COVER INFORMATION Station: VLBA_KP (Code Kp ) Experiment: BD119 freq phase cal 3/7 mm Exp. Code: BD119 Schedule Version: 3.00 Processed by SCHED version: 6.05 June 2006 PI: Richard Dodson Address: OAN Apartado 112, E-28803 Alcala de Henares, Madrid Spain Phone: (+34) 91-8855060 EMAIL: r.dodson@oan.es Fax: (+34) 91-8855062 Phone during observation: (+34) 91-8855061 Observing mode: VLBA Dual 3.5mm and 7mm observations Notes: PHASE REFERENCE experiment, DO NOT INTERRUPT the SCANS New version with improved position and pointing Schedule for VLBA_KP (Code Kp ) Page 2 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43115.99 43115.99 43215.99 43215.99 Next BBC frequencies: 715.99 715.99 815.99 815.99 Next scan bandwidths: 16.00 16.00 16.00 16.00 07 20 57 3C273 09 46 02 41.3 119.5 -2.7 -47.6 0 1 1 0 Stopped 07 21 02 --- 09 46 07 41.3 119.5 -2.7 -47.6 5 S 1 0 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 07 21 02 3C273 09 46 07 41.3 119.5 -2.7 -47.6 -4 1 1 0 07 21 02 07 24 02 --- 09 49 07 41.9 120.2 -2.7 -47.2 176 F 1 12 07 21 20 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 24 02 3C273 09 49 07 41.9 120.2 -2.7 -47.2 -4 1 1 12 07 24 02 07 27 01 --- 09 52 07 42.4 120.9 -2.6 -46.8 176 F 1 23 07 24 02 07 27 01 3C273 09 52 07 42.4 120.9 -2.6 -46.8 -4 1 1 23 07 27 01 07 27 26 --- 09 52 32 42.5 121.0 -2.6 -46.7 21 F 1 25 07 27 01 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 27 26 3C273 09 52 32 42.5 121.0 -2.6 -46.7 -4 1 1 25 07 27 26 07 27 51 --- 09 52 57 42.6 121.1 -2.6 -46.6 21 F 1 26 07 27 26 Schedule for VLBA_KP (Code Kp ) Page 3 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 27 51 3C273 09 52 57 42.6 121.1 -2.6 -46.6 -4 1 1 26 07 27 51 07 28 16 --- 09 53 22 42.6 121.2 -2.6 -46.6 21 F 1 28 07 27 51 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 28 16 3C273 09 53 22 42.6 121.2 -2.6 -46.6 -4 1 1 28 07 28 16 07 28 41 --- 09 53 47 42.7 121.3 -2.6 -46.5 21 F 1 30 07 28 16 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 28 41 3C273 09 53 47 42.7 121.3 -2.6 -46.5 -4 1 1 30 07 28 41 07 29 06 --- 09 54 12 42.8 121.4 -2.6 -46.4 21 F 1 31 07 28 41 07 29 26 3C274 09 54 32 49.1 109.6 -2.6 -54.9 1 1 1 31 07 29 06 07 29 51 --- 09 54 57 49.2 109.7 -2.6 -54.9 25 F 1 34 07 29 06 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 29 51 3C274 09 54 57 49.2 109.7 -2.6 -54.9 -4 1 1 34 07 29 51 07 30 16 --- 09 55 22 49.3 109.8 -2.6 -54.8 21 F 1 36 07 29 51 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 30 16 3C274 09 55 22 49.3 109.8 -2.6 -54.8 -4 1 1 36 07 30 16 07 30 41 --- 09 55 47 49.3 109.8 -2.6 -54.8 21 F 1 37 07 30 16 Schedule for VLBA_KP (Code Kp ) Page 4 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 30 41 3C274 09 55 47 49.3 109.8 -2.6 -54.8 -4 1 1 37 07 30 41 07 31 05 --- 09 56 12 49.4 109.9 -2.6 -54.7 21 F 1 39 07 30 41 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 31 05 3C274 09 56 12 49.4 109.9 -2.6 -54.7 -4 1 1 39 07 31 05 07 31 30 --- 09 56 37 49.5 110.0 -2.6 -54.7 21 F 1 41 07 31 05 07 31 50 3C273 09 56 57 43.3 122.0 -2.5 -46.0 1 1 1 41 07 31 30 07 32 15 --- 09 57 22 43.3 122.1 -2.5 -46.0 25 F 1 43 07 31 30 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 32 15 3C273 09 57 22 43.3 122.1 -2.5 -46.0 -4 1 1 43 07 32 15 07 32 40 --- 09 57 47 43.4 122.2 -2.5 -45.9 21 F 1 45 07 32 15 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 32 40 3C273 09 57 47 43.4 122.2 -2.5 -45.9 -4 1 1 45 07 32 40 07 33 05 --- 09 58 12 43.5 122.3 -2.5 -45.8 21 F 1 47 07 32 40 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 33 05 3C273 09 58 12 43.5 122.3 -2.5 -45.8 -4 1 1 47 07 33 05 07 33 30 --- 09 58 37 43.6 122.4 -2.5 -45.8 21 F 1 48 07 33 05 Schedule for VLBA_KP (Code Kp ) Page 5 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 33 30 3C273 09 58 37 43.6 122.4 -2.5 -45.8 -4 1 1 48 07 33 30 07 33 55 --- 09 59 02 43.6 122.5 -2.5 -45.7 21 F 1 50 07 33 30 07 34 15 3C274 09 59 22 50.1 110.6 -2.5 -54.4 1 1 1 50 07 33 55 07 34 40 --- 09 59 47 50.1 110.7 -2.5 -54.3 25 F 1 53 07 33 55 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 34 40 3C274 09 59 47 50.1 110.7 -2.5 -54.3 -4 1 1 53 07 34 40 07 35 05 --- 10 00 12 50.2 110.8 -2.5 -54.3 21 F 1 54 07 34 40 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 35 05 3C274 10 00 12 50.2 110.8 -2.5 -54.3 -4 1 1 54 07 35 05 07 35 30 --- 10 00 37 50.3 110.9 -2.5 -54.2 21 F 1 56 07 35 05 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 35 30 3C274 10 00 37 50.3 110.9 -2.5 -54.2 -4 1 1 56 07 35 30 07 35 55 --- 10 01 02 50.4 111.0 -2.5 -54.2 21 F 1 58 07 35 30 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 35 55 3C274 10 01 02 50.4 111.0 -2.5 -54.2 -4 1 1 58 07 35 55 07 36 20 --- 10 01 27 50.5 111.1 -2.5 -54.1 21 F 1 59 07 35 55 Schedule for VLBA_KP (Code Kp ) Page 6 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- 07 36 40 3C273 10 01 47 44.1 123.2 -2.5 -45.3 1 1 1 59 07 36 20 07 37 05 --- 10 02 12 44.2 123.3 -2.5 -45.2 25 F 1 62 07 36 20 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 37 05 3C273 10 02 12 44.2 123.3 -2.5 -45.2 -4 1 1 62 07 37 05 07 37 29 --- 10 02 37 44.3 123.4 -2.4 -45.1 21 F 1 64 07 37 05 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 37 29 3C273 10 02 37 44.3 123.4 -2.4 -45.1 -4 1 1 64 07 37 29 07 37 54 --- 10 03 02 44.4 123.5 -2.4 -45.1 21 F 1 65 07 37 29 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 37 54 3C273 10 03 02 44.4 123.5 -2.4 -45.1 -4 1 1 65 07 37 54 07 38 19 --- 10 03 27 44.4 123.6 -2.4 -45.0 21 F 1 67 07 37 54 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 38 19 3C273 10 03 27 44.4 123.6 -2.4 -45.0 -4 1 1 67 07 38 19 07 38 44 --- 10 03 52 44.5 123.7 -2.4 -44.9 21 F 1 69 07 38 19 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 38 44 3C273 10 03 52 44.5 123.7 -2.4 -44.9 -4 1 1 69 07 38 44 07 39 09 --- 10 04 17 44.6 123.8 -2.4 -44.9 21 F 1 70 07 38 44 Schedule for VLBA_KP (Code Kp ) Page 7 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 39 09 3C273 10 04 17 44.6 123.8 -2.4 -44.9 -4 1 1 70 07 39 09 07 39 34 --- 10 04 42 44.7 123.9 -2.4 -44.8 21 F 1 72 07 39 09 07 39 54 3C274 10 05 02 51.2 111.9 -2.4 -53.7 1 1 1 72 07 39 34 07 40 19 --- 10 05 27 51.3 112.0 -2.4 -53.6 25 F 1 75 07 39 34 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 40 19 3C274 10 05 27 51.3 112.0 -2.4 -53.6 -4 1 1 75 07 40 19 07 40 44 --- 10 05 52 51.3 112.1 -2.4 -53.6 21 F 1 76 07 40 19 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 40 44 3C274 10 05 52 51.3 112.1 -2.4 -53.6 -4 1 1 76 07 40 44 07 41 09 --- 10 06 17 51.4 112.2 -2.4 -53.5 21 F 1 78 07 40 44 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 41 09 3C274 10 06 17 51.4 112.2 -2.4 -53.5 -4 1 1 78 07 41 09 07 41 34 --- 10 06 42 51.5 112.3 -2.4 -53.5 21 F 1 79 07 41 09 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 41 34 3C274 10 06 42 51.5 112.3 -2.4 -53.5 -4 1 1 79 07 41 34 07 41 59 --- 10 07 07 51.6 112.4 -2.4 -53.4 21 F 1 81 07 41 34 Schedule for VLBA_KP (Code Kp ) Page 8 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 41 59 3C274 10 07 07 51.6 112.4 -2.4 -53.4 -4 1 1 81 07 41 59 07 42 24 --- 10 07 32 51.7 112.5 -2.4 -53.4 21 F 1 83 07 41 59 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 42 24 3C274 10 07 32 51.7 112.5 -2.4 -53.4 -4 1 1 83 07 42 24 07 42 49 --- 10 07 57 51.7 112.6 -2.4 -53.3 21 F 1 84 07 42 24 ---------- Scan added by Sched for reference pointing ---------- Next scan frequencies: 43115.99 43115.99 43215.99 43215.99 Next BBC frequencies: 715.99 715.99 815.99 815.99 Next scan bandwidths: 16.00 16.00 16.00 16.00 07 44 03 3C273 10 09 11 45.4 125.1 -2.3 -44.0 56 1 1 84 Stopped 07 45 03 --- 10 10 11 45.6 125.3 -2.3 -43.8 60 S 1 84 ---------- Scan added by Sched for reference pointing ---------- 07 45 03 3C273 10 10 11 45.6 125.3 -2.3 -43.8 -4 1 1 84 Stopped 07 46 03 --- 10 11 11 45.8 125.6 -2.3 -43.7 56 S 1 84 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 07 46 08 3C273 10 11 17 45.8 125.6 -2.3 -43.7 1 1 1 84 07 46 08 07 46 33 --- 10 11 42 45.9 125.7 -2.3 -43.6 25 F 1 86 07 46 26 Schedule for VLBA_KP (Code Kp ) Page 9 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 46 33 3C273 10 11 42 45.9 125.7 -2.3 -43.6 -4 1 1 86 07 46 33 07 46 58 --- 10 12 07 45.9 125.8 -2.3 -43.5 21 F 1 87 07 46 33 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 46 58 3C273 10 12 07 45.9 125.8 -2.3 -43.5 -4 1 1 87 07 46 58 07 47 23 --- 10 12 32 46.0 125.9 -2.3 -43.4 21 F 1 89 07 46 58 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 47 23 3C273 10 12 32 46.0 125.9 -2.3 -43.4 -4 1 1 89 07 47 23 07 47 48 --- 10 12 57 46.1 126.0 -2.3 -43.4 21 F 1 91 07 47 23 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 47 48 3C273 10 12 57 46.1 126.0 -2.3 -43.4 -4 1 1 91 07 47 48 07 48 13 --- 10 13 22 46.2 126.1 -2.3 -43.3 21 F 1 92 07 47 48 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 48 13 3C273 10 13 22 46.2 126.1 -2.3 -43.3 -4 1 1 92 07 48 13 07 48 38 --- 10 13 47 46.2 126.3 -2.3 -43.2 21 F 1 94 07 48 13 Schedule for VLBA_KP (Code Kp ) Page 10 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 48 38 3C273 10 13 47 46.2 126.3 -2.3 -43.2 -4 1 1 94 07 48 38 07 49 03 --- 10 14 12 46.3 126.4 -2.3 -43.1 21 F 1 96 07 48 38 07 49 22 3C274 10 14 32 53.0 114.2 -2.3 -52.4 0 1 1 96 07 49 03 07 49 47 --- 10 14 57 53.1 114.3 -2.3 -52.3 25 F 1 98 07 49 03 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 49 47 3C274 10 14 57 53.1 114.3 -2.3 -52.3 -4 1 1 98 07 49 47 07 50 12 --- 10 15 22 53.2 114.4 -2.3 -52.3 21 F 1 100 07 49 47 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 50 12 3C274 10 15 22 53.2 114.4 -2.3 -52.3 -4 1 1 100 07 50 12 07 50 37 --- 10 15 47 53.3 114.5 -2.3 -52.2 21 F 1 102 07 50 12 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 50 37 3C274 10 15 47 53.3 114.5 -2.3 -52.2 -4 1 1 102 07 50 37 07 51 02 --- 10 16 12 53.4 114.6 -2.3 -52.2 21 F 1 103 07 50 37 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 51 02 3C274 10 16 12 53.4 114.6 -2.3 -52.2 -4 1 1 103 07 51 02 07 51 27 --- 10 16 37 53.4 114.7 -2.2 -52.1 21 F 1 105 07 51 02 Schedule for VLBA_KP (Code Kp ) Page 11 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 51 27 3C274 10 16 37 53.4 114.7 -2.2 -52.1 -4 1 1 105 07 51 27 07 51 52 --- 10 17 02 53.5 114.8 -2.2 -52.0 21 F 1 106 07 51 27 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 51 52 3C274 10 17 02 53.5 114.8 -2.2 -52.0 -4 1 1 106 07 51 52 07 52 17 --- 10 17 27 53.6 114.9 -2.2 -52.0 21 F 1 108 07 51 52 07 52 37 3C273 10 17 47 46.9 127.3 -2.2 -42.5 1 1 1 108 07 52 17 07 53 02 --- 10 18 12 47.0 127.4 -2.2 -42.4 25 F 1 111 07 52 17 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 53 02 3C273 10 18 12 47.0 127.4 -2.2 -42.4 -4 1 1 111 07 53 02 07 53 27 --- 10 18 37 47.0 127.5 -2.2 -42.3 21 F 1 113 07 53 02 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 53 27 3C273 10 18 37 47.0 127.5 -2.2 -42.3 -4 1 1 113 07 53 27 07 53 52 --- 10 19 02 47.1 127.7 -2.2 -42.2 21 F 1 114 07 53 27 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 53 52 3C273 10 19 02 47.1 127.7 -2.2 -42.2 -4 1 1 114 07 53 52 07 54 17 --- 10 19 27 47.2 127.8 -2.2 -42.1 21 F 1 116 07 53 52 Schedule for VLBA_KP (Code Kp ) Page 12 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 54 17 3C273 10 19 27 47.2 127.8 -2.2 -42.1 -4 1 1 116 07 54 17 07 54 42 --- 10 19 52 47.3 127.9 -2.2 -42.1 21 F 1 117 07 54 17 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 54 42 3C273 10 19 52 47.3 127.9 -2.2 -42.1 -4 1 1 117 07 54 42 07 55 07 --- 10 20 17 47.3 128.0 -2.2 -42.0 21 F 1 119 07 54 42 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 55 07 3C273 10 20 17 47.3 128.0 -2.2 -42.0 -4 1 1 119 07 55 07 07 55 31 --- 10 20 42 47.4 128.1 -2.1 -41.9 21 F 1 121 07 55 07 07 55 51 3C274 10 21 02 54.3 115.8 -2.2 -51.4 0 1 1 121 07 55 31 07 56 16 --- 10 21 27 54.4 115.9 -2.2 -51.4 25 F 1 124 07 55 31 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 56 16 3C274 10 21 27 54.4 115.9 -2.2 -51.4 -4 1 1 124 07 56 16 07 56 41 --- 10 21 52 54.4 116.0 -2.2 -51.3 21 F 1 125 07 56 16 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 56 41 3C274 10 21 52 54.4 116.0 -2.2 -51.3 -4 1 1 125 07 56 41 07 57 06 --- 10 22 17 54.5 116.2 -2.1 -51.2 21 F 1 127 07 56 41 Schedule for VLBA_KP (Code Kp ) Page 13 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 07 57 06 3C274 10 22 17 54.5 116.2 -2.1 -51.2 -4 1 1 127 07 57 06 07 57 31 --- 10 22 42 54.6 116.3 -2.1 -51.2 21 F 1 128 07 57 06 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 07 57 31 3C274 10 22 42 54.6 116.3 -2.1 -51.2 -4 1 1 128 07 57 31 07 57 56 --- 10 23 07 54.7 116.4 -2.1 -51.1 21 F 1 130 07 57 31 ---------- Scan added by Sched for reference pointing ---------- Next scan frequencies: 43115.99 43115.99 43215.99 43215.99 Next BBC frequencies: 715.99 715.99 815.99 815.99 Next scan bandwidths: 16.00 16.00 16.00 16.00 07 59 10 3C273 10 24 21 48.0 129.1 -2.1 -41.2 55 1 1 130 Stopped 08 00 10 --- 10 25 21 48.2 129.4 -2.1 -41.0 60 S 1 130 ---------- Scan added by Sched for reference pointing ---------- 08 00 10 3C273 10 25 21 48.2 129.4 -2.1 -41.0 -4 1 1 130 Stopped 08 01 10 --- 10 26 21 48.3 129.7 -2.1 -40.8 56 S 1 130 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 08 01 16 3C273 10 26 27 48.3 129.7 -2.1 -40.8 1 1 1 130 08 01 16 08 01 40 --- 10 26 52 48.4 129.8 -2.0 -40.7 25 F 1 132 08 01 34 Schedule for VLBA_KP (Code Kp ) Page 14 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 01 40 3C273 10 26 52 48.4 129.8 -2.0 -40.7 -4 1 1 132 08 01 40 08 02 05 --- 10 27 17 48.5 130.0 -2.0 -40.6 21 F 1 133 08 01 40 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 02 05 3C273 10 27 17 48.5 130.0 -2.0 -40.6 -4 1 1 133 08 02 05 08 02 30 --- 10 27 42 48.5 130.1 -2.0 -40.5 21 F 1 135 08 02 05 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 02 30 3C273 10 27 42 48.5 130.1 -2.0 -40.5 -4 1 1 135 08 02 30 08 02 55 --- 10 28 07 48.6 130.2 -2.0 -40.4 21 F 1 136 08 02 30 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 02 55 3C273 10 28 07 48.6 130.2 -2.0 -40.4 -4 1 1 136 08 02 55 08 03 20 --- 10 28 32 48.7 130.3 -2.0 -40.3 21 F 1 138 08 02 55 08 03 40 3C274 10 28 52 55.8 117.9 -2.0 -50.1 0 1 1 138 08 03 20 08 04 05 --- 10 29 17 55.8 118.1 -2.0 -50.0 25 F 1 141 08 03 20 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 04 05 3C274 10 29 17 55.8 118.1 -2.0 -50.0 -4 1 1 141 08 04 05 08 04 30 --- 10 29 42 55.9 118.2 -2.0 -50.0 21 F 1 143 08 04 05 Schedule for VLBA_KP (Code Kp ) Page 15 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 04 30 3C274 10 29 42 55.9 118.2 -2.0 -50.0 -4 1 1 143 08 04 30 08 04 55 --- 10 30 07 56.0 118.3 -2.0 -49.9 21 F 1 144 08 04 30 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 04 55 3C274 10 30 07 56.0 118.3 -2.0 -49.9 -4 1 1 144 08 04 55 08 05 20 --- 10 30 32 56.1 118.4 -2.0 -49.8 21 F 1 146 08 04 55 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 05 20 3C274 10 30 32 56.1 118.4 -2.0 -49.8 -4 1 1 146 08 05 20 08 05 45 --- 10 30 57 56.1 118.5 -2.0 -49.7 21 F 1 147 08 05 20 08 06 05 3C273 10 31 17 49.1 131.1 -2.0 -39.8 0 1 1 147 08 05 45 08 06 30 --- 10 31 42 49.2 131.2 -2.0 -39.7 25 F 1 150 08 05 45 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 06 30 3C273 10 31 42 49.2 131.2 -2.0 -39.7 -4 1 1 150 08 06 30 08 06 55 --- 10 32 07 49.3 131.4 -2.0 -39.6 21 F 1 152 08 06 30 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 06 55 3C273 10 32 07 49.3 131.4 -2.0 -39.6 -4 1 1 152 08 06 55 08 07 20 --- 10 32 32 49.3 131.5 -1.9 -39.5 21 F 1 153 08 06 55 Schedule for VLBA_KP (Code Kp ) Page 16 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 07 20 3C273 10 32 32 49.3 131.5 -1.9 -39.5 -4 1 1 153 08 07 20 08 07 44 --- 10 32 57 49.4 131.6 -1.9 -39.4 21 F 1 155 08 07 20 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 07 44 3C273 10 32 57 49.4 131.6 -1.9 -39.4 -4 1 1 155 08 07 44 08 08 09 --- 10 33 22 49.5 131.7 -1.9 -39.3 21 F 1 157 08 07 44 08 08 29 3C274 10 33 42 56.7 119.3 -2.0 -49.2 0 1 1 157 08 08 09 08 08 54 --- 10 34 07 56.7 119.4 -2.0 -49.1 25 F 1 160 08 08 09 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 08 54 3C274 10 34 07 56.7 119.4 -2.0 -49.1 -4 1 1 160 08 08 54 08 09 19 --- 10 34 32 56.8 119.6 -1.9 -49.1 21 F 1 161 08 08 54 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 09 19 3C274 10 34 32 56.8 119.6 -1.9 -49.1 -4 1 1 161 08 09 19 08 09 44 --- 10 34 57 56.9 119.7 -1.9 -49.0 21 F 1 163 08 09 19 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 09 44 3C274 10 34 57 56.9 119.7 -1.9 -49.0 -4 1 1 163 08 09 44 08 10 09 --- 10 35 22 57.0 119.8 -1.9 -48.9 21 F 1 164 08 09 44 Schedule for VLBA_KP (Code Kp ) Page 17 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 10 09 3C274 10 35 22 57.0 119.8 -1.9 -48.9 -4 1 1 164 08 10 09 08 10 34 --- 10 35 47 57.0 119.9 -1.9 -48.8 21 F 1 166 08 10 09 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 10 34 3C274 10 35 47 57.0 119.9 -1.9 -48.8 -4 1 1 166 08 10 34 08 10 59 --- 10 36 12 57.1 120.0 -1.9 -48.7 21 F 1 168 08 10 34 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 10 59 3C274 10 36 12 57.1 120.0 -1.9 -48.7 -4 1 1 168 08 10 59 08 11 24 --- 10 36 37 57.2 120.2 -1.9 -48.7 21 F 1 169 08 10 59 08 11 44 3C273 10 36 57 50.0 132.8 -1.9 -38.5 0 1 1 169 08 11 24 08 12 09 --- 10 37 22 50.1 132.9 -1.9 -38.4 25 F 1 172 08 11 24 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 12 09 3C273 10 37 22 50.1 132.9 -1.9 -38.4 -4 1 1 172 08 12 09 08 12 34 --- 10 37 47 50.2 133.1 -1.9 -38.3 21 F 1 174 08 12 09 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 12 34 3C273 10 37 47 50.2 133.1 -1.9 -38.3 -4 1 1 174 08 12 34 08 12 59 --- 10 38 12 50.2 133.2 -1.9 -38.2 21 F 1 175 08 12 34 Schedule for VLBA_KP (Code Kp ) Page 18 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 12 59 3C273 10 38 12 50.2 133.2 -1.9 -38.2 -4 1 1 175 08 12 59 08 13 24 --- 10 38 37 50.3 133.3 -1.8 -38.1 21 F 1 177 08 12 59 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 13 24 3C273 10 38 37 50.3 133.3 -1.8 -38.1 -4 1 1 177 08 13 24 08 13 48 --- 10 39 02 50.3 133.5 -1.8 -38.0 21 F 1 179 08 13 24 08 14 08 3C274 10 39 22 57.7 121.0 -1.9 -48.1 -1 1 1 179 08 13 48 08 14 33 --- 10 39 47 57.8 121.1 -1.9 -48.0 24 F 1 181 08 13 48 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 14 33 3C274 10 39 47 57.8 121.1 -1.9 -48.0 -4 1 1 181 08 14 33 08 14 58 --- 10 40 12 57.9 121.3 -1.9 -47.9 21 F 1 183 08 14 33 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 14 58 3C274 10 40 12 57.9 121.3 -1.9 -47.9 -4 1 1 183 08 14 58 08 15 23 --- 10 40 37 57.9 121.4 -1.8 -47.9 21 F 1 185 08 14 58 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 15 23 3C274 10 40 37 57.9 121.4 -1.8 -47.9 -4 1 1 185 08 15 23 08 15 48 --- 10 41 02 58.0 121.5 -1.8 -47.8 21 F 1 186 08 15 23 Schedule for VLBA_KP (Code Kp ) Page 19 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 15 48 3C274 10 41 02 58.0 121.5 -1.8 -47.8 -4 1 1 186 08 15 48 08 16 13 --- 10 41 27 58.1 121.6 -1.8 -47.7 21 F 1 188 08 15 48 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 16 13 3C274 10 41 27 58.1 121.6 -1.8 -47.7 -4 1 1 188 08 16 13 08 16 38 --- 10 41 52 58.2 121.8 -1.8 -47.6 21 F 1 189 08 16 13 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 16 38 3C274 10 41 52 58.2 121.8 -1.8 -47.6 -4 1 1 189 08 16 38 08 17 03 --- 10 42 17 58.2 121.9 -1.8 -47.5 21 F 1 191 08 16 38 08 17 23 3C273 10 42 37 50.9 134.6 -1.8 -37.2 -1 1 1 191 08 17 03 08 17 48 --- 10 43 02 51.0 134.7 -1.8 -37.1 24 F 1 194 08 17 03 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 17 48 3C273 10 43 02 51.0 134.7 -1.8 -37.1 -4 1 1 194 08 17 48 08 18 13 --- 10 43 27 51.0 134.8 -1.8 -37.0 21 F 1 196 08 17 48 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 18 13 3C273 10 43 27 51.0 134.8 -1.8 -37.0 -4 1 1 196 08 18 13 08 18 38 --- 10 43 52 51.1 135.0 -1.8 -36.9 21 F 1 197 08 18 13 Schedule for VLBA_KP (Code Kp ) Page 20 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 18 38 3C273 10 43 52 51.1 135.0 -1.8 -36.9 -4 1 1 197 08 18 38 08 19 03 --- 10 44 17 51.1 135.1 -1.8 -36.8 21 F 1 199 08 18 38 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 19 03 3C273 10 44 17 51.1 135.1 -1.8 -36.8 -4 1 1 199 08 19 03 08 19 28 --- 10 44 42 51.2 135.2 -1.7 -36.7 21 F 1 200 08 19 03 08 19 47 3C274 10 45 02 58.7 122.8 -1.8 -46.9 -1 1 1 200 08 19 28 08 20 12 --- 10 45 27 58.8 122.9 -1.8 -46.8 24 F 1 203 08 19 28 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 20 12 3C274 10 45 27 58.8 122.9 -1.8 -46.8 -4 1 1 203 08 20 12 08 20 37 --- 10 45 52 58.9 123.0 -1.8 -46.7 21 F 1 205 08 20 12 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 20 37 3C274 10 45 52 58.9 123.0 -1.8 -46.7 -4 1 1 205 08 20 37 08 21 02 --- 10 46 17 58.9 123.2 -1.7 -46.6 21 F 1 207 08 20 37 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 21 02 3C274 10 46 17 58.9 123.2 -1.7 -46.6 -4 1 1 207 08 21 02 08 21 27 --- 10 46 42 59.0 123.3 -1.7 -46.5 21 F 1 208 08 21 02 Schedule for VLBA_KP (Code Kp ) Page 21 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 21 27 3C274 10 46 42 59.0 123.3 -1.7 -46.5 -4 1 1 208 08 21 27 08 21 52 --- 10 47 07 59.1 123.5 -1.7 -46.4 21 F 1 210 08 21 27 ---------- Scan added by Sched for reference pointing ---------- Next scan frequencies: 43115.99 43115.99 43215.99 43215.99 Next BBC frequencies: 715.99 715.99 815.99 815.99 Next scan bandwidths: 16.00 16.00 16.00 16.00 08 23 06 3C273 10 48 21 51.7 136.4 -1.7 -35.8 54 1 1 210 Stopped 08 24 06 --- 10 49 21 51.9 136.7 -1.7 -35.6 60 S 1 210 ---------- Scan added by Sched for reference pointing ---------- 08 24 06 3C273 10 49 21 51.9 136.7 -1.7 -35.6 -4 1 1 210 Stopped 08 25 06 --- 10 50 21 52.0 137.1 -1.7 -35.3 56 S 1 210 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 08 25 12 3C273 10 50 27 52.0 137.1 -1.7 -35.3 1 1 1 210 08 25 12 08 25 37 --- 10 50 52 52.1 137.2 -1.6 -35.2 25 F 1 211 08 25 30 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 25 37 3C273 10 50 52 52.1 137.2 -1.6 -35.2 -4 1 1 211 08 25 37 08 26 01 --- 10 51 17 52.2 137.4 -1.6 -35.1 21 F 1 213 08 25 37 Schedule for VLBA_KP (Code Kp ) Page 22 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 26 01 3C273 10 51 17 52.2 137.4 -1.6 -35.1 -4 1 1 213 08 26 01 08 26 26 --- 10 51 42 52.2 137.5 -1.6 -35.0 21 F 1 215 08 26 01 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 26 26 3C273 10 51 42 52.2 137.5 -1.6 -35.0 -4 1 1 215 08 26 26 08 26 51 --- 10 52 07 52.3 137.7 -1.6 -34.9 21 F 1 216 08 26 26 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 26 51 3C273 10 52 07 52.3 137.7 -1.6 -34.9 -4 1 1 216 08 26 51 08 27 16 --- 10 52 32 52.3 137.8 -1.6 -34.8 21 F 1 218 08 26 51 08 27 36 3C274 10 52 52 60.1 125.4 -1.6 -45.1 -2 1 1 218 08 27 16 08 28 01 --- 10 53 17 60.2 125.5 -1.6 -45.0 23 F 1 221 08 27 16 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 28 01 3C274 10 53 17 60.2 125.5 -1.6 -45.0 -4 1 1 221 08 28 01 08 28 26 --- 10 53 42 60.2 125.7 -1.6 -44.9 21 F 1 222 08 28 01 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 28 26 3C274 10 53 42 60.2 125.7 -1.6 -44.9 -4 1 1 222 08 28 26 08 28 51 --- 10 54 07 60.3 125.8 -1.6 -44.8 21 F 1 224 08 28 26 Schedule for VLBA_KP (Code Kp ) Page 23 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 28 51 3C274 10 54 07 60.3 125.8 -1.6 -44.8 -4 1 1 224 08 28 51 08 29 16 --- 10 54 32 60.4 126.0 -1.6 -44.7 21 F 1 225 08 28 51 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 29 16 3C274 10 54 32 60.4 126.0 -1.6 -44.7 -4 1 1 225 08 29 16 08 29 41 --- 10 54 57 60.5 126.1 -1.6 -44.6 21 F 1 227 08 29 16 08 30 01 3C273 10 55 17 52.7 138.7 -1.6 -34.1 -1 1 1 227 08 29 41 08 30 26 --- 10 55 42 52.8 138.9 -1.6 -33.9 23 F 1 230 08 29 41 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 30 26 3C273 10 55 42 52.8 138.9 -1.6 -33.9 -4 1 1 230 08 30 26 08 30 51 --- 10 56 07 52.9 139.0 -1.6 -33.8 21 F 1 232 08 30 26 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 30 51 3C273 10 56 07 52.9 139.0 -1.6 -33.8 -4 1 1 232 08 30 51 08 31 16 --- 10 56 32 52.9 139.2 -1.5 -33.7 21 F 1 233 08 30 51 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 31 16 3C273 10 56 32 52.9 139.2 -1.5 -33.7 -4 1 1 233 08 31 16 08 31 41 --- 10 56 57 53.0 139.3 -1.5 -33.6 21 F 1 235 08 31 16 Schedule for VLBA_KP (Code Kp ) Page 24 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 31 41 3C273 10 56 57 53.0 139.3 -1.5 -33.6 -4 1 1 235 08 31 41 08 32 05 --- 10 57 22 53.0 139.4 -1.5 -33.5 21 F 1 236 08 31 41 08 32 25 3C274 10 57 42 60.9 127.1 -1.6 -43.8 -2 1 1 236 08 32 05 08 32 50 --- 10 58 07 61.0 127.2 -1.6 -43.7 23 F 1 239 08 32 05 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 32 50 3C274 10 58 07 61.0 127.2 -1.6 -43.7 -4 1 1 239 08 32 50 08 33 15 --- 10 58 32 61.1 127.4 -1.5 -43.6 21 F 1 241 08 32 50 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 33 15 3C274 10 58 32 61.1 127.4 -1.5 -43.6 -4 1 1 241 08 33 15 08 33 40 --- 10 58 57 61.1 127.6 -1.5 -43.5 21 F 1 243 08 33 15 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 33 40 3C274 10 58 57 61.1 127.6 -1.5 -43.5 -4 1 1 243 08 33 40 08 34 05 --- 10 59 22 61.2 127.7 -1.5 -43.4 21 F 1 244 08 33 40 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 34 05 3C274 10 59 22 61.2 127.7 -1.5 -43.4 -4 1 1 244 08 34 05 08 34 30 --- 10 59 47 61.3 127.9 -1.5 -43.3 21 F 1 246 08 34 05 Schedule for VLBA_KP (Code Kp ) Page 25 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- 08 34 50 3C273 11 00 07 53.4 140.4 -1.5 -32.8 -2 1 1 246 08 34 30 08 35 15 --- 11 00 32 53.5 140.6 -1.5 -32.6 23 F 1 249 08 34 30 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 35 15 3C273 11 00 32 53.5 140.6 -1.5 -32.6 -4 1 1 249 08 35 15 08 35 40 --- 11 00 57 53.5 140.7 -1.5 -32.5 21 F 1 250 08 35 15 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 35 40 3C273 11 00 57 53.5 140.7 -1.5 -32.5 -4 1 1 250 08 35 40 08 36 05 --- 11 01 22 53.6 140.9 -1.5 -32.4 21 F 1 252 08 35 40 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 36 05 3C273 11 01 22 53.6 140.9 -1.5 -32.4 -4 1 1 252 08 36 05 08 36 30 --- 11 01 47 53.6 141.0 -1.5 -32.3 21 F 1 253 08 36 05 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 36 30 3C273 11 01 47 53.6 141.0 -1.5 -32.3 -4 1 1 253 08 36 30 08 36 55 --- 11 02 12 53.7 141.1 -1.5 -32.2 21 F 1 255 08 36 30 08 37 15 3C274 11 02 32 61.7 128.9 -1.5 -42.5 -2 1 1 255 08 36 55 08 37 40 --- 11 02 57 61.8 129.1 -1.5 -42.4 23 F 1 258 08 36 55 Schedule for VLBA_KP (Code Kp ) Page 26 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 37 40 3C274 11 02 57 61.8 129.1 -1.5 -42.4 -4 1 1 258 08 37 40 08 38 04 --- 11 03 22 61.9 129.2 -1.5 -42.3 21 F 1 260 08 37 40 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 38 04 3C274 11 03 22 61.9 129.2 -1.5 -42.3 -4 1 1 260 08 38 04 08 38 29 --- 11 03 47 61.9 129.4 -1.5 -42.2 21 F 1 261 08 38 04 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 38 29 3C274 11 03 47 61.9 129.4 -1.5 -42.2 -4 1 1 261 08 38 29 08 38 54 --- 11 04 12 62.0 129.5 -1.5 -42.1 21 F 1 263 08 38 29 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 38 54 3C274 11 04 12 62.0 129.5 -1.5 -42.1 -4 1 1 263 08 38 54 08 39 19 --- 11 04 37 62.1 129.7 -1.4 -41.9 21 F 1 264 08 38 54 08 39 39 3C273 11 04 57 54.0 142.1 -1.4 -31.4 -2 1 1 264 08 39 19 08 40 04 --- 11 05 22 54.1 142.3 -1.4 -31.3 23 F 1 267 08 39 19 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 40 04 3C273 11 05 22 54.1 142.3 -1.4 -31.3 -4 1 1 267 08 40 04 08 40 29 --- 11 05 47 54.1 142.4 -1.4 -31.2 21 F 1 269 08 40 04 Schedule for VLBA_KP (Code Kp ) Page 27 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 40 29 3C273 11 05 47 54.1 142.4 -1.4 -31.2 -4 1 1 269 08 40 29 08 40 54 --- 11 06 12 54.2 142.6 -1.4 -31.0 21 F 1 271 08 40 29 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 40 54 3C273 11 06 12 54.2 142.6 -1.4 -31.0 -4 1 1 271 08 40 54 08 41 19 --- 11 06 37 54.3 142.7 -1.4 -30.9 21 F 1 272 08 40 54 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 41 19 3C273 11 06 37 54.3 142.7 -1.4 -30.9 -4 1 1 272 08 41 19 08 41 44 --- 11 07 02 54.3 142.9 -1.4 -30.8 21 F 1 274 08 41 19 08 42 04 3C274 11 07 22 62.5 130.8 -1.4 -41.1 -2 1 1 274 08 41 44 08 42 29 --- 11 07 47 62.6 130.9 -1.4 -41.0 22 F 1 277 08 41 44 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 42 29 3C274 11 07 47 62.6 130.9 -1.4 -41.0 -4 1 1 277 08 42 29 08 42 54 --- 11 08 12 62.7 131.1 -1.4 -40.9 21 F 1 278 08 42 29 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 42 54 3C274 11 08 12 62.7 131.1 -1.4 -40.9 -4 1 1 278 08 42 54 08 43 19 --- 11 08 37 62.7 131.3 -1.4 -40.8 21 F 1 280 08 42 54 Schedule for VLBA_KP (Code Kp ) Page 28 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 43 19 3C274 11 08 37 62.7 131.3 -1.4 -40.8 -4 1 1 280 08 43 19 08 43 44 --- 11 09 02 62.8 131.4 -1.4 -40.6 21 F 1 281 08 43 19 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 43 44 3C274 11 09 02 62.8 131.4 -1.4 -40.6 -4 1 1 281 08 43 44 08 44 08 --- 11 09 27 62.9 131.6 -1.4 -40.5 21 F 1 283 08 43 44 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 44 08 3C274 11 09 27 62.9 131.6 -1.4 -40.5 -4 1 1 283 08 44 08 08 47 08 --- 11 12 27 63.3 132.9 -1.3 -39.5 176 F 1 295 08 44 08 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 47 08 3C274 11 12 27 63.3 132.9 -1.3 -39.5 -4 1 1 295 08 47 08 08 50 08 --- 11 15 27 63.8 134.1 -1.3 -38.6 176 F 1 306 08 47 08 ---------- Scan added by Sched for reference pointing ---------- Next scan frequencies: 43115.99 43115.99 43215.99 43215.99 Next BBC frequencies: 715.99 715.99 815.99 815.99 Next scan bandwidths: 16.00 16.00 16.00 16.00 08 51 04 3C273 11 16 24 55.5 146.4 -1.2 -28.0 34 1 1 306 Stopped 08 52 04 --- 11 17 24 55.6 146.8 -1.2 -27.7 60 S 1 306 Schedule for VLBA_KP (Code Kp ) Page 29 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 08 53 07 1308+326 11 18 27 66.3 81.6 -1.9 -83.2 13 1 1 306 08 53 07 08 53 32 --- 11 18 52 66.4 81.6 -1.9 -83.3 25 F 1 308 08 53 25 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 53 32 1308+326 11 18 52 66.4 81.6 -1.9 -83.3 -4 1 1 308 08 53 32 08 53 57 --- 11 19 17 66.4 81.7 -1.9 -83.3 21 F 1 309 08 53 32 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 53 57 1308+326 11 19 17 66.4 81.7 -1.9 -83.3 -4 1 1 309 08 53 57 08 54 22 --- 11 19 42 66.5 81.7 -1.9 -83.3 21 F 1 311 08 53 57 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 54 22 1308+326 11 19 42 66.5 81.7 -1.9 -83.3 -4 1 1 311 08 54 22 08 54 47 --- 11 20 07 66.6 81.7 -1.8 -83.4 21 F 1 313 08 54 22 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 54 47 1308+326 11 20 07 66.6 81.7 -1.8 -83.4 -4 1 1 313 08 54 47 08 55 12 --- 11 20 32 66.7 81.7 -1.8 -83.4 21 F 1 314 08 54 47 Schedule for VLBA_KP (Code Kp ) Page 30 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 55 12 1308+326 11 20 32 66.7 81.7 -1.8 -83.4 -4 1 1 314 08 55 12 08 55 37 --- 11 20 57 66.8 81.8 -1.8 -83.4 21 F 1 316 08 55 12 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 55 37 1308+326 11 20 57 66.8 81.8 -1.8 -83.4 -4 1 1 316 08 55 37 08 56 02 --- 11 21 22 66.9 81.8 -1.8 -83.5 21 F 1 317 08 55 37 08 56 02 1308+328 11 21 22 66.8 81.2 -1.8 -83.9 -6 1 1 317 08 56 02 08 56 36 --- 11 21 57 66.9 81.2 -1.8 -84.0 29 F 1 320 08 56 02 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 56 36 1308+328 11 21 57 66.9 81.2 -1.8 -84.0 -4 1 1 320 08 56 36 08 57 06 --- 11 22 27 67.0 81.3 -1.8 -84.0 26 F 1 322 08 56 36 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 57 06 1308+328 11 22 27 67.0 81.3 -1.8 -84.0 -4 1 1 322 08 57 06 08 57 41 --- 11 23 02 67.1 81.3 -1.8 -84.1 31 F 1 324 08 57 06 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 57 41 1308+328 11 23 02 67.1 81.3 -1.8 -84.1 -4 1 1 324 08 57 41 08 58 11 --- 11 23 32 67.3 81.3 -1.8 -84.1 26 F 1 326 08 57 41 Schedule for VLBA_KP (Code Kp ) Page 31 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 58 11 1308+328 11 23 32 67.3 81.3 -1.8 -84.1 -4 1 1 326 08 58 11 08 58 46 --- 11 24 07 67.4 81.4 -1.8 -84.1 31 F 1 328 08 58 11 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 08 58 46 1308+328 11 24 07 67.4 81.4 -1.8 -84.1 -4 1 1 328 08 58 46 08 59 16 --- 11 24 37 67.5 81.4 -1.8 -84.2 26 F 1 330 08 58 46 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 08 59 16 1308+328 11 24 37 67.5 81.4 -1.8 -84.2 -4 1 1 330 08 59 16 08 59 51 --- 11 25 12 67.6 81.4 -1.8 -84.2 31 F 1 332 08 59 16 08 59 51 1308+326 11 25 12 67.7 82.0 -1.8 -83.8 -6 1 1 332 08 59 51 09 00 16 --- 11 25 37 67.8 82.0 -1.8 -83.8 19 F 1 334 08 59 51 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 00 16 1308+326 11 25 37 67.8 82.0 -1.8 -83.8 -4 1 1 334 09 00 16 09 00 41 --- 11 26 02 67.9 82.1 -1.7 -83.8 21 F 1 336 09 00 16 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 00 41 1308+326 11 26 02 67.9 82.1 -1.7 -83.8 -4 1 1 336 09 00 41 09 01 06 --- 11 26 27 68.0 82.1 -1.7 -83.9 21 F 1 337 09 00 41 Schedule for VLBA_KP (Code Kp ) Page 32 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 01 06 1308+326 11 26 27 68.0 82.1 -1.7 -83.9 -4 1 1 337 09 01 06 09 01 31 --- 11 26 52 68.0 82.1 -1.7 -83.9 21 F 1 339 09 01 06 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 01 31 1308+326 11 26 52 68.0 82.1 -1.7 -83.9 -4 1 1 339 09 01 31 09 01 56 --- 11 27 17 68.1 82.1 -1.7 -83.9 21 F 1 340 09 01 31 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 01 56 1308+326 11 27 17 68.1 82.1 -1.7 -83.9 -4 1 1 340 09 01 56 09 02 21 --- 11 27 42 68.2 82.2 -1.7 -84.0 21 F 1 342 09 01 56 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 02 21 1308+326 11 27 42 68.2 82.2 -1.7 -84.0 -4 1 1 342 09 02 21 09 02 45 --- 11 28 07 68.3 82.2 -1.7 -84.0 21 F 1 344 09 02 21 09 02 45 1308+328 11 28 07 68.2 81.6 -1.7 -84.5 -6 1 1 344 09 02 45 09 03 25 --- 11 28 47 68.4 81.6 -1.7 -84.5 34 F 1 346 09 02 45 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 03 25 1308+328 11 28 47 68.4 81.6 -1.7 -84.5 -4 1 1 346 09 03 25 09 03 55 --- 11 29 17 68.5 81.7 -1.7 -84.6 26 F 1 348 09 03 25 Schedule for VLBA_KP (Code Kp ) Page 33 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 03 55 1308+328 11 29 17 68.5 81.7 -1.7 -84.6 -4 1 1 348 09 03 55 09 04 35 --- 11 29 57 68.6 81.7 -1.7 -84.6 36 F 1 351 09 03 55 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 04 35 1308+328 11 29 57 68.6 81.7 -1.7 -84.6 -4 1 1 351 09 04 35 09 05 05 --- 11 30 27 68.7 81.7 -1.7 -84.7 26 F 1 353 09 04 35 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 05 05 1308+328 11 30 27 68.7 81.7 -1.7 -84.7 -4 1 1 353 09 05 05 09 05 45 --- 11 31 07 68.8 81.7 -1.7 -84.7 36 F 1 355 09 05 05 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 05 45 1308+328 11 31 07 68.8 81.7 -1.7 -84.7 -4 1 1 355 09 05 45 09 06 15 --- 11 31 37 68.9 81.8 -1.7 -84.8 26 F 1 357 09 05 45 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 06 15 1308+328 11 31 37 68.9 81.8 -1.7 -84.8 -4 1 1 357 09 06 15 09 06 55 --- 11 32 17 69.1 81.8 -1.7 -84.8 36 F 1 360 09 06 15 09 06 55 1308+326 11 32 17 69.2 82.4 -1.6 -84.3 -6 1 1 360 09 06 55 09 07 20 --- 11 32 42 69.3 82.5 -1.6 -84.3 19 F 1 361 09 06 55 Schedule for VLBA_KP (Code Kp ) Page 34 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 07 20 1308+326 11 32 42 69.3 82.5 -1.6 -84.3 -4 1 1 361 09 07 20 09 07 45 --- 11 33 07 69.4 82.5 -1.6 -84.4 21 F 1 363 09 07 20 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 07 45 1308+326 11 33 07 69.4 82.5 -1.6 -84.4 -4 1 1 363 09 07 45 09 08 10 --- 11 33 32 69.4 82.5 -1.6 -84.4 21 F 1 364 09 07 45 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 08 10 1308+326 11 33 32 69.4 82.5 -1.6 -84.4 -4 1 1 364 09 08 10 09 08 34 --- 11 33 57 69.5 82.5 -1.6 -84.4 21 F 1 366 09 08 10 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 08 34 1308+326 11 33 57 69.5 82.5 -1.6 -84.4 -4 1 1 366 09 08 34 09 08 59 --- 11 34 22 69.6 82.6 -1.6 -84.5 21 F 1 368 09 08 34 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 08 59 1308+326 11 34 22 69.6 82.6 -1.6 -84.5 -4 1 1 368 09 08 59 09 09 24 --- 11 34 47 69.7 82.6 -1.6 -84.5 21 F 1 369 09 08 59 Schedule for VLBA_KP (Code Kp ) Page 35 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 09 24 1308+326 11 34 47 69.7 82.6 -1.6 -84.5 -4 1 1 369 09 09 24 09 09 49 --- 11 35 12 69.8 82.6 -1.6 -84.5 21 F 1 371 09 09 24 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 09 49 1308+326 11 35 12 69.8 82.6 -1.6 -84.5 -4 1 1 371 09 09 49 09 10 14 --- 11 35 37 69.9 82.6 -1.6 -84.6 21 F 1 373 09 09 49 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 10 14 1308+326 11 35 37 69.9 82.6 -1.6 -84.6 -4 1 1 373 09 10 14 09 10 39 --- 11 36 02 70.0 82.7 -1.6 -84.6 21 F 1 374 09 10 14 09 10 39 1308+328 11 36 02 69.9 82.0 -1.6 -85.1 -6 1 1 374 09 10 39 09 11 14 --- 11 36 37 70.0 82.0 -1.6 -85.2 29 F 1 376 09 10 39 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 11 14 1308+328 11 36 37 70.0 82.0 -1.6 -85.2 -4 1 1 376 09 11 14 09 11 44 --- 11 37 07 70.1 82.1 -1.6 -85.2 26 F 1 378 09 11 14 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 11 44 1308+328 11 37 07 70.1 82.1 -1.6 -85.2 -4 1 1 378 09 11 44 09 12 19 --- 11 37 42 70.2 82.1 -1.6 -85.3 31 F 1 381 09 11 44 Schedule for VLBA_KP (Code Kp ) Page 36 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 12 19 1308+328 11 37 42 70.2 82.1 -1.6 -85.3 -4 1 1 381 09 12 19 09 12 49 --- 11 38 12 70.3 82.1 -1.6 -85.3 26 F 1 382 09 12 19 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 12 49 1308+328 11 38 12 70.3 82.1 -1.6 -85.3 -4 1 1 382 09 12 49 09 13 24 --- 11 38 47 70.5 82.1 -1.5 -85.4 31 F 1 385 09 12 49 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 13 24 1308+328 11 38 47 70.5 82.1 -1.5 -85.4 -4 1 1 385 09 13 24 09 13 54 --- 11 39 17 70.6 82.2 -1.5 -85.4 26 F 1 387 09 13 24 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 13 54 1308+328 11 39 17 70.6 82.2 -1.5 -85.4 -4 1 1 387 09 13 54 09 14 29 --- 11 39 52 70.7 82.2 -1.5 -85.5 31 F 1 389 09 13 54 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 14 29 1308+328 11 39 52 70.7 82.2 -1.5 -85.5 -4 1 1 389 09 14 29 09 14 58 --- 11 40 22 70.8 82.2 -1.5 -85.5 26 F 1 391 09 14 29 Schedule for VLBA_KP (Code Kp ) Page 37 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 14 58 1308+328 11 40 22 70.8 82.2 -1.5 -85.5 -4 1 1 391 09 14 58 09 15 33 --- 11 40 57 70.9 82.3 -1.5 -85.6 31 F 1 393 09 14 58 ---------- Scan added by Sched for reference pointing ---------- Next scan frequencies: 43115.99 43115.99 43215.99 43215.99 Next BBC frequencies: 715.99 715.99 815.99 815.99 Next scan bandwidths: 16.00 16.00 16.00 16.00 09 17 24 3C273 11 42 47 58.1 157.5 -0.8 -19.0 54 1 1 393 Stopped 09 18 24 --- 11 43 48 58.2 157.9 -0.8 -18.6 60 S 1 393 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 09 19 33 1308+326 11 44 57 71.8 83.2 -1.4 -85.3 13 1 1 393 09 19 33 09 19 58 --- 11 45 22 71.9 83.2 -1.4 -85.4 25 F 1 395 09 19 51 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 19 58 1308+326 11 45 22 71.9 83.2 -1.4 -85.4 -4 1 1 395 09 19 58 09 20 23 --- 11 45 47 72.0 83.2 -1.4 -85.4 21 F 1 396 09 19 58 Schedule for VLBA_KP (Code Kp ) Page 38 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 20 23 1308+326 11 45 47 72.0 83.2 -1.4 -85.4 -4 1 1 396 09 20 23 09 20 47 --- 11 46 12 72.1 83.2 -1.4 -85.4 21 F 1 398 09 20 23 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 20 47 1308+326 11 46 12 72.1 83.2 -1.4 -85.4 -4 1 1 398 09 20 47 09 21 12 --- 11 46 37 72.2 83.3 -1.4 -85.5 21 F 1 400 09 20 47 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 21 12 1308+326 11 46 37 72.2 83.3 -1.4 -85.5 -4 1 1 400 09 21 12 09 21 37 --- 11 47 02 72.3 83.3 -1.4 -85.5 21 F 1 401 09 21 12 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 21 37 1308+326 11 47 02 72.3 83.3 -1.4 -85.5 -4 1 1 401 09 21 37 09 22 02 --- 11 47 27 72.4 83.3 -1.4 -85.5 21 F 1 403 09 21 37 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 22 02 1308+326 11 47 27 72.4 83.3 -1.4 -85.5 -4 1 1 403 09 22 02 09 22 27 --- 11 47 52 72.5 83.3 -1.4 -85.6 21 F 1 404 09 22 02 Schedule for VLBA_KP (Code Kp ) Page 39 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 22 27 1308+326 11 47 52 72.5 83.3 -1.4 -85.6 -4 1 1 404 09 22 27 09 22 52 --- 11 48 17 72.5 83.3 -1.4 -85.6 21 F 1 406 09 22 27 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 22 52 1308+326 11 48 17 72.5 83.3 -1.4 -85.6 -4 1 1 406 09 22 52 09 23 17 --- 11 48 42 72.6 83.4 -1.4 -85.6 21 F 1 408 09 22 52 09 23 17 1308+328 11 48 42 72.5 82.6 -1.4 -86.3 -6 1 1 408 09 23 17 09 23 52 --- 11 49 17 72.7 82.7 -1.4 -86.3 29 F 1 410 09 23 17 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 23 52 1308+328 11 49 17 72.7 82.7 -1.4 -86.3 -4 1 1 410 09 23 52 09 24 22 --- 11 49 47 72.8 82.7 -1.4 -86.4 26 F 1 412 09 23 52 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 24 22 1308+328 11 49 47 72.8 82.7 -1.4 -86.4 -4 1 1 412 09 24 22 09 24 57 --- 11 50 22 72.9 82.7 -1.3 -86.4 31 F 1 414 09 24 22 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 24 57 1308+328 11 50 22 72.9 82.7 -1.3 -86.4 -4 1 1 414 09 24 57 09 25 27 --- 11 50 52 73.0 82.7 -1.3 -86.5 26 F 1 416 09 24 57 Schedule for VLBA_KP (Code Kp ) Page 40 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 25 27 1308+328 11 50 52 73.0 82.7 -1.3 -86.5 -4 1 1 416 09 25 27 09 26 02 --- 11 51 27 73.1 82.8 -1.3 -86.5 31 F 1 418 09 25 27 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 26 02 1308+328 11 51 27 73.1 82.8 -1.3 -86.5 -4 1 1 418 09 26 02 09 26 32 --- 11 51 57 73.2 82.8 -1.3 -86.6 26 F 1 420 09 26 02 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 26 32 1308+328 11 51 57 73.2 82.8 -1.3 -86.6 -4 1 1 420 09 26 32 09 27 06 --- 11 52 32 73.3 82.8 -1.3 -86.6 31 F 1 422 09 26 32 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 27 06 1308+328 11 52 32 73.3 82.8 -1.3 -86.6 -4 1 1 422 09 27 06 09 27 36 --- 11 53 02 73.5 82.8 -1.3 -86.7 26 F 1 424 09 27 06 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 27 36 1308+328 11 53 02 73.5 82.8 -1.3 -86.7 -4 1 1 424 09 27 36 09 28 11 --- 11 53 37 73.6 82.8 -1.3 -86.7 31 F 1 427 09 27 36 09 28 11 1308+326 11 53 37 73.7 83.6 -1.3 -86.0 -6 1 1 427 09 28 11 09 28 36 --- 11 54 02 73.8 83.7 -1.3 -86.1 19 F 1 428 09 28 11 Schedule for VLBA_KP (Code Kp ) Page 41 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 28 36 1308+326 11 54 02 73.8 83.7 -1.3 -86.1 -4 1 1 428 09 28 36 09 29 01 --- 11 54 27 73.8 83.7 -1.3 -86.1 21 F 1 430 09 28 36 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 29 01 1308+326 11 54 27 73.8 83.7 -1.3 -86.1 -4 1 1 430 09 29 01 09 29 26 --- 11 54 52 73.9 83.7 -1.3 -86.1 21 F 1 431 09 29 01 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 29 26 1308+326 11 54 52 73.9 83.7 -1.3 -86.1 -4 1 1 431 09 29 26 09 29 51 --- 11 55 17 74.0 83.7 -1.3 -86.2 21 F 1 433 09 29 26 Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 29 51 1308+326 11 55 17 74.0 83.7 -1.3 -86.2 -4 1 1 433 09 29 51 09 30 16 --- 11 55 42 74.1 83.7 -1.3 -86.2 21 F 1 435 09 29 51 09 30 16 1308+328 11 55 42 74.0 82.9 -1.3 -86.9 -6 1 1 435 09 30 16 09 30 51 --- 11 56 17 74.1 83.0 -1.3 -87.0 29 F 1 437 09 30 16 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 30 51 1308+328 11 56 17 74.1 83.0 -1.3 -87.0 -4 1 1 437 09 30 51 09 31 21 --- 11 56 47 74.2 83.0 -1.2 -87.0 26 F 1 439 09 30 51 Schedule for VLBA_KP (Code Kp ) Page 42 BD119 freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 18 Feb 2007 Day 49 --- Next scan frequencies: 86393.49 86393.49 86409.49 86409.49 86425.49 86425.49 86441.49 86441.49 Next BBC frequencies: 593.49 593.49 609.49 609.49 625.49 625.49 641.49 641.49 09 31 21 1308+328 11 56 47 74.2 83.0 -1.2 -87.0 -4 1 1 439 09 31 21 09 31 56 --- 11 57 22 74.4 83.0 -1.2 -87.1 31 F 1 441 09 31 21 Next scan frequencies: 43180.49 43180.49 43196.49 43196.49 43212.49 43212.49 43228.49 43228.49 Next BBC frequencies: 780.49 780.49 796.49 796.49 812.49 812.49 828.49 828.49 09 31 56 1308+328 11 57 22 74.4 83.0