VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BB200F Observer: Brunthaler, A. Project type: VLBA Obs filename: bb200fcrd.* Date/Day: 2007JAN07/007 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 1934 Begin file VCLOCK check ok. SC at -0.156 UT1-UTC check ok (0.04) GPS delta < 10 us Operator: T. Perreault 1934 LA Mark5 pack NRAO-207 has a consistant red "o" 19666 for the seventh drive of the pack. Documentation indicated that this disk - drive 6 - of the pack may be slow but data should be ok. 1934 FD Mark5 pack NRAO-150 has a consistant red "o" 19665 for the first drive of the pack. Documentation indicates that this disk - drive 0 - of the pack may be slow but data should be ok. 1934 %MK wea: rain, possible snow, elevated system temperatures 2258 %SC wea: raining, elevated system temperatures 0000 Date is 2007JAN08/008. 0238 New operator is Jim Ogle. 0536-0733 *HN 1cm receiver temperature just shot way up. 19667 100 117 0605 *HN 1cm cryo temp continues to rise, data is 19667 basically worthless. Removing HN from observing. 0618 &HN tech Haenichen contacted, he doesn't think 19667 there is anything they can do for the 1cm tonight, will have to check it out in the morning. Also, weather conditions are against them, it just started sleeting which would make it dangerous to go climbing around on the antenna in the dark. 0733 End. Downtime Summary: Total downtime : 117 min Percentage downtime of observing: 1.6% Average downtime per hour : 1.0 min Total scheduled observing time (# Antennas): 7190 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.