COVER INFORMATION Station: VLBA_BR (Code Br ) Experiment: Measuring the orbits of M81 and M82 Exp. Code: BB229B Schedule Version: 3.00 Processed by SCHED version: 6.05 June 2006 PI: Andreas Brunthaler Address: MPIfR Auf dem Huegel 69 53121 Bonn, Germany Phone: +49 228 525377 EMAIL: brunthal@mpifr-bonn.mpg.de Fax: +49 228 525229 Phone during observation: +49 228 525377 Observing mode: VLBA+GBT+Y27+EF 256-8-2 1.3cm Notes: Schedule for VLBA_BR (Code Br ) Page 2 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- Next scan frequencies: 22010.49 22022.99 22047.99 22110.49 22272.99 22322.99 22422.99 22447.99 Next BBC frequencies: 510.49 522.99 547.99 610.49 772.99 822.99 922.99 947.99 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 02 00 00 0825+030 02 29 07 2.8 88.4 -6.0 H -41.9 0 1 1 0 02 00 00 02 01 30 --- 02 30 37 3.1 88.7 -5.9 H -41.9 0 F 1 3 02 00 18 02 05 41 0050-092 02 34 49 28.0 209.3 1.7 19.3 165 1 1 3 02 05 41 02 07 11 --- 02 36 19 27.9 209.7 1.8 19.6 90 F 1 6 02 05 59 02 08 26 0121+042 02 37 35 43.4 206.3 1.3 17.2 39 1 1 6 02 08 26 02 09 56 --- 02 39 05 43.3 206.8 1.3 17.5 90 F 1 9 02 08 44 02 11 04 0203+113 02 40 12 52.7 194.7 0.6 9.9 42 1 1 9 02 11 04 02 12 34 --- 02 41 43 52.6 195.3 0.6 10.3 90 F 1 12 02 11 22 02 13 11 0204+151 02 42 20 56.3 196.3 0.6 11.2 24 1 1 12 02 13 11 02 14 41 --- 02 43 50 56.2 196.9 0.6 11.6 90 F 1 15 02 13 29 02 15 30 0238+163 02 44 40 58.5 182.6 0.1 1.8 34 1 1 15 02 15 30 02 17 00 --- 02 46 10 58.5 183.3 0.1 2.3 90 F 1 17 02 15 48 02 19 52 0530+133 02 49 03 41.8 121.9 -2.7 -35.7 125 1 1 17 02 19 52 02 21 22 --- 02 50 33 42.1 122.3 -2.7 -35.5 90 F 1 20 02 20 10 02 24 55 0555+394 02 54 06 56.7 87.2 -3.0 -60.2 177 1 1 20 02 24 55 02 26 25 --- 02 55 37 57.0 87.5 -3.0 -60.2 90 F 1 23 02 25 13 02 28 05 0646+445 02 57 17 51.2 72.7 -3.8 -64.0 83 1 1 23 02 28 05 02 29 35 --- 02 58 47 51.5 72.8 -3.8 -64.1 90 F 1 26 02 28 23 02 32 11 0726+791 03 01 23 51.4 16.0 -4.4 -101.2 112 1 1 26 02 32 11 02 33 41 --- 03 02 54 51.5 16.0 -4.4 -101.6 90 F 1 29 02 32 29 02 36 57 0808+405 03 06 10 37.6 67.8 -5.1 -54.8 155 1 1 29 02 36 57 02 38 27 --- 03 07 40 37.9 68.0 -5.0 -54.9 90 F 1 32 02 37 15 02 40 18 0854+200 03 09 31 17.1 78.8 -5.8 -44.2 64 1 1 32 02 40 18 02 41 48 --- 03 11 02 17.4 79.1 -5.7 -44.2 90 F 1 35 02 40 36 Schedule for VLBA_BR (Code Br ) Page 3 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 02 43 22 0927+390 03 12 37 25.8 59.4 -6.2 -47.7 72 1 1 35 02 43 22 02 44 52 --- 03 14 07 26.0 59.7 -6.2 -47.8 90 F 1 38 02 43 40 Next scan frequencies: 22198.17 22198.17 22206.15 22206.15 22214.13 22214.13 22222.12 22222.12 Next BBC frequencies: 698.17 698.17 706.15 706.15 714.13 714.13 722.12 722.12 02 45 36 M81 03 14 51 40.7 27.7 -6.7 -60.0 9 1 1 38 02 45 36 02 46 36 --- 03 15 51 40.8 27.7 -6.7 -60.2 60 F 1 40 02 45 54 02 46 43 M82 03 15 58 41.1 27.0 -6.7 -60.7 1 1 1 40 02 46 36 02 47 13 --- 03 16 28 41.1 27.0 -6.7 -60.8 30 F 1 41 02 46 36 02 47 20 M81 03 16 34 40.9 27.8 -6.7 -60.4 1 1 1 41 02 47 13 02 47 50 --- 03 17 05 40.9 27.8 -6.7 -60.5 30 F 1 42 02 47 13 02 47 56 M82 03 17 11 41.2 27.1 -6.7 -60.9 1 1 1 42 02 47 50 02 48 26 --- 03 17 41 41.2 27.1 -6.6 -61.0 30 F 1 43 02 47 50 02 48 33 M81 03 17 48 41.0 27.9 -6.6 -60.6 1 1 1 43 02 48 26 02 49 03 --- 03 18 18 41.0 27.9 -6.6 -60.7 30 F 1 44 02 48 26 02 49 10 M82 03 18 25 41.3 27.2 -6.6 -61.1 1 1 1 44 02 49 03 02 49 40 --- 03 18 55 41.3 27.2 -6.6 -61.2 30 F 1 46 02 49 03 02 49 46 M81 03 19 01 41.1 27.9 -6.6 -60.9 1 1 1 46 02 49 40 02 50 16 --- 03 19 32 41.1 28.0 -6.6 -61.0 30 F 1 47 02 49 40 02 50 23 M82 03 19 38 41.4 27.2 -6.6 -61.4 1 1 1 47 02 50 16 02 50 53 --- 03 20 08 41.4 27.3 -6.6 -61.5 30 F 1 48 02 50 16 02 51 00 M81 03 20 15 41.1 28.0 -6.6 -61.1 1 1 1 48 02 50 53 02 51 30 --- 03 20 45 41.2 28.0 -6.6 -61.2 30 F 1 49 02 50 53 02 51 36 M82 03 20 52 41.5 27.3 -6.6 -61.6 1 1 1 49 02 51 30 02 52 06 --- 03 21 22 41.5 27.3 -6.6 -61.7 30 F 1 50 02 51 30 02 52 13 M81 03 21 28 41.2 28.1 -6.6 -61.3 1 1 1 50 02 52 06 02 52 43 --- 03 21 59 41.3 28.1 -6.6 -61.4 30 F 1 51 02 52 06 02 52 49 M82 03 22 05 41.6 27.4 -6.6 -61.9 1 1 1 51 02 52 43 02 53 19 --- 03 22 35 41.6 27.4 -6.6 -62.0 30 F 1 53 02 52 43 Schedule for VLBA_BR (Code Br ) Page 4 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 02 53 26 M81 03 22 42 41.3 28.1 -6.6 -61.6 1 1 1 53 02 53 19 02 53 56 --- 03 23 12 41.4 28.2 -6.6 -61.7 30 F 1 54 02 53 19 02 54 03 M82 03 23 19 41.7 27.4 -6.6 -62.1 1 1 1 54 02 53 56 02 54 33 --- 03 23 49 41.7 27.5 -6.5 -62.2 30 F 1 55 02 53 56 02 54 39 M81 03 23 55 41.4 28.2 -6.5 -61.8 1 1 1 55 02 54 33 02 55 09 --- 03 24 25 41.5 28.2 -6.5 -61.9 30 F 1 56 02 54 33 02 55 16 M82 03 24 32 41.7 27.5 -6.5 -62.4 1 1 1 56 02 55 09 02 55 46 --- 03 25 02 41.8 27.5 -6.5 -62.5 30 F 1 57 02 55 09 02 55 53 M81 03 25 09 41.5 28.3 -6.5 -62.1 1 1 1 57 02 55 46 02 56 23 --- 03 25 39 41.6 28.3 -6.5 -62.2 30 F 1 59 02 55 46 02 56 29 M82 03 25 46 41.8 27.6 -6.5 -62.6 1 1 1 59 02 56 23 02 56 59 --- 03 26 16 41.9 27.6 -6.5 -62.7 30 F 1 60 02 56 23 02 57 06 M81 03 26 22 41.6 28.3 -6.5 -62.3 1 1 1 60 02 56 59 02 57 36 --- 03 26 52 41.7 28.4 -6.5 -62.4 30 F 1 61 02 56 59 02 57 42 M82 03 26 59 41.9 27.6 -6.5 -62.8 1 1 1 61 02 57 36 02 58 12 --- 03 27 29 42.0 27.7 -6.5 -62.9 30 F 1 62 02 57 36 02 58 19 M81 03 27 36 41.7 28.4 -6.5 -62.5 1 1 1 62 02 58 12 02 58 49 --- 03 28 06 41.8 28.4 -6.5 -62.6 30 F 1 63 02 58 12 02 58 56 M82 03 28 12 42.0 27.7 -6.5 -63.1 1 1 1 63 02 58 49 02 59 26 --- 03 28 43 42.1 27.7 -6.5 -63.2 30 F 1 64 02 58 49 02 59 32 M81 03 28 49 41.8 28.5 -6.5 -62.8 1 1 1 64 02 59 26 03 00 02 --- 03 29 19 41.9 28.5 -6.4 -62.9 30 F 1 66 02 59 26 03 01 33 M81 03 30 50 42.0 28.6 -6.4 -63.2 85 1 1 66 03 01 33 03 02 23 --- 03 31 40 42.1 28.6 -6.4 -63.3 50 F 1 67 03 01 51 03 02 23 M82 03 31 40 42.3 27.9 -6.4 -63.8 -6 1 1 67 03 02 23 03 03 13 --- 03 32 30 42.4 27.9 -6.4 -63.9 44 F 1 69 03 02 23 03 03 13 M81 03 32 30 42.1 28.7 -6.4 -63.5 -6 1 1 69 03 03 13 03 04 03 --- 03 33 20 42.2 28.7 -6.4 -63.7 44 F 1 71 03 03 13 03 04 03 0945+6924 03 33 20 43.2 28.8 -6.2 -66.1 -8 1 1 71 03 04 03 03 04 53 --- 03 34 10 43.2 28.9 -6.2 -66.2 42 F 1 72 03 04 03 Schedule for VLBA_BR (Code Br ) Page 5 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 03 04 53 M81 03 34 10 42.3 28.8 -6.4 -63.8 -8 1 1 72 03 04 53 03 05 43 --- 03 35 00 42.3 28.8 -6.4 -64.0 42 F 1 74 03 04 53 03 05 43 0948+6848 03 35 00 42.8 29.5 -6.2 -65.2 -7 1 1 74 03 05 43 03 06 33 --- 03 35 51 42.9 29.5 -6.2 -65.4 43 F 1 75 03 05 43 03 06 33 M81 03 35 51 42.4 28.9 -6.3 -64.2 -7 1 1 75 03 06 33 03 07 23 --- 03 36 41 42.5 28.9 -6.3 -64.3 43 F 1 77 03 06 33 03 07 23 M82 03 36 41 42.7 28.1 -6.3 -64.8 -6 1 1 77 03 07 23 03 08 13 --- 03 37 31 42.8 28.2 -6.3 -64.9 44 F 1 79 03 07 23 03 08 13 M81 03 37 31 42.5 28.9 -6.3 -64.5 -6 1 1 79 03 08 13 03 09 03 --- 03 38 21 42.6 29.0 -6.3 -64.7 44 F 1 80 03 08 13 03 09 03 1004+6936 03 38 21 42.1 27.8 -6.5 -63.3 -7 1 1 80 03 09 03 03 09 53 --- 03 39 11 42.2 27.9 -6.4 -63.4 43 F 1 82 03 09 03 03 09 53 M81 03 39 11 42.7 29.0 -6.3 -64.8 -7 1 1 82 03 09 53 03 10 43 --- 03 40 01 42.7 29.1 -6.3 -65.0 43 F 1 83 03 09 53 03 10 43 M82 03 40 01 43.0 28.3 -6.3 -65.4 -6 1 1 83 03 10 43 03 11 33 --- 03 40 51 43.0 28.3 -6.3 -65.6 44 F 1 85 03 10 43 03 11 33 M81 03 40 51 42.8 29.1 -6.3 -65.2 -6 1 1 85 03 11 33 03 12 23 --- 03 41 42 42.9 29.2 -6.2 -65.3 44 F 1 87 03 11 33 03 12 23 0945+6924 03 41 42 43.9 29.2 -6.1 -67.7 -8 1 1 87 03 12 23 03 13 13 --- 03 42 32 43.9 29.3 -6.1 -67.9 42 F 1 88 03 12 23 03 13 13 M81 03 42 32 42.9 29.2 -6.2 -65.5 -8 1 1 88 03 13 13 03 14 03 --- 03 43 22 43.0 29.2 -6.2 -65.7 42 F 1 90 03 13 13 03 14 03 0948+6848 03 43 22 43.5 29.9 -6.1 -66.9 -7 1 1 90 03 14 03 03 14 53 --- 03 44 12 43.6 30.0 -6.1 -67.0 43 F 1 91 03 14 03 03 14 53 M81 03 44 12 43.1 29.3 -6.2 -65.8 -7 1 1 91 03 14 53 03 15 43 --- 03 45 02 43.1 29.3 -6.2 -66.0 43 F 1 93 03 14 53 03 15 43 M82 03 45 02 43.4 28.5 -6.2 -66.5 -6 1 1 93 03 15 43 03 16 33 --- 03 45 52 43.4 28.6 -6.2 -66.6 44 F 1 95 03 15 43 03 16 33 M81 03 45 52 43.2 29.4 -6.2 -66.2 -6 1 1 95 03 16 33 03 17 23 --- 03 46 42 43.3 29.4 -6.2 -66.3 44 F 1 96 03 16 33 Schedule for VLBA_BR (Code Br ) Page 6 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 03 17 23 1004+6936 03 46 42 42.7 28.3 -6.3 -64.9 -7 1 1 96 03 17 23 03 18 13 --- 03 47 33 42.8 28.3 -6.3 -65.1 43 F 1 98 03 17 23 03 18 13 M81 03 47 33 43.3 29.5 -6.1 -66.5 -7 1 1 98 03 18 13 03 19 03 --- 03 48 23 43.4 29.5 -6.1 -66.7 43 F 1 100 03 18 13 03 19 03 M82 03 48 23 43.6 28.7 -6.1 -67.1 -6 1 1 100 03 19 03 03 19 53 --- 03 49 13 43.7 28.7 -6.1 -67.3 44 F 1 101 03 19 03 03 19 53 M81 03 49 13 43.5 29.5 -6.1 -66.8 -6 1 1 101 03 19 53 03 20 43 --- 03 50 03 43.5 29.6 -6.1 -67.0 44 F 1 103 03 19 53 03 20 43 0945+6924 03 50 03 44.5 29.6 -5.9 -69.4 -8 1 1 103 03 20 43 03 21 33 --- 03 50 53 44.6 29.6 -5.9 -69.6 42 F 1 104 03 20 43 03 21 33 M81 03 50 53 43.6 29.6 -6.1 -67.2 -8 1 1 104 03 21 33 03 22 23 --- 03 51 43 43.7 29.7 -6.1 -67.3 42 F 1 106 03 21 33 03 22 23 0948+6848 03 51 43 44.2 30.3 -6.0 -68.5 -7 1 1 106 03 22 23 03 23 13 --- 03 52 33 44.3 30.4 -5.9 -68.7 43 F 1 108 03 22 23 03 23 13 M81 03 52 33 43.8 29.7 -6.1 -67.5 -7 1 1 108 03 23 13 03 24 03 --- 03 53 24 43.8 29.7 -6.0 -67.7 43 F 1 109 03 23 13 03 24 03 M82 03 53 24 44.0 28.9 -6.1 -68.1 -6 1 1 109 03 24 03 03 24 53 --- 03 54 14 44.1 29.0 -6.0 -68.3 44 F 1 111 03 24 03 03 24 53 M81 03 54 14 43.9 29.8 -6.0 -67.8 -6 1 1 111 03 24 53 03 25 43 --- 03 55 04 44.0 29.8 -6.0 -68.0 44 F 1 112 03 24 53 03 25 43 1004+6936 03 55 04 43.4 28.7 -6.2 -66.6 -7 1 1 112 03 25 43 03 26 33 --- 03 55 54 43.5 28.7 -6.2 -66.8 43 F 1 114 03 25 43 03 26 33 M81 03 55 54 44.0 29.9 -6.0 -68.2 -7 1 1 114 03 26 33 03 27 23 --- 03 56 44 44.1 29.9 -6.0 -68.3 43 F 1 116 03 26 33 03 27 44 M81 03 57 06 44.1 29.9 -6.0 -68.4 17 1 1 116 03 27 44 03 28 34 --- 03 57 56 44.2 29.9 -6.0 -68.6 50 F 1 117 03 28 02 03 29 02 M82 03 58 24 44.4 29.1 -6.0 -69.2 22 1 1 117 03 29 02 03 29 52 --- 03 59 14 44.5 29.2 -6.0 -69.3 50 F 1 119 03 29 20 03 30 21 M81 03 59 43 44.3 30.0 -5.9 -68.9 22 1 1 119 03 30 21 03 31 11 --- 04 00 33 44.4 30.1 -5.9 -69.1 50 F 1 121 03 30 39 Schedule for VLBA_BR (Code Br ) Page 7 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 03 31 39 M82 04 01 01 44.6 29.3 -5.9 -69.7 22 1 1 121 03 31 39 03 32 29 --- 04 01 51 44.7 29.3 -5.9 -69.9 50 F 1 122 03 31 57 03 32 57 M81 04 02 19 44.6 30.1 -5.9 -69.5 22 1 1 122 03 32 57 03 33 47 --- 04 03 10 44.6 30.2 -5.9 -69.6 50 F 1 124 03 33 15 03 35 47 J1048+7143 04 05 10 41.8 24.5 -6.7 -61.6 108 1 1 124 03 35 47 03 38 47 =1044+719 04 08 10 42.0 24.6 -6.7 -62.2 180 F 1 130 03 36 05 03 39 17 M81 04 08 41 45.1 30.4 -5.8 -70.8 18 1 1 130 03 39 17 03 40 07 --- 04 09 31 45.2 30.4 -5.8 -70.9 50 F 1 131 03 39 35 03 40 07 M82 04 09 31 45.3 29.6 -5.8 -71.4 -6 1 1 131 03 40 07 03 40 57 --- 04 10 21 45.4 29.6 -5.8 -71.6 44 F 1 133 03 40 07 03 40 57 M81 04 10 21 45.2 30.5 -5.8 -71.1 -6 1 1 133 03 40 57 03 41 47 --- 04 11 11 45.3 30.5 -5.8 -71.3 44 F 1 134 03 40 57 03 41 47 0945+6924 04 11 11 46.3 30.4 -5.6 -73.8 -8 1 1 134 03 41 47 03 42 37 --- 04 12 01 46.4 30.5 -5.6 -74.0 42 F 1 136 03 41 47 03 42 37 M81 04 12 01 45.4 30.6 -5.7 -71.4 -8 1 1 136 03 42 37 03 43 27 --- 04 12 51 45.5 30.6 -5.7 -71.6 42 F 1 138 03 42 37 03 43 27 0948+6848 04 12 51 46.0 31.2 -5.6 -72.8 -7 1 1 138 03 43 27 03 44 17 --- 04 13 41 46.1 31.2 -5.6 -73.0 43 F 1 139 03 43 27 03 44 17 M81 04 13 41 45.5 30.6 -5.7 -71.8 -7 1 1 139 03 44 17 03 45 07 --- 04 14 31 45.6 30.7 -5.7 -72.0 43 F 1 141 03 44 17 03 45 07 M82 04 14 31 45.8 29.8 -5.7 -72.5 -6 1 1 141 03 45 07 03 45 57 --- 04 15 22 45.8 29.8 -5.7 -72.7 44 F 1 142 03 45 07 03 45 57 M81 04 15 22 45.7 30.7 -5.7 -72.1 -6 1 1 142 03 45 57 03 46 47 --- 04 16 12 45.7 30.7 -5.7 -72.3 44 F 1 144 03 45 57 03 46 47 1004+6936 04 16 12 45.1 29.6 -5.8 -70.9 -7 1 1 144 03 46 47 03 47 37 --- 04 17 02 45.2 29.7 -5.8 -71.1 43 F 1 146 03 46 47 03 47 37 M81 04 17 02 45.8 30.8 -5.7 -72.5 -7 1 1 146 03 47 37 03 48 27 --- 04 17 52 45.9 30.8 -5.6 -72.6 43 F 1 147 03 47 37 03 48 27 M82 04 17 52 46.0 29.9 -5.6 -73.2 -6 1 1 147 03 48 27 03 49 17 --- 04 18 42 46.1 30.0 -5.6 -73.4 44 F 1 149 03 48 27 Schedule for VLBA_BR (Code Br ) Page 8 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 03 49 17 M81 04 18 42 46.0 30.8 -5.6 -72.8 -6 1 1 149 03 49 17 03 50 07 --- 04 19 32 46.0 30.8 -5.6 -73.0 44 F 1 151 03 49 17 03 50 07 0945+6924 04 19 32 47.0 30.7 -5.4 -75.5 -8 1 1 151 03 50 07 03 50 57 --- 04 20 22 47.1 30.8 -5.4 -75.7 42 F 1 152 03 50 07 03 50 57 M81 04 20 22 46.1 30.9 -5.6 -73.2 -8 1 1 152 03 50 57 03 51 47 --- 04 21 13 46.2 30.9 -5.6 -73.3 42 F 1 154 03 50 57 03 51 47 0948+6848 04 21 13 46.7 31.5 -5.5 -74.6 -7 1 1 154 03 51 47 03 52 37 --- 04 22 03 46.8 31.6 -5.4 -74.7 43 F 1 155 03 51 47 03 52 37 M81 04 22 03 46.2 30.9 -5.6 -73.5 -7 1 1 155 03 52 37 03 53 27 --- 04 22 53 46.3 31.0 -5.6 -73.7 43 F 1 157 03 52 37 03 53 27 M82 04 22 53 46.5 30.1 -5.6 -74.2 -6 1 1 157 03 53 27 03 54 17 --- 04 23 43 46.5 30.1 -5.5 -74.4 44 F 1 159 03 53 27 03 54 17 M81 04 23 43 46.4 31.0 -5.5 -73.8 -6 1 1 159 03 54 17 03 55 07 --- 04 24 33 46.5 31.0 -5.5 -74.0 44 F 1 160 03 54 17 03 55 07 1004+6936 04 24 33 45.8 29.9 -5.7 -72.6 -7 1 1 160 03 55 07 03 55 57 --- 04 25 23 45.9 30.0 -5.7 -72.8 43 F 1 162 03 55 07 03 55 57 M81 04 25 23 46.5 31.1 -5.5 -74.2 -7 1 1 162 03 55 57 03 56 47 --- 04 26 13 46.6 31.1 -5.5 -74.4 43 F 1 163 03 55 57 03 56 47 M82 04 26 13 46.7 30.2 -5.5 -74.9 -6 1 1 163 03 56 47 03 57 37 --- 04 27 04 46.8 30.2 -5.5 -75.1 44 F 1 165 03 56 47 03 57 37 M81 04 27 04 46.7 31.1 -5.5 -74.5 -6 1 1 165 03 57 37 03 58 27 --- 04 27 54 46.7 31.1 -5.5 -74.7 44 F 1 167 03 57 37 03 58 27 0945+6924 04 27 54 47.7 31.0 -5.3 -77.3 -8 1 1 167 03 58 27 03 59 17 --- 04 28 44 47.8 31.0 -5.3 -77.5 42 F 1 168 03 58 27 03 59 17 M81 04 28 44 46.8 31.2 -5.5 -74.9 -8 1 1 168 03 59 17 04 00 07 --- 04 29 34 46.9 31.2 -5.4 -75.1 42 F 1 170 03 59 17 04 00 07 0948+6848 04 29 34 47.4 31.8 -5.3 -76.3 -7 1 1 170 04 00 07 04 00 57 --- 04 30 24 47.5 31.8 -5.3 -76.5 43 F 1 171 04 00 07 04 00 57 M81 04 30 24 47.0 31.2 -5.4 -75.2 -7 1 1 171 04 00 57 04 01 47 --- 04 31 14 47.0 31.3 -5.4 -75.4 43 F 1 173 04 00 57 Schedule for VLBA_BR (Code Br ) Page 9 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 04 01 47 M82 04 31 14 47.2 30.4 -5.4 -76.0 -6 1 1 173 04 01 47 04 02 37 --- 04 32 04 47.2 30.4 -5.4 -76.2 44 F 1 175 04 01 47 04 02 37 M81 04 32 04 47.1 31.3 -5.4 -75.6 -6 1 1 175 04 02 37 04 03 27 --- 04 32 54 47.2 31.3 -5.4 -75.8 44 F 1 176 04 02 37 04 03 27 1004+6936 04 32 54 46.5 30.2 -5.5 -74.4 -7 1 1 176 04 03 27 04 04 17 --- 04 33 45 46.6 30.3 -5.5 -74.5 43 F 1 178 04 03 27 04 04 17 M81 04 33 45 47.2 31.3 -5.4 -75.9 -7 1 1 178 04 04 17 04 05 07 --- 04 34 35 47.3 31.4 -5.4 -76.1 43 F 1 180 04 04 17 04 05 29 M81 04 34 56 47.4 31.4 -5.4 -76.2 17 1 1 180 04 05 29 04 06 19 --- 04 35 46 47.4 31.4 -5.3 -76.4 50 F 1 181 04 05 47 04 06 47 M82 04 36 15 47.6 30.5 -5.3 -77.0 22 1 1 181 04 06 47 04 07 37 --- 04 37 05 47.6 30.5 -5.3 -77.2 50 F 1 183 04 07 05 04 08 05 M81 04 37 33 47.6 31.5 -5.3 -76.7 22 1 1 183 04 08 05 04 08 55 --- 04 38 23 47.7 31.5 -5.3 -76.9 50 F 1 184 04 08 23 04 09 23 M82 04 38 51 47.8 30.6 -5.3 -77.6 22 1 1 184 04 09 23 04 10 13 --- 04 39 41 47.9 30.6 -5.3 -77.8 50 F 1 186 04 09 41 04 10 41 M81 04 40 09 47.8 31.5 -5.3 -77.3 22 1 1 186 04 10 41 04 11 31 --- 04 40 59 47.9 31.6 -5.3 -77.5 50 F 1 188 04 10 59 04 12 01 M81 04 41 29 47.9 31.6 -5.2 -77.6 25 1 1 188 04 12 01 04 12 51 --- 04 42 20 48.0 31.6 -5.2 -77.8 50 F 1 189 04 12 19 04 12 51 M82 04 42 20 48.1 30.7 -5.2 -78.4 -6 1 1 189 04 12 51 04 13 41 --- 04 43 10 48.2 30.7 -5.2 -78.5 44 F 1 191 04 12 51 04 13 41 M81 04 43 10 48.1 31.6 -5.2 -77.9 -6 1 1 191 04 13 41 04 14 31 --- 04 44 00 48.1 31.6 -5.2 -78.1 44 F 1 192 04 13 41 04 14 31 0945+6924 04 44 00 49.1 31.4 -5.0 -80.8 -8 1 1 192 04 14 31 04 15 21 --- 04 44 50 49.2 31.4 -5.0 -80.9 42 F 1 194 04 14 31 04 15 21 M81 04 44 50 48.2 31.7 -5.2 -78.3 -8 1 1 194 04 15 21 04 16 11 --- 04 45 40 48.3 31.7 -5.2 -78.5 42 F 1 196 04 15 21 04 16 11 0948+6848 04 45 40 48.9 32.3 -5.1 -79.7 -7 1 1 196 04 16 11 04 17 01 --- 04 46 30 48.9 32.3 -5.0 -79.9 43 F 1 197 04 16 11 Schedule for VLBA_BR (Code Br ) Page 10 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 04 17 01 M81 04 46 30 48.4 31.7 -5.2 -78.6 -7 1 1 197 04 17 01 04 17 51 --- 04 47 20 48.4 31.7 -5.1 -78.8 43 F 1 199 04 17 01 04 17 51 M82 04 47 20 48.5 30.8 -5.2 -79.4 -6 1 1 199 04 17 51 04 18 41 --- 04 48 11 48.6 30.8 -5.1 -79.6 44 F 1 201 04 17 51 04 18 41 M81 04 48 11 48.5 31.8 -5.1 -79.0 -6 1 1 201 04 18 41 04 19 31 --- 04 49 01 48.6 31.8 -5.1 -79.2 44 F 1 202 04 18 41 04 19 31 1004+6936 04 49 01 47.9 30.7 -5.3 -77.8 -7 1 1 202 04 19 31 04 20 21 --- 04 49 51 48.0 30.8 -5.3 -77.9 43 F 1 204 04 19 31 04 20 21 M81 04 49 51 48.7 31.8 -5.1 -79.4 -7 1 1 204 04 20 21 04 21 11 --- 04 50 41 48.7 31.8 -5.1 -79.5 43 F 1 205 04 20 21 04 21 11 M82 04 50 41 48.8 30.9 -5.1 -80.2 -6 1 1 205 04 21 11 04 22 01 --- 04 51 31 48.9 30.9 -5.1 -80.3 44 F 1 207 04 21 11 04 22 01 M81 04 51 31 48.8 31.8 -5.1 -79.7 -6 1 1 207 04 22 01 04 22 51 --- 04 52 21 48.9 31.9 -5.1 -79.9 44 F 1 209 04 22 01 04 22 51 0945+6924 04 52 21 49.9 31.6 -4.9 -82.6 -8 1 1 209 04 22 51 04 23 41 --- 04 53 11 49.9 31.6 -4.9 -82.8 42 F 1 210 04 22 51 04 23 41 M81 04 53 11 48.9 31.9 -5.1 -80.1 -8 1 1 210 04 23 41 04 24 31 --- 04 54 02 49.0 31.9 -5.0 -80.3 42 F 1 212 04 23 41 04 24 31 0948+6848 04 54 02 49.6 32.4 -4.9 -81.5 -7 1 1 212 04 24 31 04 25 21 --- 04 54 52 49.7 32.5 -4.9 -81.7 43 F 1 213 04 24 31 04 25 21 M81 04 54 52 49.1 31.9 -5.0 -80.4 -7 1 1 213 04 25 21 04 26 11 --- 04 55 42 49.2 31.9 -5.0 -80.6 43 F 1 215 04 25 21 04 26 11 M82 04 55 42 49.2 31.0 -5.0 -81.2 -6 1 1 215 04 26 11 04 27 01 --- 04 56 32 49.3 31.0 -5.0 -81.4 44 F 1 217 04 26 11 04 27 01 M81 04 56 32 49.2 32.0 -5.0 -80.8 -6 1 1 217 04 27 01 04 27 51 --- 04 57 22 49.3 32.0 -5.0 -81.0 44 F 1 218 04 27 01 04 27 51 1004+6936 04 57 22 48.6 31.0 -5.1 -79.6 -7 1 1 218 04 27 51 04 28 41 --- 04 58 12 48.7 31.0 -5.1 -79.7 43 F 1 220 04 27 51 04 28 41 M81 04 58 12 49.4 32.0 -5.0 -81.2 -7 1 1 220 04 28 41 04 29 31 --- 04 59 02 49.5 32.0 -5.0 -81.3 43 F 1 221 04 28 41 Schedule for VLBA_BR (Code Br ) Page 11 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 04 29 31 M82 04 59 02 49.5 31.1 -5.0 -82.0 -6 1 1 221 04 29 31 04 30 21 --- 04 59 52 49.6 31.1 -4.9 -82.2 44 F 1 223 04 29 31 04 30 21 M81 04 59 52 49.5 32.0 -4.9 -81.5 -6 1 1 223 04 30 21 04 31 11 --- 05 00 43 49.6 32.0 -4.9 -81.7 44 F 1 225 04 30 21 04 31 11 0945+6924 05 00 43 50.6 31.7 -4.7 -84.4 -8 1 1 225 04 31 11 04 32 01 --- 05 01 33 50.7 31.7 -4.7 -84.6 42 F 1 226 04 31 11 04 32 01 M81 05 01 33 49.7 32.1 -4.9 -81.9 -8 1 1 226 04 32 01 04 32 51 --- 05 02 23 49.8 32.1 -4.9 -82.1 42 F 1 228 04 32 01 04 32 51 0948+6848 05 02 23 50.4 32.6 -4.8 -83.3 -7 1 1 228 04 32 51 04 33 41 --- 05 03 13 50.4 32.6 -4.8 -83.5 43 F 1 230 04 32 51 04 33 41 M81 05 03 13 49.8 32.1 -4.9 -82.3 -7 1 1 230 04 33 41 04 34 31 --- 05 04 03 49.9 32.1 -4.9 -82.4 43 F 1 231 04 33 41 04 34 31 M82 05 04 03 50.0 31.2 -4.9 -83.1 -6 1 1 231 04 34 31 04 35 21 --- 05 04 53 50.0 31.2 -4.9 -83.3 44 F 1 233 04 34 31 04 35 21 M81 05 04 53 50.0 32.1 -4.9 -82.6 -6 1 1 233 04 35 21 04 36 11 --- 05 05 43 50.1 32.1 -4.8 -82.8 44 F 1 234 04 35 21 04 36 11 1004+6936 05 05 43 49.3 31.1 -5.0 -81.4 -7 1 1 234 04 36 11 04 37 01 --- 05 06 34 49.4 31.2 -5.0 -81.6 43 F 1 236 04 36 11 04 37 01 M81 05 06 34 50.1 32.2 -4.8 -83.0 -7 1 1 236 04 37 01 04 37 51 --- 05 07 24 50.2 32.2 -4.8 -83.2 43 F 1 238 04 37 01 04 38 51 M81 05 08 24 50.3 32.2 -4.8 -83.4 55 1 1 238 04 38 51 04 39 41 --- 05 09 14 50.4 32.2 -4.8 -83.6 50 F 1 239 04 39 09 04 39 48 M82 05 09 21 50.4 31.2 -4.8 -84.3 1 1 1 239 04 39 41 04 40 38 --- 05 10 11 50.5 31.2 -4.8 -84.5 50 F 1 241 04 39 41 04 40 45 M81 05 10 18 50.5 32.2 -4.8 -83.8 1 1 1 241 04 40 38 04 41 35 --- 05 11 08 50.5 32.2 -4.8 -84.0 50 F 1 243 04 40 38 04 41 42 M82 05 11 16 50.6 31.3 -4.8 -84.7 1 1 1 243 04 41 35 04 42 32 --- 05 12 06 50.7 31.3 -4.7 -84.9 50 F 1 245 04 41 35 04 42 39 M81 05 12 13 50.6 32.2 -4.7 -84.2 1 1 1 245 04 42 32 04 43 29 --- 05 13 03 50.7 32.3 -4.7 -84.4 50 F 1 247 04 42 32 Schedule for VLBA_BR (Code Br ) Page 12 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 04 43 36 M82 05 13 10 50.7 31.3 -4.7 -85.1 1 1 1 247 04 43 29 04 44 26 --- 05 14 00 50.8 31.3 -4.7 -85.3 50 F 1 248 04 43 29 04 44 33 M81 05 14 07 50.8 32.3 -4.7 -84.7 1 1 1 248 04 44 26 04 45 23 --- 05 14 57 50.9 32.3 -4.7 -84.9 50 F 1 250 04 44 26 04 45 30 M82 05 15 04 50.9 31.3 -4.7 -85.6 1 1 1 250 04 45 23 04 46 20 --- 05 15 55 51.0 31.3 -4.7 -85.8 50 F 1 252 04 45 23 04 46 27 M81 05 16 02 51.0 32.3 -4.7 -85.1 1 1 1 252 04 46 20 04 47 17 --- 05 16 52 51.0 32.3 -4.7 -85.3 50 F 1 254 04 46 20 04 51 04 DA193 05 20 39 79.5 139.4 -0.6 -34.4 149 1 1 254 04 51 04 04 56 04 --- 05 25 40 80.1 144.0 -0.5 -30.7 300 F 1 264 04 51 22 04 57 33 M81 05 27 10 52.0 32.4 -4.5 -87.6 9 1 1 264 04 57 33 04 58 33 --- 05 28 10 52.1 32.4 -4.5 -87.8 60 F 1 266 04 57 51 04 58 40 M82 05 28 17 52.1 31.4 -4.5 -88.6 1 1 1 266 04 58 33 04 59 10 --- 05 28 47 52.1 31.4 -4.5 -88.7 30 F 1 267 04 58 33 04 59 17 M81 05 28 54 52.1 32.4 -4.5 -88.0 1 1 1 267 04 59 10 04 59 47 --- 05 29 24 52.2 32.4 -4.4 -88.1 30 F 1 268 04 59 10 04 59 55 M82 05 29 31 52.2 31.4 -4.5 -88.9 1 1 1 268 04 59 47 05 00 25 --- 05 30 01 52.2 31.4 -4.4 -89.0 30 F 1 269 04 59 47 05 00 32 M81 05 30 08 52.2 32.4 -4.4 -88.3 1 1 1 269 05 00 25 05 01 02 --- 05 30 39 52.3 32.4 -4.4 -88.4 30 F 1 270 05 00 25 05 01 09 M82 05 30 46 52.3 31.4 -4.4 -89.2 1 1 1 270 05 01 02 05 01 39 --- 05 31 16 52.3 31.4 -4.4 -89.3 30 F 1 272 05 01 02 05 01 46 M81 05 31 23 52.3 32.4 -4.4 -88.6 1 1 1 272 05 01 39 05 02 16 --- 05 31 53 52.4 32.4 -4.4 -88.7 30 F 1 273 05 01 39 05 02 23 M82 05 32 00 52.4 31.4 -4.4 -89.4 1 1 1 273 05 02 16 05 02 53 --- 05 32 30 52.4 31.4 -4.4 -89.6 30 F 1 274 05 02 16 05 03 00 M81 05 32 37 52.5 32.4 -4.4 -88.9 1 1 1 274 05 02 53 05 03 30 --- 05 33 07 52.5 32.4 -4.4 -89.0 30 F 1 275 05 02 53 05 03 37 M82 05 33 14 52.5 31.4 -4.4 -89.7 1 1 1 275 05 03 30 05 04 07 --- 05 33 45 52.5 31.4 -4.4 -89.9 30 F 1 276 05 03 30 Schedule for VLBA_BR (Code Br ) Page 13 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 05 04 14 M81 05 33 52 52.6 32.4 -4.4 -89.2 1 1 1 276 05 04 07 05 04 44 --- 05 34 22 52.6 32.4 -4.4 -89.3 30 F 1 278 05 04 07 05 04 51 M82 05 34 29 52.6 31.4 -4.4 -90.0 1 1 1 278 05 04 44 05 05 21 --- 05 34 59 52.6 31.4 -4.4 -90.1 30 F 1 279 05 04 44 05 05 29 M81 05 35 06 52.7 32.4 -4.4 -89.4 1 1 1 279 05 05 21 05 05 59 --- 05 35 36 52.7 32.4 -4.3 -89.6 30 F 1 280 05 05 21 05 06 06 M82 05 35 43 52.7 31.4 -4.3 -90.3 1 1 1 280 05 05 59 05 06 36 --- 05 36 13 52.7 31.4 -4.3 -90.4 30 F 1 281 05 05 59 05 06 43 M81 05 36 21 52.8 32.4 -4.3 -89.7 1 1 1 281 05 06 36 05 07 13 --- 05 36 51 52.8 32.4 -4.3 -89.9 30 F 1 282 05 06 36 05 07 20 M82 05 36 58 52.8 31.4 -4.3 -90.6 1 1 1 282 05 07 13 05 07 50 --- 05 37 28 52.9 31.4 -4.3 -90.7 30 F 1 284 05 07 13 05 07 57 M81 05 37 35 52.9 32.4 -4.3 -90.0 1 1 1 284 05 07 50 05 08 27 --- 05 38 05 52.9 32.4 -4.3 -90.1 30 F 1 285 05 07 50 05 08 34 M82 05 38 12 52.9 31.4 -4.3 -90.9 1 1 1 285 05 08 27 05 09 04 --- 05 38 42 53.0 31.4 -4.3 -91.0 30 F 1 286 05 08 27 05 09 11 M81 05 38 49 53.0 32.4 -4.3 -90.3 1 1 1 286 05 09 04 05 09 41 --- 05 39 20 53.1 32.4 -4.3 -90.4 30 F 1 287 05 09 04 05 10 11 M81 05 39 50 53.1 32.4 -4.3 -90.5 25 1 1 287 05 10 11 05 11 01 --- 05 40 40 53.2 32.4 -4.3 -90.7 50 F 1 289 05 10 29 05 11 01 M82 05 40 40 53.1 31.4 -4.3 -91.5 -6 1 1 289 05 11 01 05 11 51 --- 05 41 30 53.2 31.4 -4.3 -91.7 44 F 1 290 05 11 01 05 11 51 M81 05 41 30 53.3 32.4 -4.2 -90.9 -6 1 1 290 05 11 51 05 12 41 --- 05 42 20 53.3 32.4 -4.2 -91.1 44 F 1 292 05 11 51 05 12 41 0945+6924 05 42 20 54.2 31.8 -4.1 -94.1 -8 1 1 292 05 12 41 05 13 31 --- 05 43 10 54.3 31.8 -4.0 -94.3 42 F 1 294 05 12 41 05 13 31 M81 05 43 10 53.4 32.4 -4.2 -91.3 -8 1 1 294 05 13 31 05 14 21 --- 05 44 00 53.5 32.4 -4.2 -91.5 42 F 1 295 05 13 31 05 14 21 0948+6848 05 44 00 54.1 32.8 -4.1 -92.9 -7 1 1 295 05 14 21 05 15 11 --- 05 44 50 54.2 32.8 -4.1 -93.1 43 F 1 297 05 14 21 Schedule for VLBA_BR (Code Br ) Page 14 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 05 15 11 M81 05 44 50 53.5 32.4 -4.2 -91.7 -7 1 1 297 05 15 11 05 16 01 --- 05 45 41 53.6 32.4 -4.2 -91.9 43 F 1 298 05 15 11 05 16 01 M82 05 45 41 53.6 31.4 -4.2 -92.7 -6 1 1 298 05 16 01 05 16 51 --- 05 46 31 53.6 31.4 -4.2 -92.9 44 F 1 300 05 16 01 05 16 51 M81 05 46 31 53.7 32.4 -4.2 -92.1 -6 1 1 300 05 16 51 05 17 41 --- 05 47 21 53.8 32.4 -4.1 -92.3 44 F 1 302 05 16 51 05 17 41 1004+6936 05 47 21 52.9 31.5 -4.3 -90.8 -8 1 1 302 05 17 41 05 18 31 --- 05 48 11 53.0 31.5 -4.3 -91.0 42 F 1 303 05 17 41 05 18 31 M81 05 48 11 53.8 32.4 -4.1 -92.5 -8 1 1 303 05 18 31 05 19 21 --- 05 49 01 53.9 32.4 -4.1 -92.7 42 F 1 305 05 18 31 05 19 21 M82 05 49 01 53.9 31.3 -4.1 -93.5 -6 1 1 305 05 19 21 05 20 11 --- 05 49 51 53.9 31.3 -4.1 -93.7 44 F 1 306 05 19 21 05 20 11 M81 05 49 51 54.0 32.4 -4.1 -92.9 -6 1 1 306 05 20 11 05 21 01 --- 05 50 41 54.1 32.4 -4.1 -93.1 44 F 1 308 05 20 11 05 21 01 0945+6924 05 50 41 55.0 31.6 -3.9 -96.2 -8 1 1 308 05 21 01 05 21 51 --- 05 51 32 55.0 31.6 -3.9 -96.4 42 F 1 310 05 21 01 05 21 51 M81 05 51 32 54.1 32.4 -4.1 -93.3 -8 1 1 310 05 21 51 05 22 41 --- 05 52 22 54.2 32.4 -4.1 -93.5 42 F 1 311 05 21 51 05 22 41 0948+6848 05 52 22 54.9 32.7 -3.9 -94.9 -7 1 1 311 05 22 41 05 23 31 --- 05 53 12 55.0 32.7 -3.9 -95.1 43 F 1 313 05 22 41 05 23 31 M81 05 53 12 54.3 32.3 -4.1 -93.7 -7 1 1 313 05 23 31 05 24 21 --- 05 54 02 54.4 32.3 -4.0 -93.9 43 F 1 315 05 23 31 05 24 21 M82 05 54 02 54.3 31.3 -4.0 -94.7 -6 1 1 315 05 24 21 05 25 11 --- 05 54 52 54.4 31.3 -4.0 -94.9 44 F 1 316 05 24 21 05 25 11 M81 05 54 52 54.4 32.3 -4.0 -94.1 -6 1 1 316 05 25 11 05 26 01 --- 05 55 42 54.5 32.3 -4.0 -94.3 44 F 1 318 05 25 11 05 26 01 1004+6936 05 55 42 53.7 31.5 -4.2 -92.8 -8 1 1 318 05 26 01 05 26 51 --- 05 56 32 53.7 31.5 -4.2 -93.0 42 F 1 319 05 26 01 05 26 51 M81 05 56 32 54.6 32.3 -4.0 -94.5 -8 1 1 319 05 26 51 05 27 41 --- 05 57 23 54.7 32.3 -4.0 -94.7 42 F 1 321 05 26 51 Schedule for VLBA_BR (Code Br ) Page 15 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 05 27 41 M82 05 57 23 54.6 31.2 -4.0 -95.5 -6 1 1 321 05 27 41 05 28 31 --- 05 58 13 54.7 31.2 -4.0 -95.7 44 F 1 323 05 27 41 05 28 31 M81 05 58 13 54.7 32.3 -4.0 -94.9 -6 1 1 323 05 28 31 05 29 21 --- 05 59 03 54.8 32.3 -4.0 -95.2 44 F 1 324 05 28 31 05 29 21 0945+6924 05 59 03 55.7 31.5 -3.8 -98.3 -8 1 1 324 05 29 21 05 30 11 --- 05 59 53 55.8 31.5 -3.8 -98.5 42 F 1 326 05 29 21 05 30 11 M81 05 59 53 54.9 32.3 -3.9 -95.4 -8 1 1 326 05 30 11 05 31 01 --- 06 00 43 55.0 32.3 -3.9 -95.6 42 F 1 327 05 30 11 05 31 01 0948+6848 06 00 43 55.6 32.6 -3.8 -97.0 -7 1 1 327 05 31 01 05 31 51 --- 06 01 33 55.7 32.6 -3.8 -97.2 43 F 1 329 05 31 01 05 31 51 M81 06 01 33 55.0 32.2 -3.9 -95.8 -7 1 1 329 05 31 51 05 32 41 --- 06 02 23 55.1 32.2 -3.9 -96.0 43 F 1 331 05 31 51 05 32 41 M82 06 02 23 55.0 31.2 -3.9 -96.8 -6 1 1 331 05 32 41 05 33 31 --- 06 03 13 55.1 31.2 -3.9 -97.0 44 F 1 332 05 32 41 05 33 31 M81 06 03 13 55.2 32.2 -3.9 -96.2 -6 1 1 332 05 33 31 05 34 21 --- 06 04 04 55.3 32.2 -3.9 -96.4 44 F 1 334 05 33 31 05 34 21 1004+6936 06 04 04 54.4 31.4 -4.0 -94.9 -8 1 1 334 05 34 21 05 35 11 --- 06 04 54 54.5 31.4 -4.0 -95.1 42 F 1 335 05 34 21 05 35 11 M81 06 04 54 55.3 32.2 -3.9 -96.6 -8 1 1 335 05 35 11 05 36 01 --- 06 05 44 55.4 32.2 -3.8 -96.8 42 F 1 337 05 35 11 05 36 23 M81 06 06 06 55.4 32.2 -3.8 -96.9 17 1 1 337 05 36 23 05 37 23 --- 06 07 06 55.5 32.1 -3.8 -97.1 60 F 1 339 05 36 41 05 37 50 M82 06 07 33 55.5 31.1 -3.8 -98.1 20 1 1 339 05 37 50 05 38 40 --- 06 08 23 55.5 31.0 -3.8 -98.3 50 F 1 341 05 38 08 05 39 07 M81 06 08 50 55.7 32.1 -3.8 -97.6 20 1 1 341 05 39 07 05 39 57 --- 06 09 40 55.8 32.1 -3.8 -97.8 50 F 1 342 05 39 25 05 40 23 M82 06 10 07 55.7 31.0 -3.8 -98.7 20 1 1 342 05 40 23 05 41 13 --- 06 10 57 55.8 31.0 -3.8 -98.9 50 F 1 344 05 40 41 05 41 40 M81 06 11 24 55.9 32.1 -3.7 -98.2 20 1 1 344 05 41 40 05 42 30 --- 06 12 14 56.0 32.0 -3.7 -98.4 50 F 1 345 05 41 58 Schedule for VLBA_BR (Code Br ) Page 16 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 05 44 30 J1048+7143 06 14 14 51.5 28.1 -4.6 -89.6 105 1 1 345 05 44 30 05 47 30 =1044+719 06 17 15 51.8 28.1 -4.5 -90.4 180 F 1 351 05 44 48 05 48 00 M81 06 17 45 56.5 31.9 -3.6 -99.8 15 1 1 351 05 48 00 05 48 50 --- 06 18 35 56.6 31.9 -3.6 -100.1 50 F 1 353 05 48 18 05 48 50 M82 06 18 35 56.4 30.8 -3.6 -100.9 -6 1 1 353 05 48 50 05 49 40 --- 06 19 25 56.5 30.8 -3.6 -101.1 44 F 1 355 05 48 50 05 49 40 M81 06 19 25 56.6 31.8 -3.6 -100.3 -6 1 1 355 05 49 40 05 50 30 --- 06 20 15 56.7 31.8 -3.6 -100.5 44 F 1 356 05 49 40 05 50 30 0945+6924 06 20 15 57.5 30.8 -3.4 -103.8 -8 1 1 356 05 50 30 05 51 20 --- 06 21 05 57.6 30.8 -3.4 -104.0 42 F 1 358 05 50 30 05 51 20 M81 06 21 05 56.8 31.8 -3.6 -100.7 -8 1 1 358 05 51 20 05 52 10 --- 06 21 56 56.8 31.8 -3.6 -100.9 42 F 1 359 05 51 20 05 52 10 0948+6848 06 21 56 57.5 32.0 -3.5 -102.4 -7 1 1 359 05 52 10 05 53 00 --- 06 22 46 57.6 32.0 -3.4 -102.6 43 F 1 361 05 52 10 05 53 00 M81 06 22 46 56.9 31.7 -3.6 -101.1 -7 1 1 361 05 53 00 05 53 50 --- 06 23 36 57.0 31.7 -3.5 -101.4 43 F 1 363 05 53 00 05 53 50 M82 06 23 36 56.8 30.6 -3.5 -102.2 -6 1 1 363 05 53 50 05 54 40 --- 06 24 26 56.9 30.6 -3.5 -102.4 44 F 1 364 05 53 50 05 54 40 M81 06 24 26 57.1 31.7 -3.5 -101.6 -6 1 1 364 05 54 40 05 55 30 --- 06 25 16 57.1 31.7 -3.5 -101.8 44 F 1 366 05 54 40 05 55 30 1004+6936 06 25 16 56.2 31.0 -3.7 -100.2 -8 1 1 366 05 55 30 05 56 20 --- 06 26 06 56.3 31.0 -3.7 -100.4 42 F 1 367 05 55 30 05 56 20 M81 06 26 06 57.2 31.6 -3.5 -102.0 -8 1 1 367 05 56 20 05 57 10 --- 06 26 56 57.3 31.6 -3.5 -102.2 42 F 1 369 05 56 20 05 57 10 M82 06 26 56 57.1 30.5 -3.5 -103.1 -6 1 1 369 05 57 10 05 58 00 --- 06 27 46 57.2 30.5 -3.5 -103.3 44 F 1 371 05 57 10 05 58 00 M81 06 27 46 57.4 31.6 -3.5 -102.4 -6 1 1 371 05 58 00 05 58 50 --- 06 28 37 57.4 31.5 -3.5 -102.7 44 F 1 372 05 58 00 05 58 50 0945+6924 06 28 37 58.2 30.5 -3.3 -106.0 -8 1 1 372 05 58 50 05 59 40 --- 06 29 27 58.3 30.4 -3.3 -106.3 42 F 1 374 05 58 50 Schedule for VLBA_BR (Code Br ) Page 17 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 05 59 40 M81 06 29 27 57.5 31.5 -3.4 -102.9 -8 1 1 374 05 59 40 06 00 30 --- 06 30 17 57.6 31.5 -3.4 -103.1 42 F 1 375 05 59 40 06 00 30 0948+6848 06 30 17 58.3 31.7 -3.3 -104.6 -7 1 1 375 06 00 30 06 01 20 --- 06 31 07 58.3 31.6 -3.3 -104.9 43 F 1 377 06 00 30 06 01 20 M81 06 31 07 57.6 31.5 -3.4 -103.3 -7 1 1 377 06 01 20 06 02 10 --- 06 31 57 57.7 31.4 -3.4 -103.6 43 F 1 379 06 01 20 06 02 10 M82 06 31 57 57.5 30.3 -3.4 -104.4 -6 1 1 379 06 02 10 06 03 00 --- 06 32 47 57.6 30.3 -3.4 -104.6 44 F 1 380 06 02 10 06 03 00 M81 06 32 47 57.8 31.4 -3.4 -103.8 -6 1 1 380 06 03 00 06 03 50 --- 06 33 37 57.9 31.4 -3.4 -104.0 44 F 1 382 06 03 00 06 03 50 1004+6936 06 33 37 56.9 30.7 -3.5 -102.3 -8 1 1 382 06 03 50 06 04 40 --- 06 34 28 57.0 30.7 -3.5 -102.6 42 F 1 384 06 03 50 06 04 40 M81 06 34 28 57.9 31.3 -3.4 -104.2 -8 1 1 384 06 04 40 06 05 30 --- 06 35 18 58.0 31.3 -3.3 -104.4 42 F 1 385 06 04 40 06 05 30 M82 06 35 18 57.8 30.2 -3.4 -105.3 -6 1 1 385 06 05 30 06 06 20 --- 06 36 08 57.9 30.1 -3.3 -105.5 44 F 1 387 06 05 30 06 06 20 M81 06 36 08 58.1 31.2 -3.3 -104.7 -6 1 1 387 06 06 20 06 07 10 --- 06 36 58 58.2 31.2 -3.3 -104.9 44 F 1 388 06 06 20 06 07 10 0945+6924 06 36 58 59.0 30.1 -3.1 -108.3 -8 1 1 388 06 07 10 06 08 00 --- 06 37 48 59.0 30.0 -3.1 -108.6 42 F 1 390 06 07 10 06 08 00 M81 06 37 48 58.2 31.2 -3.3 -105.1 -8 1 1 390 06 08 00 06 08 50 --- 06 38 38 58.3 31.1 -3.3 -105.4 42 F 1 392 06 08 00 06 08 50 0948+6848 06 38 38 59.0 31.3 -3.2 -106.9 -7 1 1 392 06 08 50 06 09 40 --- 06 39 28 59.1 31.2 -3.2 -107.1 43 F 1 393 06 08 50 06 09 40 M81 06 39 28 58.4 31.1 -3.3 -105.6 -7 1 1 393 06 09 40 06 10 30 --- 06 40 19 58.4 31.1 -3.3 -105.8 43 F 1 395 06 09 40 06 10 30 M82 06 40 19 58.2 30.0 -3.3 -106.7 -6 1 1 395 06 10 30 06 11 20 --- 06 41 09 58.3 29.9 -3.3 -106.9 44 F 1 396 06 10 30 06 11 20 M81 06 41 09 58.5 31.0 -3.3 -106.0 -6 1 1 396 06 11 20 06 12 10 --- 06 41 59 58.6 31.0 -3.2 -106.3 44 F 1 398 06 11 20 Schedule for VLBA_BR (Code Br ) Page 18 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 06 12 10 1004+6936 06 41 59 57.7 30.4 -3.4 -104.6 -8 1 1 398 06 12 10 06 13 00 --- 06 42 49 57.7 30.4 -3.4 -104.8 42 F 1 400 06 12 10 06 13 00 M81 06 42 49 58.7 30.9 -3.2 -106.5 -8 1 1 400 06 13 00 06 13 50 --- 06 43 39 58.7 30.9 -3.2 -106.7 42 F 1 401 06 13 00 06 14 12 M81 06 44 01 58.8 30.9 -3.2 -106.8 17 1 1 401 06 14 12 06 15 12 --- 06 45 01 58.8 30.8 -3.2 -107.1 60 F 1 403 06 14 30 06 15 39 M82 06 45 28 58.7 29.7 -3.2 -108.1 20 1 1 403 06 15 39 06 16 29 --- 06 46 19 58.7 29.7 -3.2 -108.3 50 F 1 405 06 15 57 06 16 56 M81 06 46 46 59.0 30.7 -3.2 -107.6 21 1 1 405 06 16 56 06 17 46 --- 06 47 36 59.1 30.7 -3.1 -107.8 50 F 1 406 06 17 14 06 18 13 M82 06 48 03 58.9 29.6 -3.1 -108.8 20 1 1 406 06 18 13 06 19 03 --- 06 48 53 59.0 29.5 -3.1 -109.1 50 F 1 408 06 18 31 06 19 30 M81 06 49 20 59.2 30.6 -3.1 -108.3 21 1 1 408 06 19 30 06 20 20 --- 06 50 10 59.3 30.6 -3.1 -108.5 50 F 1 410 06 19 48 06 20 50 M81 06 50 40 59.3 30.5 -3.1 -108.7 25 1 1 410 06 20 50 06 21 40 --- 06 51 30 59.4 30.5 -3.1 -108.9 50 F 1 411 06 21 08 06 21 40 M82 06 51 30 59.2 29.4 -3.1 -109.8 -6 1 1 411 06 21 40 06 22 30 --- 06 52 21 59.2 29.3 -3.1 -110.0 44 F 1 413 06 21 40 06 22 30 M81 06 52 21 59.5 30.4 -3.1 -109.2 -6 1 1 413 06 22 30 06 23 20 --- 06 53 11 59.5 30.4 -3.1 -109.4 44 F 1 415 06 22 30 06 23 20 0945+6924 06 53 11 60.3 29.1 -2.9 -113.0 -7 1 1 415 06 23 20 06 24 10 --- 06 54 01 60.4 29.0 -2.9 -113.2 43 F 1 416 06 23 20 06 24 10 M81 06 54 01 59.6 30.3 -3.0 -109.6 -7 1 1 416 06 24 10 06 25 00 --- 06 54 51 59.7 30.3 -3.0 -109.9 43 F 1 418 06 24 10 06 25 00 0948+6848 06 54 51 60.4 30.3 -2.9 -111.5 -7 1 1 418 06 25 00 06 25 50 --- 06 55 41 60.4 30.2 -2.9 -111.8 43 F 1 419 06 25 00 06 25 50 M81 06 55 41 59.8 30.2 -3.0 -110.1 -7 1 1 419 06 25 50 06 26 40 --- 06 56 31 59.8 30.2 -3.0 -110.3 43 F 1 421 06 25 50 06 26 40 M82 06 56 31 59.6 29.1 -3.0 -111.2 -6 1 1 421 06 26 40 06 27 30 --- 06 57 21 59.6 29.0 -3.0 -111.5 44 F 1 423 06 26 40 Schedule for VLBA_BR (Code Br ) Page 19 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 06 27 30 M81 06 57 21 59.9 30.1 -3.0 -110.6 -6 1 1 423 06 27 30 06 28 20 --- 06 58 11 60.0 30.1 -3.0 -110.8 44 F 1 424 06 27 30 06 28 20 1004+6936 06 58 11 59.0 29.6 -3.1 -109.0 -8 1 1 424 06 28 20 06 29 10 --- 06 59 02 59.1 29.6 -3.1 -109.3 42 F 1 426 06 28 20 06 29 10 M81 06 59 02 60.0 30.0 -3.0 -111.1 -8 1 1 426 06 29 10 06 30 00 --- 06 59 52 60.1 30.0 -2.9 -111.3 42 F 1 427 06 29 10 06 30 00 M82 06 59 52 59.8 28.9 -2.9 -112.2 -6 1 1 427 06 30 00 06 30 50 --- 07 00 42 59.9 28.8 -2.9 -112.4 44 F 1 429 06 30 00 06 30 50 M81 07 00 42 60.2 29.9 -2.9 -111.6 -6 1 1 429 06 30 50 06 31 40 --- 07 01 32 60.2 29.9 -2.9 -111.8 44 F 1 431 06 30 50 06 31 40 0945+6924 07 01 32 61.0 28.5 -2.7 -115.5 -7 1 1 431 06 31 40 06 32 30 --- 07 02 22 61.0 28.4 -2.7 -115.7 43 F 1 432 06 31 40 06 32 30 M81 07 02 22 60.3 29.8 -2.9 -112.0 -7 1 1 432 06 32 30 06 33 20 --- 07 03 12 60.4 29.7 -2.9 -112.3 43 F 1 434 06 32 30 06 33 20 0948+6848 07 03 12 61.1 29.7 -2.8 -114.0 -7 1 1 434 06 33 20 06 34 10 --- 07 04 02 61.1 29.6 -2.8 -114.2 43 F 1 435 06 33 20 06 34 10 M81 07 04 02 60.4 29.7 -2.9 -112.5 -7 1 1 435 06 34 10 06 35 00 --- 07 04 53 60.5 29.6 -2.9 -112.8 43 F 1 437 06 34 10 06 35 00 M82 07 04 53 60.2 28.5 -2.9 -113.7 -6 1 1 437 06 35 00 06 35 50 --- 07 05 43 60.3 28.5 -2.8 -113.9 44 F 1 439 06 35 00 06 35 50 M81 07 05 43 60.6 29.6 -2.8 -113.0 -6 1 1 439 06 35 50 06 36 40 --- 07 06 33 60.7 29.5 -2.8 -113.3 44 F 1 440 06 35 50 06 36 40 1004+6936 07 06 33 59.7 29.1 -3.0 -111.4 -8 1 1 440 06 36 40 06 37 30 --- 07 07 23 59.8 29.1 -3.0 -111.6 42 F 1 442 06 36 40 06 37 30 M81 07 07 23 60.7 29.5 -2.8 -113.5 -8 1 1 442 06 37 30 06 38 20 --- 07 08 13 60.8 29.4 -2.8 -113.8 42 F 1 444 06 37 30 06 38 20 M82 07 08 13 60.5 28.3 -2.8 -114.7 -6 1 1 444 06 38 20 06 39 10 --- 07 09 03 60.6 28.2 -2.8 -114.9 44 F 1 445 06 38 20 06 39 10 M81 07 09 03 60.9 29.3 -2.8 -114.0 -6 1 1 445 06 39 10 06 40 00 --- 07 09 53 60.9 29.3 -2.8 -114.3 44 F 1 447 06 39 10 Schedule for VLBA_BR (Code Br ) Page 20 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 06 40 00 0945+6924 07 09 53 61.6 27.8 -2.6 -118.0 -7 1 1 447 06 40 00 06 40 50 --- 07 10 44 61.7 27.7 -2.6 -118.3 43 F 1 448 06 40 00 06 40 50 M81 07 10 44 61.0 29.2 -2.8 -114.5 -7 1 1 448 06 40 50 06 41 40 --- 07 11 34 61.1 29.1 -2.7 -114.8 43 F 1 450 06 40 50 06 41 40 0948+6848 07 11 34 61.8 29.0 -2.6 -116.5 -7 1 1 450 06 41 40 06 42 30 --- 07 12 24 61.8 29.0 -2.6 -116.8 43 F 1 452 06 41 40 06 42 30 M81 07 12 24 61.1 29.1 -2.7 -115.0 -7 1 1 452 06 42 30 06 43 20 --- 07 13 14 61.2 29.0 -2.7 -115.3 43 F 1 453 06 42 30 06 43 20 M82 07 13 14 60.9 27.9 -2.7 -116.2 -6 1 1 453 06 43 20 06 44 10 --- 07 14 04 61.0 27.8 -2.7 -116.4 44 F 1 455 06 43 20 06 44 10 M81 07 14 04 61.3 28.9 -2.7 -115.5 -6 1 1 455 06 44 10 06 45 00 --- 07 14 54 61.3 28.9 -2.7 -115.8 44 F 1 456 06 44 10 06 45 00 1004+6936 07 14 54 60.4 28.6 -2.8 -113.9 -8 1 1 456 06 45 00 06 45 50 --- 07 15 44 60.4 28.5 -2.8 -114.1 42 F 1 458 06 45 00 06 45 50 M81 07 15 44 61.4 28.8 -2.7 -116.0 -8 1 1 458 06 45 50 06 46 40 --- 07 16 35 61.5 28.7 -2.7 -116.3 42 F 1 460 06 45 50 06 47 03 M81 07 16 57 61.5 28.7 -2.7 -116.4 17 1 1 460 06 47 03 06 48 03 --- 07 17 57 61.6 28.6 -2.6 -116.7 60 F 1 462 06 47 21 06 48 30 M82 07 18 24 61.3 27.5 -2.6 -117.8 21 1 1 462 06 48 30 06 49 20 --- 07 19 14 61.4 27.4 -2.6 -118.0 50 F 1 463 06 48 48 06 49 47 M81 07 19 41 61.7 28.5 -2.6 -117.2 21 1 1 463 06 49 47 06 50 37 --- 07 20 31 61.8 28.4 -2.6 -117.5 50 F 1 465 06 50 05 06 51 04 M82 07 20 58 61.5 27.2 -2.6 -118.5 21 1 1 465 06 51 04 06 51 54 --- 07 21 49 61.6 27.2 -2.6 -118.8 50 F 1 466 06 51 22 06 52 21 M81 07 22 16 61.9 28.2 -2.6 -118.0 21 1 1 466 06 52 21 06 53 11 --- 07 23 06 62.0 28.2 -2.6 -118.3 50 F 1 468 06 52 39 06 53 41 M81 07 23 36 62.0 28.1 -2.5 -118.5 25 1 1 468 06 53 41 06 54 31 --- 07 24 26 62.1 28.0 -2.5 -118.7 50 F 1 470 06 53 59 06 54 31 M82 07 24 26 61.8 26.9 -2.5 -119.6 -6 1 1 470 06 54 31 06 55 21 --- 07 25 16 61.8 26.9 -2.5 -119.9 44 F 1 471 06 54 31 Schedule for VLBA_BR (Code Br ) Page 21 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 06 55 21 M81 07 25 16 62.2 28.0 -2.5 -119.0 -6 1 1 471 06 55 21 06 56 11 --- 07 26 06 62.2 27.9 -2.5 -119.3 44 F 1 473 06 55 21 06 56 11 0945+6924 07 26 06 62.8 26.2 -2.3 -123.2 -7 1 1 473 06 56 11 06 57 01 --- 07 26 56 62.9 26.1 -2.3 -123.5 43 F 1 475 06 56 11 06 57 01 M81 07 26 56 62.3 27.8 -2.5 -119.5 -7 1 1 475 06 57 01 06 57 51 --- 07 27 47 62.4 27.7 -2.5 -119.8 43 F 1 476 06 57 01 06 57 51 0948+6848 07 27 47 63.0 27.5 -2.4 -121.7 -7 1 1 476 06 57 51 06 58 41 --- 07 28 37 63.1 27.4 -2.3 -121.9 43 F 1 478 06 57 51 06 58 41 M81 07 28 37 62.4 27.7 -2.5 -120.1 -7 1 1 478 06 58 41 06 59 31 --- 07 29 27 62.5 27.6 -2.4 -120.3 43 F 1 479 06 58 41 06 59 31 M82 07 29 27 62.1 26.5 -2.5 -121.2 -6 1 1 479 06 59 31 07 00 21 --- 07 30 17 62.2 26.4 -2.4 -121.5 44 F 1 481 06 59 31 07 00 21 M81 07 30 17 62.5 27.5 -2.4 -120.6 -6 1 1 481 07 00 21 07 01 11 --- 07 31 07 62.6 27.4 -2.4 -120.9 44 F 1 483 07 00 21 07 01 11 1004+6936 07 31 07 61.6 27.3 -2.6 -118.8 -8 1 1 483 07 01 11 07 02 01 --- 07 31 57 61.7 27.2 -2.6 -119.0 42 F 1 484 07 01 11 07 02 01 M81 07 31 57 62.7 27.3 -2.4 -121.1 -8 1 1 484 07 02 01 07 02 51 --- 07 32 47 62.7 27.2 -2.4 -121.4 42 F 1 486 07 02 01 07 02 51 M82 07 32 47 62.4 26.1 -2.4 -122.3 -6 1 1 486 07 02 51 07 03 41 --- 07 33 38 62.5 26.1 -2.4 -122.6 44 F 1 487 07 02 51 07 03 41 M81 07 33 38 62.8 27.2 -2.4 -121.7 -6 1 1 487 07 03 41 07 04 31 --- 07 34 28 62.9 27.1 -2.4 -121.9 44 F 1 489 07 03 41 07 04 31 0945+6924 07 34 28 63.4 25.3 -2.2 -126.0 -7 1 1 489 07 04 31 07 05 21 --- 07 35 18 63.5 25.2 -2.2 -126.3 43 F 1 491 07 04 31 07 05 21 M81 07 35 18 62.9 27.0 -2.3 -122.2 -7 1 1 491 07 05 21 07 06 11 --- 07 36 08 63.0 26.9 -2.3 -122.5 43 F 1 492 07 05 21 07 06 11 0948+6848 07 36 08 63.7 26.6 -2.2 -124.4 -7 1 1 492 07 06 11 07 07 01 --- 07 36 58 63.7 26.5 -2.2 -124.7 43 F 1 494 07 06 11 07 07 01 M81 07 36 58 63.1 26.8 -2.3 -122.8 -7 1 1 494 07 07 01 07 07 51 --- 07 37 48 63.1 26.7 -2.3 -123.0 43 F 1 495 07 07 01 Schedule for VLBA_BR (Code Br ) Page 22 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 07 07 51 M82 07 37 48 62.8 25.6 -2.3 -123.9 -6 1 1 495 07 07 51 07 08 41 --- 07 38 38 62.8 25.5 -2.3 -124.2 44 F 1 497 07 07 51 07 08 41 M81 07 38 38 63.2 26.6 -2.3 -123.3 -6 1 1 497 07 08 41 07 09 31 --- 07 39 28 63.2 26.5 -2.3 -123.6 44 F 1 499 07 08 41 07 09 31 1004+6936 07 39 28 62.3 26.5 -2.4 -121.4 -8 1 1 499 07 09 31 07 10 21 --- 07 40 19 62.3 26.4 -2.4 -121.7 42 F 1 500 07 09 31 07 10 21 M81 07 40 19 63.3 26.4 -2.3 -123.9 -8 1 1 500 07 10 21 07 11 11 --- 07 41 09 63.4 26.3 -2.3 -124.1 42 F 1 502 07 10 21 07 11 11 M82 07 41 09 63.0 25.3 -2.3 -125.0 -6 1 1 502 07 11 11 07 12 01 --- 07 41 59 63.1 25.2 -2.2 -125.3 44 F 1 504 07 11 11 07 12 01 M81 07 41 59 63.4 26.3 -2.2 -124.4 -6 1 1 504 07 12 01 07 12 51 --- 07 42 49 63.5 26.2 -2.2 -124.7 44 F 1 505 07 12 01 07 12 51 0945+6924 07 42 49 64.0 24.3 -2.0 -128.9 -7 1 1 505 07 12 51 07 13 41 --- 07 43 39 64.1 24.2 -2.0 -129.1 43 F 1 507 07 12 51 07 13 41 M81 07 43 39 63.6 26.1 -2.2 -125.0 -7 1 1 507 07 13 41 07 14 31 --- 07 44 29 63.6 26.0 -2.2 -125.3 43 F 1 508 07 13 41 07 14 31 0948+6848 07 44 29 64.3 25.6 -2.1 -127.3 -7 1 1 508 07 14 31 07 15 21 --- 07 45 19 64.3 25.5 -2.1 -127.6 43 F 1 510 07 14 31 07 15 21 M81 07 45 19 63.7 25.9 -2.2 -125.5 -7 1 1 510 07 15 21 07 16 11 --- 07 46 10 63.7 25.8 -2.2 -125.8 43 F 1 512 07 15 21 07 16 11 M82 07 46 10 63.3 24.7 -2.2 -126.7 -6 1 1 512 07 16 11 07 17 01 --- 07 47 00 63.4 24.6 -2.2 -127.0 44 F 1 513 07 16 11 07 17 01 M81 07 47 00 63.8 25.7 -2.2 -126.1 -6 1 1 513 07 17 01 07 17 51 --- 07 47 50 63.9 25.6 -2.1 -126.4 44 F 1 515 07 17 01 07 17 51 1004+6936 07 47 50 62.9 25.7 -2.3 -124.1 -8 1 1 515 07 17 51 07 18 41 --- 07 48 40 62.9 25.6 -2.3 -124.4 42 F 1 516 07 17 51 07 18 41 M81 07 48 40 63.9 25.5 -2.1 -126.7 -8 1 1 516 07 18 41 07 19 31 --- 07 49 30 64.0 25.4 -2.1 -127.0 42 F 1 518 07 18 41 07 19 31 M82 07 49 30 63.6 24.3 -2.1 -127.8 -7 1 1 518 07 19 31 07 20 21 --- 07 50 20 63.6 24.2 -2.1 -128.1 43 F 1 520 07 19 31 Schedule for VLBA_BR (Code Br ) Page 23 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 07 20 21 M81 07 50 20 64.0 25.3 -2.1 -127.3 -7 1 1 520 07 20 21 07 21 11 --- 07 51 10 64.1 25.2 -2.1 -127.5 43 F 1 521 07 20 21 07 21 11 0945+6924 07 51 10 64.6 23.2 -1.9 -131.8 -7 1 1 521 07 21 11 07 22 01 --- 07 52 01 64.7 23.1 -1.9 -132.1 43 F 1 523 07 21 11 07 22 01 M81 07 52 01 64.2 25.1 -2.1 -127.8 -7 1 1 523 07 22 01 07 22 51 --- 07 52 51 64.2 24.9 -2.1 -128.1 43 F 1 525 07 22 01 07 22 51 0948+6848 07 52 51 64.9 24.5 -1.9 -130.2 -7 1 1 525 07 22 51 07 23 41 --- 07 53 41 64.9 24.3 -1.9 -130.5 43 F 1 526 07 22 51 07 23 41 M81 07 53 41 64.3 24.8 -2.0 -128.4 -7 1 1 526 07 23 41 07 24 31 --- 07 54 31 64.3 24.7 -2.0 -128.7 43 F 1 528 07 23 41 07 24 31 M82 07 54 31 63.9 23.7 -2.0 -129.6 -7 1 1 528 07 24 31 07 25 21 --- 07 55 21 64.0 23.6 -2.0 -129.9 43 F 1 529 07 24 31 07 25 21 M81 07 55 21 64.4 24.6 -2.0 -129.0 -7 1 1 529 07 25 21 07 26 11 --- 07 56 11 64.4 24.5 -2.0 -129.3 43 F 1 531 07 25 21 07 26 11 1004+6936 07 56 11 63.5 24.7 -2.2 -126.9 -8 1 1 531 07 26 11 07 27 01 --- 07 57 01 63.5 24.6 -2.1 -127.2 42 F 1 533 07 26 11 07 27 01 M81 07 57 01 64.5 24.4 -2.0 -129.6 -8 1 1 533 07 27 01 07 27 51 --- 07 57 51 64.6 24.3 -2.0 -129.9 42 F 1 534 07 27 01 07 27 51 M81 07 57 51 64.6 24.3 -2.0 -129.9 -4 1 1 534 07 27 51 07 28 41 --- 07 58 42 64.6 24.2 -2.0 -130.2 46 F 1 536 07 27 51 07 28 41 M82 07 58 42 64.2 23.1 -2.0 -131.0 -7 1 1 536 07 28 41 07 29 31 --- 07 59 32 64.3 23.0 -2.0 -131.3 43 F 1 537 07 28 41 07 29 31 M81 07 59 32 64.7 24.1 -1.9 -130.5 -7 1 1 537 07 29 31 07 30 21 --- 08 00 22 64.7 24.0 -1.9 -130.8 43 F 1 539 07 29 31 07 30 21 M82 08 00 22 64.3 22.9 -1.9 -131.6 -7 1 1 539 07 30 21 07 31 11 --- 08 01 12 64.4 22.8 -1.9 -131.9 43 F 1 541 07 30 21 07 31 11 M81 08 01 12 64.8 23.8 -1.9 -131.1 -7 1 1 541 07 31 11 07 32 01 --- 08 02 02 64.8 23.7 -1.9 -131.4 43 F 1 542 07 31 11 Schedule for VLBA_BR (Code Br ) Page 24 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- Next scan frequencies: 22010.49 22022.99 22047.99 22110.49 22272.99 22322.99 22422.99 22447.99 Next BBC frequencies: 510.49 522.99 547.99 610.49 772.99 822.99 922.99 947.99 07 33 28 0824+555 08 03 30 81.6 21.4 -0.4 -154.2 48 1 1 542 07 33 28 07 34 58 --- 08 05 01 81.7 20.1 -0.3 -155.9 90 F 1 545 07 33 46 07 38 37 0927+390 08 08 39 73.1 115.4 -1.3 -50.9 149 1 1 545 07 38 37 07 40 07 --- 08 10 10 73.4 116.1 -1.3 -50.5 90 F 1 548 07 38 55 07 41 44 0958+472 08 11 47 72.1 82.4 -1.8 -77.7 68 1 1 548 07 41 44 07 43 14 --- 08 13 17 72.3 82.5 -1.8 -77.8 90 F 1 551 07 42 02 07 44 56 1048+714 08 15 00 60.6 23.5 -2.6 -122.2 58 1 1 551 07 44 56 07 46 26 --- 08 16 30 60.7 23.3 -2.5 -122.7 90 F 1 554 07 45 14 07 47 30 1058+811 08 17 34 54.5 9.8 -2.7 -132.0 45 1 1 554 07 47 30 07 49 00 --- 08 19 04 54.5 9.7 -2.7 -132.4 90 F 1 557 07 47 48 07 52 03 1130+381 08 22 08 54.7 88.4 -3.2 -58.1 125 1 1 557 07 52 03 07 53 33 --- 08 23 38 55.0 88.7 -3.1 -58.1 90 F 1 560 07 52 21 07 54 27 1146+395 08 24 33 53.3 83.6 -3.4 -59.9 45 1 1 560 07 54 27 07 55 57 --- 08 26 03 53.6 83.8 -3.4 -59.9 90 F 1 563 07 54 45 07 59 19 1638+572 08 29 25 25.8 30.5 -8.1 -38.8 140 1 1 563 07 59 19 08 00 49 --- 08 30 55 25.9 30.7 -8.1 -39.1 90 F 1 565 07 59 37 08 03 05 1746+622 08 33 11 25.5 19.9 -9.2 -29.5 122 1 1 565 08 03 05 08 04 35 --- 08 34 42 25.5 20.1 -9.2 -29.7 90 F 1 568 08 03 23 08 08 04 0102+582 08 38 12 29.6 -33.4 7.6 44.6 168 1 1 568 08 08 04 08 09 34 --- 08 39 42 29.5 -33.3 7.6 44.4 90 F 1 571 08 08 22 08 12 13 0646+445 08 42 21 70.0 -88.6 1.9 70.2 72 1 1 571 08 12 13 08 13 43 --- 08 43 52 69.8 -88.4 1.9 70.2 90 F 1 574 08 12 31 08 22 36 0730-114 08 52 46 27.5 202.8 1.4 15.3 333 1 1 574 08 22 36 08 24 06 --- 08 54 17 27.4 203.2 1.4 15.5 90 F 1 577 08 22 54 Schedule for VLBA_BR (Code Br ) Page 25 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- Next scan frequencies: 22198.17 22198.17 22206.15 22206.15 22214.13 22214.13 22222.12 22222.12 Next BBC frequencies: 698.17 698.17 706.15 706.15 714.13 714.13 722.12 722.12 08 26 07 M81 08 56 17 67.8 374.2 -1.0 -152.8 0 1 1 577 08 26 07 08 27 07 --- 08 57 17 67.9 374.0 -1.0 -153.2 60 F 1 579 08 26 25 08 27 14 M82 08 57 24 67.3 373.3 -1.0 -153.8 0 1 1 579 08 27 07 08 27 44 --- 08 57 54 67.3 373.2 -1.0 -154.0 30 F 1 580 08 27 07 08 27 51 M81 08 58 02 67.9 373.8 -1.0 -153.5 0 1 1 580 08 27 44 08 28 21 --- 08 58 32 67.9 373.7 -1.0 -153.8 30 F 1 581 08 27 44 08 28 28 M82 08 58 39 67.4 373.1 -1.0 -154.3 0 1 1 581 08 28 21 08 28 58 --- 08 59 09 67.4 373.0 -1.0 -154.5 30 F 1 583 08 28 21 08 29 05 M81 08 59 16 68.0 373.6 -0.9 -154.1 0 1 1 583 08 28 58 08 29 35 --- 08 59 46 68.0 373.5 -0.9 -154.3 30 F 1 584 08 28 58 08 29 42 M82 08 59 53 67.4 372.8 -0.9 -154.8 0 1 1 584 08 29 35 08 30 12 --- 09 00 23 67.4 372.7 -0.9 -155.0 30 F 1 585 08 29 35 08 30 19 M81 09 00 31 68.0 373.3 -0.9 -154.6 0 1 1 585 08 30 12 08 30 49 --- 09 01 01 68.0 373.2 -0.9 -154.8 30 F 1 586 08 30 12 08 30 56 M82 09 01 08 67.5 372.5 -0.9 -155.4 0 1 1 586 08 30 49 08 31 26 --- 09 01 38 67.5 372.4 -0.9 -155.6 30 F 1 587 08 30 49 08 31 34 M81 09 01 45 68.0 373.0 -0.9 -155.1 0 1 1 587 08 31 26 08 32 04 --- 09 02 15 68.1 372.9 -0.9 -155.4 30 F 1 589 08 31 26 08 32 11 M82 09 02 22 67.5 372.3 -0.9 -155.9 0 1 1 589 08 32 04 08 32 41 --- 09 02 52 67.5 372.2 -0.9 -156.1 30 F 1 590 08 32 04 08 32 48 M81 09 02 59 68.1 372.8 -0.9 -155.7 0 1 1 590 08 32 41 08 33 18 --- 09 03 30 68.1 372.6 -0.9 -155.9 30 F 1 591 08 32 41 08 33 25 M82 09 03 37 67.5 372.0 -0.9 -156.4 0 1 1 591 08 33 18 08 33 55 --- 09 04 07 67.6 371.9 -0.9 -156.6 30 F 1 592 08 33 18 08 34 02 M81 09 04 14 68.1 372.5 -0.9 -156.2 0 1 1 592 08 33 55 08 34 32 --- 09 04 44 68.2 372.4 -0.9 -156.4 30 F 1 593 08 33 55 Schedule for VLBA_BR (Code Br ) Page 26 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 08 34 39 M82 09 04 51 67.6 371.8 -0.9 -157.0 0 1 1 593 08 34 32 08 35 09 --- 09 05 21 67.6 371.7 -0.9 -157.2 30 F 1 595 08 34 32 08 35 16 M81 09 05 28 68.2 372.2 -0.8 -156.8 0 1 1 595 08 35 09 08 35 46 --- 09 05 59 68.2 372.1 -0.8 -157.0 30 F 1 596 08 35 09 08 35 54 M82 09 06 06 67.6 371.5 -0.8 -157.5 0 1 1 596 08 35 46 08 36 24 --- 09 06 36 67.6 371.4 -0.8 -157.7 30 F 1 597 08 35 46 08 36 31 M81 09 06 43 68.2 371.9 -0.8 -157.3 0 1 1 597 08 36 24 08 37 01 --- 09 07 13 68.2 371.8 -0.8 -157.5 30 F 1 598 08 36 24 08 37 08 M82 09 07 20 67.7 371.2 -0.8 -158.0 0 1 1 598 08 37 01 08 37 38 --- 09 07 50 67.7 371.1 -0.8 -158.2 30 F 1 599 08 37 01 08 37 45 M81 09 07 57 68.3 371.7 -0.8 -157.9 0 1 1 599 08 37 38 08 38 15 --- 09 08 28 68.3 371.5 -0.8 -158.1 30 F 1 601 08 37 38 08 39 10 M81 09 09 23 68.3 371.3 -0.8 -158.5 50 1 1 601 08 39 10 08 40 00 --- 09 10 13 68.3 371.1 -0.8 -158.9 50 F 1 602 08 39 28 08 40 00 M82 09 10 13 67.8 370.6 -0.8 -159.3 -7 1 1 602 08 40 00 08 40 50 --- 09 11 03 67.8 370.5 -0.8 -159.6 43 F 1 604 08 40 00 08 40 50 M81 09 11 03 68.4 371.0 -0.8 -159.2 -7 1 1 604 08 40 50 08 41 40 --- 09 11 53 68.4 370.8 -0.7 -159.6 43 F 1 605 08 40 50 08 41 40 0945+6924 09 11 53 68.4 368.1 -0.6 -164.6 -8 1 1 605 08 41 40 08 42 30 --- 09 12 44 68.4 367.9 -0.5 -164.9 42 F 1 607 08 41 40 08 42 30 M81 09 12 44 68.4 370.6 -0.7 -160.0 -8 1 1 607 08 42 30 08 43 20 --- 09 13 34 68.4 370.4 -0.7 -160.4 42 F 1 609 08 42 30 08 43 20 0948+6848 09 13 34 68.9 368.9 -0.6 -163.4 -7 1 1 609 08 43 20 08 44 10 --- 09 14 24 68.9 368.7 -0.6 -163.8 43 F 1 610 08 43 20 08 44 10 M81 09 14 24 68.5 370.2 -0.7 -160.7 -7 1 1 610 08 44 10 08 45 00 --- 09 15 14 68.5 370.0 -0.7 -161.1 43 F 1 612 08 44 10 08 45 00 M82 09 15 14 67.9 369.5 -0.7 -161.4 -7 1 1 612 08 45 00 08 45 50 --- 09 16 04 67.9 369.4 -0.7 -161.8 43 F 1 613 08 45 00 08 45 50 M81 09 16 04 68.5 369.8 -0.7 -161.5 -7 1 1 613 08 45 50 08 46 40 --- 09 16 54 68.5 369.6 -0.7 -161.9 43 F 1 615 08 45 50 Schedule for VLBA_BR (Code Br ) Page 27 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 08 46 40 1004+6936 09 16 54 67.8 371.2 -0.8 -158.2 -8 1 1 615 08 46 40 08 47 30 --- 09 17 44 67.8 371.0 -0.8 -158.6 42 F 1 617 08 46 40 08 47 30 M81 09 17 44 68.6 369.4 -0.6 -162.2 -8 1 1 617 08 47 30 08 48 20 --- 09 18 34 68.6 369.2 -0.6 -162.6 42 F 1 618 08 47 30 08 48 20 M82 09 18 34 68.0 368.8 -0.6 -162.9 -7 1 1 618 08 48 20 08 49 10 --- 09 19 25 68.0 368.6 -0.6 -163.3 43 F 1 620 08 48 20 08 49 10 M81 09 19 25 68.6 369.0 -0.6 -163.0 -7 1 1 620 08 49 10 08 50 00 --- 09 20 15 68.6 368.8 -0.6 -163.4 43 F 1 622 08 49 10 08 50 00 0945+6924 09 20 15 68.5 366.1 -0.4 -168.3 -8 1 1 622 08 50 00 08 50 50 --- 09 21 05 68.5 365.9 -0.4 -168.7 42 F 1 623 08 50 00 08 50 50 M81 09 21 05 68.7 368.6 -0.6 -163.7 -8 1 1 623 08 50 50 08 51 40 --- 09 21 55 68.7 368.4 -0.6 -164.1 42 F 1 625 08 50 50 08 51 40 0948+6848 09 21 55 69.1 366.9 -0.5 -167.2 -7 1 1 625 08 51 40 08 52 30 --- 09 22 45 69.1 366.7 -0.4 -167.6 43 F 1 626 08 51 40 08 52 30 M81 09 22 45 68.7 368.2 -0.6 -164.5 -7 1 1 626 08 52 30 08 53 20 --- 09 23 35 68.7 368.0 -0.5 -164.9 43 F 1 628 08 52 30 08 53 20 M82 09 23 35 68.1 367.7 -0.5 -165.1 -7 1 1 628 08 53 20 08 54 10 --- 09 24 25 68.1 367.5 -0.5 -165.5 43 F 1 630 08 53 20 08 54 10 M81 09 24 25 68.7 367.8 -0.5 -165.3 -7 1 1 630 08 54 10 08 55 00 --- 09 25 16 68.8 367.6 -0.5 -165.6 43 F 1 631 08 54 10 08 55 00 1004+6936 09 25 16 68.0 369.4 -0.7 -161.8 -7 1 1 631 08 55 00 08 55 50 --- 09 26 06 68.0 369.2 -0.7 -162.2 43 F 1 633 08 55 00 08 55 50 M81 09 26 06 68.8 367.4 -0.5 -166.0 -7 1 1 633 08 55 50 08 56 40 --- 09 26 56 68.8 367.2 -0.5 -166.4 43 F 1 634 08 55 50 08 56 40 M82 09 26 56 68.2 366.9 -0.5 -166.6 -7 1 1 634 08 56 40 08 57 30 --- 09 27 46 68.2 366.7 -0.5 -167.0 43 F 1 636 08 56 40 08 57 30 M81 09 27 46 68.8 367.0 -0.5 -166.8 -7 1 1 636 08 57 30 08 58 20 --- 09 28 36 68.8 366.8 -0.5 -167.2 43 F 1 638 08 57 30 08 58 20 0945+6924 09 28 36 68.7 364.1 -0.3 -172.1 -8 1 1 638 08 58 20 08 59 10 --- 09 29 26 68.7 363.9 -0.3 -172.5 42 F 1 639 08 58 20 Schedule for VLBA_BR (Code Br ) Page 28 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 08 59 10 M81 09 29 26 68.8 366.6 -0.4 -167.6 -8 1 1 639 08 59 10 09 00 00 --- 09 30 16 68.9 366.4 -0.4 -167.9 42 F 1 641 08 59 10 09 00 00 0948+6848 09 30 16 69.2 364.8 -0.3 -171.1 -7 1 1 641 09 00 00 09 00 50 --- 09 31 07 69.2 364.6 -0.3 -171.5 43 F 1 643 09 00 00 09 00 50 M81 09 31 07 68.9 366.2 -0.4 -168.3 -7 1 1 643 09 00 50 09 01 40 --- 09 31 57 68.9 366.0 -0.4 -168.7 43 F 1 644 09 00 50 09 01 40 M82 09 31 57 68.3 365.8 -0.4 -168.9 -7 1 1 644 09 01 40 09 02 30 --- 09 32 47 68.3 365.6 -0.4 -169.2 43 F 1 646 09 01 40 09 02 30 M81 09 32 47 68.9 365.8 -0.4 -169.1 -7 1 1 646 09 02 30 09 03 20 --- 09 33 37 68.9 365.6 -0.4 -169.5 43 F 1 647 09 02 30 09 03 20 1004+6936 09 33 37 68.2 367.5 -0.5 -165.5 -7 1 1 647 09 03 20 09 04 10 --- 09 34 27 68.2 367.3 -0.5 -165.9 43 F 1 649 09 03 20 09 04 10 M81 09 34 27 68.9 365.4 -0.4 -169.9 -7 1 1 649 09 04 10 09 05 00 --- 09 35 17 68.9 365.2 -0.3 -170.2 43 F 1 651 09 04 10 09 05 22 M81 09 35 39 68.9 365.1 -0.3 -170.4 17 1 1 651 09 05 22 09 06 22 --- 09 36 39 69.0 364.9 -0.3 -170.9 60 F 1 653 09 05 40 09 06 50 M82 09 37 07 68.4 364.6 -0.3 -171.2 21 1 1 653 09 06 50 09 07 40 --- 09 37 57 68.4 364.4 -0.3 -171.6 50 F 1 654 09 07 08 09 08 08 M81 09 38 26 69.0 364.4 -0.3 -171.7 21 1 1 654 09 08 08 09 08 58 --- 09 39 16 69.0 364.2 -0.3 -172.1 50 F 1 656 09 08 26 09 09 26 M82 09 39 44 68.4 364.0 -0.3 -172.4 21 1 1 656 09 09 26 09 10 16 --- 09 40 34 68.4 363.8 -0.3 -172.7 50 F 1 657 09 09 44 09 10 45 M81 09 41 02 69.0 363.8 -0.3 -172.9 21 1 1 657 09 10 45 09 11 35 --- 09 41 53 69.0 363.6 -0.2 -173.3 50 F 1 659 09 11 03 09 13 35 J1048+7143 09 43 53 65.3 372.2 -1.1 -153.4 106 1 1 659 09 13 35 09 16 35 =1044+719 09 46 53 65.4 371.7 -1.0 -154.6 180 F 1 665 09 13 53 09 17 05 M81 09 47 23 69.1 362.2 -0.1 -175.9 17 1 1 665 09 17 05 09 17 55 --- 09 48 14 69.1 362.0 -0.1 -176.3 50 F 1 666 09 17 23 09 17 55 M82 09 48 14 68.5 362.0 -0.1 -176.2 -7 1 1 666 09 17 55 09 18 45 --- 09 49 04 68.5 361.8 -0.1 -176.6 43 F 1 668 09 17 55 Schedule for VLBA_BR (Code Br ) Page 29 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 09 18 45 M81 09 49 04 69.1 361.8 -0.1 -176.7 -7 1 1 668 09 18 45 09 19 35 --- 09 49 54 69.1 361.6 -0.1 -177.0 43 F 1 670 09 18 45 09 19 35 0945+6924 09 49 54 68.8 359.0 0.1 178.1 -8 1 1 670 09 19 35 09 20 25 --- 09 50 44 68.7 358.8 0.1 177.7 42 F 1 671 09 19 35 09 20 25 M81 09 50 44 69.1 361.4 -0.1 -177.4 -8 1 1 671 09 20 25 09 21 15 --- 09 51 34 69.1 361.2 -0.1 -177.8 42 F 1 673 09 20 25 09 21 15 0948+6848 09 51 34 69.4 359.4 0.0 178.8 -7 1 1 673 09 21 15 09 22 05 --- 09 52 24 69.4 359.1 0.1 178.4 43 F 1 674 09 21 15 09 22 05 M81 09 52 24 69.1 361.0 -0.1 -178.2 -7 1 1 674 09 22 05 09 22 55 --- 09 53 14 69.1 360.7 0.0 -178.6 43 F 1 676 09 22 05 09 22 55 M82 09 53 14 68.5 360.8 -0.1 -178.5 -7 1 1 676 09 22 55 09 23 45 --- 09 54 05 68.5 360.6 0.0 -178.9 43 F 1 678 09 22 55 09 23 45 M81 09 54 05 69.1 360.5 0.0 -179.0 -7 1 1 678 09 23 45 09 24 35 --- 09 54 55 69.1 360.3 0.0 -179.4 43 F 1 679 09 23 45 09 24 35 1004+6936 09 54 55 68.5 362.5 -0.2 -175.2 -7 1 1 679 09 24 35 09 25 25 --- 09 55 45 68.5 362.3 -0.2 -175.5 43 F 1 681 09 24 35 09 25 25 M81 09 55 45 69.1 360.1 0.0 -179.8 -7 1 1 681 09 25 25 09 26 15 --- 09 56 35 69.1 359.9 0.0 179.8 43 F 1 683 09 25 25 09 26 15 M82 09 56 35 68.5 360.0 0.0 180.0 -7 1 1 683 09 26 15 09 27 05 --- 09 57 25 68.5 359.8 0.0 179.6 43 F 1 684 09 26 15 09 27 05 M81 09 57 25 69.1 359.7 0.0 179.4 -7 1 1 684 09 27 05 09 27 55 --- 09 58 15 69.1 359.5 0.0 179.0 43 F 1 686 09 27 05 09 27 55 0945+6924 09 58 15 68.7 357.0 0.2 174.2 -8 1 1 686 09 27 55 09 28 45 --- 09 59 05 68.7 356.8 0.2 173.8 42 F 1 687 09 27 55 09 28 45 M81 09 59 05 69.1 359.3 0.0 178.7 -8 1 1 687 09 28 45 09 29 35 --- 09 59 56 69.1 359.1 0.1 178.3 42 F 1 689 09 28 45 09 29 35 0948+6848 09 59 56 69.3 357.2 0.2 174.9 -7 1 1 689 09 29 35 09 30 25 --- 10 00 46 69.3 357.0 0.2 174.5 43 F 1 691 09 29 35 09 30 25 M81 10 00 46 69.1 358.9 0.1 177.9 -7 1 1 691 09 30 25 09 31 15 --- 10 01 36 69.1 358.7 0.1 177.5 43 F 1 692 09 30 25 Schedule for VLBA_BR (Code Br ) Page 30 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 09 31 15 M82 10 01 36 68.5 358.8 0.1 177.7 -7 1 1 692 09 31 15 09 32 05 --- 10 02 26 68.5 358.6 0.1 177.3 43 F 1 694 09 31 15 09 32 05 M81 10 02 26 69.1 358.4 0.1 177.1 -7 1 1 694 09 32 05 09 32 55 --- 10 03 16 69.1 358.2 0.1 176.7 43 F 1 695 09 32 05 09 32 55 1004+6936 10 03 16 68.6 360.5 0.0 -179.0 -8 1 1 695 09 32 55 09 33 45 --- 10 04 06 68.6 360.3 0.0 -179.3 42 F 1 697 09 32 55 09 33 45 M81 10 04 06 69.1 358.0 0.1 176.3 -8 1 1 697 09 33 45 09 34 35 --- 10 04 56 69.1 357.8 0.1 175.9 42 F 1 699 09 33 45 09 34 35 M82 10 04 56 68.5 358.0 0.1 176.2 -7 1 1 699 09 34 35 09 35 25 --- 10 05 46 68.5 357.8 0.2 175.8 43 F 1 700 09 34 35 09 35 25 M81 10 05 46 69.1 357.6 0.2 175.5 -7 1 1 700 09 35 25 09 36 15 --- 10 06 37 69.1 357.4 0.2 175.1 43 F 1 702 09 35 25 09 36 15 0945+6924 10 06 37 68.6 355.0 0.3 170.4 -8 1 1 702 09 36 15 09 37 05 --- 10 07 27 68.6 354.8 0.4 170.0 42 F 1 703 09 36 15 09 37 05 M81 10 07 27 69.1 357.2 0.2 174.8 -8 1 1 703 09 37 05 09 37 55 --- 10 08 17 69.0 357.0 0.2 174.4 42 F 1 705 09 37 05 09 37 55 0948+6848 10 08 17 69.2 355.1 0.3 170.9 -7 1 1 705 09 37 55 09 38 45 --- 10 09 07 69.2 354.9 0.3 170.5 43 F 1 707 09 37 55 09 38 45 M81 10 09 07 69.0 356.8 0.2 174.0 -7 1 1 707 09 38 45 09 39 35 --- 10 09 57 69.0 356.6 0.2 173.6 43 F 1 708 09 38 45 09 39 35 M82 10 09 57 68.4 356.8 0.2 173.9 -7 1 1 708 09 39 35 09 40 25 --- 10 10 47 68.4 356.6 0.2 173.5 43 F 1 710 09 39 35 09 40 25 M81 10 10 47 69.0 356.4 0.2 173.2 -7 1 1 710 09 40 25 09 41 15 --- 10 11 37 69.0 356.2 0.3 172.8 43 F 1 712 09 40 25 09 41 15 1004+6936 10 11 37 68.6 358.5 0.1 177.2 -8 1 1 712 09 41 15 09 42 05 --- 10 12 28 68.5 358.3 0.1 176.8 42 F 1 713 09 41 15 09 42 05 M81 10 12 28 69.0 355.9 0.3 172.4 -8 1 1 713 09 42 05 09 42 55 --- 10 13 18 69.0 355.7 0.3 172.0 42 F 1 715 09 42 05 09 43 16 M81 10 13 39 69.0 355.6 0.3 171.9 17 1 1 715 09 43 16 09 44 16 --- 10 14 39 69.0 355.4 0.3 171.4 60 F 1 717 09 43 34 Schedule for VLBA_BR (Code Br ) Page 31 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 09 44 44 M82 10 15 08 68.4 355.6 0.3 171.6 21 1 1 717 09 44 44 09 45 34 --- 10 15 58 68.4 355.4 0.3 171.2 50 F 1 718 09 45 02 09 46 03 M81 10 16 26 69.0 355.0 0.3 170.6 21 1 1 718 09 46 03 09 46 53 --- 10 17 17 68.9 354.8 0.4 170.2 50 F 1 720 09 46 21 09 47 21 M82 10 17 45 68.3 355.0 0.4 170.4 21 1 1 720 09 47 21 09 48 11 --- 10 18 35 68.3 354.8 0.4 170.0 50 F 1 722 09 47 39 09 48 40 M81 10 19 04 68.9 354.3 0.4 169.4 21 1 1 722 09 48 40 09 49 30 --- 10 19 54 68.9 354.1 0.4 169.0 50 F 1 723 09 48 58 09 50 00 M81 10 20 24 68.9 354.0 0.4 168.7 25 1 1 723 09 50 00 09 50 50 --- 10 21 14 68.9 353.8 0.4 168.4 50 F 1 725 09 50 18 09 50 50 M82 10 21 14 68.3 354.2 0.4 168.8 -7 1 1 725 09 50 50 09 51 40 --- 10 22 04 68.3 354.0 0.4 168.4 43 F 1 726 09 50 50 09 51 40 M81 10 22 04 68.9 353.6 0.4 168.0 -7 1 1 726 09 51 40 09 52 30 --- 10 22 54 68.8 353.4 0.4 167.6 43 F 1 728 09 51 40 09 52 30 0945+6924 10 22 54 68.3 351.2 0.6 163.1 -7 1 1 728 09 52 30 09 53 20 --- 10 23 44 68.3 351.0 0.6 162.7 43 F 1 730 09 52 30 09 53 20 M81 10 23 44 68.8 353.2 0.5 167.2 -7 1 1 730 09 53 20 09 54 10 --- 10 24 35 68.8 353.0 0.5 166.8 43 F 1 731 09 53 20 09 54 10 0948+6848 10 24 35 68.9 351.1 0.6 163.4 -7 1 1 731 09 54 10 09 55 00 --- 10 25 25 68.9 350.9 0.6 163.0 43 F 1 733 09 54 10 09 55 00 M81 10 25 25 68.8 352.8 0.5 166.4 -7 1 1 733 09 55 00 09 55 50 --- 10 26 15 68.8 352.6 0.5 166.1 43 F 1 734 09 55 00 09 55 50 M82 10 26 15 68.2 353.1 0.5 166.6 -7 1 1 734 09 55 50 09 56 40 --- 10 27 05 68.2 352.9 0.5 166.2 43 F 1 736 09 55 50 09 56 40 M81 10 27 05 68.8 352.4 0.5 165.7 -7 1 1 736 09 56 40 09 57 30 --- 10 27 55 68.7 352.2 0.5 165.3 43 F 1 738 09 56 40 09 57 30 1004+6936 10 27 55 68.4 354.7 0.4 169.8 -8 1 1 738 09 57 30 09 58 20 --- 10 28 45 68.4 354.5 0.4 169.4 42 F 1 739 09 57 30 09 58 20 M81 10 28 45 68.7 352.0 0.5 164.9 -8 1 1 739 09 58 20 09 59 10 --- 10 29 35 68.7 351.8 0.6 164.5 42 F 1 741 09 58 20 Schedule for VLBA_BR (Code Br ) Page 32 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 09 59 10 M82 10 29 35 68.1 352.3 0.6 165.1 -7 1 1 741 09 59 10 10 00 00 --- 10 30 26 68.1 352.1 0.6 164.7 43 F 1 743 09 59 10 10 00 00 M81 10 30 26 68.7 351.6 0.6 164.2 -7 1 1 743 10 00 00 10 00 50 --- 10 31 16 68.7 351.4 0.6 163.8 43 F 1 744 10 00 00 10 00 50 0945+6924 10 31 16 68.0 349.3 0.8 159.4 -7 1 1 744 10 00 50 10 01 40 --- 10 32 06 68.0 349.1 0.8 159.0 43 F 1 746 10 00 50 10 01 40 M81 10 32 06 68.6 351.2 0.6 163.4 -7 1 1 746 10 01 40 10 02 30 --- 10 32 56 68.6 351.0 0.6 163.0 43 F 1 747 10 01 40 10 02 30 0948+6848 10 32 56 68.6 349.1 0.7 159.6 -7 1 1 747 10 02 30 10 03 20 --- 10 33 46 68.6 348.9 0.7 159.2 43 F 1 749 10 02 30 10 03 20 M81 10 33 46 68.6 350.8 0.6 162.6 -7 1 1 749 10 03 20 10 04 10 --- 10 34 36 68.6 350.6 0.6 162.3 43 F 1 751 10 03 20 10 04 10 M82 10 34 36 68.0 351.2 0.6 162.9 -7 1 1 751 10 04 10 10 05 00 --- 10 35 26 68.0 351.0 0.6 162.5 43 F 1 752 10 04 10 10 05 00 M81 10 35 26 68.5 350.4 0.7 161.9 -7 1 1 752 10 05 00 10 05 50 --- 10 36 17 68.5 350.2 0.7 161.5 43 F 1 754 10 05 00 10 05 50 1004+6936 10 36 17 68.2 352.8 0.5 166.1 -8 1 1 754 10 05 50 10 06 40 --- 10 37 07 68.2 352.6 0.5 165.7 42 F 1 755 10 05 50 10 06 40 M81 10 37 07 68.5 350.0 0.7 161.1 -8 1 1 755 10 06 40 10 07 30 --- 10 37 57 68.5 349.8 0.7 160.8 42 F 1 757 10 06 40 10 07 30 M82 10 37 57 67.9 350.4 0.7 161.4 -7 1 1 757 10 07 30 10 08 20 --- 10 38 47 67.9 350.3 0.7 161.0 43 F 1 759 10 07 30 10 08 20 M81 10 38 47 68.5 349.6 0.7 160.4 -7 1 1 759 10 08 20 10 09 10 --- 10 39 37 68.4 349.4 0.7 160.0 43 F 1 760 10 08 20 10 09 10 0945+6924 10 39 37 67.8 347.5 0.9 155.7 -7 1 1 760 10 09 10 10 10 00 --- 10 40 27 67.7 347.3 0.9 155.4 43 F 1 762 10 09 10 10 10 00 M81 10 40 27 68.4 349.3 0.7 159.6 -7 1 1 762 10 10 00 10 10 50 --- 10 41 17 68.4 349.1 0.8 159.3 43 F 1 763 10 10 00 10 10 50 0948+6848 10 41 17 68.4 347.2 0.9 155.9 -7 1 1 763 10 10 50 10 11 40 --- 10 42 07 68.3 347.0 0.9 155.5 43 F 1 765 10 10 50 Schedule for VLBA_BR (Code Br ) Page 33 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 10 11 40 M81 10 42 07 68.3 348.9 0.8 158.9 -7 1 1 765 10 11 40 10 12 30 --- 10 42 58 68.3 348.7 0.8 158.5 43 F 1 767 10 11 40 10 12 30 M82 10 42 58 67.8 349.4 0.8 159.2 -7 1 1 767 10 12 30 10 13 20 --- 10 43 48 67.7 349.2 0.8 158.9 43 F 1 768 10 12 30 10 13 20 M81 10 43 48 68.3 348.5 0.8 158.2 -7 1 1 768 10 13 20 10 14 10 --- 10 44 38 68.3 348.3 0.8 157.8 43 F 1 770 10 13 20 10 14 10 1004+6936 10 44 38 68.0 350.9 0.7 162.4 -8 1 1 770 10 14 10 10 15 00 --- 10 45 28 68.0 350.7 0.7 162.0 42 F 1 772 10 14 10 10 15 00 M81 10 45 28 68.2 348.1 0.8 157.4 -8 1 1 772 10 15 00 10 15 50 --- 10 46 18 68.2 347.9 0.8 157.1 42 F 1 773 10 15 00 10 15 54 M81 10 46 22 68.2 347.9 0.8 157.0 0 1 1 773 10 15 50 10 16 54 --- 10 47 23 68.2 347.7 0.9 156.6 60 F 1 775 10 15 50 10 17 01 M82 10 47 30 67.6 348.4 0.8 157.3 0 1 1 775 10 16 54 10 17 31 --- 10 48 00 67.6 348.3 0.9 157.1 30 F 1 776 10 16 54 10 17 38 M81 10 48 07 68.1 347.5 0.9 156.3 0 1 1 776 10 17 31 10 18 08 --- 10 48 37 68.1 347.4 0.9 156.0 30 F 1 778 10 17 31 10 18 15 M82 10 48 44 67.6 348.1 0.9 156.7 0 1 1 778 10 18 08 10 18 45 --- 10 49 14 67.6 348.0 0.9 156.5 30 F 1 779 10 18 08 10 18 52 M81 10 49 21 68.1 347.3 0.9 155.7 0 1 1 779 10 18 45 10 19 22 --- 10 49 51 68.1 347.2 0.9 155.5 30 F 1 780 10 18 45 10 19 29 M82 10 49 58 67.5 347.9 0.9 156.2 0 1 1 780 10 19 22 10 19 59 --- 10 50 28 67.5 347.8 0.9 156.0 30 F 1 781 10 19 22 10 20 06 M81 10 50 35 68.1 347.0 0.9 155.2 0 1 1 781 10 19 59 10 20 36 --- 10 51 05 68.0 346.9 0.9 155.0 30 F 1 782 10 19 59 10 20 43 M82 10 51 12 67.5 347.6 0.9 155.7 0 1 1 782 10 20 36 10 21 13 --- 10 51 42 67.5 347.5 0.9 155.5 30 F 1 784 10 20 36 10 21 20 M81 10 51 49 68.0 346.7 0.9 154.6 0 1 1 784 10 21 13 10 21 50 --- 10 52 20 68.0 346.6 0.9 154.4 30 F 1 785 10 21 13 10 21 57 M82 10 52 27 67.4 347.4 0.9 155.2 0 1 1 785 10 21 50 10 22 27 --- 10 52 57 67.4 347.3 0.9 155.0 30 F 1 786 10 21 50 Schedule for VLBA_BR (Code Br ) Page 34 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 10 22 34 M81 10 53 04 68.0 346.5 0.9 154.1 0 1 1 786 10 22 27 10 23 04 --- 10 53 34 67.9 346.4 1.0 153.9 30 F 1 787 10 22 27 10 23 11 M82 10 53 41 67.4 347.1 1.0 154.6 0 1 1 787 10 23 04 10 23 41 --- 10 54 11 67.4 347.0 1.0 154.4 30 F 1 788 10 23 04 10 23 48 M81 10 54 18 67.9 346.2 1.0 153.6 0 1 1 788 10 23 41 10 24 18 --- 10 54 48 67.9 346.1 1.0 153.4 30 F 1 790 10 23 41 10 24 25 M82 10 54 55 67.3 346.9 1.0 154.1 0 1 1 790 10 24 18 10 24 55 --- 10 55 25 67.3 346.7 1.0 153.9 30 F 1 791 10 24 18 10 25 02 M81 10 55 32 67.9 345.9 1.0 153.0 0 1 1 791 10 24 55 10 25 32 --- 10 56 02 67.8 345.8 1.0 152.8 30 F 1 792 10 24 55 10 25 39 M82 10 56 09 67.3 346.6 1.0 153.6 0 1 1 792 10 25 32 10 26 09 --- 10 56 39 67.3 346.5 1.0 153.4 30 F 1 793 10 25 32 10 26 16 M81 10 56 46 67.8 345.7 1.0 152.5 0 1 1 793 10 26 09 10 26 46 --- 10 57 16 67.8 345.6 1.0 152.3 30 F 1 794 10 26 09 10 26 53 M82 10 57 23 67.2 346.4 1.0 153.1 0 1 1 794 10 26 46 10 27 23 --- 10 57 54 67.2 346.3 1.0 152.9 30 F 1 796 10 26 46 10 27 30 M81 10 58 01 67.8 345.4 1.0 152.0 0 1 1 796 10 27 23 10 28 00 --- 10 58 31 67.7 345.3 1.0 151.8 30 F 1 797 10 27 23 10 28 30 M81 10 59 01 67.7 345.2 1.0 151.6 25 1 1 797 10 28 30 10 29 20 --- 10 59 51 67.7 345.0 1.1 151.2 50 F 1 798 10 28 48 10 29 20 M82 10 59 51 67.2 345.9 1.1 152.0 -7 1 1 798 10 29 20 10 30 10 --- 11 00 41 67.1 345.7 1.1 151.7 43 F 1 800 10 29 20 10 30 10 M81 11 00 41 67.6 344.9 1.1 150.9 -7 1 1 800 10 30 10 10 31 00 --- 11 01 31 67.6 344.7 1.1 150.5 43 F 1 802 10 30 10 10 31 00 0945+6924 11 01 31 66.8 343.1 1.3 146.6 -8 1 1 802 10 31 00 10 31 50 --- 11 02 21 66.8 342.9 1.3 146.2 42 F 1 803 10 31 00 10 31 50 M81 11 02 21 67.6 344.5 1.1 150.1 -8 1 1 803 10 31 50 10 32 40 --- 11 03 11 67.5 344.3 1.1 149.8 42 F 1 805 10 31 50 10 32 40 0948+6848 11 03 11 67.4 342.6 1.2 146.5 -7 1 1 805 10 32 40 10 33 30 --- 11 04 02 67.4 342.4 1.2 146.1 43 F 1 806 10 32 40 Schedule for VLBA_BR (Code Br ) Page 35 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 10 33 30 M81 11 04 02 67.5 344.2 1.1 149.4 -7 1 1 806 10 33 30 10 34 20 --- 11 04 52 67.5 344.0 1.1 149.1 43 F 1 808 10 33 30 10 34 20 M82 11 04 52 66.9 344.9 1.1 150.0 -7 1 1 808 10 34 20 10 35 10 --- 11 05 42 66.9 344.7 1.2 149.6 43 F 1 810 10 34 20 10 35 10 M81 11 05 42 67.4 343.8 1.2 148.7 -7 1 1 810 10 35 10 10 36 00 --- 11 06 32 67.4 343.7 1.2 148.4 43 F 1 811 10 35 10 10 36 00 1004+6936 11 06 32 67.3 346.2 1.0 152.9 -8 1 1 811 10 36 00 10 36 50 --- 11 07 22 67.3 346.1 1.0 152.6 42 F 1 813 10 36 00 10 36 50 M81 11 07 22 67.3 343.5 1.2 148.0 -8 1 1 813 10 36 50 10 37 40 --- 11 08 12 67.3 343.4 1.2 147.7 42 F 1 814 10 36 50 10 37 40 M82 11 08 12 66.8 344.2 1.2 148.6 -7 1 1 814 10 37 40 10 38 30 --- 11 09 02 66.8 344.1 1.2 148.3 43 F 1 816 10 37 40 10 38 30 M81 11 09 02 67.3 343.2 1.2 147.4 -7 1 1 816 10 38 30 10 39 20 --- 11 09 53 67.2 343.0 1.2 147.0 43 F 1 818 10 38 30 10 39 20 0945+6924 11 09 53 66.4 341.6 1.4 143.2 -8 1 1 818 10 39 20 10 40 10 --- 11 10 43 66.4 341.4 1.4 142.9 42 F 1 819 10 39 20 10 40 10 M81 11 10 43 67.2 342.9 1.2 146.7 -8 1 1 819 10 40 10 10 41 00 --- 11 11 33 67.1 342.7 1.3 146.3 42 F 1 821 10 40 10 10 41 00 0948+6848 11 11 33 67.0 341.0 1.4 143.1 -7 1 1 821 10 41 00 10 41 50 --- 11 12 23 66.9 340.8 1.4 142.7 43 F 1 823 10 41 00 10 41 50 M81 11 12 23 67.1 342.5 1.3 146.0 -7 1 1 823 10 41 50 10 42 40 --- 11 13 13 67.1 342.4 1.3 145.6 43 F 1 824 10 41 50 10 42 40 M82 11 13 13 66.6 343.3 1.3 146.6 -7 1 1 824 10 42 40 10 43 30 --- 11 14 03 66.5 343.2 1.3 146.2 43 F 1 826 10 42 40 10 43 30 M81 11 14 03 67.0 342.2 1.3 145.3 -7 1 1 826 10 43 30 10 44 20 --- 11 14 53 67.0 342.1 1.3 145.0 43 F 1 827 10 43 30 10 44 20 1004+6936 11 14 53 67.0 344.6 1.2 149.5 -8 1 1 827 10 44 20 10 45 10 --- 11 15 43 66.9 344.4 1.2 149.1 42 F 1 829 10 44 20 10 45 10 M81 11 15 43 66.9 341.9 1.3 144.6 -8 1 1 829 10 45 10 10 46 00 --- 11 16 34 66.9 341.8 1.3 144.3 42 F 1 831 10 45 10 Schedule for VLBA_BR (Code Br ) Page 36 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 10 46 00 M82 11 16 34 66.4 342.7 1.3 145.2 -7 1 1 831 10 46 00 10 46 50 --- 11 17 24 66.4 342.6 1.3 144.9 43 F 1 832 10 46 00 10 46 50 M81 11 17 24 66.8 341.6 1.4 143.9 -7 1 1 832 10 46 50 10 47 40 --- 11 18 14 66.8 341.5 1.4 143.6 43 F 1 834 10 46 50 10 47 40 0945+6924 11 18 14 65.9 340.2 1.5 140.0 -8 1 1 834 10 47 40 10 48 30 --- 11 19 04 65.9 340.0 1.6 139.6 42 F 1 835 10 47 40 10 48 30 M81 11 19 04 66.7 341.3 1.4 143.3 -8 1 1 835 10 48 30 10 49 20 --- 11 19 54 66.7 341.1 1.4 142.9 42 F 1 837 10 48 30 10 49 20 0948+6848 11 19 54 66.5 339.5 1.5 139.7 -7 1 1 837 10 49 20 10 50 10 --- 11 20 44 66.4 339.3 1.5 139.4 43 F 1 839 10 49 20 10 50 10 M81 11 20 44 66.7 341.0 1.4 142.6 -7 1 1 839 10 50 10 10 51 00 --- 11 21 34 66.6 340.8 1.4 142.3 43 F 1 840 10 50 10 10 51 00 M82 11 21 34 66.1 341.8 1.4 143.3 -7 1 1 840 10 51 00 10 51 50 --- 11 22 25 66.1 341.7 1.4 142.9 43 F 1 842 10 51 00 10 51 50 M81 11 22 25 66.6 340.7 1.4 141.9 -7 1 1 842 10 51 50 10 52 40 --- 11 23 15 66.5 340.6 1.5 141.6 43 F 1 843 10 51 50 10 52 40 1004+6936 11 23 15 66.6 343.0 1.3 146.1 -8 1 1 843 10 52 40 10 53 30 --- 11 24 05 66.5 342.9 1.3 145.7 42 F 1 845 10 52 40 10 53 30 M81 11 24 05 66.5 340.4 1.5 141.3 -8 1 1 845 10 53 30 10 54 20 --- 11 24 55 66.4 340.3 1.5 141.0 42 F 1 847 10 53 30 10 54 42 M81 11 25 17 66.4 340.2 1.5 140.8 17 1 1 847 10 54 42 10 55 42 --- 11 26 17 66.3 340.0 1.5 140.4 60 F 1 849 10 55 00 10 56 10 M82 11 26 45 65.9 341.0 1.5 141.2 21 1 1 849 10 56 10 10 57 00 --- 11 27 35 65.8 340.8 1.5 140.9 50 F 1 850 10 56 28 10 57 28 M81 11 28 04 66.2 339.7 1.5 139.7 22 1 1 850 10 57 28 10 58 18 --- 11 28 54 66.2 339.6 1.5 139.4 50 F 1 852 10 57 46 10 58 47 M82 11 29 22 65.7 340.5 1.5 140.2 22 1 1 852 10 58 47 10 59 37 --- 11 30 12 65.7 340.4 1.6 139.9 50 F 1 853 10 59 05 11 00 05 M81 11 30 41 66.1 339.3 1.6 138.7 22 1 1 853 11 00 05 11 00 55 --- 11 31 31 66.0 339.1 1.6 138.4 50 F 1 855 11 00 23 Schedule for VLBA_BR (Code Br ) Page 37 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 28 Jan 2007 Day 28 --- 11 02 55 J1048+7143 11 33 31 65.9 351.5 0.7 161.6 106 1 1 855 11 02 55 11 05 55 =1044+719 11 36 32 65.8 350.9 0.8 160.4 180 F 1 861 11 03 13 11 06 25 M81 11 37 02 65.7 338.3 1.7 136.3 16 1 1 861 11 06 25 11 07 15 --- 11 37 52 65.7 338.1 1.7 136.0 50 F 1 863 11 06 43 11 07 15 M82 11 37 52 65.2 339.2 1.7 137.0 -7 1 1 863 11 07 15 11 08 05 --- 11 38 42 65.2 339.1 1.7 136.7 43 F 1 864 11 07 15 11 08 05 M81 11 38 42 65.6 338.0 1.7 135.7 -7 1 1 864 11 08 05 11 08 55 --- 11 39 32 65.6 337.9 1.7 135.4 43 F 1 866 11 08 05 11 08 55 0945+6924 11 39 32 64.6 336.9 1.9 132.0 -8 1 1 866 11 08 55 11 09 45 --- 11 40 22 64.6 336.8 1.9 131.7 42 F 1 867 11 08 55 11 09 45 M81 11 40 22 65.5 337.7 1.7 135.0 -8 1 1 867 11 09 45 11 10 35 --- 11 41 12 65.4 337.6 1.7 134.7 42 F 1 869 11 09 45 11 10 35 0948+6848 11 41 12 65.2 336.1 1.9 131.7 -7 1 1 869 11 10 35 11 11 25 --- 11 42 03 65.1 336.0 1.9 131.4 43 F 1 871 11 10 35 11 11 25 M81 11 42 03 65.4 337.5 1.8 134.4 -7 1 1 871 11 11 25 11 12 15 --- 11 42 53 65.3 337.4 1.8 134.1 43 F 1 872 11 11 25 11 12 15 M82 11 42 53 64.9 338.4 1.8 135.2 -7 1 1 872 11 12 15 11 13 05 --- 11 43 43 64.9 338.3 1.8 134.9 43 F 1 874 11 12 15 11 13 05 M81 11 43 43 65.3 337.2 1.8 133.8 -7 1 1 874 11 13 05 11 13 55 --- 11 44 33 65.2 337.1 1.8 133.5 43 F 1 875 11 13 05 11 13 55 1004+6936 11 44 33 65.4 339.4 1.7 137.8 -8 1 1 875 11 13 55 11 14 45 --- 11 45 23 65.4 339.3 1.7 137.5 42 F 1 877 11 13 55 11 14 45 M81 11 45 23 65.2 337.0 1.8 133.2 -8 1 1 877 11 14 45 11 15 35 --- 11 46 13 65.1 336.9 1.8 132.9 42 F 1 879 11 14 45 11 15 35 M82 11 46 13 64.7 338.0 1.8 134.0 -7 1 1 879 11 15 35 11 16 25 --- 11 47 03 64.7 337.9 1.8 133.7 43 F 1 880 11 15 35 11 16 25 M81 11 47 03 65.1 336.7 1.8 132.6 -7 1 1 880 11 16 25 11 17 15 --- 11 47 54 65.0 336.6 1.9 132.3 43 F 1 882 11 16 25 11 17 15 0945+6924 11 47 54 64.1 335.8 2.0 129.1 -8 1 1 882 11 17 15 11 18 05 --- 11 48 44 64.0 335.7 2.1 128.8 42 F 1 883 11 17 15 Schedule for VLBA_BR (Code Br ) Page 38 Measuring the orbits of M81 and M82 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC -----------------------------