VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BR089 Observer: M. Rupen Project type: VLBA Obs filename: br089crd.* Date/Day: 2003JAN18/018 Ants Used: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Paul Dyer. VCLOCK and GPS Delta check ok. 1402 Begin at all sites except MK. 1402 *HN Antenna is 2/3 covered with snow. 1425 All readbacks ok. 1439 Begin at MK. 1445 Web cams show SC is mostly cloudy. BR and MK are still dark. All other sites are clear. 1449 All readbacks ok. 1537 All readbacks ok. 1601 %FD Bad readback on drive 1, track 5. All others ok. 1625 All readbacks ok. 1713 %NL Bad readbacks on drive 1, tracks 2,11,26. 1713 %BR Bad readback on drive 1, track 5. All others ok. 1728-1936 *NL Ran out of tape. Per instructions from OTHER 100 128 Peggy, NOT calling site tech. 1728 *MK WEA: Wind gusts > 35 mph. 1805 NL Track usage shows one track left on drive one, but autoallocate is not seeing it. I tried killing the project and restarting, but that did not help. Killing the project now, no use having the ant. moving with no tape. 1825 Readbacks ok. 1849 Readbacks ok. 1915 End at SC and HN. 1913-1936 *BR Drive two unloaded during readback. Can not reloa 10612 100 23 1936 End. Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. wea = Weather entries: MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = TP/SP x Tcal/2