SUMMARY FILE FOR PROJECT: BK113D COVER INFORMATION: Experiment: BK113D: R Leo and R Crt 3mm & 7mm SiO Exp. Code: BK113D Start Day 19 is Wed 19 Jan 2005 MJD 53389 Schedule Version: 3.00 Processed by SCHED version: NRAO internal release of 4 October 2004 PI: Athol Kemball Address: NCSA/UIUC 605 E. Springfield Ave Champaign, IL 61820 Phone: 217 244 2756 EMAIL: akemball@uiuc.edu Fax: 217 244 0287 Phone during observation: 217 384 5166 Observing mode: 3mm & 7mm Notes: Spectral line polarimetry at 3mm & 7mm Please ensure pulse cal is OFF Please use all available 3mm antennas No cover letter provided. CORRELATION REQUESTS (Defaults in parentheses): Correlator (Required if recording): SOCORRO Correlator average time (2 sec): 2.000 sec. Alternate average time (for spacecraft). 0.000 sec. Spectral channels per baseband (16): 128 Number of antennas to be correlated: 10 Polarization (ON): ON Correlator weighting function (UNIFORM): UNIFORM Distribution tape (DAT): DAT Source positions from: PLEASE USE COORDINATES IN SCHEDULE FOR R LEO & R CRT Shipping address for correlator output: Athol Kemball NCSA / UIUC 605 E. Springfield Ave Champaign, IL 61820 Correlator Notes: DERIVED INFORMATION FOR CORRELATION: Elapsed time for project: 5.93 hours. Total time in scheduled scans: 10.28 hours. Total time in recording scans: 10.04 hours. Total number of baseline hours: 206.42 (Recording scans only) Projected maximum data output rate from the correlator: 737.3 kbytes/sec if processed in one pass. Projected correlator output data set size: 4778.2 Mbytes NOTE: Above numbers assume the same correlator parameters are used for all data. NOTE: Output data set size large. Consider requesting high density tapes. **** Overlapping scans were detected. Either there was subarraying or some stations were scheduled separtely from others. If the latter, the output data rates and volume are underestimated because the number of baselines was underestimated. This might be do to inserted pointing scans in which case there is no impact on data estimates. STATIONS USED IN SCHEDULE: Station Code Latitude Longitude Elevation X Y Z VLBA_NL Nl 41.77142 91.57414 222. -130872.25 -4762317.11 4226851.04 VLBA_FD Fd 30.63503 103.94482 1606. -1324009.13 -5332181.96 3231962.47 VLBA_LA La 35.77512 106.24560 1962. -1449752.36 -4975298.59 3709123.93 VLBA_PT Pt 34.30102 108.11919 2365. -1640953.71 -5014816.02 3575411.88 VLBA_KP Kp 31.95630 111.61242 1902. -1995678.63 -5037317.71 3357328.13 VLBA_OV Ov 37.23165 118.27705 1196. -2409150.11 -4478573.23 3838617.40 VLBA_MK Mk 19.80138 155.45550 3763. -5464074.96 -2495249.12 2148296.84 VLBA_BR Br 48.13122 119.68328 251. -2112064.98 -3705356.52 4726813.80 VLBA_HN Hn 42.93361 71.98658 296. 1446375.12 -4447939.65 4322306.12 VLA1 Y 34.07697 107.61358 2114. -1600801.73 -5042219.03 3554706.24 BASELINE LENGTHS (km) Nl Fd La Pt Kp Ov Mk Br Hn Y Nl 0 1654 1432 1663 2075 2328 6156 2300 1611 1640 Fd 1654 0 608 564 744 1508 5134 2345 3105 514 La 1432 608 0 236 652 1088 4970 1757 3006 226 Pt 1663 564 236 0 417 973 4795 1806 3226 52 Kp 2075 744 652 417 0 845 4466 1913 3623 441 Ov 2328 1508 1088 973 845 0 4015 1214 3885 1025 Mk 6156 5134 4970 4795 4466 4015 0 4398 7502 4836 Br 2300 2345 1757 1806 1913 1214 4398 0 3657 1849 Hn 1611 3105 3006 3226 3623 3885 7502 3657 0 3198 Y 1640 514 226 52 441 1025 4836 1849 3198 0 RECORDING SYSTEM INFORMATION: TAPES - Stations potentially recording on tape. (See setup details later for times per pass.) Station Drives Head pos Tape len Density Start position Auto Auto Recorder (ft) Driv Head indx Aloc Reverse VLBA_NL 2 14 17600 High 1 1 Yes Yes VLBA VLBA_FD 2 14 17600 High 1 1 Yes Yes VLBA VLBA_LA 2 14 17600 High 1 1 Yes Yes VLBA VLBA_PT 2 14 17600 High 1 1 Yes Yes VLBA VLBA_KP 2 14 17600 High 1 1 Yes Yes VLBA VLBA_OV 2 14 17600 High 1 1 Yes Yes VLBA VLBA_MK 2 14 17600 High 1 1 Yes Yes VLBA VLBA_BR 2 14 17600 High 1 1 Yes Yes VLBA VLBA_HN 2 14 17600 High 1 1 Yes Yes VLBA VLA1 2 14 17600 High 1 1 Yes Yes VLBA EXPERIMENT SUMMARY: Number of input scans: 48 Number of scans scheduled: 62 Number of stations: 10 Number of sources input: 4 Number of setup files used: 4 Station summaries (tape stations): Station Control Scans Scan Hours Tape hours Tapes Passes Readbacks VLBA_NL VLBA 38 5.26 5.28 1 8 4 VLBA_FD VLBA 38 5.26 5.28 1 8 4 VLBA_LA VLBA 38 5.26 5.28 1 8 4 VLBA_PT VLBA 38 5.26 5.28 1 8 4 VLBA_KP VLBA 38 5.26 5.28 1 8 4 VLBA_OV VLBA 38 5.26 5.28 1 8 4 VLBA_MK VLBA 37 4.99 4.99 1 7 5 VLBA_BR VLBA 38 5.26 5.28 1 8 4 VLBA_HN VLBA 16 2.56 2.80 1 4 7 VLA1 VLA 24 5.02 5.73 1 8 4 Station summaries (disk stations): Station Control Scans Scan Hours Record hrs Gbytes Note: Tapes started before scan start time 255 times. See PRESTART and MINPAUSE. They may have been kept running through short scan gaps. The number can be large because each station/scan combination counts. Setup file: v7mm-sio.set Matches group v7mm_b8 in /home/filehost/cwalker/sched/catalogs/freq.dat Setup group: 1 Station: VLBA Total bit rate: 128 Format: VLBA1:2 Bits per sample: 2 Sample rate: 8.000 Number of channels: 8 Passes/head pos: 1 Speedup factor: 2.00 Tape speeds: Low density - 133.330 ips, High density - 80.00 ips Time per pass for 17600 ft, High density tapes is: 00:44:00 1st LO= 42200.00 42200.00 42200.00 42200.00 42200.00 42200.00 42200.00 42200.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = A C A C A C A C VLBA FE= 7mm omit 7mm omit VLBA Synth= 15.4 7.4 11.6 The following frequency sets based on this setup were used. Frequency Set: 4 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 43121.21 43121.21 43125.21 43125.21 42819.65 42819.65 42878.99 42878.99 BBC fr= 921.21 921.21 925.21 925.21 619.65 619.65 678.99 678.99 Bandwd= 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 Frequency Set: 5 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 43120.56 43120.56 43124.56 43124.56 42819.01 42819.01 42878.35 42878.35 BBC fr= 920.56 920.56 924.56 924.56 619.01 619.01 678.35 678.35 Bandwd= 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 2 PCAL = OFF PCALXB1= S1 S2 S3 S4 S5 S6 S7 S8 PCALXB2= M1 M2 M3 M4 M5 M6 M7 M8 PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_auto Setup file: v7mm-sio-vla.set --- WARNING --- This group does not match an entry in the frequency catalog. This might be ok because the catalog is not complete. But be very careful to be sure that the setup is correct. Setup group: 2 Station: VLA1 Total bit rate: 128 Format: VLBA1:2 Bits per sample: 2 Sample rate: 8.000 Number of channels: 8 Passes/head pos: 1 Speedup factor: 2.00 Tape speeds: Low density - 133.330 ips, High density - 80.00 ips Time per pass for 17600 ft, High density tapes is: 00:44:00 1st LO= 42510.10 42510.10 42510.10 42510.10 42510.10 42510.10 42510.10 42510.10 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D The following frequency sets based on this setup were used. Frequency Set: 6 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 43121.21 43121.21 43125.21 43125.21 43129.21 43129.21 43133.21 43133.21 BBC fr= 611.11 611.11 615.11 615.11 619.11 619.11 623.11 623.11 Bandwd= 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 Frequency Set: 7 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 43120.56 43120.56 43124.56 43124.56 43128.56 43128.56 43132.56 43132.56 BBC fr= 610.46 610.46 614.46 614.46 618.46 618.46 622.46 622.46 Bandwd= 4.000 4.000 4.000 4.000 4.000 4.000 4.000 4.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 2 PCAL = OFF PCALXB1= S1 S2 S3 S4 S5 S6 S7 S8 PCALXB2= M1 M2 M3 M4 M5 M6 M7 M8 PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_auto VLA specific information: (LO and FI cards will be written.) VLABAND: VQ VLABW: 0000 FEFILTER: 0000 VLAFEAB: 51.60 VLAFECD: 13.40 VLAIF: SYSQIF VLASYNA: 3910.10 VLASYNB: 3910.10 VLAROT: VLBQROT FLUKEA: 100.00 FLUKEB: 200.00 FLUKESET: 0 Details for VLA IFs: LO Sum Frequency span VLBI FIRSTLO VLA IF A: 43110.1000 43110.1000-43160.1000 42510.1000 VLA IF B: 43110.1000 43110.1000-43160.1000 42510.1000 VLA IF C: 43110.1000 43110.1000-43160.1000 42510.1000 VLA IF D: 43110.1000 43110.1000-43160.1000 42510.1000 With new digital patch panel, VLA IF = VLB IF. Setup file: v3mm-sio.set Matches group v3mm_ff in /home/filehost/cwalker/sched/catalogs/freq.dat Setup group: 3 Station: VLBA Total bit rate: 128 Format: VLBA1:4 Bits per sample: 2 Sample rate: 16.000 Number of channels: 4 Passes/head pos: 1 Speedup factor: 2.00 Tape speeds: Low density - 133.330 ips, High density - 80.00 ips Time per pass for 17600 ft, High density tapes is: 00:44:00 1st LO= 85500.00 85500.00 85500.00 85500.00 Net SB= U U U U Pol. = RCP LCP RCP LCP BBC = 1 2 3 4 BBC SB= U U U U IF = B D B D VLBA FE= omit 3mm omit 3mm VLBA Synth= 12.9 15.4 12.1 The following frequency sets based on this setup were used. Frequency Set: 2 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 86241.73 86241.73 86249.73 86249.73 BBC fr= 741.73 741.73 749.73 749.73 Bandwd= 8.000 8.000 8.000 8.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S2 S3 S4 OFF OFF OFF OFF PCALXB2= M1 M2 M3 M4 OFF OFF OFF OFF PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Track assignments are: track1= 2, 18, 3, 19 barrel=roll_auto Setup file: /home/filehost/cwalker/sched/setups/pt7mm.set Matches group v7mm_c8 in /home/filehost/cwalker/sched/catalogs/freq.dat Setup group: 4 Station: VLBA Total bit rate: 256 Format: NONE Bits per sample: 2 Sample rate: 32.000 Number of channels: 4 Passes/head pos: 0 Speedup factor: 0.00 1st LO= 42400.00 42400.00 42400.00 42400.00 Net SB= U U U U Pol. = RCP LCP RCP LCP BBC = 1 2 3 4 BBC SB= U U U U IF = A C A C VLBA FE= 7mm omit 7mm omit VLBA Synth= 15.4 7.6 11.6 The following frequency sets based on this setup were used. Frequency Set: 1 Setup file default. Used pcal sets: 1 LO sum= 43115.99 43115.99 43215.99 43215.99 BBC fr= 715.99 715.99 815.99 815.99 Bandwd= 16.000 16.000 16.000 16.000 Frequency Set: 3 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 43122.21 43122.21 43222.21 43222.21 BBC fr= 722.21 722.21 822.21 822.21 Bandwd= 2.000 2.000 2.000 2.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S2 S3 S4 OFF OFF OFF OFF PCALXB2= M1 M2 M3 M4 OFF OFF OFF OFF PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Track assignments are: barrel=roll_off SUMMARY for experiment BK113D BK113D: R Leo and R Crt 3mm & 7mm SiO Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: End elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 19 is Wed 19 Jan 2005 MJD 53389 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Nl Fd La Pt Kp Ov Mk Br Hn Y 19 06:31:55 J0359+50 P 46 46 51 51 52 60 59 66 --- --- 19 06:32:55 setups/pt7mm N 45 46 51 51 52 59 59 66 --- --- 19 06:32:55 J0359+50 P 45 46 51 51 52 59 59 66 --- --- 19 06:33:55 - N 45 46 51 51 52 59 59 66 --- --- 19 06:34:00 J0359+50 - 45 46 51 51 52 59 59 66 --- --- 19 06:47:00 v3mm-sio - 43 44 49 49 50 57 59 64 --- --- 19 06:49:55 RLEO P 56 56 52 52 50 43 12 37 --- --- 19 06:50:55 setups/pt7mm N 56 57 52 52 50 43 12 37 --- --- 19 06:51:00 RLEO - 56 57 52 52 50 43 12 38 --- --- 19 07:15:00 v3mm-sio - 58 61 56 56 55 47 18 41 --- --- 19 07:15:40 RLEO - 58 61 56 56 55 48 18 41 58 --- 19 07:24:00 v7mm-sio - 59 63 58 58 56 49 20 42 57 --- 19 07:26:00 RCRT - 25 28 23 23 23 15 ---D 8 28 --- 19 07:42:00 - - 26 31 25 26 25 18 ---D 10 29 --- 19 07:44:00 J0359+50 - 35 35 40 40 41 48 55 55 25 --- 19 07:51:00 - - 34 34 39 39 40 47 55 54 24 --- 19 07:53:00 J0359+50 - 34 34 38 39 39 47 54 54 24 --- 19 08:00:00 - - 33 32 37 38 38 46 54 53 23 --- 19 08:01:55 J0359+50 P 32 32 37 37 38 45 54 52 --- --- 19 08:02:55 setups/pt7mm N 32 32 37 37 38 45 53 52 --- --- 19 08:02:55 J0359+50 P 32 32 37 37 38 45 53 52 --- --- 19 08:03:55 - N 32 32 37 37 38 45 53 52 --- --- 19 08:04:00 J0359+50 - 32 32 37 37 38 45 53 52 --- --- 19 08:17:00 v3mm-sio - 30 30 35 35 36 43 52 50 --- --- 19 08:19:55 RLEO P 59 70 64 65 65 58 33 49 --- --- 19 08:20:55 setups/pt7mm N 59 70 64 65 65 58 33 49 --- --- 19 08:21:00 RLEO - 59 70 64 65 65 58 33 49 --- --- 19 08:45:00 v3mm-sio - 58 71 65 67 68 61 39 51 --- --- 19 08:45:40 RLEO - 58 71 65 67 68 61 39 51 48 --- 19 08:54:00 v7mm-sio - 57 71 66 67 69 62 41 51 47 --- 19 08:56:00 RCRT - 30 39 33 34 35 27 13 18 27 --- 19 09:12:00 - - 30 40 34 35 36 29 17 19 26 --- SUMMARY for experiment BK113D BK113D: R Leo and R Crt 3mm & 7mm SiO Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: End elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 19 is Wed 19 Jan 2005 MJD 53389 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Nl Fd La Pt Kp Ov Mk Br Hn Y 19 09:14:00 J0359+50 - 23 21 26 26 27 34 45 42 15 --- 19 09:21:00 v7mm-sio - 22 20 25 25 26 33 44 41 15 --- 19 09:23:00 J0359+50 - 22 20 25 25 25 33 43 41 14 --- 19 09:30:00 - - 21 19 24 24 24 32 42 40 14 --- 19 09:31:55 RLEO P 53 68 64 66 69 64 50 53 --- --- 19 09:32:55 setups/pt7mm N 53 68 64 66 69 64 50 53 --- --- 19 09:32:55 RLEO P 53 68 64 66 69 64 50 53 --- --- 19 09:33:55 - N 53 68 64 66 69 64 51 53 --- --- 19 09:34:00 RLEO - 53 68 64 66 69 64 51 53 --- --- 19 09:58:00 v3mm-sio - 50 65 62 64 68 64 56 53 --- --- 19 09:59:55 3C279 P 40 44 39 39 38 31 7 23 --- --- 19 10:00:55 setups/pt7mm N 40 44 39 39 39 31 7 23 --- --- 19 10:00:55 3C279 P 40 44 39 39 39 31 7 23 --- --- 19 10:01:55 - N 40 44 39 39 39 31 7 24 --- --- 19 10:02:00 3C279 - 40 44 39 39 39 31 7 24 --- --- 19 10:15:00 v3mm-sio - 41 46 41 41 41 33 10 25 --- --- 19 10:15:40 RLEO - 47 62 60 62 66 63 60 53 34 --- 19 10:24:00 v7mm-sio - 46 61 59 61 65 63 62 53 32 --- 19 10:26:00 RCRT - 27 41 36 37 40 34 31 23 19 --- 19 10:42:00 - - 26 40 35 37 40 34 34 23 17 --- 19 10:44:00 3C279 - 42 50 44 45 45 37 17 28 40 --- 19 10:51:00 - - 42 50 45 45 46 38 19 29 39 --- 19 10:53:00 3C279 - 42 51 45 46 46 39 19 29 39 --- 19 11:00:00 - - 42 51 46 46 47 39 21 30 39 --- 19 11:01:55 RLEO P 40 54 53 55 59 59 71 50 --- --- 19 11:02:55 setups/pt7mm N 40 53 53 55 58 59 71 50 --- --- 19 11:02:55 RLEO P 40 53 53 55 58 59 71 50 --- --- 19 11:03:55 - N 39 53 52 54 58 59 71 50 --- --- 19 11:04:00 RLEO - 39 53 52 54 58 59 71 50 --- --- 19 11:28:00 v3mm-sio - 35 48 48 50 54 55 76 48 --- --- 19 11:29:55 3C279 P 42 53 48 49 50 43 27 33 --- --- 19 11:30:55 setups/pt7mm N 42 53 48 49 50 43 28 33 --- --- SUMMARY for experiment BK113D BK113D: R Leo and R Crt 3mm & 7mm SiO Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: End elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 19 is Wed 19 Jan 2005 MJD 53389 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Nl Fd La Pt Kp Ov Mk Br Hn Y 19 11:30:55 3C279 P 42 53 48 49 50 43 28 33 --- --- 19 11:31:55 setups/pt7mm N 42 53 48 49 50 43 28 33 --- --- 19 11:32:00 3C279 - 42 53 48 49 50 43 28 33 --- --- 19 11:45:00 v3mm-sio - 42 53 48 49 51 44 31 34 --- --- 19 11:45:40 RLEO - 32 45 45 47 50 53 79 46 18 --- 19 11:54:00 v7mm-sio - 31 43 43 45 49 51 80 45 16 --- 19 11:56:00 RCRT - 19 34 30 32 36 33 46 22 7 --- 19 12:12:00 - - 17 32 29 31 34 32 48 22 5H --- 19 12:14:00 3C279 - 40 53 48 50 52 46 37 35 31 --- 19 12:21:00 - - 39 53 48 50 52 46 39 35 30 --- 19 12:23:00 3C279 - 39 53 48 50 52 46 39 35 30 --- 19 12:30:00 - - 39 53 48 50 52 47 41 36 29 --- 19 06:34:00 J0359+50 - --- --- --- --- --- --- --- --- --- 51 19 06:47:00 v7mm-sio-vla - --- --- --- --- --- --- --- --- --- 49 19 06:51:00 RLEO - --- --- --- --- --- --- --- --- --- 52 19 07:15:00 - - --- --- --- --- --- --- --- --- --- 57 19 07:15:40 RLEO - --- --- --- --- --- --- --- --- --- 57 19 07:24:00 - - --- --- --- --- --- --- --- --- --- 58 19 07:26:00 RCRT - --- --- --- --- --- --- --- --- --- 24 19 07:42:00 - - --- --- --- --- --- --- --- --- --- 26 19 07:44:00 J0359+50 - --- --- --- --- --- --- --- --- --- 40 19 07:51:00 - - --- --- --- --- --- --- --- --- --- 38 19 07:53:00 J0359+50 - --- --- --- --- --- --- --- --- --- 38 19 08:00:00 - - --- --- --- --- --- --- --- --- --- 37 19 08:04:00 J0359+50 - --- --- --- --- --- --- --- --- --- 36 19 08:17:00 - - --- --- --- --- --- --- --- --- --- 34 19 08:21:00 RLEO - --- --- --- --- --- --- --- --- --- 65 19 08:45:00 - - --- --- --- --- --- --- --- --- --- 67 19 08:45:40 RLEO - --- --- --- --- --- --- --- --- --- 67 19 08:54:00 - - --- --- --- --- --- --- --- --- --- 67 19 08:56:00 RCRT - --- --- --- --- --- --- --- --- --- 34 19 09:12:00 - - --- --- --- --- --- --- --- --- --- 35 SUMMARY for experiment BK113D BK113D: R Leo and R Crt 3mm & 7mm SiO Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: End elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 19 is Wed 19 Jan 2005 MJD 53389 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Nl Fd La Pt Kp Ov Mk Br Hn Y 19 09:14:00 J0359+50 - --- --- --- --- --- --- --- --- --- 26 19 09:21:00 v7mm-sio-vla - --- --- --- --- --- --- --- --- --- 25 19 09:23:00 J0359+50 - --- --- --- --- --- --- --- --- --- 25 19 09:30:00 - - --- --- --- --- --- --- --- --- --- 24 19 09:34:00 RLEO - --- --- --- --- --- --- --- --- --- 66 19 09:58:00 - - --- --- --- --- --- --- --- --- --- 64 19 10:02:00 3C279 - --- --- --- --- --- --- --- --- --- 40 19 10:15:00 - - --- --- --- --- --- --- --- --- --- 42 19 10:15:40 RLEO - --- --- --- --- --- --- --- --- --- 62 19 10:24:00 - - --- --- --- --- --- --- --- --- --- 61 19 10:26:00 RCRT - --- --- --- --- --- --- --- --- --- 38 19 10:42:00 - - --- --- --- --- --- --- --- --- --- 37 19 10:44:00 3C279 - --- --- --- --- --- --- --- --- --- 45 19 10:51:00 - - --- --- --- --- --- --- --- --- --- 46 19 10:53:00 3C279 - --- --- --- --- --- --- --- --- --- 46 19 11:00:00 - - --- --- --- --- --- --- --- --- --- 47 19 11:04:00 RLEO - --- --- --- --- --- --- --- --- --- 54 19 11:28:00 - - --- --- --- --- --- --- --- --- --- 50 19 11:32:00 3C279 - --- --- --- --- --- --- --- --- --- 49 19 11:45:00 - - --- --- --- --- --- --- --- --- --- 50 19 11:45:40 RLEO - --- --- --- --- --- --- --- --- --- 46 19 11:54:00 - - --- --- --- --- --- --- --- --- --- 45 19 11:56:00 RCRT - --- --- --- --- --- --- --- --- --- 32 19 12:12:00 - - --- --- --- --- --- --- --- --- --- 31 19 12:14:00 3C279 - --- --- --- --- --- --- --- --- --- 50 19 12:21:00 - - --- --- --- --- --- --- --- --- --- 50 19 12:23:00 3C279 - --- --- --- --- --- --- --- --- --- 50 19 12:30:00 - - --- --- --- --- --- --- --- --- --- 50 SUMMARY for experiment BK113D BK113D: R Leo and R Crt 3mm & 7mm SiO Top item is: Scan end: Tape drive, direction, and head index. Disk Gbytes. Bottom item is: Headset at scan end and tape footage (thousands) at scan start. Tape parameters are only predictions for stations using automatic tape allocation. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 19 is Wed 19 Jan 2005 MJD 53389 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Nl Fd La Pt Kp Ov Mk Br Hn Y 19 06:31:55 J0359+50 P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 06:32:55 setups/pt7mm N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 06:32:55 J0359+50 P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 06:33:55 - N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 06:34:00 J0359+50 - 1F01 1F01 1F01 1F01 1F01 1F01 1F01 1F01 --- --- 19 06:47:00 v3mm-sio - 1/00 1/00 1/00 1/00 1/00 1/00 1/00 1/00 --- --- 19 06:49:55 RLEO P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 06:50:55 setups/pt7mm N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 06:51:00 RLEO - 1F01 1F01 1F01 1F01 1F01 1F01 1F01 1F01 --- --- 19 07:15:00 v3mm-sio - 1/05 1/05 1/05 1/05 1/05 1/05 1/05 1/05 --- --- 19 07:15:40 RLEO - 1R02 1R02 1R02 1R02 1R02 1R02 1R02 1R02 1F01 --- 19 07:24:00 v7mm-sio - 1/15 1/15 1/15 1/15 1/15 1/15 1/15 1/15 1/00 --- 19 07:26:00 RCRT - 1R02 1R02 1R02 1R02 1R02 1R02 --- 1R02 1F01 --- 19 07:42:00 - - 1/17 1/17 1/17 1/17 1/17 1/17 --- 1/17 1/04 --- 19 07:44:00 J0359+50 - 1R02 1R02 1R02 1R02 1R02 1R02 1R02 1R02 1F01 --- 19 07:51:00 - - 1/10 1/10 1/10 1/10 1/10 1/10 1/17 1/10 1/11 --- 19 07:53:00 J0359+50 - 1R02 1R02 1R02 1R02 1R02 1R02 1R02 1R02 1F01 --- 19 08:00:00 - - 1/06 1/06 1/06 1/06 1/06 1/06 1/13 1/06 1/14 --- 19 08:01:55 J0359+50 P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 08:02:55 setups/pt7mm N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 08:02:55 J0359+50 P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 08:03:55 - N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 08:04:00 J0359+50 - 1F03 1F03 1F03 1F03 1F03 1F03 1R02 1F03 --- --- 19 08:17:00 v3mm-sio - 1/04 1/04 1/04 1/04 1/04 1/04 1/11 1/04 --- --- 19 08:19:55 RLEO P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 08:20:55 setups/pt7mm N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 08:21:00 RLEO - 1F03 1F03 1F03 1F03 1F03 1F03 1F03 1F03 --- --- 19 08:45:00 v3mm-sio - 1/02 1/02 1/02 1/02 1/02 1/02 1/05 1/02 --- --- 19 08:45:40 RLEO - 1F03 1F03 1F03 1F03 1F03 1F03 1F03 1F03 1R02 --- 19 08:54:00 v7mm-sio - 1/11 1/11 1/11 1/11 1/11 1/11 1/04 1/11 1/17 --- 19 08:56:00 RCRT - 1R04 1R04 1R04 1R04 1R04 1R04 1F03 1R04 1R02 --- 19 09:12:00 - - 1/15 1/15 1/15 1/15 1/15 1/15 1/08 1/15 1/15 --- SUMMARY for experiment BK113D BK113D: R Leo and R Crt 3mm & 7mm SiO Top item is: Scan end: Tape drive, direction, and head index. Disk Gbytes. Bottom item is: Headset at scan end and tape footage (thousands) at scan start. Tape parameters are only predictions for stations using automatic tape allocation. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 19 is Wed 19 Jan 2005 MJD 53389 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Nl Fd La Pt Kp Ov Mk Br Hn Y 19 09:14:00 J0359+50 - 1R04 1R04 1R04 1R04 1R04 1R04 1R04 1R04 1R02 --- 19 09:21:00 v7mm-sio - 1/13 1/13 1/13 1/13 1/13 1/13 1/15 1/13 1/08 --- 19 09:23:00 J0359+50 - 1R04 1R04 1R04 1R04 1R04 1R04 1R04 1R04 1R02 --- 19 09:30:00 - - 1/10 1/10 1/10 1/10 1/10 1/10 1/17 1/10 1/04 --- 19 09:31:55 RLEO P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 09:32:55 setups/pt7mm N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 09:32:55 RLEO P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 09:33:55 - N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 09:34:00 RLEO - 1F05 1F05 1F05 1F05 1F05 1F05 1R04 1F05 --- --- 19 09:58:00 v3mm-sio - 1/07 1/07 1/07 1/07 1/07 1/07 1/14 1/07 --- --- 19 09:59:55 3C279 P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 10:00:55 setups/pt7mm N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 10:00:55 3C279 P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 10:01:55 - N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 10:02:00 3C279 - 1F05 1F05 1F05 1F05 1F05 1F05 1F05 1F05 --- --- 19 10:15:00 v3mm-sio - 1/03 1/03 1/03 1/03 1/03 1/03 1/04 1/03 --- --- 19 10:15:40 RLEO - 1F05 1F05 1F05 1F05 1F05 1F05 1F05 1F05 1F03 --- 19 10:24:00 v7mm-sio - 1/08 1/08 1/08 1/08 1/08 1/08 1/01 1/08 1/02 --- 19 10:26:00 RCRT - 1R06 1R06 1R06 1R06 1R06 1R06 1F05 1R06 1F03 --- 19 10:42:00 - - 1/11 1/11 1/11 1/11 1/11 1/11 1/04 1/11 1/02 --- 19 10:44:00 3C279 - 1R06 1R06 1R06 1R06 1R06 1R06 1F05 1R06 1F03 --- 19 10:51:00 - - 1/17 1/17 1/17 1/17 1/17 1/17 1/11 1/17 1/09 --- 19 10:53:00 3C279 - 1R06 1R06 1R06 1R06 1R06 1R06 1F05 1R06 1F03 --- 19 11:00:00 - - 1/13 1/13 1/13 1/13 1/13 1/13 1/15 1/13 1/12 --- 19 11:01:55 RLEO P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 11:02:55 setups/pt7mm N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 11:02:55 RLEO P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 11:03:55 - N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 11:04:00 RLEO - 1R06 1R06 1R06 1R06 1R06 1R06 1R06 1R06 --- --- 19 11:28:00 v3mm-sio - 1/11 1/11 1/11 1/11 1/11 1/11 1/18 1/11 --- --- 19 11:29:55 3C279 P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 11:30:55 setups/pt7mm N ---- ---- ---- ---- ---- ---- ---- ---- --- --- SUMMARY for experiment BK113D BK113D: R Leo and R Crt 3mm & 7mm SiO Top item is: Scan end: Tape drive, direction, and head index. Disk Gbytes. Bottom item is: Headset at scan end and tape footage (thousands) at scan start. Tape parameters are only predictions for stations using automatic tape allocation. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 19 is Wed 19 Jan 2005 MJD 53389 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Nl Fd La Pt Kp Ov Mk Br Hn Y 19 11:30:55 3C279 P Stop Stop Stop Stop Stop Stop Stop Stop --- --- 19 11:31:55 setups/pt7mm N ---- ---- ---- ---- ---- ---- ---- ---- --- --- 19 11:32:00 3C279 - 1F07 1F07 1F07 1F07 1F07 1F07 1R06 1F07 --- --- 19 11:45:00 v3mm-sio - 1/01 1/01 1/01 1/01 1/01 1/01 1/08 1/01 --- --- 19 11:45:40 RLEO - 1F07 1F07 1F07 1F07 1F07 1F07 1F07 1F07 1R04 --- 19 11:54:00 v7mm-sio - 1/04 1/04 1/04 1/04 1/04 1/04 1/03 1/04 1/15 --- 19 11:56:00 RCRT - 1F07 1F07 1F07 1F07 1F07 1F07 1F07 1F07 1R04 --- 19 12:12:00 - - 1/08 1/08 1/08 1/08 1/08 1/08 1/01 1/08 1/16 --- 19 12:14:00 3C279 - 1R08 1R08 1R08 1R08 1R08 1R08 1F07 1R08 1R04 --- 19 12:21:00 - - 1/15 1/15 1/15 1/15 1/15 1/15 1/08 1/15 1/09 --- 19 12:23:00 3C279 - 1R08 1R08 1R08 1R08 1R08 1R08 1F07 1R08 1R04 --- 19 12:30:00 - - 1/17 1/17 1/17 1/17 1/17 1/17 1/11 1/17 1/06 --- 19 06:34:00 J0359+50 - --- --- --- --- --- --- --- --- --- 1F01 19 06:47:00 v7mm-sio-vla - --- --- --- --- --- --- --- --- --- 1/00 19 06:51:00 RLEO - --- --- --- --- --- --- --- --- --- 1F01 19 07:15:00 - - --- --- --- --- --- --- --- --- --- 1/07 19 07:15:40 RLEO - --- --- --- --- --- --- --- --- --- 1R02 19 07:24:00 - - --- --- --- --- --- --- --- --- --- 1/18 19 07:26:00 RCRT - --- --- --- --- --- --- --- --- --- 1R02 19 07:42:00 - - --- --- --- --- --- --- --- --- --- 1/14 19 07:44:00 J0359+50 - --- --- --- --- --- --- --- --- --- 1R02 19 07:51:00 - - --- --- --- --- --- --- --- --- --- 1/07 19 07:53:00 J0359+50 - --- --- --- --- --- --- --- --- --- 1R02 19 08:00:00 - - --- --- --- --- --- --- --- --- --- 1/04 19 08:04:00 J0359+50 - --- --- --- --- --- --- --- --- --- 1F03 19 08:17:00 - - --- --- --- --- --- --- --- --- --- 1/01 19 08:21:00 RLEO - --- --- --- --- --- --- --- --- --- 1F03 19 08:45:00 - - --- --- --- --- --- --- --- --- --- 1/06 19 08:45:40 RLEO - --- --- --- --- --- --- --- --- --- 1R04 19 08:54:00 - - --- --- --- --- --- --- --- --- --- 1/17 19 08:56:00 RCRT - --- --- --- --- --- --- --- --- --- 1R04 19 09:12:00 - - --- --- --- --- --- --- --- --- --- 1/15 SUMMARY for experiment BK113D BK113D: R Leo and R Crt 3mm & 7mm SiO Top item is: Scan end: Tape drive, direction, and head index. Disk Gbytes. Bottom item is: Headset at scan end and tape footage (thousands) at scan start. Tape parameters are only predictions for stations using automatic tape allocation. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 19 is Wed 19 Jan 2005 MJD 53389 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Nl Fd La Pt Kp Ov Mk Br Hn Y 19 09:14:00 J0359+50 - --- --- --- --- --- --- --- --- --- 1R04 19 09:21:00 v7mm-sio-vla - --- --- --- --- --- --- --- --- --- 1/08 19 09:23:00 J0359+50 - --- --- --- --- --- --- --- --- --- 1R04 19 09:30:00 - - --- --- --- --- --- --- --- --- --- 1/04 19 09:34:00 RLEO - --- --- --- --- --- --- --- --- --- 1F05 19 09:58:00 - - --- --- --- --- --- --- --- --- --- 1/02 19 10:02:00 3C279 - --- --- --- --- --- --- --- --- --- 1F05 19 10:15:00 - - --- --- --- --- --- --- --- --- --- 1/09 19 10:15:40 RLEO - --- --- --- --- --- --- --- --- --- 1R06 19 10:24:00 - - --- --- --- --- --- --- --- --- --- 1/16 19 10:26:00 RCRT - --- --- --- --- --- --- --- --- --- 1R06 19 10:42:00 - - --- --- --- --- --- --- --- --- --- 1/16 19 10:44:00 3C279 - --- --- --- --- --- --- --- --- --- 1R06 19 10:51:00 - - --- --- --- --- --- --- --- --- --- 1/09 19 10:53:00 3C279 - --- --- --- --- --- --- --- --- --- 1R06 19 11:00:00 - - --- --- --- --- --- --- --- --- --- 1/05 19 11:04:00 RLEO - --- --- --- --- --- --- --- --- --- 1F07 19 11:28:00 - - --- --- --- --- --- --- --- --- --- 1/02 19 11:32:00 3C279 - --- --- --- --- --- --- --- --- --- 1F07 19 11:45:00 - - --- --- --- --- --- --- --- --- --- 1/09 19 11:45:40 RLEO - --- --- --- --- --- --- --- --- --- 1R08 19 11:54:00 - - --- --- --- --- --- --- --- --- --- 1/15 19 11:56:00 RCRT - --- --- --- --- --- --- --- --- --- 1R08 19 12:12:00 - - --- --- --- --- --- --- --- --- --- 1/16 19 12:14:00 3C279 - --- --- --- --- --- --- --- --- --- 1R08 19 12:21:00 - - --- --- --- --- --- --- --- --- --- 1/09 19 12:23:00 3C279 - --- --- --- --- --- --- --- --- --- 1R08 19 12:30:00 - - --- --- --- --- --- --- --- --- --- 1/06 Automatic tape allocation requested for sites using VLBA control files and having 2 or more drives. SCHED cannot predict tape changes. Number of tapes used at each autoaloc station: Station Tapes VLBA_NL 0.51 VLBA_FD 0.51 VLBA_LA 0.51 VLBA_PT 0.51 VLBA_KP 0.51 VLBA_OV 0.51 VLBA_MK 0.49 VLBA_BR 0.51 VLBA_HN 0.27 VLA1 0.56 ESTIMATED TAPE TIMES (With autoallocation): Times are approximate and assume project starts at the beginning of a tape. Times can be affected by actual tape length. Tape change may occur during scan preceeding indicated time. Tape start time. Tape end time. Station Day Time Day Time (UT) (UT) VLBA_NL 19 06:34:00 19 12:30:00 VLBA_FD 19 06:34:00 19 12:30:00 VLBA_LA 19 06:34:00 19 12:30:00 VLBA_PT 19 06:34:00 19 12:30:00 VLBA_KP 19 06:34:00 19 12:30:00 VLBA_OV 19 06:34:00 19 12:30:00 VLBA_MK 19 06:34:00 19 12:30:00 VLBA_BR 19 06:34:00 19 12:30:00 VLBA_HN 19 07:15:40 19 12:30:00 VLA1 19 06:34:00 19 12:30:00 SOURCE LIST -- BK113D: R Leo and R Crt 3mm & 7mm SiO Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) (B1950) (J2000) (Date) * RCRT 10 58 05.816639 * 11 00 33.827257 11 00 49.178928 -18 03 22.31587 *-18 19 29.60501 -18 21 01.90598 From catalog imbedded in main SCHED input file. Doppler based on LSR frame and radio definition. Velocities: 11.50 11.50 11.50 11.50 11.50 11.50 11.50 11.50 Proper motion used. Reference epoch: 1991.25000 At epoch: RA = 11 00 33.853900 Dec = -18 19 29.58100 Rates: RA = -27.49 mas/yr Dec = -1.74 mas/yr Paralax: 0.4500 mas. Planetary motion (includes proper motion). Ref. MJD: 53389.2826 Rates: RA = -0.52856E-05 s/day Dec = -0.47639E-05 arcsec/day * RLEO 09 44 52.219463 * 09 47 33.489865 09 47 50.625842 11 39 39.15885 * 11 25 43.05671 11 24 18.77402 From catalog imbedded in main SCHED input file. Doppler based on LSR frame and radio definition. Velocities: -2.40 -2.40 -2.40 -2.40 -2.40 -2.40 -2.40 -2.40 Proper motion used. Reference epoch: 1991.25000 At epoch: RA = 09 47 33.490400 Dec = 11 25 43.64600 Rates: RA = -0.57 mas/yr Dec = -42.70 mas/yr Paralax: 9.8700 mas. Planetary motion (includes proper motion). Ref. MJD: 53389.2826 Rates: RA = -0.10614E-06 s/day Dec = -0.11691E-03 arcsec/day J0359+5057 03 55 45.261360 * 03 59 29.747261 03 59 52.737264 0355+508 50 49 20.28556 * 50 57 50.16151 50 58 57.10884 * J0359+50 /home/filehost/cwalker/sched/catalogs/sources.vlba NRAO150 ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. J1256-0547 12 53 35.831293 * 12 56 11.166560 12 56 26.702736 1253-055 -05 31 07.99572 *-05 47 21.52458 -05 49 01.01060 * 3C279 /home/filehost/cwalker/sched/catalogs/sources.vlba J1256-05 ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) RCRT 122.4 RLEO 154.1 J0359+50 123.4 3C279 104.2 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg Source separations in degrees for pairs closer than 30.00 degrees. J2000 coordinates formatted for possible transfer to the correlator data base: name = 'RCRT' ra = 11h00m33.827257s dec = -18d19'29.60501" name = 'RLEO' ra = 09h47m33.489865s dec = 11d25'43.05671" name = 'J0359+50' ra = 03h59m29.747261s dec = 50d57'50.16151" name = '3C279' ra = 12h56m11.166560s dec = -05d47'21.52458" Catalog versions: Station Catalog: 2004Oct03-17:33:37 Frequency Catalog: 2004Oct03-17:33:37 Code versions: Release version: NRAO internal release of 4 October 2004 Version of sched code: 5.25 Version of VEX standard: 1.50 Version of VEX code: 0.79 Version of plot code: 1.05 Version of ephemeris code: 1.01 Version of PGPLOT: v5.2.0