VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BR125B Observer: Robishaw, T. Project type: VLBA Obs filename: br125bcrd.* Date/Day: 2008FEB10/041 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK Y GB =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Alan Kerr WEA: SC,HN,BR overcast. GPSd:-4.5 MK, UT1-UTC: -0.31, vclock: OK. 1530 Begin at SC,NL,GB only 1530-0130 *MK out due to damage from ice storm. 22199 100 600 1530-0130 *HN out. FRM is frozen in place. 22193 100 600 1652 Begin at FD,LA,PT 1714 Begin at KP,BR 1714-1718 *KP slow to get on source. ACU 100 4 1725 Begin at OV,Y 1725-1728 *OV slow to get on source. ACU 100 3 1825-0110 *Y operator says that data became suspect BAC 100 405 due to HVAC problems at the VLA. Mk5 was terminated by VLA op at ~22:05. 0000 Date is 2008FEB11/042. 0110 Y recording again. 0112 %PT precipitation starting. 0122 PT precipitation stopped. 0130 End. Downtime Summary: Total downtime : 1612 min Percentage downtime of observing: 24.4% Average downtime per hour : 14.7 min Total scheduled observing time (# Antennas): 6600 min (11) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.