VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BB201B Observer: Boyce, P.J. Project type: VLBA Obs filename: bb201bcrd.* Date/Day: 2005FEB05/036 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 0211 Begin file VCLOCK check ok. SC at -0.131 UT1-UTC check ok (-0.52) GPS delta < 10 us LA recording Mark V bank B disc pack NRAO-036 Operator: T. Perreault 0211-1010 *MK not observing. Due to weather conditions WEA 100 479 the site tech could not reach the site - current weather is heavy snow. Consulted with VLBA Operations Supervisor, recommended that the antenna be pulled from observing until such time as the site techs can reach the site and monitor motor currents in an attempt to dump snow from the dish. 0339 Readback check ok 0345 Readback check ok 0420 %PT wea: snowing 0519 Readback check ok 0525 Readback check ok 0641 New operator is Paul Dyer. 0657 All readbacks ok. 0703 All readbacks ok. 0837 All readbacks ok. 0844 *KP WEA: Raining. 0955 SC End of file. 1010 End. Downtime Summary: Total downtime : 479 min Percentage downtime of observing: 10.0% Average downtime per hour : 6.0 min Total scheduled observing time (# Antennas): 4790 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.