COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: RIPL: GJ234A/GJ285 Exp. Code: BB240P Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: GB is set with SLOW azimuth rate Schedule for VLBA_PT (Code Pt ) Page 2 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 00 00 00 J0555+3948 01 29 52 37.8 63.1 -4.4 -73.6 0 1 1 0 00 00 00 00 08 00 =0552+398 01 37 53 39.3 63.7 -4.3 -74.6 480 F 1 31 00 00 18 00 20 59 J0641-0320 01 50 54 12.1 102.7 -4.9 -53.8 719 1 1 31 00 20 59 00 21 39 --- 01 51 34 12.3 102.8 -4.8 -53.8 40 F 1 34 00 21 17 00 21 39 J0629-0208 01 51 34 15.5 103.7 -4.6 -53.4 -13 1 1 34 00 21 39 00 22 49 --- 01 52 45 15.8 103.9 -4.6 -53.4 57 F 1 38 00 21 39 00 22 49 J0641-0320 01 52 45 12.5 102.9 -4.8 -53.8 -13 1 1 38 00 22 49 00 23 59 --- 01 53 55 12.7 103.1 -4.8 -53.7 57 F 1 43 00 22 49 00 23 59 GJ234A 01 53 55 15.6 104.6 -4.6 -53.2 -12 1 1 43 00 23 59 00 26 59 --- 01 56 55 16.2 105.1 -4.5 -53.0 168 F 1 54 00 23 59 00 26 59 J0641-0320 01 56 55 13.3 103.6 -4.8 -53.6 -12 1 1 54 00 26 59 00 28 09 --- 01 58 05 13.6 103.8 -4.7 -53.5 58 F 1 59 00 26 59 00 28 09 GJ234A 01 58 05 16.4 105.2 -4.5 -52.9 -12 1 1 59 00 28 09 00 31 09 --- 02 01 06 17.0 105.7 -4.5 -52.8 168 F 1 70 00 28 09 00 31 09 J0641-0320 02 01 06 14.2 104.2 -4.7 -53.3 -12 1 1 70 00 31 09 00 32 19 --- 02 02 16 14.4 104.4 -4.7 -53.3 58 F 1 75 00 31 09 00 32 19 GJ234A 02 02 16 17.2 105.9 -4.5 -52.7 -12 1 1 75 00 32 19 00 35 19 --- 02 05 17 17.8 106.4 -4.4 -52.5 168 F 1 86 00 32 19 00 35 19 J0641-0320 02 05 17 15.0 104.9 -4.6 -53.1 -12 1 1 86 00 35 19 00 36 29 --- 02 06 27 15.3 105.0 -4.6 -53.1 58 F 1 91 00 35 19 00 36 29 GJ234A 02 06 27 18.1 106.6 -4.4 -52.4 -12 1 1 91 00 36 29 00 39 29 --- 02 09 27 18.6 107.0 -4.3 -52.3 168 F 1 103 00 36 29 00 39 29 J0641-0320 02 09 27 15.9 105.5 -4.5 -52.9 -12 1 1 103 00 39 29 00 40 39 --- 02 10 38 16.1 105.7 -4.5 -52.8 58 F 1 107 00 39 29 Schedule for VLBA_PT (Code Pt ) Page 3 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 00 40 39 GJ234A 02 10 38 18.9 107.2 -4.3 -52.2 -12 1 1 107 00 40 39 00 43 39 --- 02 13 38 19.5 107.7 -4.3 -52.0 168 F 1 119 00 40 39 00 43 39 J0641-0320 02 13 38 16.7 106.2 -4.5 -52.6 -12 1 1 119 00 43 39 00 44 49 --- 02 14 48 16.9 106.4 -4.5 -52.6 58 F 1 123 00 43 39 00 44 49 J0629-0208 02 14 48 20.1 107.4 -4.2 -52.1 -12 1 1 123 00 44 49 00 45 59 --- 02 15 58 20.4 107.6 -4.2 -52.0 58 F 1 128 00 44 49 00 46 34 J0641-0320 02 16 34 17.3 106.6 -4.4 -52.5 23 1 1 128 00 46 34 00 47 14 --- 02 17 14 17.4 106.7 -4.4 -52.4 40 F 1 130 00 46 52 00 47 14 J0629-0208 02 17 14 20.6 107.8 -4.2 -51.9 -12 1 1 130 00 47 14 00 48 24 --- 02 18 24 20.9 108.0 -4.2 -51.8 58 F 1 135 00 47 14 00 48 24 J0641-0320 02 18 24 17.6 106.9 -4.4 -52.3 -12 1 1 135 00 48 24 00 49 34 --- 02 19 34 17.9 107.1 -4.4 -52.3 58 F 1 139 00 48 24 00 49 34 GJ234A 02 19 34 20.6 108.7 -4.2 -51.6 -12 1 1 139 00 49 34 00 52 34 --- 02 22 35 21.2 109.2 -4.1 -51.4 168 F 1 151 00 49 34 00 52 34 J0641-0320 02 22 35 18.5 107.6 -4.3 -52.1 -12 1 1 151 00 52 34 00 53 44 --- 02 23 45 18.7 107.8 -4.3 -52.0 58 F 1 155 00 52 34 00 53 44 GJ234A 02 23 45 21.5 109.4 -4.1 -51.3 -12 1 1 155 00 53 44 00 56 44 --- 02 26 45 22.0 109.9 -4.1 -51.1 168 F 1 167 00 53 44 00 56 44 J0641-0320 02 26 45 19.3 108.3 -4.3 -51.8 -12 1 1 167 00 56 44 00 57 54 --- 02 27 55 19.5 108.5 -4.2 -51.7 58 F 1 172 00 56 44 00 57 54 GJ234A 02 27 55 22.3 110.1 -4.0 -51.0 -12 1 1 172 00 57 54 01 00 54 --- 02 30 56 22.8 110.6 -4.0 -50.7 168 F 1 183 00 57 54 01 00 54 J0641-0320 02 30 56 20.1 109.0 -4.2 -51.5 -12 1 1 183 01 00 54 01 02 04 --- 02 32 06 20.3 109.2 -4.2 -51.4 58 F 1 188 01 00 54 01 02 04 GJ234A 02 32 06 23.1 110.8 -4.0 -50.6 -12 1 1 188 01 02 04 01 05 04 --- 02 35 07 23.7 111.3 -3.9 -50.4 168 F 1 199 01 02 04 01 05 04 J0641-0320 02 35 07 20.9 109.7 -4.1 -51.2 -11 1 1 199 01 05 04 01 06 14 --- 02 36 17 21.1 109.9 -4.1 -51.1 59 F 1 204 01 05 04 Schedule for VLBA_PT (Code Pt ) Page 4 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 01 06 14 GJ234A 02 36 17 23.9 111.5 -3.9 -50.3 -11 1 1 204 01 06 14 01 09 14 --- 02 39 17 24.5 112.1 -3.8 -50.0 169 F 1 215 01 06 14 01 09 14 J0641-0320 02 39 17 21.7 110.4 -4.0 -50.9 -11 1 1 215 01 09 14 01 10 24 --- 02 40 28 21.9 110.6 -4.0 -50.8 59 F 1 220 01 09 14 01 10 24 J0629-0208 02 40 28 25.1 111.7 -3.8 -50.2 -12 1 1 220 01 10 24 01 11 34 --- 02 41 38 25.4 111.9 -3.8 -50.1 58 F 1 225 01 10 24 01 12 09 J0641-0320 02 42 12 22.3 110.9 -4.0 -50.6 22 1 1 225 01 12 09 01 12 49 --- 02 42 53 22.4 111.0 -4.0 -50.6 40 F 1 227 01 12 27 01 12 49 J0629-0208 02 42 53 25.6 112.2 -3.8 -50.0 -12 1 1 227 01 12 49 01 13 59 --- 02 44 03 25.8 112.4 -3.8 -49.9 58 F 1 232 01 12 49 01 13 59 J0641-0320 02 44 03 22.6 111.2 -4.0 -50.5 -12 1 1 232 01 13 59 01 15 09 --- 02 45 13 22.9 111.4 -4.0 -50.4 58 F 1 236 01 13 59 01 15 09 GJ234A 02 45 13 25.6 113.1 -3.7 -49.5 -11 1 1 236 01 15 09 01 18 09 --- 02 48 13 26.2 113.7 -3.7 -49.2 169 F 1 248 01 15 09 01 18 09 J0641-0320 02 48 13 23.4 111.9 -3.9 -50.2 -11 1 1 248 01 18 09 01 19 19 --- 02 49 24 23.7 112.1 -3.9 -50.1 59 F 1 252 01 18 09 01 19 19 GJ234A 02 49 24 26.4 113.9 -3.7 -49.1 -11 1 1 252 01 19 19 01 22 19 --- 02 52 24 26.9 114.4 -3.6 -48.9 169 F 1 264 01 19 19 01 22 19 J0641-0320 02 52 24 24.2 112.6 -3.8 -49.8 -11 1 1 264 01 22 19 01 23 29 --- 02 53 34 24.5 112.8 -3.8 -49.7 59 F 1 268 01 22 19 01 23 29 GJ234A 02 53 34 27.2 114.6 -3.6 -48.7 -11 1 1 268 01 23 29 01 26 29 --- 02 56 35 27.7 115.2 -3.6 -48.4 169 F 1 280 01 23 29 01 26 29 J0641-0320 02 56 35 25.0 113.4 -3.8 -49.4 -11 1 1 280 01 26 29 01 27 39 --- 02 57 45 25.3 113.6 -3.7 -49.3 59 F 1 284 01 26 29 01 27 39 GJ234A 02 57 45 27.9 115.4 -3.5 -48.3 -11 1 1 284 01 27 39 01 30 39 --- 03 00 45 28.5 116.0 -3.5 -48.0 169 F 1 296 01 27 39 01 30 39 J0641-0320 03 00 45 25.8 114.1 -3.7 -49.0 -11 1 1 296 01 30 39 01 31 49 --- 03 01 56 26.0 114.3 -3.7 -48.9 59 F 1 301 01 30 39 Schedule for VLBA_PT (Code Pt ) Page 5 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 01 31 49 GJ234A 03 01 56 28.7 116.2 -3.5 -47.9 -11 1 1 301 01 31 49 01 34 49 --- 03 04 56 29.3 116.8 -3.4 -47.6 169 F 1 312 01 31 49 01 34 49 J0641-0320 03 04 56 26.6 114.9 -3.6 -48.6 -11 1 1 312 01 34 49 01 35 59 --- 03 06 06 26.8 115.1 -3.6 -48.5 59 F 1 317 01 34 49 01 35 59 J0629-0208 03 06 06 30.0 116.5 -3.4 -47.7 -12 1 1 317 01 35 59 01 37 09 --- 03 07 17 30.2 116.7 -3.4 -47.6 58 F 1 321 01 35 59 01 37 09 J0641-0320 03 07 17 27.0 115.3 -3.6 -48.4 -12 1 1 321 01 37 09 01 38 19 --- 03 08 27 27.3 115.5 -3.6 -48.3 58 F 1 326 01 37 09 01 39 48 J0739+0137 03 09 56 19.4 101.8 -4.5 -54.0 68 1 1 326 01 39 48 01 40 28 =0736+017 03 10 36 19.5 101.9 -4.5 -54.0 40 F 1 328 01 40 06 01 40 28 J0754+0344 03 10 36 17.7 97.8 -4.7 -55.1 -10 1 1 328 01 40 28 01 41 38 --- 03 11 46 18.0 98.0 -4.7 -55.1 60 F 1 333 01 40 28 01 41 38 J0739+0137 03 11 46 19.8 102.1 -4.5 -53.9 -10 1 1 333 01 41 38 01 42 48 =0736+017 03 12 57 20.0 102.3 -4.4 -53.9 60 F 1 337 01 41 38 01 42 48 GJ285 03 12 57 20.1 99.8 -4.5 -54.7 -8 1 1 337 01 42 48 01 45 48 --- 03 15 57 20.7 100.2 -4.5 -54.5 172 F 1 349 01 42 48 01 45 48 J0739+0137 03 15 57 20.6 102.7 -4.4 -53.7 -8 1 1 349 01 45 48 01 46 58 =0736+017 03 17 07 20.9 102.9 -4.4 -53.7 62 F 1 354 01 45 48 01 46 58 GJ285 03 17 07 20.9 100.4 -4.5 -54.5 -8 1 1 354 01 46 58 01 49 58 --- 03 20 08 21.5 100.9 -4.4 -54.4 172 F 1 365 01 46 58 01 49 58 J0739+0137 03 20 08 21.5 103.4 -4.3 -53.5 -8 1 1 365 01 49 58 01 51 08 =0736+017 03 21 18 21.7 103.6 -4.3 -53.4 62 F 1 370 01 49 58 01 51 08 GJ285 03 21 18 21.8 101.1 -4.4 -54.3 -8 1 1 370 01 51 08 01 54 08 --- 03 24 19 22.4 101.5 -4.3 -54.2 172 F 1 381 01 51 08 01 54 08 J0739+0137 03 24 19 22.3 104.1 -4.3 -53.3 -8 1 1 381 01 54 08 01 55 18 =0736+017 03 25 29 22.5 104.3 -4.2 -53.2 62 F 1 386 01 54 08 01 55 18 GJ285 03 25 29 22.6 101.7 -4.3 -54.1 -8 1 1 386 01 55 18 01 58 18 --- 03 28 29 23.2 102.2 -4.3 -54.0 172 F 1 397 01 55 18 Schedule for VLBA_PT (Code Pt ) Page 6 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 01 58 18 J0739+0137 03 28 29 23.1 104.8 -4.2 -53.0 -8 1 1 397 01 58 18 01 59 28 =0736+017 03 29 39 23.4 105.0 -4.2 -53.0 62 F 1 402 01 58 18 01 59 28 GJ285 03 29 39 23.4 102.4 -4.3 -53.9 -8 1 1 402 01 59 28 02 02 28 --- 03 32 40 24.1 102.9 -4.2 -53.8 172 F 1 414 01 59 28 02 02 28 J0739+0137 03 32 40 24.0 105.4 -4.1 -52.8 -8 1 1 414 02 02 28 02 03 38 =0736+017 03 33 50 24.2 105.6 -4.1 -52.7 62 F 1 418 02 02 28 02 03 38 J0754+0344 03 33 50 22.5 101.4 -4.3 -54.3 -9 1 1 418 02 03 38 02 04 48 --- 03 35 00 22.7 101.5 -4.3 -54.2 61 F 1 423 02 03 38 02 04 48 J0739+0137 03 35 00 24.4 105.8 -4.1 -52.7 -9 1 1 423 02 04 48 02 05 58 =0736+017 03 36 10 24.7 106.0 -4.1 -52.6 61 F 1 427 02 04 48 02 07 35 J0641-0320 03 37 48 32.6 121.3 -3.1 -45.0 75 1 1 427 02 07 35 02 08 15 --- 03 38 28 32.7 121.5 -3.1 -44.9 40 F 1 430 02 07 53 02 08 15 J0629-0208 03 38 28 35.8 123.2 -2.9 -43.8 -12 1 1 430 02 08 15 02 09 25 --- 03 39 38 36.0 123.5 -2.8 -43.6 58 F 1 434 02 08 15 02 09 25 J0641-0320 03 39 38 32.9 121.7 -3.0 -44.7 -12 1 1 434 02 09 25 02 10 35 --- 03 40 48 33.1 122.0 -3.0 -44.6 58 F 1 439 02 09 25 02 10 35 GJ234A 03 40 48 35.7 124.2 -2.8 -43.1 -11 1 1 439 02 10 35 02 13 35 --- 03 43 49 36.2 124.9 -2.8 -42.7 169 F 1 450 02 10 35 02 13 35 J0641-0320 03 43 49 33.6 122.6 -3.0 -44.2 -11 1 1 450 02 13 35 02 14 45 --- 03 44 59 33.8 122.9 -3.0 -44.0 59 F 1 455 02 13 35 02 14 45 GJ234A 03 44 59 36.4 125.2 -2.7 -42.5 -11 1 1 455 02 14 45 02 17 45 --- 03 48 00 36.9 125.9 -2.7 -42.1 169 F 1 466 02 14 45 02 17 45 J0641-0320 03 48 00 34.4 123.5 -2.9 -43.6 -11 1 1 466 02 17 45 02 18 55 --- 03 49 10 34.6 123.8 -2.9 -43.5 59 F 1 471 02 17 45 02 18 55 GJ234A 03 49 10 37.1 126.2 -2.7 -41.9 -11 1 1 471 02 18 55 02 21 55 --- 03 52 10 37.6 126.9 -2.6 -41.4 169 F 1 483 02 18 55 02 21 55 J0641-0320 03 52 10 35.1 124.5 -2.8 -43.0 -11 1 1 483 02 21 55 02 23 05 --- 03 53 21 35.3 124.7 -2.8 -42.9 59 F 1 487 02 21 55 Schedule for VLBA_PT (Code Pt ) Page 7 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 02 23 05 GJ234A 03 53 21 37.8 127.1 -2.6 -41.2 -11 1 1 487 02 23 05 02 26 05 --- 03 56 21 38.3 127.9 -2.6 -40.8 169 F 1 499 02 23 05 02 26 05 J0641-0320 03 56 21 35.8 125.4 -2.8 -42.4 -11 1 1 499 02 26 05 02 27 15 --- 03 57 31 36.0 125.7 -2.7 -42.2 59 F 1 503 02 26 05 02 27 15 GJ234A 03 57 31 38.4 128.1 -2.5 -40.6 -11 1 1 503 02 27 15 02 30 15 --- 04 00 32 38.9 128.9 -2.5 -40.1 169 F 1 515 02 27 15 02 30 15 J0641-0320 04 00 32 36.5 126.3 -2.7 -41.8 -11 1 1 515 02 30 15 02 31 25 --- 04 01 42 36.7 126.6 -2.7 -41.6 59 F 1 519 02 30 15 02 31 25 J0629-0208 04 01 42 39.7 128.7 -2.5 -40.2 -12 1 1 519 02 31 25 02 32 35 --- 04 02 52 39.8 128.9 -2.4 -40.0 58 F 1 524 02 31 25 02 32 35 J0641-0320 04 02 52 36.9 126.9 -2.7 -41.4 -12 1 1 524 02 32 35 02 33 45 --- 04 04 02 37.1 127.2 -2.6 -41.3 58 F 1 528 02 32 35 02 35 24 J0739+0137 04 05 41 30.4 111.2 -3.6 -50.4 79 1 1 528 02 35 24 02 36 04 =0736+017 04 06 21 30.6 111.3 -3.6 -50.3 40 F 1 531 02 35 42 02 36 04 J0754+0344 04 06 21 29.0 106.7 -3.8 -52.4 -9 1 1 531 02 36 04 02 37 14 --- 04 07 31 29.2 106.9 -3.8 -52.4 61 F 1 535 02 36 04 02 37 14 J0739+0137 04 07 31 30.8 111.5 -3.5 -50.2 -9 1 1 535 02 37 14 02 38 24 =0736+017 04 08 41 31.0 111.8 -3.5 -50.1 61 F 1 540 02 37 14 02 38 24 GJ285 04 08 41 31.2 109.0 -3.6 -51.5 -8 1 1 540 02 38 24 02 41 24 --- 04 11 42 31.8 109.6 -3.6 -51.2 172 F 1 552 02 38 24 02 41 24 J0739+0137 04 11 42 31.6 112.3 -3.5 -49.9 -8 1 1 552 02 41 24 02 42 34 =0736+017 04 12 52 31.8 112.6 -3.4 -49.7 62 F 1 556 02 41 24 02 42 34 GJ285 04 12 52 32.0 109.8 -3.5 -51.1 -8 1 1 556 02 42 34 02 45 34 --- 04 15 52 32.6 110.4 -3.5 -50.9 172 F 1 568 02 42 34 02 45 34 J0739+0137 04 15 52 32.4 113.1 -3.4 -49.5 -8 1 1 568 02 45 34 02 46 44 =0736+017 04 17 03 32.6 113.4 -3.4 -49.3 62 F 1 572 02 45 34 02 46 44 GJ285 04 17 03 32.8 110.6 -3.5 -50.8 -8 1 1 572 02 46 44 02 49 44 --- 04 20 03 33.4 111.1 -3.4 -50.5 172 F 1 584 02 46 44 Schedule for VLBA_PT (Code Pt ) Page 8 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 02 49 44 J0739+0137 04 20 03 33.2 113.9 -3.3 -49.1 -8 1 1 584 02 49 44 02 50 54 =0736+017 04 21 13 33.4 114.2 -3.3 -48.9 62 F 1 588 02 49 44 02 50 54 GJ285 04 21 13 33.6 111.4 -3.4 -50.4 -8 1 1 588 02 50 54 02 53 54 --- 04 24 14 34.2 111.9 -3.3 -50.1 172 F 1 600 02 50 54 02 53 54 J0739+0137 04 24 14 34.0 114.8 -3.3 -48.6 -8 1 1 600 02 53 54 02 55 04 =0736+017 04 25 24 34.2 115.0 -3.2 -48.5 62 F 1 604 02 53 54 02 55 04 GJ285 04 25 24 34.4 112.2 -3.3 -50.0 -8 1 1 604 02 55 04 02 58 04 --- 04 28 24 35.0 112.8 -3.3 -49.8 172 F 1 616 02 55 04 02 58 04 J0739+0137 04 28 24 34.8 115.6 -3.2 -48.2 -8 1 1 616 02 58 04 02 59 14 =0736+017 04 29 35 35.0 115.8 -3.2 -48.1 62 F 1 621 02 58 04 02 59 14 J0754+0344 04 29 35 33.5 110.9 -3.4 -50.6 -9 1 1 621 02 59 14 03 00 24 --- 04 30 45 33.7 111.2 -3.4 -50.5 61 F 1 625 02 59 14 03 00 24 J0739+0137 04 30 45 35.2 116.1 -3.2 -47.9 -9 1 1 625 03 00 24 03 01 34 =0736+017 04 31 55 35.4 116.3 -3.1 -47.8 61 F 1 630 03 00 24 03 03 18 J0641-0320 04 33 40 41.7 134.6 -2.1 -36.1 86 1 1 630 03 03 18 03 03 58 --- 04 34 20 41.8 134.8 -2.1 -35.9 40 F 1 632 03 03 36 03 03 58 J0629-0208 04 34 20 44.6 137.4 -1.9 -34.0 -12 1 1 632 03 03 58 03 05 08 --- 04 35 30 44.8 137.8 -1.9 -33.8 58 F 1 637 03 03 58 03 05 08 J0641-0320 04 35 30 42.0 135.1 -2.1 -35.7 -12 1 1 637 03 05 08 03 06 18 --- 04 36 41 42.1 135.5 -2.1 -35.5 58 F 1 641 03 05 08 03 06 18 GJ234A 04 36 41 44.3 138.6 -1.9 -33.2 -10 1 1 641 03 06 18 03 09 18 --- 04 39 41 44.7 139.5 -1.8 -32.5 170 F 1 653 03 06 18 03 09 18 J0641-0320 04 39 41 42.6 136.3 -2.0 -34.9 -10 1 1 653 03 09 18 03 10 28 --- 04 40 51 42.7 136.6 -2.0 -34.6 60 F 1 657 03 09 18 03 10 28 GJ234A 04 40 51 44.9 139.8 -1.8 -32.3 -10 1 1 657 03 10 28 03 13 28 --- 04 43 52 45.3 140.7 -1.8 -31.6 170 F 1 669 03 10 28 03 13 28 J0641-0320 04 43 52 43.2 137.5 -2.0 -34.0 -10 1 1 669 03 13 28 03 14 38 --- 04 45 02 43.3 137.8 -2.0 -33.8 60 F 1 674 03 13 28 Schedule for VLBA_PT (Code Pt ) Page 9 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 03 14 38 GJ234A 04 45 02 45.4 141.1 -1.7 -31.3 -10 1 1 674 03 14 38 03 17 38 --- 04 48 03 45.8 142.0 -1.7 -30.6 170 F 1 685 03 14 38 03 17 38 J0641-0320 04 48 03 43.7 138.7 -1.9 -33.1 -10 1 1 685 03 17 38 03 18 48 --- 04 49 13 43.9 139.0 -1.9 -32.9 60 F 1 690 03 17 38 03 18 48 GJ234A 04 49 13 46.0 142.3 -1.7 -30.4 -10 1 1 690 03 18 48 03 21 48 --- 04 52 13 46.4 143.3 -1.6 -29.6 170 F 1 701 03 18 48 03 21 48 J0641-0320 04 52 13 44.3 139.9 -1.8 -32.2 -10 1 1 701 03 21 48 03 22 58 --- 04 53 23 44.5 140.2 -1.8 -32.0 60 F 1 706 03 21 48 03 22 58 GJ234A 04 53 23 46.5 143.7 -1.6 -29.4 -10 1 1 706 03 22 58 03 25 58 --- 04 56 24 46.9 144.6 -1.6 -28.6 170 F 1 717 03 22 58 03 25 58 J0641-0320 04 56 24 44.8 141.1 -1.8 -31.3 -10 1 1 717 03 25 58 03 27 08 --- 04 57 34 45.0 141.5 -1.7 -31.0 60 F 1 722 03 25 58 03 27 08 J0629-0208 04 57 34 47.6 144.6 -1.5 -28.6 -11 1 1 722 03 27 08 03 28 18 --- 04 58 44 47.7 145.0 -1.5 -28.3 59 F 1 726 03 27 08 03 28 18 J0641-0320 04 58 44 45.1 141.8 -1.7 -30.8 -11 1 1 726 03 28 18 03 29 28 --- 04 59 54 45.3 142.2 -1.7 -30.5 59 F 1 731 03 28 18 03 31 09 J0739+0137 05 01 35 40.7 122.9 -2.6 -44.0 82 1 1 731 03 31 09 03 31 49 =0736+017 05 02 15 40.8 123.0 -2.6 -43.9 40 F 1 734 03 31 27 03 31 49 J0754+0344 05 02 15 39.7 117.6 -2.9 -47.2 -10 1 1 734 03 31 49 03 32 59 --- 05 03 26 39.9 117.9 -2.9 -47.0 60 F 1 738 03 31 49 03 32 59 J0739+0137 05 03 26 41.1 123.3 -2.6 -43.7 -10 1 1 738 03 32 59 03 34 09 =0736+017 05 04 36 41.3 123.6 -2.6 -43.5 60 F 1 743 03 32 59 03 34 09 GJ285 05 04 36 41.7 120.5 -2.7 -45.5 -8 1 1 743 03 34 09 03 37 09 --- 05 07 36 42.2 121.2 -2.6 -45.1 172 F 1 754 03 34 09 03 37 09 J0739+0137 05 07 36 41.8 124.3 -2.5 -43.0 -8 1 1 754 03 37 09 03 38 19 =0736+017 05 08 47 42.0 124.6 -2.5 -42.9 62 F 1 759 03 37 09 03 38 19 GJ285 05 08 47 42.4 121.5 -2.6 -44.9 -8 1 1 759 03 38 19 03 41 19 --- 05 11 47 43.0 122.2 -2.6 -44.4 172 F 1 770 03 38 19 Schedule for VLBA_PT (Code Pt ) Page 10 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 03 41 19 J0739+0137 05 11 47 42.5 125.4 -2.5 -42.4 -8 1 1 770 03 41 19 03 42 29 =0736+017 05 12 57 42.7 125.7 -2.4 -42.2 62 F 1 775 03 41 19 03 42 29 GJ285 05 12 57 43.2 122.5 -2.5 -44.3 -8 1 1 775 03 42 29 03 45 29 --- 05 15 58 43.7 123.3 -2.5 -43.8 172 F 1 786 03 42 29 03 45 29 J0739+0137 05 15 58 43.2 126.4 -2.4 -41.7 -8 1 1 786 03 45 29 03 46 39 =0736+017 05 17 08 43.4 126.7 -2.4 -41.5 62 F 1 791 03 45 29 03 46 39 GJ285 05 17 08 43.9 123.6 -2.5 -43.6 -8 1 1 791 03 46 39 03 49 39 --- 05 20 08 44.4 124.3 -2.4 -43.1 172 F 1 803 03 46 39 03 49 39 J0739+0137 05 20 08 43.9 127.5 -2.3 -41.0 -8 1 1 803 03 49 39 03 50 49 =0736+017 05 21 19 44.1 127.8 -2.3 -40.8 62 F 1 807 03 49 39 03 50 49 GJ285 05 21 19 44.6 124.6 -2.4 -42.9 -8 1 1 807 03 50 49 03 53 49 --- 05 24 19 45.1 125.4 -2.3 -42.4 172 F 1 819 03 50 49 03 53 49 J0739+0137 05 24 19 44.5 128.6 -2.3 -40.2 -8 1 1 819 03 53 49 03 54 59 =0736+017 05 25 29 44.7 128.9 -2.2 -40.0 62 F 1 823 03 53 49 03 54 59 J0754+0344 05 25 29 43.8 123.1 -2.5 -43.9 -10 1 1 823 03 54 59 03 56 09 --- 05 26 39 44.0 123.3 -2.5 -43.8 60 F 1 828 03 54 59 03 56 09 J0739+0137 05 26 39 44.9 129.2 -2.2 -39.8 -10 1 1 828 03 56 09 03 57 19 =0736+017 05 27 50 45.1 129.6 -2.2 -39.6 60 F 1 832 03 56 09 04 12 08 J0555+3948 05 42 42 83.9 24.9 -0.2 -153.1 806 1 1 832 04 12 08 04 14 08 =0552+398 05 44 42 84.0 21.6 -0.2 -156.7 120 F 1 840 04 12 26 04 19 01 J0641-0320 05 49 36 50.4 159.1 -0.9 -17.2 195 1 1 840 04 19 01 04 19 41 --- 05 50 16 50.4 159.4 -0.9 -17.0 40 F 1 843 04 19 19 04 19 41 J0629-0208 05 50 16 52.4 163.7 -0.7 -13.4 -10 1 1 843 04 19 41 04 20 51 --- 05 51 26 52.5 164.2 -0.6 -13.0 60 F 1 847 04 19 41 04 20 51 J0641-0320 05 51 26 50.5 159.8 -0.8 -16.6 -10 1 1 847 04 20 51 04 22 01 --- 05 52 36 50.6 160.2 -0.8 -16.2 60 F 1 852 04 20 51 04 22 01 GJ234A 05 52 36 51.9 164.8 -0.6 -12.5 -9 1 1 852 04 22 01 04 25 01 --- 05 55 37 52.0 166.0 -0.6 -11.5 171 F 1 863 04 22 01 Schedule for VLBA_PT (Code Pt ) Page 11 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 04 25 01 J0641-0320 05 55 37 50.8 161.4 -0.8 -15.3 -9 1 1 863 04 25 01 04 26 11 --- 05 56 47 50.8 161.8 -0.8 -15.0 61 F 1 868 04 25 01 04 26 11 GJ234A 05 56 47 52.1 166.5 -0.6 -11.1 -9 1 1 868 04 26 11 04 29 11 --- 05 59 47 52.2 167.7 -0.5 -10.2 171 F 1 879 04 26 11 04 29 11 J0641-0320 05 59 47 51.0 163.0 -0.7 -14.0 -9 1 1 879 04 29 11 04 30 21 --- 06 00 57 51.1 163.4 -0.7 -13.6 61 F 1 884 04 29 11 04 30 21 GJ234A 06 00 57 52.3 168.2 -0.5 -9.8 -9 1 1 884 04 30 21 04 33 21 --- 06 03 58 52.4 169.4 -0.4 -8.8 171 F 1 895 04 30 21 04 33 21 J0641-0320 06 03 58 51.3 164.6 -0.6 -12.7 -9 1 1 895 04 33 21 04 34 31 --- 06 05 08 51.3 165.1 -0.6 -12.3 61 F 1 900 04 33 21 04 34 31 GJ234A 06 05 08 52.4 169.9 -0.4 -8.4 -9 1 1 900 04 34 31 04 37 31 --- 06 08 09 52.5 171.1 -0.4 -7.4 171 F 1 912 04 34 31 04 37 31 J0641-0320 06 08 09 51.5 166.2 -0.6 -11.4 -9 1 1 912 04 37 31 04 38 41 --- 06 09 19 51.6 166.7 -0.5 -11.0 61 F 1 916 04 37 31 04 38 41 GJ234A 06 09 19 52.6 171.6 -0.3 -7.0 -9 1 1 916 04 38 41 04 41 41 --- 06 12 19 52.7 172.8 -0.3 -6.0 171 F 1 928 04 38 41 04 41 41 J0641-0320 06 12 19 51.7 167.9 -0.5 -10.0 -9 1 1 928 04 41 41 04 42 51 --- 06 13 29 51.7 168.3 -0.5 -9.6 61 F 1 932 04 41 41 04 42 51 J0629-0208 06 13 29 53.3 173.2 -0.3 -5.6 -9 1 1 932 04 42 51 04 44 01 --- 06 14 40 53.4 173.7 -0.2 -5.2 61 F 1 937 04 42 51 04 44 01 J0641-0320 06 14 40 51.8 168.8 -0.5 -9.2 -9 1 1 937 04 44 01 04 45 11 --- 06 15 50 51.8 169.3 -0.4 -8.9 61 F 1 941 04 44 01 04 46 37 J0739+0137 06 17 16 52.1 145.1 -1.4 -28.2 64 1 1 941 04 46 37 04 47 17 =0736+017 06 17 56 52.1 145.3 -1.4 -28.1 40 F 1 944 04 46 55 04 47 17 J0754+0344 06 17 56 52.0 138.3 -1.6 -33.4 -11 1 1 944 04 47 17 04 48 27 --- 06 19 06 52.2 138.7 -1.6 -33.1 59 F 1 948 04 47 17 04 48 27 J0739+0137 06 19 06 52.3 145.7 -1.3 -27.7 -11 1 1 948 04 48 27 04 49 37 =0736+017 06 20 16 52.4 146.2 -1.3 -27.4 59 F 1 953 04 48 27 Schedule for VLBA_PT (Code Pt ) Page 12 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 04 49 37 GJ285 06 20 16 53.5 142.7 -1.4 -30.1 -8 1 1 953 04 49 37 04 52 37 --- 06 23 17 53.8 143.8 -1.4 -29.3 172 F 1 964 04 49 37 04 52 37 J0739+0137 06 23 17 52.7 147.3 -1.3 -26.5 -8 1 1 964 04 52 37 04 53 47 =0736+017 06 24 27 52.9 147.7 -1.3 -26.2 62 F 1 969 04 52 37 04 53 47 GJ285 06 24 27 54.0 144.2 -1.3 -29.0 -8 1 1 969 04 53 47 04 56 47 --- 06 27 28 54.3 145.3 -1.3 -28.1 172 F 1 981 04 53 47 04 56 47 J0739+0137 06 27 28 53.2 148.8 -1.2 -25.3 -8 1 1 981 04 56 47 04 57 57 =0736+017 06 28 38 53.3 149.3 -1.2 -25.0 62 F 1 985 04 56 47 04 57 57 GJ285 06 28 38 54.5 145.8 -1.3 -27.7 -8 1 1 985 04 57 57 05 00 57 --- 06 31 38 54.8 146.9 -1.2 -26.9 172 F 1 997 04 57 57 05 00 57 J0739+0137 06 31 38 53.6 150.4 -1.1 -24.1 -8 1 1 997 05 00 57 05 02 07 =0736+017 06 32 49 53.8 150.9 -1.1 -23.7 62 F 1 1001 05 00 57 05 02 07 GJ285 06 32 49 54.9 147.4 -1.2 -26.5 -8 1 1 1001 05 02 07 05 05 07 --- 06 35 49 55.3 148.6 -1.2 -25.6 172 F 1 1013 05 02 07 05 05 07 J0739+0137 06 35 49 54.1 152.0 -1.1 -22.8 -8 1 1 1013 05 05 07 05 06 17 =0736+017 06 36 59 54.2 152.5 -1.0 -22.4 62 F 1 1017 05 05 07 05 06 17 GJ285 06 36 59 55.4 149.0 -1.1 -25.2 -8 1 1 1017 05 06 17 05 09 17 --- 06 40 00 55.7 150.2 -1.1 -24.3 172 F 1 1029 05 06 17 05 09 17 J0739+0137 06 40 00 54.4 153.7 -1.0 -21.5 -9 1 1 1029 05 09 17 05 10 27 =0736+017 06 41 10 54.6 154.2 -1.0 -21.1 61 F 1 1033 05 09 17 05 10 27 J0754+0344 06 41 10 55.0 146.7 -1.2 -27.0 -11 1 1 1033 05 10 27 05 11 37 --- 06 42 20 55.1 147.2 -1.2 -26.7 59 F 1 1038 05 10 27 05 11 37 J0739+0137 06 42 20 54.7 154.6 -1.0 -20.7 -11 1 1 1038 05 11 37 05 12 47 =0736+017 06 43 30 54.8 155.1 -0.9 -20.4 59 F 1 1043 05 11 37 05 14 08 J0641-0320 06 44 51 52.3 181.0 0.0 0.9 57 1 1 1043 05 14 08 05 14 48 --- 06 45 31 52.3 181.3 0.1 1.1 40 F 1 1045 05 14 26 05 14 48 J0629-0208 06 45 31 53.4 186.7 0.3 5.5 -10 1 1 1045 05 14 48 05 15 58 --- 06 46 41 53.3 187.1 0.3 5.9 60 F 1 1050 05 14 48 Schedule for VLBA_PT (Code Pt ) Page 13 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 05 15 58 J0641-0320 06 46 41 52.3 181.8 0.1 1.5 -10 1 1 1050 05 15 58 05 17 08 --- 06 47 52 52.3 182.3 0.1 1.9 60 F 1 1054 05 15 58 05 17 08 GJ234A 06 47 52 52.6 187.4 0.3 6.1 -9 1 1 1054 05 17 08 05 20 08 --- 06 50 52 52.5 188.7 0.4 7.2 171 F 1 1066 05 17 08 05 20 08 J0641-0320 06 50 52 52.3 183.5 0.1 2.9 -9 1 1 1066 05 20 08 05 21 18 --- 06 52 02 52.3 184.0 0.2 3.3 61 F 1 1070 05 20 08 05 21 18 GJ234A 06 52 02 52.5 189.1 0.4 7.5 -9 1 1 1070 05 21 18 05 24 18 --- 06 55 03 52.4 190.4 0.4 8.6 171 F 1 1082 05 21 18 05 24 18 J0641-0320 06 55 03 52.2 185.2 0.2 4.3 -9 1 1 1082 05 24 18 05 25 28 --- 06 56 13 52.2 185.7 0.2 4.7 61 F 1 1086 05 24 18 05 25 28 GJ234A 06 56 13 52.4 190.8 0.4 8.9 -9 1 1 1086 05 25 28 05 28 28 --- 06 59 14 52.2 192.0 0.5 9.9 171 F 1 1098 05 25 28 05 28 28 J0641-0320 06 59 14 52.1 186.9 0.3 5.7 -9 1 1 1098 05 28 28 05 29 38 --- 07 00 24 52.1 187.4 0.3 6.1 61 F 1 1103 05 28 28 05 29 38 GJ234A 07 00 24 52.2 192.5 0.5 10.3 -9 1 1 1103 05 29 38 05 32 38 --- 07 03 24 52.0 193.7 0.6 11.3 171 F 1 1114 05 29 38 05 32 38 J0641-0320 07 03 24 52.0 188.6 0.4 7.1 -9 1 1 1114 05 32 38 05 33 48 --- 07 04 34 52.0 189.1 0.4 7.5 61 F 1 1119 05 32 38 05 33 48 GJ234A 07 04 34 52.0 194.2 0.6 11.7 -9 1 1 1119 05 33 48 05 36 48 --- 07 07 35 51.8 195.4 0.6 12.7 171 F 1 1130 05 33 48 05 36 48 J0641-0320 07 07 35 51.9 190.3 0.4 8.5 -9 1 1 1130 05 36 48 05 37 58 --- 07 08 45 51.8 190.7 0.4 8.9 61 F 1 1135 05 36 48 05 37 58 J0629-0208 07 08 45 52.4 196.1 0.7 13.3 -10 1 1 1135 05 37 58 05 39 08 --- 07 09 55 52.3 196.6 0.7 13.7 60 F 1 1139 05 37 58 05 39 08 J0641-0320 07 09 55 51.8 191.2 0.5 9.2 -10 1 1 1139 05 39 08 05 40 18 --- 07 11 05 51.7 191.7 0.5 9.6 60 F 1 1144 05 39 08 05 41 28 J0739+0137 07 12 16 56.7 167.4 -0.5 -10.4 48 1 1 1144 05 41 28 05 42 08 =0736+017 07 12 56 56.7 167.7 -0.4 -10.1 40 F 1 1146 05 41 46 Schedule for VLBA_PT (Code Pt ) Page 14 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 05 42 08 J0754+0344 07 12 56 57.9 160.1 -0.7 -16.4 -11 1 1 1146 05 42 08 05 43 18 --- 07 14 06 58.0 160.6 -0.7 -16.0 59 F 1 1151 05 42 08 05 43 18 J0739+0137 07 14 06 56.8 168.2 -0.4 -9.7 -11 1 1 1151 05 43 18 05 44 28 =0736+017 07 15 16 56.8 168.8 -0.4 -9.3 59 F 1 1155 05 43 18 05 44 28 GJ285 07 15 16 58.5 165.7 -0.5 -11.8 -9 1 1 1155 05 44 28 05 47 28 --- 07 18 17 58.6 167.1 -0.4 -10.7 171 F 1 1167 05 44 28 05 47 28 J0739+0137 07 18 17 56.9 170.1 -0.4 -8.1 -9 1 1 1167 05 47 28 05 48 38 =0736+017 07 19 27 57.0 170.7 -0.3 -7.7 61 F 1 1172 05 47 28 05 48 38 GJ285 07 19 27 58.7 167.6 -0.4 -10.2 -9 1 1 1172 05 48 38 05 51 38 --- 07 22 27 58.8 169.0 -0.4 -9.1 171 F 1 1183 05 48 38 05 51 38 J0739+0137 07 22 27 57.0 172.0 -0.3 -6.6 -9 1 1 1183 05 51 38 05 52 48 =0736+017 07 23 37 57.1 172.6 -0.3 -6.1 61 F 1 1188 05 51 38 05 52 48 GJ285 07 23 37 58.8 169.6 -0.4 -8.6 -9 1 1 1188 05 52 48 05 55 48 --- 07 26 38 58.9 171.0 -0.3 -7.4 171 F 1 1199 05 52 48 05 55 48 J0739+0137 07 26 38 57.2 173.9 -0.2 -5.0 -10 1 1 1199 05 55 48 05 56 58 =0736+017 07 27 48 57.2 174.5 -0.2 -4.6 60 F 1 1204 05 55 48 05 56 58 GJ285 07 27 48 59.0 171.6 -0.3 -6.9 -10 1 1 1204 05 56 58 05 59 58 --- 07 30 49 59.1 173.0 -0.2 -5.8 170 F 1 1215 05 56 58 05 59 58 J0739+0137 07 30 49 57.2 175.9 -0.1 -3.4 -10 1 1 1215 05 59 58 06 01 08 =0736+017 07 31 59 57.2 176.4 -0.1 -3.0 60 F 1 1220 05 59 58 06 01 08 GJ285 07 31 59 59.1 173.6 -0.2 -5.3 -10 1 1 1220 06 01 08 06 04 08 --- 07 34 59 59.1 175.1 -0.2 -4.1 170 F 1 1232 06 01 08 06 04 08 J0739+0137 07 34 59 57.3 177.8 -0.1 -1.8 -10 1 1 1232 06 04 08 06 05 18 =0736+017 07 36 10 57.3 178.3 -0.1 -1.4 60 F 1 1236 06 04 08 06 05 18 J0754+0344 07 36 10 59.1 170.9 -0.3 -7.5 -11 1 1 1236 06 05 18 06 06 28 --- 07 37 20 59.2 171.5 -0.3 -7.0 59 F 1 1241 06 05 18 06 06 28 J0739+0137 07 37 20 57.3 178.9 0.0 -0.9 -11 1 1 1241 06 06 28 06 07 38 =0736+017 07 38 30 57.3 179.4 0.0 -0.5 59 F 1 1245 06 06 28 Schedule for VLBA_PT (Code Pt ) Page 15 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 06 11 46 4C39.25 07 42 39 68.5 69.7 -1.7 -94.4 169 1 1 1245 06 11 46 06 13 46 --- 07 44 39 68.9 69.6 -1.7 -94.8 120 F 1 1253 06 12 04 06 17 21 J0641-0320 07 48 15 49.3 205.7 1.1 21.1 118 1 1 1253 06 17 21 06 18 01 --- 07 48 55 49.2 206.0 1.1 21.3 40 F 1 1255 06 17 39 06 18 01 J0629-0208 07 48 55 49.1 211.1 1.3 25.3 -9 1 1 1255 06 18 01 06 19 11 --- 07 50 05 48.9 211.5 1.3 25.6 61 F 1 1260 06 18 01 06 19 11 J0641-0320 07 50 05 49.1 206.4 1.1 21.6 -9 1 1 1260 06 19 11 06 20 21 --- 07 51 15 49.0 206.8 1.1 21.9 61 F 1 1264 06 19 11 06 20 21 GJ234A 07 51 15 48.2 211.4 1.4 25.6 -9 1 1 1264 06 20 21 06 23 21 --- 07 54 16 47.9 212.4 1.4 26.3 171 F 1 1276 06 20 21 06 23 21 J0641-0320 07 54 16 48.7 207.9 1.2 22.8 -9 1 1 1276 06 23 21 06 24 31 --- 07 55 26 48.6 208.3 1.2 23.1 61 F 1 1281 06 23 21 06 24 31 GJ234A 07 55 26 47.8 212.8 1.4 26.6 -9 1 1 1281 06 24 31 06 27 31 --- 07 58 26 47.4 213.8 1.5 27.4 171 F 1 1292 06 24 31 06 27 31 J0641-0320 07 58 26 48.3 209.3 1.3 23.9 -9 1 1 1292 06 27 31 06 28 41 --- 07 59 37 48.2 209.7 1.3 24.2 61 F 1 1297 06 27 31 06 28 41 GJ234A 07 59 37 47.3 214.2 1.5 27.7 -9 1 1 1297 06 28 41 06 31 41 --- 08 02 37 46.9 215.2 1.5 28.5 171 F 1 1308 06 28 41 06 31 41 J0641-0320 08 02 37 47.9 210.7 1.3 25.0 -9 1 1 1308 06 31 41 06 32 51 --- 08 03 47 47.7 211.1 1.4 25.3 61 F 1 1313 06 31 41 06 32 51 GJ234A 08 03 47 46.8 215.6 1.6 28.8 -9 1 1 1313 06 32 51 06 35 51 --- 08 06 48 46.4 216.5 1.6 29.5 171 F 1 1324 06 32 51 06 35 51 J0641-0320 08 06 48 47.4 212.1 1.4 26.1 -9 1 1 1324 06 35 51 06 37 01 --- 08 07 58 47.3 212.5 1.4 26.4 61 F 1 1329 06 35 51 06 37 01 GJ234A 08 07 58 46.3 216.9 1.6 29.8 -9 1 1 1329 06 37 01 06 40 01 --- 08 10 59 45.9 217.8 1.7 30.5 171 F 1 1341 06 37 01 06 40 01 J0641-0320 08 10 59 46.9 213.5 1.5 27.2 -9 1 1 1341 06 40 01 06 41 11 --- 08 12 09 46.8 213.9 1.5 27.5 61 F 1 1345 06 40 01 Schedule for VLBA_PT (Code Pt ) Page 16 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 06 41 11 J0629-0208 08 12 09 46.3 218.7 1.7 31.1 -9 1 1 1345 06 41 11 06 42 21 --- 08 13 19 46.2 219.1 1.7 31.4 61 F 1 1350 06 41 11 06 42 21 J0641-0320 08 13 19 46.7 214.3 1.5 27.8 -9 1 1 1350 06 42 21 06 43 31 --- 08 14 29 46.5 214.6 1.5 28.0 61 F 1 1354 06 42 21 06 44 40 J0739+0137 08 15 38 56.2 196.3 0.6 13.4 44 1 1 1354 06 44 40 06 45 20 =0736+017 08 16 19 56.2 196.6 0.6 13.6 40 F 1 1357 06 44 58 06 45 20 J0754+0344 08 16 19 59.0 190.5 0.4 8.7 -12 1 1 1357 06 45 20 06 46 30 --- 08 17 29 59.0 191.1 0.4 9.1 58 F 1 1361 06 45 20 06 46 30 J0739+0137 08 17 29 56.1 197.1 0.6 14.1 -12 1 1 1361 06 46 30 06 47 40 =0736+017 08 18 39 56.1 197.6 0.6 14.5 58 F 1 1366 06 46 30 06 47 40 GJ285 08 18 39 58.3 196.1 0.6 13.2 -10 1 1 1366 06 47 40 06 50 40 --- 08 21 39 58.1 197.4 0.6 14.4 170 F 1 1377 06 47 40 06 50 40 J0739+0137 08 21 39 55.9 198.9 0.7 15.5 -10 1 1 1377 06 50 40 06 51 50 =0736+017 08 22 50 55.8 199.4 0.7 15.9 60 F 1 1382 06 50 40 06 51 50 GJ285 08 22 50 58.0 198.0 0.6 14.8 -10 1 1 1382 06 51 50 06 54 50 --- 08 25 50 57.8 199.3 0.7 15.9 170 F 1 1393 06 51 50 06 54 50 J0739+0137 08 25 50 55.6 200.7 0.8 17.0 -10 1 1 1393 06 54 50 06 56 00 =0736+017 08 27 00 55.5 201.2 0.8 17.4 60 F 1 1398 06 54 50 06 56 00 GJ285 08 27 00 57.7 199.9 0.7 16.3 -10 1 1 1398 06 56 00 06 59 00 --- 08 30 01 57.5 201.2 0.7 17.4 170 F 1 1410 06 56 00 06 59 00 J0739+0137 08 30 01 55.3 202.4 0.8 18.4 -11 1 1 1410 06 59 00 07 00 10 =0736+017 08 31 11 55.2 202.9 0.9 18.8 59 F 1 1414 06 59 00 07 00 10 GJ285 08 31 11 57.4 201.7 0.8 17.8 -11 1 1 1414 07 00 10 07 03 10 --- 08 34 12 57.2 203.0 0.8 18.9 169 F 1 1426 07 00 10 07 03 10 J0739+0137 08 34 12 54.9 204.2 0.9 19.8 -11 1 1 1426 07 03 10 07 04 20 =0736+017 08 35 22 54.8 204.6 0.9 20.1 59 F 1 1430 07 03 10 07 04 20 GJ285 08 35 22 57.1 203.5 0.8 19.3 -11 1 1 1430 07 04 20 07 07 20 --- 08 38 22 56.8 204.8 0.9 20.3 169 F 1 1442 07 04 20 Schedule for VLBA_PT (Code Pt ) Page 17 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 07 07 20 J0739+0137 08 38 22 54.6 205.9 1.0 21.1 -11 1 1 1442 07 07 20 07 08 30 =0736+017 08 39 32 54.4 206.3 1.0 21.5 59 F 1 1446 07 07 20 07 08 30 J0754+0344 08 39 32 57.7 201.3 0.7 17.5 -13 1 1 1446 07 08 30 07 09 40 --- 08 40 43 57.6 201.8 0.8 17.9 57 F 1 1451 07 08 30 07 10 20 J0739+0137 08 41 23 54.3 207.1 1.0 22.1 27 1 1 1451 07 10 20 07 11 00 =0736+017 08 42 03 54.2 207.3 1.0 22.3 40 F 1 1453 07 10 38 07 11 00 J0754+0344 08 42 03 57.5 202.4 0.8 18.4 -13 1 1 1453 07 11 00 07 12 10 --- 08 43 13 57.4 202.9 0.8 18.8 57 F 1 1458 07 11 00 07 12 10 J0739+0137 08 43 13 54.1 207.8 1.1 22.7 -13 1 1 1458 07 12 10 07 13 20 =0736+017 08 44 23 54.0 208.2 1.1 23.0 57 F 1 1462 07 12 10 07 13 20 GJ285 08 44 23 56.3 207.4 1.0 22.4 -11 1 1 1462 07 13 20 07 16 20 --- 08 47 24 56.0 208.6 1.0 23.4 169 F 1 1474 07 13 20 07 16 20 J0739+0137 08 47 24 53.7 209.4 1.1 23.9 -11 1 1 1474 07 16 20 07 17 30 =0736+017 08 48 34 53.6 209.9 1.1 24.3 59 F 1 1479 07 16 20 07 17 30 GJ285 08 48 34 55.9 209.1 1.1 23.7 -11 1 1 1479 07 17 30 07 20 30 --- 08 51 34 55.6 210.3 1.1 24.7 169 F 1 1490 07 17 30 07 20 30 J0739+0137 08 51 34 53.3 211.0 1.2 25.2 -11 1 1 1490 07 20 30 07 21 40 =0736+017 08 52 44 53.1 211.4 1.2 25.5 59 F 1 1495 07 20 30 07 21 40 GJ285 08 52 44 55.4 210.8 1.1 25.1 -11 1 1 1495 07 21 40 07 24 40 --- 08 55 45 55.1 212.0 1.2 26.0 169 F 1 1506 07 21 40 07 24 40 J0739+0137 08 55 45 52.8 212.6 1.3 26.4 -11 1 1 1506 07 24 40 07 25 50 =0736+017 08 56 55 52.7 213.0 1.3 26.7 59 F 1 1511 07 24 40 07 25 50 GJ285 08 56 55 55.0 212.4 1.2 26.3 -11 1 1 1511 07 25 50 07 28 50 --- 08 59 56 54.7 213.6 1.2 27.3 169 F 1 1522 07 25 50 07 28 50 J0739+0137 08 59 56 52.3 214.1 1.3 27.6 -11 1 1 1522 07 28 50 07 30 00 =0736+017 09 01 06 52.2 214.5 1.4 27.9 59 F 1 1527 07 28 50 07 30 00 GJ285 09 01 06 54.5 214.0 1.3 27.6 -11 1 1 1527 07 30 00 07 33 00 --- 09 04 06 54.2 215.2 1.3 28.5 169 F 1 1539 07 30 00 Schedule for VLBA_PT (Code Pt ) Page 18 RIPL: GJ234A/GJ285 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 1 Feb 2008 Day 32 --- 07 33 00 J0739+0137 09 04 06 51.8 215.6 1.4 28.7 -11 1 1 1539 07 33 00 07 34 10 =0736+017 09 05 17 51.7 216.0 1.4 29.1 59 F 1 1543 07 33 00 07 34 10 J0754+0344 09 05 17 55.3 212.1 1.2 26.1 -13 1 1 1543 07 34 10 07 35 20 --- 09 06 27 55.2 212.5 1.2 26.4 57 F 1 1548 07 34 10 07 35 20 J0739+0137 09 06 27 51.5 216.4 1.4 29.4 -13 1 1 1548 07 35 20 07 36 30 =0736+017 09 07 37 51.4 216.8 1.5 29.7 57 F 1 1552 07 35 20 07 36 30 GJ285 09 07 37 53.7 216.5 1.4 29.5 -11 1 1 1552 07 36 30 07 39 30 --- 09 10 37 53.4 217.6 1.4 30.3 169 F 1 1564 07 36 30 07 39 30 J0739+0137 09 10 37 51.0 217.9 1.5 30.5 -11 1 1 1564 07 39 30 07 40 40 =0736+017 09 11 48 50.9 218.3 1.5 30.8 59 F 1 1568 07 39 30 07 40 40 GJ285 09 11 48 53.2 218.0 1.4 30.6 -11 1 1 1568 07 40 40 07 43 40 --- 09 14 48 52.8 219.1 1.5 31.4 169 F 1 1580 07 40 40 07 43 40 J0739+0137 09 14 48 50.5 219.3 1.6 31.5 -11 1 1 1580 07 43 40 07 44 50 =0736+017 09 15 58 50.3 219.7 1.6 31.8 59 F 1 1584 07 43 40 07 44 50 GJ285 09 15 58 52.7 219.5 1.5 31.7 -11 1 1 1584 07 44 50 07 47 50 --- 09 18 59 52.3 220.5 1.6 32.5 169 F 1 1596 07 44 50 07 47 50 J0739+0137 09 18 59 49.9 220.7 1.7 32.6 -11 1 1 1596 07 47 50 07 49 00 =0736+017 09 20 09 49.8 221.0 1.7 32.9 59 F 1 1601 07 47 50 07 49 00 GJ285 09 20 09 52.1 220.9 1.6 32.8 -11 1 1 1601 07 49 00 07 52 00 --- 09 23 09 51.7 221.9 1.6 33.6 169 F 1 1612 07 49 00 07 52 00 J0739+0137 09 23 09 49.4 222.0 1.7 33.6 -11 1 1 1612 07 52 00 07 53 10 =0736+017 09 24 20 49.2 222.4 1.7 33.9 59 F 1 1617 07 52 00 07 55 49 4C39.25 09 26 59 85.3 361.5 0.0 -178.4 60 1 1 1617 07 55 49 07 57 49 --- 09 28 59 85.3 356.7 0.0 176.5 120 F 1 1624 07 56 07 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 6 Station: VLBA_PT Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 6 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ234A/GJ285 Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * J0754+0344 07 51 39.568185 * 07 54 17.230050 07 54 44.667164 0.00 03 52 29.44068 * 03 44 35.25130 03 43 17.28234 0.00 From catalog imbedded in main SCHED input file. 0.272 scan hours, 10.440 baseline hours above horizon. * GJ285 07 42 02.449139 * 07 44 39.988129 07 45 07.392884 0.00 03 40 21.91829 * 03 33 05.18995 03 31 53.59227 0.00 From catalog imbedded in main SCHED input file. 1.950 scan hours, 94.140 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 07 44 40.174300 Dec = 03 33 08.83400 Rates: RA = -344.80 mas/yr Dec = -450.80 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54497.0056 Rates: RA = -0.63055E-04 s/day Dec = -0.12342E-02 arcsec/day * J0629-0208 06 26 41.466672 * 06 29 12.740320 06 29 38.937643 0.00 -02 06 55.13539 *-02 08 57.02370 -02 09 16.46750 0.00 From catalog imbedded in main SCHED input file. 0.311 scan hours, 11.889 baseline hours above horizon. * GJ234A 06 26 53.274080 * 06 29 23.775706 06 29 49.845582 0.00 -02 46 52.60989 *-02 48 55.32406 -02 49 15.01735 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 91.245 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 06 29 23.400900 Dec = -02 48 50.32400 Rates: RA = 694.66 mas/yr Dec = -618.55 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54497.0056 Rates: RA = 0.12694E-03 s/day Dec = -0.16935E-02 arcsec/day * J0530+1331 05 28 06.759218 * 05 30 56.416749 05 31 25.471089 0.31 0528+134 13 29 42.28887 * 13 31 55.14954 13 32 21.68366 0.20 J0530+13 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.000 scan hours, 0.000 baseline hours above horizon. * J0555+3948 05 52 01.407172 * 05 55 30.805614 05 56 06.830131 0.26 0552+398 39 48 21.94585 * 39 48 49.16500 39 49 03.90919 0.40 DA193 /home/arana/cwalker/sched/catalogs/sources.vlba J0555+39 VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro 0.167 scan hours, 7.833 baseline hours above horizon. * J0641-0320 06 39 21.208024 * 06 41 51.132963 06 42 17.140318 0.26 -03 17 51.99917 *-03 20 48.58218 -03 21 17.28814 0.42 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.139 scan hours, 43.638 baseline hours above horizon. * J0739+0137 07 36 42.512338 * 07 39 18.033896 07 39 45.089194 0.30 0736+017 01 44 00.18097 * 01 37 04.61790 01 35 56.46615 0.21 J0739+01 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.089 scan hours, 45.501 baseline hours above horizon. J0927+3902 09 23 55.319213 * 09 27 03.013934 09 27 36.024844 0.26 0923+392 39 15 23.56648 * 39 02 20.85188 39 00 07.98376 0.40 * 4C39.25 /home/arana/cwalker/sched/catalogs/sources.vlba J0927+39 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.067 scan hours, 3.649 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) J0754+0344 159.7 GJ285 157.7 J0629-0208 138.9 GJ234A 138.6 J0530+1331 130.6 J0555+3948 135.1 J0641-0320 141.0 J0739+0137 155.5 4C39.25 157.3 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg