VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BS160D Observer: Shen, Z.Q. Project type: VLBA Obs filename: bs160dcrd.* Date/Day: 2008FEB17/048 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Betty Ragan Vclock, UT1-UTC, gps delta all check OK. 1125 Begin. 1125 %NL raining, possibly freezing rain. 1130-1131 *FD focus brake fault. FRM 100 1 1352 %SC raining. 1437 New Operator: Paul Padilla 1528-1534 *FD AZ #2 armature over current fault. ACU 100 6 1750 %NL Precipitation 1910 %PT windy 1925 End. Downtime Summary: Total downtime : 7 min Percentage downtime of observing: 0.1% Average downtime per hour : 0.1 min Total scheduled observing time (# Antennas): 4800 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.