 06 M82 08 46 31 61.8 12.8 -1.2 -152.2 0 1 1 280 05 05 59 05 06 36 --- 08 47 01 61.8 12.7 -1.2 -152.4 30 F 1 281 05 05 59 05 06 43 M81 08 47 08 62.4 13.3 -1.2 -152.0 0 1 1 281 05 06 36 05 07 13 --- 08 47 38 62.4 13.2 -1.1 -152.2 30 F 1 282 05 06 36 05 07 20 M82 08 47 45 61.9 12.6 -1.1 -152.7 0 1 1 282 05 07 13 05 07 50 --- 08 48 15 61.9 12.5 -1.1 -152.9 30 F 1 284 05 07 13 05 07 57 M81 08 48 22 62.5 13.0 -1.1 -152.5 0 1 1 284 05 07 50 05 08 27 --- 08 48 52 62.5 13.0 -1.1 -152.7 30 F 1 285 05 07 50 05 08 34 M82 08 48 59 61.9 12.4 -1.1 -153.1 0 1 1 285 05 08 27 05 09 04 --- 08 49 30 61.9 12.3 -1.1 -153.3 30 F 1 286 05 08 27 05 09 11 M81 08 49 37 62.5 12.8 -1.1 -153.0 0 1 1 286 05 09 04 05 09 41 --- 08 50 07 62.5 12.7 -1.1 -153.2 30 F 1 287 05 09 04 05 10 11 M81 08 50 37 62.5 12.7 -1.1 -153.4 25 1 1 287 05 10 11 05 11 01 --- 08 51 27 62.6 12.5 -1.1 -153.7 50 F 1 289 05 10 29 05 11 01 M82 08 51 27 62.0 12.0 -1.1 -154.1 -7 1 1 289 05 11 01 05 11 51 --- 08 52 17 62.0 11.9 -1.1 -154.4 43 F 1 290 05 11 01 05 11 51 M81 08 52 17 62.6 12.4 -1.1 -154.0 -7 1 1 290 05 11 51 05 12 41 --- 08 53 07 62.6 12.2 -1.1 -154.3 43 F 1 292 05 11 51 05 12 41 0945+6924 08 53 07 62.7 10.1 -0.9 -158.7 -7 1 1 292 05 12 41 05 13 31 --- 08 53 57 62.7 9.9 -0.9 -159.0 43 F 1 294 05 12 41 05 13 31 M81 08 53 57 62.7 12.1 -1.0 -154.7 -7 1 1 294 05 13 31 05 14 21 --- 08 54 48 62.7 11.9 -1.0 -155.0 43 F 1 295 05 13 31 05 14 21 0948+6848 08 54 48 63.2 10.9 -0.9 -157.6 -7 1 1 295 05 14 21 05 15 11 --- 08 55 38 63.2 10.7 -0.9 -157.9 43 F 1 297 05 14 21 Schedule for VLBA_HN (Code Hn ) Page 14 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 05 15 11 M81 08 55 38 62.7 11.8 -1.0 -155.3 -7 1 1 297 05 15 11 05 16 01 --- 08 56 28 62.8 11.6 -1.0 -155.6 43 F 1 298 05 15 11 05 16 01 M82 08 56 28 62.2 11.1 -1.0 -156.0 -7 1 1 298 05 16 01 05 16 51 --- 08 57 18 62.2 11.0 -1.0 -156.3 43 F 1 300 05 16 01 05 16 51 M81 08 57 18 62.8 11.5 -1.0 -156.0 -7 1 1 300 05 16 51 05 17 41 --- 08 58 08 62.8 11.3 -1.0 -156.3 43 F 1 302 05 16 51 05 17 41 1004+6936 08 58 08 62.0 12.4 -1.1 -153.1 -8 1 1 302 05 17 41 05 18 31 --- 08 58 58 62.0 12.3 -1.1 -153.4 42 F 1 303 05 17 41 05 18 31 M81 08 58 58 62.9 11.2 -1.0 -156.6 -8 1 1 303 05 18 31 05 19 21 --- 08 59 48 62.9 11.0 -0.9 -157.0 42 F 1 305 05 18 31 05 19 21 M82 08 59 48 62.3 10.6 -0.9 -157.3 -7 1 1 305 05 19 21 05 20 11 --- 09 00 38 62.3 10.4 -0.9 -157.6 43 F 1 306 05 19 21 05 20 11 M81 09 00 38 62.9 10.9 -0.9 -157.3 -7 1 1 306 05 20 11 05 21 01 --- 09 01 29 63.0 10.7 -0.9 -157.6 43 F 1 308 05 20 11 05 21 01 0945+6924 09 01 29 62.9 8.5 -0.7 -162.0 -7 1 1 308 05 21 01 05 21 51 --- 09 02 19 63.0 8.4 -0.7 -162.4 43 F 1 310 05 21 01 05 21 51 M81 09 02 19 63.0 10.6 -0.9 -157.9 -7 1 1 310 05 21 51 05 22 41 --- 09 03 09 63.0 10.4 -0.9 -158.3 43 F 1 311 05 21 51 05 22 41 0948+6848 09 03 09 63.5 9.3 -0.8 -161.0 -7 1 1 311 05 22 41 05 23 31 --- 09 03 59 63.5 9.1 -0.8 -161.3 43 F 1 313 05 22 41 05 23 31 M81 09 03 59 63.0 10.3 -0.9 -158.6 -7 1 1 313 05 23 31 05 24 21 --- 09 04 49 63.1 10.1 -0.9 -158.9 43 F 1 315 05 23 31 05 24 21 M82 09 04 49 62.5 9.7 -0.9 -159.2 -7 1 1 315 05 24 21 05 25 11 --- 09 05 39 62.5 9.6 -0.8 -159.6 43 F 1 316 05 24 21 05 25 11 M81 09 05 39 63.1 10.0 -0.8 -159.3 -7 1 1 316 05 25 11 05 26 01 --- 09 06 29 63.1 9.8 -0.8 -159.6 43 F 1 318 05 25 11 05 26 01 1004+6936 09 06 29 62.3 11.0 -1.0 -156.3 -8 1 1 318 05 26 01 05 26 51 --- 09 07 20 62.3 10.9 -1.0 -156.7 42 F 1 319 05 26 01 05 26 51 M81 09 07 20 63.1 9.7 -0.8 -159.9 -8 1 1 319 05 26 51 05 27 41 --- 09 08 10 63.2 9.5 -0.8 -160.3 42 F 1 321 05 26 51 Schedule for VLBA_HN (Code Hn ) Page 15 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 05 27 41 M82 09 08 10 62.6 9.1 -0.8 -160.5 -7 1 1 321 05 27 41 05 28 31 --- 09 09 00 62.6 9.0 -0.8 -160.9 43 F 1 323 05 27 41 05 28 31 M81 09 09 00 63.2 9.3 -0.8 -160.6 -7 1 1 323 05 28 31 05 29 21 --- 09 09 50 63.2 9.2 -0.8 -160.9 43 F 1 324 05 28 31 05 29 21 0945+6924 09 09 50 63.2 7.0 -0.6 -165.4 -7 1 1 324 05 29 21 05 30 11 --- 09 10 40 63.2 6.8 -0.6 -165.7 43 F 1 326 05 29 21 05 30 11 M81 09 10 40 63.2 9.0 -0.8 -161.3 -7 1 1 326 05 30 11 05 31 01 --- 09 11 30 63.3 8.9 -0.7 -161.6 43 F 1 327 05 30 11 05 31 01 0948+6848 09 11 30 63.7 7.7 -0.6 -164.4 -7 1 1 327 05 31 01 05 31 51 --- 09 12 20 63.7 7.5 -0.6 -164.7 43 F 1 329 05 31 01 05 31 51 M81 09 12 20 63.3 8.7 -0.7 -161.9 -7 1 1 329 05 31 51 05 32 41 --- 09 13 11 63.3 8.6 -0.7 -162.3 43 F 1 331 05 31 51 05 32 41 M82 09 13 11 62.7 8.2 -0.7 -162.5 -7 1 1 331 05 32 41 05 33 31 --- 09 14 01 62.7 8.1 -0.7 -162.8 43 F 1 332 05 32 41 05 33 31 M81 09 14 01 63.3 8.4 -0.7 -162.6 -7 1 1 332 05 33 31 05 34 21 --- 09 14 51 63.4 8.2 -0.7 -163.0 43 F 1 334 05 33 31 05 34 21 1004+6936 09 14 51 62.6 9.6 -0.8 -159.6 -8 1 1 334 05 34 21 05 35 11 --- 09 15 41 62.6 9.4 -0.8 -159.9 42 F 1 335 05 34 21 05 35 11 M81 09 15 41 63.4 8.1 -0.7 -163.3 -8 1 1 335 05 35 11 05 36 01 --- 09 16 31 63.4 7.9 -0.7 -163.6 42 F 1 337 05 35 11 05 36 23 M81 09 16 53 63.4 7.8 -0.7 -163.8 17 1 1 337 05 36 23 05 37 23 --- 09 17 53 63.4 7.7 -0.6 -164.2 60 F 1 339 05 36 41 05 37 50 M82 09 18 20 62.8 7.3 -0.6 -164.6 20 1 1 339 05 37 50 05 38 40 --- 09 19 10 62.9 7.1 -0.6 -164.9 50 F 1 341 05 38 08 05 39 07 M81 09 19 37 63.5 7.3 -0.6 -164.9 20 1 1 341 05 39 07 05 39 57 --- 09 20 27 63.5 7.2 -0.6 -165.2 50 F 1 342 05 39 25 05 40 23 M82 09 20 54 62.9 6.8 -0.6 -165.6 20 1 1 342 05 40 23 05 41 13 --- 09 21 44 62.9 6.6 -0.6 -165.9 50 F 1 344 05 40 41 05 41 40 M81 09 22 11 63.5 6.8 -0.6 -165.9 20 1 1 344 05 41 40 05 42 30 --- 09 23 01 63.5 6.7 -0.6 -166.3 50 F 1 345 05 41 58 Schedule for VLBA_HN (Code Hn ) Page 16 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 05 44 30 J1048+7143 09 25 01 59.5 12.8 -1.4 -148.9 106 1 1 345 05 44 30 05 47 30 =1044+719 09 28 02 59.6 12.4 -1.4 -149.9 180 F 1 351 05 44 48 05 48 00 M81 09 28 32 63.7 5.6 -0.5 -168.5 16 1 1 351 05 48 00 05 48 50 --- 09 29 22 63.7 5.4 -0.4 -168.9 50 F 1 353 05 48 18 05 48 50 M82 09 29 22 63.1 5.2 -0.5 -169.0 -7 1 1 353 05 48 50 05 49 40 --- 09 30 12 63.1 5.1 -0.4 -169.3 43 F 1 355 05 48 50 05 49 40 M81 09 30 12 63.7 5.2 -0.4 -169.2 -7 1 1 355 05 49 40 05 50 30 --- 09 31 02 63.7 5.1 -0.4 -169.6 43 F 1 356 05 49 40 05 50 30 0945+6924 09 31 02 63.5 2.9 -0.2 -174.0 -7 1 1 356 05 50 30 05 51 20 --- 09 31 53 63.5 2.7 -0.2 -174.3 43 F 1 358 05 50 30 05 51 20 M81 09 31 53 63.7 4.9 -0.4 -169.9 -7 1 1 358 05 51 20 05 52 10 --- 09 32 43 63.7 4.7 -0.4 -170.3 43 F 1 359 05 51 20 05 52 10 0948+6848 09 32 43 64.1 3.4 -0.3 -173.2 -7 1 1 359 05 52 10 05 53 00 --- 09 33 33 64.1 3.2 -0.3 -173.5 43 F 1 361 05 52 10 05 53 00 M81 09 33 33 63.7 4.6 -0.4 -170.6 -7 1 1 361 05 53 00 05 53 50 --- 09 34 23 63.7 4.4 -0.4 -170.9 43 F 1 363 05 53 00 05 53 50 M82 09 34 23 63.1 4.3 -0.4 -171.0 -7 1 1 363 05 53 50 05 54 40 --- 09 35 13 63.1 4.1 -0.4 -171.3 43 F 1 364 05 53 50 05 54 40 M81 09 35 13 63.8 4.2 -0.3 -171.3 -7 1 1 364 05 54 40 05 55 30 --- 09 36 03 63.8 4.1 -0.3 -171.6 43 F 1 366 05 54 40 05 55 30 1004+6936 09 36 03 63.1 5.7 -0.5 -168.0 -7 1 1 366 05 55 30 05 56 20 --- 09 36 53 63.1 5.5 -0.5 -168.4 43 F 1 367 05 55 30 05 56 20 M81 09 36 53 63.8 3.9 -0.3 -172.0 -7 1 1 367 05 56 20 05 57 10 --- 09 37 44 63.8 3.7 -0.3 -172.3 43 F 1 369 05 56 20 05 57 10 M82 09 37 44 63.2 3.6 -0.3 -172.3 -7 1 1 369 05 57 10 05 58 00 --- 09 38 34 63.2 3.5 -0.3 -172.7 43 F 1 371 05 57 10 05 58 00 M81 09 38 34 63.8 3.6 -0.3 -172.7 -7 1 1 371 05 58 00 05 58 50 --- 09 39 24 63.8 3.4 -0.3 -173.0 43 F 1 372 05 58 00 05 58 50 0945+6924 09 39 24 63.5 1.2 -0.1 -177.4 -7 1 1 372 05 58 50 05 59 40 --- 09 40 14 63.5 1.1 -0.1 -177.8 43 F 1 374 05 58 50 Schedule for VLBA_HN (Code Hn ) Page 17 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 05 59 40 M81 09 40 14 63.8 3.2 -0.3 -173.4 -7 1 1 374 05 59 40 06 00 30 --- 09 41 04 63.8 3.1 -0.3 -173.7 43 F 1 375 05 59 40 06 00 30 0948+6848 09 41 04 64.1 1.7 -0.1 -176.7 -7 1 1 375 06 00 30 06 01 20 --- 09 41 54 64.1 1.5 -0.1 -177.0 43 F 1 377 06 00 30 06 01 20 M81 09 41 54 63.8 2.9 -0.2 -174.1 -7 1 1 377 06 01 20 06 02 10 --- 09 42 44 63.8 2.7 -0.2 -174.4 43 F 1 379 06 01 20 06 02 10 M82 09 42 44 63.2 2.7 -0.2 -174.4 -7 1 1 379 06 02 10 06 03 00 --- 09 43 34 63.2 2.5 -0.2 -174.7 43 F 1 380 06 02 10 06 03 00 M81 09 43 34 63.9 2.6 -0.2 -174.7 -7 1 1 380 06 03 00 06 03 50 --- 09 44 25 63.9 2.4 -0.2 -175.1 43 F 1 382 06 03 00 06 03 50 1004+6936 09 44 25 63.2 4.1 -0.4 -171.4 -7 1 1 382 06 03 50 06 04 40 --- 09 45 15 63.2 3.9 -0.3 -171.7 43 F 1 384 06 03 50 06 04 40 M81 09 45 15 63.9 2.2 -0.2 -175.4 -7 1 1 384 06 04 40 06 05 30 --- 09 46 05 63.9 2.1 -0.2 -175.8 43 F 1 385 06 04 40 06 05 30 M82 09 46 05 63.3 2.0 -0.2 -175.7 -7 1 1 385 06 05 30 06 06 20 --- 09 46 55 63.3 1.9 -0.2 -176.1 43 F 1 387 06 05 30 06 06 20 M81 09 46 55 63.9 1.9 -0.2 -176.1 -7 1 1 387 06 06 20 06 07 10 --- 09 47 45 63.9 1.7 -0.1 -176.5 43 F 1 388 06 06 20 06 07 10 0945+6924 09 47 45 63.6 -0.4 0.0 179.2 -7 1 1 388 06 07 10 06 08 00 --- 09 48 35 63.6 -0.6 0.0 178.8 43 F 1 390 06 07 10 06 08 00 M81 09 48 35 63.9 1.5 -0.1 -176.8 -7 1 1 390 06 08 00 06 08 50 --- 09 49 25 63.9 1.4 -0.1 -177.2 43 F 1 392 06 08 00 06 08 50 0948+6848 09 49 25 64.2 -0.1 0.0 179.8 -7 1 1 392 06 08 50 06 09 40 --- 09 50 16 64.2 -0.3 0.0 179.5 43 F 1 393 06 08 50 06 09 40 M81 09 50 16 63.9 1.2 -0.1 -177.5 -7 1 1 393 06 09 40 06 10 30 --- 09 51 06 63.9 1.0 -0.1 -177.9 43 F 1 395 06 09 40 06 10 30 M82 09 51 06 63.3 1.1 -0.1 -177.8 -7 1 1 395 06 10 30 06 11 20 --- 09 51 56 63.3 0.9 -0.1 -178.1 43 F 1 396 06 10 30 06 11 20 M81 09 51 56 63.9 0.9 -0.1 -178.2 -7 1 1 396 06 11 20 06 12 10 --- 09 52 46 63.9 0.7 -0.1 -178.6 43 F 1 398 06 11 20 Schedule for VLBA_HN (Code Hn ) Page 18 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 06 12 10 1004+6936 09 52 46 63.3 2.5 -0.2 -174.8 -7 1 1 398 06 12 10 06 13 00 --- 09 53 36 63.3 2.3 -0.2 -175.1 43 F 1 400 06 12 10 06 13 00 M81 09 53 36 63.9 0.5 0.0 -178.9 -7 1 1 400 06 13 00 06 13 50 --- 09 54 26 63.9 0.4 0.0 -179.3 43 F 1 401 06 13 00 06 14 12 M81 09 54 48 63.9 0.3 0.0 -179.4 17 1 1 401 06 14 12 06 15 12 --- 09 55 49 63.9 0.1 0.0 -179.8 60 F 1 403 06 14 30 06 15 39 M82 09 56 16 63.3 0.1 0.0 -179.9 20 1 1 403 06 15 39 06 16 29 --- 09 57 06 63.3 -0.1 0.0 179.8 50 F 1 405 06 15 57 06 16 56 M81 09 57 33 63.9 -0.3 0.0 179.4 20 1 1 405 06 16 56 06 17 46 --- 09 58 23 63.9 -0.4 0.0 179.1 50 F 1 406 06 17 14 06 18 13 M82 09 58 50 63.3 -0.4 0.0 179.1 20 1 1 406 06 18 13 06 19 03 --- 09 59 40 63.3 -0.6 0.1 178.7 50 F 1 408 06 18 31 06 19 30 M81 10 00 07 63.9 -0.8 0.1 178.4 20 1 1 408 06 19 30 06 20 20 --- 10 00 57 63.9 -1.0 0.1 178.0 50 F 1 410 06 19 48 06 20 50 M81 10 01 27 63.9 -1.1 0.1 177.8 25 1 1 410 06 20 50 06 21 40 --- 10 02 18 63.9 -1.2 0.1 177.5 50 F 1 411 06 21 08 06 21 40 M82 10 02 18 63.3 -1.1 0.1 177.7 -7 1 1 411 06 21 40 06 22 30 --- 10 03 08 63.3 -1.3 0.1 177.3 43 F 1 413 06 21 40 06 22 30 M81 10 03 08 63.9 -1.4 0.1 177.1 -7 1 1 413 06 22 30 06 23 20 --- 10 03 58 63.9 -1.6 0.1 176.8 43 F 1 415 06 22 30 06 23 20 0945+6924 10 03 58 63.5 -3.6 0.3 172.5 -7 1 1 415 06 23 20 06 24 10 --- 10 04 48 63.4 -3.8 0.3 172.2 43 F 1 416 06 23 20 06 24 10 M81 10 04 48 63.9 -1.7 0.1 176.4 -7 1 1 416 06 24 10 06 25 00 --- 10 05 38 63.9 -1.9 0.2 176.1 43 F 1 418 06 24 10 06 25 00 0948+6848 10 05 38 64.1 -3.4 0.3 173.0 -7 1 1 418 06 25 00 06 25 50 --- 10 06 28 64.1 -3.6 0.3 172.7 43 F 1 419 06 25 00 06 25 50 M81 10 06 28 63.9 -2.1 0.2 175.7 -7 1 1 419 06 25 50 06 26 40 --- 10 07 18 63.9 -2.3 0.2 175.4 43 F 1 421 06 25 50 06 26 40 M82 10 07 18 63.3 -2.1 0.2 175.6 -7 1 1 421 06 26 40 06 27 30 --- 10 08 09 63.2 -2.2 0.2 175.3 43 F 1 423 06 26 40 Schedule for VLBA_HN (Code Hn ) Page 19 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 06 27 30 M81 10 08 09 63.9 -2.4 0.2 175.0 -7 1 1 423 06 27 30 06 28 20 --- 10 08 59 63.9 -2.6 0.2 174.7 43 F 1 424 06 27 30 06 28 20 1004+6936 10 08 59 63.4 -0.7 0.1 178.6 -7 1 1 424 06 28 20 06 29 10 --- 10 09 49 63.4 -0.8 0.1 178.3 43 F 1 426 06 28 20 06 29 10 M81 10 09 49 63.8 -2.8 0.2 174.3 -7 1 1 426 06 29 10 06 30 00 --- 10 10 39 63.8 -2.9 0.2 174.0 43 F 1 427 06 29 10 06 30 00 M82 10 10 39 63.2 -2.7 0.2 174.3 -7 1 1 427 06 30 00 06 30 50 --- 10 11 29 63.2 -2.9 0.2 173.9 43 F 1 429 06 30 00 06 30 50 M81 10 11 29 63.8 -3.1 0.3 173.7 -7 1 1 429 06 30 50 06 31 40 --- 10 12 19 63.8 -3.3 0.3 173.3 43 F 1 431 06 30 50 06 31 40 0945+6924 10 12 19 63.3 -5.2 0.4 169.1 -7 1 1 431 06 31 40 06 32 30 --- 10 13 09 63.3 -5.4 0.5 168.8 43 F 1 432 06 31 40 06 32 30 M81 10 13 09 63.8 -3.4 0.3 173.0 -7 1 1 432 06 32 30 06 33 20 --- 10 14 00 63.8 -3.6 0.3 172.6 43 F 1 434 06 32 30 06 33 20 0948+6848 10 14 00 64.0 -5.1 0.4 169.6 -7 1 1 434 06 33 20 06 34 10 --- 10 14 50 63.9 -5.3 0.4 169.2 43 F 1 435 06 33 20 06 34 10 M81 10 14 50 63.8 -3.8 0.3 172.3 -7 1 1 435 06 34 10 06 35 00 --- 10 15 40 63.8 -3.9 0.3 171.9 43 F 1 437 06 34 10 06 35 00 M82 10 15 40 63.2 -3.7 0.3 172.2 -7 1 1 437 06 35 00 06 35 50 --- 10 16 30 63.2 -3.8 0.3 171.9 43 F 1 439 06 35 00 06 35 50 M81 10 16 30 63.8 -4.1 0.3 171.6 -7 1 1 439 06 35 50 06 36 40 --- 10 17 20 63.8 -4.3 0.4 171.2 43 F 1 440 06 35 50 06 36 40 1004+6936 10 17 20 63.3 -2.3 0.2 175.2 -7 1 1 440 06 36 40 06 37 30 --- 10 18 10 63.3 -2.5 0.2 174.8 43 F 1 442 06 36 40 06 37 30 M81 10 18 10 63.7 -4.4 0.4 170.9 -7 1 1 442 06 37 30 06 38 20 --- 10 19 00 63.7 -4.6 0.4 170.5 43 F 1 444 06 37 30 06 38 20 M82 10 19 00 63.1 -4.3 0.4 170.9 -7 1 1 444 06 38 20 06 39 10 --- 10 19 50 63.1 -4.5 0.4 170.5 43 F 1 445 06 38 20 06 39 10 M81 10 19 50 63.7 -4.8 0.4 170.2 -7 1 1 445 06 39 10 06 40 00 --- 10 20 41 63.7 -4.9 0.4 169.9 43 F 1 447 06 39 10 Schedule for VLBA_HN (Code Hn ) Page 20 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 06 40 00 0945+6924 10 20 41 63.2 -6.8 0.6 165.7 -7 1 1 447 06 40 00 06 40 50 --- 10 21 31 63.2 -7.0 0.6 165.4 43 F 1 448 06 40 00 06 40 50 M81 10 21 31 63.7 -5.1 0.4 169.5 -7 1 1 448 06 40 50 06 41 40 --- 10 22 21 63.7 -5.3 0.4 169.2 43 F 1 450 06 40 50 06 41 40 0948+6848 10 22 21 63.8 -6.8 0.6 166.1 -7 1 1 450 06 41 40 06 42 30 --- 10 23 11 63.8 -7.0 0.6 165.8 43 F 1 452 06 41 40 06 42 30 M81 10 23 11 63.7 -5.4 0.4 168.8 -7 1 1 452 06 42 30 06 43 20 --- 10 24 01 63.7 -5.6 0.5 168.5 43 F 1 453 06 42 30 06 43 20 M82 10 24 01 63.1 -5.3 0.5 168.9 -7 1 1 453 06 43 20 06 44 10 --- 10 24 51 63.0 -5.4 0.5 168.5 43 F 1 455 06 43 20 06 44 10 M81 10 24 51 63.6 -5.8 0.5 168.1 -7 1 1 455 06 44 10 06 45 00 --- 10 25 41 63.6 -5.9 0.5 167.8 43 F 1 456 06 44 10 06 45 00 1004+6936 10 25 41 63.2 -3.9 0.3 171.8 -7 1 1 456 06 45 00 06 45 50 --- 10 26 32 63.2 -4.1 0.3 171.5 43 F 1 458 06 45 00 06 45 50 M81 10 26 32 63.6 -6.1 0.5 167.5 -7 1 1 458 06 45 50 06 46 40 --- 10 27 22 63.6 -6.3 0.5 167.1 43 F 1 460 06 45 50 06 47 03 M81 10 27 44 63.6 -6.3 0.5 167.0 18 1 1 460 06 47 03 06 48 03 --- 10 28 44 63.6 -6.5 0.5 166.6 60 F 1 462 06 47 21 06 48 30 M82 10 29 11 63.0 -6.2 0.5 166.8 20 1 1 462 06 48 30 06 49 20 --- 10 30 01 62.9 -6.4 0.6 166.5 50 F 1 463 06 48 48 06 49 47 M81 10 30 28 63.5 -6.9 0.6 165.8 20 1 1 463 06 49 47 06 50 37 --- 10 31 19 63.5 -7.0 0.6 165.5 50 F 1 465 06 50 05 06 51 04 M82 10 31 46 62.9 -6.7 0.6 165.8 20 1 1 465 06 51 04 06 51 54 --- 10 32 36 62.9 -6.9 0.6 165.4 50 F 1 466 06 51 22 06 52 21 M81 10 33 03 63.5 -7.4 0.6 164.8 20 1 1 466 06 52 21 06 53 11 --- 10 33 53 63.4 -7.5 0.6 164.5 50 F 1 468 06 52 39 06 53 41 M81 10 34 23 63.4 -7.6 0.6 164.3 25 1 1 468 06 53 41 06 54 31 --- 10 35 13 63.4 -7.8 0.7 163.9 50 F 1 470 06 53 59 06 54 31 M82 10 35 13 62.8 -7.3 0.6 164.4 -7 1 1 470 06 54 31 06 55 21 --- 10 36 03 62.8 -7.5 0.7 164.0 43 F 1 471 06 54 31 Schedule for VLBA_HN (Code Hn ) Page 21 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 06 55 21 M81 10 36 03 63.4 -7.9 0.7 163.6 -7 1 1 471 06 55 21 06 56 11 --- 10 36 53 63.4 -8.1 0.7 163.2 43 F 1 473 06 55 21 06 56 11 0945+6924 10 36 53 62.7 -9.8 0.9 159.3 -7 1 1 473 06 56 11 06 57 01 --- 10 37 44 62.7 -10.0 0.9 158.9 43 F 1 475 06 56 11 06 57 01 M81 10 37 44 63.4 -8.3 0.7 162.9 -7 1 1 475 06 57 01 06 57 51 --- 10 38 34 63.3 -8.4 0.7 162.6 43 F 1 476 06 57 01 06 57 51 0948+6848 10 38 34 63.4 -10.0 0.8 159.5 -7 1 1 476 06 57 51 06 58 41 --- 10 39 24 63.3 -10.1 0.8 159.2 43 F 1 478 06 57 51 06 58 41 M81 10 39 24 63.3 -8.6 0.7 162.2 -7 1 1 478 06 58 41 06 59 31 --- 10 40 14 63.3 -8.7 0.7 161.9 43 F 1 479 06 58 41 06 59 31 M82 10 40 14 62.7 -8.3 0.7 162.4 -7 1 1 479 06 59 31 07 00 21 --- 10 41 04 62.7 -8.4 0.7 162.1 43 F 1 481 06 59 31 07 00 21 M81 10 41 04 63.3 -8.9 0.7 161.6 -7 1 1 481 07 00 21 07 01 11 --- 10 41 54 63.2 -9.1 0.8 161.2 43 F 1 483 07 00 21 07 01 11 1004+6936 10 41 54 63.0 -7.0 0.6 165.3 -7 1 1 483 07 01 11 07 02 01 --- 10 42 44 62.9 -7.1 0.6 164.9 43 F 1 484 07 01 11 07 02 01 M81 10 42 44 63.2 -9.2 0.8 160.9 -7 1 1 484 07 02 01 07 02 51 --- 10 43 35 63.2 -9.4 0.8 160.5 43 F 1 486 07 02 01 07 02 51 M82 10 43 35 62.6 -8.9 0.8 161.1 -7 1 1 486 07 02 51 07 03 41 --- 10 44 25 62.6 -9.0 0.8 160.7 43 F 1 487 07 02 51 07 03 41 M81 10 44 25 63.2 -9.5 0.8 160.2 -7 1 1 487 07 03 41 07 04 31 --- 10 45 15 63.1 -9.7 0.8 159.9 43 F 1 489 07 03 41 07 04 31 0945+6924 10 45 15 62.5 -11.3 1.0 156.0 -7 1 1 489 07 04 31 07 05 21 --- 10 46 05 62.4 -11.4 1.0 155.7 43 F 1 491 07 04 31 07 05 21 M81 10 46 05 63.1 -9.8 0.8 159.5 -7 1 1 491 07 05 21 07 06 11 --- 10 46 55 63.1 -10.0 0.8 159.2 43 F 1 492 07 05 21 07 06 11 0948+6848 10 46 55 63.1 -11.5 1.0 156.2 -7 1 1 492 07 06 11 07 07 01 --- 10 47 45 63.0 -11.7 1.0 155.8 43 F 1 494 07 06 11 07 07 01 M81 10 47 45 63.1 -10.1 0.9 158.9 -7 1 1 494 07 07 01 07 07 51 --- 10 48 35 63.0 -10.3 0.9 158.5 43 F 1 495 07 07 01 Schedule for VLBA_HN (Code Hn ) Page 22 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 07 07 51 M82 10 48 35 62.5 -9.8 0.9 159.1 -7 1 1 495 07 07 51 07 08 41 --- 10 49 26 62.4 -9.9 0.9 158.8 43 F 1 497 07 07 51 07 08 41 M81 10 49 26 63.0 -10.5 0.9 158.2 -7 1 1 497 07 08 41 07 09 31 --- 10 50 16 63.0 -10.6 0.9 157.9 43 F 1 499 07 08 41 07 09 31 1004+6936 10 50 16 62.8 -8.5 0.7 161.9 -7 1 1 499 07 09 31 07 10 21 --- 10 51 06 62.7 -8.7 0.8 161.6 43 F 1 500 07 09 31 07 10 21 M81 10 51 06 62.9 -10.8 0.9 157.6 -7 1 1 500 07 10 21 07 11 11 --- 10 51 56 62.9 -10.9 0.9 157.2 43 F 1 502 07 10 21 07 11 11 M82 10 51 56 62.4 -10.3 0.9 157.8 -7 1 1 502 07 11 11 07 12 01 --- 10 52 46 62.3 -10.5 0.9 157.5 43 F 1 504 07 11 11 07 12 01 M81 10 52 46 62.9 -11.1 0.9 156.9 -7 1 1 504 07 12 01 07 12 51 --- 10 53 36 62.9 -11.2 1.0 156.6 43 F 1 505 07 12 01 07 12 51 0945+6924 10 53 36 62.1 -12.7 1.1 152.8 -7 1 1 505 07 12 51 07 13 41 --- 10 54 26 62.1 -12.9 1.1 152.5 43 F 1 507 07 12 51 07 13 41 M81 10 54 26 62.8 -11.4 1.0 156.2 -7 1 1 507 07 13 41 07 14 31 --- 10 55 16 62.8 -11.5 1.0 155.9 43 F 1 508 07 13 41 07 14 31 0948+6848 10 55 16 62.7 -13.0 1.1 152.9 -7 1 1 508 07 14 31 07 15 21 --- 10 56 07 62.7 -13.2 1.1 152.6 43 F 1 510 07 14 31 07 15 21 M81 10 56 07 62.8 -11.7 1.0 155.6 -7 1 1 510 07 15 21 07 16 11 --- 10 56 57 62.7 -11.8 1.0 155.3 43 F 1 512 07 15 21 07 16 11 M82 10 56 57 62.2 -11.2 1.0 155.9 -7 1 1 512 07 16 11 07 17 01 --- 10 57 47 62.2 -11.3 1.0 155.6 43 F 1 513 07 16 11 07 17 01 M81 10 57 47 62.7 -12.0 1.0 154.9 -7 1 1 513 07 17 01 07 17 51 --- 10 58 37 62.7 -12.1 1.0 154.6 43 F 1 515 07 17 01 07 17 51 1004+6936 10 58 37 62.5 -10.0 0.9 158.7 -7 1 1 515 07 17 51 07 18 41 --- 10 59 27 62.5 -10.1 0.9 158.3 43 F 1 516 07 17 51 07 18 41 M81 10 59 27 62.6 -12.2 1.1 154.3 -7 1 1 516 07 18 41 07 19 31 --- 11 00 17 62.6 -12.4 1.1 154.0 43 F 1 518 07 18 41 07 19 31 M82 11 00 17 62.1 -11.8 1.1 154.6 -7 1 1 518 07 19 31 07 20 21 --- 11 01 07 62.0 -11.9 1.1 154.3 43 F 1 520 07 19 31 Schedule for VLBA_HN (Code Hn ) Page 23 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 07 20 21 M81 11 01 07 62.6 -12.5 1.1 153.6 -7 1 1 520 07 20 21 07 21 11 --- 11 01 58 62.5 -12.7 1.1 153.3 43 F 1 521 07 20 21 07 21 11 0945+6924 11 01 58 61.8 -14.1 1.3 149.6 -7 1 1 521 07 21 11 07 22 01 --- 11 02 48 61.8 -14.2 1.3 149.3 43 F 1 523 07 21 11 07 22 01 M81 11 02 48 62.5 -12.8 1.1 153.0 -7 1 1 523 07 22 01 07 22 51 --- 11 03 38 62.5 -13.0 1.1 152.7 43 F 1 525 07 22 01 07 22 51 0948+6848 11 03 38 62.4 -14.5 1.2 149.7 -7 1 1 525 07 22 51 07 23 41 --- 11 04 28 62.3 -14.6 1.3 149.3 43 F 1 526 07 22 51 07 23 41 M81 11 04 28 62.4 -13.1 1.1 152.3 -7 1 1 526 07 23 41 07 24 31 --- 11 05 18 62.4 -13.3 1.2 152.0 43 F 1 528 07 23 41 07 24 31 M82 11 05 18 61.9 -12.6 1.1 152.7 -7 1 1 528 07 24 31 07 25 21 --- 11 06 08 61.8 -12.7 1.2 152.4 43 F 1 529 07 24 31 07 25 21 M81 11 06 08 62.4 -13.4 1.2 151.7 -7 1 1 529 07 25 21 07 26 11 --- 11 06 58 62.3 -13.5 1.2 151.4 43 F 1 531 07 25 21 07 26 11 1004+6936 11 06 58 62.2 -11.4 1.0 155.4 -7 1 1 531 07 26 11 07 27 01 --- 11 07 49 62.2 -11.6 1.0 155.1 43 F 1 533 07 26 11 07 27 01 M81 11 07 49 62.3 -13.7 1.2 151.1 -7 1 1 533 07 27 01 07 27 51 --- 11 08 39 62.3 -13.8 1.2 150.7 43 F 1 534 07 27 01 07 27 51 M81 11 08 39 62.3 -13.8 1.2 150.7 -4 1 1 534 07 27 51 07 28 41 --- 11 09 29 62.2 -14.0 1.2 150.4 46 F 1 536 07 27 51 07 28 41 M82 11 09 29 61.7 -13.3 1.2 151.1 -7 1 1 536 07 28 41 07 29 31 --- 11 10 19 61.7 -13.4 1.2 150.8 43 F 1 537 07 28 41 07 29 31 M81 11 10 19 62.2 -14.1 1.2 150.1 -7 1 1 537 07 29 31 07 30 21 --- 11 11 09 62.2 -14.2 1.2 149.8 43 F 1 539 07 29 31 07 30 21 M82 11 11 09 61.6 -13.5 1.2 150.5 -7 1 1 539 07 30 21 07 31 11 --- 11 11 59 61.6 -13.7 1.3 150.2 43 F 1 541 07 30 21 07 31 11 M81 11 11 59 62.1 -14.4 1.3 149.5 -7 1 1 541 07 31 11 07 32 01 --- 11 12 49 62.1 -14.5 1.3 149.1 43 F 1 542 07 31 11 Schedule for VLBA_HN (Code Hn ) Page 24 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- Next scan frequencies: 22010.49 22022.99 22047.99 22110.49 22272.99 22322.99 22422.99 22447.99 Next BBC frequencies: 510.49 522.99 547.99 610.49 772.99 822.99 922.99 947.99 07 33 28 0824+555 11 14 18 60.2 -49.4 2.8 97.7 59 1 1 542 07 33 28 07 34 58 --- 11 15 48 60.0 -49.5 2.8 97.3 90 F 1 545 07 33 46 07 38 37 0927+390 11 19 27 68.6 269.0 1.9 70.4 0 1 1 545 07 38 37 07 40 07 --- 11 20 57 68.3 269.2 1.9 70.4 90 F 1 548 07 38 55 07 41 44 0958+472 11 22 34 74.6 294.1 1.4 99.1 74 1 1 548 07 41 44 07 43 14 --- 11 24 04 74.4 293.9 1.4 98.7 90 F 1 551 07 42 02 07 44 56 1048+714 11 25 47 60.9 354.1 0.6 166.1 57 1 1 551 07 44 56 07 46 26 --- 11 27 18 60.9 353.8 0.6 165.5 90 F 1 554 07 45 14 07 47 30 1058+811 11 28 21 51.6 358.2 0.5 171.3 39 1 1 554 07 47 30 07 49 00 --- 11 29 51 51.6 358.1 0.5 170.9 90 F 1 557 07 47 48 07 52 03 1130+381 11 32 55 85.3 183.9 0.0 3.6 61 1 1 557 07 52 03 07 53 33 --- 11 34 25 85.2 187.4 0.1 6.9 90 F 1 560 07 52 21 07 54 27 1146+395 11 35 20 86.2 142.1 -0.2 -36.0 18 1 1 560 07 54 27 07 55 57 --- 11 36 50 86.4 145.8 -0.2 -32.5 90 F 1 563 07 54 45 07 59 19 1638+572 11 40 12 42.7 45.1 -5.0 -73.9 108 1 1 563 07 59 19 08 00 49 --- 11 41 43 42.9 45.2 -4.9 -74.2 90 F 1 565 07 59 37 08 03 05 1746+622 11 43 58 36.9 35.4 -6.0 -66.3 117 1 1 565 08 03 05 08 04 35 --- 11 45 29 37.1 35.4 -6.0 -66.6 90 F 1 568 08 03 23 08 08 04 0102+582 11 48 59 12.5 -9.8 10.8 13.8 155 1 1 568 08 08 04 08 09 34 --- 11 50 29 12.5 -9.6 10.8 13.5 90 F 1 571 08 08 22 08 12 13 0646+445 11 53 09 37.0 -59.6 5.1 63.0 104 1 1 571 08 12 13 08 13 43 --- 11 54 39 36.7 -59.5 5.1 62.8 90 F 1 574 08 12 31 08 22 36 0730-114 12 03 34 7.3 246.5 4.5 43.3 323 1 1 574 08 22 36 08 24 06 --- 12 05 04 7.1 246.7 4.6 43.4 90 F 1 577 08 22 54 Schedule for VLBA_HN (Code Hn ) Page 25 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- Next scan frequencies: 22198.17 22198.17 22206.15 22206.15 22214.13 22214.13 22222.12 22222.12 Next BBC frequencies: 698.17 698.17 706.15 706.15 714.13 714.13 722.12 722.12 08 26 07 M81 12 07 04 58.9 338.0 2.2 130.0 10 1 1 577 08 26 07 08 27 07 --- 12 08 04 58.9 337.9 2.2 129.6 60 F 1 579 08 26 25 08 27 14 M82 12 08 12 58.5 338.8 2.2 130.5 1 1 1 579 08 27 07 08 27 44 --- 12 08 42 58.4 338.8 2.2 130.3 30 F 1 580 08 27 07 08 27 51 M81 12 08 49 58.8 337.8 2.2 129.4 1 1 1 580 08 27 44 08 28 21 --- 12 09 19 58.8 337.7 2.2 129.2 30 F 1 581 08 27 44 08 28 28 M82 12 09 26 58.4 338.7 2.2 130.1 1 1 1 581 08 28 21 08 28 58 --- 12 09 56 58.4 338.6 2.2 129.9 30 F 1 583 08 28 21 08 29 05 M81 12 10 03 58.7 337.7 2.2 129.0 1 1 1 583 08 28 58 08 29 35 --- 12 10 33 58.7 337.6 2.2 128.8 30 F 1 584 08 28 58 08 29 42 M82 12 10 41 58.3 338.5 2.2 129.7 1 1 1 584 08 29 35 08 30 12 --- 12 11 11 58.3 338.5 2.2 129.5 30 F 1 585 08 29 35 08 30 19 M81 12 11 18 58.6 337.5 2.3 128.6 1 1 1 585 08 30 12 08 30 49 --- 12 11 48 58.6 337.5 2.3 128.4 30 F 1 586 08 30 12 08 30 56 M82 12 11 55 58.2 338.4 2.3 129.3 1 1 1 586 08 30 49 08 31 26 --- 12 12 25 58.2 338.4 2.3 129.1 30 F 1 587 08 30 49 08 31 34 M81 12 12 32 58.5 337.4 2.3 128.2 1 1 1 587 08 31 26 08 32 04 --- 12 13 02 58.5 337.3 2.3 128.0 30 F 1 589 08 31 26 08 32 11 M82 12 13 09 58.1 338.3 2.3 128.9 1 1 1 589 08 32 04 08 32 41 --- 12 13 40 58.1 338.2 2.3 128.7 30 F 1 590 08 32 04 08 32 48 M81 12 13 47 58.5 337.3 2.3 127.8 1 1 1 590 08 32 41 08 33 18 --- 12 14 17 58.4 337.2 2.3 127.6 30 F 1 591 08 32 41 08 33 25 M82 12 14 24 58.1 338.2 2.3 128.5 1 1 1 591 08 33 18 08 33 55 --- 12 14 54 58.0 338.1 2.3 128.3 30 F 1 592 08 33 18 08 34 02 M81 12 15 01 58.4 337.1 2.3 127.4 1 1 1 592 08 33 55 08 34 32 --- 12 15 31 58.3 337.1 2.3 127.2 30 F 1 593 08 33 55 Schedule for VLBA_HN (Code Hn ) Page 26 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 08 34 39 M82 12 15 38 58.0 338.0 2.3 128.1 1 1 1 593 08 34 32 08 35 09 --- 12 16 09 57.9 338.0 2.3 127.9 30 F 1 595 08 34 32 08 35 16 M81 12 16 16 58.3 337.0 2.3 127.0 1 1 1 595 08 35 09 08 35 46 --- 12 16 46 58.2 337.0 2.3 126.8 30 F 1 596 08 35 09 08 35 54 M82 12 16 53 57.9 337.9 2.3 127.7 1 1 1 596 08 35 46 08 36 24 --- 12 17 23 57.9 337.9 2.3 127.5 30 F 1 597 08 35 46 08 36 31 M81 12 17 30 58.2 336.9 2.4 126.6 1 1 1 597 08 36 24 08 37 01 --- 12 18 00 58.2 336.8 2.4 126.4 30 F 1 598 08 36 24 08 37 08 M82 12 18 07 57.8 337.8 2.4 127.3 1 1 1 598 08 37 01 08 37 38 --- 12 18 37 57.8 337.7 2.4 127.1 30 F 1 599 08 37 01 08 37 45 M81 12 18 45 58.1 336.8 2.4 126.2 1 1 1 599 08 37 38 08 38 15 --- 12 19 15 58.1 336.7 2.4 126.0 30 F 1 601 08 37 38 08 39 10 M81 12 20 10 58.0 336.6 2.4 125.7 50 1 1 601 08 39 10 08 40 00 --- 12 21 00 57.9 336.5 2.4 125.5 50 F 1 602 08 39 28 08 40 00 M82 12 21 00 57.6 337.5 2.4 126.4 -6 1 1 602 08 40 00 08 40 50 --- 12 21 50 57.5 337.4 2.4 126.1 44 F 1 604 08 40 00 08 40 50 M81 12 21 50 57.9 336.5 2.4 125.2 -6 1 1 604 08 40 50 08 41 40 --- 12 22 41 57.8 336.4 2.4 124.9 44 F 1 605 08 40 50 08 41 40 0945+6924 12 22 41 56.8 336.0 2.6 122.1 -8 1 1 605 08 41 40 08 42 30 --- 12 23 31 56.8 335.9 2.6 121.9 42 F 1 607 08 41 40 08 42 30 M81 12 23 31 57.8 336.3 2.5 124.7 -8 1 1 607 08 42 30 08 43 20 --- 12 24 21 57.7 336.2 2.5 124.4 42 F 1 609 08 42 30 08 43 20 0948+6848 12 24 21 57.3 335.2 2.6 121.8 -7 1 1 609 08 43 20 08 44 10 --- 12 25 11 57.2 335.1 2.6 121.6 43 F 1 610 08 43 20 08 44 10 M81 12 25 11 57.6 336.1 2.5 124.1 -7 1 1 610 08 44 10 08 45 00 --- 12 26 01 57.6 336.1 2.5 123.9 43 F 1 612 08 44 10 08 45 00 M82 12 26 01 57.2 337.0 2.5 124.8 -6 1 1 612 08 45 00 08 45 50 --- 12 26 51 57.2 337.0 2.5 124.5 44 F 1 613 08 45 00 08 45 50 M81 12 26 51 57.5 336.0 2.5 123.6 -6 1 1 613 08 45 50 08 46 40 --- 12 27 41 57.4 335.9 2.5 123.4 44 F 1 615 08 45 50 Schedule for VLBA_HN (Code Hn ) Page 27 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 08 46 40 1004+6936 12 27 41 57.8 337.6 2.4 127.0 -7 1 1 615 08 46 40 08 47 30 --- 12 28 32 57.8 337.5 2.4 126.7 43 F 1 617 08 46 40 08 47 30 M81 12 28 32 57.4 335.8 2.5 123.1 -7 1 1 617 08 47 30 08 48 20 --- 12 29 22 57.3 335.8 2.6 122.8 43 F 1 618 08 47 30 08 48 20 M82 12 29 22 57.0 336.7 2.5 123.7 -6 1 1 618 08 48 20 08 49 10 --- 12 30 12 56.9 336.7 2.6 123.5 44 F 1 620 08 48 20 08 49 10 M81 12 30 12 57.3 335.7 2.6 122.6 -6 1 1 620 08 49 10 08 50 00 --- 12 31 02 57.2 335.6 2.6 122.3 44 F 1 622 08 49 10 08 50 00 0945+6924 12 31 02 56.2 335.3 2.8 119.6 -8 1 1 622 08 50 00 08 50 50 --- 12 31 52 56.2 335.2 2.8 119.3 42 F 1 623 08 50 00 08 50 50 M81 12 31 52 57.1 335.5 2.6 122.1 -8 1 1 623 08 50 50 08 51 40 --- 12 32 42 57.1 335.5 2.6 121.8 42 F 1 625 08 50 50 08 51 40 0948+6848 12 32 42 56.6 334.5 2.7 119.3 -7 1 1 625 08 51 40 08 52 30 --- 12 33 32 56.6 334.4 2.7 119.1 43 F 1 626 08 51 40 08 52 30 M81 12 33 32 57.0 335.4 2.6 121.6 -7 1 1 626 08 52 30 08 53 20 --- 12 34 23 56.9 335.3 2.6 121.3 43 F 1 628 08 52 30 08 53 20 M82 12 34 23 56.6 336.3 2.6 122.2 -6 1 1 628 08 53 20 08 54 10 --- 12 35 13 56.6 336.2 2.6 122.0 44 F 1 630 08 53 20 08 54 10 M81 12 35 13 56.9 335.2 2.6 121.1 -6 1 1 630 08 54 10 08 55 00 --- 12 36 03 56.8 335.2 2.7 120.8 44 F 1 631 08 54 10 08 55 00 1004+6936 12 36 03 57.2 336.8 2.5 124.4 -7 1 1 631 08 55 00 08 55 50 --- 12 36 53 57.2 336.7 2.5 124.1 43 F 1 633 08 55 00 08 55 50 M81 12 36 53 56.7 335.1 2.7 120.5 -7 1 1 633 08 55 50 08 56 40 --- 12 37 43 56.7 335.0 2.7 120.3 43 F 1 634 08 55 50 08 56 40 M82 12 37 43 56.4 336.0 2.7 121.2 -6 1 1 634 08 56 40 08 57 30 --- 12 38 33 56.3 336.0 2.7 120.9 44 F 1 636 08 56 40 08 57 30 M81 12 38 33 56.6 335.0 2.7 120.0 -6 1 1 636 08 57 30 08 58 20 --- 12 39 23 56.6 334.9 2.7 119.8 44 F 1 638 08 57 30 08 58 20 0945+6924 12 39 23 55.6 334.6 2.9 117.1 -8 1 1 638 08 58 20 08 59 10 --- 12 40 13 55.5 334.6 2.9 116.9 42 F 1 639 08 58 20 Schedule for VLBA_HN (Code Hn ) Page 28 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 08 59 10 M81 12 40 13 56.5 334.8 2.7 119.5 -8 1 1 639 08 59 10 09 00 00 --- 12 41 04 56.4 334.8 2.7 119.3 42 F 1 641 08 59 10 09 00 00 0948+6848 12 41 04 56.0 333.8 2.9 116.8 -7 1 1 641 09 00 00 09 00 50 --- 12 41 54 55.9 333.8 2.9 116.6 43 F 1 643 09 00 00 09 00 50 M81 12 41 54 56.4 334.7 2.8 119.0 -7 1 1 643 09 00 50 09 01 40 --- 12 42 44 56.3 334.6 2.8 118.8 43 F 1 644 09 00 50 09 01 40 M82 12 42 44 56.0 335.6 2.8 119.7 -6 1 1 644 09 01 40 09 02 30 --- 12 43 34 56.0 335.6 2.8 119.4 44 F 1 646 09 01 40 09 02 30 M81 12 43 34 56.2 334.6 2.8 118.5 -6 1 1 646 09 02 30 09 03 20 --- 12 44 24 56.2 334.5 2.8 118.3 44 F 1 647 09 02 30 09 03 20 1004+6936 12 44 24 56.6 336.1 2.6 121.8 -7 1 1 647 09 03 20 09 04 10 --- 12 45 14 56.5 336.0 2.7 121.5 43 F 1 649 09 03 20 09 04 10 M81 12 45 14 56.1 334.4 2.8 118.0 -7 1 1 649 09 04 10 09 05 00 --- 12 46 04 56.0 334.4 2.8 117.8 43 F 1 651 09 04 10 09 05 22 M81 12 46 26 56.0 334.4 2.8 117.7 17 1 1 651 09 05 22 09 06 22 --- 12 47 26 55.9 334.3 2.9 117.4 60 F 1 653 09 05 40 09 06 50 M82 12 47 54 55.6 335.2 2.9 118.2 22 1 1 653 09 06 50 09 07 40 --- 12 48 44 55.6 335.2 2.9 117.9 50 F 1 654 09 07 08 09 08 08 M81 12 49 13 55.8 334.1 2.9 116.9 22 1 1 654 09 08 08 09 08 58 --- 12 50 03 55.7 334.1 2.9 116.6 50 F 1 656 09 08 26 09 09 26 M82 12 50 31 55.4 335.0 2.9 117.4 22 1 1 656 09 09 26 09 10 16 --- 12 51 21 55.4 335.0 2.9 117.1 50 F 1 657 09 09 44 09 10 45 M81 12 51 50 55.6 334.0 2.9 116.1 22 1 1 657 09 10 45 09 11 35 --- 12 52 40 55.5 333.9 2.9 115.9 50 F 1 659 09 11 03 09 13 35 J1048+7143 12 54 40 57.5 342.3 2.1 134.8 108 1 1 659 09 13 35 09 16 35 =1044+719 12 57 41 57.3 342.0 2.1 133.9 180 F 1 665 09 13 53 09 17 05 M81 12 58 11 55.1 333.5 3.0 114.3 18 1 1 665 09 17 05 09 17 55 --- 12 59 01 55.0 333.5 3.0 114.0 50 F 1 666 09 17 23 09 17 55 M82 12 59 01 54.8 334.5 3.0 114.9 -6 1 1 666 09 17 55 09 18 45 --- 12 59 51 54.7 334.4 3.1 114.7 44 F 1 668 09 17 55 Schedule for VLBA_HN (Code Hn ) Page 29 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 09 18 45 M81 12 59 51 54.9 333.4 3.1 113.8 -6 1 1 668 09 18 45 09 19 35 --- 13 00 41 54.9 333.4 3.1 113.6 44 F 1 670 09 18 45 09 19 35 0945+6924 13 00 41 53.9 333.3 3.2 111.1 -8 1 1 670 09 19 35 09 20 25 --- 13 01 31 53.8 333.3 3.3 110.8 42 F 1 671 09 19 35 09 20 25 M81 13 01 31 54.8 333.3 3.1 113.3 -8 1 1 671 09 20 25 09 21 15 --- 13 02 21 54.7 333.3 3.1 113.1 42 F 1 673 09 20 25 09 21 15 0948+6848 13 02 21 54.2 332.5 3.2 110.7 -7 1 1 673 09 21 15 09 22 05 --- 13 03 12 54.1 332.4 3.2 110.5 43 F 1 674 09 21 15 09 22 05 M81 13 03 12 54.6 333.2 3.1 112.9 -7 1 1 674 09 22 05 09 22 55 --- 13 04 02 54.6 333.2 3.1 112.6 43 F 1 676 09 22 05 09 22 55 M82 13 04 02 54.4 334.2 3.1 113.5 -6 1 1 676 09 22 55 09 23 45 --- 13 04 52 54.3 334.1 3.1 113.3 44 F 1 678 09 22 55 09 23 45 M81 13 04 52 54.5 333.1 3.1 112.4 -6 1 1 678 09 23 45 09 24 35 --- 13 05 42 54.4 333.1 3.2 112.1 44 F 1 679 09 23 45 09 24 35 1004+6936 13 05 42 55.0 334.5 3.0 115.5 -7 1 1 679 09 24 35 09 25 25 --- 13 06 32 54.9 334.5 3.0 115.2 43 F 1 681 09 24 35 09 25 25 M81 13 06 32 54.4 333.0 3.2 111.9 -7 1 1 681 09 25 25 09 26 15 --- 13 07 22 54.3 333.0 3.2 111.7 43 F 1 683 09 25 25 09 26 15 M82 13 07 22 54.1 334.0 3.2 112.6 -6 1 1 683 09 26 15 09 27 05 --- 13 08 12 54.0 333.9 3.2 112.3 44 F 1 684 09 26 15 09 27 05 M81 13 08 12 54.2 332.9 3.2 111.4 -6 1 1 684 09 27 05 09 27 55 --- 13 09 02 54.2 332.9 3.2 111.2 44 F 1 686 09 27 05 09 27 55 0945+6924 13 09 02 53.2 332.9 3.4 108.8 -8 1 1 686 09 27 55 09 28 45 --- 13 09 53 53.1 332.9 3.4 108.5 42 F 1 687 09 27 55 09 28 45 M81 13 09 53 54.1 332.8 3.2 111.0 -8 1 1 687 09 28 45 09 29 35 --- 13 10 43 54.0 332.8 3.2 110.7 42 F 1 689 09 28 45 09 29 35 0948+6848 13 10 43 53.5 332.0 3.4 108.5 -7 1 1 689 09 29 35 09 30 25 --- 13 11 33 53.4 332.0 3.4 108.2 43 F 1 691 09 29 35 09 30 25 M81 13 11 33 54.0 332.8 3.3 110.5 -7 1 1 691 09 30 25 09 31 15 --- 13 12 23 53.9 332.7 3.3 110.3 43 F 1 692 09 30 25 Schedule for VLBA_HN (Code Hn ) Page 30 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 09 31 15 M82 13 12 23 53.7 333.7 3.3 111.2 -6 1 1 692 09 31 15 09 32 05 --- 13 13 13 53.6 333.7 3.3 110.9 44 F 1 694 09 31 15 09 32 05 M81 13 13 13 53.8 332.7 3.3 110.1 -6 1 1 694 09 32 05 09 32 55 --- 13 14 03 53.7 332.6 3.3 109.8 44 F 1 695 09 32 05 09 32 55 1004+6936 13 14 03 54.3 334.0 3.1 113.1 -7 1 1 695 09 32 55 09 33 45 --- 13 14 53 54.2 333.9 3.2 112.9 43 F 1 697 09 32 55 09 33 45 M81 13 14 53 53.7 332.6 3.3 109.6 -7 1 1 697 09 33 45 09 34 35 --- 13 15 44 53.6 332.5 3.3 109.4 43 F 1 699 09 33 45 09 34 35 M82 13 15 44 53.4 333.5 3.3 110.2 -6 1 1 699 09 34 35 09 35 25 --- 13 16 34 53.4 333.5 3.3 110.0 44 F 1 700 09 34 35 09 35 25 M81 13 16 34 53.5 332.5 3.3 109.1 -6 1 1 700 09 35 25 09 36 15 --- 13 17 24 53.5 332.5 3.4 108.9 44 F 1 702 09 35 25 09 36 15 0945+6924 13 17 24 52.5 332.5 3.5 106.5 -8 1 1 702 09 36 15 09 37 05 --- 13 18 14 52.4 332.5 3.5 106.3 42 F 1 703 09 36 15 09 37 05 M81 13 18 14 53.4 332.4 3.4 108.7 -8 1 1 703 09 37 05 09 37 55 --- 13 19 04 53.3 332.4 3.4 108.5 42 F 1 705 09 37 05 09 37 55 0948+6848 13 19 04 52.8 331.7 3.5 106.2 -7 1 1 705 09 37 55 09 38 45 --- 13 19 54 52.7 331.6 3.5 106.0 43 F 1 707 09 37 55 09 38 45 M81 13 19 54 53.2 332.3 3.4 108.2 -7 1 1 707 09 38 45 09 39 35 --- 13 20 44 53.2 332.3 3.4 108.0 43 F 1 708 09 38 45 09 39 35 M82 13 20 44 53.0 333.3 3.4 108.9 -6 1 1 708 09 39 35 09 40 25 --- 13 21 35 52.9 333.2 3.4 108.6 44 F 1 710 09 39 35 09 40 25 M81 13 21 35 53.1 332.3 3.4 107.8 -6 1 1 710 09 40 25 09 41 15 --- 13 22 25 53.0 332.2 3.4 107.6 44 F 1 712 09 40 25 09 41 15 1004+6936 13 22 25 53.6 333.5 3.3 110.8 -7 1 1 712 09 41 15 09 42 05 --- 13 23 15 53.6 333.5 3.3 110.5 43 F 1 713 09 41 15 09 42 05 M81 13 23 15 53.0 332.2 3.5 107.3 -7 1 1 713 09 42 05 09 42 55 --- 13 24 05 52.9 332.1 3.5 107.1 43 F 1 715 09 42 05 09 43 16 M81 13 24 26 52.9 332.1 3.5 107.0 17 1 1 715 09 43 16 09 44 16 --- 13 25 27 52.8 332.1 3.5 106.7 60 F 1 717 09 43 34 Schedule for VLBA_HN (Code Hn ) Page 31 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 09 44 44 M82 13 25 55 52.6 333.1 3.5 107.5 22 1 1 717 09 44 44 09 45 34 --- 13 26 45 52.5 333.0 3.5 107.2 50 F 1 718 09 45 02 09 46 03 M81 13 27 14 52.6 332.0 3.5 106.3 22 1 1 718 09 46 03 09 46 53 --- 13 28 04 52.5 332.0 3.5 106.0 50 F 1 720 09 46 21 09 47 21 M82 13 28 32 52.4 332.9 3.5 106.8 22 1 1 720 09 47 21 09 48 11 --- 13 29 22 52.3 332.9 3.5 106.5 50 F 1 722 09 47 39 09 48 40 M81 13 29 51 52.4 331.9 3.6 105.6 22 1 1 722 09 48 40 09 49 30 --- 13 30 41 52.3 331.9 3.6 105.3 50 F 1 723 09 48 58 09 50 00 M81 13 31 11 52.3 331.9 3.6 105.2 25 1 1 723 09 50 00 09 50 50 --- 13 32 01 52.2 331.8 3.6 105.0 50 F 1 725 09 50 18 09 50 50 M82 13 32 01 52.1 332.8 3.6 105.8 -6 1 1 725 09 50 50 09 51 40 --- 13 32 51 52.0 332.8 3.6 105.6 44 F 1 726 09 50 50 09 51 40 M81 13 32 51 52.1 331.8 3.6 104.8 -6 1 1 726 09 51 40 09 52 30 --- 13 33 42 52.1 331.8 3.6 104.6 44 F 1 728 09 51 40 09 52 30 0945+6924 13 33 42 51.1 332.0 3.8 102.2 -8 1 1 728 09 52 30 09 53 20 --- 13 34 32 51.0 331.9 3.8 102.0 42 F 1 730 09 52 30 09 53 20 M81 13 34 32 52.0 331.7 3.6 104.3 -8 1 1 730 09 53 20 09 54 10 --- 13 35 22 51.9 331.7 3.7 104.1 42 F 1 731 09 53 20 09 54 10 0948+6848 13 35 22 51.3 331.1 3.8 101.9 -7 1 1 731 09 54 10 09 55 00 --- 13 36 12 51.3 331.0 3.8 101.7 43 F 1 733 09 54 10 09 55 00 M81 13 36 12 51.8 331.7 3.7 103.9 -7 1 1 733 09 55 00 09 55 50 --- 13 37 02 51.8 331.6 3.7 103.7 43 F 1 734 09 55 00 09 55 50 M82 13 37 02 51.7 332.6 3.7 104.5 -6 1 1 734 09 55 50 09 56 40 --- 13 37 52 51.6 332.6 3.7 104.3 44 F 1 736 09 55 50 09 56 40 M81 13 37 52 51.7 331.6 3.7 103.5 -6 1 1 736 09 56 40 09 57 30 --- 13 38 42 51.6 331.6 3.7 103.2 44 F 1 738 09 56 40 09 57 30 1004+6936 13 38 42 52.3 332.8 3.6 106.4 -7 1 1 738 09 57 30 09 58 20 --- 13 39 33 52.2 332.7 3.6 106.1 43 F 1 739 09 57 30 09 58 20 M81 13 39 33 51.6 331.6 3.7 103.0 -7 1 1 739 09 58 20 09 59 10 --- 13 40 23 51.5 331.5 3.7 102.8 43 F 1 741 09 58 20 Schedule for VLBA_HN (Code Hn ) Page 32 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 09 59 10 M82 13 40 23 51.4 332.5 3.7 103.7 -6 1 1 741 09 59 10 10 00 00 --- 13 41 13 51.3 332.5 3.7 103.4 44 F 1 743 09 59 10 10 00 00 M81 13 41 13 51.4 331.5 3.7 102.6 -6 1 1 743 10 00 00 10 00 50 --- 13 42 03 51.3 331.5 3.8 102.4 44 F 1 744 10 00 00 10 00 50 0945+6924 13 42 03 50.4 331.7 3.9 100.1 -8 1 1 744 10 00 50 10 01 40 --- 13 42 53 50.3 331.7 4.0 99.9 42 F 1 746 10 00 50 10 01 40 M81 13 42 53 51.3 331.5 3.8 102.2 -8 1 1 746 10 01 40 10 02 30 --- 13 43 43 51.2 331.4 3.8 102.0 42 F 1 747 10 01 40 10 02 30 0948+6848 13 43 43 50.6 330.8 3.9 99.8 -7 1 1 747 10 02 30 10 03 20 --- 13 44 33 50.5 330.8 3.9 99.6 43 F 1 749 10 02 30 10 03 20 M81 13 44 33 51.1 331.4 3.8 101.7 -7 1 1 749 10 03 20 10 04 10 --- 13 45 23 51.0 331.4 3.8 101.5 43 F 1 751 10 03 20 10 04 10 M82 13 45 23 50.9 332.3 3.8 102.4 -6 1 1 751 10 04 10 10 05 00 --- 13 46 14 50.9 332.3 3.8 102.1 44 F 1 752 10 04 10 10 05 00 M81 13 46 14 51.0 331.4 3.8 101.3 -6 1 1 752 10 05 00 10 05 50 --- 13 47 04 50.9 331.3 3.8 101.1 44 F 1 754 10 05 00 10 05 50 1004+6936 13 47 04 51.6 332.5 3.7 104.2 -7 1 1 754 10 05 50 10 06 40 --- 13 47 54 51.5 332.4 3.7 103.9 43 F 1 755 10 05 50 10 06 40 M81 13 47 54 50.8 331.3 3.9 100.9 -7 1 1 755 10 06 40 10 07 30 --- 13 48 44 50.7 331.3 3.9 100.7 43 F 1 757 10 06 40 10 07 30 M82 13 48 44 50.7 332.3 3.9 101.5 -6 1 1 757 10 07 30 10 08 20 --- 13 49 34 50.6 332.2 3.9 101.3 44 F 1 759 10 07 30 10 08 20 M81 13 49 34 50.7 331.3 3.9 100.5 -6 1 1 759 10 08 20 10 09 10 --- 13 50 24 50.6 331.2 3.9 100.3 44 F 1 760 10 08 20 10 09 10 0945+6924 13 50 24 49.6 331.5 4.1 98.0 -8 1 1 760 10 09 10 10 10 00 --- 13 51 14 49.6 331.5 4.1 97.8 42 F 1 762 10 09 10 10 10 00 M81 13 51 14 50.5 331.2 3.9 100.0 -8 1 1 762 10 10 00 10 10 50 --- 13 52 05 50.5 331.2 3.9 99.8 42 F 1 763 10 10 00 10 10 50 0948+6848 13 52 05 49.9 330.7 4.1 97.7 -7 1 1 763 10 10 50 10 11 40 --- 13 52 55 49.8 330.6 4.1 97.5 43 F 1 765 10 10 50 Schedule for VLBA_HN (Code Hn ) Page 33 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 10 11 40 M81 13 52 55 50.4 331.2 3.9 99.6 -7 1 1 765 10 11 40 10 12 30 --- 13 53 45 50.3 331.2 4.0 99.4 43 F 1 767 10 11 40 10 12 30 M82 13 53 45 50.2 332.1 4.0 100.2 -6 1 1 767 10 12 30 10 13 20 --- 13 54 35 50.2 332.1 4.0 100.0 44 F 1 768 10 12 30 10 13 20 M81 13 54 35 50.2 331.1 4.0 99.2 -6 1 1 768 10 13 20 10 14 10 --- 13 55 25 50.2 331.1 4.0 99.0 44 F 1 770 10 13 20 10 14 10 1004+6936 13 55 25 50.9 332.2 3.8 102.0 -7 1 1 770 10 14 10 10 15 00 --- 13 56 15 50.8 332.2 3.8 101.8 43 F 1 772 10 14 10 10 15 00 M81 13 56 15 50.1 331.1 4.0 98.8 -7 1 1 772 10 15 00 10 15 50 --- 13 57 05 50.0 331.1 4.0 98.6 43 F 1 773 10 15 00 10 15 54 M81 13 57 10 50.0 331.1 4.0 98.6 0 1 1 773 10 15 50 10 16 54 --- 13 58 10 49.9 331.1 4.0 98.3 60 F 1 775 10 15 50 10 17 01 M82 13 58 17 49.8 332.0 4.0 99.1 1 1 1 775 10 16 54 10 17 31 --- 13 58 47 49.8 332.0 4.0 99.0 30 F 1 776 10 16 54 10 17 38 M81 13 58 54 49.9 331.1 4.0 98.1 1 1 1 776 10 17 31 10 18 08 --- 13 59 24 49.8 331.0 4.1 98.0 30 F 1 778 10 17 31 10 18 15 M82 13 59 31 49.7 332.0 4.0 98.8 1 1 1 778 10 18 08 10 18 45 --- 14 00 01 49.7 332.0 4.1 98.6 30 F 1 779 10 18 08 10 18 52 M81 14 00 08 49.7 331.0 4.1 97.8 1 1 1 779 10 18 45 10 19 22 --- 14 00 38 49.7 331.0 4.1 97.7 30 F 1 780 10 18 45 10 19 29 M82 14 00 45 49.6 332.0 4.1 98.5 1 1 1 780 10 19 22 10 19 59 --- 14 01 15 49.6 332.0 4.1 98.3 30 F 1 781 10 19 22 10 20 06 M81 14 01 22 49.6 331.0 4.1 97.5 1 1 1 781 10 19 59 10 20 36 --- 14 01 53 49.6 331.0 4.1 97.4 30 F 1 782 10 19 59 10 20 43 M82 14 02 00 49.5 331.9 4.1 98.2 1 1 1 782 10 20 36 10 21 13 --- 14 02 30 49.5 331.9 4.1 98.0 30 F 1 784 10 20 36 10 21 20 M81 14 02 37 49.5 331.0 4.1 97.2 1 1 1 784 10 21 13 10 21 50 --- 14 03 07 49.5 331.0 4.1 97.1 30 F 1 785 10 21 13 10 21 57 M82 14 03 14 49.4 331.9 4.1 97.8 1 1 1 785 10 21 50 10 22 27 --- 14 03 44 49.4 331.9 4.1 97.7 30 F 1 786 10 21 50 Schedule for VLBA_HN (Code Hn ) Page 34 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 10 22 34 M81 14 03 51 49.4 331.0 4.1 96.9 1 1 1 786 10 22 27 10 23 04 --- 14 04 21 49.4 331.0 4.1 96.8 30 F 1 787 10 22 27 10 23 11 M82 14 04 28 49.3 331.9 4.1 97.5 1 1 1 787 10 23 04 10 23 41 --- 14 04 58 49.3 331.9 4.1 97.4 30 F 1 788 10 23 04 10 23 48 M81 14 05 05 49.3 330.9 4.1 96.6 1 1 1 788 10 23 41 10 24 18 --- 14 05 35 49.3 330.9 4.2 96.5 30 F 1 790 10 23 41 10 24 25 M82 14 05 42 49.2 331.9 4.2 97.2 1 1 1 790 10 24 18 10 24 55 --- 14 06 12 49.2 331.9 4.2 97.1 30 F 1 791 10 24 18 10 25 02 M81 14 06 19 49.2 330.9 4.2 96.3 1 1 1 791 10 24 55 10 25 32 --- 14 06 49 49.1 330.9 4.2 96.2 30 F 1 792 10 24 55 10 25 39 M82 14 06 56 49.1 331.9 4.2 96.9 1 1 1 792 10 25 32 10 26 09 --- 14 07 26 49.1 331.9 4.2 96.8 30 F 1 793 10 25 32 10 26 16 M81 14 07 34 49.1 330.9 4.2 96.0 1 1 1 793 10 26 09 10 26 46 --- 14 08 04 49.0 330.9 4.2 95.9 30 F 1 794 10 26 09 10 26 53 M82 14 08 11 49.0 331.8 4.2 96.6 1 1 1 794 10 26 46 10 27 23 --- 14 08 41 48.9 331.8 4.2 96.5 30 F 1 796 10 26 46 10 27 30 M81 14 08 48 49.0 330.9 4.2 95.7 1 1 1 796 10 27 23 10 28 00 --- 14 09 18 48.9 330.9 4.2 95.6 30 F 1 797 10 27 23 10 28 30 M81 14 09 48 48.9 330.9 4.2 95.4 25 1 1 797 10 28 30 10 29 20 --- 14 10 38 48.8 330.9 4.2 95.2 50 F 1 798 10 28 48 10 29 20 M82 14 10 38 48.8 331.8 4.2 96.0 -6 1 1 798 10 29 20 10 30 10 --- 14 11 28 48.7 331.8 4.2 95.8 44 F 1 800 10 29 20 10 30 10 M81 14 11 28 48.7 330.9 4.3 95.0 -6 1 1 800 10 30 10 10 31 00 --- 14 12 18 48.7 330.9 4.3 94.8 44 F 1 802 10 30 10 10 31 00 0945+6924 14 12 18 47.7 331.3 4.4 92.7 -8 1 1 802 10 31 00 10 31 50 --- 14 13 08 47.6 331.3 4.5 92.5 42 F 1 803 10 31 00 10 31 50 M81 14 13 08 48.6 330.8 4.3 94.6 -8 1 1 803 10 31 50 10 32 40 --- 14 13 59 48.5 330.8 4.3 94.4 42 F 1 805 10 31 50 10 32 40 0948+6848 14 13 59 47.9 330.4 4.4 92.4 -7 1 1 805 10 32 40 10 33 30 --- 14 14 49 47.8 330.4 4.4 92.2 43 F 1 806 10 32 40 Schedule for VLBA_HN (Code Hn ) Page 35 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 10 33 30 M81 14 14 49 48.4 330.8 4.3 94.2 -7 1 1 806 10 33 30 10 34 20 --- 14 15 39 48.4 330.8 4.3 94.0 43 F 1 808 10 33 30 10 34 20 M82 14 15 39 48.3 331.7 4.3 94.8 -6 1 1 808 10 34 20 10 35 10 --- 14 16 29 48.3 331.7 4.3 94.6 44 F 1 810 10 34 20 10 35 10 M81 14 16 29 48.3 330.8 4.3 93.8 -6 1 1 810 10 35 10 10 36 00 --- 14 17 19 48.2 330.8 4.4 93.6 44 F 1 811 10 35 10 10 36 00 1004+6936 14 17 19 49.0 331.7 4.2 96.5 -8 1 1 811 10 36 00 10 36 50 --- 14 18 09 48.9 331.7 4.2 96.3 42 F 1 813 10 36 00 10 36 50 M81 14 18 09 48.1 330.8 4.4 93.4 -8 1 1 813 10 36 50 10 37 40 --- 14 18 59 48.1 330.8 4.4 93.2 42 F 1 814 10 36 50 10 37 40 M82 14 18 59 48.1 331.7 4.4 94.0 -6 1 1 814 10 37 40 10 38 30 --- 14 19 50 48.0 331.7 4.4 93.8 44 F 1 816 10 37 40 10 38 30 M81 14 19 50 48.0 330.8 4.4 93.0 -6 1 1 816 10 38 30 10 39 20 --- 14 20 40 47.9 330.8 4.4 92.8 44 F 1 818 10 38 30 10 39 20 0945+6924 14 20 40 47.0 331.2 4.6 90.7 -8 1 1 818 10 39 20 10 40 10 --- 14 21 30 46.9 331.2 4.6 90.5 42 F 1 819 10 39 20 10 40 10 M81 14 21 30 47.8 330.8 4.4 92.6 -8 1 1 819 10 40 10 10 41 00 --- 14 22 20 47.8 330.8 4.4 92.4 42 F 1 821 10 40 10 10 41 00 0948+6848 14 22 20 47.1 330.4 4.6 90.5 -7 1 1 821 10 41 00 10 41 50 --- 14 23 10 47.1 330.4 4.6 90.3 43 F 1 823 10 41 00 10 41 50 M81 14 23 10 47.7 330.8 4.4 92.2 -7 1 1 823 10 41 50 10 42 40 --- 14 24 00 47.6 330.8 4.5 92.0 43 F 1 824 10 41 50 10 42 40 M82 14 24 00 47.6 331.7 4.5 92.8 -6 1 1 824 10 42 40 10 43 30 --- 14 24 50 47.5 331.7 4.5 92.6 44 F 1 826 10 42 40 10 43 30 M81 14 24 50 47.5 330.8 4.5 91.8 -6 1 1 826 10 43 30 10 44 20 --- 14 25 41 47.5 330.8 4.5 91.6 44 F 1 827 10 43 30 10 44 20 1004+6936 14 25 41 48.3 331.6 4.3 94.5 -8 1 1 827 10 44 20 10 45 10 --- 14 26 31 48.2 331.6 4.3 94.3 42 F 1 829 10 44 20 10 45 10 M81 14 26 31 47.4 330.7 4.5 91.4 -8 1 1 829 10 45 10 10 46 00 --- 14 27 21 47.3 330.7 4.5 91.2 42 F 1 831 10 45 10 Schedule for VLBA_HN (Code Hn ) Page 36 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 10 46 00 M82 14 27 21 47.3 331.7 4.5 92.0 -6 1 1 831 10 46 00 10 46 50 --- 14 28 11 47.3 331.6 4.5 91.8 44 F 1 832 10 46 00 10 46 50 M81 14 28 11 47.2 330.7 4.5 91.0 -6 1 1 832 10 46 50 10 47 40 --- 14 29 01 47.2 330.7 4.5 90.9 44 F 1 834 10 46 50 10 47 40 0945+6924 14 29 01 46.2 331.2 4.7 88.8 -8 1 1 834 10 47 40 10 48 30 --- 14 29 51 46.2 331.3 4.7 88.6 42 F 1 835 10 47 40 10 48 30 M81 14 29 51 47.1 330.7 4.6 90.7 -8 1 1 835 10 48 30 10 49 20 --- 14 30 41 47.0 330.7 4.6 90.5 42 F 1 837 10 48 30 10 49 20 0948+6848 14 30 41 46.4 330.4 4.7 88.5 -7 1 1 837 10 49 20 10 50 10 --- 14 31 32 46.3 330.4 4.7 88.3 43 F 1 839 10 49 20 10 50 10 M81 14 31 32 46.9 330.7 4.6 90.3 -7 1 1 839 10 50 10 10 51 00 --- 14 32 22 46.9 330.7 4.6 90.1 43 F 1 840 10 50 10 10 51 00 M82 14 32 22 46.9 331.6 4.6 90.8 -6 1 1 840 10 51 00 10 51 50 --- 14 33 12 46.8 331.6 4.6 90.6 44 F 1 842 10 51 00 10 51 50 M81 14 33 12 46.8 330.7 4.6 89.9 -6 1 1 842 10 51 50 10 52 40 --- 14 34 02 46.7 330.7 4.6 89.7 44 F 1 843 10 51 50 10 52 40 1004+6936 14 34 02 47.5 331.5 4.5 92.5 -8 1 1 843 10 52 40 10 53 30 --- 14 34 52 47.5 331.5 4.5 92.3 42 F 1 845 10 52 40 10 53 30 M81 14 34 52 46.6 330.7 4.6 89.5 -8 1 1 845 10 53 30 10 54 20 --- 14 35 42 46.6 330.7 4.7 89.3 42 F 1 847 10 53 30 10 54 42 M81 14 36 04 46.5 330.7 4.7 89.2 17 1 1 847 10 54 42 10 55 42 --- 14 37 04 46.4 330.7 4.7 89.0 60 F 1 849 10 55 00 10 56 10 M82 14 37 32 46.4 331.6 4.7 89.6 22 1 1 849 10 56 10 10 57 00 --- 14 38 22 46.4 331.6 4.7 89.4 50 F 1 850 10 56 28 10 57 28 M81 14 38 51 46.3 330.7 4.7 88.6 22 1 1 850 10 57 28 10 58 18 --- 14 39 41 46.2 330.8 4.7 88.4 50 F 1 852 10 57 46 10 58 47 M82 14 40 09 46.2 331.6 4.7 89.0 22 1 1 852 10 58 47 10 59 37 --- 14 41 00 46.1 331.6 4.7 88.8 50 F 1 853 10 59 05 11 00 05 M81 14 41 28 46.1 330.8 4.8 88.0 22 1 1 853 11 00 05 11 00 55 --- 14 42 18 46.0 330.8 4.8 87.8 50 F 1 855 11 00 23 Schedule for VLBA_HN (Code Hn ) Page 37 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 11 02 55 J1048+7143 14 44 18 50.0 335.3 3.9 103.1 106 1 1 855 11 02 55 11 05 55 =1044+719 14 47 19 49.7 335.2 4.0 102.3 180 F 1 861 11 03 13 11 06 25 M81 14 47 49 45.5 330.8 4.9 86.5 15 1 1 861 11 06 25 11 07 15 --- 14 48 39 45.4 330.8 4.9 86.3 50 F 1 863 11 06 43 11 07 15 M82 14 48 39 45.5 331.7 4.9 87.0 -6 1 1 863 11 07 15 11 08 05 --- 14 49 29 45.4 331.7 4.9 86.8 44 F 1 864 11 07 15 11 08 05 M81 14 49 29 45.3 330.8 4.9 86.1 -6 1 1 864 11 08 05 11 08 55 --- 14 50 19 45.3 330.8 4.9 85.9 44 F 1 866 11 08 05 11 08 55 0945+6924 14 50 19 44.4 331.4 5.1 83.9 -8 1 1 866 11 08 55 11 09 45 --- 14 51 10 44.3 331.4 5.1 83.7 42 F 1 867 11 08 55 11 09 45 M81 14 51 10 45.2 330.8 4.9 85.7 -8 1 1 867 11 09 45 11 10 35 --- 14 52 00 45.1 330.8 4.9 85.6 42 F 1 869 11 09 45 11 10 35 0948+6848 14 52 00 44.4 330.6 5.0 83.7 -7 1 1 869 11 10 35 11 11 25 --- 14 52 50 44.4 330.6 5.1 83.5 43 F 1 871 11 10 35 11 11 25 M81 14 52 50 45.0 330.8 4.9 85.4 -7 1 1 871 11 11 25 11 12 15 --- 14 53 40 45.0 330.9 5.0 85.2 43 F 1 872 11 11 25 11 12 15 M82 14 53 40 45.0 331.7 5.0 85.9 -6 1 1 872 11 12 15 11 13 05 --- 14 54 30 45.0 331.7 5.0 85.7 44 F 1 874 11 12 15 11 13 05 M81 14 54 30 44.9 330.9 5.0 85.0 -6 1 1 874 11 13 05 11 13 55 --- 14 55 20 44.8 330.9 5.0 84.8 44 F 1 875 11 13 05 11 13 55 1004+6936 14 55 20 45.7 331.6 4.8 87.5 -8 1 1 875 11 13 55 11 14 45 --- 14 56 10 45.6 331.6 4.8 87.3 42 F 1 877 11 13 55 11 14 45 M81 14 56 10 44.7 330.9 5.0 84.6 -8 1 1 877 11 14 45 11 15 35 --- 14 57 01 44.7 330.9 5.0 84.4 42 F 1 879 11 14 45 11 15 35 M82 14 57 01 44.8 331.7 5.0 85.1 -6 1 1 879 11 15 35 11 16 25 --- 14 57 51 44.7 331.8 5.0 84.9 44 F 1 880 11 15 35 11 16 25 M81 14 57 51 44.6 330.9 5.0 84.2 -6 1 1 880 11 16 25 11 17 15 --- 14 58 41 44.5 330.9 5.0 84.0 44 F 1 882 11 16 25 11 17 15 0945+6924 14 58 41 43.6 331.5 5.2 82.0 -8 1 1 882 11 17 15 11 18 05 --- 14 59 31 43.6 331.6 5.2 81.8 42 F 1 883 11 17 15 Schedule for VLBA_HN (Code Hn ) Page 38 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC -----------------------------