VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BD112A Observer: Doi,A. Project type: VLBI Obs filename: bd112acrd.* Date/Day: 2006FEB07/038 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Brian Willard. Vclock, UT1-UTC, GPS Delta values good. SC writing on NRAO-126, Bank A. HN writing on NRAO-019, Bank B. Fd writing on NRAO-033, Bank A. LA writing on NRAO-054, Bank B. PT writing on NRAO-016, Bank A. KP writing on NRAO-087, Bank A. BR writing on NRAO-013, Bank A. MK writing on NRAO-083, Bank A. 0450 Begin, all antennae on source. 0605 Readbacks ok. 0628 New operator: T. Perreault 0719 End. Downtime Summary: Total downtime : 0 min Percentage downtime of observing: 0.0% Average downtime per hour : 0.0 min Total scheduled observing time (# Antennas): 1490 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.