COVER INFORMATION Station: VLBA_LA (Code La ) Experiment: RIPL: GJ412B/GJ3789 Exp. Code: BB240R Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for VLBA_LA (Code La ) Page 2 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 04 30 00 4C39.25 06 59 21 60.6 72.5 -2.5 -84.5 0 1 1 0 04 30 00 04 38 00 --- 07 07 22 62.1 72.7 -2.3 -85.5 480 F 1 31 04 30 18 04 51 19 J1108+4330 07 20 44 46.3 61.7 -3.8 -80.0 762 1 1 31 04 51 19 04 51 59 =1105+437 07 21 24 46.4 61.8 -3.8 -80.0 40 F 1 34 04 51 37 04 51 59 J1110+4403 07 21 24 46.1 60.9 -3.8 -80.3 -6 1 1 34 04 51 59 04 53 09 =1107+443 07 22 34 46.3 60.9 -3.8 -80.4 64 F 1 38 04 51 59 04 53 09 J1108+4330 07 22 34 46.6 61.8 -3.8 -80.2 -6 1 1 38 04 53 09 04 54 19 =1105+437 07 23 44 46.8 61.9 -3.8 -80.4 64 F 1 43 04 53 09 04 54 19 GJ412B 07 23 44 47.3 62.0 -3.7 -80.8 -7 1 1 43 04 54 19 04 57 19 --- 07 26 45 47.9 62.1 -3.7 -81.2 173 F 1 54 04 54 19 04 57 19 J1108+4330 07 26 45 47.3 62.0 -3.7 -80.8 -7 1 1 54 04 57 19 04 58 29 =1105+437 07 27 55 47.5 62.1 -3.7 -81.0 63 F 1 59 04 57 19 04 58 29 GJ412B 07 27 55 48.1 62.2 -3.6 -81.4 -7 1 1 59 04 58 29 05 01 29 --- 07 30 55 48.6 62.3 -3.6 -81.8 173 F 1 70 04 58 29 05 01 29 J1108+4330 07 30 55 48.1 62.2 -3.6 -81.4 -7 1 1 70 05 01 29 05 02 39 =1105+437 07 32 06 48.3 62.2 -3.6 -81.5 63 F 1 75 05 01 29 05 02 39 GJ412B 07 32 06 48.8 62.3 -3.6 -82.0 -7 1 1 75 05 02 39 05 05 39 --- 07 35 06 49.4 62.4 -3.5 -82.4 173 F 1 86 05 02 39 05 05 39 J1108+4330 07 35 06 48.8 62.3 -3.6 -82.0 -7 1 1 86 05 05 39 05 06 49 =1105+437 07 36 16 49.0 62.4 -3.5 -82.1 63 F 1 91 05 05 39 05 06 49 GJ412B 07 36 16 49.6 62.5 -3.5 -82.6 -7 1 1 91 05 06 49 05 09 49 --- 07 39 17 50.1 62.6 -3.4 -83.0 173 F 1 103 05 06 49 05 09 49 J1108+4330 07 39 17 49.6 62.5 -3.5 -82.6 -7 1 1 103 05 09 49 05 10 59 =1105+437 07 40 27 49.8 62.5 -3.5 -82.7 63 F 1 107 05 09 49 Schedule for VLBA_LA (Code La ) Page 3 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 05 10 59 GJ412B 07 40 27 50.3 62.6 -3.4 -83.2 -7 1 1 107 05 10 59 05 13 59 --- 07 43 27 50.9 62.7 -3.4 -83.6 173 F 1 119 05 10 59 05 13 59 J1108+4330 07 43 27 50.3 62.7 -3.4 -83.2 -7 1 1 119 05 13 59 05 15 09 =1105+437 07 44 38 50.6 62.7 -3.4 -83.4 63 F 1 123 05 13 59 05 15 09 J1110+4403 07 44 38 50.2 61.8 -3.4 -83.7 -6 1 1 123 05 15 09 05 16 19 =1107+443 07 45 48 50.4 61.8 -3.4 -83.8 64 F 1 128 05 15 09 05 16 50 J1108+4330 07 46 19 50.9 62.7 -3.4 -83.6 24 1 1 128 05 16 50 05 17 30 =1105+437 07 46 59 51.0 62.8 -3.4 -83.7 40 F 1 130 05 17 08 05 17 30 J1110+4403 07 46 59 50.6 61.8 -3.4 -84.0 -6 1 1 130 05 17 30 05 18 40 =1107+443 07 48 09 50.8 61.9 -3.4 -84.2 64 F 1 135 05 17 30 05 18 40 J1108+4330 07 48 09 51.2 62.8 -3.3 -83.9 -6 1 1 135 05 18 40 05 19 50 =1105+437 07 49 19 51.4 62.8 -3.3 -84.0 64 F 1 139 05 18 40 05 19 50 GJ412B 07 49 19 51.9 62.9 -3.3 -84.5 -7 1 1 139 05 19 50 05 22 50 --- 07 52 20 52.5 63.0 -3.2 -84.9 173 F 1 151 05 19 50 05 22 50 J1108+4330 07 52 20 51.9 62.9 -3.3 -84.5 -7 1 1 151 05 22 50 05 24 00 =1105+437 07 53 30 52.2 63.0 -3.3 -84.7 63 F 1 155 05 22 50 05 24 00 GJ412B 07 53 30 52.7 63.0 -3.2 -85.1 -7 1 1 155 05 24 00 05 27 00 --- 07 56 30 53.2 63.1 -3.2 -85.6 173 F 1 167 05 24 00 05 27 00 J1108+4330 07 56 30 52.7 63.0 -3.2 -85.1 -7 1 1 167 05 27 00 05 28 10 =1105+437 07 57 40 52.9 63.1 -3.2 -85.3 63 F 1 172 05 27 00 05 28 10 GJ412B 07 57 40 53.4 63.1 -3.1 -85.8 -7 1 1 172 05 28 10 05 31 10 --- 08 00 41 54.0 63.2 -3.1 -86.2 173 F 1 183 05 28 10 05 31 10 J1108+4330 08 00 41 53.5 63.1 -3.1 -85.8 -7 1 1 183 05 31 10 05 32 20 =1105+437 08 01 51 53.7 63.2 -3.1 -85.9 63 F 1 188 05 31 10 05 32 20 GJ412B 08 01 51 54.2 63.2 -3.1 -86.4 -7 1 1 188 05 32 20 05 35 20 --- 08 04 52 54.7 63.3 -3.0 -86.9 173 F 1 199 05 32 20 05 35 20 J1108+4330 08 04 52 54.2 63.2 -3.1 -86.4 -7 1 1 199 05 35 20 05 36 30 =1105+437 08 06 02 54.4 63.2 -3.0 -86.6 63 F 1 204 05 35 20 Schedule for VLBA_LA (Code La ) Page 4 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 05 36 30 GJ412B 08 06 02 55.0 63.3 -3.0 -87.1 -7 1 1 204 05 36 30 05 39 30 --- 08 09 02 55.5 63.3 -2.9 -87.5 173 F 1 215 05 36 30 05 39 30 J1108+4330 08 09 02 55.0 63.3 -3.0 -87.1 -7 1 1 215 05 39 30 05 40 40 =1105+437 08 10 13 55.2 63.3 -3.0 -87.3 63 F 1 220 05 39 30 05 40 40 J1110+4403 08 10 13 54.8 62.3 -3.0 -87.6 -7 1 1 220 05 40 40 05 41 50 =1107+443 08 11 23 55.0 62.4 -3.0 -87.8 63 F 1 225 05 40 40 05 41 50 J1108+4330 08 11 23 55.4 63.3 -3.0 -87.4 -7 1 1 225 05 41 50 05 43 00 =1105+437 08 12 33 55.6 63.4 -2.9 -87.6 63 F 1 229 05 41 50 05 45 10 J1333+2725 08 14 43 23.4 72.2 -5.3 -60.5 60 1 1 229 05 45 10 05 45 50 =1330+276 08 15 23 23.6 72.3 -5.3 -60.5 40 F 1 232 05 45 28 05 45 50 J1329+3154 08 15 23 26.3 68.3 -5.2 -62.6 -12 1 1 232 05 45 50 05 47 10 =1327+321 08 16 44 26.6 68.5 -5.2 -62.7 68 F 1 237 05 45 50 05 47 10 J1333+2725 08 16 44 23.8 72.5 -5.3 -60.6 -12 1 1 237 05 47 10 05 48 30 =1330+276 08 18 04 24.1 72.6 -5.3 -60.7 68 F 1 242 05 47 10 05 48 30 GJ3789 08 18 04 25.2 71.0 -5.2 -61.5 -8 1 1 242 05 48 30 05 51 30 --- 08 21 04 25.8 71.3 -5.2 -61.7 172 F 1 254 05 48 30 05 51 30 J1333+2725 08 21 04 24.7 73.0 -5.2 -60.9 -8 1 1 254 05 51 30 05 52 50 =1330+276 08 22 25 24.9 73.1 -5.2 -61.0 72 F 1 259 05 51 30 05 52 50 GJ3789 08 22 25 26.1 71.5 -5.2 -61.8 -8 1 1 259 05 52 50 05 55 50 --- 08 25 25 26.6 71.8 -5.1 -62.0 172 F 1 270 05 52 50 05 55 50 J1333+2725 08 25 25 25.5 73.5 -5.1 -61.2 -8 1 1 270 05 55 50 05 57 10 =1330+276 08 26 45 25.8 73.6 -5.1 -61.2 72 F 1 275 05 55 50 05 57 10 GJ3789 08 26 45 26.9 72.0 -5.1 -62.1 -8 1 1 275 05 57 10 06 00 10 --- 08 29 46 27.5 72.3 -5.0 -62.4 172 F 1 287 05 57 10 06 00 10 J1333+2725 08 29 46 26.3 74.0 -5.1 -61.4 -8 1 1 287 06 00 10 06 01 30 =1330+276 08 31 06 26.6 74.2 -5.0 -61.5 72 F 1 292 06 00 10 06 01 30 J1329+3154 08 31 06 29.3 70.0 -5.0 -63.9 -11 1 1 292 06 01 30 06 02 50 =1327+321 08 32 26 29.5 70.2 -5.0 -64.0 69 F 1 297 06 01 30 Schedule for VLBA_LA (Code La ) Page 5 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 06 02 50 J1333+2725 08 32 26 26.9 74.3 -5.0 -61.6 -11 1 1 297 06 02 50 06 04 10 =1330+276 08 33 46 27.1 74.5 -5.0 -61.7 69 F 1 303 06 02 50 06 06 28 J1108+4330 08 36 05 59.9 63.4 -2.5 -91.6 67 1 1 303 06 06 28 06 07 08 =1105+437 08 36 45 60.0 63.4 -2.5 -91.8 40 F 1 305 06 06 46 06 07 08 J1110+4403 08 36 45 59.5 62.4 -2.6 -92.2 -7 1 1 305 06 07 08 06 08 18 =1107+443 08 37 55 59.8 62.3 -2.6 -92.5 63 F 1 310 06 07 08 06 08 18 J1108+4330 08 37 55 60.2 63.4 -2.5 -92.0 -7 1 1 310 06 08 18 06 09 28 =1105+437 08 39 06 60.4 63.4 -2.5 -92.2 63 F 1 314 06 08 18 06 09 28 GJ412B 08 39 06 60.9 63.3 -2.4 -92.7 -7 1 1 314 06 09 28 06 12 28 --- 08 42 06 61.5 63.2 -2.4 -93.3 173 F 1 326 06 09 28 06 12 28 J1108+4330 08 42 06 61.0 63.3 -2.4 -92.7 -7 1 1 326 06 12 28 06 13 38 =1105+437 08 43 16 61.2 63.3 -2.4 -93.0 63 F 1 330 06 12 28 06 13 38 GJ412B 08 43 16 61.7 63.2 -2.4 -93.5 -7 1 1 330 06 13 38 06 16 38 --- 08 46 17 62.2 63.1 -2.3 -94.1 173 F 1 342 06 13 38 06 16 38 J1108+4330 08 46 17 61.7 63.2 -2.4 -93.5 -7 1 1 342 06 16 38 06 17 48 =1105+437 08 47 27 61.9 63.2 -2.4 -93.8 63 F 1 346 06 16 38 06 17 48 GJ412B 08 47 27 62.5 63.1 -2.3 -94.4 -7 1 1 346 06 17 48 06 20 48 --- 08 50 27 63.0 63.0 -2.3 -95.0 173 F 1 358 06 17 48 06 20 48 J1108+4330 08 50 27 62.5 63.1 -2.3 -94.4 -7 1 1 358 06 20 48 06 21 58 =1105+437 08 51 38 62.7 63.1 -2.3 -94.6 63 F 1 363 06 20 48 06 21 58 GJ412B 08 51 38 63.2 63.0 -2.2 -95.2 -7 1 1 363 06 21 58 06 24 58 --- 08 54 38 63.8 62.8 -2.2 -95.8 173 F 1 374 06 21 58 06 24 58 J1108+4330 08 54 38 63.2 63.0 -2.2 -95.2 -7 1 1 374 06 24 58 06 26 08 =1105+437 08 55 48 63.4 62.9 -2.2 -95.4 63 F 1 379 06 24 58 06 26 08 GJ412B 08 55 48 64.0 62.8 -2.2 -96.1 -7 1 1 379 06 26 08 06 29 08 --- 08 58 49 64.5 62.7 -2.1 -96.7 173 F 1 390 06 26 08 06 29 08 J1108+4330 08 58 49 64.0 62.8 -2.2 -96.1 -7 1 1 390 06 29 08 06 30 18 =1105+437 08 59 59 64.2 62.8 -2.1 -96.3 63 F 1 395 06 29 08 Schedule for VLBA_LA (Code La ) Page 6 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 06 30 18 J1110+4403 08 59 59 63.7 61.7 -2.2 -96.9 -7 1 1 395 06 30 18 06 31 28 =1107+443 09 01 09 63.9 61.6 -2.2 -97.2 63 F 1 399 06 30 18 06 31 28 J1108+4330 09 01 09 64.4 62.7 -2.1 -96.6 -7 1 1 399 06 31 28 06 32 38 =1105+437 09 02 19 64.6 62.7 -2.1 -96.8 63 F 1 404 06 31 28 06 36 23 J1333+2725 09 06 04 33.5 78.3 -4.5 -63.5 156 1 1 404 06 36 23 06 37 03 =1330+276 09 06 44 33.6 78.4 -4.4 -63.5 40 F 1 406 06 36 41 06 37 03 J1329+3154 09 06 44 36.2 73.8 -4.4 -66.5 -11 1 1 406 06 37 03 06 38 23 =1327+321 09 08 05 36.4 73.9 -4.4 -66.6 69 F 1 412 06 37 03 06 38 23 J1333+2725 09 08 05 33.9 78.5 -4.4 -63.6 -11 1 1 412 06 38 23 06 39 43 =1330+276 09 09 25 34.2 78.7 -4.4 -63.6 69 F 1 417 06 38 23 06 39 43 GJ3789 09 09 25 35.2 76.8 -4.4 -64.9 -8 1 1 417 06 39 43 06 42 43 --- 09 12 25 35.8 77.2 -4.3 -65.0 172 F 1 428 06 39 43 06 42 43 J1333+2725 09 12 25 34.8 79.1 -4.4 -63.8 -8 1 1 428 06 42 43 06 44 03 =1330+276 09 13 45 35.0 79.2 -4.3 -63.8 72 F 1 434 06 42 43 06 44 03 GJ3789 09 13 45 36.1 77.3 -4.3 -65.1 -8 1 1 434 06 44 03 06 47 03 --- 09 16 46 36.7 77.7 -4.3 -65.3 172 F 1 445 06 44 03 06 47 03 J1333+2725 09 16 46 35.6 79.6 -4.3 -64.0 -8 1 1 445 06 47 03 06 48 23 =1330+276 09 18 06 35.9 79.7 -4.3 -64.0 72 F 1 450 06 47 03 06 48 23 GJ3789 09 18 06 37.0 77.8 -4.2 -65.3 -8 1 1 450 06 48 23 06 51 23 --- 09 21 07 37.6 78.2 -4.2 -65.5 172 F 1 462 06 48 23 06 51 23 J1333+2725 09 21 07 36.5 80.1 -4.2 -64.2 -8 1 1 462 06 51 23 06 52 43 =1330+276 09 22 27 36.8 80.3 -4.2 -64.2 72 F 1 467 06 51 23 06 52 43 GJ3789 09 22 27 37.8 78.3 -4.2 -65.6 -8 1 1 467 06 52 43 06 55 43 --- 09 25 27 38.4 78.7 -4.1 -65.7 172 F 1 479 06 52 43 06 55 43 J1333+2725 09 25 27 37.4 80.6 -4.1 -64.3 -8 1 1 479 06 55 43 06 57 03 =1330+276 09 26 48 37.6 80.8 -4.1 -64.4 72 F 1 484 06 55 43 06 57 03 GJ3789 09 26 48 38.7 78.8 -4.1 -65.8 -8 1 1 484 06 57 03 07 00 03 --- 09 29 48 39.3 79.2 -4.0 -65.9 172 F 1 495 06 57 03 Schedule for VLBA_LA (Code La ) Page 7 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 07 00 03 J1333+2725 09 29 48 38.2 81.2 -4.1 -64.5 -8 1 1 495 07 00 03 07 01 23 =1330+276 09 31 08 38.5 81.3 -4.0 -64.6 72 F 1 501 07 00 03 07 01 23 J1329+3154 09 31 08 40.9 76.3 -4.0 -68.2 -11 1 1 501 07 01 23 07 02 43 =1327+321 09 32 28 41.2 76.5 -4.0 -68.2 69 F 1 506 07 01 23 07 02 43 J1333+2725 09 32 28 38.8 81.5 -4.0 -64.6 -11 1 1 506 07 02 43 07 04 03 =1330+276 09 33 49 39.0 81.6 -4.0 -64.7 69 F 1 511 07 02 43 07 11 54 J1108+4330 09 41 42 71.6 58.6 -1.5 -107.3 401 1 1 511 07 11 54 07 12 34 =1105+437 09 42 22 71.7 58.5 -1.4 -107.5 40 F 1 514 07 12 12 07 12 34 J1110+4403 09 42 22 71.1 57.3 -1.5 -108.3 -7 1 1 514 07 12 34 07 13 44 =1107+443 09 43 32 71.3 57.1 -1.5 -108.7 63 F 1 518 07 12 34 07 13 44 J1108+4330 09 43 32 71.9 58.3 -1.4 -107.9 -7 1 1 518 07 13 44 07 14 54 =1105+437 09 44 42 72.1 58.1 -1.4 -108.3 63 F 1 523 07 13 44 07 14 54 GJ412B 09 44 42 72.6 57.5 -1.4 -109.4 -7 1 1 523 07 14 54 07 17 54 --- 09 47 43 73.1 56.9 -1.3 -110.5 173 F 1 534 07 14 54 07 17 54 J1108+4330 09 47 43 72.6 57.5 -1.4 -109.4 -7 1 1 534 07 17 54 07 19 04 =1105+437 09 48 53 72.8 57.3 -1.3 -109.9 63 F 1 539 07 17 54 07 19 04 GJ412B 09 48 53 73.3 56.6 -1.3 -111.0 -7 1 1 539 07 19 04 07 22 04 --- 09 51 54 73.8 55.9 -1.2 -112.2 173 F 1 550 07 19 04 07 22 04 J1108+4330 09 51 54 73.4 56.6 -1.3 -111.0 -7 1 1 550 07 22 04 07 23 14 =1105+437 09 53 04 73.5 56.4 -1.3 -111.5 63 F 1 555 07 22 04 07 23 14 GJ412B 09 53 04 74.0 55.6 -1.2 -112.7 -7 1 1 555 07 23 14 07 26 14 --- 09 56 04 74.5 54.8 -1.2 -114.0 173 F 1 566 07 23 14 07 26 14 J1108+4330 09 56 04 74.1 55.6 -1.2 -112.7 -7 1 1 566 07 26 14 07 27 24 =1105+437 09 57 15 74.3 55.3 -1.2 -113.2 63 F 1 571 07 26 14 07 27 24 GJ412B 09 57 15 74.7 54.5 -1.1 -114.5 -7 1 1 571 07 27 24 07 30 24 --- 10 00 15 75.2 53.6 -1.1 -115.9 173 F 1 583 07 27 24 07 30 24 J1108+4330 10 00 15 74.8 54.5 -1.1 -114.5 -7 1 1 583 07 30 24 07 31 34 =1105+437 10 01 25 74.9 54.2 -1.1 -115.0 63 F 1 587 07 30 24 Schedule for VLBA_LA (Code La ) Page 8 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 07 31 34 GJ412B 10 01 25 75.4 53.2 -1.1 -116.4 -7 1 1 587 07 31 34 07 34 34 --- 10 04 26 75.9 52.2 -1.0 -117.9 173 F 1 599 07 31 34 07 34 34 J1108+4330 10 04 26 75.4 53.2 -1.1 -116.4 -7 1 1 599 07 34 34 07 35 44 =1105+437 10 05 36 75.6 52.9 -1.1 -117.0 63 F 1 603 07 34 34 07 35 44 J1110+4403 10 05 36 75.0 51.7 -1.1 -117.7 -7 1 1 603 07 35 44 07 36 54 =1107+443 10 06 46 75.2 51.3 -1.1 -118.2 63 F 1 608 07 35 44 07 36 54 J1108+4330 10 06 46 75.8 52.5 -1.0 -117.6 -7 1 1 608 07 36 54 07 38 04 =1105+437 10 07 56 76.0 52.1 -1.0 -118.2 63 F 1 612 07 36 54 07 47 55 J1333+2725 10 17 48 47.9 87.3 -3.3 -65.9 528 1 1 612 07 47 55 07 48 35 =1330+276 10 18 28 48.0 87.4 -3.3 -65.9 40 F 1 615 07 48 13 07 48 35 J1329+3154 10 18 28 50.4 81.4 -3.2 -70.8 -11 1 1 615 07 48 35 07 49 55 =1327+321 10 19 48 50.6 81.5 -3.2 -70.9 69 F 1 620 07 48 35 07 49 55 J1333+2725 10 19 48 48.3 87.5 -3.2 -65.9 -11 1 1 620 07 49 55 07 51 15 =1330+276 10 21 09 48.6 87.7 -3.2 -65.9 69 F 1 625 07 49 55 07 51 15 GJ3789 10 21 09 49.6 85.3 -3.2 -67.9 -8 1 1 625 07 51 15 07 54 15 --- 10 24 09 50.2 85.7 -3.1 -68.0 172 F 1 637 07 51 15 07 54 15 J1333+2725 10 24 09 49.2 88.1 -3.2 -65.9 -8 1 1 637 07 54 15 07 55 35 =1330+276 10 25 29 49.5 88.3 -3.1 -66.0 72 F 1 642 07 54 15 07 55 35 GJ3789 10 25 29 50.5 85.8 -3.1 -68.0 -8 1 1 642 07 55 35 07 58 35 --- 10 28 30 51.1 86.2 -3.1 -68.1 172 F 1 654 07 55 35 07 58 35 J1333+2725 10 28 30 50.1 88.7 -3.1 -66.0 -8 1 1 654 07 58 35 07 59 55 =1330+276 10 29 50 50.4 88.9 -3.1 -66.0 72 F 1 659 07 58 35 07 59 55 GJ3789 10 29 50 51.3 86.4 -3.0 -68.1 -8 1 1 659 07 59 55 08 02 55 --- 10 32 51 52.0 86.8 -3.0 -68.2 172 F 1 670 07 59 55 08 02 55 J1333+2725 10 32 51 51.0 89.4 -3.0 -66.0 -8 1 1 670 08 02 55 08 04 15 =1330+276 10 34 11 51.2 89.6 -3.0 -66.0 72 F 1 675 08 02 55 08 04 15 GJ3789 10 34 11 52.2 87.0 -3.0 -68.2 -8 1 1 675 08 04 15 08 07 15 --- 10 37 11 52.8 87.4 -2.9 -68.2 172 F 1 687 08 04 15 Schedule for VLBA_LA (Code La ) Page 9 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 08 07 15 J1333+2725 10 37 11 51.8 90.0 -2.9 -66.0 -8 1 1 687 08 07 15 08 08 35 =1330+276 10 38 32 52.1 90.2 -2.9 -66.0 72 F 1 692 08 07 15 08 08 35 GJ3789 10 38 32 53.1 87.6 -2.9 -68.3 -8 1 1 692 08 08 35 08 11 35 --- 10 41 32 53.7 88.0 -2.8 -68.3 172 F 1 704 08 08 35 08 11 35 J1333+2725 10 41 32 52.7 90.6 -2.9 -66.0 -8 1 1 704 08 11 35 08 12 55 =1330+276 10 42 52 53.0 90.8 -2.8 -66.0 72 F 1 709 08 11 35 08 12 55 J1329+3154 10 42 52 55.3 84.1 -2.8 -71.8 -11 1 1 709 08 12 55 08 14 15 =1327+321 10 44 12 55.5 84.3 -2.8 -71.9 69 F 1 714 08 12 55 08 14 15 J1333+2725 10 44 12 53.3 91.0 -2.8 -66.0 -11 1 1 714 08 14 15 08 15 35 =1330+276 10 45 33 53.5 91.2 -2.8 -66.0 69 F 1 719 08 14 15 08 33 57 4C39.25 11 03 58 70.6 -73.2 1.6 92.0 987 1 1 719 08 33 57 08 35 57 --- 11 05 59 70.3 -73.2 1.6 91.7 120 F 1 727 08 34 15 08 37 29 J1108+4330 11 07 31 82.3 1.9 0.0 -177.9 36 1 1 727 08 37 29 08 38 09 =1105+437 11 08 11 82.3 1.0 0.0 -178.9 40 F 1 730 08 37 47 08 38 09 J1110+4403 11 08 11 81.7 3.9 -0.1 -175.6 -8 1 1 730 08 38 09 08 39 19 =1107+443 11 09 21 81.8 2.4 0.0 -177.3 62 F 1 734 08 38 09 08 39 19 J1108+4330 11 09 21 82.3 -0.6 0.0 179.3 -8 1 1 734 08 39 19 08 40 29 =1105+437 11 10 31 82.3 -2.2 0.0 177.5 62 F 1 739 08 39 19 08 40 29 GJ412B 11 10 31 82.2 -6.1 0.1 173.1 -9 1 1 739 08 40 29 08 43 29 --- 11 13 32 82.2 -10.1 0.1 168.7 171 F 1 750 08 40 29 08 43 29 J1108+4330 11 13 32 82.3 -6.3 0.1 173.0 -9 1 1 750 08 43 29 08 44 39 =1105+437 11 14 42 82.2 -7.8 0.1 171.3 61 F 1 755 08 43 29 08 44 39 GJ412B 11 14 42 82.1 -11.6 0.1 167.0 -9 1 1 755 08 44 39 08 47 39 --- 11 17 42 82.0 -15.4 0.2 162.7 171 F 1 766 08 44 39 08 47 39 J1108+4330 11 17 42 82.1 -11.8 0.1 166.8 -8 1 1 766 08 47 39 08 48 49 =1105+437 11 18 53 82.1 -13.2 0.2 165.2 62 F 1 771 08 47 39 08 48 49 GJ412B 11 18 53 81.9 -16.9 0.2 161.1 -8 1 1 771 08 48 49 08 51 49 --- 11 21 53 81.7 -20.5 0.3 157.0 172 F 1 783 08 48 49 Schedule for VLBA_LA (Code La ) Page 10 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 08 51 49 J1108+4330 11 21 53 81.9 -17.0 0.2 160.9 -8 1 1 783 08 51 49 08 52 59 =1105+437 11 23 03 81.8 -18.4 0.2 159.3 62 F 1 787 08 51 49 08 52 59 GJ412B 11 23 03 81.6 -21.8 0.3 155.5 -8 1 1 787 08 52 59 08 55 59 --- 11 26 04 81.4 -25.1 0.3 151.7 172 F 1 799 08 52 59 08 55 59 J1108+4330 11 26 04 81.6 -21.9 0.3 155.3 -8 1 1 799 08 55 59 08 57 09 =1105+437 11 27 14 81.5 -23.2 0.3 153.8 62 F 1 803 08 55 59 08 57 09 GJ412B 11 27 14 81.3 -26.3 0.4 150.3 -8 1 1 803 08 57 09 09 00 09 --- 11 30 14 81.0 -29.4 0.4 146.8 172 F 1 815 08 57 09 09 00 09 J1108+4330 11 30 14 81.3 -26.5 0.4 150.1 -8 1 1 815 09 00 09 09 01 19 =1105+437 11 31 25 81.2 -27.7 0.4 148.7 62 F 1 819 09 00 09 09 01 19 J1110+4403 11 31 25 80.9 -23.5 0.3 153.2 -9 1 1 819 09 01 19 09 02 29 =1107+443 11 32 35 80.8 -24.7 0.4 151.9 61 F 1 824 09 01 19 09 02 29 J1108+4330 11 32 35 81.1 -28.8 0.4 147.4 -9 1 1 824 09 02 29 09 03 39 =1105+437 11 33 45 80.9 -30.0 0.4 146.1 61 F 1 828 09 02 29 09 10 44 J1333+2725 11 40 51 64.7 101.4 -1.9 -63.6 331 1 1 828 09 10 44 09 11 24 =1330+276 11 41 31 64.8 101.6 -1.9 -63.5 40 F 1 831 09 11 02 09 11 24 J1329+3154 11 41 31 67.1 92.0 -1.8 -72.7 -12 1 1 831 09 11 24 09 12 44 =1327+321 11 42 52 67.4 92.2 -1.8 -72.6 68 F 1 836 09 11 24 09 12 44 J1333+2725 11 42 52 65.1 101.9 -1.8 -63.4 -12 1 1 836 09 12 44 09 14 04 =1330+276 11 44 12 65.3 102.2 -1.8 -63.3 68 F 1 841 09 12 44 09 14 04 GJ3789 11 44 12 66.4 98.4 -1.8 -66.9 -9 1 1 841 09 14 04 09 17 04 --- 11 47 12 67.0 99.0 -1.7 -66.7 171 F 1 853 09 14 04 09 17 04 J1333+2725 11 47 12 65.9 102.9 -1.8 -62.9 -9 1 1 853 09 17 04 09 18 24 =1330+276 11 48 32 66.2 103.3 -1.7 -62.8 71 F 1 858 09 17 04 09 18 24 GJ3789 11 48 32 67.3 99.3 -1.7 -66.5 -9 1 1 858 09 18 24 09 21 24 --- 11 51 33 67.9 100.0 -1.7 -66.3 171 F 1 870 09 18 24 09 21 24 J1333+2725 11 51 33 66.8 104.0 -1.7 -62.4 -9 1 1 870 09 21 24 09 22 44 =1330+276 11 52 53 67.1 104.4 -1.7 -62.2 71 F 1 875 09 21 24 Schedule for VLBA_LA (Code La ) Page 11 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 09 22 44 GJ3789 11 52 53 68.1 100.3 -1.7 -66.1 -9 1 1 875 09 22 44 09 25 44 --- 11 55 54 68.7 101.1 -1.6 -65.8 171 F 1 886 09 22 44 09 25 44 J1333+2725 11 55 54 67.6 105.2 -1.6 -61.8 -9 1 1 886 09 25 44 09 27 04 =1330+276 11 57 14 67.9 105.6 -1.6 -61.7 71 F 1 892 09 25 44 09 27 04 GJ3789 11 57 14 69.0 101.4 -1.6 -65.7 -9 1 1 892 09 27 04 09 30 04 --- 12 00 14 69.6 102.2 -1.5 -65.3 171 F 1 903 09 27 04 09 30 04 J1333+2725 12 00 14 68.5 106.4 -1.6 -61.2 -9 1 1 903 09 30 04 09 31 24 =1330+276 12 01 35 68.8 106.8 -1.5 -61.0 71 F 1 908 09 30 04 09 31 24 GJ3789 12 01 35 69.9 102.5 -1.5 -65.2 -9 1 1 908 09 31 24 09 34 24 --- 12 04 35 70.5 103.3 -1.5 -64.8 171 F 1 920 09 31 24 09 34 24 J1333+2725 12 04 35 69.3 107.7 -1.5 -60.5 -9 1 1 920 09 34 24 09 35 44 =1330+276 12 05 55 69.6 108.2 -1.5 -60.2 71 F 1 925 09 34 24 09 35 44 J1329+3154 12 05 55 72.1 96.6 -1.4 -71.6 -14 1 1 925 09 35 44 09 37 04 =1327+321 12 07 16 72.4 96.8 -1.4 -71.5 66 F 1 930 09 35 44 09 37 04 J1333+2725 12 07 16 69.9 108.6 -1.4 -60.0 -14 1 1 930 09 37 04 09 38 24 =1330+276 12 08 36 70.1 109.0 -1.4 -59.7 66 F 1 935 09 37 04 09 43 50 J1108+4330 12 14 02 75.3 -53.5 1.1 116.1 212 1 1 935 09 43 50 09 44 30 =1105+437 12 14 43 75.2 -53.7 1.1 115.8 40 F 1 938 09 44 08 09 44 30 J1110+4403 12 14 43 75.3 -51.0 1.1 118.8 -8 1 1 938 09 44 30 09 45 40 =1107+443 12 15 53 75.2 -51.4 1.1 118.2 62 F 1 943 09 44 30 09 45 40 J1108+4330 12 15 53 75.0 -54.0 1.1 115.2 -8 1 1 943 09 45 40 09 46 50 =1105+437 12 17 03 74.8 -54.4 1.1 114.7 62 F 1 947 09 45 40 09 46 50 GJ412B 12 17 03 74.3 -55.1 1.2 113.4 -7 1 1 947 09 46 50 09 49 50 --- 12 20 03 73.8 -55.9 1.2 112.2 173 F 1 959 09 46 50 09 49 50 J1108+4330 12 20 03 74.3 -55.2 1.2 113.4 -7 1 1 959 09 49 50 09 51 00 =1105+437 12 21 14 74.1 -55.5 1.2 112.9 63 F 1 963 09 49 50 09 51 00 GJ412B 12 21 14 73.6 -56.2 1.3 111.7 -7 1 1 963 09 51 00 09 54 00 --- 12 24 14 73.1 -56.9 1.3 110.5 173 F 1 975 09 51 00 Schedule for VLBA_LA (Code La ) Page 12 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 09 54 00 J1108+4330 12 24 14 73.6 -56.2 1.3 111.6 -7 1 1 975 09 54 00 09 55 10 =1105+437 12 25 24 73.4 -56.5 1.3 111.2 63 F 1 979 09 54 00 09 55 10 GJ412B 12 25 24 72.9 -57.1 1.3 110.1 -7 1 1 979 09 55 10 09 58 10 --- 12 28 25 72.4 -57.8 1.4 109.0 173 F 1 991 09 55 10 09 58 10 J1108+4330 12 28 25 72.9 -57.2 1.3 110.0 -7 1 1 991 09 58 10 09 59 20 =1105+437 12 29 35 72.7 -57.4 1.3 109.6 63 F 1 995 09 58 10 09 59 20 GJ412B 12 29 35 72.2 -58.0 1.4 108.6 -7 1 1 995 09 59 20 10 02 20 --- 12 32 35 71.7 -58.5 1.4 107.5 173 F 1 1007 09 59 20 10 02 20 J1108+4330 12 32 35 72.2 -58.0 1.4 108.5 -7 1 1 1007 10 02 20 10 03 30 =1105+437 12 33 46 72.0 -58.2 1.4 108.1 63 F 1 1012 10 02 20 10 03 30 GJ412B 12 33 46 71.5 -58.7 1.5 107.1 -7 1 1 1012 10 03 30 10 06 30 --- 12 36 46 71.0 -59.2 1.5 106.2 173 F 1 1023 10 03 30 10 06 30 J1108+4330 12 36 46 71.5 -58.8 1.5 107.1 -7 1 1 1023 10 06 30 10 07 40 =1105+437 12 37 56 71.3 -59.0 1.5 106.7 63 F 1 1028 10 06 30 10 07 40 J1110+4403 12 37 56 71.5 -56.9 1.4 109.0 -7 1 1 1028 10 07 40 10 08 50 =1107+443 12 39 07 71.3 -57.1 1.5 108.6 63 F 1 1032 10 07 40 10 08 50 J1108+4330 12 39 07 71.1 -59.1 1.5 106.3 -7 1 1 1032 10 08 50 10 10 00 =1105+437 12 40 17 70.9 -59.3 1.5 106.0 63 F 1 1037 10 08 50 10 13 56 J1333+2725 12 44 13 76.6 125.3 -0.8 -48.2 107 1 1 1037 10 13 56 10 14 36 =1330+276 12 44 53 76.7 125.7 -0.8 -47.9 40 F 1 1039 10 14 14 10 14 36 J1329+3154 12 44 53 79.8 109.3 -0.8 -64.3 -17 1 1 1039 10 14 36 10 15 56 =1327+321 12 46 14 80.1 110.0 -0.7 -63.8 63 F 1 1044 10 14 36 10 15 56 J1333+2725 12 46 14 76.9 126.6 -0.8 -47.2 -17 1 1 1044 10 15 56 10 17 16 =1330+276 12 47 34 77.1 127.5 -0.8 -46.5 63 F 1 1050 10 15 56 10 17 16 GJ3789 12 47 34 78.6 121.7 -0.7 -52.3 -10 1 1 1050 10 17 16 10 20 16 --- 12 50 34 79.1 123.8 -0.7 -50.6 170 F 1 1061 10 17 16 10 20 16 J1333+2725 12 50 34 77.6 129.6 -0.7 -44.7 -10 1 1 1061 10 20 16 10 21 36 =1330+276 12 51 54 77.8 130.6 -0.7 -43.9 70 F 1 1066 10 20 16 Schedule for VLBA_LA (Code La ) Page 13 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 10 21 36 GJ3789 12 51 54 79.3 124.8 -0.7 -49.7 -10 1 1 1066 10 21 36 10 24 36 --- 12 54 55 79.8 127.2 -0.6 -47.8 170 F 1 1078 10 21 36 10 24 36 J1333+2725 12 54 55 78.3 133.0 -0.6 -41.9 -10 1 1 1078 10 24 36 10 25 56 =1330+276 12 56 15 78.5 134.1 -0.6 -41.0 70 F 1 1083 10 24 36 10 25 56 GJ3789 12 56 15 80.0 128.3 -0.6 -46.8 -10 1 1 1083 10 25 56 10 28 56 --- 12 59 16 80.5 131.0 -0.5 -44.5 170 F 1 1095 10 25 56 10 28 56 J1333+2725 12 59 16 78.9 136.7 -0.6 -38.8 -10 1 1 1095 10 28 56 10 30 16 =1330+276 13 00 36 79.1 137.9 -0.5 -37.8 70 F 1 1100 10 28 56 10 30 16 GJ3789 13 00 36 80.7 132.3 -0.5 -43.4 -10 1 1 1100 10 30 16 10 33 16 --- 13 03 36 81.1 135.4 -0.5 -40.8 170 F 1 1112 10 30 16 10 33 16 J1333+2725 13 03 36 79.5 140.8 -0.5 -35.3 -10 1 1 1112 10 33 16 10 34 36 =1330+276 13 04 57 79.6 142.1 -0.5 -34.1 70 F 1 1117 10 33 16 10 34 36 GJ3789 13 04 57 81.3 136.9 -0.5 -39.5 -10 1 1 1117 10 34 36 10 37 36 --- 13 07 57 81.7 140.4 -0.4 -36.4 170 F 1 1128 10 34 36 10 37 36 J1333+2725 13 07 57 80.0 145.3 -0.4 -31.3 -9 1 1 1128 10 37 36 10 38 56 =1330+276 13 09 17 80.1 146.8 -0.4 -30.0 71 F 1 1133 10 37 36 10 38 56 J1329+3154 13 09 17 84.1 130.5 -0.3 -46.6 -17 1 1 1133 10 38 56 10 40 16 =1327+321 13 10 38 84.3 132.4 -0.3 -44.8 63 F 1 1139 10 38 56 10 40 16 J1333+2725 13 10 38 80.3 148.3 -0.4 -28.7 -17 1 1 1139 10 40 16 10 41 36 =1330+276 13 11 58 80.4 149.9 -0.4 -27.3 63 F 1 1144 10 40 16 10 51 14 3C345 13 21 38 50.5 68.5 -3.4 -79.3 513 1 1 1144 10 51 14 10 53 14 --- 13 23 38 50.9 68.6 -3.3 -79.5 120 F 1 1152 10 51 32 11 01 31 J1108+4330 13 31 56 61.6 -63.2 2.4 93.5 403 1 1 1152 11 01 31 11 02 11 =1105+437 13 32 36 61.5 -63.3 2.4 93.3 40 F 1 1154 11 01 49 11 02 11 J1110+4403 13 32 36 61.9 -62.1 2.4 94.8 -7 1 1 1154 11 02 11 11 03 21 =1107+443 13 33 47 61.7 -62.1 2.4 94.6 63 F 1 1159 11 02 11 11 03 21 J1108+4330 13 33 47 61.3 -63.3 2.4 93.1 -7 1 1 1159 11 03 21 11 04 31 =1105+437 13 34 57 61.1 -63.3 2.4 92.9 63 F 1 1163 11 03 21 Schedule for VLBA_LA (Code La ) Page 14 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 11 04 31 GJ412B 13 34 57 60.6 -63.3 2.5 92.4 -7 1 1 1163 11 04 31 11 07 31 --- 13 37 57 60.0 -63.4 2.5 91.8 173 F 1 1175 11 04 31 11 07 31 J1108+4330 13 37 57 60.5 -63.4 2.5 92.3 -7 1 1 1175 11 07 31 11 08 41 =1105+437 13 39 08 60.3 -63.4 2.5 92.1 63 F 1 1179 11 07 31 11 08 41 GJ412B 13 39 08 59.8 -63.4 2.6 91.6 -7 1 1 1179 11 08 41 11 11 41 --- 13 42 08 59.3 -63.4 2.6 91.0 173 F 1 1191 11 08 41 11 11 41 J1108+4330 13 42 08 59.8 -63.4 2.6 91.6 -7 1 1 1191 11 11 41 11 12 51 =1105+437 13 43 18 59.6 -63.4 2.6 91.3 63 F 1 1195 11 11 41 11 12 51 GJ412B 13 43 18 59.0 -63.4 2.6 90.8 -7 1 1 1195 11 12 51 11 15 51 --- 13 46 19 58.5 -63.4 2.7 90.3 173 F 1 1207 11 12 51 11 15 51 J1108+4330 13 46 19 59.0 -63.4 2.6 90.8 -7 1 1 1207 11 15 51 11 17 01 =1105+437 13 47 29 58.8 -63.4 2.6 90.6 63 F 1 1212 11 15 51 11 17 01 J1110+4403 13 47 29 59.2 -62.4 2.6 91.9 -7 1 1 1212 11 17 01 11 18 11 =1107+443 13 48 39 59.0 -62.4 2.6 91.7 63 F 1 1216 11 17 01 11 36 26 J1333+2725 14 06 57 79.0 222.5 0.6 38.2 899 1 1 1216 11 36 26 11 37 06 =1330+276 14 07 37 78.9 223.2 0.6 38.7 40 F 1 1219 11 36 44 11 37 06 J1329+3154 14 07 37 81.3 245.8 0.6 60.6 -21 1 1 1219 11 37 06 11 38 26 =1327+321 14 08 57 81.1 246.7 0.6 61.4 59 F 1 1224 11 37 06 11 38 26 J1333+2725 14 08 57 78.7 224.3 0.6 39.7 -21 1 1 1224 11 38 26 11 39 46 =1330+276 14 10 18 78.5 225.5 0.6 40.7 59 F 1 1229 11 38 26 11 39 46 GJ3789 14 10 18 79.6 233.5 0.6 48.3 -11 1 1 1229 11 39 46 11 42 46 --- 14 13 18 79.1 235.8 0.7 50.3 169 F 1 1241 11 39 46 11 42 46 J1333+2725 14 13 18 78.1 228.0 0.7 42.7 -11 1 1 1241 11 42 46 11 44 06 =1330+276 14 14 38 77.9 229.0 0.7 43.6 69 F 1 1246 11 42 46 11 44 06 GJ3789 14 14 38 78.9 236.8 0.7 51.1 -11 1 1 1246 11 44 06 11 47 06 --- 14 17 39 78.4 238.8 0.8 52.7 169 F 1 1257 11 44 06 11 47 06 J1333+2725 14 17 39 77.4 231.2 0.7 45.4 -11 1 1 1257 11 47 06 11 48 26 =1330+276 14 18 59 77.2 232.2 0.8 46.2 69 F 1 1263 11 47 06 Schedule for VLBA_LA (Code La ) Page 15 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 11 48 26 GJ3789 14 18 59 78.2 239.7 0.8 53.4 -11 1 1 1263 11 48 26 11 51 26 --- 14 22 00 77.6 241.5 0.8 54.8 169 F 1 1274 11 48 26 11 51 26 J1333+2725 14 22 00 76.7 234.2 0.8 47.8 -11 1 1 1274 11 51 26 11 52 46 =1330+276 14 23 20 76.5 235.0 0.8 48.5 69 F 1 1279 11 51 26 11 52 46 GJ3789 14 23 20 77.4 242.3 0.9 55.4 -11 1 1 1279 11 52 46 11 55 46 --- 14 26 20 76.9 244.0 0.9 56.7 169 F 1 1291 11 52 46 11 55 46 J1333+2725 14 26 20 76.0 236.9 0.9 49.9 -11 1 1 1291 11 55 46 11 57 06 =1330+276 14 27 41 75.8 237.6 0.9 50.5 69 F 1 1296 11 55 46 11 57 06 GJ3789 14 27 41 76.6 244.7 0.9 57.2 -11 1 1 1296 11 57 06 12 00 06 --- 14 30 41 76.1 246.1 1.0 58.2 169 F 1 1308 11 57 06 12 00 06 J1333+2725 14 30 41 75.2 239.3 1.0 51.8 -11 1 1 1308 12 00 06 12 01 26 =1330+276 14 32 01 75.0 240.0 1.0 52.3 69 F 1 1313 12 00 06 12 01 26 J1329+3154 14 32 01 76.6 257.4 1.0 68.8 -18 1 1 1313 12 01 26 12 02 46 =1327+321 14 33 21 76.3 257.9 1.1 69.0 62 F 1 1318 12 01 26 12 03 37 J1333+2725 14 34 12 74.6 241.1 1.0 53.2 33 1 1 1318 12 03 37 12 04 17 =1330+276 14 34 52 74.5 241.5 1.0 53.4 40 F 1 1321 12 03 55 12 04 17 J1329+3154 14 34 52 76.0 258.3 1.1 69.3 -17 1 1 1321 12 04 17 12 05 37 =1327+321 14 36 12 75.8 258.7 1.1 69.5 63 F 1 1326 12 04 17 12 05 37 J1333+2725 14 36 12 74.3 242.1 1.0 53.9 -17 1 1 1326 12 05 37 12 06 57 =1330+276 14 37 33 74.0 242.8 1.1 54.3 63 F 1 1331 12 05 37 12 06 57 GJ3789 14 37 33 74.8 249.2 1.1 60.3 -10 1 1 1331 12 06 57 12 09 57 --- 14 40 33 74.2 250.4 1.1 61.1 170 F 1 1342 12 06 57 12 09 57 J1333+2725 14 40 33 73.5 244.1 1.1 55.3 -10 1 1 1342 12 09 57 12 11 17 =1330+276 14 41 53 73.2 244.7 1.1 55.7 70 F 1 1348 12 09 57 12 11 17 GJ3789 14 41 53 73.9 250.9 1.2 61.5 -10 1 1 1348 12 11 17 12 14 17 --- 14 44 54 73.4 252.0 1.2 62.1 170 F 1 1359 12 11 17 12 14 17 J1333+2725 14 44 54 72.7 246.0 1.2 56.6 -10 1 1 1359 12 14 17 12 15 37 =1330+276 14 46 14 72.4 246.5 1.2 56.9 70 F 1 1364 12 14 17 Schedule for VLBA_LA (Code La ) Page 16 RIPL: GJ412B/GJ3789 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 14 Feb 2008 Day 45 --- 12 15 37 GJ3789 14 46 14 73.1 252.5 1.2 62.4 -10 1 1 1364 12 15 37 12 18 37 --- 14 49 14 72.5 253.5 1.3 63.0 170 F 1 1376 12 15 37 12 18 37 J1333+2725 14 49 14 71.9 247.7 1.3 57.7 -10 1 1 1376 12 18 37 12 19 57 =1330+276 14 50 35 71.6 248.2 1.3 58.0 70 F 1 1381 12 18 37 12 19 57 GJ3789 14 50 35 72.3 253.9 1.3 63.3 -10 1 1 1381 12 19 57 12 22 57 --- 14 53 35 71.7 254.9 1.4 63.8 170 F 1 1393 12 19 57 12 22 57 J1333+2725 14 53 35 71.0 249.3 1.3 58.7 -10 1 1 1393 12 22 57 12 24 17 =1330+276 14 54 55 70.8 249.8 1.4 59.0 70 F 1 1398 12 22 57 12 24 17 GJ3789 14 54 55 71.4 255.3 1.4 64.0 -10 1 1 1398 12 24 17 12 27 17 --- 14 57 56 70.8 256.1 1.4 64.5 170 F 1 1410 12 24 17 12 27 17 J1333+2725 14 57 56 70.2 250.8 1.4 59.6 -10 1 1 1410 12 27 17 12 28 37 =1330+276 14 59 16 70.0 251.2 1.4 59.9 70 F 1 1415 12 27 17 12 28 37 J1329+3154 14 59 16 71.1 264.4 1.5 71.9 -15 1 1 1415 12 28 37 12 29 57 =1327+321 15 00 36 70.9 264.7 1.5 72.0 65 F 1 1420 12 28 37 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 5 Station: VLBA_LA Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 5 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ412B/GJ3789 Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * GJ412B 11 02 38.508032 * 11 05 27.668971 11 05 57.853871 0.00 43 47 37.81072 * 43 31 25.62704 43 28 34.90658 0.00 From catalog imbedded in main SCHED input file. 1.650 scan hours, 85.005 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 11 05 30.900000 Dec = 43 31 17.90000 Rates: RA = -4328.00 mas/yr Dec = 952.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54510.1931 Rates: RA = -0.10895E-02 s/day Dec = 0.26064E-02 arcsec/day * GJ3789 13 29 27.200533 * 13 31 46.468786 13 32 10.613737 0.00 29 32 00.20473 * 29 16 35.57661 29 13 44.74397 0.00 From catalog imbedded in main SCHED input file. 1.650 scan hours, 79.525 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 13 31 46.614000 Dec = 29 16 36.68900 Rates: RA = -234.00 mas/yr Dec = -137.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54510.1931 Rates: RA = -0.48965E-04 s/day Dec = -0.37509E-03 arcsec/day J0927+3902 09 23 55.319213 * 09 27 03.013934 09 27 36.184379 0.26 0923+392 39 15 23.56648 * 39 02 20.85188 39 00 09.43854 0.40 * 4C39.25 /home/arana/cwalker/sched/catalogs/sources.vlba J0927+39 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.167 scan hours, 9.167 baseline hours above horizon. * J1108+4330 11 05 35.113899 * 11 08 23.476935 11 08 53.521167 0.39 1105+437 43 47 08.86341 * 43 30 53.65710 43 28 02.19507 0.50 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.953 scan hours, 44.418 baseline hours above horizon. * J1110+4403 11 07 58.361537 * 11 10 46.345807 11 11 16.343012 0.42 1107+443 44 19 43.46580 * 44 03 25.92518 44 00 33.86530 0.52 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.272 scan hours, 12.422 baseline hours above horizon. * J1329+3154 13 27 34.876201 * 13 29 52.864906 13 30 16.856046 0.24 1327+321 32 09 38.80944 * 31 54 11.05454 31 51 19.26717 0.40 J1329+31 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.311 scan hours, 11.480 baseline hours above horizon. J1331+3030 13 28 49.657756 * 13 31 08.288048 13 31 32.352428 0.37 1328+307 30 45 58.64060 * 30 30 32.95924 30 27 41.73034 0.47 * 3C286 /home/arana/cwalker/sched/catalogs/sources.vlba J1331+30 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.000 scan hours, 0.000 baseline hours above horizon. * J1333+2725 13 30 47.332193 * 13 33 07.490722 13 33 31.744821 0.31 1330+276 27 40 40.74292 * 27 25 18.38312 27 22 28.25651 0.57 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.078 scan hours, 44.988 baseline hours above horizon. J1642+3948 16 41 17.606231 * 16 42 58.809968 16 43 15.236850 0.26 1641+399 39 54 10.81494 * 39 48 36.99400 39 47 17.60317 0.40 * 3C345 /home/arana/cwalker/sched/catalogs/sources.vlba J1642+39 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.033 scan hours, 1.833 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) GJ412B 145.5 GJ3789 126.1 4C39.25 153.7 J1108+4330 145.2 J1110+4403 144.5 J1329+3154 126.3 3C286 126.2 J1333+2725 126.0 3C345 88.3 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg