Date: Mon, 1 Nov 2004 07:43:50 -0500 (EST) From: Lincoln Greenhill Reply to: lincoln greenhill To: vlbiobs@nrao.edu Cc: "Roger W. Romani" Subject: Dynamic schedules BG154a / BG154c Dear Analysts, Attached are 2 of 3 dynamic schedules for BG154 (3 epochs separated by ~ 90 days). These two are U-band snapshots. The remaining epoch includes U, Q, W bands. I will submit it later today. I have put the U-band-only epochs as 1 and 3 so that we can (1) get started quickly and (2) put the W-band observing in the winter (Feb). We want to start observing soon so that we can minimize the time gap following a March 2004 observation. We put a U-band-only epoch first since it has a minimal scheduling constraints. If it turns out that waiting until winter for W-band weather is not necessary, the series of observations can start with U, Q, W-band epoch. These specifications are more complicated than most, for dynamic programs. Please let me know if I can clarify anything. Regards, Lincoln -- Lincoln J. Greenhill Harvard-Smithsonian Center for Astrophysics Office: 1 617-495-7194 60 Garden St, Cambridge, MA 02138 Cell: 1 617 851 8918 E-mail: greenhill@cfa.harvard.edu FAX: 1 617-495-7345 http://cfa-www.harvard.edu/~lincoln