The job script value below is adjusted by the traditional HH offset of  -6.50000E-07us
    The traditional offset is the typical  value of the measured clock minus the GPS.
    Note the sign convention for the traditional offset was reversed in July 2005.

 ------------- For jobs: ----------------------
!* HH clock from plotgps fit to log data with   -0.650 us added. *!
name = HH   time = 2006FEB02_05h54m18s   offset =   2.14173E-06
        rate =  -6.50763E-14   !row!
 ----------------------------------------------

