COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines Exp. Code: BS160D Schedule Version: 4.10 Processed by SCHED version: 6.05 June 2006 PI: Zhi-Qiang Shen Address: Shanghai Astronomical Observatory Chinese Academy of Sciences 80 Nandan Road Shanghai 200030, P.R.China Phone: +86-21-64386191 ext 221 EMAIL: zshen@shao.ac.cn Fax: +86-21-64384618 Phone during observation: +86-21-64386191 ext 221 Observing mode: VLBA 256-8-2 at 7mm LCP Notes: IF frequency setup is for the bandwidth synthesis acorss ~301 MHz between IF1 and IF8 total recording time of ~8hr at 256 Mbps note the new position for VX Sgr Schedule for VLBA_PT (Code Pt ) Page 2 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- Next scan frequencies: 42821.13 42837.88 42879.76 42946.77 43038.91 43089.16 43114.29 43122.66 Next BBC frequencies: 621.13 637.88 679.76 746.77 838.91 889.16 914.29 922.66 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 11 25 11 J1512-0905 14 00 00 43.2 154.8 -1.2 -20.9 0 1 1 0 11 25 11 11 30 10 --- 14 05 00 43.6 156.4 -1.1 -19.6 299 F 1 10 11 25 29 11 32 12 J0157+7442 14 07 02 19.1 0.6-11.9 -1.9 12 1 1 10 11 32 12 11 33 12 --- 14 08 02 19.1 0.7-11.8 -2.1 60 F 1 12 11 32 30 11 34 30 J0808+4950 14 09 21 25.5 -45.6 6.0 66.2 41 1 1 12 11 34 30 11 35 30 --- 14 10 21 25.4 -45.6 6.0 66.1 60 F 1 14 11 34 48 11 38 03 J1625+4134 14 12 54 62.9 64.6 -2.2 -94.5 72 1 1 14 11 38 03 11 39 03 --- 14 13 54 63.1 64.5 -2.2 -94.7 60 F 1 15 11 38 21 11 41 07 J0841+7053 14 15 58 34.3 -23.2 5.6 83.4 59 1 1 15 11 41 07 11 42 06 --- 14 16 58 34.2 -23.2 5.6 83.2 60 F 1 17 11 41 25 11 43 16 J1748+7005 14 18 08 44.5 22.3 -3.5 -113.1 33 1 1 17 11 43 16 11 44 16 --- 14 19 08 44.6 22.2 -3.5 -113.4 60 F 1 19 11 43 34 11 45 56 J0948+4039 14 20 49 37.1 -61.8 4.5 73.6 39 1 1 19 11 45 56 11 46 56 --- 14 21 49 36.9 -61.8 4.5 73.5 60 F 1 21 11 46 14 11 48 58 J1638+5720 14 23 51 57.8 34.1 -2.2 -121.0 51 1 1 21 11 48 58 11 49 57 --- 14 24 51 57.9 34.0 -2.2 -121.3 60 F 1 23 11 49 16 11 51 42 J1642+3948 14 26 36 62.4 68.5 -2.3 -90.5 76 1 1 23 11 51 42 11 52 42 --- 14 27 36 62.6 68.5 -2.3 -90.7 60 F 1 25 11 52 00 11 54 43 J1740+5211 14 29 37 51.8 47.2 -3.2 -98.6 93 1 1 25 11 54 43 11 55 43 --- 14 30 37 51.9 47.2 -3.2 -98.9 60 F 1 27 11 55 01 11 58 15 J1229+0203 14 33 10 46.7 228.5 2.1 38.2 26 1 1 27 11 58 15 11 59 15 --- 14 34 10 46.6 228.8 2.1 38.4 60 F 1 29 11 58 33 12 01 17 J1824+5651 14 36 12 45.9 401.2 -3.8 -95.6 1 1 1 29 12 01 17 12 02 17 --- 14 37 12 46.0 401.2 -3.8 -95.9 60 F 1 31 12 01 35 Schedule for VLBA_PT (Code Pt ) Page 3 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 12 03 36 J2202+4216 14 38 32 9.2 404.3 -7.4 -51.3 0 1 1 31 12 03 36 12 04 36 --- 14 39 32 9.3 404.4 -7.4 -51.5 60 F 1 33 12 03 54 12 06 17 J1642+6856 14 41 12 51.5 376.9 -2.0 -138.1 10 1 1 33 12 06 17 12 07 16 --- 14 42 12 51.6 376.8 -2.0 -138.4 60 F 1 35 12 06 35 12 09 22 J1337-1257 14 44 19 40.2 201.3 1.1 17.9 3 1 1 35 12 09 22 12 10 22 --- 14 45 19 40.1 201.6 1.1 18.2 60 F 1 37 12 09 40 12 11 40 J1733-1304 14 46 37 28.2 132.6 -2.8 -38.6 26 1 1 37 12 11 40 12 12 40 --- 14 47 37 28.4 132.8 -2.8 -38.4 60 F 1 39 12 11 58 12 14 07 J1058+0133 14 49 04 27.3 251.6 3.8 51.6 2 1 1 39 12 14 07 12 15 07 --- 14 50 04 27.1 251.8 3.9 51.7 60 F 1 41 12 14 25 12 15 58 J1256-0547 14 50 56 41.6 219.5 1.9 31.9 16 1 1 41 12 15 58 12 16 58 --- 14 51 56 41.5 219.8 1.9 32.1 60 F 1 42 12 16 16 12 16 58 VX_SGR 14 51 56 16.7 133.0 -3.3 -40.7 -64 1 1 42 Stopped 12 18 58 --- 14 53 56 17.0 133.4 -3.2 -40.4 56 S 1 46 12 18 58 VX_SGR 14 53 56 17.0 133.4 -3.2 -40.4 -4 1 1 46 Stopped 12 20 58 --- 14 55 56 17.3 133.8 -3.2 -40.1 116 S 1 50 12 20 58 VX_SGR 14 55 56 17.3 133.8 -3.2 -40.1 -4 1 1 50 12 20 58 12 21 57 --- 14 56 56 17.4 133.9 -3.2 -40.0 56 F 1 52 12 21 16 12 21 57 J1733-1304 14 56 56 29.8 134.9 -2.6 -36.9 -31 1 1 52 12 21 57 12 22 57 --- 14 57 56 29.9 135.1 -2.6 -36.8 29 F 1 54 12 21 57 12 22 57 VX_SGR 14 57 56 17.6 134.1 -3.2 -39.8 -31 1 1 54 12 22 57 12 23 57 --- 14 58 56 17.7 134.3 -3.2 -39.7 29 F 1 56 12 22 57 12 23 57 J1733-1304 14 58 56 30.1 135.4 -2.6 -36.6 -31 1 1 56 12 23 57 12 24 57 --- 14 59 56 30.2 135.6 -2.6 -36.4 29 F 1 58 12 23 57 12 24 57 VX_SGR 14 59 56 17.9 134.5 -3.1 -39.5 -31 1 1 58 12 24 57 12 25 57 --- 15 00 56 18.0 134.7 -3.1 -39.4 29 F 1 60 12 24 57 12 25 57 J1733-1304 15 00 56 30.3 135.8 -2.5 -36.2 -31 1 1 60 12 25 57 12 26 57 --- 15 01 56 30.5 136.0 -2.5 -36.1 29 F 1 62 12 25 57 Schedule for VLBA_PT (Code Pt ) Page 4 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 12 26 57 VX_SGR 15 01 56 18.2 134.9 -3.1 -39.2 -31 1 1 62 12 26 57 12 27 56 --- 15 02 56 18.3 135.1 -3.1 -39.1 29 F 1 64 12 26 57 12 27 56 J1733-1304 15 02 56 30.6 136.3 -2.5 -35.9 -31 1 1 64 12 27 56 12 28 56 --- 15 03 56 30.8 136.5 -2.5 -35.7 29 F 1 66 12 27 56 12 28 56 VX_SGR 15 03 56 18.5 135.3 -3.1 -38.9 -31 1 1 66 12 28 56 12 29 56 --- 15 04 56 18.6 135.5 -3.1 -38.8 29 F 1 68 12 28 56 12 29 56 J1733-1304 15 04 56 30.9 136.7 -2.5 -35.5 -31 1 1 68 12 29 56 12 30 56 --- 15 05 56 31.1 137.0 -2.5 -35.4 29 F 1 69 12 29 56 12 30 56 VX_SGR 15 05 56 18.7 135.6 -3.0 -38.6 -31 1 1 69 12 30 56 12 31 56 --- 15 06 56 18.9 135.8 -3.0 -38.4 29 F 1 71 12 30 56 12 31 56 J1733-1304 15 06 56 31.2 137.2 -2.4 -35.2 -31 1 1 71 12 31 56 12 32 56 --- 15 07 56 31.3 137.4 -2.4 -35.0 29 F 1 73 12 31 56 12 32 56 VX_SGR 15 07 56 19.0 136.0 -3.0 -38.3 -31 1 1 73 12 32 56 12 33 55 --- 15 08 56 19.2 136.2 -3.0 -38.1 29 F 1 75 12 32 56 12 33 55 J1733-1304 15 08 56 31.5 137.7 -2.4 -34.8 -31 1 1 75 12 33 55 12 34 55 --- 15 09 56 31.6 137.9 -2.4 -34.7 29 F 1 77 12 33 55 12 34 55 VX_SGR 15 09 56 19.3 136.4 -3.0 -38.0 -31 1 1 77 12 34 55 12 35 55 --- 15 10 56 19.5 136.6 -3.0 -37.8 29 F 1 79 12 34 55 12 35 55 J1733-1304 15 10 56 31.8 138.1 -2.4 -34.5 -31 1 1 79 12 35 55 12 36 55 --- 15 11 56 31.9 138.4 -2.4 -34.3 29 F 1 81 12 35 55 12 36 55 VX_SGR 15 11 56 19.6 136.8 -2.9 -37.7 -31 1 1 81 12 36 55 12 37 55 --- 15 12 56 19.7 137.0 -2.9 -37.5 29 F 1 83 12 36 55 12 37 55 J1733-1304 15 12 56 32.0 138.6 -2.3 -34.1 -31 1 1 83 12 37 55 12 38 55 --- 15 13 56 32.2 138.8 -2.3 -33.9 29 F 1 85 12 37 55 12 38 55 VX_SGR 15 13 56 19.9 137.2 -2.9 -37.3 -31 1 1 85 12 38 55 12 39 54 --- 15 14 56 20.0 137.4 -2.9 -37.2 29 F 1 87 12 38 55 12 39 54 J1733-1304 15 14 56 32.3 139.1 -2.3 -33.8 -31 1 1 87 12 39 54 12 40 54 --- 15 15 56 32.4 139.3 -2.3 -33.6 29 F 1 89 12 39 54 Schedule for VLBA_PT (Code Pt ) Page 5 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 12 40 54 VX_SGR 15 15 56 20.2 137.6 -2.9 -37.0 -31 1 1 89 12 40 54 12 41 54 --- 15 16 56 20.3 137.8 -2.9 -36.8 29 F 1 91 12 40 54 12 41 54 J1733-1304 15 16 56 32.6 139.6 -2.3 -33.4 -31 1 1 91 12 41 54 12 42 54 --- 15 17 56 32.7 139.8 -2.3 -33.2 29 F 1 93 12 41 54 12 42 54 VX_SGR 15 17 56 20.4 138.0 -2.8 -36.7 -31 1 1 93 12 42 54 12 43 54 --- 15 18 56 20.6 138.2 -2.8 -36.5 29 F 1 95 12 42 54 12 43 54 J1733-1304 15 18 56 32.8 140.0 -2.2 -33.0 -31 1 1 95 12 43 54 12 44 54 --- 15 19 56 33.0 140.3 -2.2 -32.8 29 F 1 97 12 43 54 12 44 54 VX_SGR 15 19 56 20.7 138.4 -2.8 -36.4 -31 1 1 97 12 44 54 12 45 53 --- 15 20 56 20.9 138.6 -2.8 -36.2 29 F 1 98 12 44 54 12 45 53 J1733-1304 15 20 56 33.1 140.5 -2.2 -32.6 -30 1 1 98 12 45 53 12 46 53 --- 15 21 56 33.2 140.8 -2.2 -32.4 29 F 1 100 12 45 53 12 46 53 VX_SGR 15 21 56 21.0 138.8 -2.8 -36.0 -30 1 1 100 12 46 53 12 47 53 --- 15 22 56 21.1 139.0 -2.8 -35.9 29 F 1 102 12 46 53 12 47 53 J1733-1304 15 22 56 33.4 141.0 -2.2 -32.2 -30 1 1 102 12 47 53 12 48 53 --- 15 23 56 33.5 141.3 -2.2 -32.1 29 F 1 104 12 47 53 12 48 53 VX_SGR 15 23 56 21.3 139.2 -2.7 -35.7 -30 1 1 104 12 48 53 12 49 53 --- 15 24 56 21.4 139.4 -2.7 -35.5 29 F 1 106 12 48 53 12 49 53 J1733-1304 15 24 56 33.6 141.5 -2.1 -31.9 -30 1 1 106 12 49 53 12 50 53 --- 15 25 56 33.7 141.8 -2.1 -31.7 29 F 1 108 12 49 53 12 50 53 VX_SGR 15 25 56 21.5 139.6 -2.7 -35.4 -30 1 1 108 12 50 53 12 51 52 --- 15 26 56 21.7 139.8 -2.7 -35.2 29 F 1 110 12 50 53 12 51 52 J1733-1304 15 26 56 33.9 142.0 -2.1 -31.5 -30 1 1 110 12 51 52 12 52 52 --- 15 27 56 34.0 142.3 -2.1 -31.3 29 F 1 112 12 51 52 12 52 52 VX_SGR 15 27 56 21.8 140.0 -2.7 -35.0 -30 1 1 112 12 52 52 12 53 52 --- 15 28 56 21.9 140.2 -2.7 -34.8 29 F 1 114 12 52 52 12 53 52 J1733-1304 15 28 56 34.1 142.5 -2.1 -31.1 -30 1 1 114 12 53 52 12 54 52 --- 15 29 56 34.3 142.8 -2.1 -30.9 29 F 1 116 12 53 52 Schedule for VLBA_PT (Code Pt ) Page 6 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 12 54 52 VX_SGR 15 29 56 22.1 140.4 -2.6 -34.7 -30 1 1 116 12 54 52 12 55 52 --- 15 30 56 22.2 140.6 -2.6 -34.5 29 F 1 118 12 54 52 12 55 52 J1733-1304 15 30 56 34.4 143.0 -2.0 -30.7 -30 1 1 118 12 55 52 12 56 52 --- 15 31 56 34.5 143.3 -2.0 -30.5 29 F 1 120 12 55 52 12 56 52 VX_SGR 15 31 56 22.3 140.8 -2.6 -34.3 -30 1 1 120 12 56 52 12 57 51 --- 15 32 56 22.5 141.0 -2.6 -34.2 29 F 1 122 12 56 52 12 57 51 VX_SGR 15 32 56 22.5 141.0 -2.6 -34.2 -4 1 1 122 Stopped 12 59 51 --- 15 34 56 22.7 141.4 -2.6 -33.8 116 S 1 125 12 59 51 VX_SGR 15 34 56 22.7 141.4 -2.6 -33.8 -4 1 1 125 Stopped 13 01 51 --- 15 36 56 23.0 141.9 -2.5 -33.5 116 S 1 129 13 01 51 VX_SGR 15 36 56 23.0 141.9 -2.5 -33.5 -4 1 1 129 13 01 51 13 03 50 --- 15 38 56 23.2 142.3 -2.5 -33.1 116 F 1 133 13 02 09 13 03 50 VX_SGR 15 38 56 23.2 142.3 -2.5 -33.1 -4 1 1 133 13 03 50 13 04 20 --- 15 39 26 23.3 142.4 -2.5 -33.0 26 F 1 134 13 03 50 13 04 20 J1808-2124 15 39 26 24.0 141.9 -2.5 -33.2 -7 1 1 134 13 04 20 13 04 40 --- 15 39 46 24.0 142.0 -2.5 -33.2 13 F 1 135 13 04 20 13 04 40 VX_SGR 15 39 46 23.3 142.4 -2.5 -32.9 -7 1 1 135 13 04 40 13 05 10 --- 15 40 16 23.4 142.6 -2.5 -32.9 23 F 1 136 13 04 40 13 05 10 J1811-2055 15 40 16 24.1 141.1 -2.5 -33.7 -7 1 1 136 13 05 10 13 05 30 --- 15 40 36 24.1 141.2 -2.5 -33.7 13 F 1 136 13 05 10 13 05 30 VX_SGR 15 40 36 23.4 142.6 -2.5 -32.8 -7 1 1 136 13 05 30 13 06 00 --- 15 41 06 23.5 142.7 -2.5 -32.7 23 F 1 137 13 05 30 13 06 00 J1807-2506 15 41 06 21.1 144.5 -2.5 -32.0 -11 1 1 137 13 06 00 13 06 25 --- 15 41 31 21.2 144.6 -2.4 -31.9 14 F 1 138 13 06 00 13 06 25 VX_SGR 15 41 31 23.5 142.8 -2.5 -32.6 -11 1 1 138 13 06 25 13 06 55 --- 15 42 01 23.6 142.9 -2.4 -32.5 19 F 1 139 13 06 25 13 06 55 J1808-2124 15 42 01 24.3 142.4 -2.4 -32.7 -7 1 1 139 13 06 55 13 07 15 --- 15 42 21 24.3 142.5 -2.4 -32.7 13 F 1 140 13 06 55 Schedule for VLBA_PT (Code Pt ) Page 7 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 13 07 15 VX_SGR 15 42 21 23.7 143.0 -2.4 -32.5 -7 1 1 140 13 07 15 13 07 45 --- 15 42 51 23.7 143.1 -2.4 -32.4 23 F 1 141 13 07 15 13 07 45 J1811-2055 15 42 51 24.4 141.7 -2.5 -33.3 -7 1 1 141 13 07 45 13 08 05 --- 15 43 11 24.5 141.7 -2.5 -33.2 13 F 1 141 13 07 45 13 08 05 VX_SGR 15 43 11 23.8 143.2 -2.4 -32.3 -7 1 1 141 13 08 05 13 08 35 --- 15 43 41 23.8 143.3 -2.4 -32.2 23 F 1 142 13 08 05 13 08 35 J1807-2506 15 43 41 21.4 145.0 -2.4 -31.5 -11 1 1 142 13 08 35 13 09 00 --- 15 44 06 21.5 145.1 -2.4 -31.5 14 F 1 143 13 08 35 13 09 00 VX_SGR 15 44 06 23.9 143.4 -2.4 -32.2 -11 1 1 143 13 09 00 13 09 30 --- 15 44 36 23.9 143.5 -2.4 -32.1 19 F 1 144 13 09 00 13 09 30 J1808-2124 15 44 36 24.6 143.0 -2.4 -32.3 -7 1 1 144 13 09 30 13 09 50 --- 15 44 56 24.7 143.1 -2.4 -32.2 13 F 1 145 13 09 30 13 09 50 VX_SGR 15 44 56 24.0 143.5 -2.4 -32.0 -7 1 1 145 13 09 50 13 10 19 --- 15 45 26 24.0 143.7 -2.4 -31.9 23 F 1 146 13 09 50 13 10 19 J1811-2055 15 45 26 24.8 142.2 -2.4 -32.8 -7 1 1 146 13 10 19 13 10 39 --- 15 45 46 24.8 142.3 -2.4 -32.7 13 F 1 146 13 10 19 13 10 39 VX_SGR 15 45 46 24.1 143.7 -2.4 -31.9 -7 1 1 146 13 10 39 13 11 09 --- 15 46 16 24.1 143.8 -2.4 -31.8 23 F 1 147 13 10 39 13 11 09 J1807-2506 15 46 16 21.7 145.5 -2.4 -31.1 -11 1 1 147 13 11 09 13 11 34 --- 15 46 41 21.8 145.6 -2.4 -31.0 14 F 1 148 13 11 09 13 11 34 VX_SGR 15 46 41 24.2 143.9 -2.4 -31.7 -11 1 1 148 13 11 34 13 12 04 --- 15 47 11 24.2 144.0 -2.4 -31.6 19 F 1 149 13 11 34 13 12 04 J1808-2124 15 47 11 24.9 143.6 -2.4 -31.8 -7 1 1 149 13 12 04 13 12 24 --- 15 47 31 25.0 143.6 -2.4 -31.8 13 F 1 150 13 12 04 13 12 24 VX_SGR 15 47 31 24.3 144.1 -2.4 -31.5 -7 1 1 150 13 12 24 13 12 54 --- 15 48 01 24.3 144.2 -2.3 -31.5 23 F 1 151 13 12 24 13 12 54 J1811-2055 15 48 01 25.1 142.8 -2.4 -32.3 -7 1 1 151 13 12 54 13 13 14 --- 15 48 21 25.1 142.9 -2.4 -32.3 13 F 1 151 13 12 54 Schedule for VLBA_PT (Code Pt ) Page 8 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 13 13 14 VX_SGR 15 48 21 24.4 144.3 -2.3 -31.4 -7 1 1 151 13 13 14 13 13 44 --- 15 48 51 24.4 144.4 -2.3 -31.3 22 F 1 152 13 13 14 13 13 44 J1807-2506 15 48 51 22.0 146.1 -2.3 -30.6 -11 1 1 152 13 13 44 13 14 09 --- 15 49 16 22.1 146.2 -2.3 -30.5 14 F 1 153 13 13 44 13 14 09 VX_SGR 15 49 16 24.5 144.5 -2.3 -31.2 -11 1 1 153 13 14 09 13 14 39 --- 15 49 46 24.6 144.6 -2.3 -31.1 19 F 1 154 13 14 09 13 14 39 J1808-2124 15 49 46 25.2 144.1 -2.3 -31.3 -7 1 1 154 13 14 39 13 14 59 --- 15 50 06 25.3 144.2 -2.3 -31.3 13 F 1 155 13 14 39 13 14 59 VX_SGR 15 50 06 24.6 144.7 -2.3 -31.1 -7 1 1 155 13 14 59 13 15 29 --- 15 50 36 24.7 144.8 -2.3 -31.0 23 F 1 156 13 14 59 13 15 29 J1811-2055 15 50 36 25.4 143.4 -2.4 -31.9 -7 1 1 156 13 15 29 13 15 49 --- 15 50 56 25.4 143.4 -2.3 -31.8 12 F 1 156 13 15 29 13 15 49 VX_SGR 15 50 56 24.7 144.8 -2.3 -30.9 -7 1 1 156 13 15 49 13 16 18 --- 15 51 26 24.8 145.0 -2.3 -30.8 22 F 1 157 13 15 49 13 16 18 J1807-2506 15 51 26 22.3 146.6 -2.3 -30.1 -11 1 1 157 13 16 18 13 16 43 --- 15 51 51 22.4 146.7 -2.3 -30.0 14 F 1 158 13 16 18 13 16 43 VX_SGR 15 51 51 24.8 145.0 -2.3 -30.7 -11 1 1 158 13 16 43 13 17 13 --- 15 52 21 24.9 145.2 -2.3 -30.7 19 F 1 159 13 16 43 13 17 13 J1808-2124 15 52 21 25.6 144.7 -2.3 -30.9 -7 1 1 159 13 17 13 13 17 33 --- 15 52 41 25.6 144.8 -2.3 -30.8 13 F 1 160 13 17 13 13 17 33 VX_SGR 15 52 41 24.9 145.2 -2.3 -30.6 -7 1 1 160 13 17 33 13 18 03 --- 15 53 11 25.0 145.3 -2.3 -30.5 23 F 1 161 13 17 33 13 18 03 J1811-2055 15 53 11 25.7 143.9 -2.3 -31.4 -7 1 1 161 13 18 03 13 18 23 --- 15 53 31 25.8 144.0 -2.3 -31.3 12 F 1 161 13 18 03 13 18 23 VX_SGR 15 53 31 25.0 145.4 -2.3 -30.4 -7 1 1 161 13 18 23 13 18 53 --- 15 54 01 25.1 145.5 -2.2 -30.3 22 F 1 162 13 18 23 13 18 53 J1807-2506 15 54 01 22.6 147.2 -2.2 -29.6 -11 1 1 162 13 18 53 13 19 18 --- 15 54 26 22.7 147.3 -2.2 -29.6 14 F 1 163 13 18 53 Schedule for VLBA_PT (Code Pt ) Page 9 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 13 19 18 VX_SGR 15 54 26 25.1 145.6 -2.2 -30.3 -11 1 1 163 13 19 18 13 19 48 --- 15 54 56 25.2 145.7 -2.2 -30.2 19 F 1 164 13 19 18 13 19 48 J1808-2124 15 54 56 25.9 145.3 -2.2 -30.4 -7 1 1 164 13 19 48 13 20 08 --- 15 55 16 25.9 145.3 -2.2 -30.3 13 F 1 165 13 19 48 13 20 08 VX_SGR 15 55 16 25.2 145.8 -2.2 -30.1 -7 1 1 165 13 20 08 13 20 38 --- 15 55 46 25.3 145.9 -2.2 -30.0 23 F 1 166 13 20 08 13 20 38 J1811-2055 15 55 46 26.0 144.5 -2.3 -30.9 -8 1 1 166 13 20 38 13 20 58 --- 15 56 06 26.1 144.6 -2.3 -30.8 12 F 1 166 13 20 38 13 20 58 VX_SGR 15 56 06 25.3 146.0 -2.2 -29.9 -8 1 1 166 13 20 58 13 21 28 --- 15 56 36 25.4 146.1 -2.2 -29.9 22 F 1 167 13 20 58 13 21 28 J1807-2506 15 56 36 22.9 147.7 -2.2 -29.1 -11 1 1 167 13 21 28 13 21 53 --- 15 57 01 22.9 147.8 -2.2 -29.1 14 F 1 168 13 21 28 13 21 53 VX_SGR 15 57 01 25.4 146.2 -2.2 -29.8 -11 1 1 168 13 21 53 13 22 22 --- 15 57 31 25.5 146.3 -2.2 -29.7 19 F 1 169 13 21 53 13 22 22 J1808-2124 15 57 31 26.2 145.8 -2.2 -29.9 -7 1 1 169 13 22 22 13 22 42 --- 15 57 51 26.2 145.9 -2.2 -29.8 13 F 1 170 13 22 22 13 22 42 VX_SGR 15 57 51 25.5 146.4 -2.2 -29.6 -7 1 1 170 13 22 42 13 23 12 --- 15 58 21 25.6 146.5 -2.2 -29.5 23 F 1 171 13 22 42 13 23 12 J1811-2055 15 58 21 26.3 145.1 -2.2 -30.4 -8 1 1 171 13 23 12 13 23 32 --- 15 58 41 26.4 145.2 -2.2 -30.4 12 F 1 171 13 23 12 13 23 32 VX_SGR 15 58 41 25.6 146.6 -2.2 -29.5 -8 1 1 171 13 23 32 13 24 02 --- 15 59 11 25.7 146.7 -2.2 -29.4 22 F 1 172 13 23 32 13 24 02 J1807-2506 15 59 11 23.2 148.3 -2.1 -28.7 -11 1 1 172 13 24 02 13 24 27 --- 15 59 36 23.2 148.4 -2.1 -28.6 14 F 1 173 13 24 02 13 24 27 VX_SGR 15 59 36 25.7 146.8 -2.1 -29.3 -11 1 1 173 13 24 27 13 24 57 --- 16 00 06 25.8 146.9 -2.1 -29.2 19 F 1 174 13 24 27 13 24 57 J1808-2124 16 00 06 26.5 146.4 -2.1 -29.4 -7 1 1 174 13 24 57 13 25 17 --- 16 00 26 26.5 146.5 -2.1 -29.3 13 F 1 175 13 24 57 Schedule for VLBA_PT (Code Pt ) Page 10 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 13 25 17 VX_SGR 16 00 26 25.8 147.0 -2.1 -29.1 -7 1 1 175 13 25 17 13 25 47 --- 16 00 56 25.9 147.1 -2.1 -29.0 23 F 1 176 13 25 17 13 25 47 J1811-2055 16 00 56 26.6 145.7 -2.2 -29.9 -8 1 1 176 13 25 47 13 26 07 --- 16 01 16 26.7 145.7 -2.2 -29.9 12 F 1 176 13 25 47 13 26 07 VX_SGR 16 01 16 25.9 147.1 -2.1 -29.0 -8 1 1 176 13 26 07 13 26 37 --- 16 01 46 25.9 147.3 -2.1 -28.9 22 F 1 177 13 26 07 13 26 37 J1807-2506 16 01 46 23.5 148.9 -2.1 -28.2 -11 1 1 177 13 26 37 13 27 02 --- 16 02 11 23.5 148.9 -2.1 -28.1 14 F 1 178 13 26 37 13 27 02 VX_SGR 16 02 11 26.0 147.3 -2.1 -28.8 -11 1 1 178 13 27 02 13 27 32 --- 16 02 41 26.0 147.5 -2.1 -28.7 19 F 1 179 13 27 02 13 27 32 J1808-2124 16 02 41 26.8 147.0 -2.1 -28.9 -7 1 1 179 13 27 32 13 27 52 --- 16 03 01 26.8 147.1 -2.1 -28.8 13 F 1 180 13 27 32 13 27 52 VX_SGR 16 03 01 26.1 147.5 -2.1 -28.6 -7 1 1 180 13 27 52 13 28 21 --- 16 03 31 26.1 147.6 -2.1 -28.5 23 F 1 181 13 27 52 13 28 21 J1811-2055 16 03 31 26.9 146.3 -2.1 -29.4 -8 1 1 181 13 28 21 13 28 41 --- 16 03 51 27.0 146.3 -2.1 -29.4 12 F 1 181 13 28 21 13 28 41 VX_SGR 16 03 51 26.2 147.7 -2.1 -28.5 -8 1 1 181 13 28 41 13 29 11 --- 16 04 21 26.2 147.8 -2.1 -28.4 22 F 1 182 13 28 41 13 29 11 J1807-2506 16 04 21 23.7 149.4 -2.1 -27.7 -11 1 1 182 13 29 11 13 29 36 --- 16 04 46 23.8 149.5 -2.1 -27.6 14 F 1 183 13 29 11 13 29 36 VX_SGR 16 04 46 26.3 147.9 -2.1 -28.3 -11 1 1 183 13 29 36 13 30 06 --- 16 05 16 26.3 148.0 -2.1 -28.2 19 F 1 184 13 29 36 13 30 06 J1808-2124 16 05 16 27.0 147.6 -2.1 -28.4 -7 1 1 184 13 30 06 13 30 26 --- 16 05 36 27.1 147.7 -2.1 -28.3 13 F 1 185 13 30 06 13 30 26 VX_SGR 16 05 36 26.4 148.1 -2.0 -28.1 -7 1 1 185 13 30 26 13 30 56 --- 16 06 06 26.4 148.2 -2.0 -28.0 23 F 1 186 13 30 26 13 30 56 J1811-2055 16 06 06 27.2 146.8 -2.1 -28.9 -8 1 1 186 13 30 56 13 31 16 --- 16 06 26 27.3 146.9 -2.1 -28.9 12 F 1 186 13 30 56 Schedule for VLBA_PT (Code Pt ) Page 11 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 13 31 16 VX_SGR 16 06 26 26.5 148.3 -2.0 -28.0 -8 1 1 186 13 31 16 13 31 46 --- 16 06 56 26.5 148.4 -2.0 -27.9 22 F 1 187 13 31 16 13 31 46 J1807-2506 16 06 56 24.0 150.0 -2.0 -27.2 -11 1 1 187 13 31 46 13 32 11 --- 16 07 21 24.0 150.1 -2.0 -27.1 14 F 1 188 13 31 46 13 32 11 VX_SGR 16 07 21 26.6 148.5 -2.0 -27.8 -11 1 1 188 13 32 11 13 32 41 --- 16 07 51 26.6 148.6 -2.0 -27.7 19 F 1 189 13 32 11 13 32 41 J1808-2124 16 07 51 27.3 148.2 -2.0 -27.9 -7 1 1 189 13 32 41 13 33 01 --- 16 08 11 27.4 148.3 -2.0 -27.8 13 F 1 190 13 32 41 13 33 01 VX_SGR 16 08 11 26.6 148.7 -2.0 -27.6 -7 1 1 190 13 33 01 13 33 31 --- 16 08 41 26.7 148.8 -2.0 -27.5 23 F 1 191 13 33 01 13 33 31 J1811-2055 16 08 41 27.5 147.4 -2.0 -28.4 -8 1 1 191 13 33 31 13 33 51 --- 16 09 01 27.6 147.5 -2.0 -28.4 12 F 1 191 13 33 31 13 33 51 VX_SGR 16 09 01 26.7 148.9 -2.0 -27.4 -8 1 1 191 13 33 51 13 34 20 --- 16 09 31 26.8 149.0 -2.0 -27.3 22 F 1 192 13 33 51 13 34 20 J1807-2506 16 09 31 24.3 150.6 -2.0 -26.6 -11 1 1 192 13 34 20 13 34 45 --- 16 09 56 24.3 150.6 -2.0 -26.6 14 F 1 193 13 34 20 13 34 45 VX_SGR 16 09 56 26.8 149.1 -2.0 -27.3 -11 1 1 193 13 34 45 13 35 15 --- 16 10 26 26.9 149.2 -2.0 -27.2 19 F 1 194 13 34 45 13 35 15 J1808-2124 16 10 26 27.6 148.8 -2.0 -27.4 -7 1 1 194 13 35 15 13 35 35 --- 16 10 46 27.6 148.9 -2.0 -27.3 13 F 1 195 13 35 15 13 35 35 VX_SGR 16 10 46 26.9 149.3 -2.0 -27.1 -7 1 1 195 13 35 35 13 36 05 --- 16 11 16 27.0 149.4 -2.0 -27.0 23 F 1 196 13 35 35 13 36 05 J1811-2055 16 11 16 27.8 148.0 -2.0 -27.9 -8 1 1 196 13 36 05 13 36 25 --- 16 11 36 27.8 148.1 -2.0 -27.8 12 F 1 196 13 36 05 13 36 25 VX_SGR 16 11 36 27.0 149.5 -1.9 -26.9 -8 1 1 196 13 36 25 13 36 55 --- 16 12 06 27.1 149.6 -1.9 -26.8 22 F 1 197 13 36 25 13 36 55 J1807-2506 16 12 06 24.5 151.1 -1.9 -26.1 -11 1 1 197 13 36 55 13 37 20 --- 16 12 31 24.6 151.2 -1.9 -26.1 14 F 1 198 13 36 55 Schedule for VLBA_PT (Code Pt ) Page 12 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 13 37 20 VX_SGR 16 12 31 27.1 149.7 -1.9 -26.7 -11 1 1 198 13 37 20 13 37 50 --- 16 13 01 27.2 149.8 -1.9 -26.6 19 F 1 199 13 37 20 13 37 50 J1808-2124 16 13 01 27.9 149.4 -1.9 -26.8 -7 1 1 199 13 37 50 13 38 10 --- 16 13 21 27.9 149.5 -1.9 -26.8 13 F 1 200 13 37 50 13 38 10 VX_SGR 16 13 21 27.2 149.9 -1.9 -26.6 -7 1 1 200 13 38 10 13 38 40 --- 16 13 51 27.2 150.0 -1.9 -26.5 23 F 1 201 13 38 10 13 38 40 J1811-2055 16 13 51 28.1 148.6 -2.0 -27.4 -8 1 1 201 13 38 40 13 39 00 --- 16 14 11 28.1 148.7 -2.0 -27.3 12 F 1 201 13 38 40 13 39 00 VX_SGR 16 14 11 27.3 150.1 -1.9 -26.4 -8 1 1 201 13 39 00 13 39 30 --- 16 14 41 27.3 150.2 -1.9 -26.3 22 F 1 202 13 39 00 13 39 30 J1807-2506 16 14 41 24.8 151.7 -1.9 -25.6 -11 1 1 202 13 39 30 13 39 55 --- 16 15 06 24.8 151.8 -1.9 -25.5 14 F 1 203 13 39 30 13 39 55 VX_SGR 16 15 06 27.4 150.3 -1.9 -26.2 -11 1 1 203 Stopped 13 41 54 --- 16 17 06 27.6 150.8 -1.9 -25.8 109 S 1 207 13 41 54 VX_SGR 16 17 06 27.6 150.8 -1.9 -25.8 -4 1 1 207 Stopped 13 43 54 --- 16 19 06 27.8 151.3 -1.8 -25.4 116 S 1 211 13 43 54 VX_SGR 16 19 06 27.8 151.3 -1.8 -25.4 -4 1 1 211 13 43 54 13 44 54 --- 16 20 06 27.9 151.5 -1.8 -25.2 56 F 1 213 13 44 12 13 44 54 J1733-1304 16 20 06 39.5 156.6 -1.2 -19.7 -29 1 1 213 13 44 54 13 45 54 --- 16 21 06 39.6 156.9 -1.2 -19.5 31 F 1 215 13 44 54 13 45 54 VX_SGR 16 21 06 28.0 151.7 -1.8 -25.0 -29 1 1 215 13 45 54 13 46 53 --- 16 22 06 28.1 152.0 -1.8 -24.8 31 F 1 216 13 45 54 13 46 53 J1733-1304 16 22 06 39.7 157.2 -1.2 -19.2 -29 1 1 216 13 46 53 13 47 53 --- 16 23 06 39.7 157.5 -1.2 -19.0 31 F 1 218 13 46 53 13 47 53 VX_SGR 16 23 06 28.2 152.2 -1.8 -24.6 -29 1 1 218 13 47 53 13 48 53 --- 16 24 06 28.3 152.4 -1.7 -24.4 31 F 1 220 13 47 53 13 48 53 J1733-1304 16 24 06 39.8 157.8 -1.2 -18.7 -29 1 1 220 13 48 53 13 49 53 --- 16 25 06 39.9 158.1 -1.1 -18.5 31 F 1 222 13 48 53 Schedule for VLBA_PT (Code Pt ) Page 13 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 13 49 53 VX_SGR 16 25 06 28.4 152.7 -1.7 -24.2 -29 1 1 222 13 49 53 13 50 53 --- 16 26 06 28.5 152.9 -1.7 -24.0 31 F 1 224 13 49 53 13 50 53 J1733-1304 16 26 06 40.0 158.4 -1.1 -18.2 -29 1 1 224 13 50 53 13 51 53 --- 16 27 06 40.1 158.7 -1.1 -18.0 31 F 1 226 13 50 53 13 51 53 VX_SGR 16 27 06 28.5 153.2 -1.7 -23.8 -29 1 1 226 13 51 53 13 52 52 --- 16 28 06 28.6 153.4 -1.7 -23.5 31 F 1 228 13 51 53 13 52 52 J1733-1304 16 28 06 40.1 159.0 -1.1 -17.7 -29 1 1 228 13 52 52 13 53 52 --- 16 29 06 40.2 159.3 -1.1 -17.5 31 F 1 230 13 52 52 13 53 52 VX_SGR 16 29 06 28.7 153.6 -1.7 -23.3 -29 1 1 230 13 53 52 13 54 52 --- 16 30 06 28.8 153.9 -1.6 -23.1 31 F 1 232 13 53 52 13 54 52 J1733-1304 16 30 06 40.3 159.6 -1.1 -17.2 -29 1 1 232 13 54 52 13 55 52 --- 16 31 06 40.3 159.9 -1.0 -16.9 31 F 1 234 13 54 52 13 55 52 VX_SGR 16 31 06 28.9 154.1 -1.6 -22.9 -29 1 1 234 13 55 52 13 56 52 --- 16 32 06 29.0 154.4 -1.6 -22.7 31 F 1 236 13 55 52 13 56 52 J1733-1304 16 32 06 40.4 160.2 -1.0 -16.7 -29 1 1 236 13 56 52 13 57 52 --- 16 33 06 40.5 160.5 -1.0 -16.4 31 F 1 238 13 56 52 13 57 52 VX_SGR 16 33 06 29.1 154.6 -1.6 -22.5 -29 1 1 238 13 57 52 13 58 51 --- 16 34 06 29.2 154.9 -1.6 -22.3 31 F 1 240 13 57 52 13 58 51 J1733-1304 16 34 06 40.6 160.8 -1.0 -16.2 -29 1 1 240 13 58 51 13 59 51 --- 16 35 06 40.6 161.1 -1.0 -15.9 31 F 1 242 13 58 51 13 59 51 VX_SGR 16 35 06 29.3 155.1 -1.6 -22.1 -29 1 1 242 13 59 51 14 00 51 --- 16 36 06 29.4 155.4 -1.5 -21.8 31 F 1 244 13 59 51 14 00 51 J1733-1304 16 36 06 40.7 161.4 -1.0 -15.7 -29 1 1 244 14 00 51 14 01 51 --- 16 37 06 40.7 161.7 -0.9 -15.4 31 F 1 245 14 00 51 14 01 51 VX_SGR 16 37 06 29.4 155.6 -1.5 -21.6 -29 1 1 245 14 01 51 14 02 51 --- 16 38 06 29.5 155.9 -1.5 -21.4 31 F 1 247 14 01 51 14 02 51 J1733-1304 16 38 06 40.8 162.1 -0.9 -15.1 -29 1 1 247 14 02 51 14 03 51 --- 16 39 06 40.9 162.4 -0.9 -14.9 31 F 1 249 14 02 51 Schedule for VLBA_PT (Code Pt ) Page 14 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 14 03 51 VX_SGR 16 39 06 29.6 156.1 -1.5 -21.2 -29 1 1 249 14 03 51 14 04 50 --- 16 40 06 29.7 156.3 -1.5 -21.0 31 F 1 251 14 03 51 14 04 50 J1733-1304 16 40 06 40.9 162.7 -0.9 -14.6 -28 1 1 251 14 04 50 14 05 50 --- 16 41 06 41.0 163.0 -0.9 -14.4 31 F 1 253 14 04 50 14 05 50 VX_SGR 16 41 06 29.8 156.6 -1.5 -20.8 -28 1 1 253 14 05 50 14 06 50 --- 16 42 06 29.9 156.8 -1.4 -20.5 31 F 1 255 14 05 50 14 06 50 J1733-1304 16 42 06 41.1 163.3 -0.9 -14.1 -28 1 1 255 14 06 50 14 07 50 --- 16 43 06 41.1 163.6 -0.8 -13.8 31 F 1 257 14 06 50 14 07 50 VX_SGR 16 43 06 29.9 157.1 -1.4 -20.3 -28 1 1 257 14 07 50 14 08 50 --- 16 44 06 30.0 157.3 -1.4 -20.1 31 F 1 259 14 07 50 14 08 50 J1733-1304 16 44 06 41.2 163.9 -0.8 -13.6 -28 1 1 259 14 08 50 14 09 50 --- 16 45 06 41.2 164.2 -0.8 -13.3 32 F 1 261 14 08 50 14 09 50 VX_SGR 16 45 06 30.1 157.6 -1.4 -19.9 -28 1 1 261 14 09 50 14 10 49 --- 16 46 06 30.2 157.9 -1.4 -19.7 32 F 1 263 14 09 50 14 10 49 J1733-1304 16 46 06 41.3 164.6 -0.8 -13.0 -28 1 1 263 14 10 49 14 11 49 --- 16 47 06 41.3 164.9 -0.8 -12.8 32 F 1 265 14 10 49 14 11 49 VX_SGR 16 47 06 30.2 158.1 -1.4 -19.4 -28 1 1 265 14 11 49 14 12 49 --- 16 48 06 30.3 158.4 -1.3 -19.2 32 F 1 267 14 11 49 14 12 49 J1733-1304 16 48 06 41.4 165.2 -0.8 -12.5 -28 1 1 267 14 12 49 14 13 49 --- 16 49 06 41.4 165.5 -0.7 -12.3 32 F 1 269 14 12 49 14 13 49 VX_SGR 16 49 06 30.4 158.6 -1.3 -19.0 -28 1 1 269 14 13 49 14 14 49 --- 16 50 06 30.5 158.9 -1.3 -18.8 32 F 1 271 14 13 49 14 14 49 J1733-1304 16 50 06 41.5 165.8 -0.7 -12.0 -28 1 1 271 14 14 49 14 15 49 --- 16 51 06 41.5 166.1 -0.7 -11.7 32 F 1 272 14 14 49 14 15 49 VX_SGR 16 51 06 30.6 159.1 -1.3 -18.5 -28 1 1 272 14 15 49 14 16 48 --- 16 52 06 30.6 159.4 -1.3 -18.3 32 F 1 274 14 15 49 14 16 48 J1733-1304 16 52 06 41.6 166.5 -0.7 -11.4 -28 1 1 274 14 16 48 14 17 48 --- 16 53 06 41.6 166.8 -0.7 -11.2 32 F 1 276 14 16 48 Schedule for VLBA_PT (Code Pt ) Page 15 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 14 17 48 VX_SGR 16 53 06 30.7 159.6 -1.3 -18.1 -28 1 1 276 14 17 48 14 18 48 --- 16 54 06 30.8 159.9 -1.2 -17.9 32 F 1 278 14 17 48 14 18 48 J1733-1304 16 54 06 41.7 167.1 -0.7 -10.9 -28 1 1 278 14 18 48 14 19 48 --- 16 55 06 41.7 167.4 -0.6 -10.6 32 F 1 280 14 18 48 14 19 48 VX_SGR 16 55 06 30.8 160.1 -1.2 -17.6 -28 1 1 280 14 19 48 14 20 48 --- 16 56 06 30.9 160.4 -1.2 -17.4 32 F 1 282 14 19 48 14 20 48 J1733-1304 16 56 06 41.8 167.7 -0.6 -10.4 -28 1 1 282 14 20 48 14 21 48 --- 16 57 06 41.8 168.1 -0.6 -10.1 32 F 1 284 14 20 48 14 21 48 VX_SGR 16 57 06 31.0 160.7 -1.2 -17.2 -28 1 1 284 14 21 48 14 22 48 --- 16 58 06 31.0 160.9 -1.2 -17.0 32 F 1 286 14 21 48 14 22 48 J1733-1304 16 58 06 41.9 168.4 -0.6 -9.8 -28 1 1 286 14 22 48 14 23 47 --- 16 59 06 41.9 168.7 -0.6 -9.6 32 F 1 288 14 22 48 14 23 47 VX_SGR 16 59 06 31.1 161.2 -1.2 -16.7 -28 1 1 288 14 23 47 14 24 47 --- 17 00 06 31.2 161.4 -1.1 -16.5 32 F 1 290 14 23 47 14 24 47 J1733-1304 17 00 06 41.9 169.0 -0.6 -9.3 -28 1 1 290 14 24 47 14 25 47 --- 17 01 06 42.0 169.4 -0.5 -9.0 32 F 1 292 14 24 47 14 25 47 VX_SGR 17 01 06 31.2 161.7 -1.1 -16.3 -27 1 1 292 14 25 47 14 26 47 --- 17 02 06 31.3 162.0 -1.1 -16.0 32 F 1 294 14 25 47 14 26 47 VX_SGR 17 02 06 31.3 162.0 -1.1 -16.0 -4 1 1 294 Stopped 14 28 47 --- 17 04 06 31.4 162.5 -1.1 -15.6 116 S 1 298 14 28 47 VX_SGR 17 04 06 31.4 162.5 -1.1 -15.6 -4 1 1 298 Stopped 14 30 46 --- 17 06 06 31.6 163.0 -1.0 -15.1 116 S 1 301 14 30 46 VX_SGR 17 06 06 31.6 163.0 -1.0 -15.1 -4 1 1 301 14 30 46 14 32 46 --- 17 08 06 31.7 163.5 -1.0 -14.7 116 F 1 305 14 31 04 14 32 46 VX_SGR 17 08 06 31.7 163.5 -1.0 -14.7 -4 1 1 305 14 32 46 14 33 16 --- 17 08 36 31.7 163.7 -1.0 -14.5 26 F 1 306 14 32 46 14 33 16 J1808-2124 17 08 36 32.5 163.4 -1.0 -14.7 -8 1 1 306 14 33 16 14 33 36 --- 17 08 56 32.5 163.5 -1.0 -14.6 12 F 1 307 14 33 16 Schedule for VLBA_PT (Code Pt ) Page 16 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 14 33 36 VX_SGR 17 08 56 31.7 163.7 -1.0 -14.5 -8 1 1 307 14 33 36 14 34 06 --- 17 09 26 31.8 163.9 -1.0 -14.4 22 F 1 308 14 33 36 14 34 06 J1811-2055 17 09 26 32.8 162.7 -1.0 -15.3 -8 1 1 308 14 34 06 14 34 26 --- 17 09 46 32.9 162.8 -1.0 -15.2 12 F 1 308 14 34 06 14 34 26 VX_SGR 17 09 46 31.8 164.0 -1.0 -14.3 -8 1 1 308 14 34 26 14 34 56 --- 17 10 16 31.8 164.1 -1.0 -14.2 22 F 1 309 14 34 26 14 34 56 J1807-2506 17 10 16 29.0 165.0 -1.0 -13.7 -12 1 1 309 14 34 56 14 35 20 --- 17 10 41 29.0 165.1 -1.0 -13.6 13 F 1 310 14 34 56 14 35 20 VX_SGR 17 10 41 31.8 164.2 -1.0 -14.1 -12 1 1 310 14 35 20 14 35 50 --- 17 11 11 31.9 164.3 -1.0 -13.9 18 F 1 311 14 35 20 14 35 50 J1808-2124 17 11 11 32.6 164.1 -1.0 -14.1 -8 1 1 311 14 35 50 14 36 10 --- 17 11 31 32.7 164.2 -1.0 -14.0 12 F 1 312 14 35 50 14 36 10 VX_SGR 17 11 31 31.9 164.4 -1.0 -13.9 -8 1 1 312 14 36 10 14 36 40 --- 17 12 01 31.9 164.6 -0.9 -13.7 22 F 1 313 14 36 10 14 36 40 J1811-2055 17 12 01 33.0 163.4 -1.0 -14.7 -8 1 1 313 14 36 40 14 37 00 --- 17 12 21 33.0 163.5 -1.0 -14.6 12 F 1 313 14 36 40 14 37 00 VX_SGR 17 12 21 31.9 164.6 -0.9 -13.7 -8 1 1 313 14 37 00 14 37 30 --- 17 12 51 31.9 164.8 -0.9 -13.6 22 F 1 314 14 37 00 14 37 30 J1807-2506 17 12 51 29.2 165.6 -0.9 -13.1 -12 1 1 314 14 37 30 14 37 55 --- 17 13 16 29.2 165.8 -0.9 -13.0 13 F 1 315 14 37 30 14 37 55 VX_SGR 17 13 16 32.0 164.9 -0.9 -13.5 -12 1 1 315 14 37 55 14 38 25 --- 17 13 46 32.0 165.0 -0.9 -13.3 18 F 1 316 14 37 55 14 38 25 J1808-2124 17 13 46 32.8 164.8 -0.9 -13.5 -8 1 1 316 14 38 25 14 38 45 --- 17 14 06 32.8 164.9 -0.9 -13.4 12 F 1 317 14 38 25 14 38 45 VX_SGR 17 14 06 32.0 165.1 -0.9 -13.3 -8 1 1 317 14 38 45 14 39 15 --- 17 14 36 32.0 165.2 -0.9 -13.1 22 F 1 318 14 38 45 14 39 15 J1811-2055 17 14 36 33.1 164.1 -1.0 -14.1 -8 1 1 318 14 39 15 14 39 35 --- 17 14 56 33.2 164.2 -0.9 -14.0 12 F 1 318 14 39 15 Schedule for VLBA_PT (Code Pt ) Page 17 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 14 39 35 VX_SGR 17 14 56 32.1 165.3 -0.9 -13.1 -8 1 1 318 14 39 35 14 40 05 --- 17 15 26 32.1 165.5 -0.9 -12.9 22 F 1 319 14 39 35 14 40 05 J1807-2506 17 15 26 29.3 166.3 -0.9 -12.5 -12 1 1 319 14 40 05 14 40 30 --- 17 15 51 29.3 166.4 -0.9 -12.4 13 F 1 320 14 40 05 14 40 30 VX_SGR 17 15 51 32.1 165.6 -0.9 -12.8 -12 1 1 320 14 40 30 14 41 00 --- 17 16 21 32.1 165.7 -0.9 -12.7 18 F 1 321 14 40 30 14 41 00 J1808-2124 17 16 21 32.9 165.5 -0.9 -12.9 -8 1 1 321 14 41 00 14 41 19 --- 17 16 41 32.9 165.6 -0.9 -12.8 12 F 1 322 14 41 00 14 41 19 VX_SGR 17 16 41 32.1 165.8 -0.9 -12.6 -8 1 1 322 14 41 19 14 41 49 --- 17 17 11 32.2 165.9 -0.9 -12.5 22 F 1 323 14 41 19 14 41 49 J1811-2055 17 17 11 33.3 164.8 -0.9 -13.4 -8 1 1 323 14 41 49 14 42 09 --- 17 17 31 33.3 164.9 -0.9 -13.4 12 F 1 323 14 41 49 14 42 09 VX_SGR 17 17 31 32.2 166.0 -0.9 -12.5 -8 1 1 323 14 42 09 14 42 39 --- 17 18 01 32.2 166.2 -0.8 -12.3 22 F 1 324 14 42 09 14 42 39 J1807-2506 17 18 01 29.4 167.0 -0.8 -11.9 -12 1 1 324 14 42 39 14 43 04 --- 17 18 26 29.4 167.1 -0.8 -11.8 13 F 1 325 14 42 39 14 43 04 VX_SGR 17 18 26 32.2 166.3 -0.8 -12.2 -12 1 1 325 14 43 04 14 43 34 --- 17 18 56 32.3 166.4 -0.8 -12.1 18 F 1 326 14 43 04 14 43 34 J1808-2124 17 18 56 33.0 166.2 -0.8 -12.2 -8 1 1 326 14 43 34 14 43 54 --- 17 19 16 33.1 166.3 -0.8 -12.2 12 F 1 327 14 43 34 14 43 54 VX_SGR 17 19 16 32.3 166.5 -0.8 -12.0 -8 1 1 327 14 43 54 14 44 24 --- 17 19 46 32.3 166.6 -0.8 -11.9 22 F 1 328 14 43 54 14 44 24 J1811-2055 17 19 46 33.4 165.5 -0.9 -12.8 -8 1 1 328 14 44 24 14 44 44 --- 17 20 06 33.4 165.6 -0.9 -12.7 12 F 1 328 14 44 24 14 44 44 VX_SGR 17 20 06 32.3 166.7 -0.8 -11.8 -8 1 1 328 14 44 44 14 45 14 --- 17 20 36 32.3 166.8 -0.8 -11.7 22 F 1 329 14 44 44 14 45 14 J1807-2506 17 20 36 29.5 167.6 -0.8 -11.3 -12 1 1 329 14 45 14 14 45 39 --- 17 21 01 29.5 167.7 -0.8 -11.2 13 F 1 330 14 45 14 Schedule for VLBA_PT (Code Pt ) Page 18 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 14 45 39 VX_SGR 17 21 01 32.4 167.0 -0.8 -11.6 -12 1 1 330 14 45 39 14 46 09 --- 17 21 31 32.4 167.1 -0.8 -11.5 18 F 1 331 14 45 39 14 46 09 J1808-2124 17 21 31 33.2 166.9 -0.8 -11.6 -8 1 1 331 14 46 09 14 46 29 --- 17 21 51 33.2 167.0 -0.8 -11.5 12 F 1 332 14 46 09 14 46 29 VX_SGR 17 21 51 32.4 167.2 -0.8 -11.4 -8 1 1 332 14 46 29 14 46 59 --- 17 22 21 32.4 167.3 -0.8 -11.3 22 F 1 333 14 46 29 14 46 59 J1811-2055 17 22 21 33.6 166.2 -0.8 -12.2 -8 1 1 333 14 46 59 14 47 18 --- 17 22 41 33.6 166.3 -0.8 -12.1 12 F 1 333 14 46 59 14 47 18 VX_SGR 17 22 41 32.4 167.4 -0.8 -11.2 -8 1 1 333 14 47 18 14 47 48 --- 17 23 11 32.5 167.5 -0.8 -11.1 22 F 1 334 14 47 18 14 47 48 J1807-2506 17 23 11 29.6 168.3 -0.7 -10.7 -12 1 1 334 14 47 48 14 48 13 --- 17 23 36 29.7 168.4 -0.7 -10.6 13 F 1 335 14 47 48 14 48 13 VX_SGR 17 23 36 32.5 167.7 -0.7 -11.0 -12 1 1 335 14 48 13 14 48 43 --- 17 24 06 32.5 167.8 -0.7 -10.9 18 F 1 336 14 48 13 14 48 43 J1808-2124 17 24 06 33.3 167.6 -0.7 -11.0 -8 1 1 336 14 48 43 14 49 03 --- 17 24 26 33.3 167.7 -0.7 -10.9 12 F 1 337 14 48 43 14 49 03 VX_SGR 17 24 26 32.5 167.9 -0.7 -10.8 -8 1 1 337 14 49 03 14 49 33 --- 17 24 56 32.5 168.0 -0.7 -10.7 22 F 1 338 14 49 03 14 49 33 J1811-2055 17 24 56 33.7 166.9 -0.8 -11.6 -8 1 1 338 14 49 33 14 49 53 --- 17 25 16 33.7 167.0 -0.8 -11.5 12 F 1 338 14 49 33 14 49 53 VX_SGR 17 25 16 32.5 168.1 -0.7 -10.6 -8 1 1 338 14 49 53 14 50 23 --- 17 25 46 32.6 168.2 -0.7 -10.5 22 F 1 339 14 49 53 14 50 23 J1807-2506 17 25 46 29.7 168.9 -0.7 -10.1 -12 1 1 339 14 50 23 14 50 48 --- 17 26 11 29.8 169.0 -0.7 -10.0 13 F 1 340 14 50 23 14 50 48 VX_SGR 17 26 11 32.6 168.3 -0.7 -10.4 -12 1 1 340 14 50 48 14 51 18 --- 17 26 41 32.6 168.5 -0.7 -10.3 18 F 1 341 14 50 48 14 51 18 J1808-2124 17 26 41 33.4 168.3 -0.7 -10.4 -8 1 1 341 14 51 18 14 51 38 --- 17 27 01 33.4 168.4 -0.7 -10.3 12 F 1 342 14 51 18 Schedule for VLBA_PT (Code Pt ) Page 19 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 14 51 38 VX_SGR 17 27 01 32.6 168.6 -0.7 -10.2 -8 1 1 342 14 51 38 14 52 08 --- 17 27 31 32.6 168.7 -0.7 -10.1 22 F 1 343 14 51 38 14 52 08 J1811-2055 17 27 31 33.8 167.6 -0.7 -11.0 -8 1 1 343 14 52 08 14 52 28 --- 17 27 51 33.8 167.7 -0.7 -10.9 12 F 1 343 14 52 08 14 52 28 VX_SGR 17 27 51 32.7 168.8 -0.7 -10.0 -8 1 1 343 14 52 28 14 52 58 --- 17 28 21 32.7 168.9 -0.7 -9.9 22 F 1 344 14 52 28 14 52 58 J1807-2506 17 28 21 29.8 169.6 -0.7 -9.5 -12 1 1 344 14 52 58 14 53 22 --- 17 28 46 29.9 169.7 -0.7 -9.4 13 F 1 345 14 52 58 14 53 22 VX_SGR 17 28 46 32.7 169.0 -0.7 -9.8 -12 1 1 345 14 53 22 14 53 52 --- 17 29 16 32.7 169.2 -0.7 -9.6 18 F 1 346 14 53 22 14 53 52 J1808-2124 17 29 16 33.5 169.0 -0.7 -9.7 -8 1 1 346 14 53 52 14 54 12 --- 17 29 36 33.5 169.1 -0.7 -9.7 12 F 1 347 14 53 52 14 54 12 VX_SGR 17 29 36 32.7 169.3 -0.6 -9.6 -8 1 1 347 14 54 12 14 54 42 --- 17 30 06 32.7 169.4 -0.6 -9.4 22 F 1 348 14 54 12 14 54 42 J1811-2055 17 30 06 33.9 168.3 -0.7 -10.3 -8 1 1 348 14 54 42 14 55 02 --- 17 30 26 33.9 168.4 -0.7 -10.2 12 F 1 348 14 54 42 14 55 02 VX_SGR 17 30 26 32.8 169.5 -0.6 -9.4 -8 1 1 348 14 55 02 14 55 32 --- 17 30 56 32.8 169.6 -0.6 -9.2 22 F 1 349 14 55 02 14 55 32 J1807-2506 17 30 56 29.9 170.3 -0.6 -8.9 -12 1 1 349 14 55 32 14 55 57 --- 17 31 21 30.0 170.4 -0.6 -8.8 13 F 1 350 14 55 32 14 55 57 VX_SGR 17 31 21 32.8 169.7 -0.6 -9.1 -12 1 1 350 14 55 57 14 56 27 --- 17 31 51 32.8 169.9 -0.6 -9.0 18 F 1 351 14 55 57 14 56 27 J1808-2124 17 31 51 33.6 169.7 -0.6 -9.1 -8 1 1 351 14 56 27 14 56 47 --- 17 32 11 33.6 169.8 -0.6 -9.0 12 F 1 352 14 56 27 14 56 47 VX_SGR 17 32 11 32.8 170.0 -0.6 -8.9 -8 1 1 352 14 56 47 14 57 17 --- 17 32 41 32.8 170.1 -0.6 -8.8 22 F 1 353 14 56 47 14 57 17 J1811-2055 17 32 41 34.0 169.0 -0.6 -9.7 -8 1 1 353 14 57 17 14 57 37 --- 17 33 01 34.0 169.1 -0.6 -9.6 12 F 1 353 14 57 17 Schedule for VLBA_PT (Code Pt ) Page 20 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 14 57 37 VX_SGR 17 33 01 32.8 170.2 -0.6 -8.7 -8 1 1 353 14 57 37 14 58 07 --- 17 33 31 32.9 170.3 -0.6 -8.6 22 F 1 354 14 57 37 14 58 07 J1807-2506 17 33 31 30.0 170.9 -0.6 -8.3 -12 1 1 354 14 58 07 14 58 32 --- 17 33 56 30.0 171.0 -0.6 -8.2 13 F 1 355 14 58 07 14 58 32 VX_SGR 17 33 56 32.9 170.5 -0.6 -8.5 -12 1 1 355 14 58 32 14 59 02 --- 17 34 26 32.9 170.6 -0.6 -8.4 18 F 1 356 14 58 32 14 59 02 J1808-2124 17 34 26 33.7 170.4 -0.6 -8.5 -8 1 1 356 14 59 02 14 59 22 --- 17 34 46 33.7 170.5 -0.6 -8.4 12 F 1 357 14 59 02 14 59 22 VX_SGR 17 34 46 32.9 170.7 -0.6 -8.3 -8 1 1 357 14 59 22 14 59 51 --- 17 35 16 32.9 170.8 -0.6 -8.2 22 F 1 358 14 59 22 14 59 51 J1811-2055 17 35 16 34.1 169.7 -0.6 -9.1 -8 1 1 358 14 59 51 15 00 11 --- 17 35 36 34.1 169.8 -0.6 -9.0 12 F 1 358 14 59 51 15 00 11 VX_SGR 17 35 36 32.9 170.9 -0.5 -8.1 -8 1 1 358 15 00 11 15 00 41 --- 17 36 06 32.9 171.0 -0.5 -8.0 22 F 1 359 15 00 11 15 00 41 J1807-2506 17 36 06 30.1 171.6 -0.5 -7.7 -12 1 1 359 15 00 41 15 01 06 --- 17 36 31 30.1 171.7 -0.5 -7.6 13 F 1 360 15 00 41 15 01 06 VX_SGR 17 36 31 33.0 171.2 -0.5 -7.9 -12 1 1 360 15 01 06 15 01 36 --- 17 37 01 33.0 171.3 -0.5 -7.8 18 F 1 361 15 01 06 15 01 36 J1808-2124 17 37 01 33.8 171.1 -0.5 -7.8 -8 1 1 361 15 01 36 15 01 56 --- 17 37 21 33.8 171.2 -0.5 -7.8 12 F 1 362 15 01 36 15 01 56 VX_SGR 17 37 21 33.0 171.4 -0.5 -7.7 -8 1 1 362 15 01 56 15 02 26 --- 17 37 51 33.0 171.5 -0.5 -7.6 22 F 1 363 15 01 56 15 02 26 J1811-2055 17 37 51 34.2 170.5 -0.6 -8.4 -8 1 1 363 15 02 26 15 02 46 --- 17 38 11 34.2 170.6 -0.6 -8.3 12 F 1 363 15 02 26 15 02 46 VX_SGR 17 38 11 33.0 171.6 -0.5 -7.5 -8 1 1 363 15 02 46 15 03 16 --- 17 38 41 33.0 171.7 -0.5 -7.4 22 F 1 364 15 02 46 15 03 16 J1807-2506 17 38 41 30.2 172.3 -0.5 -7.0 -12 1 1 364 15 03 16 15 03 41 --- 17 39 06 30.2 172.4 -0.5 -6.9 13 F 1 365 15 03 16 Schedule for VLBA_PT (Code Pt ) Page 21 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 15 03 41 VX_SGR 17 39 06 33.0 171.9 -0.5 -7.3 -12 1 1 365 15 03 41 15 04 11 --- 17 39 36 33.1 172.0 -0.5 -7.1 18 F 1 366 15 03 41 15 04 11 J1808-2124 17 39 36 33.9 171.9 -0.5 -7.2 -8 1 1 366 15 04 11 15 04 31 --- 17 39 56 33.9 172.0 -0.5 -7.1 12 F 1 367 15 04 11 15 04 31 VX_SGR 17 39 56 33.1 172.1 -0.5 -7.1 -8 1 1 367 15 04 31 15 05 01 --- 17 40 26 33.1 172.2 -0.5 -6.9 22 F 1 368 15 04 31 15 05 01 J1811-2055 17 40 26 34.3 171.2 -0.5 -7.8 -8 1 1 368 15 05 01 15 05 21 --- 17 40 46 34.3 171.3 -0.5 -7.7 12 F 1 368 15 05 01 15 05 21 VX_SGR 17 40 46 33.1 172.3 -0.5 -6.9 -8 1 1 368 15 05 21 15 05 50 --- 17 41 16 33.1 172.5 -0.5 -6.7 22 F 1 369 15 05 21 15 05 50 J1807-2506 17 41 16 30.2 172.9 -0.4 -6.4 -12 1 1 369 15 05 50 15 06 15 --- 17 41 41 30.3 173.1 -0.4 -6.3 13 F 1 370 15 05 50 15 06 15 VX_SGR 17 41 41 33.1 172.6 -0.4 -6.6 -12 1 1 370 15 06 15 15 06 45 --- 17 42 11 33.1 172.7 -0.4 -6.5 18 F 1 371 15 06 15 15 06 45 J1808-2124 17 42 11 33.9 172.6 -0.4 -6.6 -8 1 1 371 15 06 45 15 07 05 --- 17 42 31 33.9 172.7 -0.4 -6.5 12 F 1 372 15 06 45 15 07 05 VX_SGR 17 42 31 33.1 172.8 -0.4 -6.4 -8 1 1 372 15 07 05 15 07 35 --- 17 43 01 33.1 172.9 -0.4 -6.3 22 F 1 373 15 07 05 15 07 35 J1811-2055 17 43 01 34.4 171.9 -0.5 -7.2 -8 1 1 373 15 07 35 15 07 55 --- 17 43 21 34.4 172.0 -0.5 -7.1 12 F 1 373 15 07 35 15 07 55 VX_SGR 17 43 21 33.2 173.0 -0.4 -6.2 -8 1 1 373 15 07 55 15 08 25 --- 17 43 51 33.2 173.2 -0.4 -6.1 21 F 1 374 15 07 55 15 08 25 J1807-2506 17 43 51 30.3 173.6 -0.4 -5.8 -12 1 1 374 15 08 25 15 08 50 --- 17 44 16 30.3 173.7 -0.4 -5.7 13 F 1 375 15 08 25 15 10 51 J0157+7442 17 46 17 25.2 14.1 -8.2 -50.0 8 1 1 375 15 10 51 15 11 51 --- 17 47 17 25.2 14.1 -8.2 -50.2 60 F 1 377 15 11 09 15 14 53 J2253+1608 17 50 20 20.4 83.9 -5.1 -58.8 130 1 1 377 15 14 53 15 15 53 --- 17 51 20 20.6 84.0 -5.1 -58.8 60 F 1 379 15 15 11 Schedule for VLBA_PT (Code Pt ) Page 22 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 15 18 11 J1638+5720 17 53 39 63.7 -23.2 1.3 143.0 46 1 1 379 15 18 11 15 19 11 --- 17 54 39 63.6 -23.4 1.3 142.6 60 F 1 381 15 18 29 15 19 46 J1748+7005 17 55 13 54.2 -1.0 0.1 177.6 10 1 1 381 15 19 46 15 20 45 --- 17 56 13 54.2 -1.1 0.1 177.2 60 F 1 383 15 20 04 15 21 27 J1740+5211 17 56 55 71.9 -8.0 0.3 169.2 0 1 1 383 15 21 27 15 22 27 --- 17 57 55 71.9 -8.5 0.3 168.6 60 F 1 385 15 21 45 15 24 07 J2202+4216 17 59 35 42.6 61.3 -4.1 -78.6 35 1 1 385 15 24 07 15 25 06 --- 18 00 35 42.8 61.4 -4.0 -78.7 60 F 1 387 15 24 25 15 26 27 J1642+6856 18 01 56 53.6 -11.9 1.3 151.6 26 1 1 387 15 26 27 15 27 27 --- 18 02 56 53.6 -12.1 1.3 151.3 60 F 1 389 15 26 45 15 30 28 J1337-1257 18 05 57 10.9 245.9 4.5 50.7 3 1 1 389 15 30 28 15 31 28 --- 18 06 57 10.7 246.1 4.5 50.8 60 F 1 391 15 30 46 15 33 31 J2354+4553 18 09 01 26.1 410.7 -5.8 -66.7 8 1 1 391 15 33 31 15 34 31 --- 18 10 01 26.3 410.7 -5.7 -66.8 60 F 1 392 15 33 49 15 36 47 J1512-0905 18 12 17 29.3 232.9 3.0 41.8 11 1 1 392 15 36 47 15 37 46 --- 18 13 17 29.2 233.1 3.0 42.0 60 F 1 394 15 37 05 15 39 42 J0019+7327 18 15 13 32.4 379.6 -6.1 -77.9 12 1 1 394 15 39 42 15 40 42 --- 18 16 13 32.4 379.7 -6.1 -78.1 60 F 1 396 15 40 00 15 43 19 J1924-2914 18 18 51 24.6 164.1 -1.1 -15.1 7 1 1 396 15 43 19 15 44 19 --- 18 19 51 24.6 164.3 -1.1 -14.8 60 F 1 398 15 43 37 15 46 15 J0136+4751 18 21 47 13.8 40.8 -7.3 -53.6 28 1 1 398 15 46 15 15 47 15 --- 18 22 47 13.9 40.9 -7.2 -53.7 60 F 1 400 15 46 33 15 48 59 J1806+6949 18 24 31 54.4 -2.6 0.3 173.7 17 1 1 400 15 48 59 15 49 59 --- 18 25 31 54.4 -2.8 0.3 173.3 60 F 1 402 15 49 17 15 52 04 J2225-0457 18 27 37 21.6 112.4 -4.0 -50.0 42 1 1 402 15 52 04 15 53 03 --- 18 28 37 21.8 112.6 -4.0 -50.0 60 F 1 404 15 52 22 Source only 9.3 degrees from the Sun. 15 53 03 J1924-2914 18 28 37 25.1 166.3 -0.9 -12.9 -42 1 1 404 15 53 03 15 56 03 --- 18 31 37 25.2 167.0 -0.9 -12.3 138 F 1 410 15 53 03 Schedule for VLBA_PT (Code Pt ) Page 23 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 15 56 03 VX_SGR 18 31 37 33.2 186.4 0.4 5.7 -22 1 1 410 Stopped 15 58 03 --- 18 33 37 33.2 186.9 0.4 6.2 98 S 1 414 15 58 03 VX_SGR 18 33 37 33.2 186.9 0.4 6.2 -4 1 1 414 Stopped 16 00 02 --- 18 35 37 33.1 187.5 0.5 6.7 116 S 1 418 16 00 02 VX_SGR 18 35 37 33.1 187.5 0.5 6.7 -4 1 1 418 16 00 02 16 02 02 --- 18 37 37 33.1 188.0 0.5 7.2 116 F 1 421 16 00 20 16 02 02 VX_SGR 18 37 37 33.1 188.0 0.5 7.2 -4 1 1 421 16 02 02 16 02 32 --- 18 38 07 33.0 188.2 0.5 7.3 26 F 1 422 16 02 02 16 02 32 J1808-2124 18 38 07 33.8 188.3 0.5 7.3 -8 1 1 422 16 02 32 16 02 52 --- 18 38 27 33.8 188.4 0.5 7.4 12 F 1 423 16 02 32 16 02 52 VX_SGR 18 38 27 33.0 188.3 0.5 7.4 -8 1 1 423 16 02 52 16 03 22 --- 18 38 57 33.0 188.4 0.5 7.5 22 F 1 424 16 02 52 16 03 22 J1811-2055 18 38 57 34.4 187.7 0.5 6.8 -9 1 1 424 16 03 22 16 03 42 --- 18 39 17 34.4 187.8 0.5 6.9 11 F 1 425 16 03 22 16 03 42 VX_SGR 18 39 17 33.0 188.5 0.5 7.6 -9 1 1 425 16 03 42 16 04 12 --- 18 39 47 33.0 188.6 0.5 7.7 21 F 1 426 16 03 42 16 04 12 J1807-2506 18 39 47 30.1 188.3 0.5 7.5 -12 1 1 426 16 04 12 16 04 37 --- 18 40 12 30.1 188.4 0.5 7.6 13 F 1 426 16 04 12 16 04 37 VX_SGR 18 40 12 33.0 188.7 0.5 7.8 -12 1 1 426 16 04 37 16 05 06 --- 18 40 42 33.0 188.9 0.5 7.9 18 F 1 427 16 04 37 16 05 06 J1808-2124 18 40 42 33.8 189.0 0.5 8.0 -8 1 1 427 16 05 06 16 05 26 --- 18 41 02 33.8 189.1 0.5 8.1 12 F 1 428 16 05 06 16 05 26 VX_SGR 18 41 02 32.9 189.0 0.5 8.0 -8 1 1 428 16 05 26 16 05 56 --- 18 41 32 32.9 189.1 0.5 8.1 22 F 1 429 16 05 26 16 05 56 J1811-2055 18 41 32 34.3 188.5 0.5 7.5 -9 1 1 429 16 05 56 16 06 16 --- 18 41 52 34.3 188.6 0.5 7.6 11 F 1 430 16 05 56 16 06 16 VX_SGR 18 41 52 32.9 189.2 0.6 8.2 -9 1 1 430 16 06 16 16 06 46 --- 18 42 22 32.9 189.3 0.6 8.3 21 F 1 431 16 06 16 Schedule for VLBA_PT (Code Pt ) Page 24 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 16 06 46 J1807-2506 18 42 22 30.0 188.9 0.6 8.2 -12 1 1 431 16 06 46 16 07 11 --- 18 42 47 30.0 189.0 0.6 8.2 13 F 1 431 16 06 46 16 07 11 VX_SGR 18 42 47 32.9 189.4 0.6 8.4 -12 1 1 431 16 07 11 16 07 41 --- 18 43 17 32.9 189.6 0.6 8.5 18 F 1 432 16 07 11 16 07 41 J1808-2124 18 43 17 33.7 189.7 0.6 8.6 -8 1 1 432 16 07 41 16 08 01 --- 18 43 37 33.7 189.8 0.6 8.7 12 F 1 433 16 07 41 16 08 01 VX_SGR 18 43 37 32.9 189.7 0.6 8.6 -8 1 1 433 16 08 01 16 08 31 --- 18 44 07 32.8 189.8 0.6 8.7 22 F 1 434 16 08 01 16 08 31 J1811-2055 18 44 07 34.2 189.2 0.5 8.1 -9 1 1 434 16 08 31 16 08 51 --- 18 44 27 34.2 189.3 0.5 8.2 11 F 1 435 16 08 31 16 08 51 VX_SGR 18 44 27 32.8 189.9 0.6 8.8 -9 1 1 435 16 08 51 16 09 21 --- 18 44 57 32.8 190.0 0.6 8.9 21 F 1 436 16 08 51 16 09 21 J1807-2506 18 44 57 30.0 189.6 0.6 8.8 -12 1 1 436 16 09 21 16 09 46 --- 18 45 22 29.9 189.7 0.6 8.9 13 F 1 436 16 09 21 16 09 46 VX_SGR 18 45 22 32.8 190.1 0.6 9.0 -12 1 1 436 16 09 46 16 10 16 --- 18 45 52 32.8 190.3 0.6 9.2 18 F 1 437 16 09 46 16 10 16 J1808-2124 18 45 52 33.6 190.4 0.6 9.2 -8 1 1 437 16 10 16 16 10 36 --- 18 46 12 33.6 190.5 0.6 9.3 12 F 1 438 16 10 16 16 10 36 VX_SGR 18 46 12 32.8 190.4 0.6 9.2 -8 1 1 438 16 10 36 16 11 05 --- 18 46 42 32.8 190.5 0.6 9.4 22 F 1 439 16 10 36 16 11 05 J1811-2055 18 46 42 34.2 189.9 0.6 8.8 -9 1 1 439 16 11 05 16 11 25 --- 18 47 02 34.1 190.0 0.6 8.8 11 F 1 440 16 11 05 16 11 25 VX_SGR 18 47 02 32.7 190.6 0.6 9.4 -9 1 1 440 16 11 25 16 11 55 --- 18 47 32 32.7 190.7 0.6 9.6 21 F 1 441 16 11 25 16 11 55 J1807-2506 18 47 32 29.9 190.3 0.7 9.4 -12 1 1 441 16 11 55 16 12 20 --- 18 47 57 29.8 190.4 0.7 9.5 13 F 1 441 16 11 55 16 12 20 VX_SGR 18 47 57 32.7 190.8 0.7 9.7 -12 1 1 441 16 12 20 16 12 50 --- 18 48 27 32.7 191.0 0.7 9.8 18 F 1 442 16 12 20 Schedule for VLBA_PT (Code Pt ) Page 25 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 16 12 50 J1808-2124 18 48 27 33.5 191.1 0.7 9.9 -8 1 1 442 16 12 50 16 13 10 --- 18 48 47 33.5 191.2 0.7 9.9 12 F 1 443 16 12 50 16 13 10 VX_SGR 18 48 47 32.7 191.1 0.7 9.9 -8 1 1 443 16 13 10 16 13 40 --- 18 49 17 32.7 191.2 0.7 10.0 22 F 1 444 16 13 10 16 13 40 J1811-2055 18 49 17 34.1 190.6 0.6 9.4 -9 1 1 444 16 13 40 16 14 00 --- 18 49 37 34.0 190.7 0.6 9.5 11 F 1 445 16 13 40 16 14 00 VX_SGR 18 49 37 32.6 191.3 0.7 10.1 -9 1 1 445 16 14 00 16 14 30 --- 18 50 07 32.6 191.4 0.7 10.2 21 F 1 446 16 14 00 16 14 30 J1807-2506 18 50 07 29.8 190.9 0.7 10.0 -12 1 1 446 16 14 30 16 14 55 --- 18 50 32 29.7 191.0 0.7 10.1 13 F 1 446 16 14 30 16 14 55 VX_SGR 18 50 32 32.6 191.5 0.7 10.3 -12 1 1 446 16 14 55 16 15 25 --- 18 51 02 32.6 191.7 0.7 10.4 18 F 1 447 16 14 55 16 15 25 J1808-2124 18 51 02 33.4 191.8 0.7 10.5 -8 1 1 447 16 15 25 16 15 45 --- 18 51 22 33.4 191.9 0.7 10.6 12 F 1 448 16 15 25 16 15 45 VX_SGR 18 51 22 32.6 191.8 0.7 10.5 -8 1 1 448 16 15 45 16 16 15 --- 18 51 52 32.5 191.9 0.7 10.6 22 F 1 449 16 15 45 16 16 15 J1811-2055 18 51 52 34.0 191.4 0.7 10.0 -9 1 1 449 16 16 15 16 16 35 --- 18 52 12 33.9 191.4 0.7 10.1 11 F 1 450 16 16 15 16 16 35 VX_SGR 18 52 12 32.5 192.0 0.7 10.7 -9 1 1 450 16 16 35 16 17 04 --- 18 52 42 32.5 192.1 0.7 10.8 21 F 1 451 16 16 35 16 17 04 J1807-2506 18 52 42 29.7 191.6 0.7 10.6 -12 1 1 451 16 17 04 16 17 29 --- 18 53 07 29.6 191.7 0.7 10.7 13 F 1 451 16 17 04 16 17 29 VX_SGR 18 53 07 32.5 192.2 0.7 10.9 -12 1 1 451 16 17 29 16 17 59 --- 18 53 37 32.5 192.4 0.8 11.0 18 F 1 452 16 17 29 16 17 59 J1808-2124 18 53 37 33.3 192.5 0.8 11.1 -8 1 1 452 16 17 59 16 18 19 --- 18 53 57 33.3 192.6 0.8 11.2 12 F 1 453 16 17 59 16 18 19 VX_SGR 18 53 57 32.5 192.5 0.8 11.1 -8 1 1 453 16 18 19 16 18 49 --- 18 54 27 32.4 192.6 0.8 11.2 22 F 1 454 16 18 19 Schedule for VLBA_PT (Code Pt ) Page 26 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 16 18 49 J1811-2055 18 54 27 33.8 192.1 0.7 10.7 -9 1 1 454 16 18 49 16 19 09 --- 18 54 47 33.8 192.2 0.7 10.7 11 F 1 455 16 18 49 16 19 09 VX_SGR 18 54 47 32.4 192.7 0.8 11.3 -9 1 1 455 16 19 09 16 19 39 --- 18 55 17 32.4 192.8 0.8 11.4 21 F 1 455 16 19 09 16 19 39 J1807-2506 18 55 17 29.5 192.3 0.8 11.2 -12 1 1 455 16 19 39 16 20 04 --- 18 55 42 29.5 192.4 0.8 11.3 13 F 1 456 16 19 39 16 20 04 VX_SGR 18 55 42 32.4 192.9 0.8 11.5 -12 1 1 456 16 20 04 16 20 34 --- 18 56 12 32.4 193.1 0.8 11.6 18 F 1 457 16 20 04 16 20 34 J1808-2124 18 56 12 33.1 193.3 0.8 11.7 -8 1 1 457 16 20 34 16 20 54 --- 18 56 32 33.1 193.3 0.8 11.8 12 F 1 458 16 20 34 16 20 54 VX_SGR 18 56 32 32.3 193.2 0.8 11.7 -8 1 1 458 16 20 54 16 21 24 --- 18 57 02 32.3 193.3 0.8 11.8 22 F 1 459 16 20 54 16 21 24 J1811-2055 18 57 02 33.7 192.8 0.8 11.3 -9 1 1 459 16 21 24 16 21 44 --- 18 57 22 33.7 192.9 0.8 11.4 11 F 1 460 16 21 24 16 21 44 VX_SGR 18 57 22 32.3 193.4 0.8 11.9 -9 1 1 460 16 21 44 16 22 14 --- 18 57 52 32.3 193.5 0.8 12.0 21 F 1 460 16 21 44 16 22 14 J1807-2506 18 57 52 29.4 192.9 0.8 11.8 -12 1 1 460 16 22 14 16 22 39 --- 18 58 17 29.4 193.0 0.8 11.9 13 F 1 461 16 22 14 16 22 39 VX_SGR 18 58 17 32.3 193.6 0.8 12.1 -12 1 1 461 16 22 39 16 23 08 --- 18 58 47 32.2 193.8 0.8 12.3 18 F 1 462 16 22 39 16 23 08 J1808-2124 18 58 47 33.0 194.0 0.8 12.4 -8 1 1 462 16 23 08 16 23 28 --- 18 59 07 33.0 194.0 0.8 12.4 12 F 1 463 16 23 08 16 23 28 VX_SGR 18 59 07 32.2 193.8 0.8 12.3 -8 1 1 463 16 23 28 16 23 58 --- 18 59 37 32.2 194.0 0.9 12.5 22 F 1 464 16 23 28 16 23 58 J1811-2055 18 59 37 33.6 193.5 0.8 11.9 -9 1 1 464 16 23 58 16 24 18 --- 18 59 57 33.6 193.6 0.8 12.0 11 F 1 465 16 23 58 16 24 18 VX_SGR 18 59 57 32.2 194.1 0.9 12.5 -9 1 1 465 16 24 18 16 24 48 --- 19 00 27 32.1 194.2 0.9 12.7 21 F 1 465 16 24 18 Schedule for VLBA_PT (Code Pt ) Page 27 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 16 24 48 J1807-2506 19 00 27 29.3 193.6 0.9 12.4 -12 1 1 465 16 24 48 16 25 13 --- 19 00 52 29.3 193.7 0.9 12.5 13 F 1 466 16 24 48 16 25 13 VX_SGR 19 00 52 32.1 194.3 0.9 12.7 -12 1 1 466 16 25 13 16 25 43 --- 19 01 22 32.1 194.5 0.9 12.9 18 F 1 467 16 25 13 16 25 43 J1808-2124 19 01 22 32.9 194.7 0.9 13.0 -8 1 1 467 16 25 43 16 26 03 --- 19 01 42 32.9 194.7 0.9 13.1 12 F 1 468 16 25 43 16 26 03 VX_SGR 19 01 42 32.1 194.5 0.9 12.9 -8 1 1 468 16 26 03 16 26 33 --- 19 02 12 32.1 194.7 0.9 13.1 22 F 1 469 16 26 03 16 26 33 J1811-2055 19 02 12 33.5 194.2 0.8 12.5 -9 1 1 469 16 26 33 16 26 53 --- 19 02 32 33.5 194.3 0.8 12.6 11 F 1 469 16 26 33 16 26 53 VX_SGR 19 02 32 32.0 194.8 0.9 13.1 -9 1 1 469 16 26 53 16 27 23 --- 19 03 02 32.0 194.9 0.9 13.3 21 F 1 470 16 26 53 16 27 23 J1807-2506 19 03 02 29.2 194.2 0.9 13.0 -12 1 1 470 16 27 23 16 27 48 --- 19 03 27 29.2 194.3 0.9 13.1 13 F 1 471 16 27 23 16 27 48 VX_SGR 19 03 27 32.0 195.0 0.9 13.4 -12 1 1 471 16 27 48 16 28 18 --- 19 03 57 32.0 195.1 0.9 13.5 18 F 1 472 16 27 48 16 28 18 J1808-2124 19 03 57 32.8 195.3 0.9 13.6 -8 1 1 472 16 28 18 16 28 38 --- 19 04 17 32.7 195.4 0.9 13.7 12 F 1 473 16 28 18 16 28 38 VX_SGR 19 04 17 31.9 195.2 0.9 13.6 -8 1 1 473 16 28 38 16 29 07 --- 19 04 47 31.9 195.4 0.9 13.7 22 F 1 474 16 28 38 16 29 07 J1811-2055 19 04 47 33.4 194.9 0.9 13.1 -9 1 1 474 16 29 07 16 29 27 --- 19 05 07 33.3 195.0 0.9 13.2 11 F 1 474 16 29 07 16 29 27 VX_SGR 19 05 07 31.9 195.4 0.9 13.7 -9 1 1 474 16 29 27 16 29 57 --- 19 05 37 31.9 195.6 1.0 13.9 21 F 1 475 16 29 27 16 29 57 J1807-2506 19 05 37 29.0 194.9 1.0 13.6 -12 1 1 475 16 29 57 16 30 22 --- 19 06 02 29.0 195.0 1.0 13.6 13 F 1 476 16 29 57 16 30 22 VX_SGR 19 06 02 31.8 195.7 1.0 14.0 -12 1 1 476 16 30 22 16 30 52 --- 19 06 32 31.8 195.8 1.0 14.1 18 F 1 477 16 30 22 Schedule for VLBA_PT (Code Pt ) Page 28 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 16 30 52 J1808-2124 19 06 32 32.6 196.0 1.0 14.2 -8 1 1 477 16 30 52 16 31 12 --- 19 06 52 32.6 196.1 1.0 14.3 12 F 1 478 16 30 52 16 31 12 VX_SGR 19 06 52 31.8 195.9 1.0 14.2 -8 1 1 478 16 31 12 16 31 42 --- 19 07 22 31.8 196.0 1.0 14.3 22 F 1 479 16 31 12 16 31 42 J1811-2055 19 07 22 33.2 195.6 0.9 13.8 -9 1 1 479 16 31 42 16 32 02 --- 19 07 42 33.2 195.7 0.9 13.8 11 F 1 479 16 31 42 16 32 02 VX_SGR 19 07 42 31.8 196.1 1.0 14.4 -9 1 1 479 16 32 02 16 32 32 --- 19 08 12 31.7 196.3 1.0 14.5 21 F 1 480 16 32 02 16 32 32 J1807-2506 19 08 12 28.9 195.5 1.0 14.1 -12 1 1 480 16 32 32 16 32 57 --- 19 08 37 28.9 195.6 1.0 14.2 13 F 1 481 16 32 32 16 32 57 VX_SGR 19 08 37 31.7 196.4 1.0 14.6 -12 1 1 481 16 32 57 16 33 27 --- 19 09 07 31.7 196.5 1.0 14.7 18 F 1 482 16 32 57 16 33 27 J1808-2124 19 09 07 32.5 196.7 1.0 14.8 -8 1 1 482 16 33 27 16 33 47 --- 19 09 27 32.4 196.8 1.0 14.9 12 F 1 483 16 33 27 16 33 47 VX_SGR 19 09 27 31.7 196.6 1.0 14.8 -8 1 1 483 16 33 47 16 34 17 --- 19 09 57 31.6 196.7 1.0 14.9 22 F 1 484 16 33 47 16 34 17 J1811-2055 19 09 57 33.1 196.3 1.0 14.4 -9 1 1 484 16 34 17 16 34 37 --- 19 10 17 33.0 196.4 1.0 14.5 11 F 1 484 16 34 17 16 34 37 VX_SGR 19 10 17 31.6 196.8 1.0 15.0 -9 1 1 484 16 34 37 16 35 07 --- 19 10 47 31.6 196.9 1.0 15.1 21 F 1 485 16 34 37 16 35 07 J1807-2506 19 10 47 28.8 196.2 1.0 14.7 -12 1 1 485 16 35 07 16 35 31 --- 19 11 12 28.7 196.3 1.1 14.8 13 F 1 486 16 35 07 16 35 31 VX_SGR 19 11 12 31.5 197.0 1.0 15.2 -12 1 1 486 16 35 31 16 36 01 --- 19 11 42 31.5 197.2 1.1 15.3 18 F 1 487 16 35 31 16 36 01 J1808-2124 19 11 42 32.3 197.4 1.1 15.4 -8 1 1 487 16 36 01 16 36 21 --- 19 12 02 32.3 197.5 1.1 15.5 12 F 1 488 16 36 01 16 36 21 VX_SGR 19 12 02 31.5 197.3 1.1 15.4 -8 1 1 488 16 36 21 16 36 51 --- 19 12 32 31.5 197.4 1.1 15.5 22 F 1 489 16 36 21 Schedule for VLBA_PT (Code Pt ) Page 29 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 16 36 51 J1811-2055 19 12 32 32.9 197.0 1.0 15.0 -9 1 1 489 16 36 51 16 37 11 --- 19 12 52 32.9 197.1 1.0 15.1 11 F 1 489 16 36 51 16 37 11 VX_SGR 19 12 52 31.4 197.5 1.1 15.6 -9 1 1 489 16 37 11 16 37 41 --- 19 13 22 31.4 197.6 1.1 15.7 21 F 1 490 16 37 11 16 37 41 J1807-2506 19 13 22 28.6 196.8 1.1 15.3 -12 1 1 490 16 37 41 16 38 06 --- 19 13 47 28.6 196.9 1.1 15.4 13 F 1 491 16 37 41 16 38 06 VX_SGR 19 13 47 31.4 197.7 1.1 15.8 -12 1 1 491 Stopped 16 40 06 --- 19 15 47 31.3 198.2 1.1 16.2 108 S 1 495 16 40 06 VX_SGR 19 15 47 31.3 198.2 1.1 16.2 -4 1 1 495 Stopped 16 42 05 --- 19 17 47 31.1 198.8 1.2 16.7 116 S 1 499 16 42 05 VX_SGR 19 17 47 31.1 198.8 1.2 16.7 -4 1 1 499 16 42 05 16 43 05 --- 19 18 47 31.1 199.0 1.2 16.9 56 F 1 501 16 42 23 16 43 05 J1733-1304 19 18 47 36.4 212.5 1.8 27.1 -17 1 1 501 16 43 05 16 44 05 --- 19 19 47 36.3 212.7 1.8 27.3 43 F 1 503 16 43 05 16 44 05 VX_SGR 19 19 47 31.0 199.3 1.2 17.1 -17 1 1 503 16 44 05 16 45 05 --- 19 20 47 30.9 199.5 1.2 17.4 43 F 1 505 16 44 05 16 45 05 J1733-1304 19 20 47 36.2 213.0 1.8 27.5 -17 1 1 505 16 45 05 16 46 05 --- 19 21 47 36.1 213.3 1.8 27.7 43 F 1 507 16 45 05 16 46 05 VX_SGR 19 21 47 30.9 199.8 1.2 17.6 -16 1 1 507 16 46 05 16 47 05 --- 19 22 47 30.8 200.1 1.2 17.8 43 F 1 509 16 46 05 16 47 05 J1733-1304 19 22 47 36.0 213.5 1.8 27.9 -16 1 1 509 16 47 05 16 48 04 --- 19 23 47 35.8 213.8 1.8 28.1 43 F 1 511 16 47 05 16 48 04 VX_SGR 19 23 47 30.7 200.3 1.3 18.0 -16 1 1 511 16 48 04 16 49 04 --- 19 24 47 30.6 200.6 1.3 18.3 44 F 1 512 16 48 04 16 49 04 J1733-1304 19 24 47 35.7 214.1 1.9 28.4 -16 1 1 512 16 49 04 16 50 04 --- 19 25 47 35.6 214.3 1.9 28.6 44 F 1 514 16 49 04 16 50 04 VX_SGR 19 25 47 30.6 200.8 1.3 18.5 -16 1 1 514 16 50 04 16 51 04 --- 19 26 47 30.5 201.1 1.3 18.7 44 F 1 516 16 50 04 Schedule for VLBA_PT (Code Pt ) Page 30 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 16 51 04 J1733-1304 19 26 47 35.5 214.6 1.9 28.8 -16 1 1 516 16 51 04 16 52 04 --- 19 27 47 35.4 214.8 1.9 29.0 44 F 1 518 16 51 04 16 52 04 VX_SGR 19 27 47 30.4 201.3 1.3 18.9 -16 1 1 518 16 52 04 16 53 04 --- 19 28 47 30.3 201.6 1.3 19.2 44 F 1 520 16 52 04 16 53 04 J1733-1304 19 28 47 35.3 215.1 1.9 29.2 -16 1 1 520 16 53 04 16 54 03 --- 19 29 47 35.1 215.4 1.9 29.4 44 F 1 522 16 53 04 16 54 03 VX_SGR 19 29 47 30.3 201.8 1.4 19.4 -16 1 1 522 16 54 03 16 55 03 --- 19 30 47 30.2 202.1 1.4 19.6 44 F 1 524 16 54 03 16 55 03 J1733-1304 19 30 47 35.0 215.6 2.0 29.6 -16 1 1 524 16 55 03 16 56 03 --- 19 31 47 34.9 215.9 2.0 29.8 44 F 1 526 16 55 03 16 56 03 VX_SGR 19 31 47 30.1 202.3 1.4 19.8 -16 1 1 526 16 56 03 16 57 03 --- 19 32 47 30.0 202.6 1.4 20.0 44 F 1 528 16 56 03 16 57 03 J1733-1304 19 32 47 34.8 216.1 2.0 30.0 -16 1 1 528 16 57 03 16 58 03 --- 19 33 47 34.7 216.4 2.0 30.2 44 F 1 530 16 57 03 16 58 03 VX_SGR 19 33 47 30.0 202.8 1.4 20.3 -15 1 1 530 16 58 03 16 59 03 --- 19 34 47 29.9 203.1 1.4 20.5 44 F 1 532 16 58 03 16 59 03 J1733-1304 19 34 47 34.5 216.6 2.0 30.4 -15 1 1 532 16 59 03 17 00 02 --- 19 35 47 34.4 216.9 2.0 30.6 45 F 1 534 16 59 03 17 00 02 VX_SGR 19 35 47 29.8 203.3 1.5 20.7 -15 1 1 534 17 00 02 17 01 02 --- 19 36 47 29.7 203.6 1.5 20.9 45 F 1 536 17 00 02 17 01 02 J1733-1304 19 36 47 34.3 217.2 2.1 30.8 -15 1 1 536 17 01 02 17 02 02 --- 19 37 47 34.2 217.4 2.1 31.0 45 F 1 538 17 01 02 17 02 02 VX_SGR 19 37 47 29.6 203.8 1.5 21.1 -15 1 1 538 17 02 02 17 03 02 --- 19 38 47 29.5 204.1 1.5 21.4 45 F 1 539 17 02 02 17 03 02 J1733-1304 19 38 47 34.0 217.7 2.1 31.2 -15 1 1 539 17 03 02 17 04 02 --- 19 39 47 33.9 217.9 2.1 31.4 45 F 1 541 17 03 02 17 04 02 VX_SGR 19 39 47 29.5 204.3 1.5 21.6 -15 1 1 541 17 04 02 17 05 02 --- 19 40 47 29.4 204.6 1.5 21.8 45 F 1 543 17 04 02 Schedule for VLBA_PT (Code Pt ) Page 31 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 17 05 02 J1733-1304 19 40 47 33.8 218.2 2.1 31.6 -15 1 1 543 17 05 02 17 06 01 --- 19 41 47 33.7 218.4 2.1 31.8 45 F 1 545 17 05 02 17 06 01 VX_SGR 19 41 47 29.3 204.8 1.6 22.0 -15 1 1 545 17 06 01 17 07 01 --- 19 42 47 29.2 205.1 1.6 22.2 45 F 1 547 17 06 01 17 07 01 J1733-1304 19 42 47 33.5 218.7 2.2 32.0 -15 1 1 547 17 07 01 17 08 01 --- 19 43 47 33.4 218.9 2.2 32.2 45 F 1 549 17 07 01 17 08 01 VX_SGR 19 43 47 29.1 205.3 1.6 22.4 -15 1 1 549 17 08 01 17 09 01 --- 19 44 47 29.0 205.6 1.6 22.6 45 F 1 551 17 08 01 17 09 01 J1733-1304 19 44 47 33.3 219.2 2.2 32.4 -15 1 1 551 17 09 01 17 10 01 --- 19 45 47 33.1 219.4 2.2 32.6 45 F 1 553 17 09 01 17 10 01 VX_SGR 19 45 47 28.9 205.8 1.6 22.9 -15 1 1 553 17 10 01 17 11 01 --- 19 46 47 28.8 206.1 1.6 23.1 45 F 1 555 17 10 01 17 11 01 J1733-1304 19 46 47 33.0 219.6 2.2 32.8 -15 1 1 555 17 11 01 17 12 00 --- 19 47 47 32.9 219.9 2.2 32.9 45 F 1 557 17 11 01 17 12 00 VX_SGR 19 47 47 28.8 206.3 1.7 23.3 -15 1 1 557 17 12 00 17 13 00 --- 19 48 47 28.7 206.5 1.7 23.5 45 F 1 559 17 12 00 17 13 00 J1733-1304 19 48 47 32.7 220.1 2.3 33.1 -15 1 1 559 17 13 00 17 14 00 --- 19 49 47 32.6 220.4 2.3 33.3 45 F 1 561 17 13 00 17 14 00 VX_SGR 19 49 47 28.6 206.8 1.7 23.7 -15 1 1 561 17 14 00 17 15 00 --- 19 50 47 28.5 207.0 1.7 23.9 45 F 1 563 17 14 00 17 15 00 J1733-1304 19 50 47 32.5 220.6 2.3 33.5 -15 1 1 563 17 15 00 17 16 00 --- 19 51 47 32.3 220.9 2.3 33.7 45 F 1 565 17 15 00 17 16 00 VX_SGR 19 51 47 28.4 207.3 1.7 24.1 -15 1 1 565 17 16 00 17 17 00 --- 19 52 47 28.3 207.5 1.7 24.3 45 F 1 566 17 16 00 17 17 00 J1733-1304 19 52 47 32.2 221.1 2.3 33.9 -15 1 1 566 17 17 00 17 17 59 --- 19 53 47 32.1 221.3 2.3 34.1 45 F 1 568 17 17 00 17 17 59 VX_SGR 19 53 47 28.2 207.7 1.8 24.5 -15 1 1 568 17 17 59 17 18 59 --- 19 54 47 28.1 208.0 1.8 24.7 45 F 1 570 17 17 59 Schedule for VLBA_PT (Code Pt ) Page 32 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 17 18 59 J1733-1304 19 54 47 31.9 221.6 2.4 34.2 -15 1 1 570 17 18 59 17 19 59 --- 19 55 47 31.8 221.8 2.4 34.4 45 F 1 572 17 18 59 17 19 59 VX_SGR 19 55 47 28.0 208.2 1.8 25.0 -15 1 1 572 17 19 59 17 20 59 --- 19 56 47 27.9 208.5 1.8 25.2 45 F 1 574 17 19 59 17 20 59 J1733-1304 19 56 47 31.7 222.0 2.4 34.6 -15 1 1 574 17 20 59 17 21 59 --- 19 57 47 31.5 222.3 2.4 34.8 45 F 1 576 17 20 59 17 21 59 VX_SGR 19 57 47 27.8 208.7 1.8 25.4 -15 1 1 576 17 21 59 17 22 59 --- 19 58 47 27.7 208.9 1.8 25.6 45 F 1 578 17 21 59 17 22 59 J1733-1304 19 58 47 31.4 222.5 2.4 35.0 -15 1 1 578 17 22 59 17 23 58 --- 19 59 47 31.2 222.7 2.4 35.1 45 F 1 580 17 22 59 17 23 58 VX_SGR 19 59 47 27.6 209.2 1.9 25.8 -15 1 1 580 17 23 58 17 24 58 --- 20 00 47 27.5 209.4 1.9 26.0 45 F 1 582 17 23 58 17 24 58 VX_SGR 20 00 47 27.5 209.4 1.9 26.0 -4 1 1 582 Stopped 17 26 58 --- 20 02 47 27.3 209.9 1.9 26.4 116 S 1 586 17 26 58 VX_SGR 20 02 47 27.3 209.9 1.9 26.4 -4 1 1 586 Stopped 17 28 58 --- 20 04 47 27.1 210.3 1.9 26.8 116 S 1 590 17 28 58 VX_SGR 20 04 47 27.1 210.3 1.9 26.8 -4 1 1 590 17 28 58 17 30 57 --- 20 06 47 26.9 210.8 2.0 27.2 116 F 1 593 17 29 16 17 30 57 VX_SGR 20 06 47 26.9 210.8 2.0 27.2 -4 1 1 593 17 30 57 17 31 27 --- 20 07 17 26.8 210.9 2.0 27.3 26 F 1 594 17 30 57 17 31 27 J1808-2124 20 07 17 27.5 211.3 2.0 27.5 -7 1 1 594 17 31 27 17 31 47 --- 20 07 37 27.5 211.4 2.0 27.5 13 F 1 595 17 31 27 17 31 47 VX_SGR 20 07 37 26.8 211.0 2.0 27.3 -7 1 1 595 17 31 47 17 32 17 --- 20 08 07 26.7 211.1 2.0 27.4 23 F 1 596 17 31 47 17 32 17 J1811-2055 20 08 07 28.2 211.1 1.9 27.2 -9 1 1 596 17 32 17 17 32 37 --- 20 08 27 28.2 211.1 1.9 27.2 11 F 1 597 17 32 17 17 32 37 VX_SGR 20 08 27 26.7 211.2 2.0 27.5 -9 1 1 597 17 32 37 17 33 07 --- 20 08 57 26.6 211.3 2.0 27.6 21 F 1 598 17 32 37 Schedule for VLBA_PT (Code Pt ) Page 33 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 17 33 07 J1807-2506 20 08 57 24.0 209.9 2.0 27.1 -11 1 1 598 17 33 07 17 33 32 --- 20 09 22 24.0 210.0 2.0 27.1 14 F 1 598 17 33 07 17 33 32 VX_SGR 20 09 22 26.6 211.4 2.0 27.7 -11 1 1 598 17 33 32 17 34 02 --- 20 09 52 26.5 211.5 2.0 27.8 19 F 1 599 17 33 32 17 34 02 J1808-2124 20 09 52 27.3 211.9 2.0 28.0 -7 1 1 599 17 34 02 17 34 22 --- 20 10 12 27.2 212.0 2.0 28.0 13 F 1 600 17 34 02 17 34 22 VX_SGR 20 10 12 26.5 211.6 2.0 27.9 -7 1 1 600 17 34 22 17 34 52 --- 20 10 42 26.5 211.7 2.0 28.0 23 F 1 601 17 34 22 17 34 52 J1811-2055 20 10 42 27.9 211.7 2.0 27.7 -9 1 1 601 17 34 52 17 35 12 --- 20 11 02 27.9 211.8 2.0 27.7 11 F 1 602 17 34 52 17 35 12 VX_SGR 20 11 02 26.4 211.8 2.0 28.0 -9 1 1 602 17 35 12 17 35 42 --- 20 11 32 26.4 211.9 2.0 28.1 21 F 1 603 17 35 12 17 35 42 J1807-2506 20 11 32 23.8 210.5 2.1 27.6 -11 1 1 603 17 35 42 17 36 06 --- 20 11 57 23.7 210.6 2.1 27.6 14 F 1 603 17 35 42 17 36 06 VX_SGR 20 11 57 26.3 212.0 2.1 28.2 -11 1 1 603 17 36 06 17 36 36 --- 20 12 27 26.3 212.1 2.1 28.3 19 F 1 604 17 36 06 17 36 36 J1808-2124 20 12 27 27.0 212.5 2.1 28.5 -7 1 1 604 17 36 36 17 36 56 --- 20 12 47 26.9 212.6 2.1 28.5 13 F 1 605 17 36 36 17 36 56 VX_SGR 20 12 47 26.2 212.2 2.1 28.4 -7 1 1 605 17 36 56 17 37 26 --- 20 13 17 26.2 212.3 2.1 28.5 23 F 1 606 17 36 56 17 37 26 J1811-2055 20 13 17 27.7 212.3 2.0 28.2 -9 1 1 606 17 37 26 17 37 46 --- 20 13 37 27.6 212.4 2.0 28.2 11 F 1 607 17 37 26 17 37 46 VX_SGR 20 13 37 26.1 212.4 2.1 28.5 -9 1 1 607 17 37 46 17 38 16 --- 20 14 07 26.1 212.5 2.1 28.6 21 F 1 608 17 37 46 17 38 16 J1807-2506 20 14 07 23.5 211.0 2.1 28.1 -11 1 1 608 17 38 16 17 38 41 --- 20 14 32 23.5 211.1 2.1 28.1 14 F 1 608 17 38 16 17 38 41 VX_SGR 20 14 32 26.0 212.6 2.1 28.7 -11 1 1 608 17 38 41 17 39 11 --- 20 15 02 26.0 212.7 2.1 28.8 19 F 1 609 17 38 41 Schedule for VLBA_PT (Code Pt ) Page 34 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 17 39 11 J1808-2124 20 15 02 26.7 213.1 2.1 29.0 -7 1 1 609 17 39 11 17 39 31 --- 20 15 22 26.7 213.2 2.1 29.0 13 F 1 610 17 39 11 17 39 31 VX_SGR 20 15 22 25.9 212.7 2.1 28.9 -7 1 1 610 17 39 31 17 40 01 --- 20 15 52 25.9 212.9 2.1 29.0 23 F 1 611 17 39 31 17 40 01 J1811-2055 20 15 52 27.4 212.9 2.1 28.7 -9 1 1 611 17 40 01 17 40 21 --- 20 16 12 27.3 213.0 2.1 28.8 11 F 1 612 17 40 01 17 40 21 VX_SGR 20 16 12 25.8 212.9 2.1 29.0 -9 1 1 612 17 40 21 17 40 51 --- 20 16 42 25.8 213.0 2.1 29.1 21 F 1 613 17 40 21 17 40 51 J1807-2506 20 16 42 23.2 211.6 2.1 28.6 -11 1 1 613 17 40 51 17 41 16 --- 20 17 07 23.2 211.7 2.1 28.6 14 F 1 613 17 40 51 17 41 16 VX_SGR 20 17 07 25.7 213.1 2.1 29.2 -11 1 1 613 17 41 16 17 41 46 --- 20 17 37 25.7 213.3 2.2 29.3 19 F 1 614 17 41 16 17 41 46 J1808-2124 20 17 37 26.4 213.7 2.2 29.5 -7 1 1 614 17 41 46 17 42 06 --- 20 17 57 26.4 213.8 2.2 29.5 13 F 1 615 17 41 46 17 42 06 VX_SGR 20 17 57 25.7 213.3 2.2 29.4 -7 1 1 615 17 42 06 17 42 35 --- 20 18 27 25.6 213.4 2.2 29.5 23 F 1 616 17 42 06 17 42 35 J1811-2055 20 18 27 27.1 213.5 2.1 29.2 -9 1 1 616 17 42 35 17 42 55 --- 20 18 47 27.0 213.5 2.1 29.3 11 F 1 617 17 42 35 17 42 55 VX_SGR 20 18 47 25.6 213.5 2.2 29.5 -9 1 1 617 17 42 55 17 43 25 --- 20 19 17 25.5 213.6 2.2 29.6 21 F 1 618 17 42 55 17 43 25 J1807-2506 20 19 17 22.9 212.2 2.2 29.1 -11 1 1 618 17 43 25 17 43 50 --- 20 19 42 22.9 212.3 2.2 29.1 14 F 1 618 17 43 25 17 43 50 VX_SGR 20 19 42 25.5 213.7 2.2 29.7 -11 1 1 618 17 43 50 17 44 20 --- 20 20 12 25.4 213.8 2.2 29.8 19 F 1 619 17 43 50 17 44 20 J1808-2124 20 20 12 26.1 214.3 2.2 30.0 -7 1 1 619 17 44 20 17 44 40 --- 20 20 32 26.1 214.3 2.2 30.0 13 F 1 620 17 44 20 17 44 40 VX_SGR 20 20 32 25.4 213.9 2.2 29.9 -7 1 1 620 17 44 40 17 45 10 --- 20 21 02 25.3 214.0 2.2 29.9 23 F 1 621 17 44 40 Schedule for VLBA_PT (Code Pt ) Page 35 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 17 45 10 J1811-2055 20 21 02 26.8 214.1 2.2 29.7 -9 1 1 621 17 45 10 17 45 30 --- 20 21 22 26.7 214.1 2.2 29.8 11 F 1 622 17 45 10 17 45 30 VX_SGR 20 21 22 25.3 214.1 2.2 30.0 -9 1 1 622 17 45 30 17 46 00 --- 20 21 52 25.2 214.2 2.2 30.1 21 F 1 623 17 45 30 17 46 00 J1807-2506 20 21 52 22.7 212.7 2.2 29.5 -11 1 1 623 17 46 00 17 46 25 --- 20 22 17 22.6 212.8 2.2 29.6 14 F 1 623 17 46 00 17 46 25 VX_SGR 20 22 17 25.2 214.3 2.2 30.2 -11 1 1 623 17 46 25 17 46 55 --- 20 22 47 25.1 214.4 2.2 30.3 19 F 1 624 17 46 25 17 46 55 J1808-2124 20 22 47 25.8 214.8 2.2 30.5 -7 1 1 624 17 46 55 17 47 15 --- 20 23 07 25.8 214.9 2.2 30.5 13 F 1 625 17 46 55 17 47 15 VX_SGR 20 23 07 25.1 214.5 2.2 30.3 -7 1 1 625 17 47 15 17 47 45 --- 20 23 37 25.0 214.6 2.3 30.4 23 F 1 626 17 47 15 17 47 45 J1811-2055 20 23 37 26.5 214.6 2.2 30.2 -9 1 1 626 17 47 45 17 48 05 --- 20 23 57 26.4 214.7 2.2 30.2 11 F 1 627 17 47 45 17 48 05 VX_SGR 20 23 57 25.0 214.7 2.3 30.5 -9 1 1 627 17 48 05 17 48 34 --- 20 24 27 24.9 214.8 2.3 30.6 21 F 1 628 17 48 05 17 48 34 J1807-2506 20 24 27 22.4 213.3 2.3 30.0 -11 1 1 628 17 48 34 17 48 59 --- 20 24 52 22.3 213.4 2.3 30.1 14 F 1 628 17 48 34 17 48 59 VX_SGR 20 24 52 24.9 214.9 2.3 30.7 -11 1 1 628 17 48 59 17 49 29 --- 20 25 22 24.8 215.0 2.3 30.8 19 F 1 629 17 48 59 17 49 29 J1808-2124 20 25 22 25.5 215.4 2.3 30.9 -7 1 1 629 17 49 29 17 49 49 --- 20 25 42 25.5 215.5 2.3 31.0 13 F 1 630 17 49 29 17 49 49 VX_SGR 20 25 42 24.8 215.0 2.3 30.8 -7 1 1 630 17 49 49 17 50 19 --- 20 26 12 24.7 215.2 2.3 30.9 23 F 1 631 17 49 49 17 50 19 J1811-2055 20 26 12 26.2 215.2 2.2 30.7 -9 1 1 631 17 50 19 17 50 39 --- 20 26 32 26.1 215.3 2.2 30.7 11 F 1 632 17 50 19 17 50 39 VX_SGR 20 26 32 24.7 215.2 2.3 31.0 -9 1 1 632 17 50 39 17 51 09 --- 20 27 02 24.6 215.3 2.3 31.1 21 F 1 633 17 50 39 Schedule for VLBA_PT (Code Pt ) Page 36 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 17 51 09 J1807-2506 20 27 02 22.1 213.8 2.3 30.5 -11 1 1 633 17 51 09 17 51 34 --- 20 27 27 22.0 213.9 2.3 30.6 14 F 1 633 17 51 09 17 51 34 VX_SGR 20 27 27 24.5 215.4 2.3 31.1 -11 1 1 633 17 51 34 17 52 04 --- 20 27 57 24.5 215.5 2.3 31.2 19 F 1 634 17 51 34 17 52 04 J1808-2124 20 27 57 25.2 216.0 2.3 31.4 -7 1 1 634 17 52 04 17 52 24 --- 20 28 17 25.1 216.1 2.3 31.5 13 F 1 635 17 52 04 17 52 24 VX_SGR 20 28 17 24.4 215.6 2.3 31.3 -7 1 1 635 17 52 24 17 52 54 --- 20 28 47 24.4 215.7 2.3 31.4 23 F 1 636 17 52 24 17 52 54 J1811-2055 20 28 47 25.9 215.8 2.3 31.2 -9 1 1 636 17 52 54 17 53 14 --- 20 29 07 25.8 215.9 2.3 31.2 11 F 1 637 17 52 54 17 53 14 VX_SGR 20 29 07 24.3 215.8 2.3 31.5 -9 1 1 637 17 53 14 17 53 44 --- 20 29 37 24.3 215.9 2.4 31.5 21 F 1 638 17 53 14 17 53 44 J1807-2506 20 29 37 21.8 214.4 2.4 31.0 -11 1 1 638 17 53 44 17 54 09 --- 20 30 02 21.7 214.4 2.4 31.1 14 F 1 638 17 53 44 17 54 09 VX_SGR 20 30 02 24.2 216.0 2.4 31.6 -11 1 1 638 17 54 09 17 54 38 --- 20 30 32 24.2 216.1 2.4 31.7 19 F 1 639 17 54 09 17 54 38 J1808-2124 20 30 32 24.9 216.6 2.4 31.9 -7 1 1 639 17 54 38 17 54 58 --- 20 30 52 24.8 216.6 2.4 32.0 13 F 1 640 17 54 38 17 54 58 VX_SGR 20 30 52 24.1 216.2 2.4 31.8 -7 1 1 640 17 54 58 17 55 28 --- 20 31 22 24.1 216.3 2.4 31.9 23 F 1 641 17 54 58 17 55 28 J1811-2055 20 31 22 25.6 216.4 2.3 31.6 -9 1 1 641 17 55 28 17 55 48 --- 20 31 42 25.5 216.4 2.3 31.7 11 F 1 642 17 55 28 17 55 48 VX_SGR 20 31 42 24.0 216.3 2.4 31.9 -9 1 1 642 17 55 48 17 56 18 --- 20 32 12 24.0 216.5 2.4 32.0 21 F 1 643 17 55 48 17 56 18 J1807-2506 20 32 12 21.5 214.9 2.4 31.5 -11 1 1 643 17 56 18 17 56 43 --- 20 32 37 21.4 215.0 2.4 31.5 14 F 1 643 17 56 18 17 56 43 VX_SGR 20 32 37 23.9 216.5 2.4 32.1 -11 1 1 643 17 56 43 17 57 13 --- 20 33 07 23.9 216.6 2.4 32.2 19 F 1 644 17 56 43 Schedule for VLBA_PT (Code Pt ) Page 37 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 17 57 13 J1808-2124 20 33 07 24.5 217.1 2.4 32.4 -7 1 1 644 17 57 13 17 57 33 --- 20 33 27 24.5 217.2 2.4 32.4 13 F 1 645 17 57 13 17 57 33 VX_SGR 20 33 27 23.8 216.7 2.4 32.2 -7 1 1 645 17 57 33 17 58 03 --- 20 33 57 23.8 216.8 2.4 32.3 23 F 1 646 17 57 33 17 58 03 J1811-2055 20 33 57 25.2 216.9 2.4 32.1 -9 1 1 646 17 58 03 17 58 23 --- 20 34 17 25.2 217.0 2.4 32.2 11 F 1 647 17 58 03 17 58 23 VX_SGR 20 34 17 23.7 216.9 2.4 32.4 -9 1 1 647 17 58 23 17 58 53 --- 20 34 47 23.6 217.0 2.4 32.5 21 F 1 648 17 58 23 17 58 53 J1807-2506 20 34 47 21.2 215.4 2.4 31.9 -11 1 1 648 17 58 53 17 59 18 --- 20 35 12 21.1 215.5 2.5 32.0 14 F 1 648 17 58 53 17 59 18 VX_SGR 20 35 12 23.6 217.1 2.4 32.6 -11 1 1 648 17 59 18 17 59 48 --- 20 35 42 23.5 217.2 2.5 32.7 19 F 1 649 17 59 18 17 59 48 J1808-2124 20 35 42 24.2 217.7 2.5 32.8 -7 1 1 649 17 59 48 18 00 08 --- 20 36 02 24.2 217.7 2.5 32.9 13 F 1 650 17 59 48 18 00 08 VX_SGR 20 36 02 23.5 217.3 2.5 32.7 -7 1 1 650 18 00 08 18 00 37 --- 20 36 32 23.4 217.4 2.5 32.8 23 F 1 651 18 00 08 18 00 37 J1811-2055 20 36 32 24.9 217.5 2.4 32.6 -9 1 1 651 18 00 37 18 00 57 --- 20 36 52 24.9 217.6 2.4 32.6 11 F 1 652 18 00 37 18 00 57 VX_SGR 20 36 52 23.4 217.4 2.5 32.9 -9 1 1 652 18 00 57 18 01 27 --- 20 37 22 23.3 217.6 2.5 33.0 21 F 1 653 18 00 57 18 01 27 J1807-2506 20 37 22 20.9 216.0 2.5 32.4 -11 1 1 653 18 01 27 18 01 52 --- 20 37 47 20.8 216.0 2.5 32.5 14 F 1 653 18 01 27 18 01 52 VX_SGR 20 37 47 23.3 217.6 2.5 33.0 -11 1 1 653 18 01 52 18 02 22 --- 20 38 17 23.2 217.7 2.5 33.1 19 F 1 654 18 01 52 18 02 22 J1808-2124 20 38 17 23.9 218.2 2.5 33.3 -7 1 1 654 18 02 22 18 02 42 --- 20 38 37 23.9 218.3 2.5 33.4 13 F 1 655 18 02 22 18 02 42 VX_SGR 20 38 37 23.2 217.8 2.5 33.2 -7 1 1 655 18 02 42 18 03 12 --- 20 39 07 23.1 217.9 2.5 33.3 23 F 1 656 18 02 42 Schedule for VLBA_PT (Code Pt ) Page 38 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Feb 2008 Day 48 --- 18 03 12 J1811-2055 20 39 07 24.6 218.1 2.5 33.0 -9 1 1 656 18 03 12 18 03 32 --- 20 39 27 24.5 218.1 2.5 33.1 11 F 1 657 18 03 12 18 03 32 VX_SGR 20 39 27 23.1 218.0 2.5 33.3 -9 1 1 657 18 03 32 18 04 02 --- 20 39 57 23.0 218.1 2.5 33.4 21 F 1 658 18 03 32 18 04 02 J1807-2506 20 39 57 20.5 216.5 2.5 32.8 -11 1 1 658 18 04 02 18 04 27 --- 20 40 22 20.5 216.6 2.5 32.9 14 F 1 658 18 04 02 18 04 27 VX_SGR 20 40 22 22.9 218.2 2.5 33.5 -11 1 1 658 18 04 27 18 04 57 --- 20 40 52 22.9 218.3 2.5 33.6 19 F 1 659 18 04 27 18 04 57 J1808-2124 20 40 52 23.6 218.8 2.5 33.8 -7 1 1 659 18 04 57 18 05 17 --- 20 41 12 23.5 218.8 2.5 33.8 13 F 1 660 18 04 57 18 05 17 VX_SGR 20 41 12 22.8 218.4 2.5 33.6 -7 1 1 660 18 05 17 18 05 47 --- 20 41 42 22.8 218.5 2.6 33.7 23 F 1 661 18 05 17 18 05 47 J1811-2055 20 41 42 24.3 218.6 2.5 33.5 -9 1 1 661 18 05 47 18 06 07 --- 20 42 02 24.2 218.7 2.5 33.6 11 F 1 662 18 05 47 18 06 07 VX_SGR 20 42 02 22.7 218.5 2.6 33.8 -9 1 1 662 18 06 07 18 06 36 --- 20 42 32 22.7 218.6 2.6 33.9 21 F 1 662 18 06 07 18 06 36 J1807-2506 20 42 32 20.2 217.0 2.6 33.3 -11 1 1 662 18 06 36 18 07 01 --- 20 42 57 20.2 217.1 2.6