VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BS135B Observer: Stanghellini, C. Project type: VLBA Obs filename: bs135bcrd.* Date/Day: 2004JAN26/026 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 0353 Begin file VCLOCK check ok. SC at -0.141 UT1-UTC check ok GPS delta < 10 us Operator: T. Perreault 0353-0810 %KP high system temperatures, unknown as to why. OTHER 100 257 Checking VLCJ shows that the system temperatures have slowly decreased until it is reading a more normal value (~ 30 degrees). 0353-1254 *MK cyro compressor A shut down following power COM 100 541 glitch at site. Bill Hancock was called up, he determined that due to rolling blackouts on the main island (local power company lost a generator) and weather conditions at the site, that it would not be practical to restart the compressor. As a result, the 20cm / 4cm / 7mm / and 3mm receivers are warm. Seeing high system temperatures at 4cm. 0357 Readback check ok 0437 %PT wea: raining/snowing 0611 Readback check ok 1034 Readback check ok 1230 SC wea: scattered low clouds, no precipitation 1254 End. Downtime Summary: Total downtime : 798 min Percentage downtime of observing: 14.8% Average downtime per hour : 8.9 min Total scheduled observing time (# Antennas): 5410 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.