VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC152N Observer: Claussen,M. Project type: VLBA Obs filename: bc152ncrd.* Date/Day: 2006FEB04/035 Ants Scheduled: SC HN NL FD LA KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Brian Willard. Vclock, UT1-UTC, GPS Delta values nominal. WEA: recent rain BR. SC writing on NRAO-126, Bank A. HN writing on NRAO-031, Bank A. NL writing on NRAO-157, Bank A. FD writing on NRAO-122, Bank B. LA writing on NRAO-054, Bank B. KP writing on NRAO-087, Bank A. OV writing on NRAO-074, Bank B. BR writing on NRAO-150, Bank B. Mk writing on NRAO-111, Bank B. PT not available, participating in project AG715. 1214 Begin, on source. 1244 %BR: high Tsys due to rain. 1400-1715 %MK 1cm receiver running slightly warm, may elevate system temperatures. 1441 New operator is Jim Ogle. 1511-1715 *KP lost all power to antenna, unable to monitor 17617 100 124 condition of antenna or hardware. Also no data. 1515 &KP site tech contacted, on his way to the site. 17617 Shutting down observing system, no point running it while antenna is in this condition. 1659 *Raining at SC. 1715 End. Downtime Summary: Total downtime : 124 min Percentage downtime of observing: 4.6% Average downtime per hour : 2.7 min Total scheduled observing time (# Antennas): 2709 min (9) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.