VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC159 Observer: Claussen. M. Project type: VLBA Obs filename: bc159crd.* Date/Day: 2006JAN23/023 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK Y =UT-Time===Comment===============================================MF#===%AD==AMD= 1330 Begin file. VCLOCK check ok. SC at -0.105 UT1-UTC check ok. GPS delta < 10 us Mark5 recording status: HN bank B pack NRAO-144 FD bank B pack NRAO-128 LA bank A pack NRAO-042 PT bank B pack NRAO-148 KP bank B pack NRAO-008 BR bank A pack NRAO-141 MK bank B pack NRAO-056 SC, NL, OV, Y on tape Operator: T. Perreault 1330-1335 *SC,NL,OV: the observe files that were sent out to HUERR 300 15 these sites were set up to write to tape and not to disc. When data began to be recorded, the Mark5 units were still ONLINE. The initial 5 minutes of monitor data on the tape for each of these sites will be bad. The observe file for PT and MK was also supposed to write to tape; PT had no tapes mounted and AUTOALLOCATE complained. I was able to convert the files for PT and MK from tape to disc recording and sent the files out to the sites before observing started. 1330 HN wea: snowing 1330-2132 %FD at the beginning of each source, the Mark5 17550 10 48 unit is reformatting the formatter, causing the Mark5 to go into a PAUSE state where data are not recorded. 1330-2132 %KP there may be an issue with hard drive 6 17552 in pack NRAO-008 1336 %NL bad readback drive 1 track 8; all other sites ok 1404 HN wea: overcast, heavy snow 1413 Readback check ok 1438 Begin MK. 1452-1454 *NL: power hit autostow, repointed. COM 100 2 1547 KP writing on NRAO-062, Bank A. 1640 Readbacks ok. 1647 %NL: snow. 1718 Readbacks ok. 1734 LA writing on NRAO-063, Bank B. 1832 %NL: bad readback track 8 drive 1. All others ok. 1909 Readbacks ok. 1929-1942 *HN: gap in data: disk pac change. REC 100 13 1938 %MK: alto cumulus. 1942 HN writing on NRAO-127, Bank B. 1959-2010 *KP: power hit autostow, repointed. COM 100 11 2018 End SC 2018 End HN. 2132 End. Downtime Summary: Total downtime : 89 min Percentage downtime of observing: 1.7% Average downtime per hour : 1.0 min Total scheduled observing time (# Antennas): 5302 min (11) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.