COVER INFORMATION Station: VLBA_NL (Code Nl ) Experiment: VLBA format test phase referencing H2O Exp. Code: bc139e Schedule Version: 1.50 Processed by SCHED version: NRAO internal release of 4 October 2004 PI: M. Claussen Address: NRAO-AOC P.O. Box O Socorro, NM 87801 Phone: 505-835-7284 EMAIL: mclausse@nrao.edu Fax: 505-835-7027 Phone during observation: 505-835-4071 Observing mode: Notes: Use all available antennas. Schedule for VLBA_NL (Code Nl ) Page 2 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- Next scan frequencies: 22105.94 22231.47 22356.99 22482.52 Next BBC frequencies: 605.94 731.47 856.99 982.52 Next scan bandwidths: 16.00 16.00 16.00 16.00 10 08 59 3C279 12 06 11 41.0 163.3 -0.8 -12.4 0 1 1 0 10 08 59 10 13 58 --- 12 11 11 41.3 164.9 -0.8 -11.2 299 F 1 3989 10 16 01 VXUMA 12 13 15 58.5 -11.4 1.3 151.9 0 1 1 3989 10 16 01 10 17 01 --- 12 14 15 58.4 -11.5 1.3 151.5 60 F 1 4787 10 17 08 J1048+7143 12 14 22 58.3 -12.6 1.4 148.9 1 1 1 4787 10 17 01 10 18 08 =1044+719 12 15 22 58.2 -12.7 1.4 148.5 60 F 1 5677 10 18 15 VXUMA 12 15 28 58.4 -11.6 1.3 151.1 1 1 1 5677 10 18 08 10 19 15 --- 12 16 28 58.4 -11.8 1.3 150.8 60 F 1 6566 10 19 39 J1058+8114 12 16 53 50.0 -4.6 1.3 157.2 2 1 1 6566 10 19 15 10 20 39 =1053+815 12 17 53 50.0 -4.6 1.3 156.9 60 F 1 7694 10 21 04 VXUMA 12 18 18 58.3 -12.0 1.4 150.1 2 1 1 7694 10 20 39 10 22 04 --- 12 19 18 58.2 -12.1 1.4 149.8 60 F 1 8822 10 22 11 J1048+7143 12 19 25 58.1 -13.2 1.5 147.1 1 1 1 8822 10 22 04 10 23 10 =1044+719 12 20 25 58.0 -13.3 1.5 146.8 60 F 1 9712 10 23 17 VXUMA 12 20 32 58.2 -12.3 1.4 149.4 1 1 1 9712 10 23 10 10 24 17 --- 12 21 32 58.2 -12.4 1.4 149.0 60 F 1 10601 10 24 49 J1357+7643 12 22 04 53.6 9.1 -1.6 -149.3 11 1 1 10601 10 24 17 10 25 49 =1357+769 12 23 04 53.7 9.0 -1.6 -149.6 60 F 1 11820 10 26 20 VXUMA 12 23 35 58.1 -12.7 1.5 148.3 11 1 1 11820 10 25 49 10 27 20 --- 12 24 35 58.0 -12.8 1.5 148.0 60 F 1 13041 10 27 27 J1048+7143 12 24 42 57.8 -13.9 1.6 145.3 1 1 1 13041 10 27 20 10 28 27 =1044+719 12 25 42 57.8 -14.0 1.6 145.0 60 F 1 13931 10 28 34 VXUMA 12 25 49 58.0 -13.0 1.5 147.5 1 1 1 13931 10 28 27 10 29 34 --- 12 26 49 57.9 -13.1 1.5 147.2 60 F 1 14820 10 30 23 J1311+5513 12 27 39 74.8 24.3 -0.7 -147.5 10 1 1 14820 10 29 34 10 31 23 =1308+554 12 28 39 74.9 23.8 -0.7 -148.1 60 F 1 16279 Schedule for VLBA_NL (Code Nl ) Page 3 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 10 32 13 VXUMA 12 29 29 57.8 -13.4 1.6 146.3 10 1 2 16279 10 31 23 10 33 13 --- 12 30 29 57.8 -13.5 1.6 146.0 60 R 1 17459 10 33 20 J1048+7143 12 30 36 57.6 -14.6 1.7 143.3 1 1 2 17459 10 33 13 10 34 19 =1044+719 12 31 36 57.5 -14.7 1.7 143.0 60 R 1 16570 10 34 26 VXUMA 12 31 43 57.7 -13.7 1.6 145.5 1 1 2 16570 10 34 19 10 35 26 --- 12 32 43 57.7 -13.8 1.6 145.2 60 R 1 15681 10 35 51 J1058+8114 12 33 07 49.7 -5.4 1.6 152.5 3 1 2 15681 10 35 26 10 36 51 =1053+815 12 34 07 49.7 -5.5 1.6 152.2 60 R 1 14553 10 37 15 VXUMA 12 34 32 57.6 -14.0 1.6 144.6 3 1 2 14553 10 36 51 10 38 15 --- 12 35 32 57.6 -14.1 1.7 144.2 60 R 1 13426 10 38 47 J1357+7643 12 36 04 54.0 7.9 -1.4 -153.6 11 1 2 13426 10 38 15 10 39 47 =1357+769 12 37 04 54.0 7.8 -1.3 -154.0 60 R 1 12207 10 40 18 VXUMA 12 37 36 57.5 -14.4 1.7 143.5 11 1 2 12207 10 39 47 10 41 18 --- 12 38 36 57.4 -14.5 1.7 143.2 60 R 1 10986 10 41 25 J1048+7143 12 38 43 57.2 -15.5 1.8 140.6 1 1 2 10986 10 41 18 10 42 25 =1044+719 12 39 43 57.1 -15.6 1.8 140.3 60 R 1 10097 10 42 32 VXUMA 12 39 49 57.4 -14.6 1.7 142.8 1 1 2 10097 10 42 25 10 43 31 --- 12 40 49 57.3 -14.7 1.7 142.5 60 R 1 9209 10 44 21 J1311+5513 12 41 39 75.7 17.4 -0.5 -157.1 7 1 2 9209 10 43 31 10 45 21 =1308+554 12 42 39 75.8 16.8 -0.5 -157.8 60 R 1 7750 10 46 11 VXUMA 12 43 29 57.2 -15.1 1.8 141.6 7 1 2 7750 10 45 21 10 47 10 --- 12 44 29 57.1 -15.2 1.8 141.3 60 R 1 6288 10 47 17 J1048+7143 12 44 36 56.9 -16.1 1.9 138.7 1 1 2 6288 10 47 10 10 48 17 =1044+719 12 45 36 56.8 -16.2 1.9 138.4 60 R 1 5399 10 48 24 VXUMA 12 45 43 57.1 -15.3 1.8 140.8 1 1 2 5399 10 48 17 10 49 24 --- 12 46 43 57.0 -15.4 1.8 140.5 60 R 1 4511 10 49 48 J1058+8114 12 47 07 49.4 -6.1 1.8 148.5 4 1 2 4511 10 49 24 10 50 48 =1053+815 12 48 07 49.4 -6.2 1.8 148.2 60 R 1 3384 Schedule for VLBA_NL (Code Nl ) Page 4 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 10 51 13 VXUMA 12 48 32 56.9 -15.6 1.9 139.9 4 1 2 3384 10 50 48 10 52 13 --- 12 49 32 56.9 -15.7 1.9 139.6 60 R 1 2256 10 52 20 J1048+7143 12 49 39 56.6 -16.7 2.0 137.0 1 1 2 2256 10 52 13 10 53 19 =1044+719 12 50 39 56.6 -16.8 2.0 136.7 60 R 1 1368 10 53 26 VXUMA 12 50 46 56.8 -15.9 1.9 139.2 1 1 2 1368 10 53 19 10 54 26 --- 12 51 46 56.8 -16.0 1.9 138.9 60 R 1 480 10 54 58 J1357+7643 12 52 17 54.4 6.4 -1.1 -158.8 11 1 1 480 10 54 26 10 55 57 =1357+769 12 53 17 54.4 6.3 -1.1 -159.1 60 F 2 737 10 56 29 VXUMA 12 53 49 56.7 -16.2 2.0 138.2 11 1 1 737 10 55 57 10 57 29 --- 12 54 49 56.6 -16.3 2.0 137.9 60 F 2 1956 10 58 18 J1311+5513 12 55 39 76.3 9.5 -0.3 -167.6 4 1 1 1956 10 57 29 10 59 18 =1308+554 12 56 39 76.4 8.9 -0.2 -168.4 60 F 2 3412 11 00 08 VXUMA 12 57 28 56.5 -16.6 2.0 137.0 4 1 1 3412 10 59 18 11 01 07 --- 12 58 28 56.4 -16.7 2.0 136.7 60 F 2 4871 11 01 14 J1048+7143 12 58 35 56.1 -17.6 2.2 134.2 1 1 1 4871 11 01 07 11 02 14 =1044+719 12 59 35 56.1 -17.7 2.2 133.9 60 F 2 5760 11 02 21 VXUMA 12 59 42 56.4 -16.8 2.1 136.3 1 1 1 5760 11 02 14 11 03 21 --- 13 00 42 56.3 -16.9 2.1 136.0 60 F 2 6647 11 03 45 J1058+8114 13 01 07 49.2 -6.8 2.0 144.5 4 1 1 6647 11 03 21 11 04 45 =1053+815 13 02 07 49.1 -6.9 2.1 144.3 60 F 2 7774 11 05 10 VXUMA 13 02 31 56.2 -17.1 2.1 135.4 5 1 1 7774 11 04 45 11 06 10 --- 13 03 31 56.1 -17.2 2.1 135.0 60 F 2 8901 11 06 16 J1048+7143 13 03 38 55.8 -18.1 2.2 132.6 1 1 1 8901 11 06 10 11 07 16 =1044+719 13 04 38 55.8 -18.2 2.3 132.3 60 F 2 9789 11 07 23 VXUMA 13 04 45 56.1 -17.3 2.1 134.7 1 1 1 9789 11 07 16 11 08 23 --- 13 05 45 56.0 -17.4 2.2 134.3 60 F 2 10677 11 08 54 J1357+7643 13 06 16 54.6 5.1 -0.9 -163.2 10 1 1 10677 11 08 23 11 09 54 =1357+769 13 07 16 54.7 5.0 -0.8 -163.6 60 F 2 11891 Schedule for VLBA_NL (Code Nl ) Page 5 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 11 10 25 VXUMA 13 07 48 55.9 -17.6 2.2 133.7 10 1 1 11891 11 09 54 11 11 25 --- 13 08 48 55.8 -17.7 2.2 133.4 60 F 2 13107 11 11 32 J1048+7143 13 08 54 55.5 -18.6 2.3 130.9 1 1 1 13107 11 11 25 11 12 32 =1044+719 13 09 54 55.5 -18.6 2.4 130.6 60 F 2 13995 11 12 38 VXUMA 13 10 01 55.8 -17.8 2.2 133.0 1 1 1 13995 11 12 32 11 13 38 --- 13 11 01 55.7 -17.9 2.2 132.7 60 F 2 14883 11 14 27 J1311+5513 13 11 50 76.6 -0.3 0.0 179.6 1 1 1 14883 11 13 38 11 15 27 =1308+554 13 12 50 76.6 -1.0 0.0 178.7 60 F 2 16333 11 16 16 VXUMA 13 13 40 55.6 -18.1 2.3 131.8 1 1 2 16333 11 15 27 11 17 16 --- 13 14 40 55.5 -18.2 2.3 131.5 60 R 2 17414 11 17 23 J1048+7143 13 14 46 55.2 -19.1 2.4 129.1 0 1 2 17414 11 17 16 11 18 23 =1044+719 13 15 46 55.1 -19.2 2.4 128.8 60 R 2 16525 11 18 29 VXUMA 13 15 53 55.4 -18.3 2.3 131.1 0 1 2 16525 11 18 23 11 19 29 --- 13 16 53 55.4 -18.4 2.3 130.8 60 R 2 15637 11 19 54 J1058+8114 13 17 18 48.8 -7.6 2.3 140.0 5 1 2 15637 11 19 29 11 20 54 =1053+815 13 18 18 48.7 -7.6 2.3 139.7 60 R 2 14513 11 21 18 VXUMA 13 18 42 55.3 -18.6 2.4 130.3 5 1 2 14513 11 20 54 11 22 18 --- 13 19 42 55.2 -18.7 2.4 130.0 60 R 2 13390 11 22 49 J1357+7643 13 20 13 54.8 3.8 -0.6 -167.7 10 1 2 13390 11 22 18 11 23 49 =1357+769 13 21 13 54.9 3.7 -0.6 -168.1 60 R 2 12180 11 24 19 VXUMA 13 21 44 55.1 -18.9 2.4 129.3 10 1 2 12180 11 23 49 11 25 19 --- 13 22 44 55.0 -18.9 2.4 129.0 60 R 2 10970 11 25 26 J1048+7143 13 22 51 54.7 -19.8 2.6 126.6 0 1 2 10970 11 25 19 11 26 26 =1044+719 13 23 51 54.6 -19.8 2.6 126.3 60 R 2 10080 11 26 33 VXUMA 13 23 58 55.0 -19.1 2.5 128.6 0 1 2 10080 11 26 26 11 27 33 --- 13 24 58 54.9 -19.1 2.5 128.3 60 R 2 9192 11 28 22 J1311+5513 13 25 47 76.4 -8.8 0.2 168.5 0 1 2 9192 11 27 33 11 29 21 =1308+554 13 26 47 76.3 -9.4 0.3 167.7 60 R 2 7741 Schedule for VLBA_NL (Code Nl ) Page 6 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 11 30 11 VXUMA 13 27 36 54.7 -19.4 2.5 127.5 0 1 2 7741 11 29 21 11 31 11 --- 13 28 36 54.7 -19.4 2.5 127.2 60 R 2 6287 11 31 17 J1048+7143 13 28 43 54.3 -20.2 2.7 124.9 0 1 2 6287 11 31 11 11 32 17 =1044+719 13 29 43 54.2 -20.3 2.7 124.6 60 R 2 5398 11 32 24 VXUMA 13 29 50 54.6 -19.5 2.6 126.9 0 1 2 5398 11 32 17 11 33 24 --- 13 30 50 54.5 -19.6 2.6 126.6 60 R 2 4508 11 33 48 J1058+8114 13 31 14 48.4 -8.2 2.5 136.1 6 1 2 4508 11 33 24 11 34 48 =1053+815 13 32 14 48.4 -8.2 2.6 135.8 60 R 2 3390 11 35 12 VXUMA 13 32 38 54.4 -19.8 2.6 126.0 6 1 2 3390 11 34 48 11 36 12 --- 13 33 38 54.4 -19.8 2.6 125.7 60 R 2 2272 11 36 19 J1048+7143 13 33 45 54.0 -20.6 2.7 123.4 0 1 2 2272 11 36 12 11 37 18 =1044+719 13 34 45 53.9 -20.7 2.8 123.1 60 R 2 1382 11 37 25 VXUMA 13 34 52 54.3 -19.9 2.6 125.3 0 1 2 1382 11 37 18 11 38 25 --- 13 35 52 54.2 -20.0 2.7 125.0 60 R 2 492 11 38 55 J1357+7643 13 36 23 55.0 2.2 -0.4 -173.0 10 1 3 492 11 38 25 11 39 55 =1357+769 13 37 23 55.0 2.1 -0.3 -173.3 60 F 1 710 11 40 26 VXUMA 13 37 53 54.1 -20.2 2.7 124.4 10 1 3 710 11 39 55 11 41 26 --- 13 38 53 54.0 -20.2 2.7 124.1 60 F 1 1913 11 42 15 J1311+5513 13 39 43 75.8 -16.7 0.5 157.9 0 1 3 1913 11 41 26 11 43 15 =1308+554 13 40 43 75.7 -17.3 0.5 157.2 60 F 1 3372 11 44 05 VXUMA 13 41 33 53.8 -20.4 2.8 123.3 0 1 3 3372 11 43 15 11 45 05 --- 13 42 33 53.8 -20.5 2.8 123.0 60 F 1 4833 11 45 11 J1048+7143 13 42 40 53.4 -21.2 2.9 120.7 0 1 3 4833 11 45 05 11 46 11 =1044+719 13 43 40 53.3 -21.3 2.9 120.4 60 F 1 5723 11 46 18 VXUMA 13 43 46 53.7 -20.6 2.8 122.7 0 1 3 5723 11 46 11 11 47 18 --- 13 44 46 53.6 -20.7 2.8 122.4 60 F 1 6613 11 47 42 J1058+8114 13 45 10 48.0 -8.7 2.8 132.2 6 1 3 6613 11 47 18 11 48 41 =1053+815 13 46 10 48.0 -8.8 2.8 132.0 60 F 1 7726 Schedule for VLBA_NL (Code Nl ) Page 7 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 11 49 05 VXUMA 13 46 34 53.5 -20.8 2.8 121.9 7 1 3 7726 11 48 41 11 50 05 --- 13 47 34 53.5 -20.9 2.9 121.6 60 F 1 8838 11 50 12 J1048+7143 13 47 41 53.0 -21.5 3.0 119.3 0 1 3 8838 11 50 05 11 51 12 =1044+719 13 48 41 53.0 -21.6 3.0 119.0 60 F 1 9728 11 51 19 VXUMA 13 48 48 53.4 -20.9 2.9 121.2 0 1 3 9728 11 51 12 11 52 18 --- 13 49 48 53.3 -21.0 2.9 120.9 60 F 1 10618 11 52 48 J1357+7643 13 50 18 55.1 0.8 -0.1 -177.5 9 1 3 10618 11 52 18 11 53 48 =1357+769 13 51 18 55.1 0.7 -0.1 -177.8 60 F 1 11813 11 54 18 VXUMA 13 51 47 53.2 -21.1 2.9 120.3 9 1 3 11813 11 53 48 11 55 18 --- 13 52 47 53.1 -21.2 2.9 120.1 60 F 1 13008 11 55 25 J1048+7143 13 52 54 52.7 -21.9 3.1 117.8 0 1 3 13008 11 55 18 11 56 24 =1044+719 13 53 54 52.6 -21.9 3.1 117.5 60 F 1 13899 11 56 31 VXUMA 13 54 01 53.0 -21.3 3.0 119.7 0 1 3 13899 11 56 24 11 57 31 --- 13 55 01 53.0 -21.4 3.0 119.4 60 F 1 14789 11 58 21 J1311+5513 13 55 51 74.7 -24.7 0.7 146.8 0 1 3 14789 11 57 31 11 59 21 =1308+554 13 56 51 74.6 -25.2 0.8 146.2 60 F 1 16247 12 00 10 VXUMA 13 57 41 52.8 -21.5 3.0 118.6 0 1 4 16247 11 59 21 12 01 10 --- 13 58 41 52.7 -21.6 3.0 118.4 60 R 1 17492 12 01 17 J1048+7143 13 58 48 52.3 -22.2 3.2 116.1 0 1 4 17492 12 01 10 12 02 17 =1044+719 13 59 48 52.2 -22.3 3.2 115.8 60 R 1 16601 12 02 24 VXUMA 13 59 55 52.6 -21.7 3.1 118.0 0 1 4 16601 12 02 17 12 03 24 --- 14 00 55 52.5 -21.7 3.1 117.7 60 R 1 15711 12 03 47 J1058+8114 14 01 19 47.6 -9.3 3.0 127.8 8 1 4 15711 12 03 24 12 04 47 =1053+815 14 02 19 47.5 -9.3 3.1 127.5 60 R 1 14597 12 05 11 VXUMA 14 02 42 52.4 -21.8 3.1 117.2 8 1 4 14597 12 04 47 12 06 11 --- 14 03 42 52.4 -21.9 3.1 116.9 60 R 1 13482 12 06 40 J1357+7643 14 04 12 55.1 -0.6 0.1 178.0 9 1 4 13482 12 06 11 12 07 40 =1357+769 14 05 12 55.1 -0.7 0.1 177.6 60 R 1 12296 Schedule for VLBA_NL (Code Nl ) Page 8 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 12 08 09 VXUMA 14 05 41 52.2 -22.0 3.2 116.4 9 1 4 12296 12 07 40 12 09 09 --- 14 06 41 52.1 -22.0 3.2 116.1 60 R 1 11110 12 09 16 J1048+7143 14 06 48 51.7 -22.6 3.3 113.9 0 1 4 11110 12 09 09 12 10 16 =1044+719 14 07 48 51.6 -22.7 3.3 113.6 60 R 1 10219 12 10 23 VXUMA 14 07 55 52.1 -22.1 3.2 115.7 0 1 4 10219 12 10 16 12 11 22 --- 14 08 55 52.0 -22.2 3.2 115.5 60 R 1 9329 12 12 11 J1311+5513 14 09 44 73.5 -30.5 1.0 138.5 0 1 4 9329 12 11 22 12 13 11 =1308+554 14 10 44 73.4 -30.9 1.0 137.9 60 R 1 7877 12 14 01 VXUMA 14 11 33 51.8 -22.3 3.3 114.7 0 1 4 7877 12 13 11 12 15 00 --- 14 12 33 51.7 -22.4 3.3 114.4 60 R 1 6423 12 15 07 J1048+7143 14 12 40 51.3 -22.9 3.4 112.2 0 1 4 6423 12 15 00 12 16 07 =1044+719 14 13 40 51.2 -23.0 3.4 112.0 60 R 1 5531 12 16 14 VXUMA 14 13 47 51.6 -22.4 3.3 114.1 0 1 4 5531 12 16 07 12 17 14 --- 14 14 47 51.6 -22.5 3.3 113.8 60 R 1 4641 12 17 38 J1058+8114 14 15 11 47.1 -9.8 3.3 124.0 9 1 4 4641 12 17 14 12 18 38 =1053+815 14 16 11 47.1 -9.8 3.3 123.8 60 R 1 3522 12 19 02 VXUMA 14 16 36 51.4 -22.6 3.3 113.3 9 1 4 3522 12 18 38 12 20 02 --- 14 17 36 51.4 -22.6 3.4 113.0 60 R 1 2402 12 20 09 J1048+7143 14 17 43 50.9 -23.2 3.5 110.9 0 1 4 2402 12 20 02 12 21 09 =1044+719 14 18 43 50.8 -23.2 3.5 110.6 60 R 1 1511 12 21 16 VXUMA 14 18 50 51.3 -22.7 3.4 112.7 0 1 4 1511 12 21 09 12 22 16 --- 14 19 50 51.2 -22.7 3.4 112.4 60 R 1 620 12 22 44 J1357+7643 14 20 18 55.0 -2.2 0.4 172.7 9 1 3 620 12 22 16 12 23 44 =1357+769 14 21 18 55.0 -2.3 0.4 172.4 60 F 2 553 12 24 12 VXUMA 14 21 46 51.1 -22.8 3.4 111.9 9 1 3 553 12 23 44 12 25 12 --- 14 22 46 51.0 -22.9 3.4 111.6 60 F 2 1727 12 26 00 J1311+5513 14 23 35 72.1 -35.2 1.2 131.1 0 1 3 1727 12 25 12 12 27 00 =1308+554 14 24 35 72.0 -35.5 1.2 130.6 60 F 2 3174 Schedule for VLBA_NL (Code Nl ) Page 9 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 12 27 49 VXUMA 14 25 24 50.8 -23.0 3.5 110.9 1 1 3 3174 12 27 00 12 28 49 --- 14 26 24 50.7 -23.0 3.5 110.6 60 F 2 4624 12 28 56 J1048+7143 14 26 31 50.2 -23.5 3.6 108.5 0 1 3 4624 12 28 49 12 29 56 =1044+719 14 27 31 50.2 -23.6 3.6 108.2 60 F 2 5515 12 30 03 VXUMA 14 27 38 50.6 -23.1 3.5 110.3 0 1 3 5515 12 29 56 12 31 03 --- 14 28 38 50.6 -23.1 3.5 110.0 60 F 2 6406 12 31 27 J1058+8114 14 29 03 46.7 -10.2 3.5 120.3 10 1 3 6406 12 31 03 12 32 27 =1053+815 14 30 03 46.7 -10.2 3.5 120.0 60 F 2 7529 12 32 51 VXUMA 14 30 27 50.4 -23.2 3.6 109.5 10 1 3 7529 12 32 27 12 33 51 --- 14 31 27 50.4 -23.2 3.6 109.3 60 F 2 8652 12 33 58 J1048+7143 14 31 34 49.9 -23.7 3.7 107.2 0 1 3 8652 12 33 51 12 34 58 =1044+719 14 32 34 49.8 -23.8 3.7 106.9 60 F 2 9544 12 35 05 VXUMA 14 32 41 50.3 -23.3 3.6 108.9 0 1 3 9544 12 34 58 12 36 05 --- 14 33 41 50.2 -23.3 3.6 108.7 60 F 2 10435 12 36 32 J1357+7643 14 34 09 54.9 -3.6 0.6 168.2 8 1 3 10435 12 36 05 12 37 32 =1357+769 14 35 09 54.9 -3.7 0.6 167.9 60 F 2 11597 12 37 59 VXUMA 14 35 36 50.1 -23.4 3.7 108.2 8 1 3 11597 12 37 32 12 38 59 --- 14 36 36 50.0 -23.4 3.7 107.9 60 F 2 12758 12 39 06 J1048+7143 14 36 43 49.5 -23.9 3.8 105.8 0 1 3 12758 12 38 59 12 40 06 =1044+719 14 37 43 49.4 -23.9 3.8 105.5 60 F 2 13650 12 40 13 VXUMA 14 37 50 49.9 -23.5 3.7 107.6 0 1 3 13650 12 40 06 12 41 13 --- 14 38 50 49.8 -23.5 3.7 107.3 60 F 2 14541 12 42 02 J1311+5513 14 39 39 70.3 -39.5 1.5 123.7 2 1 3 14541 12 41 13 12 43 02 =1308+554 14 40 39 70.2 -39.8 1.5 123.3 60 F 2 15997 12 43 51 VXUMA 14 41 29 49.6 -23.6 3.8 106.6 3 1 3 15997 12 43 02 12 44 51 --- 14 42 29 49.5 -23.6 3.8 106.3 60 F 2 17456 12 44 58 J1048+7143 14 42 36 49.0 -24.1 3.9 104.3 0 1 4 17456 12 44 51 12 45 58 =1044+719 14 43 36 49.0 -24.1 3.9 104.0 60 R 2 16565 Schedule for VLBA_NL (Code Nl ) Page 10 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 12 46 05 VXUMA 14 43 43 49.5 -23.7 3.8 106.0 0 1 4 16565 12 45 58 12 47 05 --- 14 44 43 49.4 -23.7 3.8 105.8 60 R 2 15673 12 47 30 J1058+8114 14 45 08 46.1 -10.6 3.8 116.0 10 1 4 15673 12 47 05 12 48 29 =1053+815 14 46 08 46.1 -10.6 3.8 115.8 60 R 2 14547 12 48 54 VXUMA 14 46 33 49.2 -23.8 3.8 105.3 10 1 4 14547 12 48 29 12 49 54 --- 14 47 33 49.2 -23.8 3.9 105.0 60 R 2 13421 12 50 20 J1357+7643 14 47 59 54.7 -4.9 0.8 163.8 8 1 4 13421 12 49 54 12 51 20 =1357+769 14 48 59 54.7 -5.0 0.9 163.5 60 R 2 12273 12 51 46 VXUMA 14 49 25 49.0 -23.9 3.9 104.5 8 1 4 12273 12 51 20 12 52 46 --- 14 50 25 49.0 -23.9 3.9 104.3 60 R 2 11125 12 52 53 J1048+7143 14 50 32 48.4 -24.3 4.0 102.2 0 1 4 11125 12 52 46 12 53 53 =1044+719 14 51 32 48.3 -24.3 4.0 102.0 60 R 2 10233 12 54 00 VXUMA 14 51 39 48.9 -23.9 3.9 103.9 0 1 4 10233 12 53 53 12 55 00 --- 14 52 39 48.8 -24.0 3.9 103.7 60 R 2 9342 12 55 49 J1311+5513 14 53 29 68.6 -42.4 1.7 118.2 4 1 4 9342 12 55 00 12 56 49 =1308+554 14 54 29 68.5 -42.6 1.7 117.8 60 R 2 7883 12 57 39 VXUMA 14 55 19 48.6 -24.0 4.0 103.0 4 1 4 7883 12 56 49 12 58 39 --- 14 56 19 48.5 -24.1 4.0 102.7 60 R 2 6420 12 58 46 J1048+7143 14 56 26 48.0 -24.4 4.1 100.7 0 1 4 6420 12 58 39 12 59 46 =1044+719 14 57 26 47.9 -24.5 4.1 100.5 60 R 2 5528 12 59 53 VXUMA 14 57 33 48.4 -24.1 4.0 102.4 0 1 4 5528 12 59 46 13 00 53 --- 14 58 33 48.3 -24.1 4.0 102.2 60 R 2 4637 13 01 17 J1058+8114 14 58 58 45.7 -10.9 4.0 112.4 10 1 4 4637 13 00 53 13 02 17 =1053+815 14 59 58 45.6 -10.9 4.0 112.1 60 R 2 3510 13 02 42 VXUMA 15 00 23 48.2 -24.2 4.1 101.7 10 1 4 3510 13 02 17 13 03 42 --- 15 01 23 48.1 -24.2 4.1 101.4 60 R 2 2382 13 03 49 J1048+7143 15 01 30 47.6 -24.5 4.2 99.4 0 1 4 2382 13 03 42 13 04 49 =1044+719 15 02 30 47.5 -24.6 4.2 99.2 60 R 2 1490 Schedule for VLBA_NL (Code Nl ) Page 11 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 13 04 56 VXUMA 15 02 37 48.0 -24.2 4.1 101.1 0 1 4 1490 13 04 49 13 05 56 --- 15 03 37 47.9 -24.2 4.1 100.9 60 R 2 599 13 06 22 J1357+7643 15 04 03 54.4 -6.5 1.1 158.6 7 1 5 599 13 05 56 13 07 22 =1357+769 15 05 03 54.4 -6.5 1.1 158.3 60 F 1 549 13 07 48 VXUMA 15 05 30 47.8 -24.3 4.2 100.4 7 1 5 549 13 07 22 13 08 48 --- 15 06 30 47.7 -24.3 4.2 100.1 60 F 1 1699 13 09 38 J1311+5513 15 07 20 66.8 -44.7 1.9 113.2 5 1 5 1699 13 08 48 13 10 37 =1308+554 15 08 20 66.7 -44.8 2.0 112.9 60 F 1 3158 13 13 41 3C279 15 11 23 33.3 221.4 2.2 29.7 0 1 5 3158 13 13 41 13 18 40 --- 15 16 23 32.7 222.7 2.3 30.5 299 F 1 7147 Next scan frequencies: 22104.14 22229.65 22355.17 22480.68 Next BBC frequencies: 604.14 729.65 855.17 980.68 13 20 40 3C279 15 18 23 32.5 223.2 2.4 30.9 114 1 5 7147 13 20 40 13 25 39 --- 15 23 23 31.8 224.4 2.4 31.7 299 F 1 11136 13 27 01 RXBOO 15 24 45 69.7 222.4 1.0 33.9 0 1 5 11136 13 27 01 13 28 00 --- 15 25 45 69.5 223.0 1.0 34.3 60 F 1 11934 13 28 18 J1419+2706 15 26 03 70.1 227.7 1.1 38.3 9 1 5 11934 13 28 00 13 29 18 =1417+273 15 27 03 69.9 228.2 1.1 38.7 60 F 1 12969 13 29 35 RXBOO 15 27 20 69.3 223.8 1.0 34.9 8 1 5 12969 13 29 18 13 30 35 --- 15 28 20 69.2 224.3 1.1 35.3 60 F 1 13992 13 31 32 J1327+2210 15 29 17 57.8 242.0 2.0 45.3 28 1 5 13992 13 31 32 13 32 32 =1324+224 15 30 17 57.6 242.3 2.1 45.5 60 F 1 14790 13 33 26 RXBOO 15 31 12 68.8 225.8 1.1 36.4 26 1 5 14790 13 33 26 13 34 26 --- 15 32 12 68.7 226.3 1.1 36.7 60 F 1 15588 13 34 42 J1419+2706 15 32 28 69.2 230.9 1.2 40.5 7 1 5 15588 13 34 26 13 35 42 =1417+273 15 33 28 69.0 231.4 1.2 40.9 60 F 1 16605 13 35 58 RXBOO 15 33 44 68.5 227.0 1.2 37.3 7 1 5 16605 13 35 42 13 36 58 --- 15 34 44 68.3 227.5 1.2 37.6 60 F 1 17612 Schedule for VLBA_NL (Code Nl ) Page 12 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 13 37 42 J1504+1029 15 35 28 58.0 194.4 0.5 10.9 16 1 6 17612 13 36 58 13 38 42 =1502+106 15 36 28 57.9 194.9 0.5 11.2 60 R 1 16226 13 39 28 RXBOO 15 37 14 68.0 228.7 1.2 38.5 17 1 6 16226 13 38 42 13 40 27 --- 15 38 14 67.9 229.2 1.2 38.8 60 R 1 14816 13 40 43 J1419+2706 15 38 30 68.3 233.7 1.3 42.4 6 1 6 14816 13 40 27 13 41 42 =1417+273 15 39 30 68.1 234.1 1.3 42.7 60 R 1 13817 13 41 57 RXBOO 15 39 44 67.6 229.9 1.3 39.3 6 1 6 13817 13 41 42 13 42 57 --- 15 40 44 67.5 230.3 1.3 39.6 60 R 1 12826 13 44 12 J1310+3220 15 42 00 58.7 264.9 2.5 61.5 46 1 6 12826 13 44 12 13 45 12 =1308+326 15 43 00 58.5 265.1 2.5 61.6 60 R 1 12028 13 46 22 RXBOO 15 44 10 67.0 231.9 1.3 40.6 42 1 6 12028 13 46 22 13 47 22 --- 15 45 10 66.9 232.3 1.3 40.9 60 R 1 11230 13 47 36 J1419+2706 15 45 24 67.2 236.6 1.4 44.4 5 1 6 11230 13 47 22 13 48 36 =1417+273 15 46 24 67.1 237.0 1.4 44.6 60 R 1 10248 13 48 49 RXBOO 15 46 38 66.6 232.9 1.4 41.3 5 1 6 10248 13 48 36 13 49 49 --- 15 47 38 66.5 233.4 1.4 41.6 60 R 1 9271 13 50 31 J1327+2210 15 48 20 54.6 247.4 2.4 48.0 12 1 6 9271 13 49 49 13 51 31 =1324+224 15 49 20 54.4 247.7 2.4 48.1 60 R 1 7916 13 52 12 RXBOO 15 50 01 66.1 234.4 1.4 42.3 11 1 6 7916 13 51 31 13 53 11 --- 15 51 01 66.0 234.8 1.4 42.5 60 R 1 6575 13 53 59 J1504+1029 15 51 48 57.0 201.7 0.8 16.3 20 1 6 6575 13 53 11 13 54 59 =1502+106 15 52 48 57.0 202.1 0.8 16.6 60 R 1 5140 13 55 48 RXBOO 15 53 37 65.6 235.8 1.5 43.2 20 1 6 5140 13 54 59 13 56 47 --- 15 54 37 65.4 236.2 1.5 43.4 60 R 1 3695 13 57 03 J1419+2706 15 54 52 65.7 240.3 1.6 46.7 7 1 6 3695 13 56 47 13 58 03 =1417+273 15 55 52 65.5 240.7 1.6 46.9 60 R 1 2694 13 58 17 RXBOO 15 56 07 65.2 236.8 1.5 43.8 6 1 6 2694 13 58 03 13 59 17 --- 15 57 07 65.0 237.2 1.5 44.1 60 R 1 1701 Schedule for VLBA_NL (Code Nl ) Page 13 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 14 00 22 J1310+3220 15 58 12 55.6 267.9 2.8 61.9 38 1 6 1701 14 00 22 14 01 22 =1308+326 15 59 12 55.4 268.1 2.8 61.9 60 R 1 903 14 02 25 RXBOO 16 00 15 64.5 238.4 1.6 44.8 37 1 6 903 14 02 25 14 03 25 --- 16 01 15 64.4 238.7 1.6 45.0 60 R 1 105 14 03 40 J1419+2706 16 01 30 64.6 242.7 1.7 48.1 6 1 5 105 14 03 25 14 04 39 =1417+273 16 02 30 64.5 243.0 1.7 48.3 60 F 2 1102 14 04 54 RXBOO 16 02 45 64.1 239.3 1.6 45.3 6 1 5 1102 14 04 39 14 05 54 --- 16 03 45 64.0 239.6 1.7 45.6 60 F 2 2091 14 06 31 J1327+2210 16 04 23 51.8 251.5 2.6 49.8 7 1 5 2091 14 05 54 14 07 31 =1324+224 16 05 23 51.6 251.7 2.6 49.9 60 F 2 3392 14 08 08 RXBOO 16 05 59 63.6 240.4 1.7 46.0 7 1 5 3392 14 07 31 14 09 08 --- 16 06 59 63.5 240.8 1.7 46.2 60 F 2 4677 14 09 22 J1419+2706 16 07 14 63.7 244.6 1.8 49.2 6 1 5 4677 14 09 08 14 10 22 =1417+273 16 08 14 63.5 245.0 1.8 49.4 60 F 2 5665 14 10 35 RXBOO 16 08 27 63.2 241.3 1.7 46.5 5 1 5 5665 14 10 22 14 11 35 --- 16 09 27 63.1 241.6 1.8 46.7 60 F 2 6647 14 12 21 J1504+1029 16 10 14 55.6 209.4 1.1 21.8 18 1 5 6647 14 11 35 14 13 21 =1502+106 16 11 14 55.5 209.8 1.1 22.1 60 F 2 8058 14 14 07 RXBOO 16 12 00 62.6 242.5 1.8 47.2 18 1 5 8058 14 13 21 14 15 07 --- 16 13 00 62.5 242.8 1.8 47.4 60 F 2 9472 14 16 04 J1310+3220 16 13 57 52.7 270.6 3.1 61.9 31 1 5 9472 14 16 04 14 17 04 =1308+326 16 14 57 52.5 270.8 3.1 61.9 60 F 2 10270 14 17 59 RXBOO 16 15 52 62.0 243.8 1.9 47.9 30 1 5 10270 14 17 59 14 18 59 --- 16 16 52 61.8 244.1 1.9 48.1 60 F 2 11067 14 19 12 J1419+2706 16 17 05 62.0 247.7 1.9 50.8 5 1 5 11067 14 18 59 14 20 11 =1417+273 16 18 05 61.8 248.0 2.0 51.0 60 F 2 12039 14 20 24 RXBOO 16 18 18 61.6 244.5 1.9 48.3 4 1 5 12039 14 20 11 14 21 24 --- 16 19 18 61.4 244.8 1.9 48.5 60 F 2 13005 Schedule for VLBA_NL (Code Nl ) Page 14 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 14 21 57 J1327+2210 16 19 51 49.0 255.1 2.9 51.1 2 1 5 13005 14 21 24 14 22 57 =1324+224 16 20 51 48.9 255.3 2.9 51.2 60 F 2 14243 14 23 29 RXBOO 16 21 23 61.1 245.5 1.9 48.8 2 1 5 14243 14 22 57 14 24 29 --- 16 22 23 60.9 245.8 2.0 49.0 60 F 2 15475 14 24 41 J1419+2706 16 22 36 61.0 249.3 2.0 51.6 4 1 5 15475 14 24 29 14 25 41 =1417+273 16 23 36 60.9 249.6 2.1 51.7 60 F 2 16438 14 25 53 RXBOO 16 23 48 60.7 246.2 2.0 49.2 4 1 5 16438 14 25 41 14 26 53 --- 16 24 48 60.5 246.5 2.0 49.4 60 F 2 17396 14 27 37 J1504+1029 16 25 32 54.0 215.3 1.3 26.0 17 1 6 17396 14 26 53 14 28 37 =1502+106 16 26 32 53.9 215.7 1.4 26.3 60 R 2 16015 14 29 21 RXBOO 16 27 16 60.1 247.3 2.0 49.7 17 1 6 16015 14 28 37 14 30 21 --- 16 28 16 59.9 247.5 2.1 49.9 60 R 2 14625 14 30 33 J1419+2706 16 28 28 60.0 251.0 2.1 52.4 3 1 6 14625 14 30 21 14 31 33 =1417+273 16 29 28 59.8 251.2 2.2 52.5 60 R 2 13671 14 31 44 RXBOO 16 29 39 59.6 247.9 2.1 50.1 3 1 6 13671 14 31 33 14 32 44 --- 16 30 39 59.5 248.2 2.1 50.2 60 R 2 12720 14 33 31 J1310+3220 16 31 27 49.4 273.4 3.3 61.8 21 1 6 12720 14 32 44 14 34 31 =1308+326 16 32 27 49.3 273.5 3.4 61.7 60 R 2 11295 14 35 16 RXBOO 16 33 12 59.0 248.9 2.1 50.6 20 1 6 11295 14 34 31 14 36 16 --- 16 34 12 58.9 249.2 2.2 50.7 60 R 2 9890 14 36 27 J1419+2706 16 34 24 58.9 252.5 2.2 53.0 3 1 6 9890 14 36 16 14 37 27 =1417+273 16 35 24 58.8 252.8 2.3 53.1 60 R 2 8943 14 37 38 RXBOO 16 35 35 58.6 249.6 2.2 50.9 3 1 6 8943 14 37 27 14 38 38 --- 16 36 35 58.4 249.9 2.2 51.0 60 R 2 7998 14 39 11 J1327+2210 16 37 08 45.9 258.7 3.2 52.2 2 1 6 7998 14 38 38 14 40 11 =1324+224 16 38 08 45.7 258.9 3.2 52.2 60 R 2 6759 14 40 44 RXBOO 16 38 41 58.1 250.4 2.2 51.2 2 1 6 6759 14 40 11 14 41 43 --- 16 39 41 57.9 250.7 2.3 51.4 60 R 2 5525 Schedule for VLBA_NL (Code Nl ) Page 15 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 14 42 27 J1504+1029 16 40 24 52.3 220.7 1.6 29.7 17 1 6 5525 14 41 43 14 43 26 =1502+106 16 41 24 52.2 221.1 1.6 29.9 60 R 2 4153 14 44 10 RXBOO 16 42 07 57.5 251.3 2.3 51.6 17 1 6 4153 14 43 26 14 45 10 --- 16 43 07 57.3 251.6 2.3 51.7 60 R 2 2777 14 45 20 J1419+2706 16 43 18 57.4 254.8 2.4 53.9 3 1 6 2777 14 45 10 14 46 20 =1417+273 16 44 18 57.2 255.0 2.4 54.0 60 R 2 1837 14 46 31 RXBOO 16 44 28 57.1 251.9 2.3 51.9 2 1 6 1837 14 46 20 14 47 30 --- 16 45 28 56.9 252.2 2.4 52.0 60 R 2 900 14 48 10 J1310+3220 16 46 09 46.7 275.6 3.6 61.4 14 1 7 900 14 47 30 14 49 10 =1308+326 16 47 09 46.5 275.7 3.6 61.4 60 F 1 431 14 49 49 RXBOO 16 47 47 56.5 252.8 2.4 52.2 13 1 7 431 14 49 10 14 50 49 --- 16 48 47 56.3 253.0 2.4 52.3 60 F 1 1747 14 50 59 J1419+2706 16 48 58 56.3 256.1 2.5 54.4 2 1 7 1747 14 50 49 14 51 59 =1417+273 16 49 58 56.2 256.4 2.5 54.5 60 F 1 2685 14 52 10 RXBOO 16 50 08 56.0 253.4 2.4 52.5 2 1 7 2685 14 51 59 14 53 09 --- 16 51 08 55.9 253.6 2.4 52.6 60 F 1 3621 14 53 43 J1327+2210 16 51 42 43.2 261.6 3.4 52.8 2 1 7 3621 14 53 09 14 54 42 =1324+224 16 52 42 43.0 261.8 3.4 52.8 60 F 1 4861 14 55 15 RXBOO 16 53 14 55.5 254.1 2.5 52.7 2 1 7 4861 14 54 42 14 56 15 --- 16 54 14 55.3 254.4 2.5 52.8 60 F 1 6094 14 56 25 J1419+2706 16 54 25 55.3 257.4 2.6 54.8 2 1 7 6094 14 56 15 14 57 25 =1417+273 16 55 25 55.2 257.6 2.6 54.9 60 F 1 7031 14 57 35 RXBOO 16 55 35 55.1 254.7 2.5 53.0 2 1 7 7031 14 57 25 14 58 35 --- 16 56 35 54.9 254.9 2.5 53.0 60 F 1 7964 14 59 16 J1504+1029 16 57 16 50.1 226.4 1.9 33.3 16 1 7 7964 14 58 35 15 00 16 =1502+106 16 58 16 50.0 226.7 1.9 33.5 60 F 1 9303 15 00 56 RXBOO 16 58 56 54.5 255.5 2.6 53.2 15 1 7 9303 15 00 16 15 01 56 --- 16 59 56 54.3 255.7 2.6 53.3 60 F 1 10643 Schedule for VLBA_NL (Code Nl ) Page 16 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 15 02 34 J1310+3220 17 00 34 44.0 277.7 3.8 61.0 11 1 7 10643 15 01 56 15 03 34 =1308+326 17 01 34 43.9 277.8 3.8 61.0 60 F 1 11944 15 04 12 RXBOO 17 02 13 53.9 256.2 2.6 53.5 12 1 7 11944 15 03 34 15 05 12 --- 17 03 13 53.7 256.4 2.6 53.6 60 F 1 13250 15 05 22 J1419+2706 17 03 23 53.7 259.3 2.7 55.4 2 1 7 13250 15 05 12 15 06 22 =1417+273 17 04 23 53.5 259.5 2.7 55.5 60 F 1 14183 15 06 32 RXBOO 17 04 33 53.4 256.7 2.7 53.7 2 1 7 14183 15 06 22 15 07 31 --- 17 05 33 53.3 257.0 2.7 53.7 60 F 1 15113 15 08 05 J1327+2210 17 06 06 40.6 264.3 3.6 53.3 2 1 7 15113 15 07 31 15 09 04 =1324+224 17 07 06 40.4 264.5 3.7 53.3 60 F 1 16354 15 09 37 RXBOO 17 07 39 52.9 257.4 2.7 53.9 2 1 7 16354 15 09 04 15 10 37 --- 17 08 39 52.7 257.7 2.7 53.9 60 F 1 17589 15 10 47 J1419+2706 17 08 49 52.7 260.5 2.8 55.7 2 1 8 17589 15 10 37 15 11 47 =1417+273 17 09 49 52.5 260.7 2.8 55.8 60 R 1 16659 15 11 57 RXBOO 17 09 59 52.5 257.9 2.8 54.0 2 1 8 16659 15 11 47 15 12 56 --- 17 10 59 52.3 258.2 2.8 54.1 60 R 1 15731 15 13 34 J1504+1029 17 11 37 48.1 230.8 2.1 36.0 14 1 8 15731 15 12 56 15 14 34 =1502+106 17 12 37 48.0 231.1 2.1 36.2 60 R 1 14428 15 15 12 RXBOO 17 13 15 51.9 258.6 2.8 54.2 14 1 8 14428 15 14 34 15 16 12 --- 17 14 15 51.7 258.9 2.8 54.3 60 R 1 13125 15 16 22 J1419+2706 17 14 24 51.7 261.6 2.9 56.0 2 1 8 13125 15 16 12 15 17 21 =1417+273 17 15 24 51.5 261.8 2.9 56.0 60 R 1 12197 15 17 31 RXBOO 17 15 34 51.4 259.1 2.9 54.4 2 1 8 12197 15 17 21 15 18 31 --- 17 16 34 51.3 259.4 2.9 54.4 60 R 1 11271 15 19 17 J1310+3220 17 17 21 40.9 280.0 4.1 60.3 20 1 8 11271 15 18 31 15 20 17 =1308+326 17 18 21 40.8 280.2 4.1 60.3 60 R 1 9855 15 21 04 RXBOO 17 19 07 50.8 259.9 2.9 54.6 21 1 8 9855 15 20 17 15 22 04 --- 17 20 07 50.6 260.1 2.9 54.6 60 R 1 8435 Schedule for VLBA_NL (Code Nl ) Page 17 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 15 22 13 J1419+2706 17 20 17 50.6 262.8 3.0 56.2 2 1 8 8435 15 22 04 15 23 13 =1417+273 17 21 17 50.4 263.0 3.0 56.2 60 R 1 7509 15 23 23 RXBOO 17 21 26 50.4 260.4 3.0 54.7 2 1 8 7509 15 23 13 15 24 22 --- 17 22 26 50.2 260.6 3.0 54.7 60 R 1 6586 15 24 56 J1327+2210 17 23 00 37.4 267.3 3.9 53.5 2 1 8 6586 15 24 22 15 25 55 =1324+224 17 24 00 37.2 267.5 3.9 53.6 60 R 1 5344 15 26 28 RXBOO 17 24 33 49.8 261.0 3.0 54.8 2 1 8 5344 15 25 55 15 27 28 --- 17 25 33 49.6 261.2 3.0 54.9 60 R 1 4110 15 28 03 J1504+1029 17 26 08 46.0 235.0 2.4 38.4 12 1 8 4110 15 27 28 15 29 03 =1502+106 17 27 08 45.8 235.3 2.4 38.6 60 R 1 2843 15 29 38 RXBOO 17 27 43 49.2 261.6 3.1 55.0 12 1 8 2843 15 29 03 15 30 38 --- 17 28 43 49.0 261.8 3.1 55.0 60 R 1 1576 15 30 48 J1419+2706 17 28 53 49.0 264.4 3.1 56.5 2 1 8 1576 15 30 38 15 31 48 =1417+273 17 29 53 48.8 264.6 3.2 56.5 60 R 1 649 15 31 57 RXBOO 17 30 03 48.8 262.1 3.1 55.0 2 1 7 649 15 31 48 15 32 57 --- 17 31 03 48.6 262.3 3.1 55.1 60 F 2 279 15 33 51 J1310+3220 17 31 57 38.3 282.0 4.4 59.7 27 1 7 279 15 33 51 15 34 51 =1308+326 17 32 57 38.1 282.2 4.4 59.6 60 F 2 1077 15 35 45 RXBOO 17 33 51 48.1 262.8 3.2 55.2 28 1 7 1077 15 35 45 15 36 45 --- 17 34 51 47.9 263.0 3.2 55.2 60 F 2 1874 15 36 55 J1419+2706 17 35 01 47.9 265.6 3.2 56.6 2 1 7 1874 15 36 45 15 37 55 =1417+273 17 36 01 47.7 265.7 3.3 56.6 60 F 2 2806 15 38 05 RXBOO 17 36 11 47.6 263.3 3.2 55.3 2 1 7 2806 15 37 55 15 39 05 --- 17 37 11 47.5 263.5 3.2 55.3 60 F 2 3738 15 39 38 J1327+2210 17 37 45 34.7 269.8 4.2 53.6 2 1 7 3738 15 39 05 15 40 38 =1324+224 17 38 45 34.5 270.0 4.2 53.6 60 F 2 4980 15 41 12 RXBOO 17 39 19 47.1 263.9 3.2 55.4 3 1 7 4980 15 40 38 15 42 12 --- 17 40 19 46.9 264.0 3.3 55.4 60 F 2 6237 Schedule for VLBA_NL (Code Nl ) Page 18 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 15 42 23 J1419+2706 17 40 30 46.8 266.5 3.3 56.7 3 1 7 6237 15 42 12 15 43 23 =1417+273 17 41 30 46.7 266.7 3.4 56.7 60 F 2 7173 15 43 33 RXBOO 17 41 40 46.6 264.3 3.3 55.4 3 1 7 7173 15 43 23 15 44 33 --- 17 42 40 46.4 264.5 3.3 55.5 60 F 2 8110 15 45 09 J1504+1029 17 43 16 43.3 239.6 2.6 40.8 13 1 7 8110 15 44 33 15 46 08 =1502+106 17 44 16 43.1 239.8 2.7 41.0 60 F 2 9386 15 46 45 RXBOO 17 44 53 46.0 264.9 3.3 55.5 14 1 7 9386 15 46 08 15 47 45 --- 17 45 53 45.8 265.1 3.4 55.5 60 F 2 10672 15 48 45 J1310+3220 17 46 53 35.6 284.0 4.6 58.9 34 1 7 10672 15 48 45 15 49 45 =1308+326 17 47 53 35.4 284.2 4.6 58.8 60 F 2 11469 15 52 19 3C279 17 50 27 8.2 254.5 4.9 46.3 93 1 7 11469 15 52 19 15 57 18 --- 17 55 27 7.3 255.4 5.0 46.5 299 F 2 15459 Next scan frequencies: 22099.02 22224.50 22349.99 22475.47 Next BBC frequencies: 599.02 724.50 849.99 975.47 15 59 17 NRAO530 17 57 27 34.9 187.2 0.4 5.5 59 1 8 15459 15 59 17 16 04 17 --- 18 02 27 34.7 188.6 0.5 6.6 299 R 2 15752 16 05 39 W51M 18 03 50 57.7 141.7 -1.3 -28.6 31 1 8 15752 16 05 39 16 06 39 --- 18 04 50 57.8 142.0 -1.3 -28.3 60 R 2 14955 16 06 50 J1924+1540 18 05 02 58.8 140.7 -1.3 -29.4 3 1 8 14955 16 06 39 16 07 50 =1922+155 18 06 02 58.9 141.1 -1.3 -29.1 60 R 2 14006 16 08 01 W51M 18 06 13 58.0 142.6 -1.3 -27.9 3 1 8 14006 16 07 50 16 09 01 --- 18 07 13 58.1 143.0 -1.3 -27.6 60 R 2 13061 16 09 11 J1930+1532 18 07 22 58.2 139.3 -1.4 -30.3 1 1 8 13061 16 09 01 16 10 11 --- 18 08 22 58.3 139.7 -1.4 -30.1 60 R 2 12131 16 10 21 W51M 18 08 33 58.2 143.5 -1.3 -27.2 1 1 8 12131 16 10 11 16 11 21 --- 18 09 33 58.3 144.0 -1.2 -27.0 60 R 2 11200 16 11 32 J1924+1540 18 09 43 59.3 142.6 -1.3 -28.1 3 1 8 11200 16 11 21 16 12 31 =1922+155 18 10 43 59.4 143.0 -1.2 -27.8 60 R 2 10258 Schedule for VLBA_NL (Code Nl ) Page 19 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 16 12 42 W51M 18 10 54 58.5 144.5 -1.2 -26.6 3 1 8 10258 16 12 31 16 13 42 --- 18 11 54 58.6 144.9 -1.2 -26.3 60 R 2 9320 16 15 23 J2016+1632 18 13 35 53.6 124.5 -2.0 -39.9 81 1 8 9320 16 15 23 16 16 23 =2013+163 18 14 35 53.7 124.8 -2.0 -39.7 60 R 2 8522 16 18 04 W51M 18 16 17 59.1 146.8 -1.1 -25.0 81 1 8 8522 16 18 04 16 19 04 --- 18 17 17 59.2 147.2 -1.1 -24.7 60 R 2 7725 16 19 14 J1924+1540 18 17 27 60.1 145.9 -1.1 -25.7 2 1 8 7725 16 19 04 16 20 14 =1922+155 18 18 27 60.3 146.3 -1.1 -25.4 60 R 2 6793 16 20 24 W51M 18 18 37 59.3 147.8 -1.1 -24.2 2 1 8 6793 16 20 14 16 21 24 --- 18 19 37 59.4 148.2 -1.1 -23.9 60 R 2 5863 16 22 11 J1756+1535 18 20 25 63.3 192.6 0.4 9.7 12 1 8 5863 16 21 24 16 23 11 --- 18 21 25 63.3 193.1 0.4 10.1 60 R 2 4434 16 23 58 W51M 18 22 11 59.6 149.3 -1.0 -23.1 11 1 8 4434 16 23 11 16 24 57 --- 18 23 11 59.7 149.8 -1.0 -22.8 60 R 2 3014 16 25 07 J1924+1540 18 23 21 60.7 148.5 -1.0 -23.9 2 1 8 3014 16 24 57 16 26 07 =1922+155 18 24 21 60.8 149.0 -1.0 -23.5 60 R 2 2088 16 26 16 W51M 18 24 31 59.9 150.4 -1.0 -22.4 2 1 8 2088 16 26 07 16 27 16 --- 18 25 31 60.0 150.8 -1.0 -22.1 60 R 2 1164 16 27 26 J1930+1532 18 25 40 60.2 146.9 -1.1 -25.0 1 1 8 1164 16 27 16 16 28 26 --- 18 26 40 60.3 147.3 -1.1 -24.7 60 R 2 236 16 28 36 W51M 18 26 50 60.1 151.4 -1.0 -21.6 1 1 9 236 16 28 26 16 29 36 --- 18 27 50 60.2 151.9 -0.9 -21.3 60 F 1 1166 16 30 30 J2016+1632 18 28 45 55.8 129.4 -1.8 -36.9 33 1 9 1166 16 30 30 16 31 30 =2013+163 18 29 45 56.0 129.8 -1.8 -36.7 60 F 1 1964 16 32 18 W51M 18 30 34 60.4 153.1 -0.9 -20.4 27 1 9 1964 16 31 30 16 33 18 --- 18 31 34 60.5 153.6 -0.9 -20.1 60 F 1 3408 16 33 27 J1924+1540 18 31 43 61.5 152.4 -0.9 -21.1 1 1 9 3408 16 33 18 16 34 27 =1922+155 18 32 43 61.6 152.8 -0.9 -20.7 60 F 1 4328 Schedule for VLBA_NL (Code Nl ) Page 20 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 16 34 36 W51M 18 32 52 60.6 154.2 -0.9 -19.6 1 1 9 4328 16 34 27 16 35 36 --- 18 33 52 60.7 154.6 -0.8 -19.3 60 F 1 5246 16 36 23 J1756+1535 18 34 39 62.6 200.0 0.6 15.3 11 1 9 5246 16 35 36 16 37 23 --- 18 35 39 62.5 200.5 0.6 15.7 60 F 1 6677 16 38 10 W51M 18 36 26 60.9 155.8 -0.8 -18.4 11 1 9 6677 16 37 23 16 39 10 --- 18 37 26 60.9 156.3 -0.8 -18.0 60 F 1 8097 16 39 19 J1924+1540 18 37 35 62.0 155.2 -0.8 -19.0 1 1 9 8097 16 39 10 16 40 19 =1922+155 18 38 35 62.1 155.7 -0.8 -18.6 60 F 1 9013 16 40 27 W51M 18 38 44 61.0 156.9 -0.8 -17.6 1 1 9 9013 16 40 19 16 41 27 --- 18 39 44 61.1 157.4 -0.7 -17.2 60 F 1 9928 16 41 37 J1930+1532 18 39 54 61.6 153.4 -0.9 -20.3 1 1 9 9928 16 41 27 16 42 37 --- 18 40 54 61.6 153.9 -0.8 -19.9 60 F 1 10856 16 42 47 W51M 18 41 04 61.2 158.0 -0.7 -16.7 1 1 9 10856 16 42 37 16 43 46 --- 18 42 04 61.3 158.5 -0.7 -16.4 60 F 1 11786 16 43 55 J1924+1540 18 42 12 62.3 157.4 -0.7 -17.3 1 1 9 11786 16 43 46 16 44 55 =1922+155 18 43 12 62.4 157.9 -0.7 -16.9 60 F 1 12699 16 45 04 W51M 18 43 21 61.4 159.2 -0.7 -15.9 1 1 9 12699 16 44 55 16 46 03 --- 18 44 21 61.4 159.6 -0.7 -15.5 60 F 1 13612 16 46 35 J2016+1632 18 44 52 58.0 135.2 -1.5 -33.2 9 1 9 13612 16 46 03 16 47 35 =2013+163 18 45 52 58.2 135.6 -1.5 -33.0 60 F 1 14827 16 48 06 W51M 18 46 24 61.6 160.6 -0.6 -14.8 9 1 9 14827 16 47 35 16 49 06 --- 18 47 24 61.6 161.1 -0.6 -14.4 60 F 1 16048 16 49 54 J1756+1535 18 48 12 61.6 206.6 0.9 20.3 11 1 9 16048 16 49 06 16 50 53 --- 18 49 12 61.5 207.1 0.9 20.6 60 F 1 17479 16 51 40 W51M 18 49 59 61.8 162.4 -0.6 -13.5 11 1 10 17479 16 50 53 16 52 40 --- 18 50 59 61.8 162.9 -0.5 -13.1 60 R 1 16058 16 52 48 J1924+1540 18 51 07 62.9 161.9 -0.6 -13.9 0 1 10 16058 16 52 40 16 53 48 =1922+155 18 52 07 63.0 162.4 -0.5 -13.5 60 R 1 15148 Schedule for VLBA_NL (Code Nl ) Page 21 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 16 53 57 W51M 18 52 16 61.9 163.6 -0.5 -12.6 0 1 10 15148 16 53 48 16 54 57 --- 18 53 16 61.9 164.1 -0.5 -12.2 60 R 1 14239 16 55 06 J1930+1532 18 53 25 62.6 160.0 -0.6 -15.3 1 1 10 14239 16 54 57 16 56 06 --- 18 54 25 62.6 160.5 -0.6 -15.0 60 R 1 13311 16 56 16 W51M 18 54 35 62.0 164.7 -0.5 -11.7 1 1 10 13311 16 56 06 16 57 16 --- 18 55 35 62.1 165.2 -0.5 -11.3 60 R 1 12382 16 57 24 J1924+1540 18 55 44 63.2 164.3 -0.5 -12.1 0 1 10 12382 16 57 16 16 58 24 =1922+155 18 56 44 63.2 164.8 -0.5 -11.7 60 R 1 11473 16 58 32 W51M 18 56 52 62.1 165.9 -0.5 -10.8 0 1 10 11473 16 58 24 16 59 32 --- 18 57 52 62.2 166.4 -0.4 -10.4 60 R 1 10563 17 00 04 J2016+1632 18 58 23 59.7 140.6 -1.3 -29.6 8 1 10 10563 16 59 32 17 01 03 =2013+163 18 59 23 59.8 141.0 -1.3 -29.3 60 R 1 9347 17 01 35 W51M 18 59 55 62.3 167.4 -0.4 -9.6 8 1 10 9347 17 01 03 17 02 35 --- 19 00 55 62.3 168.0 -0.4 -9.3 60 R 1 8125 17 02 43 J1924+1540 19 01 04 63.4 167.1 -0.4 -9.9 0 1 10 8125 17 02 35 17 03 43 =1922+155 19 02 04 63.5 167.6 -0.4 -9.5 60 R 1 7216 17 03 52 W51M 19 02 12 62.3 168.6 -0.4 -8.8 0 1 10 7216 17 03 43 17 04 51 --- 19 03 12 62.4 169.1 -0.3 -8.4 60 R 1 6307 17 05 41 J1756+1535 19 04 01 60.1 213.8 1.1 25.5 13 1 10 6307 17 04 51 17 06 40 --- 19 05 01 60.0 214.2 1.1 25.8 60 R 1 4853 17 07 29 W51M 19 05 50 62.5 170.5 -0.3 -7.3 14 1 10 4853 17 06 40 17 08 29 --- 19 06 50 62.5 171.0 -0.3 -6.9 60 R 1 3403 17 08 37 J1924+1540 19 06 59 63.6 170.3 -0.3 -7.5 0 1 10 3403 17 08 29 17 09 37 =1922+155 19 07 59 63.7 170.8 -0.3 -7.1 60 R 1 2495 17 09 46 W51M 19 08 07 62.5 171.7 -0.3 -6.4 0 1 10 2495 17 09 37 17 10 46 --- 19 09 07 62.6 172.2 -0.2 -6.0 60 R 1 1586 17 10 55 J1930+1532 19 09 17 63.4 168.2 -0.4 -9.1 1 1 10 1586 17 10 46 17 11 55 --- 19 10 17 63.4 168.8 -0.3 -8.7 60 R 1 659 Schedule for VLBA_NL (Code Nl ) Page 22 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 17 12 05 W51M 19 10 27 62.6 172.9 -0.2 -5.5 1 1 9 659 17 11 55 17 13 05 --- 19 11 27 62.6 173.4 -0.2 -5.1 60 F 2 270 17 13 36 J2016+1632 19 11 58 61.2 146.4 -1.1 -25.5 7 1 9 270 17 13 05 17 14 36 =2013+163 19 12 58 61.3 146.9 -1.1 -25.2 60 F 2 1486 17 15 08 W51M 19 13 30 62.6 174.5 -0.2 -4.2 7 1 9 1486 17 14 36 17 16 08 --- 19 14 30 62.7 175.0 -0.2 -3.8 60 F 2 2709 17 16 16 J1924+1540 19 14 38 63.8 174.4 -0.2 -4.3 0 1 9 2709 17 16 08 17 17 16 =1922+155 19 15 38 63.8 175.0 -0.2 -3.9 60 F 2 3618 17 17 24 W51M 19 15 47 62.7 175.7 -0.1 -3.3 0 1 9 3618 17 17 16 17 18 24 --- 19 16 47 62.7 176.2 -0.1 -2.9 60 F 2 4527 17 19 16 J1756+1535 19 17 39 58.6 219.5 1.3 29.5 17 1 9 4527 17 19 16 17 20 16 --- 19 18 39 58.5 219.9 1.4 29.8 60 F 2 5324 17 21 07 W51M 19 19 31 62.7 177.7 -0.1 -1.8 17 1 9 5324 17 21 07 17 22 07 --- 19 20 31 62.7 178.2 -0.1 -1.4 60 F 2 6122 17 22 16 J1924+1540 19 20 39 63.9 177.7 -0.1 -1.8 0 1 9 6122 17 22 07 17 23 15 =1922+155 19 21 39 63.9 178.2 -0.1 -1.4 60 F 2 7031 17 23 24 W51M 19 21 47 62.7 178.9 0.0 -0.9 0 1 9 7031 17 23 15 17 24 24 --- 19 22 47 62.7 179.4 0.0 -0.5 60 F 2 7940 17 24 33 J1930+1532 19 22 57 63.7 175.6 -0.1 -3.4 1 1 9 7940 17 24 24 17 25 33 --- 19 23 57 63.7 176.1 -0.1 -3.0 60 F 2 8869 17 25 43 W51M 19 24 07 62.7 180.1 0.0 0.1 1 1 9 8869 17 25 33 17 26 43 --- 19 25 07 62.7 180.6 0.0 0.5 60 F 2 9801 17 26 51 J1924+1540 19 25 16 63.9 180.2 0.0 0.2 0 1 9 9801 17 26 43 17 27 51 =1922+155 19 26 16 63.9 180.8 0.0 0.6 60 F 2 10710 17 28 00 W51M 19 26 24 62.7 181.3 0.0 1.0 0 1 9 10710 17 27 51 17 28 59 --- 19 27 24 62.7 181.8 0.1 1.4 60 F 2 11619 17 29 31 J2016+1632 19 27 55 62.7 153.9 -0.8 -20.0 7 1 9 11619 17 28 59 17 30 31 =2013+163 19 28 55 62.8 154.4 -0.8 -19.6 60 F 2 12835 Schedule for VLBA_NL (Code Nl ) Page 23 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 17 31 02 W51M 19 29 27 62.7 182.9 0.1 2.2 7 1 9 12835 17 30 31 17 32 02 --- 19 30 27 62.7 183.4 0.1 2.7 60 F 2 14057 17 32 55 J1756+1535 19 31 21 56.9 224.8 1.6 33.1 19 1 9 14057 17 32 55 17 33 55 --- 19 32 21 56.7 225.2 1.6 33.3 60 F 2 14855 17 34 48 W51M 19 33 13 62.7 184.9 0.2 3.8 19 1 9 14855 17 34 48 17 35 47 --- 19 34 13 62.7 185.4 0.2 4.2 60 F 2 15653 17 35 56 J1924+1540 19 34 21 63.8 185.2 0.2 4.0 0 1 9 15653 17 35 47 17 36 56 =1922+155 19 35 21 63.8 185.7 0.2 4.4 60 F 2 16562 17 37 04 W51M 19 35 30 62.6 186.1 0.2 4.7 0 1 9 16562 17 36 56 17 38 04 --- 19 36 30 62.6 186.6 0.2 5.1 60 F 2 17472 17 38 14 J1930+1532 19 36 40 63.8 183.0 0.1 2.4 2 1 10 17472 17 38 04 17 39 14 --- 19 37 40 63.7 183.6 0.1 2.8 60 R 2 16538 17 39 24 W51M 19 37 51 62.6 187.3 0.2 5.6 2 1 10 16538 17 39 14 17 40 24 --- 19 38 51 62.6 187.8 0.2 6.0 60 R 2 15601 17 40 32 J1924+1540 19 38 59 63.7 187.7 0.2 6.0 0 1 10 15601 17 40 24 17 41 32 =1922+155 19 39 59 63.7 188.2 0.3 6.4 60 R 2 14692 17 41 41 W51M 19 40 07 62.5 188.5 0.3 6.5 0 1 10 14692 17 41 32 17 42 40 --- 19 41 07 62.5 189.0 0.3 6.9 60 R 2 13782 17 43 12 J2016+1632 19 41 39 63.7 160.9 -0.6 -14.7 7 1 10 13782 17 42 40 17 44 12 =2013+163 19 42 39 63.8 161.4 -0.6 -14.3 60 R 2 12566 17 44 44 W51M 19 43 11 62.4 190.1 0.3 7.8 7 1 10 12566 17 44 12 17 45 43 --- 19 44 11 62.4 190.6 0.3 8.2 60 R 2 11344 17 45 52 J1924+1540 19 44 19 63.6 190.6 0.3 8.2 0 1 10 11344 17 45 43 17 46 52 =1922+155 19 45 19 63.5 191.1 0.3 8.6 60 R 2 10434 17 47 00 W51M 19 45 28 62.3 191.3 0.4 8.7 0 1 10 10434 17 46 52 17 48 00 --- 19 46 28 62.3 191.8 0.4 9.1 60 R 2 9524 17 48 52 J1756+1535 19 47 19 54.7 230.4 1.8 36.6 20 1 10 9524 17 48 52 17 49 51 --- 19 48 19 54.5 230.7 1.9 36.8 60 R 2 8727 Schedule for VLBA_NL (Code Nl ) Page 24 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 17 50 42 W51M 19 49 10 62.2 193.2 0.4 10.1 20 1 10 8727 17 50 42 17 51 42 --- 19 50 10 62.2 193.7 0.4 10.5 60 R 2 7929 17 51 50 J1924+1540 19 50 19 63.3 193.8 0.4 10.6 0 1 10 7929 17 51 42 17 52 50 =1922+155 19 51 19 63.3 194.3 0.4 11.0 60 R 2 7019 17 52 59 W51M 19 51 27 62.1 194.3 0.5 11.0 0 1 10 7019 17 52 50 17 53 58 --- 19 52 27 62.1 194.9 0.5 11.4 60 R 2 6110 17 54 09 J1930+1532 19 52 38 63.4 191.6 0.4 9.0 2 1 10 6110 17 53 58 17 55 09 --- 19 53 38 63.3 192.2 0.4 9.4 60 R 2 5172 17 55 19 W51M 19 53 48 62.0 195.5 0.5 11.9 2 1 10 5172 17 55 09 17 56 19 --- 19 54 48 61.9 196.0 0.5 12.3 60 R 2 4231 17 56 51 J2016+1632 19 55 20 64.4 168.2 -0.4 -9.1 7 1 10 4231 17 56 19 17 57 50 =2013+163 19 56 20 64.4 168.8 -0.3 -8.7 60 R 2 3015 17 58 22 W51M 19 56 52 61.8 197.1 0.5 13.1 7 1 10 3015 17 57 50 17 59 22 --- 19 57 52 61.8 197.6 0.6 13.4 60 R 2 1793 17 59 31 J1924+1540 19 58 00 63.0 197.8 0.6 13.7 0 1 10 1793 17 59 22 18 00 30 =1922+155 19 59 00 62.9 198.3 0.6 14.1 60 R 2 883 18 00 39 W51M 19 59 09 61.7 198.2 0.6 13.9 0 1 11 883 18 00 30 18 01 39 --- 20 00 09 61.6 198.7 0.6 14.3 60 F 1 26 18 02 29 J1756+1535 20 00 59 52.6 234.8 2.1 39.2 20 1 11 26 18 02 29 18 03 29 --- 20 01 59 52.5 235.1 2.1 39.4 60 F 1 824 18 04 18 W51M 20 02 48 61.5 200.0 0.6 15.3 20 1 11 824 18 03 29 18 05 18 --- 20 03 48 61.4 200.5 0.7 15.7 60 F 1 2282 18 05 26 J1924+1540 20 03 57 62.6 200.8 0.7 16.0 0 1 11 2282 18 05 18 18 06 26 =1922+155 20 04 57 62.5 201.3 0.7 16.3 60 F 1 3191 18 06 34 W51M 20 05 05 61.3 201.1 0.7 16.1 0 1 11 3191 18 06 26 18 07 34 --- 20 06 05 61.3 201.6 0.7 16.5 60 F 1 4101 18 07 45 J1930+1532 20 06 16 62.7 198.7 0.6 14.4 2 1 11 4101 18 07 34 18 08 45 --- 20 07 16 62.6 199.2 0.6 14.8 60 F 1 5038 Schedule for VLBA_NL (Code Nl ) Page 25 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 18 08 55 W51M 20 07 26 61.2 202.3 0.7 17.0 2 1 11 5038 18 08 45 18 09 55 --- 20 08 26 61.1 202.7 0.7 17.3 60 F 1 5977 18 10 03 J1924+1540 20 08 35 62.3 203.1 0.7 17.7 0 1 11 5977 18 09 55 18 11 03 =1922+155 20 09 35 62.2 203.6 0.7 18.1 60 F 1 6887 18 11 12 W51M 20 09 43 61.0 203.3 0.8 17.8 0 1 11 6887 18 11 03 18 12 12 --- 20 10 43 60.9 203.8 0.8 18.1 60 F 1 7796 18 12 46 J2016+1632 20 11 17 64.8 177.1 -0.1 -2.2 10 1 11 7796 18 12 12 18 13 46 =2013+163 20 12 17 64.8 177.7 -0.1 -1.8 60 F 1 9050 18 14 21 W51M 20 12 53 60.8 204.8 0.8 18.9 11 1 11 9050 18 13 46 18 15 20 --- 20 13 53 60.7 205.3 0.8 19.2 60 F 1 10314 18 16 10 J1756+1535 20 14 42 50.5 238.8 2.3 41.5 21 1 11 10314 18 15 20 18 17 10 --- 20 15 42 50.3 239.1 2.3 41.6 60 F 1 11772 18 17 58 W51M 20 16 31 60.5 206.5 0.9 20.1 21 1 11 11772 18 17 10 18 18 58 --- 20 17 31 60.4 207.0 0.9 20.5 60 F 1 13218 18 19 07 J1924+1540 20 17 39 61.5 207.5 0.9 20.9 0 1 11 13218 18 18 58 18 20 06 =1922+155 20 18 39 61.5 207.9 0.9 21.3 60 F 1 14128 18 20 15 W51M 20 18 48 60.3 207.6 0.9 20.9 0 1 11 14128 18 20 06 18 21 15 --- 20 19 48 60.2 208.0 0.9 21.2 60 F 1 15037 18 21 25 J1930+1532 20 19 58 61.7 205.5 0.8 19.5 1 1 11 15037 18 21 15 18 22 25 --- 20 20 58 61.7 206.0 0.8 19.8 60 F 1 15970 18 22 35 W51M 20 21 08 60.1 208.6 1.0 21.7 1 1 11 15970 18 22 25 18 23 35 --- 20 22 08 60.0 209.1 1.0 22.0 60 F 1 16906 18 23 43 J1924+1540 20 22 17 61.1 209.6 1.0 22.5 0 1 12 16906 18 23 35 18 24 43 =1922+155 20 23 17 61.0 210.1 1.0 22.9 60 R 1 17385 18 24 51 W51M 20 23 25 59.9 209.7 1.0 22.4 0 1 12 17385 18 24 43 18 25 51 --- 20 24 25 59.8 210.1 1.0 22.7 60 R 1 16475 18 26 27 J2016+1632 20 25 01 64.7 184.8 0.1 3.8 13 1 12 16475 18 25 51 18 27 27 =2013+163 20 26 01 64.7 185.4 0.2 4.2 60 R 1 15194 Schedule for VLBA_NL (Code Nl ) Page 26 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 18 28 04 W51M 20 26 39 59.6 211.1 1.0 23.4 14 1 12 15194 18 27 27 18 29 04 --- 20 27 39 59.5 211.5 1.1 23.7 60 R 1 13903 18 29 12 J1924+1540 20 27 47 60.6 212.1 1.0 24.3 0 1 12 13903 18 29 04 18 30 12 =1922+155 20 28 47 60.5 212.6 1.1 24.6 60 R 1 12994 18 30 21 W51M 20 28 55 59.3 212.1 1.1 24.1 0 1 12 12994 18 30 12 18 31 21 --- 20 29 55 59.2 212.5 1.1 24.5 60 R 1 12084 18 32 08 J1756+1535 20 30 43 47.9 243.2 2.6 43.7 19 1 12 12084 18 31 21 18 33 08 --- 20 31 43 47.7 243.4 2.6 43.8 60 R 1 10650 18 33 55 W51M 20 32 30 59.0 213.6 1.1 25.2 18 1 12 10650 18 33 08 18 34 55 --- 20 33 30 58.9 214.0 1.2 25.5 60 R 1 9227 18 35 03 J1924+1540 20 33 39 60.0 214.7 1.1 26.2 0 1 12 9227 18 34 55 18 36 03 =1922+155 20 34 39 59.9 215.1 1.2 26.5 60 R 1 8317 18 36 11 W51M 20 34 47 58.7 214.6 1.2 25.9 0 1 12 8317 18 36 03 18 37 11 --- 20 35 47 58.6 215.0 1.2 26.2 60 R 1 7408 18 37 21 J1930+1532 20 35 57 60.3 212.9 1.1 24.8 1 1 12 7408 18 37 11 18 38 21 --- 20 36 57 60.2 213.3 1.1 25.2 60 R 1 6475 18 38 31 W51M 20 37 07 58.5 215.5 1.2 26.6 1 1 12 6475 18 38 21 18 39 31 --- 20 38 07 58.4 216.0 1.2 26.9 60 R 1 5540 18 40 08 J2016+1632 20 38 44 64.3 192.4 0.4 9.6 15 1 12 5540 18 39 31 18 41 08 =2013+163 20 39 44 64.3 193.0 0.4 10.1 60 R 1 4253 18 41 45 W51M 20 40 22 58.1 216.9 1.3 27.5 15 1 12 4253 18 41 08 18 42 45 --- 20 41 22 58.0 217.3 1.3 27.8 60 R 1 2958 18 42 53 J1924+1540 20 41 30 59.1 218.0 1.3 28.5 0 1 12 2958 18 42 45 18 43 53 =1922+155 20 42 30 59.0 218.4 1.3 28.8 60 R 1 2048 18 44 02 W51M 20 42 38 57.9 217.8 1.3 28.2 0 1 12 2048 18 43 53 18 45 01 --- 20 43 38 57.8 218.2 1.3 28.4 60 R 1 1138 18 45 49 J1756+1535 20 44 26 45.6 246.6 2.8 45.3 17 1 11 1138 18 45 01 18 46 49 --- 20 45 26 45.4 246.9 2.8 45.4 60 F 2 294 Schedule for VLBA_NL (Code Nl ) Page 27 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 18 47 36 W51M 20 46 13 57.4 219.2 1.4 29.1 17 1 11 294 18 46 49 18 48 36 --- 20 47 13 57.3 219.6 1.4 29.4 60 F 2 1717 18 48 44 J1924+1540 20 47 22 58.4 220.4 1.4 30.1 0 1 11 1717 18 48 36 18 49 44 =1922+155 20 48 22 58.3 220.8 1.4 30.4 60 F 2 2627 18 49 52 W51M 20 48 30 57.2 220.1 1.4 29.8 0 1 11 2627 18 49 44 18 50 52 --- 20 49 30 57.1 220.5 1.4 30.0 60 F 2 3536 18 51 02 J1930+1532 20 49 40 58.8 218.7 1.3 28.9 0 1 11 3536 18 50 52 18 52 02 --- 20 50 40 58.7 219.1 1.3 29.2 60 F 2 4465 18 52 12 W51M 20 50 50 56.9 221.0 1.4 30.4 0 1 11 4465 18 52 02 18 53 11 --- 20 51 50 56.8 221.4 1.5 30.6 60 F 2 5395 18 53 20 J1924+1540 20 51 58 57.9 222.2 1.5 31.4 0 1 11 5395 18 53 11 18 54 20 =1922+155 20 52 58 57.7 222.6 1.5 31.6 60 F 2 6305 18 54 28 W51M 20 53 07 56.6 221.9 1.5 30.9 0 1 11 6305 18 54 20 18 55 28 --- 20 54 07 56.5 222.2 1.5 31.2 60 F 2 7215 18 56 03 J2016+1632 20 54 42 63.5 200.9 0.6 16.1 15 1 11 7215 18 55 28 18 57 03 =2013+163 20 55 42 63.4 201.4 0.7 16.5 60 F 2 8477 18 57 38 W51M 20 56 17 56.2 223.1 1.5 31.7 15 1 11 8477 18 57 03 18 58 38 --- 20 57 17 56.1 223.4 1.6 32.0 60 F 2 9744 18 59 25 J1756+1535 20 58 05 43.2 249.8 3.0 46.6 16 1 11 9744 18 58 38 19 00 25 --- 20 59 05 43.0 250.0 3.0 46.7 60 F 2 11176 19 01 12 W51M 20 59 51 55.8 224.4 1.6 32.6 15 1 11 11176 19 00 25 19 02 12 --- 21 00 51 55.6 224.7 1.6 32.8 60 F 2 12598 19 03 35 NRAO530 21 02 15 17.1 233.7 3.5 38.1 0 1 11 12598 19 03 35 19 08 34 --- 21 07 15 16.3 234.7 3.6 38.7 299 F 2 16587 Next scan frequencies: 22103.81 22229.32 22354.83 22480.35 Next BBC frequencies: 603.81 729.32 854.83 980.35 19 11 27 3C454.3 21 10 08 56.0 131.1 -1.7 -35.8 87 1 12 16587 19 11 27 19 16 26 --- 21 15 08 56.7 132.9 -1.7 -34.7 299 R 2 14624 Schedule for VLBA_NL (Code Nl ) Page 28 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 19 18 10 IRAS00420 21 16 52 54.0 48.9 -3.5 -90.5 42 1 12 14624 19 18 10 19 19 10 --- 21 17 52 54.1 48.9 -3.5 -90.7 60 R 2 13826 19 19 18 J0042+5708 21 18 01 54.4 46.5 -3.4 -93.2 1 1 12 13826 19 19 10 19 20 18 =0039+568 21 19 01 54.6 46.5 -3.4 -93.4 60 R 2 12918 19 20 26 IRAS00420 21 19 09 54.3 48.9 -3.4 -90.9 1 1 12 12918 19 20 18 19 21 26 --- 21 20 09 54.4 48.9 -3.4 -91.1 60 R 2 12010 19 21 39 J0102+5824 21 20 22 52.0 44.6 -3.7 -90.9 2 1 12 12010 19 21 26 19 22 39 =0059+581 21 21 22 52.1 44.6 -3.7 -91.1 60 R 2 11038 19 22 52 IRAS00420 21 21 35 54.6 48.9 -3.4 -91.5 2 1 12 11038 19 22 39 19 23 52 --- 21 22 35 54.8 48.9 -3.4 -91.7 60 R 2 10065 19 24 00 J0042+5708 21 22 44 55.1 46.5 -3.3 -94.2 1 1 12 10065 19 23 52 19 25 00 =0039+568 21 23 44 55.2 46.4 -3.3 -94.4 60 R 2 9156 19 25 08 IRAS00420 21 23 52 54.9 48.9 -3.4 -91.9 1 1 12 9156 19 25 00 19 26 08 --- 21 24 52 55.1 48.8 -3.3 -92.1 60 R 2 8247 19 26 27 J0113+4948 21 25 11 50.4 58.1 -3.8 -79.1 4 1 12 8247 19 26 08 19 27 27 =0110+495 21 26 11 50.5 58.2 -3.8 -79.3 60 R 2 7193 19 27 47 IRAS00420 21 26 31 55.3 48.8 -3.3 -92.5 4 1 12 7193 19 27 27 19 28 47 --- 21 27 31 55.4 48.8 -3.3 -92.7 60 R 2 6136 19 28 55 J0042+5708 21 27 39 55.7 46.4 -3.2 -95.3 1 1 12 6136 19 28 47 19 29 55 =0039+568 21 28 39 55.9 46.3 -3.2 -95.6 60 R 2 5227 19 30 03 IRAS00420 21 28 48 55.6 48.8 -3.3 -93.0 1 1 12 5227 19 29 55 19 31 03 --- 21 29 48 55.8 48.8 -3.3 -93.2 60 R 2 4317 19 31 31 J0136+4751 21 30 15 47.0 59.9 -4.1 -74.3 4 1 12 4317 19 31 03 19 32 31 =0133+476 21 31 15 47.1 60.0 -4.1 -74.4 60 R 2 3150 19 32 58 IRAS00420 21 31 43 56.0 48.8 -3.2 -93.6 4 1 12 3150 19 32 31 19 33 58 --- 21 32 43 56.2 48.7 -3.2 -93.9 60 R 2 1979 19 34 07 J0042+5708 21 32 52 56.4 46.2 -3.2 -96.5 1 1 12 1979 19 33 58 19 35 07 =0039+568 21 33 52 56.6 46.2 -3.1 -96.8 60 R 2 1069 Schedule for VLBA_NL (Code Nl ) Page 29 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 19 35 15 IRAS00420 21 34 00 56.4 48.7 -3.2 -94.1 1 1 12 1069 19 35 07 19 36 15 --- 21 35 00 56.5 48.7 -3.2 -94.4 60 R 2 159 19 36 28 J0102+5824 21 35 13 53.9 44.4 -3.5 -94.2 2 1 13 159 19 36 15 19 37 28 =0059+581 21 36 13 54.1 44.4 -3.4 -94.4 60 F 1 1130 19 37 41 IRAS00420 21 36 26 56.7 48.7 -3.1 -94.7 2 1 13 1130 19 37 28 19 38 41 --- 21 37 26 56.8 48.6 -3.1 -94.9 60 F 1 2101 19 39 00 J0113+4948 21 37 46 52.4 58.7 -3.6 -81.1 4 1 13 2101 19 38 41 19 39 59 =0110+495 21 38 46 52.5 58.7 -3.6 -81.2 60 F 1 3153 19 40 19 IRAS00420 21 39 05 57.1 48.6 -3.1 -95.3 4 1 13 3153 19 39 59 19 41 18 --- 21 40 05 57.2 48.6 -3.1 -95.5 60 F 1 4207 19 41 27 J0042+5708 21 40 13 57.4 46.0 -3.0 -98.3 1 1 13 4207 19 41 18 19 42 27 =0039+568 21 41 13 57.6 46.0 -3.0 -98.5 60 F 1 5119 19 42 35 IRAS00420 21 41 22 57.4 48.6 -3.1 -95.8 1 1 13 5119 19 42 27 19 43 35 --- 21 42 22 57.5 48.5 -3.0 -96.0 60 F 1 6030 19 44 03 J0136+4751 21 42 49 49.0 60.7 -3.9 -76.0 4 1 13 6030 19 43 35 19 45 03 =0133+476 21 43 49 49.2 60.8 -3.9 -76.2 60 F 1 7195 19 45 30 IRAS00420 21 44 17 57.8 48.5 -3.0 -96.5 5 1 13 7195 19 45 03 19 46 30 --- 21 45 17 57.9 48.4 -3.0 -96.7 60 F 1 8363 19 46 39 J0042+5708 21 45 26 58.1 45.8 -3.0 -99.5 1 1 13 8363 19 46 30 19 47 39 =0039+568 21 46 26 58.3 45.7 -2.9 -99.8 60 F 1 9276 19 47 47 IRAS00420 21 46 35 58.1 48.4 -3.0 -97.0 1 1 13 9276 19 47 39 19 48 47 --- 21 47 35 58.3 48.4 -3.0 -97.2 60 F 1 10187 19 49 00 J0102+5824 21 47 47 55.6 44.1 -3.3 -97.1 1 1 13 10187 19 48 47 19 50 00 =0059+581 21 48 47 55.7 44.1 -3.2 -97.3 60 F 1 11157 19 50 13 IRAS00420 21 49 00 58.5 48.3 -2.9 -97.6 1 1 13 11157 19 50 00 19 51 12 --- 21 50 00 58.6 48.3 -2.9 -97.8 60 F 1 12127 19 51 21 J0042+5708 21 50 09 58.8 45.6 -2.9 -100.7 1 1 13 12127 19 51 12 19 52 21 =0039+568 21 51 09 58.9 45.5 -2.9 -101.0 60 F 1 13040 Schedule for VLBA_NL (Code Nl ) Page 30 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 19 52 29 IRAS00420 21 51 18 58.8 48.2 -2.9 -98.1 1 1 13 13040 19 52 21 19 53 29 --- 21 52 18 58.9 48.2 -2.9 -98.4 60 F 1 13952 19 53 48 J0113+4948 21 52 37 54.7 59.2 -3.4 -83.5 5 1 13 13952 19 53 29 19 54 48 =0110+495 21 53 37 54.9 59.3 -3.3 -83.7 60 F 1 15004 19 55 08 IRAS00420 21 53 56 59.1 48.1 -2.9 -98.8 5 1 13 15004 19 54 48 19 56 07 --- 21 54 56 59.3 48.1 -2.8 -99.0 60 F 1 16059 19 56 35 J0136+4751 21 55 24 51.0 61.5 -3.7 -77.8 5 1 13 16059 19 56 07 19 57 35 =0133+476 21 56 24 51.2 61.5 -3.7 -77.9 60 F 1 17222 19 58 02 IRAS00420 21 56 51 59.5 48.0 -2.8 -99.5 5 1 14 17222 19 57 35 19 59 02 --- 21 57 51 59.7 48.0 -2.8 -99.7 60 R 1 16056 19 59 11 J0042+5708 21 58 00 59.8 45.2 -2.7 -102.7 1 1 14 16056 19 59 02 20 00 11 =0039+568 21 59 00 59.9 45.1 -2.7 -103.0 60 R 1 15143 20 00 19 IRAS00420 21 59 09 59.9 47.9 -2.8 -100.0 1 1 14 15143 20 00 11 20 01 19 --- 22 00 09 60.0 47.8 -2.8 -100.3 60 R 1 14230 20 01 32 J0102+5824 22 00 21 57.2 43.7 -3.0 -100.1 1 1 14 14230 20 01 19 20 02 32 =0059+581 22 01 21 57.3 43.7 -3.0 -100.4 60 R 1 13260 20 02 45 IRAS00420 22 01 35 60.2 47.8 -2.7 -100.7 1 1 14 13260 20 02 32 20 03 45 --- 22 02 35 60.3 47.7 -2.7 -100.9 60 R 1 12289 20 03 53 J0042+5708 22 02 43 60.4 44.9 -2.7 -104.0 1 1 14 12289 20 03 45 20 04 53 =0039+568 22 03 43 60.5 44.8 -2.6 -104.2 60 R 1 11375 20 05 02 IRAS00420 22 03 52 60.5 47.6 -2.7 -101.2 1 1 14 11375 20 04 53 20 06 02 --- 22 04 52 60.7 47.6 -2.7 -101.5 60 R 1 10462 20 06 22 J0113+4948 22 05 13 56.8 59.6 -3.1 -85.6 7 1 14 10462 20 06 02 20 07 22 =0110+495 22 06 13 56.9 59.6 -3.1 -85.8 60 R 1 9390 20 07 43 IRAS00420 22 06 33 60.9 47.5 -2.6 -101.9 7 1 14 9390 20 07 22 20 08 43 --- 22 07 33 61.0 47.4 -2.6 -102.2 60 R 1 8316 20 08 51 J0042+5708 22 07 42 61.1 44.5 -2.6 -105.3 1 1 14 8316 20 08 43 20 09 51 =0039+568 22 08 42 61.2 44.4 -2.6 -105.6 60 R 1 7401 Schedule for VLBA_NL (Code Nl ) Page 31 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 20 10 00 IRAS00420 22 08 51 61.2 47.4 -2.6 -102.5 1 1 14 7401 20 09 51 20 11 00 --- 22 09 51 61.3 47.3 -2.6 -102.8 60 R 1 6488 20 11 27 J0136+4751 22 10 18 53.5 62.3 -3.4 -79.9 5 1 14 6488 20 11 00 20 12 27 =0133+476 22 11 18 53.7 62.3 -3.4 -80.1 60 R 1 5328 20 12 54 IRAS00420 22 11 45 61.6 47.2 -2.6 -103.3 5 1 14 5328 20 12 27 20 13 54 --- 22 12 45 61.7 47.1 -2.5 -103.6 60 R 1 4165 20 14 03 J0042+5708 22 12 54 61.7 44.1 -2.5 -106.8 1 1 14 4165 20 13 54 20 15 02 =0039+568 22 13 54 61.9 44.0 -2.5 -107.1 60 R 1 3251 20 15 11 IRAS00420 22 14 03 61.9 47.0 -2.5 -103.9 1 1 14 3251 20 15 02 20 16 11 --- 22 15 03 62.0 46.9 -2.5 -104.2 60 R 1 2337 20 16 24 J0102+5824 22 15 16 59.1 42.9 -2.8 -104.0 1 1 14 2337 20 16 11 20 17 24 =0059+581 22 16 16 59.2 42.9 -2.8 -104.2 60 R 1 1365 20 17 37 IRAS00420 22 16 29 62.2 46.8 -2.5 -104.6 1 1 14 1365 20 17 24 20 18 37 --- 22 17 29 62.4 46.7 -2.5 -104.8 60 R 1 392 20 18 59 J0113+4948 22 17 51 58.8 59.8 -2.9 -87.9 7 1 13 392 20 18 37 20 19 59 =0110+495 22 18 51 59.0 59.8 -2.9 -88.0 60 F 2 1485 20 20 21 IRAS00420 22 19 14 62.6 46.6 -2.4 -105.3 8 1 13 1485 20 19 59 20 21 21 --- 22 20 14 62.7 46.5 -2.4 -105.6 60 F 2 2582 20 21 30 J0042+5708 22 20 23 62.7 43.4 -2.4 -108.9 1 1 13 2582 20 21 21 20 22 30 =0039+568 22 21 23 62.8 43.3 -2.4 -109.2 60 F 2 3497 20 22 38 IRAS00420 22 21 31 62.9 46.4 -2.4 -106.0 1 1 13 3497 20 22 30 20 23 38 --- 22 22 31 63.1 46.3 -2.4 -106.3 60 F 2 4411 20 24 06 J0136+4751 22 23 00 55.6 62.9 -3.2 -81.8 7 1 13 4411 20 23 38 20 25 06 =0133+476 22 24 00 55.8 62.9 -3.2 -81.9 60 F 2 5582 20 25 34 IRAS00420 22 24 28 63.3 46.2 -2.3 -106.8 7 1 13 5582 20 25 06 20 26 34 --- 22 25 28 63.5 46.1 -2.3 -107.1 60 F 2 6759 20 26 43 J0042+5708 22 25 37 63.4 42.9 -2.3 -110.5 1 1 13 6759 20 26 34 20 27 43 =0039+568 22 26 37 63.5 42.8 -2.3 -110.8 60 F 2 7674 Schedule for VLBA_NL (Code Nl ) Page 32 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 20 27 52 IRAS00420 22 26 46 63.6 45.9 -2.3 -107.5 1 1 13 7674 20 27 43 20 28 51 --- 22 27 46 63.8 45.8 -2.3 -107.8 60 F 2 8588 20 29 05 J0102+5824 22 27 59 60.7 42.0 -2.6 -107.4 1 1 13 8588 20 28 51 20 30 04 =0059+581 22 28 59 60.8 42.0 -2.6 -107.7 60 F 2 9560 20 30 18 IRAS00420 22 29 12 64.0 45.7 -2.3 -108.2 1 1 13 9560 20 30 04 20 31 17 --- 22 30 12 64.1 45.6 -2.3 -108.5 60 F 2 10533 20 31 26 J0042+5708 22 30 21 64.0 42.4 -2.2 -112.0 1 1 13 10533 20 31 17 20 32 26 =0039+568 22 31 21 64.1 42.3 -2.2 -112.3 60 F 2 11448 20 32 35 IRAS00420 22 31 29 64.3 45.5 -2.2 -108.9 1 1 13 11448 20 32 26 20 33 34 --- 22 32 29 64.4 45.4 -2.2 -109.2 60 F 2 12362 20 33 59 J0113+4948 22 32 54 61.2 59.9 -2.7 -90.7 9 1 13 12362 20 33 34 20 34 59 =0110+495 22 33 54 61.4 59.8 -2.7 -90.9 60 F 2 13483 20 35 23 IRAS00420 22 34 18 64.6 45.2 -2.2 -109.7 9 1 13 13483 20 34 59 20 36 23 --- 22 35 18 64.8 45.1 -2.2 -110.0 60 F 2 14609 20 36 54 J0136+4751 22 35 49 57.7 63.4 -3.0 -83.8 11 1 13 14609 20 36 23 20 37 54 =0133+476 22 36 49 57.9 63.4 -3.0 -83.9 60 F 2 15818 20 38 25 IRAS00420 22 37 21 65.0 44.8 -2.1 -110.7 11 1 13 15818 20 37 54 20 39 25 --- 22 38 21 65.2 44.7 -2.1 -111.0 60 F 2 17035 20 39 34 J0042+5708 22 38 30 65.0 41.4 -2.1 -114.6 0 1 14 17035 20 39 25 20 40 34 =0039+568 22 39 30 65.1 41.2 -2.1 -114.9 60 R 2 17251 20 40 42 IRAS00420 22 39 38 65.3 44.5 -2.1 -111.4 0 1 14 17251 20 40 34 20 41 42 --- 22 40 38 65.5 44.4 -2.1 -111.7 60 R 2 16338 20 41 55 J0102+5824 22 40 51 62.3 40.9 -2.4 -111.2 1 1 14 16338 20 41 42 20 42 55 =0059+581 22 41 51 62.4 40.8 -2.4 -111.5 60 R 2 15366 20 43 08 IRAS00420 22 42 05 65.7 44.2 -2.1 -112.2 1 1 14 15366 20 42 55 20 44 08 --- 22 43 05 65.8 44.1 -2.0 -112.5 60 R 2 14393 20 44 17 J0042+5708 22 43 13 65.6 40.7 -2.0 -116.2 0 1 14 14393 20 44 08 20 45 16 =0039+568 22 44 13 65.7 40.6 -2.0 -116.5 60 R 2 13480 Schedule for VLBA_NL (Code Nl ) Page 33 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 20 45 25 IRAS00420 22 44 22 65.9 43.9 -2.0 -112.9 0 1 14 13480 20 45 16 20 46 25 --- 22 45 22 66.1 43.8 -2.0 -113.3 60 R 2 12566 20 46 51 J0113+4948 22 45 48 63.3 59.7 -2.5 -93.3 9 1 14 12566 20 46 25 20 47 51 =0110+495 22 46 48 63.5 59.7 -2.4 -93.5 60 R 2 11421 20 48 17 IRAS00420 22 47 15 66.3 43.5 -2.0 -113.9 10 1 14 11421 20 47 51 20 49 17 --- 22 48 15 66.4 43.4 -1.9 -114.2 60 R 2 10270 20 49 26 J0042+5708 22 48 23 66.2 39.9 -1.9 -118.0 0 1 14 10270 20 49 17 20 50 26 =0039+568 22 49 23 66.3 39.8 -1.9 -118.3 60 R 2 9356 20 50 34 IRAS00420 22 49 32 66.6 43.2 -1.9 -114.7 0 1 14 9356 20 50 26 20 51 34 --- 22 50 32 66.7 43.1 -1.9 -115.0 60 R 2 8442 20 52 09 J0136+4751 22 51 07 60.3 63.8 -2.8 -86.2 15 1 14 8442 20 51 34 20 53 09 =0133+476 22 52 07 60.5 63.8 -2.8 -86.4 60 R 2 7180 20 53 44 IRAS00420 22 52 43 67.0 42.7 -1.9 -115.8 15 1 14 7180 20 53 09 20 54 44 --- 22 53 43 67.1 42.6 -1.9 -116.1 60 R 2 5909 20 54 53 J0042+5708 22 53 51 66.8 39.0 -1.8 -120.0 0 1 14 5909 20 54 44 20 55 53 =0039+568 22 54 51 67.0 38.9 -1.8 -120.3 60 R 2 4995 20 56 01 IRAS00420 22 55 00 67.3 42.4 -1.8 -116.6 0 1 14 4995 20 55 53 20 57 01 --- 22 56 00 67.4 42.2 -1.8 -116.9 60 R 2 4081 20 57 14 J0102+5824 22 56 13 64.1 39.1 -2.1 -116.1 0 1 14 4081 20 57 01 20 58 14 =0059+581 22 57 13 64.2 38.9 -2.1 -116.4 60 R 2 3112 20 58 27 IRAS00420 22 57 26 67.6 42.0 -1.8 -117.5 0 1 14 3112 20 58 14 20 59 27 --- 22 58 26 67.7 41.8 -1.8 -117.8 60 R 2 2142 20 59 54 J0113+4948 22 58 54 65.4 59.3 -2.2 -96.1 10 1 14 2142 20 59 27 21 00 54 =0110+495 22 59 54 65.6 59.3 -2.2 -96.4 60 R 2 975 ----------- Tape Change ------------ 21 01 22 IRAS00420 23 00 22 68.0 41.4 -1.7 -118.5 10 2 1 975 21 00 54 21 02 22 --- 23 01 22 68.1 41.3 -1.7 -118.9 60 F 1 199 21 02 31 J0042+5708 23 01 31 67.7 37.6 -1.7 -122.9 0 2 1 199 21 02 22 21 03 31 =0039+568 23 02 31 67.8 37.4 -1.7 -123.3 60 F 1 1113 Schedule for VLBA_NL (Code Nl ) Page 34 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 21 03 40 IRAS00420 23 02 39 68.3 41.0 -1.7 -119.4 0 2 1 1113 21 03 31 21 04 39 --- 23 03 39 68.4 40.8 -1.7 -119.8 60 F 1 2028 21 05 18 J0136+4751 23 04 18 62.5 64.0 -2.5 -88.5 17 2 1 2028 21 04 39 21 06 18 =0133+476 23 05 18 62.7 64.0 -2.5 -88.7 60 F 1 3337 21 06 57 IRAS00420 23 05 57 68.7 40.4 -1.7 -120.7 17 2 1 3337 21 06 18 21 07 57 --- 23 06 57 68.8 40.2 -1.6 -121.1 60 F 1 4657 21 08 05 J0042+5708 23 07 06 68.4 36.5 -1.6 -125.1 0 2 1 4657 21 07 57 21 09 05 =0039+568 23 08 06 68.5 36.3 -1.6 -125.5 60 F 1 5572 21 09 14 IRAS00420 23 08 15 68.9 39.9 -1.6 -121.6 0 2 1 5572 21 09 05 21 10 14 --- 23 09 15 69.1 39.7 -1.6 -122.0 60 F 1 6487 21 10 27 J0102+5824 23 09 28 65.6 37.1 -1.9 -120.7 0 2 1 6487 21 10 14 21 11 27 =0059+581 23 10 28 65.8 37.0 -1.9 -121.0 60 F 1 7456 21 11 39 IRAS00420 23 10 41 69.2 39.4 -1.6 -122.5 0 2 1 7456 21 11 27 21 12 39 --- 23 11 41 69.3 39.2 -1.6 -122.9 60 F 1 8426 21 12 48 J0042+5708 23 11 49 68.9 35.5 -1.5 -127.0 0 2 1 8426 21 12 39 21 13 48 =0039+568 23 12 49 69.0 35.2 -1.5 -127.5 60 F 1 9341 21 13 57 IRAS00420 23 12 58 69.5 38.9 -1.5 -123.5 0 2 1 9341 21 13 48 21 14 57 --- 23 13 58 69.6 38.7 -1.5 -123.9 60 F 1 10256 21 15 25 J0113+4948 23 14 27 67.9 58.4 -2.0 -99.9 9 2 1 10256 21 14 57 21 16 25 =0110+495 23 15 27 68.0 58.3 -2.0 -100.2 60 F 1 11435 21 16 54 IRAS00420 23 15 56 69.8 38.3 -1.5 -124.7 10 2 1 11435 21 16 25 21 17 54 --- 23 16 56 70.0 38.0 -1.5 -125.2 60 F 1 12620 21 18 36 J0136+4751 23 17 38 64.7 64.0 -2.3 -90.9 18 2 1 12620 21 17 54 21 19 36 =0133+476 23 18 38 64.9 64.0 -2.3 -91.1 60 F 1 13975 21 20 18 IRAS00420 23 19 21 70.2 37.4 -1.4 -126.2 19 2 1 13975 21 19 36 21 21 18 --- 23 20 21 70.3 37.2 -1.4 -126.6 60 F 1 15341 21 21 27 J0042+5708 23 20 30 69.8 33.4 -1.4 -130.8 0 2 1 15341 21 21 18 21 22 27 =0039+568 23 21 30 69.9 33.1 -1.4 -131.3 60 F 1 16257 Schedule for VLBA_NL (Code Nl ) Page 35 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 21 22 35 IRAS00420 23 21 38 70.5 36.9 -1.4 -127.2 0 2 1 16257 21 22 27 21 23 35 --- 23 22 38 70.6 36.6 -1.4 -127.7 60 F 1 17172 21 23 48 J0102+5824 23 22 51 67.1 34.7 -1.7 -125.7 0 2 2 17172 21 23 35 21 24 48 =0059+581 23 23 51 67.2 34.5 -1.7 -126.1 60 R 1 16201 21 25 01 IRAS00420 23 24 04 70.8 36.2 -1.4 -128.3 0 2 2 16201 21 24 48 21 26 01 --- 23 25 04 70.9 36.0 -1.3 -128.8 60 R 1 15229 21 26 10 J0042+5708 23 25 13 70.3 32.1 -1.3 -133.0 0 2 2 15229 21 26 01 21 27 10 =0039+568 23 26 13 70.4 31.8 -1.3 -133.5 60 R 1 14314 21 27 18 IRAS00420 23 26 22 71.0 35.6 -1.3 -129.4 0 2 2 14314 21 27 10 21 28 18 --- 23 27 22 71.1 35.3 -1.3 -129.8 60 R 1 13398 21 28 46 J0113+4948 23 27 50 70.0 57.2 -1.8 -103.6 7 2 2 13398 21 28 18 21 29 46 =0110+495 23 28 50 70.2 57.1 -1.7 -103.9 60 R 1 12233 21 30 13 IRAS00420 23 29 18 71.3 34.8 -1.3 -130.7 7 2 2 12233 21 29 46 21 31 13 --- 23 30 18 71.4 34.5 -1.2 -131.2 60 R 1 11064 21 31 22 J0042+5708 23 30 27 70.8 30.6 -1.2 -135.5 0 2 2 11064 21 31 13 21 32 22 =0039+568 23 31 27 70.9 30.3 -1.2 -136.0 60 R 1 10149 21 32 31 IRAS00420 23 31 35 71.6 34.1 -1.2 -131.9 0 2 2 10149 21 32 22 21 33 31 --- 23 32 35 71.7 33.8 -1.2 -132.3 60 R 1 9233 21 34 15 J0136+4751 23 33 20 67.4 63.7 -2.1 -94.1 19 2 2 9233 21 33 31 21 35 15 =0133+476 23 34 20 67.5 63.7 -2.0 -94.3 60 R 1 7841 21 36 00 IRAS00420 23 35 05 71.9 33.1 -1.2 -133.6 19 2 2 7841 21 35 15 21 37 00 --- 23 36 05 72.0 32.8 -1.2 -134.1 60 R 1 6440 21 37 09 J0042+5708 23 36 14 71.3 28.9 -1.1 -138.4 0 2 2 6440 21 37 00 21 38 09 =0039+568 23 37 14 71.4 28.6 -1.1 -138.9 60 R 1 5524 21 38 18 IRAS00420 23 37 23 72.2 32.3 -1.1 -134.8 0 2 2 5524 21 38 09 21 39 17 --- 23 38 23 72.3 32.0 -1.1 -135.3 60 R 1 4609 21 39 31 J0102+5824 23 38 36 68.7 31.3 -1.4 -132.3 0 2 2 4609 21 39 17 21 40 30 =0059+581 23 39 36 68.8 31.1 -1.4 -132.7 60 R 1 3637 Schedule for VLBA_NL (Code Nl ) Page 36 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 21 40 44 IRAS00420 23 39 49 72.4 31.5 -1.1 -136.0 0 2 2 3637 21 40 30 21 41 43 --- 23 40 49 72.5 31.2 -1.1 -136.6 60 R 1 2663 21 42 07 J0113+4948 23 41 13 72.1 55.4 -1.5 -107.9 2 2 2 2663 21 41 43 21 43 07 =0110+495 23 42 13 72.2 55.2 -1.5 -108.2 60 R 1 1547 21 43 31 IRAS00420 23 42 37 72.7 30.6 -1.0 -137.5 1 2 2 1547 21 43 07 21 44 31 --- 23 43 37 72.8 30.2 -1.0 -138.1 60 R 1 431 21 44 40 J0042+5708 23 43 46 72.0 26.4 -1.0 -142.3 0 2 1 431 21 44 31 21 45 40 =0039+568 23 44 46 72.0 26.0 -1.0 -142.9 60 F 2 1346 21 45 48 IRAS00420 23 44 55 72.9 29.8 -1.0 -138.8 0 2 1 1346 21 45 40 21 46 48 --- 23 45 55 73.0 29.4 -1.0 -139.3 60 F 2 2262 21 47 33 J0136+4751 23 46 40 69.6 63.1 -1.8 -97.1 16 2 1 2262 21 46 48 21 48 32 =0133+476 23 47 40 69.8 63.1 -1.8 -97.4 60 F 2 3653 21 49 17 IRAS00420 23 48 25 73.2 28.5 -0.9 -140.7 16 2 1 3653 21 48 32 21 50 17 --- 23 49 25 73.3 28.1 -0.9 -141.3 60 F 2 5049 21 50 26 J0042+5708 23 49 34 72.4 24.3 -0.9 -145.5 0 2 1 5049 21 50 17 21 51 26 =0039+568 23 50 34 72.5 23.9 -0.9 -146.1 60 F 2 5965 21 51 35 IRAS00420 23 50 42 73.4 27.6 -0.9 -142.0 0 2 1 5965 21 51 26 21 52 35 --- 23 51 42 73.5 27.2 -0.9 -142.6 60 F 2 6880 21 52 48 J0102+5824 23 51 56 69.9 27.8 -1.2 -138.4 1 2 1 6880 21 52 35 21 53 48 =0059+581 23 52 56 70.0 27.5 -1.2 -138.9 60 F 2 7861 21 54 02 IRAS00420 23 53 10 73.6 26.6 -0.9 -143.5 1 2 1 7861 21 53 48 21 55 02 --- 23 54 10 73.7 26.2 -0.9 -144.1 60 F 2 8844 21 55 11 J0042+5708 23 54 19 72.8 22.5 -0.8 -148.2 0 2 1 8844 21 55 02 21 56 11 =0039+568 23 55 19 72.8 22.1 -0.8 -148.8 60 F 2 9760 21 56 19 IRAS00420 23 55 28 73.8 25.7 -0.8 -144.8 0 2 1 9760 21 56 11 21 57 19 --- 23 56 28 73.9 25.3 -0.8 -145.4 60 F 2 10675 21 57 43 J0113+4948 23 56 52 74.4 52.3 -1.3 -113.9 0 2 1 10675 21 57 19 21 58 43 =0110+495 23 57 52 74.6 52.0 -1.3 -114.3 60 F 2 11792 Schedule for VLBA_NL (Code Nl ) Page 37 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 21 Jan 2005 Day 21 --- 21 59 07 IRAS00420 23 58 16 74.0 24.5 -0.8 -146.5 0 2 1 11792 21 58 43 22 00 07 --- 23 59 16 74.1 24.1 -0.8 -147.2 60 F 2 12914 22 00 47 J0136+4751 23 59 57 71.8 62.1 -1.6 -100.6 9 2 1 12914 22 00 07 22 01 47 =0133+476 00 00 57 71.9 62.0 -1.6 -100.9 60 F 2 14250 22 04 13 3C454.3 00 03 23 60.4 215.3 1.2 26.7 38 2 2 14250 22 04 13 22 09 13 --- 00 08 23 59.8 217.5 1.2 28.2 299 R 2 16961 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: bc089.set Matches group v1cm_b3 in /home/arana/cwalker/sched/catalogs/freq.dat ****** Only 61.92 of 64.00 MHz total bandwidth is within the IFs in the setup file before any FREQ or DOPPLER shifts. Setup group: 1 Station: VLBA Total bit rate: 128 Format: VLBA1:4 Bits per sample: 1 Sample rate: 32.000 Number of channels: 4 Passes/head pos: 2 Speedup factor: 1.00 Tape speeds: Low density - 266.660 ips, High density - 160.00 ips Time per pass for 17600 ft, High density tapes is: 00:22:00 1st LO= 21500.00 21500.00 21500.00 21500.00 Net SB= U U U U Pol. = LCP LCP LCP LCP BBC = 1 2 3 4 BBC SB= U U U U IF = D D D D VLBA FE= omit 1cm omit 1cm VLBA Synth= 9.1 15.4 12.4 The following frequency sets based on this setup were used. Frequency Set: 1 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 22105.94 22231.47 22356.99 22482.52 BBC fr= 605.94 731.47 856.99 982.52 Bandwd= 16.000 16.000 16.000 16.000 Frequency Set: 2 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 22104.14 22229.65 22355.17 22480.68 BBC fr= 604.14 729.65 855.17 980.68 Bandwd= 16.000 16.000 16.000 16.000 Frequency Set: 3 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 22099.02 22224.50 22349.99 22475.47 BBC fr= 599.02 724.50 849.99 975.47 Bandwd= 16.000 16.000 16.000 16.000 Frequency Set: 4 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 22103.81 22229.32 22354.83 22480.35 BBC fr= 603.81 729.32 854.83 980.35 Bandwd= 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S3 OFF OFF OFF OFF OFF OFF PCALXB2= S2 S4 OFF OFF OFF OFF OFF OFF PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Track assignments are: track1= 2, 10, 18, 26 track2= 3, 11, 19, 27 barrel=roll_8 SOURCE LIST -- VLBA format test phase referencing H2O Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) (B1950) (J2000) (Date) * VXUMA 10 52 08.670537 * 10 55 40.884000 10 56 06.185429 72 08 10.03206 * 71 52 09.57100 71 50 21.79186 From catalog imbedded in main SCHED input file. Doppler based on LSR frame and radio definition. Velocities: -50.70 -50.70 -50.70 -50.70 * RXBOO 14 21 56.747540 * 14 24 11.632000 14 24 24.932558 25 55 46.14300 * 25 42 13.17900 25 40 36.15951 From catalog imbedded in main SCHED input file. Doppler based on LSR frame and radio definition. Velocities: 2.40 2.40 2.40 2.40 * IRAS00420 00 42 06.176956 * 00 44 58.397000 00 45 13.956692 55 30 23.76239 * 55 46 47.60000 55 48 39.60834 From catalog imbedded in main SCHED input file. Doppler based on LSR frame and radio definition. Velocities: -44.70 -44.70 -44.70 -44.70 * W51M 19 21 26.284824 * 19 23 43.953000 19 23 56.074346 14 24 35.00530 * 14 30 28.37000 14 30 51.57736 From catalog imbedded in main SCHED input file. Doppler based on LSR frame and radio definition. Velocities: 55.60 55.60 55.60 55.60 * J1930+1532 19 28 36.092075 * 19 30 52.767000 19 31 04.770527 15 26 11.96561 * 15 32 34.42700 15 33 00.72177 From catalog imbedded in main SCHED input file. Doppler based on other sources. * J1756+1535 17 54 37.953378 * 17 56 53.102000 17 57 05.192977 15 35 39.32360 * 15 35 20.82700 15 35 04.91126 From catalog imbedded in main SCHED input file. Doppler based on other sources. * J0042+5708 00 39 27.423134 * 00 42 19.451773 00 42 34.900254 0039+568 56 52 10.63286 * 57 08 36.58569 57 10 29.00105 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib. Survey - ICRF Frame - reduced by GSFC group - Aug 2001 Doppler based on other sources. * J0102+5824 00 59 43.470974 * 01 02 45.762382 01 03 02.406885 0059+581 58 08 04.84747 * 58 24 11.13662 58 26 02.94915 J0102+58 /home/arana/cwalker/sched/catalogs/sources.vlba ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. * J0113+4948 01 10 28.934861 * 01 13 27.006817 01 13 43.646878 0110+495 49 32 31.15327 * 49 48 24.04341 49 50 12.74069 J0113+49 /home/arana/cwalker/sched/catalogs/sources.vlba ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. * J0136+4751 01 33 55.103066 * 01 36 58.594811 01 37 16.048268 0133+476 47 36 12.85367 * 47 51 29.10006 47 53 14.50191 J0136+47 /home/arana/cwalker/sched/catalogs/sources.vlba ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. * J1048+7143 10 44 49.735101 * 10 48 27.619917 10 48 53.519593 1044+719 71 59 26.88525 * 71 43 35.93828 71 41 49.73744 J1048+71 /home/arana/cwalker/sched/catalogs/sources.vlba ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. * J1058+8114 10 53 36.229429 * 10 58 11.535365 10 58 47.465496 1053+815 81 30 35.56785 * 81 14 32.67521 81 12 44.48011 J1058+81 /home/arana/cwalker/sched/catalogs/sources.vlba ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. J1256-0547 12 53 35.831293 * 12 56 11.166560 12 56 26.778980 1253-055 -05 31 07.99572 *-05 47 21.52458 -05 49 01.47625 * 3C279 /home/arana/cwalker/sched/catalogs/sources.vlba J1256-05 ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. * J1310+3220 13 08 07.560126 * 13 10 28.663845 13 10 43.179078 1308+326 32 36 40.23888 * 32 20 43.78295 32 18 53.02079 J1310+32 /home/arana/cwalker/sched/catalogs/sources.vlba ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. * J1311+5513 13 08 58.530461 * 13 11 03.210944 13 11 16.638173 1308+554 55 29 49.75582 * 55 13 54.32088 55 11 59.06112 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib. Survey - ICRF Frame - reduced by GSFC group - Aug 2001 Doppler based on other sources. * J1327+2210 13 24 37.118626 * 13 27 00.861311 13 27 15.395819 1324+224 22 26 22.70262 * 22 10 50.16306 22 09 03.98408 J1327+22 /home/arana/cwalker/sched/catalogs/sources.vlba ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. * J1357+7643 13 57 42.116987 * 13 57 55.371517 13 57 58.665453 1357+769 76 57 53.35431 * 76 43 21.05111 76 41 30.45418 J1357+76 /home/arana/cwalker/sched/catalogs/sources.vlba ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. * J1419+2706 14 17 45.094576 * 14 19 59.297062 14 20 12.570737 1417+273 27 20 09.10592 * 27 06 25.55269 27 04 47.17952 J1419+27 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib. Survey - ICRF Frame - reduced by GSFC group - Aug 2001 Doppler based on other sources. * J1504+1029 15 02 00.157713 * 15 04 24.979782 15 04 38.910670 1502+106 10 41 17.74007 * 10 29 39.19865 10 28 17.40137 J1504+10 /home/arana/cwalker/sched/catalogs/sources.vlba ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. J1733-1304 17 30 13.535192 * 17 33 02.705790 17 33 18.228329 1730-130 -13 02 45.83975 *-13 04 49.54823 -13 05 10.28842 J1733-13 /home/arana/cwalker/sched/catalogs/sources.vlba * NRAO530 ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. * J1924+1540 19 22 23.129981 * 19 24 39.455875 19 24 51.432032 1922+155 15 34 46.75026 * 15 40 43.94129 15 41 07.51964 J1924+15 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib. Survey - ICRF Frame - reduced by GSFC group - Aug 2001 Doppler based on other sources. * J2016+1632 20 13 56.486732 * 20 16 13.860025 20 16 25.892137 2013+163 16 23 17.05339 * 16 32 34.11273 16 33 19.42928 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib. Survey - ICRF Frame - reduced by GSFC group - Aug 2001 Doppler based on other sources. J2253+1608 22 51 29.519733 * 22 53 57.747932 22 54 11.204488 2251+158 15 52 54.34806 * 16 08 53.56089 16 10 25.91730 * 3C454.3 /home/arana/cwalker/sched/catalogs/sources.vlba J2253+16 ICRF - Ext.1 Source - 1998 IERS Annual Report Doppler based on other sources. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) VXUMA 123.1 RXBOO 96.6 IRAS00420 94.4 W51M 36.6 J1930+1532 37.0 J1756+1535 49.1 J0042+5708 94.7 J0102+5824 97.7 J0113+4948 95.5 J0136+4751 98.3 J1048+7143 123.6 J1058+8114 116.3 3C279 106.5 J1310+3220 113.8 J1311+5513 115.3 J1327+2210 108.1 J1357+7643 110.3 J1419+2706 98.0 J1504+1029 82.3 NRAO530 39.5 J1924+1540 37.6 J2016+1632 36.3 3C454.3 53.0 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg