VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BK130B Observer: Y.Y. Kovalev Project type: VLBA Obs filename: bk130bcrd.* Date/Day: 2006FEB16/047 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Jim Ogle. HN writing to NRAO-076 in bank B. FD writing to VIPSK-04 in bank A. LA writing to NRAO-041 in bank B. PT writing to NRAO-123 in bank B. KP writing to NRAO-115 in bank B. BR writing to NRAO-134 in bank B. MK writing to NRAO-129 in bank A. VCLOCK and gps delta checks okay. %Raining at SC. %High wind gusts at LA, PT and KP. 0803 Begin. 0855 Readbacks okay. 1137 Readbacks okay. 1141 Readbacks okay. 1319 %NL reports freezing rain, ice. 1334 FD reports clear skies. 1358 HN now writing to NRAO-158 in bank A. 1406 HN reports clear skies. 1426 Readbacks okay. 1444 Operator is Sonja Mendoza. 1455 LA WEA: Site tech reports scattered low clouds, dry. 1519 BR WEA: Site tech reports clear skies, dry. 1541-1545 %NL Site techs brought their Mk5 online, which may affect the monitor data since this site is recording on tape. 1547-1648 *NL Temporarily suspending observing at NL in order OTHER 100 61 to check the Mk5 system. 1552 SC WEA: Site tech reports clear skies, dry. 1604 OV WEA: Site tech reports clear skies, dry. 1714 Readbacks ok. 1734 %FD WEA: wind gusts > 35mph. 1806 FD writing on Mk5 disk NRAO-159, bank B. 1837 KP WEA: Site tech reports scattered high clouds, dry. 1900 LA writing on Mk5 disk NRAO-104, bank A. 1944-2018 *SC Site tech needs antenna to replace bad wiring ACU 100 34 in antenna drive cabinet. Briefly removed from observation to check on Mark5 disk status. 1956 %BR WEA: wind gusts > 35mph. 1956 %LA WEA: wind gusts : 35mph. 2100-2114 *OV Suspending observing for a few minutes to check OTHER 100 14 on Mk5 status. 2104 KP writing to Mk5 disk NRAO-067, bank A. 2129-2200 %SC Recorder tech is using drive 2, it is possible this could cause problems with data written to drive 1. 2211-2222 *FD Suspending observing for a few minutes to check OTHER 100 11 on Mk5 problem with bank A. 2225 New operator: T. Perreault 2341 MK wea: scattered clouds, no precipitation 2343 OV wea: clear, no precipitation 0000 Date is 2006FEB17/048. 0034 Readback check ok All Mark5 packs that were loaded and unverified look ok. 0327-0329 *SC AZ#2 armature overcurrent error ACU 100 2 Cleared by momentarily diabling the AZ axis motors. 0607 Readback check ok 0613 Readback check ok 0643 New operator is Jim Ogle. 0807 End. Downtime Summary: Total downtime : 122 min Percentage downtime of observing: 0.8% Average downtime per hour : 0.5 min Total scheduled observing time (# Antennas): 14440 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.