VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BB201A Observer: Boyce, P.J. Project type: VLBA Obs filename: bb201acrd.* Date/Day: 2005FEB04/035 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 0215 Begin file VCLOCK check ok. SC at -0.578 UT1-UTC check ok (-0.52) GPS delta < 10 us LA recording Mark V bank A disc pack NRAO-037 Operator: T. Perreault 0217-1014 %MK seeing elevated system temperatures due to WEA snow in the dish. Weather conditions are overcast and possible snow. 0220 MK readback check ok 0343 Readback check ok 0403 %HN wea: snowing 0440-0444 *SC autostowed. Power glitch. Repointed. COM 100 4 0445 %MK wea: snowing 0523 Readback check ok 0529 Readback checks ok at all sites except: FD bad readback track 4 drive 1 MK bad readback track 17 drive 1 0641 New operator is Paul Dyer. 0701 All readbacks ok. 0840-0845 *MK Dumping snow. WEA 100 5 0841 All readbacks ok. 0959 SC End of file. 1014 End. Downtime Summary: Total downtime : 9 min Percentage downtime of observing: 0.2% Average downtime per hour : 0.1 min Total scheduled observing time (# Antennas): 4790 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.