COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: 86GHz VLBI test between VLBA_NL and VLBA_PT Exp. Code: ts021b Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Shep Doeleman Address: Haystack Observatory Off Route 40 Westford, MA 01886 USA Phone: 781-981-5407 EMAIL: sdoeleman@haystack.mit.edu Fax: 781-981-0590 Phone during observation: Observing mode: 86GHz (512 Mb/s) Notes: Schedule for VLBA_PT (Code Pt ) Page 2 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- Next scan frequencies: 43124.56 43124.56 43124.56 43124.56 Next BBC frequencies: 724.56 724.56 724.56 724.56 Next scan bandwidths: 2.00 2.00 2.00 2.00 15 00 00 VXSGR 16 32 20 29.0 154.4 -1.6 -22.6 0 1 1 0 Stopped 15 00 10 --- 16 32 30 29.0 154.5 -1.6 -22.6 10 S 1 0 15 00 10 VXSGR 16 32 30 29.0 154.5 -1.6 -22.6 -4 1 1 0 Stopped 15 01 10 --- 16 33 30 29.1 154.7 -1.6 -22.4 56 S 1 0 15 01 10 VXSGR 16 33 30 29.1 154.7 -1.6 -22.4 -4 1 1 0 Stopped 15 02 10 --- 16 34 30 29.2 155.0 -1.6 -22.2 56 S 1 0 Next scan frequencies: 86223.99 86223.99 86239.99 86239.99 86255.99 86255.99 86271.99 86271.99 Next BBC frequencies: 723.99 723.99 739.99 739.99 755.99 755.99 771.99 771.99 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 15 02 39 NRAO530 16 34 59 40.6 161.1 -1.0 -16.0 0 1 1 0 15 02 39 15 03 39 --- 16 35 59 40.7 161.4 -1.0 -15.7 60 F 1 0 15 02 40 15 04 17 SGRA 16 36 37 24.6 163.3 -1.2 -15.8 0 1 1 0 15 04 17 15 04 47 --- 16 37 07 24.6 163.4 -1.2 -15.6 30 F 1 0 15 04 18 15 04 54 1745-283 16 37 14 25.3 163.2 -1.2 -15.7 0 1 1 0 15 04 53 15 05 02 --- 16 37 23 25.3 163.2 -1.2 -15.7 8 F 1 0 15 04 54 15 05 09 SGRA 16 37 30 24.6 163.5 -1.1 -15.6 0 1 1 0 15 05 08 15 05 17 --- 16 37 38 24.6 163.5 -1.1 -15.5 8 F 1 0 15 05 09 15 05 25 1745-283 16 37 45 25.3 163.3 -1.1 -15.6 0 1 1 0 15 05 24 15 05 33 --- 16 37 53 25.3 163.3 -1.1 -15.6 8 F 1 0 15 05 25 15 05 40 SGRA 16 38 00 24.7 163.6 -1.1 -15.5 0 1 1 0 15 05 39 15 05 48 --- 16 38 08 24.7 163.6 -1.1 -15.4 8 F 1 0 15 05 40 15 05 55 1745-283 16 38 15 25.3 163.4 -1.1 -15.5 0 1 1 0 15 05 54 15 06 03 --- 16 38 23 25.3 163.5 -1.1 -15.5 8 F 1 0 15 05 55 Schedule for VLBA_PT (Code Pt ) Page 3 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 15 06 10 SGRA 16 38 31 24.7 163.7 -1.1 -15.3 0 1 1 0 15 06 09 15 06 18 --- 16 38 39 24.7 163.8 -1.1 -15.3 8 F 1 0 15 06 10 15 06 25 1745-283 16 38 46 25.3 163.6 -1.1 -15.4 0 1 1 0 15 06 24 15 06 33 --- 16 38 54 25.4 163.6 -1.1 -15.4 8 F 1 0 15 06 25 15 06 40 SGRA 16 39 01 24.7 163.9 -1.1 -15.2 0 1 1 0 15 06 39 15 06 48 --- 16 39 09 24.7 163.9 -1.1 -15.2 8 F 1 0 15 06 40 15 06 56 1745-283 16 39 16 25.4 163.7 -1.1 -15.3 0 1 1 0 15 06 55 15 07 04 --- 16 39 24 25.4 163.7 -1.1 -15.3 8 F 1 0 15 06 56 15 07 11 SGRA 16 39 31 24.8 164.0 -1.1 -15.1 0 1 1 0 15 07 10 15 07 19 --- 16 39 39 24.8 164.0 -1.1 -15.1 8 F 1 0 15 07 11 15 07 26 1745-283 16 39 47 25.4 163.8 -1.1 -15.2 0 1 1 0 15 07 25 15 07 34 --- 16 39 55 25.4 163.8 -1.1 -15.2 8 F 1 0 15 07 26 15 07 41 SGRA 16 40 02 24.8 164.1 -1.1 -15.0 0 1 1 0 15 07 40 15 07 49 --- 16 40 10 24.8 164.1 -1.1 -15.0 8 F 1 0 15 07 41 15 07 56 1745-283 16 40 17 25.4 163.9 -1.1 -15.1 0 1 1 0 15 07 55 15 08 04 --- 16 40 25 25.4 163.9 -1.1 -15.1 8 F 1 0 15 07 56 15 08 11 SGRA 16 40 32 24.8 164.2 -1.1 -14.9 0 1 1 0 15 08 10 15 08 19 --- 16 40 40 24.8 164.2 -1.1 -14.9 8 F 1 0 15 08 11 15 08 27 1745-283 16 40 48 25.5 164.0 -1.1 -15.0 0 1 1 0 15 08 26 15 08 35 --- 16 40 56 25.5 164.1 -1.1 -14.9 8 F 1 0 15 08 27 15 08 42 SGRA 16 41 03 24.8 164.3 -1.1 -14.8 0 1 1 0 15 08 41 15 08 50 --- 16 41 11 24.9 164.4 -1.1 -14.8 8 F 1 0 15 08 42 15 08 57 1745-283 16 41 18 25.5 164.1 -1.1 -14.9 0 1 1 0 15 08 56 15 09 05 --- 16 41 26 25.5 164.2 -1.1 -14.8 8 F 1 0 15 08 57 15 09 12 SGRA 16 41 33 24.9 164.4 -1.1 -14.7 0 1 1 0 15 09 11 15 09 20 --- 16 41 41 24.9 164.5 -1.1 -14.6 8 F 1 0 15 09 12 15 09 27 1745-283 16 41 48 25.5 164.3 -1.1 -14.7 0 1 1 0 15 09 26 15 09 35 --- 16 41 57 25.5 164.3 -1.1 -14.7 8 F 1 0 15 09 27 15 09 43 SGRA 16 42 04 24.9 164.6 -1.1 -14.6 0 1 1 0 15 09 42 15 09 51 --- 16 42 12 24.9 164.6 -1.1 -14.5 8 F 1 0 15 09 43 Schedule for VLBA_PT (Code Pt ) Page 4 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 15 09 58 1745-283 16 42 19 25.5 164.4 -1.1 -14.6 0 1 1 0 15 09 57 15 10 06 --- 16 42 27 25.6 164.4 -1.1 -14.6 8 F 1 0 15 09 58 15 10 13 SGRA 16 42 34 24.9 164.7 -1.1 -14.5 0 1 1 0 15 10 12 15 10 21 --- 16 42 42 24.9 164.7 -1.1 -14.4 8 F 1 0 15 10 13 15 10 28 1745-283 16 42 49 25.6 164.5 -1.1 -14.5 0 1 1 0 15 10 27 15 10 36 --- 16 42 57 25.6 164.5 -1.1 -14.5 8 F 1 0 15 10 28 15 10 43 SGRA 16 43 05 25.0 164.8 -1.1 -14.3 0 1 1 0 15 10 42 15 10 51 --- 16 43 13 25.0 164.8 -1.0 -14.3 8 F 1 0 15 10 43 15 10 59 1745-283 16 43 20 25.6 164.6 -1.1 -14.4 0 1 1 0 15 10 58 15 11 07 --- 16 43 28 25.6 164.7 -1.0 -14.4 8 F 1 0 15 10 59 15 11 14 SGRA 16 43 35 25.0 164.9 -1.0 -14.2 0 1 1 0 15 11 13 15 11 22 --- 16 43 43 25.0 164.9 -1.0 -14.2 8 F 1 0 15 11 14 15 11 29 1745-283 16 43 50 25.6 164.7 -1.0 -14.3 0 1 1 0 15 11 28 15 11 37 --- 16 43 58 25.6 164.8 -1.0 -14.3 8 F 1 0 15 11 29 15 11 44 SGRA 16 44 06 25.0 165.0 -1.0 -14.1 0 1 1 0 15 11 43 15 11 52 --- 16 44 14 25.0 165.1 -1.0 -14.1 8 F 1 0 15 11 44 15 11 59 1745-283 16 44 21 25.7 164.9 -1.0 -14.2 0 1 1 0 15 11 58 15 12 07 --- 16 44 29 25.7 164.9 -1.0 -14.2 8 F 1 0 15 11 59 15 12 14 SGRA 16 44 36 25.0 165.2 -1.0 -14.0 0 1 1 0 15 12 13 15 12 22 --- 16 44 44 25.0 165.2 -1.0 -14.0 8 F 1 0 15 12 14 15 12 30 1745-283 16 44 51 25.7 165.0 -1.0 -14.1 0 1 1 0 15 12 29 15 12 38 --- 16 44 59 25.7 165.0 -1.0 -14.0 8 F 1 0 15 12 30 15 12 45 SGRA 16 45 06 25.1 165.3 -1.0 -13.9 0 1 1 0 15 12 44 15 12 53 --- 16 45 14 25.1 165.3 -1.0 -13.9 8 F 1 0 15 12 45 15 13 00 1745-283 16 45 22 25.7 165.1 -1.0 -14.0 0 1 1 0 15 12 59 15 13 08 --- 16 45 30 25.7 165.1 -1.0 -13.9 8 F 1 0 15 13 00 15 13 15 SGRA 16 45 37 25.1 165.4 -1.0 -13.8 0 1 1 0 15 13 14 15 13 23 --- 16 45 45 25.1 165.4 -1.0 -13.8 8 F 1 0 15 13 15 15 13 30 1745-283 16 45 52 25.7 165.2 -1.0 -13.8 0 1 1 0 15 13 29 15 13 38 --- 16 46 00 25.7 165.3 -1.0 -13.8 8 F 1 0 15 13 30 Schedule for VLBA_PT (Code Pt ) Page 5 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 15 13 46 SGRA 16 46 07 25.1 165.5 -1.0 -13.7 0 1 1 0 15 13 45 15 13 54 --- 16 46 15 25.1 165.5 -1.0 -13.6 8 F 1 0 15 13 46 15 14 01 1745-283 16 46 23 25.8 165.3 -1.0 -13.7 0 1 1 0 15 14 00 15 14 09 --- 16 46 31 25.8 165.4 -1.0 -13.7 8 F 1 0 15 14 01 15 14 16 SGRA 16 46 38 25.1 165.6 -1.0 -13.6 0 1 1 0 15 14 15 15 14 24 --- 16 46 46 25.1 165.7 -1.0 -13.5 8 F 1 0 15 14 16 15 14 31 1745-283 16 46 53 25.8 165.5 -1.0 -13.6 0 1 1 0 15 14 30 15 14 39 --- 16 47 01 25.8 165.5 -1.0 -13.6 8 F 1 0 15 14 31 15 14 46 SGRA 16 47 08 25.2 165.7 -1.0 -13.4 0 1 1 0 15 14 45 15 14 54 --- 16 47 16 25.2 165.8 -1.0 -13.4 8 F 1 0 15 14 46 15 15 02 1745-283 16 47 24 25.8 165.6 -1.0 -13.5 0 1 1 0 15 15 01 15 15 10 --- 16 47 32 25.8 165.6 -1.0 -13.5 8 F 1 0 15 15 02 15 15 17 SGRA 16 47 39 25.2 165.9 -1.0 -13.3 0 1 1 0 15 15 16 15 15 25 --- 16 47 47 25.2 165.9 -1.0 -13.3 8 F 1 0 15 15 17 15 15 32 1745-283 16 47 54 25.8 165.7 -1.0 -13.4 0 1 1 0 15 15 31 15 15 40 --- 16 48 02 25.9 165.7 -1.0 -13.4 8 F 1 0 15 15 32 15 15 47 SGRA 16 48 09 25.2 166.0 -1.0 -13.2 0 1 1 0 15 15 46 15 15 55 --- 16 48 17 25.2 166.0 -1.0 -13.2 8 F 1 0 15 15 47 15 16 02 1745-283 16 48 25 25.9 165.8 -1.0 -13.3 0 1 1 0 15 16 01 15 16 10 --- 16 48 33 25.9 165.9 -1.0 -13.3 8 F 1 0 15 16 02 15 16 18 SGRA 16 48 40 25.2 166.1 -1.0 -13.1 0 1 1 0 15 16 17 15 16 26 --- 16 48 48 25.3 166.1 -1.0 -13.1 8 F 1 0 15 16 18 15 16 33 1745-283 16 48 55 25.9 166.0 -1.0 -13.2 0 1 1 0 15 16 32 15 16 41 --- 16 49 03 25.9 166.0 -1.0 -13.1 8 F 1 0 15 16 33 15 16 48 SGRA 16 49 10 25.3 166.2 -1.0 -13.0 0 1 1 0 15 16 47 15 16 56 --- 16 49 18 25.3 166.3 -0.9 -13.0 8 F 1 0 15 16 48 15 17 03 1745-283 16 49 26 25.9 166.1 -0.9 -13.1 0 1 1 0 15 17 02 15 17 11 --- 16 49 34 25.9 166.1 -0.9 -13.0 8 F 1 0 15 17 03 15 17 18 SGRA 16 49 41 25.3 166.3 -0.9 -12.9 0 1 1 0 15 17 17 15 17 26 --- 16 49 49 25.3 166.4 -0.9 -12.9 8 F 1 0 15 17 18 Schedule for VLBA_PT (Code Pt ) Page 6 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 15 17 34 1745-283 16 49 56 25.9 166.2 -0.9 -12.9 0 1 1 0 15 17 33 15 17 42 --- 16 50 04 26.0 166.2 -0.9 -12.9 8 F 1 0 15 17 34 15 17 49 SGRA 16 50 11 25.3 166.5 -0.9 -12.8 0 1 1 0 15 17 48 15 17 57 --- 16 50 19 25.3 166.5 -0.9 -12.7 8 F 1 0 15 17 49 15 18 04 1745-283 16 50 26 26.0 166.3 -0.9 -12.8 0 1 1 0 15 18 03 15 18 12 --- 16 50 34 26.0 166.3 -0.9 -12.8 8 F 1 0 15 18 04 15 18 19 SGRA 16 50 42 25.3 166.6 -0.9 -12.7 0 1 1 0 15 18 18 15 18 27 --- 16 50 50 25.4 166.6 -0.9 -12.6 8 F 1 0 15 18 19 15 18 34 1745-283 16 50 57 26.0 166.4 -0.9 -12.7 0 1 1 0 15 18 33 15 18 42 --- 16 51 05 26.0 166.5 -0.9 -12.7 8 F 1 0 15 18 34 15 18 50 SGRA 16 51 12 25.4 166.7 -0.9 -12.5 0 1 1 0 15 18 49 15 18 58 --- 16 51 20 25.4 166.7 -0.9 -12.5 8 F 1 0 15 18 50 15 19 05 1745-283 16 51 27 26.0 166.6 -0.9 -12.6 0 1 1 0 15 19 04 15 19 13 --- 16 51 35 26.0 166.6 -0.9 -12.6 8 F 1 0 15 19 05 15 19 20 SGRA 16 51 43 25.4 166.8 -0.9 -12.4 0 1 1 0 15 19 19 15 19 28 --- 16 51 51 25.4 166.9 -0.9 -12.4 8 F 1 0 15 19 20 15 19 35 1745-283 16 51 58 26.0 166.7 -0.9 -12.5 0 1 1 0 15 19 34 15 19 43 --- 16 52 06 26.1 166.7 -0.9 -12.5 8 F 1 0 15 19 35 15 19 50 SGRA 16 52 13 25.4 166.9 -0.9 -12.3 0 1 1 0 15 19 49 15 19 58 --- 16 52 21 25.4 167.0 -0.9 -12.3 8 F 1 0 15 19 50 Next scan frequencies: 43124.56 43124.56 43124.56 43124.56 Next BBC frequencies: 724.56 724.56 724.56 724.56 Next scan bandwidths: 2.00 2.00 2.00 2.00 15 19 58 VXSGR 16 52 21 30.6 159.4 -1.3 -18.3 -16 1 1 0 Stopped 15 20 08 --- 16 52 31 30.7 159.5 -1.3 -18.2 -6 S 1 0 15 20 08 VXSGR 16 52 31 30.7 159.5 -1.3 -18.2 -4 1 1 0 Stopped 15 21 08 --- 16 53 31 30.7 159.7 -1.3 -18.0 56 S 1 0 15 21 08 VXSGR 16 53 31 30.7 159.7 -1.3 -18.0 -4 1 1 0 Stopped 15 22 08 --- 16 54 32 30.8 160.0 -1.2 -17.8 56 S 1 0 Schedule for VLBA_PT (Code Pt ) Page 7 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- Next scan frequencies: 86223.99 86223.99 86239.99 86239.99 86255.99 86255.99 86271.99 86271.99 Next BBC frequencies: 723.99 723.99 739.99 739.99 755.99 755.99 771.99 771.99 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 15 22 36 NRAO530 16 55 00 41.7 167.4 -0.6 -10.7 0 1 1 0 15 22 35 15 23 36 --- 16 56 00 41.8 167.7 -0.6 -10.4 60 F 1 0 15 22 36 15 24 15 SGRA 16 56 38 25.6 168.0 -0.8 -11.3 0 1 1 0 15 24 14 15 24 45 --- 16 57 08 25.6 168.1 -0.8 -11.2 30 F 1 0 15 24 15 15 24 52 1745-283 16 57 15 26.3 167.9 -0.8 -11.3 0 1 1 0 15 24 51 15 25 00 --- 16 57 23 26.3 168.0 -0.8 -11.3 8 F 1 0 15 24 52 15 25 07 SGRA 16 57 31 25.7 168.2 -0.8 -11.1 0 1 1 0 15 25 06 15 25 15 --- 16 57 39 25.7 168.2 -0.8 -11.1 8 F 1 0 15 25 07 15 25 22 1745-283 16 57 46 26.3 168.1 -0.8 -11.2 0 1 1 0 15 25 21 15 25 30 --- 16 57 54 26.3 168.1 -0.8 -11.2 8 F 1 0 15 25 22 15 25 37 SGRA 16 58 01 25.7 168.3 -0.8 -11.0 0 1 1 0 15 25 36 15 25 45 --- 16 58 09 25.7 168.4 -0.8 -11.0 8 F 1 0 15 25 37 15 25 53 1745-283 16 58 16 26.3 168.2 -0.8 -11.1 0 1 1 0 15 25 52 15 26 01 --- 16 58 24 26.3 168.2 -0.8 -11.0 8 F 1 0 15 25 53 15 26 08 SGRA 16 58 32 25.7 168.4 -0.8 -10.9 0 1 1 0 15 26 07 15 26 16 --- 16 58 40 25.7 168.5 -0.8 -10.9 8 F 1 0 15 26 08 15 26 23 1745-283 16 58 47 26.4 168.3 -0.8 -11.0 0 1 1 0 15 26 22 15 26 31 --- 16 58 55 26.4 168.3 -0.8 -10.9 8 F 1 0 15 26 23 15 26 38 SGRA 16 59 02 25.7 168.6 -0.8 -10.8 0 1 1 0 15 26 37 15 26 46 --- 16 59 10 25.7 168.6 -0.8 -10.8 8 F 1 0 15 26 38 15 26 54 1745-283 16 59 17 26.4 168.4 -0.8 -10.8 0 1 1 0 15 26 53 15 27 02 --- 16 59 26 26.4 168.5 -0.8 -10.8 8 F 1 0 15 26 54 15 27 09 SGRA 16 59 33 25.7 168.7 -0.8 -10.7 0 1 1 0 15 27 08 15 27 17 --- 16 59 41 25.7 168.7 -0.8 -10.6 8 F 1 0 15 27 09 Schedule for VLBA_PT (Code Pt ) Page 8 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 15 27 24 1745-283 16 59 48 26.4 168.6 -0.8 -10.7 0 1 1 0 15 27 23 15 27 32 --- 16 59 56 26.4 168.6 -0.8 -10.7 8 F 1 0 15 27 24 15 27 39 SGRA 17 00 03 25.8 168.8 -0.8 -10.6 0 1 1 0 15 27 38 15 27 47 --- 17 00 11 25.8 168.8 -0.8 -10.5 8 F 1 0 15 27 39 15 27 54 1745-283 17 00 19 26.4 168.7 -0.8 -10.6 0 1 1 0 15 27 53 15 28 02 --- 17 00 27 26.4 168.7 -0.8 -10.6 8 F 1 0 15 27 54 15 28 10 SGRA 17 00 34 25.8 168.9 -0.8 -10.4 0 1 1 0 15 28 09 15 28 18 --- 17 00 42 25.8 169.0 -0.8 -10.4 8 F 1 0 15 28 10 15 28 25 1745-283 17 00 49 26.4 168.8 -0.8 -10.5 0 1 1 0 15 28 24 15 28 33 --- 17 00 57 26.4 168.8 -0.8 -10.5 8 F 1 0 15 28 25 15 28 40 SGRA 17 01 04 25.8 169.1 -0.8 -10.3 0 1 1 0 15 28 39 15 28 48 --- 17 01 12 25.8 169.1 -0.7 -10.3 8 F 1 0 15 28 40 15 28 55 1745-283 17 01 20 26.5 168.9 -0.8 -10.4 0 1 1 0 15 28 54 15 29 03 --- 17 01 28 26.5 169.0 -0.7 -10.4 8 F 1 0 15 28 55 15 29 11 SGRA 17 01 35 25.8 169.2 -0.7 -10.2 0 1 1 0 15 29 10 15 29 19 --- 17 01 43 25.8 169.2 -0.7 -10.2 8 F 1 0 15 29 11 15 29 26 1745-283 17 01 50 26.5 169.1 -0.7 -10.3 0 1 1 0 15 29 25 15 29 34 --- 17 01 58 26.5 169.1 -0.7 -10.2 8 F 1 0 15 29 26 15 29 41 SGRA 17 02 05 25.8 169.3 -0.7 -10.1 0 1 1 0 15 29 40 15 29 49 --- 17 02 13 25.8 169.3 -0.7 -10.1 8 F 1 0 15 29 41 15 29 56 1745-283 17 02 21 26.5 169.2 -0.7 -10.2 0 1 1 0 15 29 55 15 30 04 --- 17 02 29 26.5 169.2 -0.7 -10.1 8 F 1 0 15 29 56 15 30 11 SGRA 17 02 36 25.9 169.4 -0.7 -10.0 0 1 1 0 15 30 10 15 30 19 --- 17 02 44 25.9 169.4 -0.7 -10.0 8 F 1 0 15 30 11 15 30 27 1745-283 17 02 51 26.5 169.3 -0.7 -10.0 0 1 1 0 15 30 26 15 30 35 --- 17 02 59 26.5 169.3 -0.7 -10.0 8 F 1 0 15 30 27 15 30 42 SGRA 17 03 06 25.9 169.5 -0.7 -9.9 0 1 1 0 15 30 41 15 30 50 --- 17 03 14 25.9 169.6 -0.7 -9.8 8 F 1 0 15 30 42 15 30 57 1745-283 17 03 22 26.5 169.4 -0.7 -9.9 0 1 1 0 15 30 56 15 31 05 --- 17 03 30 26.5 169.5 -0.7 -9.9 8 F 1 0 15 30 57 Schedule for VLBA_PT (Code Pt ) Page 9 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 15 31 12 SGRA 17 03 37 25.9 169.7 -0.7 -9.8 0 1 1 0 15 31 11 15 31 20 --- 17 03 45 25.9 169.7 -0.7 -9.7 8 F 1 0 15 31 12 15 31 28 1745-283 17 03 52 26.6 169.5 -0.7 -9.8 0 1 1 0 15 31 27 15 31 36 --- 17 04 00 26.6 169.6 -0.7 -9.8 8 F 1 0 15 31 28 15 31 43 SGRA 17 04 07 25.9 169.8 -0.7 -9.6 0 1 1 0 15 31 42 15 31 51 --- 17 04 15 25.9 169.8 -0.7 -9.6 8 F 1 0 15 31 43 15 31 58 1745-283 17 04 23 26.6 169.7 -0.7 -9.7 0 1 1 0 15 31 57 15 32 06 --- 17 04 31 26.6 169.7 -0.7 -9.7 8 F 1 0 15 31 58 15 32 13 SGRA 17 04 38 25.9 169.9 -0.7 -9.5 0 1 1 0 15 32 12 15 32 21 --- 17 04 46 25.9 169.9 -0.7 -9.5 8 F 1 0 15 32 13 15 32 28 1745-283 17 04 53 26.6 169.8 -0.7 -9.6 0 1 1 0 15 32 27 15 32 36 --- 17 05 01 26.6 169.8 -0.7 -9.5 8 F 1 0 15 32 28 15 32 44 SGRA 17 05 09 25.9 170.0 -0.7 -9.4 0 1 1 0 15 32 43 15 32 52 --- 17 05 17 26.0 170.1 -0.7 -9.4 8 F 1 0 15 32 44 15 32 59 1745-283 17 05 24 26.6 169.9 -0.7 -9.5 0 1 1 0 15 32 58 15 33 07 --- 17 05 32 26.6 169.9 -0.7 -9.4 8 F 1 0 15 32 59 15 33 14 SGRA 17 05 39 26.0 170.1 -0.7 -9.3 0 1 1 0 15 33 13 15 33 22 --- 17 05 47 26.0 170.2 -0.7 -9.3 8 F 1 0 15 33 14 15 33 29 1745-283 17 05 54 26.6 170.0 -0.7 -9.3 0 1 1 0 15 33 28 15 33 37 --- 17 06 02 26.6 170.1 -0.7 -9.3 8 F 1 0 15 33 29 15 33 45 SGRA 17 06 10 26.0 170.3 -0.7 -9.2 0 1 1 0 15 33 44 15 33 53 --- 17 06 18 26.0 170.3 -0.7 -9.2 8 F 1 0 15 33 45 15 34 00 1745-283 17 06 25 26.6 170.2 -0.7 -9.2 0 1 1 0 15 33 59 15 34 08 --- 17 06 33 26.6 170.2 -0.7 -9.2 8 F 1 0 15 34 00 15 34 15 SGRA 17 06 40 26.0 170.4 -0.7 -9.1 0 1 1 0 15 34 14 15 34 23 --- 17 06 48 26.0 170.4 -0.7 -9.0 8 F 1 0 15 34 15 15 34 30 1745-283 17 06 55 26.7 170.3 -0.7 -9.1 0 1 1 0 15 34 29 15 34 38 --- 17 07 03 26.7 170.3 -0.7 -9.1 8 F 1 0 15 34 30 15 34 45 SGRA 17 07 11 26.0 170.5 -0.6 -9.0 0 1 1 0 15 34 44 15 34 53 --- 17 07 19 26.0 170.5 -0.6 -8.9 8 F 1 0 15 34 45 Schedule for VLBA_PT (Code Pt ) Page 10 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 15 35 01 1745-283 17 07 26 26.7 170.4 -0.6 -9.0 0 1 1 0 15 35 00 15 35 09 --- 17 07 34 26.7 170.4 -0.6 -9.0 8 F 1 0 15 35 01 15 35 16 SGRA 17 07 41 26.0 170.6 -0.6 -8.8 0 1 1 0 15 35 15 15 35 24 --- 17 07 49 26.0 170.7 -0.6 -8.8 8 F 1 0 15 35 16 15 35 31 1745-283 17 07 57 26.7 170.5 -0.6 -8.9 0 1 1 0 15 35 30 15 35 39 --- 17 08 05 26.7 170.6 -0.6 -8.8 8 F 1 0 15 35 31 15 35 46 SGRA 17 08 12 26.1 170.8 -0.6 -8.7 0 1 1 0 15 35 45 15 35 54 --- 17 08 20 26.1 170.8 -0.6 -8.7 8 F 1 0 15 35 46 15 36 02 1745-283 17 08 27 26.7 170.7 -0.6 -8.8 0 1 1 0 15 36 01 15 36 10 --- 17 08 35 26.7 170.7 -0.6 -8.7 8 F 1 0 15 36 02 15 36 17 SGRA 17 08 42 26.1 170.9 -0.6 -8.6 0 1 1 0 15 36 16 15 36 25 --- 17 08 50 26.1 170.9 -0.6 -8.6 8 F 1 0 15 36 17 15 36 32 1745-283 17 08 58 26.7 170.8 -0.6 -8.6 0 1 1 0 15 36 31 15 36 40 --- 17 09 06 26.7 170.8 -0.6 -8.6 8 F 1 0 15 36 32 15 36 47 SGRA 17 09 13 26.1 171.0 -0.6 -8.5 0 1 1 0 15 36 46 15 36 55 --- 17 09 21 26.1 171.0 -0.6 -8.5 8 F 1 0 15 36 47 15 37 03 1745-283 17 09 28 26.7 170.9 -0.6 -8.5 0 1 1 0 15 37 02 15 37 11 --- 17 09 36 26.8 170.9 -0.6 -8.5 8 F 1 0 15 37 03 15 37 18 SGRA 17 09 43 26.1 171.1 -0.6 -8.4 0 1 1 0 15 37 17 15 37 26 --- 17 09 51 26.1 171.2 -0.6 -8.3 8 F 1 0 15 37 18 15 37 33 1745-283 17 09 59 26.8 171.0 -0.6 -8.4 0 1 1 0 15 37 32 15 37 41 --- 17 10 07 26.8 171.1 -0.6 -8.4 8 F 1 0 15 37 33 15 37 48 SGRA 17 10 14 26.1 171.3 -0.6 -8.3 0 1 1 0 15 37 47 15 37 56 --- 17 10 22 26.1 171.3 -0.6 -8.2 8 F 1 0 15 37 48 15 38 04 1745-283 17 10 29 26.8 171.2 -0.6 -8.3 0 1 1 0 15 38 03 15 38 12 --- 17 10 37 26.8 171.2 -0.6 -8.3 8 F 1 0 15 38 04 15 38 19 SGRA 17 10 45 26.1 171.4 -0.6 -8.1 0 1 1 0 15 38 18 15 38 27 --- 17 10 53 26.1 171.4 -0.6 -8.1 8 F 1 0 15 38 19 15 38 34 1745-283 17 11 00 26.8 171.3 -0.6 -8.2 0 1 1 0 15 38 33 15 38 42 --- 17 11 08 26.8 171.3 -0.6 -8.2 8 F 1 0 15 38 34 Schedule for VLBA_PT (Code Pt ) Page 11 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 15 38 49 SGRA 17 11 15 26.2 171.5 -0.6 -8.0 0 1 1 0 15 38 48 15 38 57 --- 17 11 23 26.2 171.5 -0.6 -8.0 8 F 1 0 15 38 49 15 39 04 1745-283 17 11 30 26.8 171.4 -0.6 -8.1 0 1 1 0 15 39 03 15 39 12 --- 17 11 38 26.8 171.4 -0.6 -8.0 8 F 1 0 15 39 04 15 39 20 SGRA 17 11 46 26.2 171.6 -0.6 -7.9 0 1 1 0 15 39 19 15 39 28 --- 17 11 54 26.2 171.7 -0.6 -7.9 8 F 1 0 15 39 20 15 39 35 1745-283 17 12 01 26.8 171.5 -0.6 -7.9 0 1 1 0 15 39 34 15 39 43 --- 17 12 09 26.8 171.6 -0.6 -7.9 8 F 1 0 15 39 35 15 39 50 SGRA 17 12 16 26.2 171.7 -0.6 -7.8 0 1 1 0 15 39 49 15 39 58 --- 17 12 24 26.2 171.8 -0.6 -7.8 8 F 1 0 15 39 50 15 40 37 NRAO530 17 13 03 42.4 173.3 -0.3 -5.7 0 1 1 0 15 40 36 15 41 37 --- 17 14 03 42.4 173.6 -0.3 -5.4 60 F 1 0 15 40 37 Next scan frequencies: 43124.56 43124.56 43124.56 43124.56 Next BBC frequencies: 724.56 724.56 724.56 724.56 Next scan bandwidths: 2.00 2.00 2.00 2.00 15 41 37 VXSGR 17 14 03 32.0 165.1 -0.9 -13.3 -27 1 1 0 Stopped 15 41 47 --- 17 14 13 32.0 165.1 -0.9 -13.2 -17 S 1 0 15 41 47 VXSGR 17 14 13 32.0 165.1 -0.9 -13.2 -4 1 1 0 Stopped 15 42 47 --- 17 15 13 32.1 165.4 -0.9 -13.0 56 S 1 0 15 42 47 VXSGR 17 15 13 32.1 165.4 -0.9 -13.0 -4 1 1 0 Stopped 15 43 47 --- 17 16 13 32.1 165.7 -0.9 -12.8 56 S 1 0 Next scan frequencies: 86223.99 86223.99 86239.99 86239.99 86255.99 86255.99 86271.99 86271.99 Next BBC frequencies: 723.99 723.99 739.99 739.99 755.99 755.99 771.99 771.99 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 15 44 13 NRAO530 17 16 40 42.4 174.4 -0.3 -4.7 0 1 1 0 15 44 12 15 45 13 --- 17 17 40 42.5 174.8 -0.3 -4.4 60 F 1 0 15 44 13 Schedule for VLBA_PT (Code Pt ) Page 12 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 15 45 51 SGRA 17 18 18 26.3 173.2 -0.5 -6.4 0 1 1 0 15 45 50 15 46 21 --- 17 18 49 26.4 173.3 -0.5 -6.3 30 F 1 0 15 45 51 15 46 29 1745-283 17 18 56 27.0 173.2 -0.5 -6.4 0 1 1 0 15 46 28 15 46 37 --- 17 19 04 27.0 173.3 -0.5 -6.3 8 F 1 0 15 46 29 15 46 44 SGRA 17 19 11 26.4 173.4 -0.4 -6.2 0 1 1 0 15 46 43 15 46 52 --- 17 19 19 26.4 173.4 -0.4 -6.2 8 F 1 0 15 46 44 15 46 59 1745-283 17 19 26 27.0 173.3 -0.4 -6.2 0 1 1 0 15 46 58 15 47 07 --- 17 19 34 27.0 173.4 -0.4 -6.2 8 F 1 0 15 46 59 15 47 14 SGRA 17 19 42 26.4 173.5 -0.4 -6.1 0 1 1 0 15 47 13 15 47 22 --- 17 19 50 26.4 173.6 -0.4 -6.1 8 F 1 0 15 47 14 15 47 30 1745-283 17 19 57 27.0 173.5 -0.4 -6.1 0 1 1 0 15 47 29 15 47 38 --- 17 20 05 27.0 173.5 -0.4 -6.1 8 F 1 0 15 47 30 15 47 45 SGRA 17 20 12 26.4 173.7 -0.4 -6.0 0 1 1 0 15 47 44 15 47 53 --- 17 20 20 26.4 173.7 -0.4 -6.0 8 F 1 0 15 47 45 15 48 00 1745-283 17 20 28 27.1 173.6 -0.4 -6.0 0 1 1 0 15 47 59 15 48 08 --- 17 20 36 27.1 173.6 -0.4 -6.0 8 F 1 0 15 48 00 15 48 15 SGRA 17 20 43 26.4 173.8 -0.4 -5.9 0 1 1 0 15 48 14 15 48 23 --- 17 20 51 26.4 173.8 -0.4 -5.8 8 F 1 0 15 48 15 15 48 31 1745-283 17 20 58 27.1 173.7 -0.4 -5.9 0 1 1 0 15 48 30 15 48 39 --- 17 21 06 27.1 173.8 -0.4 -5.9 8 F 1 0 15 48 31 15 48 46 SGRA 17 21 13 26.4 173.9 -0.4 -5.8 0 1 1 0 15 48 45 15 48 54 --- 17 21 21 26.4 173.9 -0.4 -5.7 8 F 1 0 15 48 46 15 49 01 1745-283 17 21 29 27.1 173.8 -0.4 -5.8 0 1 1 0 15 49 00 15 49 09 --- 17 21 37 27.1 173.9 -0.4 -5.7 8 F 1 0 15 49 01 15 49 16 SGRA 17 21 44 26.4 174.0 -0.4 -5.6 0 1 1 0 15 49 15 15 49 24 --- 17 21 52 26.4 174.1 -0.4 -5.6 8 F 1 0 15 49 16 15 49 32 1745-283 17 21 59 27.1 174.0 -0.4 -5.7 0 1 1 0 15 49 31 15 49 40 --- 17 22 07 27.1 174.0 -0.4 -5.6 8 F 1 0 15 49 32 15 49 47 SGRA 17 22 15 26.4 174.2 -0.4 -5.5 0 1 1 0 15 49 46 15 49 55 --- 17 22 23 26.4 174.2 -0.4 -5.5 8 F 1 0 15 49 47 Schedule for VLBA_PT (Code Pt ) Page 13 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 15 50 02 1745-283 17 22 30 27.1 174.1 -0.4 -5.5 0 1 1 0 15 50 01 15 50 10 --- 17 22 38 27.1 174.1 -0.4 -5.5 8 F 1 0 15 50 02 15 50 17 SGRA 17 22 45 26.4 174.3 -0.4 -5.4 0 1 1 0 15 50 16 15 50 25 --- 17 22 53 26.4 174.3 -0.4 -5.4 8 F 1 0 15 50 17 15 50 33 1745-283 17 23 00 27.1 174.2 -0.4 -5.4 0 1 1 0 15 50 32 15 50 41 --- 17 23 08 27.1 174.3 -0.4 -5.4 8 F 1 0 15 50 33 15 50 48 SGRA 17 23 16 26.5 174.4 -0.4 -5.3 0 1 1 0 15 50 47 15 50 56 --- 17 23 24 26.5 174.4 -0.4 -5.3 8 F 1 0 15 50 48 15 51 03 1745-283 17 23 31 27.1 174.3 -0.4 -5.3 0 1 1 0 15 51 02 15 51 11 --- 17 23 39 27.1 174.4 -0.4 -5.3 8 F 1 0 15 51 03 15 51 18 SGRA 17 23 46 26.5 174.5 -0.4 -5.2 0 1 1 0 15 51 17 15 51 26 --- 17 23 54 26.5 174.6 -0.4 -5.1 8 F 1 0 15 51 18 15 51 34 1745-283 17 24 02 27.1 174.5 -0.4 -5.2 0 1 1 0 15 51 33 15 51 42 --- 17 24 10 27.1 174.5 -0.4 -5.2 8 F 1 0 15 51 34 15 51 49 SGRA 17 24 17 26.5 174.7 -0.4 -5.1 0 1 1 0 15 51 48 15 51 57 --- 17 24 25 26.5 174.7 -0.4 -5.0 8 F 1 0 15 51 49 15 52 04 1745-283 17 24 32 27.1 174.6 -0.4 -5.1 0 1 1 0 15 52 03 15 52 12 --- 17 24 40 27.1 174.6 -0.4 -5.0 8 F 1 0 15 52 04 15 52 19 SGRA 17 24 47 26.5 174.8 -0.4 -4.9 0 1 1 0 15 52 18 15 52 27 --- 17 24 55 26.5 174.8 -0.4 -4.9 8 F 1 0 15 52 19 15 52 35 1745-283 17 25 03 27.2 174.7 -0.4 -5.0 0 1 1 0 15 52 34 15 52 43 --- 17 25 11 27.2 174.8 -0.4 -4.9 8 F 1 0 15 52 35 15 52 50 SGRA 17 25 18 26.5 174.9 -0.3 -4.8 0 1 1 0 15 52 49 15 52 58 --- 17 25 26 26.5 174.9 -0.3 -4.8 8 F 1 0 15 52 50 15 53 05 1745-283 17 25 33 27.2 174.9 -0.3 -4.8 0 1 1 0 15 53 04 15 53 13 --- 17 25 41 27.2 174.9 -0.3 -4.8 8 F 1 0 15 53 05 15 53 20 SGRA 17 25 49 26.5 175.0 -0.3 -4.7 0 1 1 0 15 53 19 15 53 28 --- 17 25 57 26.5 175.1 -0.3 -4.7 8 F 1 0 15 53 20 15 53 36 1745-283 17 26 04 27.2 175.0 -0.3 -4.7 0 1 1 0 15 53 35 15 53 44 --- 17 26 12 27.2 175.0 -0.3 -4.7 8 F 1 0 15 53 36 Schedule for VLBA_PT (Code Pt ) Page 14 86GHz VLBI test between VLBA_NL and VLBA_PT UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 15 53 51 SGRA 17 26 19 26.5 175.1 -0.3 -4.6 0 1 1 0 15 53 50 15 53 59 --- 17 26 27 26.5 175.2 -0.3 -4.6 8 F 1 0 15 53 51 15 54 06 1745-283 17 26 35 27.2 175.1 -0.3 -4.6 0 1 1 0 15 54 05 15 54 14 --- 17 26 43 27.2 175.1 -0.3 -4.6 8 F 1 0 15 54 06 15 54 21 SGRA 17 26 50 26.5 175.3 -0.3 -4.5 0 1 1 0 15 54 20 15 54 29 --- 17 26 58 26.5 175.3 -0.3 -4.4 8 F 1 0 15 54 21 15 54 37 1745-283 17 27 05 27.2 175.2 -0.3 -4.5 0 1 1 0 15 54 36 15 54 45 --- 17 27 13 27.2 175.3 -0.3 -4.4 8 F 1 0 15 54 37 15 54 52 SGRA 17 27 20 26.5 175.4 -0.3 -4.3 0 1 1 0 15 54 51 15 55 00 --- 17 27 28 26.5 175.4 -0.3 -4.3 8 F 1 0 15 54 52 15 55 07 1745-283 17 27 36 27.2 175.4 -0.3 -4.4 0 1 1 0 15 55 06 15 55 15 --- 17 27 44 27.2 175.4 -0.3 -4.3 8 F 1 0 15 55 07 15 55 22 SGRA 17 27 51 26.5 175.5 -0.3 -4.2 0 1 1 0 15 55 21 15 55 30 --- 17 27 59 26.5 175.6 -0.3 -4.2 8 F 1 0 15 55 22 15 55 38 1745-283 17 28 06 27.2 175.5 -0.3 -4.2 0 1 1 0 15 55 37 15 55 46 --- 17 28 14 27.2 175.5 -0.3 -4.2 8 F 1 0 15 55 38 15 55 53 SGRA 17 28 22 26.5 175.6 -0.3 -4.1 0 1 1 0 15 55 52 15 56 01 --- 17 28 30 26.5 175.7 -0.3 -4.1 8 F 1 0 15 55 53 15 56 08 1745-283 17 28 37 27.2 175.6 -0.3 -4.1 0 1 1 0 15 56 07 15 56 16 --- 17 28 45 27.2 175.6 -0.3 -4.1 8 F 1 0 15 56 08 15 56 23 SGRA 17 28 52 26.6 175.8 -0.3 -4.0 0 1 1 0 15 56 22 15 56 31 --- 17 29 00 26.6 175.8 -0.3 -4.0 8 F 1 0 15 56 23 15 57 09 NRAO530 17 29 38 42.6 178.7 -0.1 -1.1 0 1 1 0 15 57 08 15 58 09 --- 17 30 39 42.6 179.1 0.0 -0.8 60 F 1 0 15 57 09 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: pt7mm_new.set Matches group v7mm_c8 in /users/cwalker/sched/catalogs/freq.dat Setup group: 2 Station: VLBA_PT Total bit rate: 32 Format: VLBA1:2 Bits per sample: 2 Sample rate: 4.000 Number of channels: 4 1st LO= 42400.00 42400.00 42400.00 42400.00 Net SB= U U U U Pol. = RCP LCP RCP LCP BBC = 1 2 3 4 BBC SB= U U U U IF = A C A C VLBA FE= 7mm omit 7mm omit VLBA Synth= 15.4 7.6 11.6 The following frequency sets based on this setup were used. Frequency Set: 1 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 43124.56 43124.56 43124.56 43124.56 BBC fr= 724.56 724.56 724.56 724.56 Bandwd= 2.000 2.000 2.000 2.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S1 S3 S1 S2 S3 S4 PCALXB2= S2 S4 S2 S4 M1 M2 M3 M4 PCALFR1= 440 440 1440 1440 0 0 0 0 PCALFR2= 440 440 1440 1440 0 0 0 0 Setup file: 3mm_usb.set Matches group v3mm_ff in /users/cwalker/sched/catalogs/freq.dat Setup group: 1 Station: VLBA_PT Total bit rate: 256 Format: VLBA1:2 Bits per sample: 2 Sample rate: 16.000 Number of channels: 8 1st LO= 85500.00 85500.00 85500.00 85500.00 85500.00 85500.00 85500.00 85500.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 3mm omit 3mm VLBA Synth= 12.9 15.4 12.1 The following frequency sets based on this setup were used. Frequency Set: 2 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 86223.99 86223.99 86239.99 86239.99 86255.99 86255.99 86271.99 86271.99 BBC fr= 723.99 723.99 739.99 739.99 755.99 755.99 771.99 771.99 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 2 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 10 10 10 10 6010 6010 6010 6010 PCALFR2= 10 10 10 10 6010 6010 6010 6010 SOURCE LIST -- 86GHz VLBI test between VLBA_NL and VLBA_PT Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * VXSGR 18 05 02.959213 * 18 08 04.040000 18 08 32.886910 0.00 -22 13 55.57754 *-22 13 26.90000 -22 13 29.06313 0.00 From catalog imbedded in main SCHED input file. Doppler based on LSR frame and radio definition. Velocities: 7.00 7.00 7.00 7.00 0.000 scan hours, 0.000 baseline hours above horizon. * SGRA 17 42 29.309927 * 17 45 40.040900 17 46 10.498019 0.00 -28 59 18.53332 *-29 00 28.11800 -29 00 44.18159 0.00 From catalog imbedded in main SCHED input file. 0.203 scan hours, 0.000 baseline hours above horizon. * 1745-283 17 42 42.771471 * 17 45 52.496800 17 46 22.794051 0.00 -28 19 17.65272 *-28 20 26.29400 -28 20 42.38468 0.00 From catalog imbedded in main SCHED input file. 0.178 scan hours, 0.000 baseline hours above horizon. * NRAO530 17 30 13.535004 * 17 33 02.705600 17 33 29.762869 0.00 -13 02 45.83451 *-13 04 49.54300 -13 05 18.57721 0.00 From catalog imbedded in main SCHED input file. 0.083 scan hours, 0.000 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) VXSGR 40.2 SGRA 45.5 1745-283 45.4 NRAO530 49.5 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg