COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: RIPL: GJ644C/GJ1207 Exp. Code: BB240T Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for VLBA_PT (Code Pt ) Page 2 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 09 15 00 J1658-0739 12 32 50 14.5 110.1 -4.4 -51.5 0 1 1 0 09 15 00 09 23 00 --- 12 40 51 16.0 111.4 -4.3 -50.9 480 F 1 31 09 15 18 09 31 45 J1658-0739 12 49 38 17.7 112.8 -4.2 -50.2 516 1 1 31 09 31 45 09 32 25 --- 12 50 18 17.8 112.9 -4.1 -50.2 40 F 1 34 09 32 03 09 32 25 J1652-0915 12 50 18 18.0 115.3 -4.0 -49.2 -8 1 1 34 09 32 25 09 33 35 --- 12 51 28 18.3 115.5 -4.0 -49.1 62 F 1 38 09 32 25 09 33 35 J1658-0739 12 51 28 18.1 113.1 -4.1 -50.1 -8 1 1 38 09 33 35 09 34 45 --- 12 52 38 18.3 113.3 -4.1 -50.0 62 F 1 43 09 33 35 09 34 45 GJ644C 12 52 38 18.4 114.4 -4.1 -49.5 -6 1 1 43 09 34 45 09 37 45 --- 12 55 39 19.0 114.9 -4.0 -49.2 174 F 1 54 09 34 45 09 37 45 J1658-0739 12 55 39 18.9 113.8 -4.1 -49.7 -6 1 1 54 09 37 45 09 38 55 --- 12 56 49 19.1 114.0 -4.0 -49.6 64 F 1 59 09 37 45 09 38 55 GJ644C 12 56 49 19.2 115.1 -4.0 -49.1 -6 1 1 59 09 38 55 09 41 55 --- 12 59 49 19.7 115.7 -3.9 -48.8 174 F 1 70 09 38 55 09 41 55 J1658-0739 12 59 49 19.6 114.5 -4.0 -49.3 -6 1 1 70 09 41 55 09 43 05 --- 13 01 00 19.9 114.7 -4.0 -49.2 64 F 1 75 09 41 55 09 43 05 GJ644C 13 01 00 20.0 115.9 -3.9 -48.7 -6 1 1 75 09 43 05 09 46 05 --- 13 04 00 20.5 116.4 -3.9 -48.4 174 F 1 86 09 43 05 09 46 05 J1658-0739 13 04 00 20.4 115.2 -3.9 -48.9 -6 1 1 86 09 46 05 09 47 15 --- 13 05 10 20.6 115.4 -3.9 -48.8 64 F 1 91 09 46 05 09 47 15 GJ644C 13 05 10 20.7 116.6 -3.8 -48.3 -6 1 1 91 09 47 15 09 50 15 --- 13 08 11 21.3 117.1 -3.8 -48.0 174 F 1 103 09 47 15 09 50 15 J1658-0739 13 08 11 21.2 116.0 -3.9 -48.5 -6 1 1 103 09 50 15 09 51 25 --- 13 09 21 21.4 116.2 -3.8 -48.4 64 F 1 107 09 50 15 Schedule for VLBA_PT (Code Pt ) Page 3 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 09 51 25 GJ644C 13 09 21 21.5 117.3 -3.8 -47.9 -6 1 1 107 09 51 25 09 54 25 --- 13 12 21 22.1 117.9 -3.7 -47.6 174 F 1 119 09 51 25 09 54 25 J1658-0739 13 12 21 22.0 116.7 -3.8 -48.1 -6 1 1 119 09 54 25 09 55 35 --- 13 13 32 22.2 116.9 -3.8 -48.0 64 F 1 123 09 54 25 09 55 35 J1652-0915 13 13 32 22.3 119.4 -3.7 -46.8 -8 1 1 123 09 55 35 09 56 45 --- 13 14 42 22.5 119.6 -3.6 -46.7 62 F 1 128 09 55 35 09 56 45 J1658-0739 13 14 42 22.4 117.1 -3.7 -47.9 -8 1 1 128 09 56 45 09 57 55 --- 13 15 52 22.6 117.3 -3.7 -47.8 62 F 1 132 09 56 45 09 58 38 J1656-0206 13 16 35 26.8 113.2 -3.7 -49.4 29 1 1 132 09 58 38 09 59 18 =1654-020 13 17 16 26.9 113.4 -3.7 -49.4 40 F 1 135 09 58 56 09 59 18 J1658-0739 13 17 16 22.9 117.6 -3.7 -47.6 -14 1 1 135 09 59 18 10 00 28 --- 13 18 26 23.1 117.8 -3.7 -47.5 56 F 1 139 09 59 18 10 00 28 J1656-0206 13 18 26 27.1 113.6 -3.6 -49.3 -14 1 1 139 10 00 28 10 01 38 =1654-020 13 19 36 27.3 113.8 -3.6 -49.2 56 F 1 144 10 00 28 10 01 38 GJ1207 13 19 36 25.8 115.6 -3.6 -48.3 -9 1 1 144 10 01 38 10 04 38 --- 13 22 36 26.4 116.2 -3.6 -48.0 171 F 1 155 10 01 38 10 04 38 J1656-0206 13 22 36 27.9 114.3 -3.6 -48.9 -9 1 1 155 10 04 38 10 05 48 =1654-020 13 23 47 28.1 114.6 -3.6 -48.8 61 F 1 160 10 04 38 10 05 48 GJ1207 13 23 47 26.6 116.4 -3.6 -47.9 -9 1 1 160 10 05 48 10 08 48 --- 13 26 47 27.2 117.0 -3.5 -47.6 171 F 1 172 10 05 48 10 08 48 J1656-0206 13 26 47 28.7 115.1 -3.5 -48.5 -9 1 1 172 10 08 48 10 09 58 =1654-020 13 27 57 28.9 115.3 -3.5 -48.3 61 F 1 176 10 08 48 10 09 58 GJ1207 13 27 57 27.4 117.2 -3.5 -47.5 -9 1 1 176 10 09 58 10 12 58 --- 13 30 58 27.9 117.8 -3.4 -47.1 171 F 1 188 10 09 58 10 12 58 J1656-0206 13 30 58 29.5 115.9 -3.4 -48.0 -9 1 1 188 10 12 58 10 14 08 =1654-020 13 32 08 29.7 116.1 -3.4 -47.9 61 F 1 192 10 12 58 10 14 08 GJ1207 13 32 08 28.1 118.0 -3.4 -47.0 -9 1 1 192 10 14 08 10 17 08 --- 13 35 09 28.7 118.6 -3.4 -46.7 171 F 1 204 10 14 08 Schedule for VLBA_PT (Code Pt ) Page 4 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 10 17 08 J1656-0206 13 35 09 30.2 116.7 -3.4 -47.6 -9 1 1 204 10 17 08 10 18 18 =1654-020 13 36 19 30.4 116.9 -3.4 -47.5 61 F 1 208 10 17 08 10 18 18 GJ1207 13 36 19 28.9 118.8 -3.4 -46.6 -9 1 1 208 10 18 18 10 21 18 --- 13 39 19 29.4 119.4 -3.3 -46.2 171 F 1 220 10 18 18 10 21 18 J1656-0206 13 39 19 31.0 117.5 -3.3 -47.1 -9 1 1 220 10 21 18 10 22 28 =1654-020 13 40 29 31.2 117.8 -3.3 -47.0 61 F 1 225 10 21 18 10 22 28 J1658-0739 13 40 29 27.0 122.0 -3.3 -45.0 -14 1 1 225 10 22 28 10 23 38 --- 13 41 40 27.2 122.2 -3.3 -44.9 56 F 1 229 10 22 28 10 23 38 J1656-0206 13 41 40 31.4 118.0 -3.3 -46.9 -14 1 1 229 10 23 38 10 24 48 =1654-020 13 42 50 31.6 118.2 -3.2 -46.7 56 F 1 234 10 23 38 10 25 32 J1658-0739 13 43 33 27.6 122.6 -3.3 -44.6 29 1 1 234 10 25 32 10 26 12 --- 13 44 13 27.7 122.7 -3.2 -44.5 40 F 1 236 10 25 50 10 26 12 J1652-0915 13 44 13 27.7 125.3 -3.1 -43.1 -8 1 1 236 10 26 12 10 27 22 --- 13 45 24 27.9 125.5 -3.1 -42.9 62 F 1 241 10 26 12 10 27 22 J1658-0739 13 45 24 27.9 123.0 -3.2 -44.4 -8 1 1 241 10 27 22 10 28 32 --- 13 46 34 28.1 123.2 -3.2 -44.2 62 F 1 245 10 27 22 10 28 32 GJ644C 13 46 34 28.1 124.4 -3.2 -43.5 -7 1 1 245 10 28 32 10 31 32 --- 13 49 34 28.6 125.0 -3.1 -43.1 173 F 1 257 10 28 32 10 31 32 J1658-0739 13 49 34 28.6 123.8 -3.2 -43.8 -7 1 1 257 10 31 32 10 32 42 --- 13 50 45 28.8 124.0 -3.1 -43.7 63 F 1 261 10 31 32 10 32 42 GJ644C 13 50 45 28.8 125.3 -3.1 -43.0 -7 1 1 261 10 32 42 10 35 42 --- 13 53 45 29.3 125.9 -3.0 -42.6 173 F 1 273 10 32 42 10 35 42 J1658-0739 13 53 45 29.3 124.7 -3.1 -43.3 -7 1 1 273 10 35 42 10 36 52 --- 13 54 55 29.5 124.9 -3.1 -43.1 63 F 1 277 10 35 42 10 36 52 GJ644C 13 54 55 29.5 126.1 -3.0 -42.4 -7 1 1 277 10 36 52 10 39 52 --- 13 57 56 30.0 126.8 -3.0 -42.0 173 F 1 289 10 36 52 10 39 52 J1658-0739 13 57 56 30.0 125.5 -3.0 -42.7 -7 1 1 289 10 39 52 10 41 02 --- 13 59 06 30.2 125.8 -3.0 -42.6 63 F 1 294 10 39 52 Schedule for VLBA_PT (Code Pt ) Page 5 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 10 41 02 GJ644C 13 59 06 30.2 127.0 -2.9 -41.8 -7 1 1 294 10 41 02 10 44 02 --- 14 02 06 30.7 127.7 -2.9 -41.4 173 F 1 305 10 41 02 10 44 02 J1658-0739 14 02 06 30.7 126.4 -3.0 -42.1 -7 1 1 305 10 44 02 10 45 12 --- 14 03 17 30.9 126.7 -2.9 -42.0 63 F 1 310 10 44 02 10 45 12 GJ644C 14 03 17 30.9 127.9 -2.9 -41.2 -7 1 1 310 10 45 12 10 48 12 --- 14 06 17 31.4 128.6 -2.8 -40.8 173 F 1 321 10 45 12 10 48 12 J1658-0739 14 06 17 31.4 127.3 -2.9 -41.5 -7 1 1 321 10 48 12 10 49 22 --- 14 07 27 31.6 127.6 -2.9 -41.4 63 F 1 326 10 48 12 10 49 22 J1652-0915 14 07 27 31.5 130.2 -2.8 -39.7 -8 1 1 326 10 49 22 10 50 32 --- 14 08 37 31.6 130.5 -2.7 -39.5 62 F 1 330 10 49 22 10 50 32 J1658-0739 14 08 37 31.8 127.8 -2.8 -41.2 -8 1 1 330 10 50 32 10 51 42 --- 14 09 48 32.0 128.1 -2.8 -41.0 62 F 1 335 10 50 32 10 52 26 J1656-0206 14 10 32 36.5 124.2 -2.8 -43.2 29 1 1 335 10 52 26 10 53 06 =1654-020 14 11 12 36.7 124.3 -2.8 -43.1 40 F 1 337 10 52 44 10 53 06 J1658-0739 14 11 12 32.2 128.4 -2.8 -40.8 -15 1 1 337 10 53 06 10 54 16 --- 14 12 22 32.4 128.6 -2.8 -40.6 55 F 1 342 10 53 06 10 54 16 J1656-0206 14 12 22 36.9 124.6 -2.7 -42.9 -15 1 1 342 10 54 16 10 55 26 =1654-020 14 13 33 37.0 124.8 -2.7 -42.7 55 F 1 346 10 54 16 10 55 26 GJ1207 14 13 33 35.4 126.7 -2.7 -41.6 -9 1 1 346 10 55 26 10 58 26 --- 14 16 33 35.9 127.4 -2.7 -41.2 171 F 1 358 10 55 26 10 58 26 J1656-0206 14 16 33 37.6 125.5 -2.7 -42.3 -9 1 1 358 10 58 26 10 59 36 =1654-020 14 17 43 37.8 125.8 -2.7 -42.1 61 F 1 363 10 58 26 10 59 36 GJ1207 14 17 43 36.1 127.6 -2.7 -41.0 -9 1 1 363 10 59 36 11 02 36 --- 14 20 44 36.5 128.3 -2.6 -40.5 171 F 1 374 10 59 36 11 02 36 J1656-0206 14 20 44 38.3 126.5 -2.6 -41.6 -9 1 1 374 11 02 36 11 03 46 =1654-020 14 21 54 38.4 126.8 -2.6 -41.4 61 F 1 379 11 02 36 11 03 46 GJ1207 14 21 54 36.7 128.6 -2.6 -40.3 -9 1 1 379 11 03 46 11 06 46 --- 14 24 55 37.2 129.3 -2.5 -39.9 171 F 1 390 11 03 46 Schedule for VLBA_PT (Code Pt ) Page 6 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 11 06 46 J1656-0206 14 24 55 38.9 127.5 -2.5 -41.0 -9 1 1 390 11 06 46 11 07 56 =1654-020 14 26 05 39.1 127.8 -2.5 -40.8 61 F 1 395 11 06 46 11 07 56 GJ1207 14 26 05 37.4 129.6 -2.5 -39.7 -9 1 1 395 11 07 56 11 10 56 --- 14 29 05 37.9 130.3 -2.5 -39.2 171 F 1 406 11 07 56 11 10 56 J1656-0206 14 29 05 39.6 128.6 -2.5 -40.3 -9 1 1 406 11 10 56 11 12 06 =1654-020 14 30 15 39.8 128.8 -2.5 -40.1 61 F 1 411 11 10 56 11 12 06 GJ1207 14 30 15 38.1 130.6 -2.5 -39.0 -10 1 1 411 11 12 06 11 15 06 --- 14 33 16 38.5 131.4 -2.4 -38.4 170 F 1 423 11 12 06 11 15 06 J1656-0206 14 33 16 40.3 129.6 -2.4 -39.6 -10 1 1 423 11 15 06 11 16 16 =1654-020 14 34 26 40.5 129.9 -2.4 -39.4 60 F 1 427 11 15 06 11 16 16 J1658-0739 14 34 26 35.8 133.8 -2.4 -37.0 -15 1 1 427 11 16 16 11 17 26 --- 14 35 36 36.0 134.1 -2.4 -36.8 55 F 1 432 11 16 16 11 17 26 J1656-0206 14 35 36 40.7 130.2 -2.4 -39.2 -15 1 1 432 11 17 26 11 18 36 =1654-020 14 36 46 40.8 130.5 -2.3 -39.0 55 F 1 436 11 17 26 11 19 21 J1658-0739 14 37 31 36.3 134.6 -2.4 -36.4 29 1 1 436 11 19 21 11 20 01 --- 14 38 11 36.4 134.7 -2.3 -36.3 40 F 1 439 11 19 39 11 20 01 J1652-0915 14 38 11 36.0 137.5 -2.2 -34.4 -8 1 1 439 11 20 01 11 21 11 --- 14 39 21 36.2 137.8 -2.2 -34.2 62 F 1 443 11 20 01 11 21 11 J1658-0739 14 39 21 36.6 135.0 -2.3 -36.1 -8 1 1 443 11 21 11 11 22 21 --- 14 40 31 36.7 135.3 -2.3 -35.9 62 F 1 448 11 21 11 11 22 21 GJ644C 14 40 31 36.6 136.6 -2.3 -35.0 -7 1 1 448 11 22 21 11 25 21 --- 14 43 32 37.0 137.4 -2.2 -34.4 173 F 1 459 11 22 21 11 25 21 J1658-0739 14 43 32 37.2 136.1 -2.3 -35.3 -7 1 1 459 11 25 21 11 26 31 --- 14 44 42 37.3 136.4 -2.2 -35.1 63 F 1 464 11 25 21 11 26 31 GJ644C 14 44 42 37.2 137.7 -2.2 -34.2 -7 1 1 464 11 26 31 11 29 31 --- 14 47 43 37.6 138.5 -2.1 -33.6 173 F 1 475 11 26 31 11 29 31 J1658-0739 14 47 43 37.8 137.1 -2.2 -34.5 -7 1 1 475 11 29 31 11 30 41 --- 14 48 53 37.9 137.4 -2.2 -34.3 63 F 1 480 11 29 31 Schedule for VLBA_PT (Code Pt ) Page 7 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 11 30 41 GJ644C 14 48 53 37.7 138.8 -2.1 -33.4 -7 1 1 480 11 30 41 11 33 41 --- 14 51 53 38.2 139.6 -2.1 -32.8 173 F 1 492 11 30 41 11 33 41 J1658-0739 14 51 53 38.3 138.2 -2.1 -33.7 -7 1 1 492 11 33 41 11 34 51 --- 14 53 04 38.5 138.5 -2.1 -33.5 63 F 1 496 11 33 41 11 34 51 GJ644C 14 53 04 38.3 139.9 -2.0 -32.6 -7 1 1 496 11 34 51 11 37 51 --- 14 56 04 38.7 140.7 -2.0 -31.9 173 F 1 508 11 34 51 11 37 51 J1658-0739 14 56 04 38.9 139.3 -2.1 -32.9 -7 1 1 508 11 37 51 11 39 01 --- 14 57 14 39.1 139.6 -2.0 -32.7 63 F 1 512 11 37 51 11 39 01 GJ644C 14 57 14 38.9 141.0 -2.0 -31.7 -7 1 1 512 11 39 01 11 42 01 --- 15 00 15 39.2 141.8 -1.9 -31.1 173 F 1 524 11 39 01 11 42 01 J1658-0739 15 00 15 39.5 140.4 -2.0 -32.1 -7 1 1 524 11 42 01 11 43 11 --- 15 01 25 39.6 140.8 -2.0 -31.8 63 F 1 528 11 42 01 11 43 11 J1652-0915 15 01 25 39.1 143.6 -1.9 -29.8 -8 1 1 528 11 43 11 11 44 21 --- 15 02 35 39.2 144.0 -1.8 -29.5 62 F 1 533 11 43 11 11 44 21 J1658-0739 15 02 35 39.8 141.1 -1.9 -31.6 -8 1 1 533 11 44 21 11 45 31 --- 15 03 45 39.9 141.4 -1.9 -31.3 62 F 1 537 11 44 21 11 46 15 J1656-0206 15 04 30 44.9 138.1 -1.9 -33.5 28 1 1 537 11 46 15 11 46 55 =1654-020 15 05 10 45.0 138.3 -1.9 -33.4 40 F 1 540 11 46 33 11 46 55 J1658-0739 15 05 10 40.1 141.8 -1.9 -31.0 -16 1 1 540 11 46 55 11 48 05 --- 15 06 20 40.3 142.1 -1.9 -30.8 54 F 1 544 11 46 55 11 48 05 J1656-0206 15 06 20 45.2 138.7 -1.9 -33.1 -16 1 1 544 11 48 05 11 49 15 =1654-020 15 07 30 45.4 139.0 -1.8 -32.8 54 F 1 549 11 48 05 11 49 15 GJ1207 15 07 30 43.4 140.6 -1.8 -31.7 -10 1 1 549 11 49 15 11 52 15 --- 15 10 31 43.8 141.5 -1.8 -31.0 170 F 1 561 11 49 15 11 52 15 J1656-0206 15 10 31 45.8 139.9 -1.8 -32.2 -10 1 1 561 11 52 15 11 53 25 =1654-020 15 11 41 45.9 140.3 -1.8 -31.9 60 F 1 565 11 52 15 11 53 25 GJ1207 15 11 41 44.0 141.9 -1.8 -30.8 -10 1 1 565 11 53 25 11 56 25 --- 15 14 42 44.4 142.8 -1.7 -30.1 170 F 1 577 11 53 25 Schedule for VLBA_PT (Code Pt ) Page 8 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 11 56 25 J1656-0206 15 14 42 46.3 141.2 -1.7 -31.2 -10 1 1 577 11 56 25 11 57 35 =1654-020 15 15 52 46.5 141.6 -1.7 -30.9 60 F 1 581 11 56 25 11 57 35 GJ1207 15 15 52 44.5 143.1 -1.7 -29.8 -10 1 1 581 11 57 35 12 00 35 --- 15 18 52 44.9 144.0 -1.6 -29.1 170 F 1 593 11 57 35 12 00 35 J1656-0206 15 18 52 46.8 142.5 -1.6 -30.2 -10 1 1 593 12 00 35 12 01 45 =1654-020 15 20 02 47.0 142.9 -1.6 -29.9 60 F 1 597 12 00 35 12 01 45 GJ1207 15 20 02 45.0 144.4 -1.6 -28.8 -10 1 1 597 12 01 45 12 04 45 --- 15 23 03 45.4 145.3 -1.6 -28.1 170 F 1 609 12 01 45 12 04 45 J1656-0206 15 23 03 47.4 143.8 -1.6 -29.2 -10 1 1 609 12 04 45 12 05 55 =1654-020 15 24 13 47.5 144.2 -1.6 -28.9 60 F 1 614 12 04 45 12 05 55 GJ1207 15 24 13 45.5 145.7 -1.6 -27.8 -10 1 1 614 12 05 55 12 08 55 --- 15 27 14 45.9 146.7 -1.5 -27.1 170 F 1 625 12 05 55 12 08 55 J1656-0206 15 27 14 47.9 145.2 -1.5 -28.2 -10 1 1 625 12 08 55 12 10 05 =1654-020 15 28 24 48.0 145.6 -1.5 -27.9 60 F 1 630 12 08 55 12 10 05 J1658-0739 15 28 24 42.8 148.6 -1.5 -25.8 -16 1 1 630 12 10 05 12 11 15 --- 15 29 34 43.0 148.9 -1.5 -25.5 54 F 1 634 12 10 05 12 11 15 J1656-0206 15 29 34 48.1 146.0 -1.5 -27.6 -16 1 1 634 12 11 15 12 12 25 =1654-020 15 30 44 48.3 146.4 -1.4 -27.3 54 F 1 639 12 11 15 12 13 09 J1658-0739 15 31 29 43.2 149.5 -1.5 -25.0 28 1 1 639 12 13 09 12 13 49 --- 15 32 09 43.2 149.7 -1.5 -24.9 40 F 1 641 12 13 27 12 13 49 J1652-0915 15 32 09 42.4 152.6 -1.3 -22.6 -8 1 1 641 12 13 49 12 14 59 --- 15 33 19 42.5 153.0 -1.3 -22.4 62 F 1 646 12 13 49 12 14 59 J1658-0739 15 33 19 43.4 150.1 -1.4 -24.6 -8 1 1 646 12 14 59 12 16 09 --- 15 34 29 43.5 150.4 -1.4 -24.3 62 F 1 650 12 14 59 12 16 09 GJ644C 15 34 29 43.1 151.8 -1.4 -23.2 -7 1 1 650 12 16 09 12 19 09 --- 15 37 30 43.4 152.8 -1.3 -22.5 173 F 1 662 12 16 09 12 19 09 J1658-0739 15 37 30 43.8 151.4 -1.4 -23.5 -7 1 1 662 12 19 09 12 20 19 --- 15 38 40 43.9 151.7 -1.3 -23.2 63 F 1 666 12 19 09 Schedule for VLBA_PT (Code Pt ) Page 9 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 12 20 19 GJ644C 15 38 40 43.5 153.1 -1.3 -22.2 -7 1 1 666 12 20 19 12 23 19 --- 15 41 40 43.8 154.1 -1.2 -21.4 173 F 1 678 12 20 19 12 23 19 J1658-0739 15 41 40 44.2 152.7 -1.3 -22.5 -7 1 1 678 12 23 19 12 24 29 --- 15 42 50 44.3 153.1 -1.3 -22.2 63 F 1 683 12 23 19 12 24 29 GJ644C 15 42 50 43.9 154.5 -1.2 -21.1 -7 1 1 683 12 24 29 12 27 29 --- 15 45 51 44.2 155.4 -1.2 -20.3 173 F 1 694 12 24 29 12 27 29 J1658-0739 15 45 51 44.6 154.0 -1.2 -21.4 -7 1 1 694 12 27 29 12 28 39 --- 15 47 01 44.7 154.4 -1.2 -21.1 63 F 1 699 12 27 29 12 28 39 GJ644C 15 47 01 44.3 155.8 -1.2 -20.0 -7 1 1 699 12 28 39 12 31 39 --- 15 50 02 44.5 156.8 -1.1 -19.2 173 F 1 710 12 28 39 12 31 39 J1658-0739 15 50 02 44.9 155.4 -1.2 -20.3 -7 1 1 710 12 31 39 12 32 49 --- 15 51 12 45.0 155.8 -1.1 -20.0 63 F 1 715 12 31 39 12 32 49 GJ644C 15 51 12 44.6 157.2 -1.1 -18.9 -7 1 1 715 12 32 49 12 35 49 --- 15 54 12 44.8 158.2 -1.0 -18.1 173 F 1 726 12 32 49 12 35 49 J1658-0739 15 54 12 45.3 156.8 -1.1 -19.2 -7 1 1 726 12 35 49 12 36 59 --- 15 55 22 45.4 157.2 -1.1 -18.9 63 F 1 731 12 35 49 12 36 59 J1652-0915 15 55 22 44.4 160.0 -1.0 -16.6 -8 1 1 731 12 36 59 12 38 09 --- 15 56 33 44.4 160.4 -0.9 -16.3 62 F 1 735 12 36 59 12 38 09 J1658-0739 15 56 33 45.5 157.6 -1.0 -18.5 -8 1 1 735 12 38 09 12 39 19 --- 15 57 43 45.6 158.0 -1.0 -18.2 62 F 1 740 12 38 09 12 40 03 J1656-0206 15 58 26 51.0 156.2 -1.0 -19.5 26 1 1 740 12 40 03 12 40 43 =1654-020 15 59 06 51.1 156.4 -1.0 -19.3 40 F 1 743 12 40 21 12 40 43 J1658-0739 15 59 06 45.7 158.4 -1.0 -17.8 -17 1 1 743 12 40 43 12 41 53 --- 16 00 17 45.8 158.8 -1.0 -17.5 53 F 1 747 12 40 43 12 41 53 J1656-0206 16 00 17 51.2 156.9 -1.0 -19.0 -17 1 1 747 12 41 53 12 43 03 =1654-020 16 01 27 51.3 157.3 -0.9 -18.6 53 F 1 752 12 41 53 12 43 03 GJ1207 16 01 27 49.1 158.3 -0.9 -17.8 -10 1 1 752 12 43 03 12 46 03 --- 16 04 27 49.4 159.4 -0.9 -16.9 170 F 1 763 12 43 03 Schedule for VLBA_PT (Code Pt ) Page 10 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 12 46 03 J1656-0206 16 04 27 51.5 158.4 -0.9 -17.7 -10 1 1 763 12 46 03 12 47 13 =1654-020 16 05 37 51.6 158.9 -0.9 -17.3 60 F 1 768 12 46 03 12 47 13 GJ1207 16 05 37 49.4 159.9 -0.9 -16.6 -10 1 1 768 12 47 13 12 50 13 --- 16 08 38 49.6 161.0 -0.8 -15.7 170 F 1 779 12 47 13 12 50 13 J1656-0206 16 08 38 51.8 160.1 -0.8 -16.4 -10 1 1 779 12 50 13 12 51 23 =1654-020 16 09 48 51.9 160.5 -0.8 -16.0 60 F 1 784 12 50 13 12 51 23 GJ1207 16 09 48 49.7 161.4 -0.8 -15.3 -10 1 1 784 12 51 23 12 54 23 --- 16 12 49 49.9 162.5 -0.7 -14.4 170 F 1 795 12 51 23 12 54 23 J1656-0206 16 12 49 52.1 161.7 -0.7 -15.1 -10 1 1 795 12 54 23 12 55 33 =1654-020 16 13 59 52.2 162.1 -0.7 -14.7 60 F 1 800 12 54 23 12 55 33 GJ1207 16 13 59 50.0 163.0 -0.7 -14.0 -10 1 1 800 12 55 33 12 58 33 --- 16 16 59 50.2 164.1 -0.7 -13.1 170 F 1 812 12 55 33 12 58 33 J1656-0206 16 16 59 52.4 163.3 -0.7 -13.7 -10 1 1 812 12 58 33 12 59 43 =1654-020 16 18 09 52.4 163.8 -0.7 -13.3 60 F 1 816 12 58 33 12 59 43 GJ1207 16 18 09 50.2 164.5 -0.7 -12.8 -10 1 1 816 12 59 43 13 02 43 --- 16 21 10 50.4 165.7 -0.6 -11.8 170 F 1 828 12 59 43 13 02 43 J1656-0206 16 21 10 52.6 165.0 -0.6 -12.4 -10 1 1 828 13 02 43 13 03 53 =1654-020 16 22 20 52.6 165.5 -0.6 -12.0 60 F 1 832 13 02 43 13 03 53 J1658-0739 16 22 20 47.1 166.5 -0.6 -11.2 -17 1 1 832 13 03 53 13 05 03 --- 16 23 30 47.2 166.9 -0.6 -10.9 53 F 1 837 13 03 53 13 05 03 J1656-0206 16 23 30 52.7 165.9 -0.6 -11.6 -17 1 1 837 13 05 03 13 06 13 =1654-020 16 24 41 52.8 166.4 -0.5 -11.2 53 F 1 841 13 05 03 13 19 27 3C345 16 37 57 84.4 10.5 -0.1 -168.7 684 1 1 841 13 19 27 13 21 27 --- 16 39 57 84.5 6.6 -0.1 -172.9 120 F 1 849 13 19 45 13 25 48 J1658-0739 16 44 19 47.9 174.5 -0.2 -4.6 143 1 1 849 13 25 48 13 26 28 --- 16 44 59 47.9 174.8 -0.2 -4.4 40 F 1 852 13 26 06 13 26 28 J1652-0915 16 44 59 46.4 177.3 -0.1 -2.3 -9 1 1 852 13 26 28 13 27 38 --- 16 46 09 46.4 177.7 -0.1 -1.9 61 F 1 856 13 26 28 Schedule for VLBA_PT (Code Pt ) Page 11 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 13 27 38 J1658-0739 16 46 09 47.9 175.2 -0.2 -4.0 -9 1 1 856 13 27 38 13 28 48 --- 16 47 20 47.9 175.6 -0.2 -3.7 61 F 1 861 13 27 38 13 28 48 GJ644C 16 47 20 47.2 176.8 -0.1 -2.6 -7 1 1 861 13 28 48 13 31 48 --- 16 50 20 47.3 177.9 -0.1 -1.7 173 F 1 872 13 28 48 13 31 48 J1658-0739 16 50 20 48.0 176.7 -0.1 -2.7 -7 1 1 872 13 31 48 13 32 58 --- 16 51 30 48.0 177.2 -0.1 -2.4 63 F 1 877 13 31 48 13 32 58 GJ644C 16 51 30 47.3 178.4 -0.1 -1.4 -7 1 1 877 13 32 58 13 35 58 --- 16 54 31 47.3 179.4 0.0 -0.5 173 F 1 888 13 32 58 13 35 58 J1658-0739 16 54 31 48.0 178.3 -0.1 -1.4 -7 1 1 888 13 35 58 13 37 08 --- 16 55 41 48.0 178.7 -0.1 -1.1 63 F 1 893 13 35 58 13 37 08 GJ644C 16 55 41 47.3 179.9 0.0 -0.1 -7 1 1 893 13 37 08 13 40 08 --- 16 58 42 47.3 181.0 0.0 0.8 173 F 1 904 13 37 08 13 40 08 J1658-0739 16 58 42 48.0 179.8 0.0 -0.2 -7 1 1 904 13 40 08 13 41 18 --- 16 59 52 48.0 180.3 0.0 0.2 63 F 1 909 13 40 08 13 41 18 GJ644C 16 59 52 47.3 181.4 0.1 1.2 -7 1 1 909 13 41 18 13 44 18 --- 17 02 52 47.3 182.5 0.1 2.1 173 F 1 921 13 41 18 13 44 18 J1658-0739 17 02 52 48.0 181.4 0.1 1.1 -7 1 1 921 13 44 18 13 45 28 --- 17 04 02 48.0 181.8 0.1 1.5 63 F 1 925 13 44 18 13 45 28 GJ644C 17 04 02 47.2 182.9 0.1 2.4 -8 1 1 925 13 45 28 13 48 28 --- 17 07 03 47.2 184.0 0.2 3.3 172 F 1 937 13 45 28 13 48 28 J1658-0739 17 07 03 48.0 182.9 0.1 2.4 -8 1 1 937 13 48 28 13 49 38 --- 17 08 13 48.0 183.3 0.2 2.8 62 F 1 941 13 48 28 13 49 38 J1652-0915 17 08 13 46.3 185.6 0.3 4.7 -9 1 1 941 13 49 38 13 50 48 --- 17 09 23 46.2 186.0 0.3 5.0 61 F 1 946 13 49 38 13 50 48 J1658-0739 17 09 23 48.0 183.8 0.2 3.1 -9 1 1 946 13 50 48 13 51 58 --- 17 10 33 47.9 184.2 0.2 3.5 61 F 1 950 13 50 48 13 52 39 J1656-0206 17 11 14 53.4 185.8 0.2 4.8 24 1 1 950 13 52 39 13 53 19 =1654-020 17 11 54 53.4 186.1 0.2 5.0 40 F 1 953 13 52 57 Schedule for VLBA_PT (Code Pt ) Page 12 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 13 53 19 J1658-0739 17 11 54 47.9 184.7 0.2 3.9 -17 1 1 953 13 53 19 13 54 29 --- 17 13 05 47.9 185.1 0.2 4.3 53 F 1 957 13 53 19 13 54 29 J1656-0206 17 13 05 53.4 186.6 0.3 5.4 -17 1 1 957 13 54 29 13 55 39 =1654-020 17 14 15 53.4 187.1 0.3 5.8 53 F 1 962 13 54 29 13 55 39 GJ1207 17 14 15 51.1 186.6 0.3 5.5 -10 1 1 962 13 55 39 13 58 39 --- 17 17 15 51.1 187.8 0.3 6.5 170 F 1 973 13 55 39 13 58 39 J1656-0206 17 17 15 53.3 188.3 0.3 6.9 -10 1 1 973 13 58 39 13 59 49 =1654-020 17 18 26 53.2 188.8 0.4 7.3 60 F 1 978 13 58 39 13 59 49 GJ1207 17 18 26 51.0 188.3 0.3 6.9 -10 1 1 978 13 59 49 14 02 49 --- 17 21 26 50.9 189.5 0.4 7.8 170 F 1 990 13 59 49 14 02 49 J1656-0206 17 21 26 53.1 190.1 0.4 8.3 -10 1 1 990 14 02 49 14 03 59 =1654-020 17 22 36 53.1 190.5 0.4 8.7 60 F 1 994 14 02 49 14 03 59 GJ1207 17 22 36 50.9 189.9 0.4 8.2 -10 1 1 994 14 03 59 14 06 59 --- 17 25 37 50.8 191.1 0.5 9.2 170 F 1 1006 14 03 59 14 06 59 J1656-0206 17 25 37 53.0 191.8 0.5 9.7 -10 1 1 1006 14 06 59 14 08 09 =1654-020 17 26 47 52.9 192.2 0.5 10.1 60 F 1 1010 14 06 59 14 08 09 GJ1207 17 26 47 50.7 191.6 0.5 9.6 -10 1 1 1010 14 08 09 14 11 09 --- 17 29 47 50.6 192.7 0.5 10.5 170 F 1 1022 14 08 09 14 11 09 J1656-0206 17 29 47 52.8 193.5 0.5 11.1 -10 1 1 1022 14 11 09 14 12 19 =1654-020 17 30 58 52.7 193.9 0.6 11.5 60 F 1 1026 14 11 09 14 12 19 GJ1207 17 30 58 50.5 193.2 0.6 10.9 -10 1 1 1026 14 12 19 14 15 19 --- 17 33 58 50.4 194.3 0.6 11.8 170 F 1 1038 14 12 19 14 15 19 J1656-0206 17 33 58 52.6 195.2 0.6 12.5 -10 1 1 1038 14 15 19 14 16 29 =1654-020 17 35 08 52.5 195.6 0.6 12.9 60 F 1 1043 14 15 19 14 16 29 J1658-0739 17 35 08 47.2 193.2 0.6 10.9 -17 1 1 1043 14 16 29 14 17 39 --- 17 36 18 47.1 193.6 0.6 11.3 53 F 1 1047 14 16 29 14 17 39 J1656-0206 17 36 18 52.4 196.1 0.6 13.2 -17 1 1 1047 14 17 39 14 18 49 =1654-020 17 37 29 52.4 196.6 0.7 13.6 53 F 1 1052 14 17 39 Schedule for VLBA_PT (Code Pt ) Page 13 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 14 19 29 J1658-0739 17 38 09 47.0 194.2 0.6 11.8 24 1 1 1052 14 19 29 14 20 09 --- 17 38 49 47.0 194.5 0.7 12.0 40 F 1 1054 14 19 47 14 20 09 J1652-0915 17 38 49 45.1 196.2 0.8 13.5 -10 1 1 1054 14 20 09 14 21 19 --- 17 39 59 45.0 196.6 0.8 13.9 60 F 1 1059 14 20 09 14 21 19 J1658-0739 17 39 59 46.9 194.9 0.7 12.4 -10 1 1 1059 14 21 19 14 22 29 --- 17 41 10 46.9 195.3 0.7 12.7 60 F 1 1063 14 21 19 14 22 29 GJ644C 17 41 10 46.0 196.2 0.8 13.4 -8 1 1 1063 14 22 29 14 25 29 --- 17 44 10 45.8 197.2 0.8 14.3 172 F 1 1075 14 22 29 14 25 29 J1658-0739 17 44 10 46.7 196.4 0.7 13.6 -8 1 1 1075 14 25 29 14 26 39 --- 17 45 20 46.6 196.8 0.8 13.9 62 F 1 1079 14 25 29 14 26 39 GJ644C 17 45 20 45.7 197.6 0.8 14.6 -8 1 1 1079 14 26 39 14 29 39 --- 17 48 21 45.5 198.6 0.9 15.5 172 F 1 1091 14 26 39 14 29 39 J1658-0739 17 48 21 46.4 197.8 0.8 14.8 -8 1 1 1091 14 29 39 14 30 49 --- 17 49 31 46.4 198.2 0.8 15.1 62 F 1 1095 14 29 39 14 30 49 GJ644C 17 49 31 45.4 199.0 0.9 15.8 -8 1 1 1095 14 30 49 14 33 49 --- 17 52 32 45.2 200.0 0.9 16.6 172 F 1 1107 14 30 49 14 33 49 J1658-0739 17 52 32 46.2 199.3 0.9 16.0 -8 1 1 1107 14 33 49 14 34 59 --- 17 53 42 46.1 199.7 0.9 16.3 62 F 1 1112 14 33 49 14 34 59 GJ644C 17 53 42 45.2 200.4 1.0 17.0 -8 1 1 1112 14 34 59 14 37 59 --- 17 56 42 44.9 201.4 1.0 17.8 172 F 1 1123 14 34 59 14 37 59 J1658-0739 17 56 42 45.9 200.7 1.0 17.1 -8 1 1 1123 14 37 59 14 39 09 --- 17 57 52 45.8 201.1 1.0 17.5 62 F 1 1128 14 37 59 14 39 09 GJ644C 17 57 52 44.8 201.8 1.0 18.1 -8 1 1 1128 14 39 09 14 42 09 --- 18 00 53 44.6 202.8 1.1 18.9 172 F 1 1139 14 39 09 14 42 09 J1658-0739 18 00 53 45.6 202.1 1.0 18.3 -8 1 1 1139 14 42 09 14 43 19 --- 18 02 03 45.5 202.5 1.0 18.6 62 F 1 1144 14 42 09 14 43 19 J1652-0915 18 02 03 43.4 203.9 1.2 19.8 -10 1 1 1144 14 43 19 14 44 29 --- 18 03 13 43.3 204.3 1.2 20.1 60 F 1 1148 14 43 19 Schedule for VLBA_PT (Code Pt ) Page 14 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 14 44 29 J1658-0739 18 03 13 45.4 202.9 1.1 18.9 -10 1 1 1148 14 44 29 14 45 39 --- 18 04 23 45.3 203.3 1.1 19.2 60 F 1 1153 14 44 29 14 46 21 J1656-0206 18 05 05 50.2 207.1 1.1 22.1 26 1 1 1153 14 46 21 14 47 01 =1654-020 18 05 45 50.2 207.3 1.1 22.3 40 F 1 1155 14 46 39 14 47 01 J1658-0739 18 05 45 45.2 203.7 1.1 19.6 -16 1 1 1155 14 47 01 14 48 11 --- 18 06 55 45.1 204.1 1.1 19.9 54 F 1 1160 14 47 01 14 48 11 J1656-0206 18 06 55 50.1 207.7 1.2 22.6 -16 1 1 1160 14 48 11 14 49 21 =1654-020 18 08 06 50.0 208.1 1.2 23.0 54 F 1 1164 14 48 11 14 49 21 GJ1207 18 08 06 47.9 206.8 1.2 21.9 -10 1 1 1164 14 49 21 14 52 21 --- 18 11 06 47.6 207.8 1.2 22.7 170 F 1 1176 14 49 21 14 52 21 J1656-0206 18 11 06 49.7 209.2 1.2 23.8 -10 1 1 1176 14 52 21 14 53 31 =1654-020 18 12 16 49.5 209.6 1.2 24.1 60 F 1 1181 14 52 21 14 53 31 GJ1207 18 12 16 47.5 208.2 1.2 23.1 -10 1 1 1181 14 53 31 14 56 31 --- 18 15 17 47.2 209.2 1.3 23.9 170 F 1 1192 14 53 31 14 56 31 J1656-0206 18 15 17 49.2 210.7 1.3 24.9 -10 1 1 1192 14 56 31 14 57 41 =1654-020 18 16 27 49.1 211.1 1.3 25.3 60 F 1 1197 14 56 31 14 57 41 GJ1207 18 16 27 47.1 209.6 1.3 24.2 -10 1 1 1197 14 57 41 15 00 41 --- 18 19 27 46.8 210.6 1.4 25.0 170 F 1 1208 14 57 41 15 00 41 J1656-0206 18 19 27 48.8 212.1 1.4 26.1 -10 1 1 1208 15 00 41 15 01 51 =1654-020 18 20 38 48.7 212.5 1.4 26.4 60 F 1 1213 15 00 41 15 01 51 GJ1207 18 20 38 46.7 211.0 1.4 25.3 -10 1 1 1213 15 01 51 15 04 51 --- 18 23 38 46.3 212.0 1.4 26.0 170 F 1 1224 15 01 51 15 04 51 J1656-0206 18 23 38 48.3 213.5 1.4 27.2 -10 1 1 1224 15 04 51 15 06 01 =1654-020 18 24 48 48.2 213.9 1.5 27.5 60 F 1 1229 15 04 51 15 06 01 GJ1207 18 24 48 46.2 212.4 1.5 26.3 -10 1 1 1229 15 06 01 15 09 01 --- 18 27 49 45.9 213.3 1.5 27.1 170 F 1 1241 15 06 01 15 09 01 J1656-0206 18 27 49 47.8 214.9 1.5 28.2 -10 1 1 1241 15 09 01 15 10 11 =1654-020 18 28 59 47.7 215.3 1.5 28.5 60 F 1 1245 15 09 01 Schedule for VLBA_PT (Code Pt ) Page 15 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 15 10 11 J1658-0739 18 28 59 43.0 211.1 1.5 25.5 -15 1 1 1245 15 10 11 15 11 21 --- 18 30 09 42.8 211.5 1.5 25.8 55 F 1 1250 15 10 11 15 11 21 J1656-0206 18 30 09 47.5 215.7 1.5 28.8 -15 1 1 1250 15 11 21 15 12 31 =1654-020 18 31 19 47.4 216.1 1.6 29.1 55 F 1 1254 15 11 21 15 15 37 3C345 18 34 26 67.2 292.1 1.9 95.1 129 1 1 1254 15 15 37 15 17 37 --- 18 36 26 66.9 292.0 1.9 94.7 120 F 1 1262 15 15 55 15 20 53 J1658-0739 18 39 43 41.8 214.3 1.7 28.1 138 1 1 1262 15 20 53 15 21 33 --- 18 40 23 41.7 214.5 1.7 28.2 40 F 1 1264 15 21 11 15 21 33 J1652-0915 18 40 23 39.5 215.4 1.8 29.0 -10 1 1 1264 15 21 33 15 22 43 --- 18 41 33 39.4 215.7 1.8 29.3 60 F 1 1269 15 21 33 15 22 43 J1658-0739 18 41 33 41.5 214.9 1.7 28.5 -10 1 1 1269 15 22 43 15 23 53 --- 18 42 43 41.4 215.2 1.7 28.7 60 F 1 1273 15 22 43 15 23 53 GJ644C 18 42 43 40.4 215.7 1.8 29.1 -8 1 1 1273 15 23 53 15 26 53 --- 18 45 44 40.0 216.5 1.8 29.8 172 F 1 1285 15 23 53 15 26 53 J1658-0739 18 45 44 41.0 216.1 1.8 29.4 -8 1 1 1285 15 26 53 15 28 03 --- 18 46 54 40.9 216.4 1.8 29.7 62 F 1 1290 15 26 53 15 28 03 GJ644C 18 46 54 39.9 216.8 1.8 30.0 -8 1 1 1290 15 28 03 15 31 03 --- 18 49 54 39.5 217.7 1.9 30.7 172 F 1 1301 15 28 03 15 31 03 J1658-0739 18 49 54 40.5 217.3 1.8 30.3 -8 1 1 1301 15 31 03 15 32 13 --- 18 51 05 40.4 217.6 1.9 30.6 62 F 1 1306 15 31 03 15 32 13 GJ644C 18 51 05 39.3 218.0 1.9 30.9 -8 1 1 1306 15 32 13 15 35 13 --- 18 54 05 39.0 218.8 2.0 31.6 172 F 1 1317 15 32 13 15 35 13 J1658-0739 18 54 05 40.0 218.4 1.9 31.2 -8 1 1 1317 15 35 13 15 36 23 --- 18 55 15 39.8 218.8 1.9 31.5 62 F 1 1322 15 35 13 15 36 23 GJ644C 18 55 15 38.8 219.1 2.0 31.8 -8 1 1 1322 15 36 23 15 39 23 --- 18 58 16 38.4 219.9 2.0 32.4 172 F 1 1333 15 36 23 15 39 23 J1658-0739 18 58 16 39.5 219.6 2.0 32.1 -8 1 1 1333 15 39 23 15 40 33 --- 18 59 26 39.3 219.9 2.0 32.3 62 F 1 1338 15 39 23 Schedule for VLBA_PT (Code Pt ) Page 16 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 15 40 33 GJ644C 18 59 26 38.3 220.2 2.1 32.6 -8 1 1 1338 15 40 33 15 43 33 --- 19 02 26 37.8 221.0 2.1 33.2 172 F 1 1350 15 40 33 15 43 33 J1658-0739 19 02 26 38.9 220.7 2.1 32.9 -8 1 1 1350 15 43 33 15 44 43 --- 19 03 37 38.7 221.0 2.1 33.2 62 F 1 1354 15 43 33 15 44 43 J1652-0915 19 03 37 36.5 221.6 2.2 33.8 -10 1 1 1354 15 44 43 15 45 53 --- 19 04 47 36.3 221.9 2.2 34.0 60 F 1 1359 15 44 43 15 45 53 J1658-0739 19 04 47 38.6 221.3 2.1 33.4 -10 1 1 1359 15 45 53 15 47 03 --- 19 05 57 38.4 221.6 2.1 33.6 60 F 1 1363 15 45 53 15 47 44 J1656-0206 19 06 39 42.6 226.5 2.2 36.9 27 1 1 1363 15 47 44 15 48 24 =1654-020 19 07 19 42.5 226.7 2.2 37.0 40 F 1 1366 15 48 02 15 48 24 J1658-0739 19 07 19 38.2 222.0 2.1 33.9 -15 1 1 1366 15 48 24 15 49 34 --- 19 08 29 38.1 222.3 2.2 34.1 55 F 1 1370 15 48 24 15 49 34 J1656-0206 19 08 29 42.3 227.0 2.2 37.2 -14 1 1 1370 15 49 34 15 50 44 =1654-020 19 09 39 42.1 227.3 2.2 37.4 56 F 1 1375 15 49 34 15 50 44 GJ1207 19 09 39 40.4 225.5 2.2 36.2 -10 1 1 1375 15 50 44 15 53 44 --- 19 12 40 39.9 226.3 2.3 36.8 170 F 1 1386 15 50 44 15 53 44 J1656-0206 19 12 40 41.7 228.1 2.3 38.0 -10 1 1 1386 15 53 44 15 54 54 =1654-020 19 13 50 41.5 228.4 2.3 38.2 60 F 1 1391 15 53 44 15 54 54 GJ1207 19 13 50 39.7 226.6 2.3 37.0 -9 1 1 1391 15 54 54 15 57 54 --- 19 16 51 39.3 227.4 2.3 37.6 171 F 1 1402 15 54 54 15 57 54 J1656-0206 19 16 51 41.0 229.2 2.3 38.8 -9 1 1 1402 15 57 54 15 59 04 =1654-020 19 18 01 40.8 229.5 2.3 39.0 61 F 1 1407 15 57 54 15 59 04 GJ1207 19 18 01 39.1 227.7 2.3 37.8 -9 1 1 1407 15 59 04 16 02 04 --- 19 21 01 38.7 228.4 2.4 38.3 171 F 1 1419 15 59 04 16 02 04 J1656-0206 19 21 01 40.4 230.3 2.4 39.5 -9 1 1 1419 16 02 04 16 03 14 =1654-020 19 22 11 40.2 230.6 2.4 39.7 61 F 1 1423 16 02 04 16 03 14 GJ1207 19 22 11 38.5 228.7 2.4 38.5 -9 1 1 1423 16 03 14 16 06 14 --- 19 25 12 38.0 229.5 2.5 39.0 171 F 1 1435 16 03 14 Schedule for VLBA_PT (Code Pt ) Page 17 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 16 06 14 J1656-0206 19 25 12 39.7 231.3 2.5 40.2 -9 1 1 1435 16 06 14 16 07 24 =1654-020 19 26 22 39.5 231.6 2.5 40.4 61 F 1 1439 16 06 14 16 07 24 GJ1207 19 26 22 37.8 229.7 2.5 39.2 -9 1 1 1439 16 07 24 16 10 24 --- 19 29 23 37.3 230.5 2.5 39.7 171 F 1 1451 16 07 24 16 10 24 J1656-0206 19 29 23 39.0 232.4 2.5 40.9 -9 1 1 1451 16 10 24 16 11 34 =1654-020 19 30 33 38.8 232.6 2.6 41.1 61 F 1 1455 16 10 24 16 11 34 J1658-0739 19 30 33 34.8 227.8 2.5 38.1 -14 1 1 1455 16 11 34 16 12 44 --- 19 31 43 34.7 228.1 2.5 38.3 56 F 1 1460 16 11 34 16 12 44 J1656-0206 19 31 43 38.6 232.9 2.6 41.3 -14 1 1 1460 16 12 44 16 13 54 =1654-020 19 32 53 38.4 233.2 2.6 41.5 56 F 1 1464 16 12 44 16 14 35 J1658-0739 19 33 34 34.4 228.5 2.6 38.6 27 1 1 1464 16 14 35 16 15 15 --- 19 34 14 34.3 228.7 2.6 38.7 40 F 1 1467 16 14 53 16 15 15 J1652-0915 19 34 14 32.0 229.0 2.7 39.2 -11 1 1 1467 16 15 15 16 16 25 --- 19 35 24 31.8 229.2 2.7 39.3 59 F 1 1472 16 15 15 16 16 25 J1658-0739 19 35 24 34.1 228.9 2.6 38.9 -11 1 1 1472 16 16 25 16 17 35 --- 19 36 35 33.9 229.2 2.6 39.1 59 F 1 1476 16 16 25 16 17 35 GJ644C 19 36 35 32.8 229.4 2.7 39.3 -8 1 1 1476 16 17 35 16 20 35 --- 19 39 35 32.4 230.1 2.7 39.8 172 F 1 1488 16 17 35 16 20 35 J1658-0739 19 39 35 33.4 229.9 2.7 39.6 -8 1 1 1488 16 20 35 16 21 45 --- 19 40 45 33.3 230.2 2.7 39.8 62 F 1 1492 16 20 35 16 21 45 GJ644C 19 40 45 32.2 230.3 2.7 40.0 -8 1 1 1492 16 21 45 16 24 45 --- 19 43 46 31.7 231.0 2.8 40.5 172 F 1 1504 16 21 45 16 24 45 J1658-0739 19 43 46 32.8 230.9 2.7 40.3 -8 1 1 1504 16 24 45 16 25 55 --- 19 44 56 32.6 231.1 2.8 40.5 62 F 1 1508 16 24 45 16 25 55 GJ644C 19 44 56 31.5 231.2 2.8 40.6 -8 1 1 1508 16 25 55 16 28 55 --- 19 47 56 31.0 231.9 2.9 41.1 172 F 1 1520 16 25 55 16 28 55 J1658-0739 19 47 56 32.1 231.8 2.8 40.9 -8 1 1 1520 16 28 55 16 30 05 --- 19 49 07 31.9 232.0 2.8 41.1 62 F 1 1524 16 28 55 Schedule for VLBA_PT (Code Pt ) Page 18 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 16 30 05 GJ644C 19 49 07 30.8 232.2 2.9 41.3 -8 1 1 1524 16 30 05 16 33 05 --- 19 52 07 30.3 232.8 2.9 41.7 172 F 1 1536 16 30 05 16 33 05 J1658-0739 19 52 07 31.4 232.7 2.9 41.5 -8 1 1 1536 16 33 05 16 34 15 --- 19 53 17 31.2 233.0 2.9 41.7 62 F 1 1541 16 33 05 16 34 15 GJ644C 19 53 17 30.2 233.1 3.0 41.9 -8 1 1 1541 16 34 15 16 37 15 --- 19 56 18 29.7 233.7 3.0 42.3 172 F 1 1552 16 34 15 16 37 15 J1658-0739 19 56 18 30.7 233.6 3.0 42.1 -8 1 1 1552 16 37 15 16 38 25 --- 19 57 28 30.5 233.8 3.0 42.3 62 F 1 1557 16 37 15 16 38 25 J1652-0915 19 57 28 28.3 234.0 3.1 42.6 -11 1 1 1557 16 38 25 16 39 35 --- 19 58 38 28.1 234.2 3.1 42.8 59 F 1 1561 16 38 25 16 39 35 J1658-0739 19 58 38 30.3 234.1 3.0 42.5 -11 1 1 1561 16 39 35 16 40 45 --- 19 59 48 30.1 234.3 3.0 42.6 59 F 1 1566 16 39 35 16 47 04 3C454.3 20 06 08 48.3 104.9 -2.8 -56.2 286 1 1 1566 16 47 04 16 49 04 --- 20 08 08 48.7 105.3 -2.8 -56.1 120 F 1 1573 16 47 22 16 49 04 J1656-0206 20 08 08 32.3 241.0 3.2 46.3 -96 1 1 1573 16 49 04 16 50 14 =1654-020 20 09 19 32.1 241.2 3.2 46.4 -26 F 1 1578 16 49 04 16 50 14 GJ1207 20 09 19 30.6 239.3 3.2 45.4 -9 1 1 1578 16 50 14 16 52 54 --- 20 11 59 30.1 239.9 3.2 45.8 151 F 1 1588 16 50 14 16 52 54 J1656-0206 20 11 59 31.6 241.8 3.2 46.7 -9 1 1 1588 16 52 54 16 54 04 =1654-020 20 13 09 31.4 242.0 3.3 46.9 61 F 1 1593 16 52 54 16 54 04 GJ1207 20 13 09 29.9 240.1 3.3 45.9 -9 1 1 1593 16 54 04 16 56 44 --- 20 15 50 29.4 240.6 3.3 46.2 151 F 1 1603 16 54 04 16 56 44 J1656-0206 20 15 50 30.9 242.5 3.3 47.2 -9 1 1 1603 16 56 44 16 57 54 =1654-020 20 17 00 30.7 242.8 3.3 47.3 61 F 1 1608 16 56 44 16 57 54 GJ1207 20 17 00 29.2 240.9 3.3 46.4 -9 1 1 1608 16 57 54 17 00 34 --- 20 19 40 28.7 241.4 3.4 46.7 151 F 1 1618 16 57 54 17 00 34 J1656-0206 20 19 40 30.2 243.3 3.4 47.6 -9 1 1 1618 17 00 34 17 01 44 =1654-020 20 20 51 30.0 243.5 3.4 47.7 61 F 1 1622 17 00 34 Schedule for VLBA_PT (Code Pt ) Page 19 RIPL: GJ644C/GJ1207 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Feb 2008 Day 59 --- 17 01 44 GJ1207 20 20 51 28.5 241.6 3.4 46.8 -9 1 1 1622 17 01 44 17 04 24 --- 20 23 31 28.0 242.1 3.4 47.1 151 F 1 1633 17 01 44 17 04 24 J1656-0206 20 23 31 29.5 244.0 3.4 48.0 -9 1 1 1633 17 04 24 17 05 34 =1654-020 20 24 41 29.3 244.3 3.5 48.1 61 F 1 1637 17 04 24 17 05 34 GJ1207 20 24 41 27.8 242.3 3.5 47.2 -9 1 1 1637 17 05 34 17 08 14 --- 20 27 22 27.3 242.9 3.5 47.5 151 F 1 1648 17 05 34 17 08 14 J1656-0206 20 27 22 28.8 244.8 3.5 48.4 -9 1 1 1648 17 08 14 17 09 24 =1654-020 20 28 32 28.6 245.0 3.5 48.5 61 F 1 1652 17 08 14 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 6 Station: VLBA_PT Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 6 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ644C/GJ1207 Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * J1652-0915 16 49 25.985513 * 16 52 10.118070 16 52 37.380718 0.00 -09 10 21.10459 *-09 15 19.10810 -09 16 19.98439 0.00 From catalog imbedded in main SCHED input file. 0.311 scan hours, 12.332 baseline hours above horizon. * GJ644C 16 52 51.667676 * 16 55 34.866110 16 56 01.956399 0.00 -08 19 03.51726 *-08 23 47.20604 -08 24 46.03183 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 93.767 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 16 55 35.290000 Dec = -08 23 40.10000 Rates: RA = -771.00 mas/yr Dec = -871.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54524.3910 Rates: RA = -0.14225E-03 s/day Dec = -0.23847E-02 arcsec/day * GJ1207 16 54 27.453863 * 16 57 06.079827 16 57 32.407871 0.00 -04 16 22.94038 *-04 21 00.07575 -04 21 59.25102 0.00 From catalog imbedded in main SCHED input file. 1.972 scan hours, 91.942 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 16 57 05.800000 Dec = -04 20 57.00000 Rates: RA = 513.00 mas/yr Dec = -377.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54524.3910 Rates: RA = 0.93905E-04 s/day Dec = -0.10322E-02 arcsec/day J1642+3948 16 41 17.606231 * 16 42 58.809968 16 43 15.744568 0.26 1641+399 39 54 10.81494 * 39 48 36.99400 39 47 16.10035 0.40 * 3C345 /home/arana/cwalker/sched/catalogs/sources.vlba J1642+39 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.067 scan hours, 3.667 baseline hours above horizon. * J1656-0206 16 54 20.006723 * 16 56 56.118139 16 57 22.032151 0.49 1654-020 -02 02 11.78164 *-02 06 49.52034 -02 07 49.57218 0.89 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.147 scan hours, 45.799 baseline hours above horizon. * J1658-0739 16 56 01.672896 * 16 58 44.061983 16 59 11.001762 0.23 -07 34 47.28667 *-07 39 17.69393 -07 40 14.59483 0.37 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.583 scan hours, 63.231 baseline hours above horizon. J2253+1608 22 51 29.519744 * 22 53 57.747943 22 54 21.051254 0.31 2251+158 15 52 54.34806 * 16 08 53.56089 16 11 25.21386 0.20 * 3C454.3 /home/arana/cwalker/sched/catalogs/sources.vlba J2253+16 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.033 scan hours, 1.832 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) J1652-0915 86.5 GJ644C 85.8 GJ1207 85.9 3C345 95.2 J1656-0206 86.3 J1658-0739 85.1 3C454.3 24.4 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg