VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BD112B Observer: Doi, A. Project type: VLBA Obs filename: bd112bcrd.* Date/Day: 2006FEB10/041 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 0806 Begin file VCLOCK check ok. SC at -0.180 UT1-UTC check ok (0.32) GPS delta < 10 us Mark5 recording status: HN bank B pack NRAO-019 FD bank A pack NRAO-033 LA bank B pack NRAO-064 PT bank A pack NRAO-016 KP bank B pack JIVE-014 BR bank B pack NRAO-135 MK bank B pack NRAO-117 Operator: T. Perreault 0829 HN recording Mark5 bank A pack NRAO-140 1205-1918 PT removed from observing for PT/VLA link SCH observation AY165 1232 Readback check ok 1240 SC wea: light scattered low clouds, no precipitation 1307-1316 %NL site tech mounted disc pack in Mark5 unit OTHER 100 9 in order to check out the pack. Mark5 unit was put online. I put the Mark5 unit offline. Monitor data during this time period will be bad, astronomical data should be unaffected. 1342 FD wea: high clouds, no precipitation 1347 SC bad readback drive 1 track 2; all other sites ok 1427 Operator is Anthony Sowinski. 1502 BR Site tech: clear skies, dish is clear. 1505 LA Site tech: scattered low clouds, dry. 1514 FD now recording on NRAO-036, bank B. 1525 NL WEA: Rain. 1533-1550 *KP VME froze, had to be rebooted. 100 17 1611 All readbacks okay. 1715 Readbacks okay. 1746 LA now recording on NRAO-091, bank A. 1903 Readbacks okay. 1905 End at SC. 1936 End. Downtime Summary: Total downtime : 26 min Percentage downtime of observing: 0.4% Average downtime per hour : 0.2 min Total scheduled observing time (# Antennas): 6900 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.