COVER INFORMATION Station: VLBA_NL (Code Nl ) Experiment: RIPL: GJ686/GJ1224 Exp. Code: BB240Q Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for VLBA_NL (Code Nl ) Page 2 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 11 30 00 J1743-0350 14 31 35 26.8 123.5 -3.2 -38.5 0 1 1 0 11 30 00 11 43 00 =1741-038 14 44 37 28.8 126.4 -3.0 -37.0 780 F 1 50 11 30 18 11 52 57 J1742+1904 14 54 36 47.9 109.6 -2.8 -48.0 553 1 1 50 11 52 57 11 53 37 =1739+190 14 55 17 48.0 109.7 -2.8 -48.0 40 F 1 53 11 53 15 11 53 37 J1745+1814 14 55 17 46.8 109.7 -2.9 -47.7 -8 1 1 53 11 53 37 11 54 47 =1743+182 14 56 27 47.0 110.0 -2.8 -47.6 62 F 1 57 11 53 37 11 54 47 J1742+1904 14 56 27 48.2 110.0 -2.8 -47.9 -8 1 1 57 11 54 47 11 55 57 =1739+190 14 57 37 48.4 110.3 -2.7 -47.7 62 F 1 62 11 54 47 11 55 57 GJ686 14 57 37 48.8 111.8 -2.7 -46.9 -7 1 1 62 11 55 57 11 58 57 --- 15 00 37 49.3 112.6 -2.6 -46.6 173 F 1 74 11 55 57 11 58 57 J1742+1904 15 00 37 48.9 111.0 -2.7 -47.4 -7 1 1 74 11 58 57 12 00 07 =1739+190 15 01 48 49.1 111.3 -2.7 -47.3 63 F 1 78 11 58 57 12 00 07 GJ686 15 01 48 49.5 112.9 -2.6 -46.5 -7 1 1 78 12 00 07 12 03 07 --- 15 04 48 50.1 113.6 -2.6 -46.1 173 F 1 90 12 00 07 12 03 07 J1742+1904 15 04 48 49.7 112.0 -2.6 -47.0 -7 1 1 90 12 03 07 12 04 17 =1739+190 15 05 58 49.9 112.3 -2.6 -46.9 63 F 1 94 12 03 07 12 04 17 GJ686 15 05 58 50.2 113.9 -2.5 -46.0 -7 1 1 94 12 04 17 12 07 17 --- 15 08 59 50.8 114.7 -2.5 -45.6 173 F 1 106 12 04 17 12 07 17 J1742+1904 15 08 59 50.4 113.1 -2.6 -46.5 -7 1 1 106 12 07 17 12 08 27 =1739+190 15 10 09 50.6 113.4 -2.5 -46.4 63 F 1 110 12 07 17 12 08 27 GJ686 15 10 09 51.0 115.0 -2.5 -45.5 -7 1 1 110 12 08 27 12 11 27 --- 15 13 09 51.5 115.8 -2.4 -45.1 173 F 1 122 12 08 27 12 11 27 J1742+1904 15 13 09 51.1 114.2 -2.5 -46.1 -7 1 1 122 12 11 27 12 12 37 =1739+190 15 14 20 51.3 114.5 -2.5 -45.9 63 F 1 126 12 11 27 Schedule for VLBA_NL (Code Nl ) Page 3 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 12 12 37 GJ686 15 14 20 51.7 116.1 -2.4 -44.9 -7 1 1 126 12 12 37 12 15 37 --- 15 17 20 52.2 117.0 -2.3 -44.5 173 F 1 138 12 12 37 12 15 37 J1742+1904 15 17 20 51.8 115.3 -2.4 -45.5 -7 1 1 138 12 15 37 12 16 47 =1739+190 15 18 30 52.0 115.6 -2.4 -45.4 63 F 1 143 12 15 37 12 16 47 J1745+1814 15 18 30 50.8 115.5 -2.5 -45.1 -8 1 1 143 12 16 47 12 17 57 =1743+182 15 19 41 51.0 115.8 -2.4 -45.0 62 F 1 147 12 16 47 12 18 28 J1742+1904 15 20 11 52.3 116.0 -2.4 -45.2 22 1 1 147 12 18 28 12 19 08 =1739+190 15 20 51 52.4 116.2 -2.4 -45.1 40 F 1 150 12 18 46 12 19 08 J1745+1814 15 20 51 51.2 116.1 -2.4 -44.8 -8 1 1 150 12 19 08 12 20 18 =1743+182 15 22 01 51.4 116.4 -2.4 -44.7 62 F 1 154 12 19 08 12 20 18 J1742+1904 15 22 01 52.6 116.5 -2.3 -44.9 -8 1 1 154 12 20 18 12 21 28 =1739+190 15 23 11 52.8 116.9 -2.3 -44.7 62 F 1 159 12 20 18 12 21 28 GJ686 15 23 11 53.1 118.6 -2.3 -43.7 -7 1 1 159 12 21 28 12 24 28 --- 15 26 12 53.6 119.5 -2.2 -43.2 173 F 1 170 12 21 28 12 24 28 J1742+1904 15 26 12 53.3 117.7 -2.3 -44.3 -7 1 1 170 12 24 28 12 25 38 =1739+190 15 27 22 53.5 118.0 -2.3 -44.1 63 F 1 175 12 24 28 12 25 38 GJ686 15 27 22 53.8 119.8 -2.2 -43.1 -7 1 1 175 12 25 38 12 28 38 --- 15 30 22 54.3 120.7 -2.1 -42.6 173 F 1 186 12 25 38 12 28 38 J1742+1904 15 30 22 54.0 118.9 -2.2 -43.7 -7 1 1 186 12 28 38 12 29 48 =1739+190 15 31 33 54.2 119.2 -2.2 -43.5 63 F 1 191 12 28 38 12 29 48 GJ686 15 31 33 54.5 121.1 -2.1 -42.4 -7 1 1 191 12 29 48 12 32 48 --- 15 34 33 55.0 122.0 -2.1 -41.9 173 F 1 203 12 29 48 12 32 48 J1742+1904 15 34 33 54.6 120.1 -2.1 -43.0 -7 1 1 203 12 32 48 12 33 58 =1739+190 15 35 43 54.8 120.5 -2.1 -42.8 63 F 1 207 12 32 48 12 33 58 GJ686 15 35 43 55.1 122.3 -2.0 -41.7 -7 1 1 207 12 33 58 12 36 58 --- 15 38 44 55.6 123.3 -2.0 -41.1 173 F 1 219 12 33 58 12 36 58 J1742+1904 15 38 44 55.3 121.4 -2.1 -42.3 -7 1 1 219 12 36 58 12 38 08 =1739+190 15 39 54 55.5 121.8 -2.0 -42.1 63 F 1 223 12 36 58 Schedule for VLBA_NL (Code Nl ) Page 4 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 12 38 08 GJ686 15 39 54 55.8 123.6 -2.0 -40.9 -7 1 1 223 12 38 08 12 41 08 --- 15 42 55 56.3 124.6 -1.9 -40.4 173 F 1 235 12 38 08 12 41 08 J1742+1904 15 42 55 56.0 122.7 -2.0 -41.6 -7 1 1 235 12 41 08 12 42 18 =1739+190 15 44 05 56.2 123.1 -2.0 -41.4 63 F 1 239 12 41 08 12 42 18 J1745+1814 15 44 05 54.9 122.8 -2.0 -41.3 -8 1 1 239 12 42 18 12 43 28 =1743+182 15 45 15 55.1 123.2 -2.0 -41.1 62 F 1 244 12 42 18 12 43 58 J1742+1904 15 45 45 56.4 123.6 -1.9 -41.1 21 1 1 244 12 43 58 12 44 38 =1739+190 15 46 25 56.5 123.8 -1.9 -41.0 40 F 1 246 12 44 16 12 44 38 J1745+1814 15 46 25 55.3 123.6 -2.0 -40.9 -8 1 1 246 12 44 38 12 45 48 =1743+182 15 47 35 55.5 123.9 -2.0 -40.7 62 F 1 251 12 44 38 12 45 48 J1742+1904 15 47 35 56.7 124.2 -1.9 -40.7 -8 1 1 251 12 45 48 12 46 58 =1739+190 15 48 46 56.9 124.6 -1.9 -40.5 62 F 1 255 12 45 48 12 46 58 GJ686 15 48 46 57.1 126.5 -1.8 -39.2 -7 1 1 255 12 46 58 12 49 58 --- 15 51 46 57.6 127.6 -1.8 -38.6 173 F 1 267 12 46 58 12 49 58 J1742+1904 15 51 46 57.3 125.6 -1.8 -39.9 -7 1 1 267 12 49 58 12 51 08 =1739+190 15 52 56 57.5 126.0 -1.8 -39.7 63 F 1 272 12 49 58 12 51 08 GJ686 15 52 56 57.8 128.0 -1.8 -38.3 -7 1 1 272 12 51 08 12 54 08 --- 15 55 57 58.2 129.0 -1.7 -37.7 173 F 1 283 12 51 08 12 54 08 J1742+1904 15 55 57 58.0 127.0 -1.8 -39.1 -7 1 1 283 12 54 08 12 55 18 =1739+190 15 57 07 58.1 127.4 -1.8 -38.8 63 F 1 288 12 54 08 12 55 18 GJ686 15 57 07 58.4 129.5 -1.7 -37.4 -7 1 1 288 12 55 18 12 58 18 --- 16 00 07 58.8 130.6 -1.6 -36.7 173 F 1 299 12 55 18 12 58 18 J1742+1904 16 00 07 58.6 128.5 -1.7 -38.2 -7 1 1 299 12 58 18 12 59 28 =1739+190 16 01 18 58.8 128.9 -1.7 -37.9 63 F 1 304 12 58 18 12 59 28 GJ686 16 01 18 59.0 131.0 -1.6 -36.4 -7 1 1 304 12 59 28 13 02 28 --- 16 04 18 59.4 132.1 -1.6 -35.7 173 F 1 315 12 59 28 13 02 28 J1742+1904 16 04 18 59.2 130.0 -1.6 -37.2 -7 1 1 315 13 02 28 13 03 38 =1739+190 16 05 28 59.4 130.4 -1.6 -36.9 63 F 1 320 13 02 28 Schedule for VLBA_NL (Code Nl ) Page 5 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 13 03 38 GJ686 16 05 28 59.6 132.6 -1.5 -35.4 -7 1 1 320 13 03 38 13 06 38 --- 16 08 29 60.0 133.7 -1.5 -34.7 173 F 1 332 13 03 38 13 06 38 J1742+1904 16 08 29 59.8 131.5 -1.6 -36.2 -7 1 1 332 13 06 38 13 07 48 =1739+190 16 09 39 59.9 132.0 -1.5 -35.9 63 F 1 336 13 06 38 13 07 48 J1745+1814 16 09 39 58.7 131.5 -1.6 -36.0 -8 1 1 336 13 07 48 13 08 58 =1743+182 16 10 49 58.9 131.9 -1.6 -35.7 62 F 1 341 13 07 48 13 08 58 J1742+1904 16 10 49 60.1 132.4 -1.5 -35.6 -8 1 1 341 13 08 58 13 10 08 =1739+190 16 11 59 60.3 132.9 -1.5 -35.3 62 F 1 345 13 08 58 13 13 01 J1805-1408 16 14 53 28.5 149.1 -1.9 -23.3 103 1 1 345 13 13 01 13 13 41 --- 16 15 33 28.6 149.2 -1.8 -23.2 40 F 1 348 13 13 19 13 13 41 J1753-1843 16 15 33 25.4 154.2 -1.6 -20.0 -12 1 1 348 13 13 41 13 14 51 --- 16 16 43 25.5 154.5 -1.6 -19.8 58 F 1 352 13 13 41 13 14 51 J1805-1408 16 16 43 28.7 149.5 -1.8 -23.0 -12 1 1 352 13 14 51 13 16 01 --- 16 17 53 28.8 149.8 -1.8 -22.7 58 F 1 357 13 14 51 13 16 01 GJ1224 16 17 53 26.9 150.1 -1.8 -22.7 -10 1 1 357 13 16 01 13 19 01 --- 16 20 54 27.2 150.9 -1.8 -22.2 170 F 1 368 13 16 01 13 19 01 J1805-1408 16 20 54 29.1 150.6 -1.8 -22.2 -10 1 1 368 13 19 01 13 20 11 --- 16 22 04 29.2 150.9 -1.7 -22.0 60 F 1 373 13 19 01 13 20 11 GJ1224 16 22 04 27.3 151.2 -1.8 -22.0 -10 1 1 373 13 20 11 13 23 11 --- 16 25 04 27.6 151.9 -1.7 -21.4 170 F 1 384 13 20 11 13 23 11 J1805-1408 16 25 04 29.4 151.7 -1.7 -21.4 -10 1 1 384 13 23 11 13 24 21 --- 16 26 15 29.5 152.0 -1.7 -21.2 60 F 1 389 13 23 11 13 24 21 GJ1224 16 26 15 27.7 152.2 -1.7 -21.2 -10 1 1 389 13 24 21 13 27 21 --- 16 29 15 27.9 153.0 -1.6 -20.6 170 F 1 401 13 24 21 13 27 21 J1805-1408 16 29 15 29.8 152.8 -1.6 -20.6 -10 1 1 401 13 27 21 13 28 31 --- 16 30 25 29.9 153.1 -1.6 -20.4 60 F 1 405 13 27 21 13 28 31 GJ1224 16 30 25 28.0 153.3 -1.6 -20.4 -10 1 1 405 13 28 31 13 31 31 --- 16 33 26 28.3 154.0 -1.6 -19.9 170 F 1 417 13 28 31 Schedule for VLBA_NL (Code Nl ) Page 6 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 13 31 31 J1805-1408 16 33 26 30.1 153.9 -1.5 -19.8 -10 1 1 417 13 31 31 13 32 41 --- 16 34 36 30.2 154.2 -1.5 -19.6 60 F 1 421 13 31 31 13 32 41 GJ1224 16 34 36 28.4 154.3 -1.6 -19.6 -10 1 1 421 13 32 41 13 35 41 --- 16 37 36 28.6 155.1 -1.5 -19.1 170 F 1 433 13 32 41 13 35 41 J1805-1408 16 37 36 30.5 155.0 -1.5 -19.0 -10 1 1 433 13 35 41 13 36 51 --- 16 38 47 30.6 155.3 -1.5 -18.8 60 F 1 437 13 35 41 13 36 51 J1753-1843 16 38 47 27.1 160.1 -1.2 -15.6 -13 1 1 437 13 36 51 13 38 01 --- 16 39 57 27.1 160.4 -1.2 -15.4 57 F 1 442 13 36 51 13 38 01 J1805-1408 16 39 57 30.7 155.6 -1.4 -18.5 -13 1 1 442 13 38 01 13 39 11 --- 16 41 07 30.8 155.9 -1.4 -18.3 57 F 1 446 13 38 01 13 41 29 J1742+1904 16 43 26 64.1 146.6 -1.0 -25.7 66 1 1 446 13 41 29 13 42 09 =1739+190 16 44 06 64.1 146.9 -1.0 -25.5 40 F 1 449 13 41 47 13 42 09 J1745+1814 16 44 06 63.0 145.9 -1.0 -26.1 -8 1 1 449 13 42 09 13 43 19 =1743+182 16 45 16 63.1 146.5 -1.0 -25.7 62 F 1 454 13 42 09 13 43 19 J1742+1904 16 45 16 64.3 147.5 -1.0 -25.1 -8 1 1 454 13 43 19 13 44 29 =1739+190 16 46 27 64.4 148.1 -0.9 -24.6 62 F 1 458 13 43 19 13 44 29 GJ686 16 46 27 64.3 150.6 -0.9 -22.7 -8 1 1 458 13 44 29 13 47 29 --- 16 49 27 64.6 152.2 -0.8 -21.5 172 F 1 470 13 44 29 13 47 29 J1742+1904 16 49 27 64.7 149.6 -0.9 -23.5 -8 1 1 470 13 47 29 13 48 39 =1739+190 16 50 37 64.8 150.2 -0.9 -23.1 62 F 1 474 13 47 29 13 48 39 GJ686 16 50 37 64.7 152.8 -0.8 -21.1 -8 1 1 474 13 48 39 13 51 39 --- 16 53 38 64.9 154.3 -0.7 -19.9 172 F 1 486 13 48 39 13 51 39 J1742+1904 16 53 38 65.0 151.7 -0.8 -21.9 -8 1 1 486 13 51 39 13 52 49 =1739+190 16 54 48 65.1 152.4 -0.8 -21.5 62 F 1 490 13 51 39 13 52 49 GJ686 16 54 48 65.0 155.0 -0.7 -19.5 -8 1 1 490 13 52 49 13 55 49 --- 16 57 48 65.3 156.6 -0.7 -18.2 172 F 1 502 13 52 49 13 55 49 J1742+1904 16 57 48 65.4 153.9 -0.7 -20.3 -8 1 1 502 13 55 49 13 56 59 =1739+190 16 58 59 65.5 154.6 -0.7 -19.8 62 F 1 506 13 55 49 Schedule for VLBA_NL (Code Nl ) Page 7 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 13 56 59 GJ686 16 58 59 65.3 157.2 -0.7 -17.8 -8 1 1 506 13 56 59 13 59 59 --- 17 01 59 65.6 158.8 -0.6 -16.5 172 F 1 518 13 56 59 13 59 59 J1742+1904 17 01 59 65.7 156.2 -0.7 -18.6 -8 1 1 518 13 59 59 14 01 09 =1739+190 17 03 09 65.8 156.8 -0.7 -18.1 62 F 1 523 13 59 59 14 01 09 GJ686 17 03 09 65.6 159.5 -0.6 -16.0 -8 1 1 523 14 01 09 14 04 09 --- 17 06 10 65.8 161.2 -0.5 -14.7 172 F 1 534 14 01 09 14 04 09 J1742+1904 17 06 10 66.0 158.5 -0.6 -16.8 -8 1 1 534 14 04 09 14 05 19 =1739+190 17 07 20 66.1 159.2 -0.6 -16.3 62 F 1 539 14 04 09 14 05 19 J1745+1814 17 07 20 65.0 157.6 -0.6 -17.4 -8 1 1 539 14 05 19 14 06 29 =1743+182 17 08 30 65.1 158.3 -0.6 -16.9 62 F 1 543 14 05 19 14 06 29 J1742+1904 17 08 30 66.2 159.8 -0.6 -15.8 -8 1 1 543 14 06 29 14 07 39 =1739+190 17 09 40 66.3 160.5 -0.5 -15.3 62 F 1 548 14 06 29 14 09 55 J1805-1408 17 11 57 32.7 164.4 -0.9 -11.9 63 1 1 548 14 09 55 14 10 35 --- 17 12 37 32.7 164.6 -0.9 -11.8 40 F 1 550 14 10 13 14 10 35 J1753-1843 17 12 37 28.8 168.9 -0.7 -8.7 -14 1 1 550 14 10 35 14 11 45 --- 17 13 47 28.8 169.2 -0.7 -8.5 56 F 1 555 14 10 35 14 11 45 J1805-1408 17 13 47 32.8 164.9 -0.9 -11.6 -14 1 1 555 14 11 45 14 12 55 --- 17 14 57 32.9 165.2 -0.9 -11.3 56 F 1 559 14 11 45 14 12 55 GJ1224 17 14 57 31.0 165.1 -0.9 -11.5 -10 1 1 559 14 12 55 14 15 55 --- 17 17 58 31.1 165.9 -0.8 -10.9 170 F 1 571 14 12 55 14 15 55 J1805-1408 17 17 58 33.0 166.1 -0.8 -10.7 -10 1 1 571 14 15 55 14 17 05 --- 17 19 08 33.0 166.4 -0.8 -10.4 60 F 1 575 14 15 55 14 17 05 GJ1224 17 19 08 31.2 166.2 -0.8 -10.6 -10 1 1 575 14 17 05 14 20 05 --- 17 22 08 31.3 167.1 -0.8 -10.0 170 F 1 587 14 17 05 14 20 05 J1805-1408 17 22 08 33.2 167.3 -0.7 -9.8 -10 1 1 587 14 20 05 14 21 15 --- 17 23 19 33.2 167.6 -0.7 -9.5 60 F 1 592 14 20 05 14 21 15 GJ1224 17 23 19 31.3 167.4 -0.7 -9.7 -10 1 1 592 14 21 15 14 24 15 --- 17 26 19 31.5 168.2 -0.7 -9.1 170 F 1 603 14 21 15 Schedule for VLBA_NL (Code Nl ) Page 8 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 14 24 15 J1805-1408 17 26 19 33.3 168.5 -0.7 -8.8 -10 1 1 603 14 24 15 14 25 25 --- 17 27 29 33.4 168.8 -0.6 -8.6 60 F 1 608 14 24 15 14 25 25 GJ1224 17 27 29 31.5 168.6 -0.7 -8.8 -10 1 1 608 14 25 25 14 28 25 --- 17 30 30 31.6 169.4 -0.6 -8.2 170 F 1 619 14 25 25 14 28 25 J1805-1408 17 30 30 33.5 169.7 -0.6 -7.9 -10 1 1 619 14 28 25 14 29 35 --- 17 31 40 33.5 170.0 -0.6 -7.7 60 F 1 624 14 28 25 14 29 35 GJ1224 17 31 40 31.7 169.7 -0.6 -8.0 -10 1 1 624 14 29 35 14 32 35 --- 17 34 40 31.8 170.6 -0.6 -7.3 170 F 1 635 14 29 35 14 32 35 J1805-1408 17 34 40 33.6 170.9 -0.5 -7.0 -10 1 1 635 14 32 35 14 33 45 --- 17 35 51 33.7 171.2 -0.5 -6.7 60 F 1 640 14 32 35 14 33 45 J1753-1843 17 35 51 29.4 175.2 -0.3 -3.8 -15 1 1 640 14 33 45 14 34 55 --- 17 37 01 29.4 175.5 -0.3 -3.6 55 F 1 644 14 33 45 14 34 55 J1805-1408 17 37 01 33.7 171.6 -0.5 -6.5 -15 1 1 644 14 34 55 14 36 05 --- 17 38 11 33.7 171.9 -0.5 -6.2 55 F 1 649 14 34 55 14 38 15 J1742+1904 17 40 21 67.3 178.7 0.0 -1.0 56 1 1 649 14 38 15 14 38 55 =1739+190 17 41 01 67.3 179.1 0.0 -0.7 40 F 1 652 14 38 33 14 38 55 J1745+1814 17 41 01 66.4 176.9 -0.1 -2.5 -8 1 1 652 14 38 55 14 40 05 =1743+182 17 42 11 66.5 177.6 -0.1 -1.9 62 F 1 656 14 38 55 14 40 05 J1742+1904 17 42 11 67.3 179.9 0.0 -0.1 -8 1 1 656 14 40 05 14 41 15 =1739+190 17 43 22 67.3 180.6 0.0 0.4 62 F 1 661 14 40 05 14 41 15 GJ686 17 43 22 66.8 183.1 0.1 2.4 -8 1 1 661 14 41 15 14 44 15 --- 17 46 22 66.7 184.9 0.1 3.8 172 F 1 672 14 41 15 14 44 15 J1742+1904 17 46 22 67.3 182.4 0.1 1.9 -8 1 1 672 14 44 15 14 45 25 =1739+190 17 47 32 67.3 183.1 0.1 2.5 62 F 1 677 14 44 15 14 45 25 GJ686 17 47 32 66.7 185.6 0.2 4.4 -8 1 1 677 14 45 25 14 48 25 --- 17 50 33 66.7 187.4 0.2 5.8 172 F 1 688 14 45 25 14 48 25 J1742+1904 17 50 33 67.2 185.0 0.1 3.9 -8 1 1 688 14 48 25 14 49 35 =1739+190 17 51 43 67.2 185.7 0.2 4.5 62 F 1 693 14 48 25 Schedule for VLBA_NL (Code Nl ) Page 9 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 14 49 35 GJ686 17 51 43 66.6 188.1 0.2 6.3 -8 1 1 693 14 49 35 14 52 35 --- 17 54 43 66.5 189.9 0.3 7.7 172 F 1 704 14 49 35 14 52 35 J1742+1904 17 54 43 67.1 187.5 0.2 5.9 -8 1 1 704 14 52 35 14 53 45 =1739+190 17 55 54 67.1 188.2 0.2 6.5 62 F 1 709 14 52 35 14 53 45 GJ686 17 55 54 66.5 190.5 0.3 8.3 -8 1 1 709 14 53 45 14 56 45 --- 17 58 54 66.4 192.3 0.3 9.7 172 F 1 721 14 53 45 14 56 45 J1742+1904 17 58 54 67.0 190.0 0.3 7.9 -7 1 1 721 14 56 45 14 57 55 =1739+190 18 00 04 67.0 190.7 0.3 8.4 63 F 1 725 14 56 45 14 57 55 GJ686 18 00 04 66.4 193.0 0.4 10.2 -7 1 1 725 14 57 55 15 00 55 --- 18 03 05 66.2 194.7 0.4 11.5 173 F 1 737 14 57 55 15 00 55 J1742+1904 18 03 05 66.9 192.5 0.3 9.8 -7 1 1 737 15 00 55 15 02 05 =1739+190 18 04 15 66.8 193.2 0.4 10.4 63 F 1 741 15 00 55 15 02 05 J1745+1814 18 04 15 66.2 190.6 0.3 8.3 -8 1 1 741 15 02 05 15 03 15 =1743+182 18 05 25 66.1 191.3 0.3 8.8 62 F 1 746 15 02 05 15 03 15 J1742+1904 18 05 25 66.8 193.9 0.4 10.9 -8 1 1 746 15 03 15 15 04 25 =1739+190 18 06 35 66.7 194.6 0.4 11.5 62 F 1 750 15 03 15 15 06 28 J1805-1408 18 08 39 34.1 180.8 0.0 0.6 52 1 1 750 15 06 28 15 07 08 --- 18 09 19 34.1 181.0 0.1 0.8 40 F 1 753 15 06 46 15 07 08 J1753-1843 18 09 19 29.4 184.3 0.3 3.4 -15 1 1 753 15 07 08 15 08 18 --- 18 10 29 29.4 184.6 0.3 3.6 55 F 1 757 15 07 08 15 08 18 J1805-1408 18 10 29 34.1 181.3 0.1 1.0 -15 1 1 757 15 08 18 15 09 28 --- 18 11 39 34.1 181.7 0.1 1.3 55 F 1 762 15 08 18 15 09 28 GJ1224 18 11 39 32.3 181.0 0.1 0.8 -10 1 1 762 15 09 28 15 12 28 --- 18 14 40 32.2 181.9 0.1 1.5 170 F 1 773 15 09 28 15 12 28 J1805-1408 18 14 40 34.0 182.5 0.1 2.0 -10 1 1 773 15 12 28 15 13 38 --- 18 15 50 34.0 182.9 0.2 2.2 60 F 1 778 15 12 28 15 13 38 GJ1224 18 15 50 32.2 182.2 0.1 1.7 -10 1 1 778 15 13 38 15 16 38 --- 18 18 50 32.2 183.1 0.2 2.4 170 F 1 790 15 13 38 Schedule for VLBA_NL (Code Nl ) Page 10 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 15 16 38 J1805-1408 18 18 50 34.0 183.8 0.2 2.9 -10 1 1 790 15 16 38 15 17 48 --- 18 20 00 34.0 184.1 0.2 3.2 60 F 1 794 15 16 38 15 17 48 GJ1224 18 20 00 32.2 183.4 0.2 2.6 -10 1 1 794 15 17 48 15 20 48 --- 18 23 01 32.2 184.3 0.3 3.3 170 F 1 806 15 17 48 15 20 48 J1805-1408 18 23 01 33.9 185.0 0.3 3.8 -10 1 1 806 15 20 48 15 21 58 --- 18 24 11 33.9 185.3 0.3 4.1 60 F 1 810 15 20 48 15 21 58 GJ1224 18 24 11 32.1 184.6 0.3 3.6 -10 1 1 810 15 21 58 15 24 58 --- 18 27 12 32.1 185.4 0.3 4.2 170 F 1 822 15 21 58 15 24 58 J1805-1408 18 27 12 33.9 186.2 0.4 4.8 -10 1 1 822 15 24 58 15 26 08 --- 18 28 22 33.8 186.5 0.4 5.0 60 F 1 826 15 24 58 15 26 08 GJ1224 18 28 22 32.1 185.8 0.3 4.5 -10 1 1 826 15 26 08 15 29 08 --- 18 31 22 32.0 186.6 0.4 5.1 170 F 1 838 15 26 08 15 29 08 J1805-1408 18 31 22 33.8 187.4 0.4 5.7 -10 1 1 838 15 29 08 15 30 18 --- 18 32 33 33.7 187.8 0.4 6.0 60 F 1 843 15 29 08 15 30 18 J1753-1843 18 32 33 28.8 190.5 0.6 8.3 -16 1 1 843 15 30 18 15 31 28 --- 18 33 43 28.8 190.8 0.7 8.5 54 F 1 847 15 30 18 15 31 28 J1805-1408 18 33 43 33.7 188.1 0.5 6.2 -16 1 1 847 15 31 28 15 32 38 --- 18 34 53 33.7 188.4 0.5 6.5 54 F 1 852 15 31 28 15 42 05 J1743-0350 18 44 22 42.4 200.5 1.0 15.1 544 1 1 852 15 42 05 15 44 05 =1741-038 18 46 22 42.3 201.1 1.0 15.6 120 F 1 859 15 42 23 15 45 46 J1742+1904 18 48 03 63.4 216.5 1.1 28.0 53 1 1 859 15 45 46 15 46 26 =1739+190 18 48 43 63.3 216.8 1.1 28.2 40 F 1 862 15 46 04 15 46 26 J1745+1814 18 48 43 63.0 214.2 1.0 26.2 -8 1 1 862 15 46 26 15 47 36 =1743+182 18 49 53 62.8 214.8 1.1 26.6 62 F 1 866 15 46 26 15 47 36 J1742+1904 18 49 53 63.2 217.4 1.1 28.6 -8 1 1 866 15 47 36 15 48 46 =1739+190 18 51 04 63.0 217.9 1.1 29.0 62 F 1 871 15 47 36 15 48 46 GJ686 18 51 04 62.1 219.3 1.2 29.9 -8 1 1 871 15 48 46 15 51 46 --- 18 54 04 61.7 220.6 1.3 30.8 172 F 1 883 15 48 46 Schedule for VLBA_NL (Code Nl ) Page 11 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 15 51 46 J1742+1904 18 54 04 62.7 219.3 1.2 30.0 -8 1 1 883 15 51 46 15 52 56 =1739+190 18 55 14 62.5 219.8 1.2 30.3 62 F 1 887 15 51 46 15 52 56 GJ686 18 55 14 61.6 221.1 1.3 31.1 -8 1 1 887 15 52 56 15 55 56 --- 18 58 15 61.2 222.3 1.3 32.0 172 F 1 899 15 52 56 15 55 56 J1742+1904 18 58 15 62.2 221.1 1.3 31.3 -8 1 1 899 15 55 56 15 57 06 =1739+190 18 59 25 62.0 221.6 1.3 31.6 62 F 1 903 15 55 56 15 57 06 GJ686 18 59 25 61.1 222.8 1.4 32.3 -8 1 1 903 15 57 06 16 00 06 --- 19 02 25 60.7 224.1 1.4 33.2 172 F 1 915 15 57 06 16 00 06 J1742+1904 19 02 25 61.6 222.9 1.3 32.5 -8 1 1 915 16 00 06 16 01 16 =1739+190 19 03 36 61.5 223.4 1.4 32.8 62 F 1 919 16 00 06 16 01 16 GJ686 19 03 36 60.5 224.5 1.4 33.5 -8 1 1 919 16 01 16 16 04 16 --- 19 06 36 60.2 225.7 1.5 34.3 172 F 1 931 16 01 16 16 04 16 J1742+1904 19 06 36 61.1 224.6 1.4 33.7 -8 1 1 931 16 04 16 16 05 26 =1739+190 19 07 46 61.0 225.1 1.4 34.0 62 F 1 935 16 04 16 16 05 26 GJ686 19 07 46 60.0 226.2 1.5 34.6 -8 1 1 935 16 05 26 16 08 26 --- 19 10 47 59.6 227.4 1.5 35.4 172 F 1 947 16 05 26 16 08 26 J1742+1904 19 10 47 60.6 226.3 1.5 34.8 -8 1 1 947 16 08 26 16 09 36 =1739+190 19 11 57 60.4 226.7 1.5 35.1 62 F 1 952 16 08 26 16 09 36 J1745+1814 19 11 57 60.2 224.3 1.4 33.3 -8 1 1 952 16 09 36 16 10 46 =1743+182 19 13 07 60.1 224.8 1.4 33.6 62 F 1 956 16 09 36 16 10 46 J1742+1904 19 13 07 60.2 227.2 1.5 35.4 -8 1 1 956 16 10 46 16 11 56 =1739+190 19 14 17 60.1 227.7 1.5 35.7 62 F 1 961 16 10 46 16 14 14 J1805-1408 19 16 36 31.8 200.2 1.2 15.4 75 1 1 961 16 14 14 16 14 54 --- 19 17 16 31.7 200.4 1.2 15.6 40 F 1 963 16 14 32 16 14 54 J1753-1843 19 17 16 26.5 202.2 1.4 17.3 -16 1 1 963 16 14 54 16 16 04 --- 19 18 26 26.4 202.5 1.4 17.5 54 F 1 968 16 14 54 16 16 04 J1805-1408 19 18 26 31.6 200.7 1.2 15.8 -16 1 1 968 16 16 04 16 17 14 --- 19 19 36 31.6 201.1 1.2 16.0 54 F 1 972 16 16 04 Schedule for VLBA_NL (Code Nl ) Page 12 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 16 17 14 GJ1224 19 19 36 29.9 199.9 1.2 15.3 -9 1 1 972 16 17 14 16 20 14 --- 19 22 37 29.7 200.7 1.2 15.9 171 F 1 984 16 17 14 16 20 14 J1805-1408 19 22 37 31.4 201.9 1.3 16.7 -9 1 1 984 16 20 14 16 21 24 --- 19 23 47 31.3 202.2 1.3 16.9 61 F 1 988 16 20 14 16 21 24 GJ1224 19 23 47 29.7 201.1 1.3 16.2 -9 1 1 988 16 21 24 16 24 24 --- 19 26 47 29.5 201.8 1.3 16.8 171 F 1 1000 16 21 24 16 24 24 J1805-1408 19 26 47 31.1 203.0 1.3 17.5 -9 1 1 1000 16 24 24 16 25 34 --- 19 27 57 31.0 203.3 1.4 17.7 61 F 1 1004 16 24 24 16 25 34 GJ1224 19 27 57 29.4 202.2 1.3 17.0 -9 1 1 1004 16 25 34 16 28 34 --- 19 30 58 29.2 202.9 1.4 17.6 171 F 1 1016 16 25 34 16 28 34 J1805-1408 19 30 58 30.7 204.1 1.4 18.3 -9 1 1 1016 16 28 34 16 29 44 --- 19 32 08 30.7 204.4 1.4 18.6 61 F 1 1021 16 28 34 16 29 44 GJ1224 19 32 08 29.1 203.3 1.4 17.8 -9 1 1 1021 16 29 44 16 32 44 --- 19 35 09 28.9 204.0 1.5 18.4 171 F 1 1032 16 29 44 16 32 44 J1805-1408 19 35 09 30.4 205.2 1.5 19.2 -9 1 1 1032 16 32 44 16 33 54 --- 19 36 19 30.3 205.6 1.5 19.4 61 F 1 1037 16 32 44 16 33 54 GJ1224 19 36 19 28.8 204.3 1.5 18.6 -9 1 1 1037 16 33 54 16 36 54 --- 19 39 19 28.5 205.1 1.5 19.2 171 F 1 1048 16 33 54 16 36 54 J1805-1408 19 39 19 30.1 206.4 1.6 20.0 -9 1 1 1048 16 36 54 16 38 04 --- 19 40 29 30.0 206.7 1.6 20.2 61 F 1 1053 16 36 54 16 38 04 J1753-1843 19 40 29 24.6 207.9 1.8 21.6 -17 1 1 1053 16 38 04 16 39 14 --- 19 41 40 24.5 208.2 1.8 21.9 53 F 1 1057 16 38 04 16 39 14 J1805-1408 19 41 40 29.9 207.0 1.6 20.4 -17 1 1 1057 16 39 14 16 40 24 --- 19 42 50 29.8 207.3 1.6 20.6 53 F 1 1062 16 39 14 16 42 45 J1742+1904 19 45 11 55.5 238.3 2.0 42.2 83 1 1 1062 16 42 45 16 43 25 =1739+190 19 45 51 55.4 238.5 2.1 42.3 40 F 1 1064 16 43 03 16 43 25 J1745+1814 19 45 51 55.3 236.3 2.0 40.8 -7 1 1 1064 16 43 25 16 44 35 =1743+182 19 47 01 55.2 236.7 2.0 41.0 63 F 1 1069 16 43 25 Schedule for VLBA_NL (Code Nl ) Page 13 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 16 44 35 J1742+1904 19 47 01 55.2 238.9 2.1 42.5 -7 1 1 1069 16 44 35 16 45 45 =1739+190 19 48 12 55.0 239.2 2.1 42.7 63 F 1 1073 16 44 35 16 45 45 GJ686 19 48 12 54.0 239.9 2.2 42.9 -8 1 1 1073 16 45 45 16 48 45 --- 19 51 12 53.5 240.8 2.2 43.4 172 F 1 1085 16 45 45 16 48 45 J1742+1904 19 51 12 54.5 240.1 2.1 43.2 -8 1 1 1085 16 48 45 16 49 55 =1739+190 19 52 22 54.3 240.5 2.2 43.4 62 F 1 1090 16 48 45 16 49 55 GJ686 19 52 22 53.3 241.1 2.2 43.6 -8 1 1 1090 16 49 55 16 52 55 --- 19 55 23 52.8 242.0 2.3 44.0 172 F 1 1101 16 49 55 16 52 55 J1742+1904 19 55 23 53.8 241.4 2.2 43.8 -8 1 1 1101 16 52 55 16 54 05 =1739+190 19 56 33 53.6 241.7 2.2 44.0 62 F 1 1106 16 52 55 16 54 05 GJ686 19 56 33 52.6 242.3 2.3 44.2 -8 1 1 1106 16 54 05 16 57 05 --- 19 59 33 52.1 243.1 2.4 44.6 172 F 1 1117 16 54 05 16 57 05 J1742+1904 19 59 33 53.1 242.5 2.3 44.4 -8 1 1 1117 16 57 05 16 58 15 =1739+190 20 00 44 52.9 242.9 2.3 44.6 62 F 1 1122 16 57 05 16 58 15 GJ686 20 00 44 51.9 243.5 2.4 44.7 -8 1 1 1122 16 58 15 17 01 15 --- 20 03 44 51.4 244.3 2.4 45.1 172 F 1 1133 16 58 15 17 01 15 J1742+1904 20 03 44 52.4 243.7 2.4 45.0 -8 1 1 1133 17 01 15 17 02 25 =1739+190 20 04 54 52.2 244.0 2.4 45.2 62 F 1 1138 17 01 15 17 02 25 GJ686 20 04 54 51.2 244.6 2.4 45.3 -8 1 1 1138 17 02 25 17 05 25 --- 20 07 55 50.7 245.4 2.5 45.7 172 F 1 1150 17 02 25 17 05 25 J1742+1904 20 07 55 51.7 244.8 2.4 45.6 -8 1 1 1150 17 05 25 17 06 35 =1739+190 20 09 05 51.5 245.1 2.4 45.7 62 F 1 1154 17 05 25 17 06 35 J1745+1814 20 09 05 51.6 243.2 2.4 44.5 -7 1 1 1154 17 06 35 17 07 45 =1743+182 20 10 15 51.4 243.5 2.4 44.6 63 F 1 1159 17 06 35 17 07 45 J1742+1904 20 10 15 51.3 245.5 2.5 45.9 -7 1 1 1159 17 07 45 17 08 55 =1739+190 20 11 25 51.1 245.8 2.5 46.0 63 F 1 1163 17 07 45 17 11 10 J1805-1408 20 13 41 26.8 215.1 2.1 26.2 81 1 1 1163 17 11 10 17 11 50 --- 20 14 21 26.7 215.2 2.1 26.3 40 F 1 1166 17 11 28 Schedule for VLBA_NL (Code Nl ) Page 14 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 17 11 50 J1753-1843 20 14 21 21.3 215.9 2.3 27.5 -17 1 1 1166 17 11 50 17 13 00 --- 20 15 31 21.2 216.1 2.4 27.7 53 F 1 1170 17 11 50 17 13 00 J1805-1408 20 15 31 26.6 215.5 2.2 26.5 -17 1 1 1170 17 13 00 17 14 10 --- 20 16 42 26.5 215.8 2.2 26.7 53 F 1 1175 17 13 00 17 14 10 GJ1224 20 16 42 25.1 214.4 2.1 26.0 -9 1 1 1175 17 14 10 17 17 10 --- 20 19 42 24.7 215.1 2.2 26.5 171 F 1 1186 17 14 10 17 17 10 J1805-1408 20 19 42 26.1 216.5 2.2 27.2 -9 1 1 1186 17 17 10 17 18 20 --- 20 20 52 26.0 216.8 2.2 27.4 61 F 1 1191 17 17 10 17 18 20 GJ1224 20 20 52 24.6 215.4 2.2 26.7 -9 1 1 1191 17 18 20 17 21 20 --- 20 23 53 24.3 216.1 2.3 27.2 171 F 1 1203 17 18 20 17 21 20 J1805-1408 20 23 53 25.7 217.5 2.3 27.9 -9 1 1 1203 17 21 20 17 22 30 --- 20 25 03 25.5 217.8 2.3 28.1 61 F 1 1207 17 21 20 17 22 30 GJ1224 20 25 03 24.2 216.4 2.3 27.4 -9 1 1 1207 17 22 30 17 25 30 --- 20 28 04 23.8 217.1 2.3 27.9 171 F 1 1219 17 22 30 17 25 30 J1805-1408 20 28 04 25.2 218.5 2.4 28.6 -9 1 1 1219 17 25 30 17 26 40 --- 20 29 14 25.1 218.8 2.4 28.8 61 F 1 1223 17 25 30 17 26 40 GJ1224 20 29 14 23.7 217.4 2.4 28.1 -9 1 1 1223 17 26 40 17 29 40 --- 20 32 14 23.4 218.1 2.4 28.6 171 F 1 1235 17 26 40 17 29 40 J1805-1408 20 32 14 24.7 219.5 2.4 29.3 -9 1 1 1235 17 29 40 17 30 50 --- 20 33 24 24.6 219.8 2.5 29.5 61 F 1 1239 17 29 40 17 30 50 GJ1224 20 33 24 23.2 218.3 2.4 28.8 -9 1 1 1239 17 30 50 17 33 50 --- 20 36 25 22.9 219.0 2.5 29.2 171 F 1 1251 17 30 50 17 33 50 J1805-1408 20 36 25 24.2 220.5 2.5 29.9 -9 1 1 1251 17 33 50 17 35 00 --- 20 37 35 24.1 220.7 2.5 30.1 61 F 1 1255 17 33 50 17 35 00 J1753-1843 20 37 35 18.6 221.0 2.7 31.1 -17 1 1 1255 17 35 00 17 36 10 --- 20 38 45 18.5 221.2 2.8 31.3 53 F 1 1260 17 35 00 17 36 10 J1805-1408 20 38 45 23.9 221.0 2.5 30.3 -17 1 1 1260 17 36 10 17 37 20 --- 20 39 55 23.8 221.3 2.6 30.5 53 F 1 1264 17 36 10 Schedule for VLBA_NL (Code Nl ) Page 15 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 17 38 09 J1733-1304 20 40 45 20.3 229.2 3.1 35.4 36 1 1 1264 17 38 09 17 40 09 =1730-130 20 42 45 20.0 229.6 3.2 35.7 120 F 1 1272 17 38 27 17 42 02 J1742+1904 20 44 38 45.3 253.7 3.0 49.2 56 1 1 1272 17 42 02 17 42 42 =1739+190 20 45 18 45.2 253.9 3.0 49.3 40 F 1 1275 17 42 20 17 42 42 J1745+1814 20 45 18 45.4 252.1 3.0 48.4 -7 1 1 1275 17 42 42 17 43 52 =1743+182 20 46 28 45.1 252.4 3.0 48.5 63 F 1 1279 17 42 42 17 43 52 J1742+1904 20 46 28 45.0 254.1 3.1 49.4 -7 1 1 1279 17 43 52 17 45 02 =1739+190 20 47 39 44.8 254.4 3.1 49.5 63 F 1 1284 17 43 52 17 45 02 GJ686 20 47 39 43.7 254.7 3.2 49.4 -8 1 1 1284 17 45 02 17 48 02 --- 20 50 39 43.2 255.4 3.2 49.6 172 F 1 1295 17 45 02 17 48 02 J1742+1904 20 50 39 44.3 255.0 3.1 49.7 -8 1 1 1295 17 48 02 17 49 12 =1739+190 20 51 49 44.0 255.3 3.2 49.7 62 F 1 1300 17 48 02 17 49 12 GJ686 20 51 49 43.0 255.6 3.2 49.7 -8 1 1 1300 17 49 12 17 52 12 --- 20 54 50 42.4 256.3 3.3 49.8 172 F 1 1312 17 49 12 17 52 12 J1742+1904 20 54 50 43.5 255.9 3.2 49.9 -8 1 1 1312 17 52 12 17 53 22 =1739+190 20 56 00 43.3 256.1 3.2 50.0 62 F 1 1316 17 52 12 17 53 22 GJ686 20 56 00 42.2 256.5 3.3 49.9 -8 1 1 1316 17 53 22 17 56 22 --- 20 59 00 41.7 257.1 3.3 50.1 172 F 1 1328 17 53 22 17 56 22 J1742+1904 20 59 00 42.7 256.8 3.3 50.2 -8 1 1 1328 17 56 22 17 57 32 =1739+190 21 00 11 42.5 257.0 3.3 50.3 62 F 1 1332 17 56 22 17 57 32 GJ686 21 00 11 41.5 257.4 3.4 50.2 -8 1 1 1332 17 57 32 18 00 32 --- 21 03 11 40.9 258.0 3.4 50.3 172 F 1 1344 17 57 32 18 00 32 J1742+1904 21 03 11 42.0 257.6 3.3 50.4 -8 1 1 1344 18 00 32 18 01 42 =1739+190 21 04 21 41.8 257.8 3.4 50.5 62 F 1 1348 18 00 32 18 01 42 GJ686 21 04 21 40.7 258.2 3.4 50.4 -8 1 1 1348 18 01 42 18 04 42 --- 21 07 22 40.2 258.8 3.5 50.5 172 F 1 1360 18 01 42 18 04 42 J1742+1904 21 07 22 41.2 258.5 3.4 50.6 -8 1 1 1360 18 04 42 18 05 52 =1739+190 21 08 32 41.0 258.7 3.4 50.7 62 F 1 1364 18 04 42 Schedule for VLBA_NL (Code Nl ) Page 16 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 18 05 52 J1745+1814 21 08 32 41.2 257.1 3.4 49.9 -7 1 1 1364 18 05 52 18 07 02 =1743+182 21 09 42 41.0 257.3 3.4 50.0 63 F 1 1369 18 05 52 18 07 02 J1742+1904 21 09 42 40.8 258.9 3.5 50.7 -7 1 1 1369 18 07 02 18 08 12 =1739+190 21 10 52 40.6 259.1 3.5 50.8 63 F 1 1373 18 07 02 18 10 22 J1805-1408 21 13 03 19.4 228.5 3.1 35.2 82 1 1 1373 18 10 22 18 11 02 --- 21 13 43 19.3 228.7 3.1 35.3 40 F 1 1376 18 10 40 18 11 02 J1753-1843 21 13 43 13.9 228.4 3.3 36.1 -17 1 1 1376 18 11 02 18 12 12 --- 21 14 53 13.7 228.6 3.4 36.2 53 F 1 1381 18 11 02 18 12 12 J1805-1408 21 14 53 19.2 228.9 3.1 35.4 -17 1 1 1381 18 12 12 18 13 22 --- 21 16 04 19.0 229.1 3.2 35.6 53 F 1 1385 18 12 12 18 13 22 GJ1224 21 16 04 17.8 227.6 3.1 35.0 -8 1 1 1385 18 13 22 18 16 22 --- 21 19 04 17.4 228.2 3.2 35.4 172 F 1 1397 18 13 22 18 16 22 J1805-1408 21 19 04 18.6 229.8 3.2 36.0 -8 1 1 1397 18 16 22 18 17 32 --- 21 20 14 18.4 230.0 3.2 36.1 62 F 1 1401 18 16 22 18 17 32 GJ1224 21 20 14 17.2 228.5 3.2 35.5 -8 1 1 1401 18 17 32 18 20 32 --- 21 23 15 16.8 229.1 3.3 35.9 172 F 1 1413 18 17 32 18 20 32 J1805-1408 21 23 15 18.0 230.6 3.3 36.5 -8 1 1 1413 18 20 32 18 21 42 --- 21 24 25 17.8 230.9 3.3 36.6 62 F 1 1417 18 20 32 18 21 42 GJ1224 21 24 25 16.6 229.3 3.3 36.0 -8 1 1 1417 18 21 42 18 24 42 --- 21 27 25 16.2 229.9 3.3 36.4 172 F 1 1429 18 21 42 18 24 42 J1805-1408 21 27 25 17.4 231.5 3.4 37.0 -8 1 1 1429 18 24 42 18 25 52 --- 21 28 36 17.2 231.7 3.4 37.1 62 F 1 1433 18 24 42 18 25 52 GJ1224 21 28 36 16.0 230.2 3.3 36.6 -8 1 1 1433 18 25 52 18 28 52 --- 21 31 36 15.6 230.8 3.4 36.9 172 F 1 1445 18 25 52 18 28 52 J1805-1408 21 31 36 16.8 232.3 3.4 37.5 -8 1 1 1445 18 28 52 18 30 02 --- 21 32 46 16.6 232.6 3.4 37.6 62 F 1 1450 18 28 52 18 30 02 GJ1224 21 32 46 15.4 231.0 3.4 37.1 -8 1 1 1450 18 30 02 18 33 02 --- 21 35 47 15.0 231.6 3.5 37.4 172 F 1 1461 18 30 02 Schedule for VLBA_NL (Code Nl ) Page 17 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 18 33 02 J1805-1408 21 35 47 16.1 233.2 3.5 38.0 -8 1 1 1461 18 33 02 18 34 12 --- 21 36 57 16.0 233.4 3.5 38.1 62 F 1 1466 18 33 02 18 34 12 J1753-1843 21 36 57 10.5 232.8 3.7 38.9 -17 1 1 1466 18 34 12 18 35 22 --- 21 38 07 10.4 233.1 3.7 39.0 53 F 1 1470 18 34 12 18 35 39 J1805-1408 21 38 24 15.7 233.7 3.5 38.3 0 1 1 1470 18 35 22 18 36 19 --- 21 39 04 15.6 233.8 3.6 38.4 40 F 1 1474 18 35 22 18 36 19 J1753-1843 21 39 04 10.2 233.2 3.8 39.1 -17 1 1 1474 18 36 19 18 37 29 --- 21 40 14 10.0 233.5 3.8 39.3 53 F 1 1478 18 36 19 18 37 29 J1805-1408 21 40 14 15.5 234.0 3.6 38.5 -17 1 1 1478 18 37 29 18 38 39 --- 21 41 24 15.3 234.3 3.6 38.6 53 F 1 1483 18 37 29 18 38 39 GJ1224 21 41 24 14.2 232.7 3.6 38.1 -8 1 1 1483 18 38 39 18 41 39 --- 21 44 25 13.7 233.3 3.6 38.5 172 F 1 1495 18 38 39 18 41 39 J1805-1408 21 44 25 14.8 234.9 3.6 39.0 -8 1 1 1495 18 41 39 18 42 49 --- 21 45 35 14.7 235.1 3.7 39.1 62 F 1 1499 18 41 39 18 42 49 GJ1224 21 45 35 13.5 233.5 3.6 38.6 -8 1 1 1499 18 42 49 18 45 49 --- 21 48 36 13.1 234.1 3.7 38.9 172 F 1 1511 18 42 49 18 45 49 J1805-1408 21 48 36 14.2 235.7 3.7 39.4 -8 1 1 1511 18 45 49 18 46 59 --- 21 49 46 14.0 235.9 3.7 39.6 62 F 1 1515 18 45 49 18 46 59 GJ1224 21 49 46 12.9 234.3 3.7 39.1 -8 1 1 1515 18 46 59 18 49 59 --- 21 52 46 12.5 234.9 3.7 39.4 172 F 1 1527 18 46 59 18 49 59 J1805-1408 21 52 46 13.5 236.5 3.8 39.9 -8 1 1 1527 18 49 59 18 51 09 --- 21 53 57 13.4 236.7 3.8 40.0 62 F 1 1531 18 49 59 18 51 09 GJ1224 21 53 57 12.3 235.1 3.8 39.5 -8 1 1 1531 18 51 09 18 54 09 --- 21 56 57 11.8 235.7 3.8 39.8 172 F 1 1543 18 51 09 18 54 09 J1805-1408 21 56 57 12.9 237.3 3.8 40.3 -8 1 1 1543 18 54 09 18 55 19 --- 21 58 07 12.7 237.5 3.9 40.4 62 F 1 1547 18 54 09 18 55 19 GJ1224 21 58 07 11.6 235.9 3.8 40.0 -8 1 1 1547 18 55 19 18 58 19 --- 22 01 08 11.2 236.5 3.9 40.3 172 F 1 1559 18 55 19 Schedule for VLBA_NL (Code Nl ) Page 18 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 18 58 19 J1805-1408 22 01 08 12.2 238.1 3.9 40.7 -8 1 1 1559 18 58 19 18 59 29 --- 22 02 18 12.1 238.3 3.9 40.9 62 F 1 1564 18 58 19 18 59 29 J1753-1843 22 02 18 6.7 237.5 4.1 41.6 -17 1 1 1564 18 59 29 19 00 39 --- 22 03 28 6.5 237.7 4.2 41.7 53 F 1 1568 18 59 29 19 00 56 J1805-1408 22 03 45 11.8 238.6 4.0 41.0 0 1 1 1568 19 00 39 19 01 36 --- 22 04 25 11.7 238.7 4.0 41.1 40 F 1 1572 19 00 39 19 01 36 J1753-1843 22 04 25 6.3 237.9 4.2 41.8 -17 1 1 1572 19 01 36 19 02 46 --- 22 05 35 6.1 238.1 4.2 41.9 53 F 1 1576 19 01 36 19 02 46 J1805-1408 22 05 35 11.5 238.9 4.0 41.2 -17 1 1 1576 19 02 46 19 03 56 --- 22 06 45 11.3 239.1 4.0 41.3 53 F 1 1581 19 02 46 19 03 56 GJ1224 22 06 45 10.3 237.5 4.0 40.9 -8 1 1 1581 19 03 56 19 06 56 --- 22 09 46 9.8 238.1 4.0 41.2 172 F 1 1592 19 03 56 19 06 56 J1805-1408 22 09 46 10.9 239.7 4.1 41.6 -8 1 1 1592 19 06 56 19 08 06 --- 22 10 56 10.7 239.9 4.1 41.7 62 F 1 1597 19 06 56 19 08 06 GJ1224 22 10 56 9.6 238.3 4.0 41.3 -8 1 1 1597 19 08 06 19 11 06 --- 22 13 57 9.2 238.8 4.1 41.6 172 F 1 1609 19 08 06 19 11 06 J1805-1408 22 13 57 10.2 240.4 4.1 42.0 -8 1 1 1609 19 11 06 19 12 16 --- 22 15 07 10.0 240.6 4.2 42.1 62 F 1 1613 19 11 06 19 12 16 GJ1224 22 15 07 9.0 239.0 4.1 41.7 -8 1 1 1613 19 12 16 19 15 16 --- 22 18 07 8.5 239.6 4.2 42.0 172 F 1 1625 19 12 16 19 15 16 J1805-1408 22 18 07 9.5 241.2 4.2 42.4 -8 1 1 1625 19 15 16 19 16 26 --- 22 19 18 9.3 241.4 4.2 42.5 62 F 1 1629 19 15 16 19 16 26 GJ1224 22 19 18 8.3 239.8 4.2 42.1 -8 1 1 1629 19 16 26 19 19 26 --- 22 22 18 7.8 240.3 4.2 42.4 172 F 1 1641 19 16 26 19 19 26 J1805-1408 22 22 18 8.8 242.0 4.3 42.8 -8 1 1 1641 19 19 26 19 20 36 --- 22 23 28 8.6 242.2 4.3 42.9 62 F 1 1645 19 19 26 19 20 36 GJ1224 22 23 28 7.6 240.6 4.3 42.5 -8 1 1 1645 19 20 36 19 23 36 --- 22 26 29 7.1 241.1 4.3 42.8 172 F 1 1657 19 20 36 Schedule for VLBA_NL (Code Nl ) Page 19 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 7 Feb 2008 Day 38 --- 19 23 36 J1805-1408 22 26 29 8.1 242.7 4.3 43.1 -8 1 1 1657 19 23 36 19 24 46 --- 22 27 39 7.9 242.9 4.4 43.2 62 F 1 1661 19 23 36 19 24 46 J1753-1843 22 27 39 2.6 241.9 4.6 44.0 -17 1 1 1661 19 24 46 19 25 56 --- 22 28 49 2.4 242.1 4.6 44.1 53 F 1 1666 19 24 46 19 25 56 J1805-1408 22 28 49 7.7 243.1 4.4 43.3 -17 1 1 1666 19 25 56 19 27 06 --- 22 29 59 7.5 243.3 4.4 43.4 53 F 1 1670 19 25 56 19 27 23 J1733-1304 22 30 16 2.7 249.8 4.9 45.9 1 1 1 1670 19 27 06 19 29 23 =1730-130 22 32 17 2.3 250.1 5.0 46.1 120 F 1 1679 19 27 06 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 3 Station: VLBA_NL Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 3 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ686/GJ1224 Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * GJ686 17 35 42.465818 * 17 37 53.875140 17 38 14.835310 0.00 18 37 19.31690 * 18 35 38.11696 18 35 03.68196 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 98.041 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 17 37 53.347000 Dec = 18 35 30.15200 Rates: RA = 926.84 mas/yr Dec = 983.18 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54503.4882 Rates: RA = 0.17849E-03 s/day Dec = 0.26918E-02 arcsec/day * GJ1224 18 04 39.605369 * 18 07 32.503401 18 08 00.225154 0.00 -15 58 16.55470 *-15 57 49.86962 -15 57 54.24474 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 85.427 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 18 07 32.850000 Dec = -15 57 47.09900 Rates: RA = -617.00 mas/yr Dec = -342.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54503.4882 Rates: RA = -0.11713E-03 s/day Dec = -0.93634E-03 arcsec/day * J1733-1304 17 30 13.535187 * 17 33 02.705785 17 33 29.960533 0.21 1730-130 -13 02 45.83975 *-13 04 49.54823 -13 05 19.17690 0.30 J1733-13 /home/arana/cwalker/sched/catalogs/sources.vlba NRAO530 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.067 scan hours, 2.767 baseline hours above horizon. * J1742+1904 17 39 54.360726 * 17 42 05.109000 17 42 25.934004 0.00 1739+190 19 05 59.93578 * 19 04 36.99000 19 04 05.54347 0.00 /home/arana/cwalker/sched/catalogs/sources.vlba JVAS - Browne et al. 1998, mnras, 293, 257; S8.4GHz= 199 mJy 1.139 scan hours, 50.121 baseline hours above horizon. * J1743-0350 17 41 20.616010 * 17 43 58.856134 17 44 24.274223 0.20 1741-038 -03 48 48.89989 *-03 50 04.61669 -03 50 29.05073 0.30 J1743-03 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.250 scan hours, 11.583 baseline hours above horizon. * J1745+1814 17 43 44.129494 * 17 45 55.927430 17 46 16.909859 0.61 1743+182 18 15 56.63237 * 18 14 50.42003 18 14 22.00151 1.36 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.311 scan hours, 13.291 baseline hours above horizon. * J1753-1843 17 50 12.672464 * 17 53 09.088756 17 53 37.435339 2.09 -18 43 02.15812 *-18 43 38.52321 -18 43 52.35425 3.74 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.311 scan hours, 9.873 baseline hours above horizon. * J1805-1408 18 02 40.609014 * 18 05 31.235733 18 05 58.595743 19.91 -14 09 02.65128 *-14 08 44.71754 -14 08 50.99939 13.28 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.139 scan hours, 43.286 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) GJ686 64.8 GJ1224 46.8 J1733-1304 55.4 J1742+1904 64.2 J1743-0350 54.9 J1745+1814 63.0 J1753-1843 49.9 J1805-1408 47.5 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg