COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: BM230 VLBA format 7 mm ~ 0200-1800 LST Exp. Code: BM230I Schedule Version: 1.00 Processed by SCHED version: 6.02 July 2005 PI: Alan P. Marscher Address: Dept. of Astronomy, Boston University 725 Commonwealth Ave. Boston, MA 02215 Phone: (617)353-5029 (office) or (508)788-8317 (home) EMAIL: marscher@bu.edu Fax: (617)353-5704 Phone during observation: (617)353-5029 (office) or (508)788-8317 (home) Observing mode: continuum Notes: Use all available antennas Program sources: 3C111, 3C120 Calibrators: 0336-019, 0420-014, 0735+178 Fringe finder: 0420-014 Schedule for VLBA_PT (Code Pt ) Page 2 BM230 VLBA format 7 mm ~ 0200-1800 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 28 Jan 2006 Day 28 --- Next scan frequencies: 43201.49 43201.49 43209.49 43209.49 43217.49 43217.49 43225.49 43225.49 Next BBC frequencies: 801.49 801.49 809.49 809.49 817.49 817.49 825.49 825.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 22 10 21 0420-014 23 30 00 12.9 100.6 -4.9 -54.3 0 1 1 0 22 10 21 22 15 21 --- 23 35 00 13.9 101.4 -4.8 -54.1 299 F 1 1995 22 10 34 22 15 21 3C120 23 35 00 15.7 94.3 -5.0 -55.8 -11 1 1 1995 22 15 21 22 20 20 --- 23 40 00 16.7 95.0 -4.9 -55.8 288 F 1 3989 22 15 21 22 20 20 3C111 23 40 00 35.0 64.3 -4.6 -71.0 -42 1 1 3989 22 20 20 22 26 19 --- 23 46 00 36.1 64.8 -4.5 -71.6 317 F 1 6383 22 20 20 22 26 19 0336-019 23 46 00 24.5 110.6 -3.9 -50.7 -37 1 1 6383 22 26 19 22 30 18 --- 23 50 00 25.3 111.3 -3.8 -50.4 203 F 1 7978 22 26 19 22 30 18 0420-014 23 50 00 16.9 103.7 -4.6 -53.4 -23 1 1 7978 22 30 18 22 35 17 --- 23 55 00 17.9 104.5 -4.5 -53.1 276 F 1 9973 22 30 18 22 35 17 3C120 23 55 00 19.8 97.2 -4.6 -55.4 -11 1 1 9973 22 35 17 22 40 17 --- 00 00 00 20.8 98.0 -4.6 -55.3 288 F 1 11967 22 35 17 22 40 17 3C111 00 00 00 38.7 65.8 -4.3 -73.2 -42 1 1 11967 22 40 17 22 46 16 --- 00 06 00 39.8 66.3 -4.2 -73.8 317 F 1 14361 22 40 17 22 46 16 0336-019 00 06 00 28.3 114.2 -3.6 -48.9 -38 1 1 14361 22 46 16 22 50 15 --- 00 10 00 29.1 114.9 -3.5 -48.5 201 F 1 15956 22 46 16 22 50 15 0420-014 00 10 00 20.9 106.9 -4.2 -52.2 -22 1 2 15956 22 50 15 22 55 14 --- 00 15 00 21.9 107.7 -4.1 -51.9 277 R 1 17249 22 50 15 22 55 14 3C120 00 15 00 23.9 100.3 -4.3 -54.7 -11 1 2 17249 22 55 14 23 00 13 --- 00 20 00 24.9 101.1 -4.2 -54.5 288 R 1 15255 22 55 14 23 00 13 3C111 00 20 00 42.5 67.2 -4.0 -75.3 -41 1 2 15255 23 00 13 23 06 12 --- 00 26 00 43.6 67.6 -3.9 -76.0 318 R 1 12861 23 00 13 23 06 12 0336-019 00 26 00 32.0 118.1 -3.2 -46.8 -40 1 2 12861 23 06 12 23 10 12 --- 00 30 00 32.8 118.9 -3.2 -46.4 200 R 1 11266 23 06 12 Schedule for VLBA_PT (Code Pt ) Page 3 BM230 VLBA format 7 mm ~ 0200-1800 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 28 Jan 2006 Day 28 --- 23 10 12 0420-014 00 30 00 24.8 110.3 -3.9 -50.8 -22 1 2 11266 23 10 12 23 15 11 --- 00 35 00 25.8 111.1 -3.8 -50.4 277 R 1 9271 23 10 12 23 15 11 3C120 00 35 00 27.9 103.5 -4.0 -53.8 -11 1 2 9271 23 15 11 23 20 10 --- 00 40 00 28.9 104.3 -3.9 -53.5 288 R 1 7276 23 15 11 23 20 10 3C111 00 40 00 46.3 68.5 -3.6 -77.5 -41 1 2 7276 23 20 10 23 26 09 --- 00 46 00 47.5 68.9 -3.5 -78.1 318 R 1 4883 23 20 10 23 26 09 0336-019 00 46 00 35.6 122.3 -2.9 -44.3 -42 1 2 4883 23 26 09 23 30 08 --- 00 50 00 36.3 123.2 -2.8 -43.8 198 R 1 3287 23 26 09 23 30 08 0420-014 00 50 00 28.6 113.9 -3.6 -49.1 -21 1 2 3287 23 30 08 23 35 08 --- 00 55 00 29.6 114.8 -3.5 -48.6 278 R 1 1293 23 30 08 23 35 08 3C120 00 55 00 31.9 107.0 -3.6 -52.5 -11 1 3 1293 23 35 08 23 40 07 --- 01 00 00 32.9 107.9 -3.6 -52.2 288 F 1 702 23 35 08 23 40 07 3C111 01 00 00 50.2 69.7 -3.3 -79.7 -41 1 3 702 23 40 07 23 46 06 --- 01 06 00 51.4 70.0 -3.2 -80.4 318 F 1 3095 23 40 07 23 46 06 0336-019 01 06 00 39.0 126.9 -2.6 -41.4 -44 1 3 3095 23 46 06 23 50 05 --- 01 10 00 39.7 127.9 -2.5 -40.7 195 F 1 4691 23 46 06 23 50 05 0420-014 01 10 00 32.4 117.7 -3.2 -47.0 -21 1 3 4691 23 50 05 23 55 04 --- 01 15 00 33.3 118.8 -3.1 -46.4 279 F 1 6685 23 50 05 --- Start: Sat 28 Jan 2006 Day 28 -- Stop: Sun 29 Jan 2006 Day 29 --- 23 55 04 3C120 01 15 00 35.8 110.7 -3.3 -50.9 -11 1 3 6685 23 55 04 00 00 03 --- 01 20 00 36.8 111.6 -3.2 -50.5 288 F 1 8680 23 55 04 00 00 03 3C111 01 20 00 54.1 70.7 -3.0 -82.0 -41 1 3 8680 00 00 03 00 06 02 --- 01 26 00 55.2 71.0 -2.9 -82.7 318 F 1 11073 00 00 03 00 06 02 0336-019 01 26 00 42.2 131.9 -2.2 -37.9 -47 1 3 11073 00 06 02 00 10 02 --- 01 30 00 42.8 133.0 -2.2 -37.2 193 F 1 12669 00 06 02 00 12 01 0420-014 01 32 00 36.3 122.4 -2.9 -44.2 101 1 3 12669 00 12 01 00 16 01 --- 01 36 00 37.0 123.3 -2.8 -43.7 239 F 1 14265 00 12 14 00 16 01 3C120 01 36 00 39.8 114.9 -3.0 -48.8 -12 1 3 14265 00 16 01 00 21 00 --- 01 41 00 40.8 116.0 -2.9 -48.2 287 F 1 16259 00 16 01 Schedule for VLBA_PT (Code Pt ) Page 4 BM230 VLBA format 7 mm ~ 0200-1800 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 29 Jan 2006 Day 29 --- 00 21 00 3C111 01 41 00 58.2 71.6 -2.6 -84.5 -41 1 4 16259 00 21 00 00 25 59 --- 01 46 00 59.2 71.8 -2.5 -85.1 258 R 1 16946 00 21 00 00 25 59 0336-019 01 46 00 45.1 137.5 -1.9 -33.9 -50 1 4 16946 00 25 59 00 29 58 --- 01 50 00 45.7 138.7 -1.8 -33.0 190 R 1 15351 00 25 59 00 29 58 0420-014 01 50 00 39.4 126.6 -2.6 -41.6 -19 1 4 15351 00 29 58 00 34 58 --- 01 55 00 40.2 127.8 -2.5 -40.8 281 R 1 13356 00 29 58 00 34 58 3C120 01 55 00 43.3 119.2 -2.6 -46.4 -12 1 4 13356 00 34 58 00 39 57 --- 02 00 00 44.2 120.4 -2.6 -45.7 287 R 1 11362 00 34 58 00 39 57 3C111 02 00 00 61.9 72.2 -2.3 -86.9 -41 1 4 11362 00 39 57 00 45 56 --- 02 06 00 63.1 72.3 -2.2 -87.8 318 R 1 8968 00 39 57 00 45 56 0336-019 02 06 00 47.7 143.7 -1.6 -29.3 -54 1 4 8968 00 45 56 00 49 55 --- 02 10 00 48.2 145.0 -1.5 -28.3 186 R 1 7373 00 45 56 00 49 55 0420-014 02 10 00 42.6 131.7 -2.2 -38.1 -17 1 4 7373 00 49 55 00 54 54 --- 02 15 00 43.3 133.0 -2.1 -37.2 282 R 1 5378 00 49 55 00 54 54 3C120 02 15 00 46.8 124.2 -2.3 -43.3 -13 1 4 5378 00 54 54 00 59 54 --- 02 20 00 47.7 125.5 -2.2 -42.5 286 R 1 3383 00 54 54 00 59 54 3C111 02 20 00 65.8 72.4 -2.0 -89.8 -42 1 4 3383 00 59 54 01 05 53 --- 02 26 00 67.0 72.4 -1.9 -90.7 317 R 1 990 00 59 54 01 05 53 0336-019 02 26 00 50.0 150.5 -1.2 -24.0 -58 1 5 990 01 05 53 01 09 52 --- 02 30 00 50.4 151.9 -1.2 -22.9 181 F 1 606 01 05 53 01 09 52 0420-014 02 30 00 45.5 137.3 -1.9 -34.1 -16 1 5 606 01 09 52 01 14 51 --- 02 35 00 46.2 138.8 -1.8 -33.0 283 F 1 2600 01 09 52 01 14 51 3C120 02 35 00 50.1 129.8 -2.0 -39.6 -14 1 5 2600 01 14 51 01 19 50 --- 02 40 00 50.9 131.3 -1.9 -38.5 285 F 1 4595 01 14 51 01 19 50 3C111 02 40 00 69.8 72.2 -1.6 -93.1 -45 1 5 4595 01 19 50 01 25 49 --- 02 46 00 71.0 71.9 -1.5 -94.2 314 F 1 6988 01 19 50 01 25 49 0336-019 02 46 00 51.8 157.9 -0.9 -18.1 -63 1 5 6988 01 25 49 01 29 49 --- 02 50 00 52.1 159.5 -0.8 -16.9 176 F 1 8584 01 25 49 Schedule for VLBA_PT (Code Pt ) Page 5 BM230 VLBA format 7 mm ~ 0200-1800 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 29 Jan 2006 Day 29 --- 01 29 49 0420-014 02 50 00 48.2 143.5 -1.6 -29.4 -17 1 5 8584 01 29 49 01 34 48 --- 02 55 00 48.8 145.1 -1.5 -28.2 283 F 1 10578 01 29 49 01 34 48 3C120 02 55 00 53.2 136.2 -1.6 -35.0 -15 1 5 10578 01 34 48 01 39 47 --- 03 00 00 53.9 137.9 -1.6 -33.8 284 F 1 12573 01 34 48 01 39 47 3C111 03 00 00 73.7 71.0 -1.3 -97.3 -51 1 5 12573 01 39 47 01 45 46 --- 03 06 00 74.9 70.4 -1.2 -98.8 308 F 1 14966 01 39 47 01 45 46 0336-019 03 06 00 53.1 165.8 -0.6 -11.7 -70 1 5 14966 01 45 46 01 49 45 --- 03 10 00 53.3 167.5 -0.5 -10.3 170 F 1 16562 01 45 46 01 49 45 0420-014 03 10 00 50.4 150.3 -1.2 -24.1 -17 1 6 16562 01 49 45 01 54 45 --- 03 15 00 50.9 152.1 -1.1 -22.7 282 R 1 16644 01 49 45 01 54 45 3C120 03 15 00 55.8 143.4 -1.3 -29.6 -16 1 6 16644 01 54 45 01 59 44 --- 03 20 00 56.4 145.4 -1.2 -28.1 283 R 1 14649 01 54 45 01 59 44 3C111 03 20 00 77.6 68.2 -1.0 -103.1 -57 1 6 14649 01 59 44 02 05 43 --- 03 26 00 78.7 66.8 -0.9 -105.4 302 R 1 12256 01 59 44 02 05 43 0336-019 03 26 00 53.8 174.1 -0.2 -4.8 -78 1 6 12256 02 05 43 02 09 42 --- 03 30 00 53.9 175.8 -0.2 -3.4 162 R 1 10660 02 05 43 02 11 42 0420-014 03 32 00 52.4 158.6 -0.9 -17.6 102 1 6 10660 02 11 42 02 15 41 --- 03 36 00 52.7 160.1 -0.8 -16.3 239 R 1 9064 02 11 55 02 15 41 3C120 03 36 00 58.1 152.1 -1.0 -22.9 -17 1 6 9064 02 15 41 02 20 40 --- 03 41 00 58.6 154.3 -0.9 -21.1 282 R 1 7070 02 15 41 02 20 40 3C111 03 41 00 81.5 61.1 -0.6 -113.3 -68 1 6 7070 02 20 40 02 25 39 --- 03 46 00 82.4 58.1 -0.5 -117.0 231 R 1 5075 02 20 40 02 25 39 0336-019 03 46 00 53.9 182.6 0.1 2.2 -89 1 6 5075 02 25 39 02 29 39 --- 03 50 00 53.9 184.3 0.2 3.6 150 R 1 3480 02 25 39 02 29 39 0735+178 03 50 00 36.8 92.9 -3.8 -60.0 -67 1 6 3480 02 29 39 02 32 38 --- 03 53 00 37.4 93.3 -3.8 -60.0 113 R 1 2283 02 29 39 02 32 38 0420-014 03 53 00 53.7 167.0 -0.5 -10.7 -55 1 6 2283 02 32 38 02 36 38 --- 03 57 00 53.8 168.7 -0.4 -9.3 184 R 1 687 02 32 38 Schedule for VLBA_PT (Code Pt ) Page 6 BM230 VLBA format 7 mm ~ 0200-1800 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 29 Jan 2006 Day 29 --- 02 36 38 3C120 03 57 00 59.9 161.7 -0.6 -15.1 -18 1 7 687 02 36 38 02 40 37 --- 04 01 00 60.1 163.6 -0.5 -13.6 221 F 1 908 02 36 38 02 40 37 3C111 04 01 00 84.8 42.5 -0.3 -134.9 -87 1 7 908 02 40 37 02 44 36 --- 04 05 00 85.3 35.6 -0.2 -142.4 153 F 1 2504 02 40 37 02 44 36 0336-019 04 05 00 53.5 190.6 0.4 8.7 -109 1 7 2504 02 44 36 02 48 36 --- 04 09 00 53.3 192.3 0.5 10.1 130 F 1 4100 02 44 36 02 48 36 0735+178 04 09 00 40.7 95.8 -3.5 -59.6 -70 1 7 4100 02 48 36 02 51 35 --- 04 12 00 41.3 96.3 -3.4 -59.5 109 F 1 5296 02 48 36 02 51 35 0420-014 04 12 00 54.3 175.0 -0.2 -4.1 -59 1 7 5296 02 51 35 02 55 35 --- 04 16 00 54.3 176.7 -0.1 -2.7 181 F 1 6892 02 51 35 02 55 35 3C120 04 16 00 60.8 171.0 -0.3 -7.4 -19 1 7 6892 02 55 35 02 59 34 --- 04 20 00 60.9 173.1 -0.2 -5.7 220 F 1 8488 02 55 35 02 59 34 3C111 04 20 00 86.2 -3.7 0.0 176.1 -124 1 7 8488 02 59 34 03 03 33 --- 04 24 00 86.1 -15.4 0.1 163.9 115 F 1 10083 02 59 34 03 03 33 0336-019 04 24 00 52.5 198.3 0.7 15.1 -148 1 7 10083 03 03 33 03 07 33 --- 04 28 00 52.2 199.9 0.8 16.3 91 F 1 11679 03 03 33 03 07 33 0735+178 04 28 00 44.6 98.9 -3.2 -58.9 -73 1 7 11679 03 07 33 03 10 32 --- 04 31 00 45.2 99.5 -3.1 -58.8 106 F 1 12876 03 07 33 03 10 32 0420-014 04 31 00 54.3 183.2 0.1 2.6 -62 1 7 12876 03 10 32 03 14 31 --- 04 35 00 54.3 184.9 0.2 4.0 178 F 1 14471 03 10 32 03 14 31 3C120 04 35 00 61.1 180.8 0.0 0.6 -20 1 7 14471 03 14 31 03 18 31 --- 04 39 00 61.0 182.8 0.1 2.3 220 F 1 16067 03 14 31 03 18 31 3C111 04 39 00 84.5 314.0 0.3 131.0 -93 1 8 16067 03 18 31 03 22 30 --- 04 43 00 83.8 309.2 0.4 125.6 146 R 1 17537 03 18 31 03 22 30 0336-019 04 43 00 51.0 205.6 1.1 20.9 -75 1 8 17537 03 22 30 03 26 29 --- 04 47 00 50.6 207.1 1.1 22.1 164 R 1 15942 03 22 30 03 26 29 0735+178 04 47 00 48.4 102.4 -2.9 -57.9 -76 1 8 15942 03 26 29 03 29 29 --- 04 50 00 49.0 103.0 -2.8 -57.7 104 R 1 14745 03 26 29 Schedule for VLBA_PT (Code Pt ) Page 7 BM230 VLBA format 7 mm ~ 0200-1800 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 29 Jan 2006 Day 29 --- 03 29 29 0420-014 04 50 00 53.8 191.2 0.4 9.3 -65 1 8 14745 03 29 29 03 33 28 --- 04 54 00 53.7 192.9 0.5 10.6 174 R 1 13149 03 29 29 03 33 28 3C120 04 54 00 60.7 190.5 0.3 8.7 -20 1 8 13149 03 33 28 03 37 28 --- 04 58 00 60.5 192.5 0.4 10.3 219 R 1 11554 03 33 28 03 37 28 3C111 04 58 00 81.2 298.2 0.7 112.4 -76 1 8 11554 03 37 28 03 41 27 --- 05 02 00 80.5 296.4 0.7 110.0 163 R 1 9958 03 37 28 03 41 27 0336-019 05 02 00 49.1 212.4 1.4 26.3 -69 1 8 9958 03 41 27 03 45 26 --- 05 06 00 48.7 213.8 1.4 27.3 171 R 1 8363 03 41 27 03 45 26 0735+178 05 06 00 52.2 106.2 -2.5 -56.4 -78 1 8 8363 03 45 26 03 48 26 --- 05 09 00 52.8 106.9 -2.5 -56.1 102 R 1 7166 03 45 26 03 48 26 0420-014 05 09 00 52.8 199.0 0.8 15.6 -67 1 8 7166 03 48 26 03 52 25 --- 05 13 00 52.5 200.6 0.8 16.9 172 R 1 5570 03 48 26 03 52 25 3C120 05 13 00 59.7 199.7 0.7 16.3 -20 1 8 5570 03 52 25 03 56 25 --- 05 17 00 59.4 201.6 0.7 17.8 219 R 1 3975 03 52 25 03 56 25 3C111 05 17 00 77.7 291.9 1.0 103.3 -66 1 8 3975 03 56 25 04 00 24 --- 05 21 00 76.9 291.1 1.0 101.9 173 R 1 2379 03 56 25 04 00 24 0336-019 05 21 00 46.8 218.6 1.7 31.1 -66 1 8 2379 04 00 24 04 04 23 --- 05 25 00 46.3 219.9 1.8 32.0 173 R 1 783 04 00 24 04 06 23 0735+178 05 27 00 56.3 111.1 -2.2 -54.0 41 1 9 783 04 06 23 04 10 22 --- 05 31 00 57.1 112.2 -2.1 -53.4 239 F 1 812 04 06 36 04 10 22 0420-014 05 31 00 51.0 207.4 1.1 22.4 -70 1 9 812 04 10 22 04 14 22 --- 05 35 00 50.6 208.9 1.2 23.5 170 F 1 2408 04 10 22 04 14 22 3C120 05 35 00 57.8 209.6 1.0 24.2 -20 1 9 2408 04 14 22 04 18 21 --- 05 39 00 57.3 211.3 1.1 25.6 219 F 1 4004 04 14 22 04 18 21 3C111 05 39 00 73.4 288.9 1.3 96.9 -58 1 9 4004 04 18 21 04 22 20 --- 05 43 00 72.6 288.5 1.4 96.0 182 F 1 5599 04 18 21 04 22 20 0336-019 05 43 00 43.8 225.1 2.1 35.9 -64 1 9 5599 04 22 20 04 26 20 --- 05 47 00 43.2 226.3 2.1 36.7 176 F 1 7195 04 22 20 Schedule for VLBA_PT (Code Pt ) Page 8 BM230 VLBA format 7 mm ~ 0200-1800 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 29 Jan 2006 Day 29 --- 04 26 20 0735+178 05 47 00 60.1 116.7 -1.9 -50.8 -79 1 9 7195 04 26 20 04 31 19 --- 05 52 00 61.0 118.2 -1.8 -49.8 220 F 1 9189 04 26 20 04 31 19 0420-014 05 52 00 48.8 214.8 1.5 28.1 -70 1 9 9189 04 31 19 04 35 18 --- 05 56 00 48.3 216.1 1.5 29.2 169 F 1 10785 04 31 19 04 35 18 3C120 05 56 00 55.3 218.1 1.4 30.8 -20 1 9 10785 04 35 18 04 39 18 --- 06 00 00 54.8 219.5 1.4 31.9 219 F 1 12381 04 35 18 04 39 18 3C111 06 00 00 69.3 287.8 1.7 92.7 -51 1 9 12381 04 39 18 04 43 17 --- 06 04 00 68.5 287.7 1.8 92.0 188 F 1 13976 04 39 18 04 43 17 0336-019 06 04 00 40.6 230.7 2.4 39.8 -62 1 9 13976 04 43 17 04 47 16 --- 06 08 00 39.9 231.7 2.5 40.5 177 F 1 15572 04 43 17 04 47 16 0735+178 06 08 00 63.9 123.7 -1.5 -46.2 -78 1 9 15572 04 47 16 04 52 15 --- 06 13 00 64.7 125.6 -1.4 -44.8 221 F 1 17566 04 47 16 04 52 15 0420-014 06 13 00 46.1 221.5 1.8 33.2 -70 1 10 17566 04 52 15 04 56 15 --- 06 17 00 45.5 222.7 1.9 34.1 169 R 1 15971 04 52 15 04 56 15 3C120 06 17 00 52.4 225.5 1.7 36.3 -20 1 10 15971 04 56 15 05 00 14 --- 06 21 00 51.8 226.8 1.8 37.2 220 R 1 14375 04 56 15 05 00 14 3C111 06 21 00 65.2 287.6 2.0 89.3 -47 1 10 14375 05 00 14 05 04 13 --- 06 25 00 64.4 287.6 2.1 88.7 193 R 1 12780 05 00 14 05 04 13 0336-019 06 25 00 37.1 235.8 2.8 43.1 -61 1 10 12780 05 04 13 05 08 13 --- 06 29 00 36.4 236.7 2.8 43.7 179 R 1 11184 05 04 13 05 08 13 0735+178 06 29 00 67.3 132.6 -1.2 -39.7 -75 1 10 11184 05 08 13 05 13 12 --- 06 34 00 68.0 135.0 -1.1 -37.8 224 R 1 9189 05 08 13 05 13 12 0420-014 06 34 00 43.1 227.5 2.2 37.5 -68 1 10 9189 05 13 12 05 17 11 --- 06 38 00 42.4 228.6 2.2 38.3 172 R 1 7594 05 13 12 05 17 11 3C120 06 38 00 49.2 231.9 2.1 40.8 -19 1 10 7594 05 17 11 05 21 11 --- 06 42 00 48.5 233.1 2.1 41.5 220 R 1 5998 05 17 11 05 21 11 3C111 06 42 00 61.0 287.9 2.4 86.3 -43 1 10 5998 05 21 11 05 25 10 --- 06 46 00 60.2 288.1 2.5 85.8 197 R 1 4402 05 21 11 Schedule for VLBA_PT (Code Pt ) Page 9 BM230 VLBA format 7 mm ~ 0200-1800 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 29 Jan 2006 Day 29 --- 05 25 10 0336-019 06 46 00 33.4 240.4 3.1 45.9 -60 1 10 4402 05 25 10 05 29 09 --- 06 50 00 32.7 241.2 3.2 46.4 180 R 1 2807 05 25 10 05 29 09 0735+178 06 50 00 70.2 143.8 -0.8 -30.8 -81 1 10 2807 05 29 09 05 34 09 --- 06 55 00 70.8 146.9 -0.7 -28.2 218 R 1 812 05 29 09 05 34 09 0420-014 06 55 00 39.7 232.9 2.5 41.2 -68 1 11 812 05 34 09 05 38 08 --- 06 59 00 39.1 233.9 2.6 41.9 171 F 1 783 05 34 09 05 38 08 3C120 06 59 00 45.6 237.6 2.4 44.5 -19 1 11 783 05 38 08 05 42 07 --- 07 03 00 44.9 238.6 2.5 45.1 220 F 1 2379 05 38 08 05 42 07 3C111 07 03 00 56.9 288.6 2.7 83.7 -39 1 11 2379 05 42 07 05 46 07 --- 07 07 00 56.1 288.8 2.8 83.2 200 F 1 3975 05 42 07 05 46 07 0336-019 07 07 00 29.6 244.6 3.5 48.3 -59 1 11 3975 05 46 07 05 50 06 --- 07 11 00 28.8 245.3 3.5 48.7 180 F 1 5570 05 46 07 05 50 06 0735+178 07 11 00 72.3 158.0 -0.5 -19.0 -93 1 11 5570 05 50 06 05 55 05 --- 07 16 00 72.6 161.8 -0.4 -15.8 206 F 1 7565 05 50 06 05 55 05 0420-014 07 16 00 36.2 237.8 2.9 44.4 -79 1 11 7565 05 55 05 05 59 04 --- 07 20 00 35.4 238.7 2.9 44.9 160 F 1 9160 05 55 05 05 59 04 3C120 07 20 00 41.9 242.6 2.8 47.5 -19 1 11 9160 05 59 04 06 03 04 --- 07 24 00 41.1 243.5 2.8 48.0 220 F 1 10756 05 59 04 06 03 04 3C111 07 24 00 52.8 289.6 3.1 81.2 -37 1 11 10756 06 03 04 06 07 03 --- 07 28 00 52.0 289.8 3.2 80.8 203 F 1 12352 06 03 04 06 07 03 0336-019 07 28 00 25.6 248.4 3.8 50.2 -59 1 11 12352 06 07 03 06 11 02 --- 07 32 00 24.8 249.1 3.9 50.6 180 F 1 13947 06 07 03 06 13 02 0735+178 07 34 00 73.4 176.3 -0.1 -3.2 17 1 11 13947 06 13 02 06 18 01 --- 07 39 00 73.4 180.4 0.0 0.4 299 F 1 15942 06 13 15 06 18 01 0420-014 07 39 00 32.0 242.6 3.3 47.2 -89 1 11 15942 06 18 01 06 22 01 --- 07 43 00 31.3 243.4 3.3 47.6 151 F 1 17537 06 18 01 06 22 01 3C120 07 43 00 37.6 247.5 3.2 50.1 -19 1 12 17537 06 22 01 06 26 00 --- 07 47 00 36.8 248.3 3.2 50.5 221 R 1 15942 06 22 01 Schedule for VLBA_PT (Code Pt ) Page 10 BM230 VLBA format 7 mm ~ 0200-1800 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 29 Jan 2006 Day 29 --- 06 26 00 3C111 07 47 00 48.4 290.8 3.5 78.7 -34 1 12 15942 06 26 00 06 29 59 --- 07 51 00 47.6 291.1 3.5 78.2 205 R 1 14346 06 26 00 06 29 59 0735+178 07 51 00 73.2 190.3 0.2 8.9 -73 1 12 14346 06 29 59 06 34 59 --- 07 56 00 72.9 194.3 0.3 12.4 226 R 1 12352 06 29 59 06 34 59 0420-014 07 56 00 28.9 245.9 3.5 49.0 -94 1 12 12352 06 34 59 06 38 58 --- 08 00 00 28.1 246.7 3.6 49.3 145 R 1 10756 06 34 59 06 38 58 3C120 08 00 00 34.3 250.8 3.4 51.6 -18 1 12 10756 06 38 58 06 43 57 --- 08 05 00 33.3 251.8 3.5 52.0 281 R 1 8761 06 38 58 06 43 57 3C111 08 05 00 44.9 291.9 3.8 76.7 -33 1 12 8761 06 43 57 06 49 56 --- 08 11 00 43.7 292.3 3.9 76.0 326 R 1 6368 06 43 57 06 49 56 0735+178 08 11 00 71.9 205.6 0.5 22.0 -64 1 12 6368 06 49 56 06 54 55 --- 08 16 00 71.4 209.1 0.6 25.0 235 R 1 4373 06 49 56 06 54 55 0420-014 08 16 00 25.0 249.5 3.9 50.7 -99 1 12 4373 06 54 55 06 58 55 --- 08 20 00 24.3 250.2 3.9 51.0 141 R 1 2778 06 54 55 06 58 55 3C120 08 20 00 30.3 254.4 3.8 53.1 -18 1 12 2778 06 58 55 07 03 54 --- 08 25 00 29.3 255.3 3.9 53.4 281 R 1 783 06 58 55 07 03 54 3C111 08 25 00 41.1 293.3 4.1 74.5 -31 1 13 783 07 03 54 07 09 53 --- 08 31 00 39.9 293.7 4.2 73.9 328 F 1 1610 07 03 54 07 09 53 0735+178 08 31 00 69.7 218.5 0.9 32.7 -65 1 13 1610 07 09 53 07 14 52 --- 08 36 00 69.0 221.3 1.0 34.9 234 F 1 3605 07 09 53 07 14 52 0420-014 08 36 00 21.1 252.9 4.2 52.2 -102 1 13 3605 07 14 52 07 18 51 --- 08 40 00 20.3 253.6 4.3 52.4 138 F 1 5200 07 14 52 07 18 51 3C120 08 40 00 26.3 257.8 4.1 54.2 -18 1 13 5200 07 18 51 07 23 51 --- 08 45 00 25.3 258.6 4.2 54.4 281 F 1 7195 07 18 51 07 23 51 3C111 08 45 00 37.3 294.7 4.4 72.3 -30 1 13 7195 07 23 51 07 29 50 --- 08 51 00 36.2 295.2 4.5 71.7 329 F 1 9588 07 23 51 07 29 50 0735+178 08 51 00 66.8 228.8 1.2 40.7 -67 1 13 9588 07 29 50 07 34 49 --- 08 56 00 66.0 231.1 1.3 42.4 232 F 1 11583 07 29 50 Schedule for VLBA_PT (Code Pt ) Page 11 BM230 VLBA format 7 mm ~ 0200-1800 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 29 Jan 2006 Day 29 --- 07 34 49 0420-014 08 56 00 17.2 256.1 4.5 53.3 -104 1 13 11583 07 34 49 07 38 48 --- 09 00 00 16.3 256.7 4.6 53.5 136 F 1 13179 07 34 49 07 38 48 3C120 09 00 00 22.3 261.0 4.4 55.0 -18 1 13 13179 07 38 48 07 43 47 --- 09 05 00 21.3 261.7 4.5 55.2 281 F 1 15173 07 38 48 07 43 47 3C111 09 05 00 33.6 296.3 4.8 70.2 -31 1 13 15173 07 43 47 07 49 46 --- 09 11 00 32.5 296.8 4.9 69.5 328 F 1 17567 07 43 47 07 49 46 0735+178 09 11 00 63.5 237.0 1.5 46.7 -68 1 14 17567 07 49 46 07 54 45 --- 09 16 00 62.6 238.8 1.6 47.9 231 R 1 15572 07 49 46 07 54 45 0420-014 09 16 00 13.1 259.2 4.9 54.3 -105 1 14 15572 07 54 45 07 58 45 --- 09 20 00 12.3 259.8 4.9 54.4 134 R 1 13976 07 54 45 07 58 45 3C120 09 20 00 18.2 264.0 4.8 55.6 -18 1 14 13976 07 58 45 08 03 44 --- 09 25 00 17.2 264.7 4.9 55.7 281 R 1 11982 07 58 45 08 03 44 3C111 09 25 00 29.9 297.9 5.1 67.9 -31 1 14 11982 08 03 44 08 09 43 --- 09 31 00 28.8 298.4 5.2 67.3 328 R 1 9588 08 03 44 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v7mm-128-8-1.set Matches group v7mm_c8 in /home/filehost/cwalker/sched/catalogs/freq.dat Setup group: 6 Station: VLBA_PT Total bit rate: 128 Format: VLBA1:4 Bits per sample: 1 Sample rate: 16.000 Number of channels: 8 Passes/head pos: 1 Speedup factor: 2.00 Tape used at high density at 80.000 ips. Time per pass is 44.00 minutes. 1st LO= 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = A C A C A C A C VLBA FE= 7mm omit 7mm omit VLBA Synth= 15.4 7.6 11.6 The following frequency sets based on this setup were used. Frequency Set: 6 Setup file default. Used pcal sets: 1 LO sum= 43201.49 43201.49 43209.49 43209.49 43217.49 43217.49 43225.49 43225.49 BBC fr= 801.49 801.49 809.49 809.49 817.49 817.49 825.49 825.49 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 6510 6510 6510 6510 PCALFR2= 510 510 510 510 6510 6510 6510 6510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_auto SOURCE LIST -- BM230 VLBA format 7 mm ~ 0200-1800 LST Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * 3C111 04 15 00.613041 * 04 18 21.280000 04 18 46.275484 0.00 37 54 19.24071 * 38 01 35.76000 38 02 42.67067 0.00 From catalog imbedded in main SCHED input file. 2.560 scan hours, 86.393 baseline hours above horizon. J0339-0146 03 36 58.953150 * 03 39 30.937790 03 39 49.826613 0.20 * 0336-019 -01 56 16.89653 *-01 46 35.80413 -01 45 24.42997 0.30 CTA26 /home/arana/cwalker/sched/catalogs/sources.vlba J0339-01 VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro 1.596 scan hours, 44.606 baseline hours above horizon. J0423-0120 04 20 43.539850 * 04 23 15.800727 04 23 34.950237 0.20 * 0420-014 -01 27 28.70008 *-01 20 33.06538 -01 19 40.81983 0.30 J0423-01 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro 2.177 scan hours, 65.747 baseline hours above horizon. J0433+0521 04 30 31.602058 * 04 33 11.095527 04 33 31.150907 0.30 0430+052 05 14 59.61639 * 05 21 15.61917 05 22 05.18416 0.20 * 3C120 /home/arana/cwalker/sched/catalogs/sources.vlba J0433+05 VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro 2.294 scan hours, 84.409 baseline hours above horizon. J0738+1742 07 35 14.126463 * 07 38 07.393751 07 38 29.853668 0.32 * 0735+178 17 49 09.26245 * 17 42 18.99824 17 41 32.80841 0.20 J0738+17 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro 1.230 scan hours, 38.449 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) 3C111 119.0 0336-019 102.2 0420-014 112.7 3C120 117.2 0735+178 163.9 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg