VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BK146A Observer: Mioduszewski, A. Project type: VLBA Obs filename: bk146acrd.* Date/Day: 2008FEB27/058 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 0546 Begin file: BR, MK join later VCLOCK check ok. SC at -0.164 UT1-UTC check ok (-0.32) GPS delta < 10us (MK: -4.9us) Operator: T. Perreault 0546-0946 *FD not observing. Scheduled maintenance visit. SCH 100 240 0546-0946 *HN not observing. Subreflector is frozen in ROTATION WEA 100 240 will not move. Site got approx. 11" of snow and was in AVOIDSNOW, but it looks like ice built up anyhow. Pulled from observing. 0636 MK joins 0651 BR joins 0648 New operator is Betty Ragan. 0946 End. Downtime Summary: Total downtime : 480 min Percentage downtime of observing: 20.0% Average downtime per hour : 12.0 min Total scheduled observing time (# Antennas): 2400 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.