COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: H2O maser monitoring in G24.78+0.08 Exp. Code: BC137C Schedule Version: 1.00 Processed by SCHED version: Release of 18 Sept. 2003 PI: Riccardo Cesaroni Address: INAF-Osservatorio Astrofisico di Arcetri Largo E. Fermi 5 50125 - Firenze Italy Phone: +39 (0)55-2752-215 EMAIL: cesa@arcetri.astro.it Fax: +39 (0)55 220039 Phone during observation: Observing mode: 1.3cm VLBA setup Notes: This observation consists of four (4) different epochs, spaced by 90 days. USE THIS "KEY_IN" FILE FOR EACH EPOCH. This is a PHASE REF experiment, DO NOT INTERRUPT SCAN SEQUENCE SPECTRAL LINE observations: Make sure *** PHASE CAL is OFF*** Schedule for VLBA_PT (Code Pt ) Page 2 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- Next scan frequencies: 22221.72 22221.72 Next BBC frequencies: 721.72 721.72 Next scan bandwidths: 16.00 16.00 11 21 22 J1751 14 00 00 31.8 100.6 -3.9 -55.4 0 1 1 0 11 21 22 11 24 22 --- 14 03 00 32.4 101.1 -3.8 -55.3 180 F 1 2393 11 25 06 J1825 14 03 44 15.3 110.7 -4.4 -51.2 4 1 1 2393 11 25 06 11 25 41 --- 14 04 19 15.4 110.8 -4.4 -51.2 35 F 1 2859 11 25 41 G24.78_H2O 14 04 19 13.7 108.8 -4.5 -52.0 -10 1 1 2859 11 25 41 11 26 21 --- 14 04 59 13.8 108.9 -4.5 -52.0 30 F 1 3391 11 26 21 J1825 14 04 59 15.6 110.9 -4.3 -51.1 -10 1 1 3391 11 26 21 11 26 51 --- 14 05 29 15.7 111.0 -4.3 -51.1 20 F 1 3790 11 26 51 G24.78_H2O 14 05 29 13.9 109.0 -4.5 -51.9 -10 1 1 3790 11 26 51 11 27 31 --- 14 06 09 14.0 109.1 -4.5 -51.9 30 F 1 4322 11 27 31 J1825 14 06 09 15.8 111.1 -4.3 -51.0 -10 1 1 4322 11 27 31 11 28 01 --- 14 06 39 15.9 111.2 -4.3 -51.0 20 F 1 4720 11 28 01 G24.78_H2O 14 06 39 14.1 109.1 -4.5 -51.9 -10 1 1 4720 11 28 01 11 28 41 --- 14 07 19 14.2 109.3 -4.5 -51.8 30 F 1 5252 11 28 41 J1825 14 07 19 16.0 111.3 -4.3 -50.9 -10 1 1 5252 11 28 41 11 29 11 --- 14 07 49 16.1 111.4 -4.3 -50.9 20 F 1 5651 11 29 11 G24.78_H2O 14 07 49 14.3 109.3 -4.5 -51.8 -10 1 1 5651 11 29 11 11 29 50 --- 14 08 29 14.5 109.4 -4.5 -51.7 30 F 1 6183 11 29 50 J1825 14 08 29 16.3 111.5 -4.3 -50.9 -10 1 1 6183 11 29 50 11 30 20 --- 14 08 59 16.3 111.6 -4.3 -50.8 20 F 1 6582 11 30 20 G24.78_H2O 14 08 59 14.6 109.5 -4.5 -51.7 -10 1 1 6582 11 30 20 11 31 00 --- 14 09 39 14.7 109.6 -4.4 -51.7 30 F 1 7114 11 31 00 J1825 14 09 39 16.5 111.7 -4.3 -50.8 -10 1 1 7114 11 31 00 11 31 30 --- 14 10 09 16.6 111.8 -4.3 -50.7 20 F 1 7513 11 31 30 G24.78_H2O 14 10 09 14.8 109.7 -4.4 -51.6 -10 1 1 7513 11 31 30 11 32 10 --- 14 10 49 14.9 109.8 -4.4 -51.6 30 F 1 8045 Schedule for VLBA_PT (Code Pt ) Page 3 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 11 32 10 J1825 14 10 49 16.7 111.9 -4.3 -50.7 -10 1 1 8045 11 32 10 11 32 40 --- 14 11 19 16.8 111.9 -4.2 -50.6 20 F 1 8444 11 32 40 G24.78_H2O 14 11 19 15.0 109.9 -4.4 -51.5 -10 1 1 8444 11 32 40 11 33 20 --- 14 11 59 15.1 110.0 -4.4 -51.5 30 F 1 8975 11 33 20 J1825 14 11 59 16.9 112.1 -4.2 -50.6 -10 1 1 8975 11 33 20 11 33 50 --- 14 12 29 17.0 112.1 -4.2 -50.5 20 F 1 9374 11 33 50 G24.78_H2O 14 12 29 15.2 110.1 -4.4 -51.5 -10 1 1 9374 11 33 50 11 34 30 --- 14 13 09 15.4 110.2 -4.4 -51.4 30 F 1 9906 11 34 30 J1825 14 13 09 17.1 112.2 -4.2 -50.5 -10 1 1 9906 11 34 30 11 35 00 --- 14 13 39 17.2 112.3 -4.2 -50.4 20 F 1 10305 11 35 00 G24.78_H2O 14 13 39 15.5 110.3 -4.4 -51.4 -10 1 1 10305 11 35 00 11 35 39 --- 14 14 19 15.6 110.4 -4.4 -51.3 30 F 1 10837 11 35 39 J1825 14 14 19 17.4 112.4 -4.2 -50.4 -10 1 1 10837 11 35 39 11 36 09 --- 14 14 49 17.5 112.5 -4.2 -50.3 20 F 1 11236 11 36 09 G24.78_H2O 14 14 49 15.7 110.4 -4.4 -51.3 -10 1 1 11236 11 36 09 11 36 49 --- 14 15 29 15.8 110.6 -4.3 -51.2 30 F 1 11768 11 36 49 J1825 14 15 29 17.6 112.6 -4.2 -50.3 -10 1 1 11768 11 36 49 11 37 19 --- 14 15 59 17.7 112.7 -4.2 -50.2 20 F 1 12167 11 37 19 G24.78_H2O 14 15 59 15.9 110.6 -4.3 -51.2 -10 1 1 12167 11 37 19 11 37 59 --- 14 16 39 16.1 110.7 -4.3 -51.1 30 F 1 12699 11 37 59 J1825 14 16 39 17.8 112.8 -4.2 -50.2 -10 1 1 12699 11 37 59 11 38 29 --- 14 17 09 17.9 112.9 -4.1 -50.1 20 F 1 13097 11 38 29 G24.78_H2O 14 17 09 16.1 110.8 -4.3 -51.1 -10 1 1 13097 11 38 29 11 39 09 --- 14 17 49 16.3 110.9 -4.3 -51.1 30 F 1 13629 11 39 09 J1825 14 17 49 18.0 113.0 -4.1 -50.1 -10 1 1 13629 11 39 09 11 39 39 --- 14 18 19 18.1 113.1 -4.1 -50.1 20 F 1 14028 11 39 39 G24.78_H2O 14 18 19 16.4 111.0 -4.3 -51.0 -10 1 1 14028 11 39 39 11 40 19 --- 14 18 59 16.5 111.1 -4.3 -51.0 30 F 1 14560 Schedule for VLBA_PT (Code Pt ) Page 4 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 11 40 19 J1825 14 18 59 18.3 113.2 -4.1 -50.0 -10 1 1 14560 11 40 19 11 40 49 --- 14 19 29 18.4 113.3 -4.1 -50.0 20 F 1 14959 11 40 49 G24.78_H2O 14 19 29 16.6 111.2 -4.3 -50.9 -10 1 1 14959 11 40 49 11 41 28 --- 14 20 09 16.7 111.3 -4.3 -50.9 30 F 1 15491 11 41 28 J1825 14 20 09 18.5 113.4 -4.1 -49.9 -10 1 1 15491 11 41 28 11 41 58 --- 14 20 39 18.6 113.5 -4.1 -49.8 20 F 1 15890 11 41 58 G24.78_H2O 14 20 39 16.8 111.4 -4.3 -50.8 -10 1 1 15890 11 41 58 11 42 38 --- 14 21 19 17.0 111.5 -4.3 -50.8 30 F 1 16422 11 42 38 J1825 14 21 19 18.7 113.6 -4.1 -49.8 -9 1 1 16422 11 42 38 11 43 08 --- 14 21 49 18.8 113.7 -4.1 -49.7 20 F 1 16821 11 43 08 G24.78_H2O 14 21 49 17.0 111.6 -4.2 -50.7 -9 1 1 16821 11 43 08 11 43 48 --- 14 22 29 17.2 111.7 -4.2 -50.7 30 F 1 17352 11 43 48 J1825 14 22 29 18.9 113.8 -4.1 -49.7 -9 1 2 17352 11 43 48 11 44 18 --- 14 22 59 19.0 113.9 -4.0 -49.6 20 R 1 16954 11 44 18 G24.78_H2O 14 22 59 17.3 111.8 -4.2 -50.6 -9 1 2 16954 11 44 18 11 44 58 --- 14 23 39 17.4 111.9 -4.2 -50.6 30 R 1 16422 11 44 58 J1825 14 23 39 19.1 114.0 -4.0 -49.6 -9 1 2 16422 11 44 58 11 45 28 --- 14 24 09 19.2 114.1 -4.0 -49.5 20 R 1 16023 11 45 28 G24.78_H2O 14 24 09 17.5 112.0 -4.2 -50.6 -9 1 2 16023 11 45 28 11 46 08 --- 14 24 49 17.6 112.1 -4.2 -50.5 30 R 1 15491 11 46 08 J1825 14 24 49 19.4 114.2 -4.0 -49.5 -9 1 2 15491 11 46 08 11 46 38 --- 14 25 19 19.5 114.3 -4.0 -49.4 20 R 1 15092 11 46 38 G24.78_H2O 14 25 19 17.7 112.2 -4.2 -50.5 -9 1 2 15092 11 46 38 11 47 18 --- 14 25 59 17.8 112.3 -4.2 -50.4 30 R 1 14560 11 47 18 J1825 14 25 59 19.6 114.4 -4.0 -49.4 -9 1 2 14560 11 47 18 11 47 47 --- 14 26 29 19.7 114.5 -4.0 -49.3 20 R 1 14161 11 47 47 G24.78_H2O 14 26 29 17.9 112.4 -4.2 -50.4 -9 1 2 14161 11 47 47 11 48 27 --- 14 27 09 18.1 112.5 -4.2 -50.3 30 R 1 13629 Schedule for VLBA_PT (Code Pt ) Page 5 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 11 48 27 J1825 14 27 09 19.8 114.6 -4.0 -49.3 -9 1 2 13629 11 48 27 11 48 57 --- 14 27 39 19.9 114.7 -4.0 -49.2 20 R 1 13230 11 48 57 G24.78_H2O 14 27 39 18.2 112.6 -4.1 -50.3 -9 1 2 13230 11 48 57 11 49 37 --- 14 28 19 18.3 112.7 -4.1 -50.2 30 R 1 12699 11 49 37 J1825 14 28 19 20.0 114.8 -4.0 -49.2 -9 1 2 12699 11 49 37 11 50 07 --- 14 28 49 20.1 114.9 -4.0 -49.1 20 R 1 12300 11 50 07 G24.78_H2O 14 28 49 18.4 112.7 -4.1 -50.2 -9 1 2 12300 11 50 07 11 50 47 --- 14 29 29 18.5 112.9 -4.1 -50.1 30 R 1 11768 11 50 47 J1825 14 29 29 20.2 115.0 -3.9 -49.1 -9 1 2 11768 11 50 47 11 51 17 --- 14 29 59 20.3 115.1 -3.9 -49.0 20 R 1 11369 11 51 17 G24.78_H2O 14 29 59 18.6 112.9 -4.1 -50.1 -9 1 2 11369 11 51 17 11 51 57 --- 14 30 39 18.7 113.1 -4.1 -50.0 30 R 1 10837 11 51 57 J1825 14 30 39 20.5 115.2 -3.9 -48.9 -9 1 2 10837 11 51 57 11 52 27 --- 14 31 09 20.5 115.3 -3.9 -48.9 20 R 1 10438 11 52 27 G24.78_H2O 14 31 09 18.8 113.1 -4.1 -50.0 -9 1 2 10438 11 52 27 11 53 07 --- 14 31 49 19.0 113.3 -4.1 -49.9 30 R 1 9906 11 53 07 J1825 14 31 49 20.7 115.4 -3.9 -48.8 -9 1 2 9906 11 53 07 11 53 37 --- 14 32 19 20.8 115.5 -3.9 -48.8 20 R 1 9507 11 53 37 G24.78_H2O 14 32 19 19.1 113.3 -4.1 -49.9 -9 1 2 9507 11 53 37 11 54 16 --- 14 32 59 19.2 113.4 -4.1 -49.8 30 R 1 8975 11 54 16 J1825 14 32 59 20.9 115.6 -3.9 -48.7 -9 1 2 8975 11 54 16 11 54 46 --- 14 33 29 21.0 115.7 -3.9 -48.7 20 R 1 8577 11 54 46 G24.78_H2O 14 33 29 19.3 113.5 -4.0 -49.8 -9 1 2 8577 11 54 46 11 55 26 --- 14 34 09 19.4 113.6 -4.0 -49.7 30 R 1 8045 11 55 26 J1825 14 34 09 21.1 115.8 -3.9 -48.6 -9 1 2 8045 11 55 26 11 55 56 --- 14 34 39 21.2 115.9 -3.9 -48.6 21 R 1 7646 11 55 56 G24.78_H2O 14 34 39 19.5 113.7 -4.0 -49.7 -9 1 2 7646 11 55 56 11 56 36 --- 14 35 19 19.6 113.8 -4.0 -49.6 30 R 1 7114 Schedule for VLBA_PT (Code Pt ) Page 6 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 11 56 36 J1825 14 35 19 21.3 116.0 -3.8 -48.5 -9 1 2 7114 11 56 36 11 57 06 --- 14 35 49 21.4 116.1 -3.8 -48.5 21 R 1 6715 11 57 06 G24.78_H2O 14 35 49 19.7 113.9 -4.0 -49.6 -9 1 2 6715 11 57 06 11 57 46 --- 14 36 29 19.8 114.0 -4.0 -49.5 30 R 1 6183 11 57 46 J1825 14 36 29 21.5 116.2 -3.8 -48.4 -9 1 2 6183 11 57 46 11 58 16 --- 14 36 59 21.6 116.3 -3.8 -48.3 21 R 1 5784 11 58 16 G24.78_H2O 14 36 59 19.9 114.1 -4.0 -49.5 -9 1 2 5784 11 58 16 11 58 56 --- 14 37 39 20.1 114.2 -4.0 -49.4 30 R 1 5252 11 58 56 J1825 14 37 39 21.8 116.4 -3.8 -48.3 -9 1 2 5252 11 58 56 11 59 26 --- 14 38 09 21.8 116.5 -3.8 -48.2 21 R 1 4853 11 59 26 G24.78_H2O 14 38 09 20.2 114.3 -4.0 -49.3 -9 1 2 4853 11 59 26 12 00 05 --- 14 38 49 20.3 114.4 -4.0 -49.3 30 R 1 4322 12 00 05 J1825 14 38 49 22.0 116.6 -3.8 -48.2 -9 1 2 4322 12 00 05 12 00 35 --- 14 39 19 22.1 116.7 -3.8 -48.1 21 R 1 3923 12 00 35 G24.78_H2O 14 39 19 20.4 114.5 -4.0 -49.2 -9 1 2 3923 12 00 35 12 01 15 --- 14 39 59 20.5 114.6 -3.9 -49.2 31 R 1 3391 12 01 15 J1825 14 39 59 22.2 116.9 -3.8 -48.0 -9 1 2 3391 12 01 15 12 01 45 --- 14 40 29 22.3 116.9 -3.8 -48.0 21 R 1 2992 12 01 45 G24.78_H2O 14 40 29 20.6 114.7 -3.9 -49.1 -9 1 2 2992 12 01 45 12 02 25 --- 14 41 09 20.7 114.9 -3.9 -49.1 31 R 1 2460 12 02 25 J1825 14 41 09 22.4 117.1 -3.7 -47.9 -9 1 2 2460 12 02 25 12 02 55 --- 14 41 39 22.5 117.2 -3.7 -47.9 21 R 1 2061 12 02 55 G24.78_H2O 14 41 39 20.8 114.9 -3.9 -49.0 -9 1 2 2061 12 02 55 12 03 35 --- 14 42 19 20.9 115.1 -3.9 -49.0 31 R 1 1529 12 03 35 J1825 14 42 19 22.6 117.3 -3.7 -47.8 -9 1 2 1529 12 03 35 12 04 05 --- 14 42 49 22.7 117.4 -3.7 -47.7 21 R 1 1130 12 04 05 G24.78_H2O 14 42 49 21.0 115.1 -3.9 -48.9 -9 1 2 1130 12 04 05 12 04 45 --- 14 43 29 21.2 115.3 -3.9 -48.9 31 R 1 598 Schedule for VLBA_PT (Code Pt ) Page 7 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 12 04 45 J1825 14 43 29 22.8 117.5 -3.7 -47.7 -9 1 2 598 12 04 45 12 05 15 --- 14 43 59 22.9 117.6 -3.7 -47.6 21 R 1 199 12 05 15 G24.78_H2O 14 43 59 21.2 115.3 -3.9 -48.8 -9 1 1 199 12 05 15 12 05 54 --- 14 44 39 21.4 115.5 -3.9 -48.7 31 F 2 731 12 05 54 J1825 14 44 39 23.0 117.7 -3.7 -47.6 -9 1 1 731 12 05 54 12 06 24 --- 14 45 09 23.1 117.8 -3.7 -47.5 21 F 2 1130 12 06 24 G24.78_H2O 14 45 09 21.5 115.6 -3.9 -48.7 -9 1 1 1130 12 06 24 12 07 04 --- 14 45 49 21.6 115.7 -3.8 -48.6 31 F 2 1662 12 07 04 J1825 14 45 49 23.3 117.9 -3.7 -47.4 -9 1 1 1662 12 07 04 12 07 34 --- 14 46 19 23.3 118.0 -3.7 -47.4 21 F 2 2061 12 07 34 G24.78_H2O 14 46 19 21.7 115.8 -3.8 -48.6 -9 1 1 2061 12 07 34 12 08 14 --- 14 46 59 21.8 115.9 -3.8 -48.5 31 F 2 2593 12 08 14 J1825 14 46 59 23.5 118.1 -3.6 -47.3 -9 1 1 2593 12 08 14 12 08 44 --- 14 47 29 23.6 118.2 -3.6 -47.3 21 F 2 2992 12 08 44 G24.78_H2O 14 47 29 21.9 116.0 -3.8 -48.5 -9 1 1 2992 12 08 44 12 09 24 --- 14 48 09 22.0 116.1 -3.8 -48.4 31 F 2 3524 12 09 24 J1825 14 48 09 23.7 118.3 -3.6 -47.2 -9 1 1 3524 12 09 24 12 09 54 --- 14 48 39 23.8 118.4 -3.6 -47.1 21 F 2 3923 12 09 54 G24.78_H2O 14 48 39 22.1 116.2 -3.8 -48.4 -9 1 1 3923 12 09 54 12 10 34 --- 14 49 19 22.2 116.3 -3.8 -48.3 31 F 2 4454 12 10 34 J1825 14 49 19 23.9 118.5 -3.6 -47.1 -9 1 1 4454 12 10 34 12 11 04 --- 14 49 49 24.0 118.6 -3.6 -47.0 21 F 2 4853 12 11 04 G24.78_H2O 14 49 49 22.3 116.4 -3.8 -48.2 -9 1 1 4853 12 11 04 12 11 44 --- 14 50 29 22.5 116.5 -3.8 -48.2 31 F 2 5385 12 11 44 J1825 14 50 29 24.1 118.8 -3.6 -46.9 -9 1 1 5385 12 11 44 12 12 13 --- 14 50 59 24.2 118.9 -3.6 -46.9 21 F 2 5784 12 12 13 G24.78_H2O 14 50 59 22.5 116.6 -3.8 -48.1 -9 1 1 5784 12 12 13 12 12 53 --- 14 51 39 22.7 116.7 -3.7 -48.1 31 F 2 6316 Schedule for VLBA_PT (Code Pt ) Page 8 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 12 12 53 J1825 14 51 39 24.3 119.0 -3.6 -46.8 -9 1 1 6316 12 12 53 12 13 23 --- 14 52 09 24.4 119.1 -3.6 -46.8 21 F 2 6715 12 13 23 G24.78_H2O 14 52 09 22.8 116.8 -3.7 -48.0 -9 1 1 6715 12 13 23 12 14 03 --- 14 52 49 22.9 116.9 -3.7 -47.9 31 F 2 7247 12 14 03 J1825 14 52 49 24.5 119.2 -3.6 -46.7 -9 1 1 7247 12 14 03 12 14 33 --- 14 53 19 24.6 119.3 -3.5 -46.6 21 F 2 7646 12 14 33 G24.78_H2O 14 53 19 23.0 117.0 -3.7 -47.9 -9 1 1 7646 12 14 33 12 15 13 --- 14 53 59 23.1 117.1 -3.7 -47.8 31 F 2 8178 12 15 13 J1825 14 53 59 24.7 119.4 -3.5 -46.6 -9 1 1 8178 12 15 13 12 15 43 --- 14 54 29 24.8 119.5 -3.5 -46.5 21 F 2 8577 12 15 43 G24.78_H2O 14 54 29 23.2 117.2 -3.7 -47.8 -9 1 1 8577 12 15 43 12 16 23 --- 14 55 09 23.3 117.3 -3.7 -47.7 31 F 2 9108 12 16 23 J1825 14 55 09 24.9 119.6 -3.5 -46.4 -9 1 1 9108 12 16 23 12 16 53 --- 14 55 39 25.0 119.7 -3.5 -46.4 21 F 2 9507 12 16 53 G24.78_H2O 14 55 39 23.4 117.4 -3.7 -47.7 -9 1 1 9507 12 16 53 12 17 33 --- 14 56 19 23.5 117.6 -3.7 -47.6 31 F 2 10039 12 17 33 J1825 14 56 19 25.2 119.9 -3.5 -46.3 -9 1 1 10039 12 17 33 12 18 02 --- 14 56 49 25.2 120.0 -3.5 -46.2 21 F 2 10438 12 18 02 G24.78_H2O 14 56 49 23.6 117.6 -3.7 -47.5 -9 1 1 10438 12 18 02 12 18 42 --- 14 57 29 23.7 117.8 -3.6 -47.5 31 F 2 10970 12 18 42 J1825 14 57 29 25.4 120.1 -3.5 -46.2 -9 1 1 10970 12 18 42 12 19 12 --- 14 57 59 25.5 120.2 -3.5 -46.1 21 F 2 11369 12 19 12 G24.78_H2O 14 57 59 23.8 117.9 -3.6 -47.4 -9 1 1 11369 12 19 12 12 19 52 --- 14 58 39 24.0 118.0 -3.6 -47.3 31 F 2 11901 12 19 52 J1825 14 58 39 25.6 120.3 -3.5 -46.0 -9 1 1 11901 12 19 52 12 20 22 --- 14 59 09 25.7 120.4 -3.4 -46.0 21 F 2 12300 12 20 22 G24.78_H2O 14 59 09 24.0 118.1 -3.6 -47.3 -9 1 1 12300 12 20 22 12 21 02 --- 14 59 49 24.2 118.2 -3.6 -47.2 31 F 2 12832 Schedule for VLBA_PT (Code Pt ) Page 9 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 12 21 02 J1825 14 59 49 25.8 120.5 -3.4 -45.9 -9 1 1 12832 12 21 02 12 21 32 --- 15 00 19 25.9 120.6 -3.4 -45.8 21 F 2 13230 12 21 32 G24.78_H2O 15 00 19 24.3 118.3 -3.6 -47.2 -9 1 1 13230 12 21 32 12 22 12 --- 15 00 59 24.4 118.4 -3.6 -47.1 31 F 2 13762 12 22 12 J1825 15 00 59 26.0 120.7 -3.4 -45.8 -9 1 1 13762 12 22 12 12 22 42 --- 15 01 29 26.1 120.8 -3.4 -45.7 21 F 2 14161 12 22 42 G24.78_H2O 15 01 29 24.5 118.5 -3.6 -47.0 -9 1 1 14161 12 22 42 12 23 22 --- 15 02 09 24.6 118.6 -3.6 -47.0 31 F 2 14693 12 23 22 J1825 15 02 09 26.2 121.0 -3.4 -45.6 -9 1 1 14693 12 23 22 12 23 52 --- 15 02 39 26.3 121.1 -3.4 -45.6 21 F 2 15092 12 23 52 G24.78_H2O 15 02 39 24.7 118.7 -3.6 -46.9 -9 1 1 15092 12 23 52 12 24 31 --- 15 03 19 24.8 118.8 -3.6 -46.8 31 F 2 15624 12 24 31 J1825 15 03 19 26.4 121.2 -3.4 -45.5 -9 1 1 15624 12 24 31 12 25 01 --- 15 03 49 26.5 121.3 -3.4 -45.4 21 F 2 16023 12 25 01 G24.78_H2O 15 03 49 24.9 118.9 -3.5 -46.8 -9 1 1 16023 12 25 01 12 25 41 --- 15 04 29 25.0 119.1 -3.5 -46.7 31 F 2 16555 12 25 41 J1825 15 04 29 26.6 121.4 -3.4 -45.3 -9 1 1 16555 12 25 41 12 26 11 --- 15 04 59 26.7 121.5 -3.3 -45.3 21 F 2 16954 12 26 11 G24.78_H2O 15 04 59 25.1 119.2 -3.5 -46.6 -9 1 1 16954 12 26 11 12 26 51 --- 15 05 39 25.2 119.3 -3.5 -46.6 31 F 2 17485 12 26 51 J1825 15 05 39 26.8 121.7 -3.3 -45.2 -9 1 2 17485 12 26 51 12 27 21 --- 15 06 09 26.9 121.7 -3.3 -45.1 21 R 2 17087 12 27 21 G24.78_H2O 15 06 09 25.3 119.4 -3.5 -46.5 -9 1 2 17087 12 27 21 12 28 01 --- 15 06 49 25.4 119.5 -3.5 -46.4 31 R 2 16555 12 28 01 J1825 15 06 49 27.0 121.9 -3.3 -45.1 -9 1 2 16555 12 28 01 12 28 31 --- 15 07 19 27.1 122.0 -3.3 -45.0 21 R 2 16156 12 28 31 G24.78_H2O 15 07 19 25.5 119.6 -3.5 -46.4 -9 1 2 16156 12 28 31 12 29 11 --- 15 07 59 25.6 119.7 -3.5 -46.3 31 R 2 15624 Schedule for VLBA_PT (Code Pt ) Page 10 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 12 29 11 J1825 15 07 59 27.2 122.1 -3.3 -44.9 -9 1 2 15624 12 29 11 12 29 41 --- 15 08 29 27.3 122.2 -3.3 -44.8 21 R 2 15225 12 29 41 G24.78_H2O 15 08 29 25.7 119.8 -3.5 -46.3 -9 1 2 15225 12 29 41 12 30 20 --- 15 09 09 25.9 119.9 -3.5 -46.2 31 R 2 14693 12 30 20 J1825 15 09 09 27.4 122.3 -3.3 -44.8 -9 1 2 14693 12 30 20 12 30 50 --- 15 09 39 27.5 122.4 -3.3 -44.7 21 R 2 14294 12 30 50 G24.78_H2O 15 09 39 25.9 120.0 -3.4 -46.1 -9 1 2 14294 12 30 50 12 31 30 --- 15 10 19 26.1 120.2 -3.4 -46.0 31 R 2 13762 12 31 30 J1825 15 10 19 27.6 122.6 -3.3 -44.6 -9 1 2 13762 12 31 30 12 32 00 --- 15 10 49 27.7 122.7 -3.3 -44.6 21 R 2 13363 12 32 00 G24.78_H2O 15 10 49 26.1 120.3 -3.4 -46.0 -9 1 2 13363 12 32 00 12 32 40 --- 15 11 29 26.3 120.4 -3.4 -45.9 31 R 2 12832 12 32 40 J1825 15 11 29 27.8 122.8 -3.2 -44.5 -9 1 2 12832 12 32 40 12 33 10 --- 15 11 59 27.9 122.9 -3.2 -44.4 21 R 2 12433 12 33 10 G24.78_H2O 15 11 59 26.4 120.5 -3.4 -45.9 -9 1 2 12433 12 33 10 12 33 50 --- 15 12 39 26.5 120.6 -3.4 -45.8 31 R 2 11901 12 33 50 J1825 15 12 39 28.0 123.0 -3.2 -44.3 -9 1 2 11901 12 33 50 12 34 20 --- 15 13 09 28.1 123.1 -3.2 -44.3 21 R 2 11502 12 34 20 G24.78_H2O 15 13 09 26.6 120.7 -3.4 -45.7 -9 1 2 11502 12 34 20 12 35 00 --- 15 13 49 26.7 120.8 -3.4 -45.6 31 R 2 10970 12 35 00 J1825 15 13 49 28.2 123.3 -3.2 -44.2 -9 1 2 10970 12 35 00 12 35 30 --- 15 14 19 28.3 123.4 -3.2 -44.1 21 R 2 10571 12 37 29 J1642 15 16 19 71.9 66.0 -1.4 -100.8 27 1 2 10571 12 37 29 12 40 29 --- 15 19 19 72.5 65.6 -1.4 -101.6 180 R 2 8178 12 42 20 J1825 15 21 11 29.5 124.8 -3.1 -43.2 19 1 2 8178 12 42 20 12 42 55 --- 15 21 46 29.6 124.9 -3.1 -43.1 35 R 2 7712 12 42 55 G24.78_H2O 15 21 46 28.1 122.4 -3.2 -44.7 -9 1 2 7712 12 42 55 12 43 35 --- 15 22 26 28.2 122.5 -3.2 -44.6 31 R 2 7180 Schedule for VLBA_PT (Code Pt ) Page 11 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 12 43 35 J1825 15 22 26 29.7 125.0 -3.1 -43.0 -9 1 2 7180 12 43 35 12 44 04 --- 15 22 56 29.8 125.1 -3.0 -43.0 21 R 2 6781 12 44 04 G24.78_H2O 15 22 56 28.3 122.6 -3.2 -44.5 -9 1 2 6781 12 44 04 12 44 44 --- 15 23 36 28.4 122.8 -3.2 -44.4 31 R 2 6250 12 44 44 J1825 15 23 36 29.9 125.3 -3.0 -42.9 -9 1 2 6250 12 44 44 12 45 14 --- 15 24 06 30.0 125.4 -3.0 -42.8 21 R 2 5851 12 45 14 G24.78_H2O 15 24 06 28.5 122.9 -3.2 -44.4 -9 1 2 5851 12 45 14 12 45 54 --- 15 24 46 28.6 123.0 -3.2 -44.3 31 R 2 5319 12 45 54 J1825 15 24 46 30.1 125.5 -3.0 -42.7 -9 1 2 5319 12 45 54 12 46 24 --- 15 25 16 30.2 125.6 -3.0 -42.6 21 R 2 4920 12 46 24 G24.78_H2O 15 25 16 28.7 123.1 -3.2 -44.2 -9 1 2 4920 12 46 24 12 47 04 --- 15 25 56 28.8 123.2 -3.2 -44.1 31 R 2 4388 12 47 04 J1825 15 25 56 30.3 125.8 -3.0 -42.5 -9 1 2 4388 12 47 04 12 47 34 --- 15 26 26 30.4 125.9 -3.0 -42.5 21 R 2 3989 12 47 34 G24.78_H2O 15 26 26 28.9 123.3 -3.2 -44.1 -9 1 2 3989 12 47 34 12 48 14 --- 15 27 06 29.0 123.5 -3.2 -44.0 31 R 2 3457 12 48 14 J1825 15 27 06 30.5 126.0 -3.0 -42.4 -9 1 2 3457 12 48 14 12 48 44 --- 15 27 36 30.6 126.1 -3.0 -42.3 21 R 2 3058 12 48 44 G24.78_H2O 15 27 36 29.1 123.6 -3.1 -43.9 -9 1 2 3058 12 48 44 12 49 24 --- 15 28 16 29.2 123.7 -3.1 -43.8 31 R 2 2526 12 49 24 J1825 15 28 16 30.7 126.3 -3.0 -42.2 -9 1 2 2526 12 49 24 12 49 54 --- 15 28 46 30.8 126.4 -3.0 -42.1 21 R 2 2128 12 49 54 G24.78_H2O 15 28 46 29.3 123.8 -3.1 -43.8 -9 1 2 2128 12 49 54 12 50 33 --- 15 29 26 29.4 124.0 -3.1 -43.7 31 R 2 1596 12 50 33 J1825 15 29 26 30.9 126.5 -2.9 -42.1 -9 1 2 1596 12 50 33 12 51 03 --- 15 29 56 31.0 126.6 -2.9 -42.0 21 R 2 1197 12 51 03 G24.78_H2O 15 29 56 29.5 124.1 -3.1 -43.6 -9 1 2 1197 12 51 03 12 51 43 --- 15 30 36 29.6 124.2 -3.1 -43.5 31 R 2 665 Schedule for VLBA_PT (Code Pt ) Page 12 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 12 51 43 J1825 15 30 36 31.1 126.8 -2.9 -41.9 -9 1 2 665 12 51 43 12 52 13 --- 15 31 06 31.2 126.9 -2.9 -41.8 21 R 2 266 12 52 13 G24.78_H2O 15 31 06 29.7 124.3 -3.1 -43.5 -9 1 3 266 12 52 13 12 52 53 --- 15 31 46 29.8 124.4 -3.1 -43.4 31 F 1 798 12 52 53 J1825 15 31 46 31.3 127.0 -2.9 -41.7 -9 1 3 798 12 52 53 12 53 23 --- 15 32 16 31.3 127.1 -2.9 -41.6 21 F 1 1197 12 53 23 G24.78_H2O 15 32 16 29.9 124.5 -3.1 -43.3 -9 1 3 1197 12 53 23 12 54 03 --- 15 32 56 30.0 124.7 -3.1 -43.2 31 F 1 1729 12 54 03 J1825 15 32 56 31.5 127.3 -2.9 -41.5 -9 1 3 1729 12 54 03 12 54 33 --- 15 33 26 31.5 127.4 -2.9 -41.5 21 F 1 2128 12 54 33 G24.78_H2O 15 33 26 30.1 124.8 -3.0 -43.1 -9 1 3 2128 12 54 33 12 55 13 --- 15 34 06 30.2 124.9 -3.0 -43.1 31 F 1 2659 12 55 13 J1825 15 34 06 31.6 127.5 -2.9 -41.4 -9 1 3 2659 12 55 13 12 55 43 --- 15 34 36 31.7 127.6 -2.9 -41.3 21 F 1 3058 12 55 43 G24.78_H2O 15 34 36 30.3 125.0 -3.0 -43.0 -9 1 3 3058 12 55 43 12 56 22 --- 15 35 16 30.4 125.2 -3.0 -42.9 31 F 1 3590 12 56 22 J1825 15 35 16 31.8 127.8 -2.8 -41.2 -9 1 3 3590 12 56 22 12 56 52 --- 15 35 46 31.9 127.9 -2.8 -41.1 21 F 1 3989 12 56 52 G24.78_H2O 15 35 46 30.5 125.3 -3.0 -42.8 -9 1 3 3989 12 56 52 12 57 32 --- 15 36 26 30.6 125.4 -3.0 -42.7 31 F 1 4521 12 57 32 J1825 15 36 26 32.0 128.0 -2.8 -41.0 -9 1 3 4521 12 57 32 12 58 02 --- 15 36 56 32.1 128.2 -2.8 -41.0 21 F 1 4920 12 58 02 G24.78_H2O 15 36 56 30.7 125.5 -3.0 -42.7 -9 1 3 4920 12 58 02 12 58 42 --- 15 37 36 30.8 125.7 -3.0 -42.6 31 F 1 5452 12 58 42 J1825 15 37 36 32.2 128.3 -2.8 -40.9 -9 1 3 5452 12 58 42 12 59 12 --- 15 38 06 32.3 128.4 -2.8 -40.8 21 F 1 5851 12 59 12 G24.78_H2O 15 38 06 30.9 125.8 -3.0 -42.5 -9 1 3 5851 12 59 12 12 59 52 --- 15 38 46 31.0 125.9 -3.0 -42.4 31 F 1 6383 Schedule for VLBA_PT (Code Pt ) Page 13 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 12 59 52 J1825 15 38 46 32.4 128.6 -2.8 -40.7 -9 1 3 6383 12 59 52 13 00 22 --- 15 39 16 32.5 128.7 -2.8 -40.6 21 F 1 6781 13 00 22 G24.78_H2O 15 39 16 31.1 126.0 -3.0 -42.3 -9 1 3 6781 13 00 22 13 01 02 --- 15 39 56 31.2 126.2 -2.9 -42.2 31 F 1 7313 13 01 02 J1825 15 39 56 32.6 128.8 -2.8 -40.5 -9 1 3 7313 13 01 02 13 01 32 --- 15 40 26 32.7 128.9 -2.8 -40.4 21 F 1 7712 13 01 32 G24.78_H2O 15 40 26 31.3 126.3 -2.9 -42.2 -9 1 3 7712 13 01 32 13 02 11 --- 15 41 06 31.4 126.4 -2.9 -42.1 31 F 1 8244 13 02 11 J1825 15 41 06 32.8 129.1 -2.7 -40.3 -9 1 3 8244 13 02 11 13 02 41 --- 15 41 36 32.9 129.2 -2.7 -40.2 21 F 1 8643 13 02 41 G24.78_H2O 15 41 36 31.5 126.5 -2.9 -42.0 -9 1 3 8643 13 02 41 13 03 21 --- 15 42 16 31.6 126.7 -2.9 -41.9 31 F 1 9175 13 03 21 J1825 15 42 16 33.0 129.3 -2.7 -40.1 -9 1 3 9175 13 03 21 13 03 51 --- 15 42 46 33.0 129.5 -2.7 -40.1 21 F 1 9574 13 03 51 G24.78_H2O 15 42 46 31.6 126.8 -2.9 -41.8 -9 1 3 9574 13 03 51 13 04 31 --- 15 43 26 31.8 126.9 -2.9 -41.7 31 F 1 10106 13 04 31 J1825 15 43 26 33.2 129.6 -2.7 -40.0 -9 1 3 10106 13 04 31 13 05 01 --- 15 43 56 33.2 129.7 -2.7 -39.9 21 F 1 10505 13 05 01 G24.78_H2O 15 43 56 31.8 127.0 -2.9 -41.7 -9 1 3 10505 13 05 01 13 05 41 --- 15 44 36 32.0 127.2 -2.9 -41.6 31 F 1 11036 13 05 41 J1825 15 44 36 33.3 129.9 -2.7 -39.8 -9 1 3 11036 13 05 41 13 06 11 --- 15 45 06 33.4 130.0 -2.7 -39.7 21 F 1 11435 13 06 11 G24.78_H2O 15 45 06 32.0 127.3 -2.9 -41.5 -9 1 3 11435 13 06 11 13 06 51 --- 15 45 46 32.1 127.4 -2.8 -41.4 31 F 1 11967 13 06 51 J1825 15 45 46 33.5 130.1 -2.7 -39.6 -9 1 3 11967 13 06 51 13 07 21 --- 15 46 16 33.6 130.3 -2.7 -39.5 21 F 1 12366 13 07 21 G24.78_H2O 15 46 16 32.2 127.5 -2.8 -41.3 -9 1 3 12366 13 07 21 13 08 01 --- 15 46 56 32.3 127.7 -2.8 -41.2 31 F 1 12898 Schedule for VLBA_PT (Code Pt ) Page 14 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 13 08 01 J1825 15 46 56 33.7 130.4 -2.6 -39.4 -9 1 3 12898 13 08 01 13 08 30 --- 15 47 26 33.8 130.5 -2.6 -39.3 21 F 1 13297 13 08 30 G24.78_H2O 15 47 26 32.4 127.8 -2.8 -41.1 -9 1 3 13297 13 08 30 13 09 10 --- 15 48 06 32.5 128.0 -2.8 -41.0 31 F 1 13829 13 09 10 J1825 15 48 06 33.9 130.7 -2.6 -39.2 -9 1 3 13829 13 09 10 13 09 40 --- 15 48 36 34.0 130.8 -2.6 -39.1 21 F 1 14228 13 09 40 G24.78_H2O 15 48 36 32.6 128.1 -2.8 -41.0 -9 1 3 14228 13 09 40 13 10 20 --- 15 49 16 32.7 128.2 -2.8 -40.9 31 F 1 14760 13 10 20 J1825 15 49 16 34.1 130.9 -2.6 -39.0 -9 1 3 14760 13 10 20 13 10 50 --- 15 49 46 34.2 131.1 -2.6 -38.9 21 F 1 15158 13 10 50 G24.78_H2O 15 49 46 32.8 128.3 -2.8 -40.8 -9 1 3 15158 13 10 50 13 11 30 --- 15 50 26 32.9 128.5 -2.8 -40.7 31 F 1 15690 13 11 30 J1825 15 50 26 34.3 131.2 -2.6 -38.8 -9 1 3 15690 13 11 30 13 12 00 --- 15 50 56 34.3 131.3 -2.6 -38.7 21 F 1 16089 13 12 00 G24.78_H2O 15 50 56 33.0 128.6 -2.8 -40.6 -9 1 3 16089 13 12 00 13 12 40 --- 15 51 36 33.1 128.7 -2.7 -40.5 31 F 1 16621 13 12 40 J1825 15 51 36 34.4 131.5 -2.6 -38.6 -9 1 3 16621 13 12 40 13 13 10 --- 15 52 06 34.5 131.6 -2.6 -38.5 21 F 1 17020 13 13 10 G24.78_H2O 15 52 06 33.2 128.8 -2.7 -40.4 -9 1 3 17020 13 13 10 13 13 50 --- 15 52 46 33.3 129.0 -2.7 -40.3 31 F 1 17552 13 13 50 J1825 15 52 46 34.6 131.8 -2.6 -38.4 -9 1 4 17552 13 13 50 13 14 19 --- 15 53 16 34.7 131.9 -2.5 -38.4 21 R 1 17153 13 14 19 G24.78_H2O 15 53 16 33.4 129.1 -2.7 -40.2 -9 1 4 17153 13 14 19 13 14 59 --- 15 53 56 33.5 129.3 -2.7 -40.1 31 R 1 16621 13 14 59 J1825 15 53 56 34.8 132.0 -2.5 -38.2 -9 1 4 16621 13 14 59 13 15 29 --- 15 54 26 34.9 132.2 -2.5 -38.2 21 R 1 16222 13 15 29 G24.78_H2O 15 54 26 33.5 129.4 -2.7 -40.1 -9 1 4 16222 13 15 29 13 16 09 --- 15 55 06 33.7 129.5 -2.7 -40.0 31 R 1 15690 Schedule for VLBA_PT (Code Pt ) Page 15 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 13 16 09 J1825 15 55 06 35.0 132.3 -2.5 -38.0 -9 1 4 15690 13 16 09 13 16 39 --- 15 55 36 35.1 132.4 -2.5 -38.0 21 R 1 15291 13 16 39 G24.78_H2O 15 55 36 33.7 129.6 -2.7 -39.9 -9 1 4 15291 13 16 39 13 17 19 --- 15 56 16 33.8 129.8 -2.7 -39.8 31 R 1 14760 13 17 19 J1825 15 56 16 35.2 132.6 -2.5 -37.8 -9 1 4 14760 13 17 19 13 17 49 --- 15 56 46 35.2 132.7 -2.5 -37.8 21 R 1 14361 13 17 49 G24.78_H2O 15 56 46 33.9 129.9 -2.7 -39.7 -9 1 4 14361 13 17 49 13 18 29 --- 15 57 26 34.0 130.1 -2.6 -39.6 31 R 1 13829 13 18 29 J1825 15 57 26 35.3 132.9 -2.5 -37.6 -9 1 4 13829 13 18 29 13 18 59 --- 15 57 56 35.4 133.0 -2.5 -37.6 21 R 1 13430 13 18 59 G24.78_H2O 15 57 56 34.1 130.2 -2.6 -39.5 -9 1 4 13430 13 18 59 13 19 39 --- 15 58 36 34.2 130.3 -2.6 -39.4 31 R 1 12898 13 19 39 J1825 15 58 36 35.5 133.2 -2.5 -37.4 -9 1 4 12898 13 19 39 13 20 09 --- 15 59 06 35.6 133.3 -2.4 -37.4 21 R 1 12499 13 20 09 G24.78_H2O 15 59 06 34.3 130.4 -2.6 -39.3 -9 1 4 12499 13 20 09 13 20 48 --- 15 59 46 34.4 130.6 -2.6 -39.2 31 R 1 11967 13 20 48 J1825 15 59 46 35.7 133.4 -2.4 -37.2 -9 1 4 11967 13 20 48 13 21 18 --- 16 00 16 35.8 133.6 -2.4 -37.2 21 R 1 11568 13 21 18 G24.78_H2O 16 00 16 34.5 130.7 -2.6 -39.1 -9 1 4 11568 13 21 18 13 21 58 --- 16 00 56 34.6 130.9 -2.6 -39.0 31 R 1 11036 13 21 58 J1825 16 00 56 35.9 133.7 -2.4 -37.0 -9 1 4 11036 13 21 58 13 22 28 --- 16 01 26 35.9 133.8 -2.4 -36.9 21 R 1 10638 13 22 28 G24.78_H2O 16 01 26 34.6 131.0 -2.6 -38.9 -9 1 4 10638 13 22 28 13 23 08 --- 16 02 06 34.8 131.1 -2.6 -38.8 31 R 1 10106 13 23 08 J1825 16 02 06 36.0 134.0 -2.4 -36.8 -9 1 4 10106 13 23 08 13 23 38 --- 16 02 36 36.1 134.1 -2.4 -36.7 21 R 1 9707 13 23 38 G24.78_H2O 16 02 36 34.8 131.3 -2.6 -38.7 -9 1 4 9707 13 23 38 13 24 18 --- 16 03 16 34.9 131.4 -2.6 -38.6 31 R 1 9175 Schedule for VLBA_PT (Code Pt ) Page 16 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 13 24 18 J1825 16 03 16 36.2 134.3 -2.4 -36.6 -9 1 4 9175 13 24 18 13 24 48 --- 16 03 46 36.3 134.4 -2.4 -36.5 21 R 1 8776 13 24 48 G24.78_H2O 16 03 46 35.0 131.5 -2.5 -38.6 -9 1 4 8776 13 24 48 13 25 28 --- 16 04 26 35.1 131.7 -2.5 -38.4 31 R 1 8244 13 25 28 J1825 16 04 26 36.4 134.6 -2.4 -36.4 -9 1 4 8244 13 25 28 13 25 58 --- 16 04 56 36.4 134.7 -2.3 -36.3 21 R 1 7845 13 25 58 G24.78_H2O 16 04 56 35.2 131.8 -2.5 -38.4 -9 1 4 7845 13 25 58 13 26 37 --- 16 05 36 35.3 132.0 -2.5 -38.2 31 R 1 7313 13 26 37 J1825 16 05 36 36.5 134.9 -2.3 -36.2 -9 1 4 7313 13 26 37 13 27 07 --- 16 06 06 36.6 135.0 -2.3 -36.1 21 R 1 6914 13 27 07 G24.78_H2O 16 06 06 35.4 132.1 -2.5 -38.2 -8 1 4 6914 13 27 07 13 27 47 --- 16 06 46 35.5 132.3 -2.5 -38.0 31 R 1 6383 13 27 47 J1825 16 06 46 36.7 135.2 -2.3 -36.0 -8 1 4 6383 13 27 47 13 28 17 --- 16 07 16 36.8 135.3 -2.3 -35.9 21 R 1 5984 13 28 17 G24.78_H2O 16 07 16 35.5 132.4 -2.5 -38.0 -8 1 4 5984 13 28 17 13 28 57 --- 16 07 56 35.7 132.5 -2.5 -37.8 31 R 1 5452 13 28 57 J1825 16 07 56 36.9 135.5 -2.3 -35.8 -8 1 4 5452 13 28 57 13 29 27 --- 16 08 26 37.0 135.6 -2.3 -35.7 21 R 1 5053 13 29 27 G24.78_H2O 16 08 26 35.7 132.7 -2.5 -37.8 -8 1 4 5053 13 29 27 13 30 07 --- 16 09 06 35.8 132.8 -2.5 -37.6 31 R 1 4521 13 30 07 J1825 16 09 06 37.1 135.8 -2.3 -35.6 -8 1 4 4521 13 30 07 13 30 37 --- 16 09 36 37.1 135.9 -2.3 -35.5 21 R 1 4122 13 30 37 G24.78_H2O 16 09 36 35.9 132.9 -2.4 -37.6 -8 1 4 4122 13 30 37 13 31 17 --- 16 10 16 36.0 133.1 -2.4 -37.4 31 R 1 3590 13 31 17 J1825 16 10 16 37.2 136.0 -2.3 -35.3 -8 1 4 3590 13 31 17 13 31 47 --- 16 10 46 37.3 136.2 -2.3 -35.2 21 R 1 3191 13 31 47 G24.78_H2O 16 10 46 36.1 133.2 -2.4 -37.4 -8 1 4 3191 13 31 47 13 32 27 --- 16 11 26 36.2 133.4 -2.4 -37.2 31 R 1 2659 Schedule for VLBA_PT (Code Pt ) Page 17 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 13 32 27 J1825 16 11 26 37.4 136.3 -2.2 -35.1 -8 1 4 2659 13 32 27 13 32 56 --- 16 11 56 37.5 136.5 -2.2 -35.0 22 R 1 2260 13 32 56 G24.78_H2O 16 11 56 36.3 133.5 -2.4 -37.1 -8 1 4 2260 13 32 56 13 33 36 --- 16 12 36 36.4 133.7 -2.4 -37.0 31 R 1 1729 13 33 36 J1825 16 12 36 37.6 136.6 -2.2 -34.9 -8 1 4 1729 13 33 36 13 34 06 --- 16 13 06 37.6 136.8 -2.2 -34.8 22 R 1 1330 13 34 06 G24.78_H2O 16 13 06 36.4 133.8 -2.4 -36.9 -8 1 4 1330 13 34 06 13 34 46 --- 16 13 46 36.5 134.0 -2.4 -36.8 32 R 1 798 13 34 46 J1825 16 13 46 37.7 136.9 -2.2 -34.7 -8 1 4 798 13 34 46 13 35 16 --- 16 14 16 37.8 137.1 -2.2 -34.6 22 R 1 399 13 35 16 G24.78_H2O 16 14 16 36.6 134.1 -2.4 -36.7 -8 1 3 399 13 35 16 13 35 56 --- 16 14 56 36.7 134.3 -2.4 -36.6 32 F 2 931 13 35 56 J1825 16 14 56 37.9 137.2 -2.2 -34.5 -8 1 3 931 13 35 56 13 36 26 --- 16 15 26 38.0 137.4 -2.2 -34.4 22 F 2 1330 13 36 26 G24.78_H2O 16 15 26 36.8 134.4 -2.3 -36.5 -8 1 3 1330 13 36 26 13 37 06 --- 16 16 06 36.9 134.5 -2.3 -36.4 32 F 2 1862 13 37 06 J1825 16 16 06 38.0 137.5 -2.2 -34.2 -8 1 3 1862 13 37 06 13 37 36 --- 16 16 36 38.1 137.7 -2.2 -34.1 22 F 2 2260 13 37 36 G24.78_H2O 16 16 36 36.9 134.7 -2.3 -36.3 -8 1 3 2260 13 37 36 13 38 16 --- 16 17 16 37.0 134.8 -2.3 -36.2 32 F 2 2792 13 38 16 J1825 16 17 16 38.2 137.9 -2.1 -34.0 -8 1 3 2792 13 38 16 13 38 45 --- 16 17 46 38.3 138.0 -2.1 -33.9 22 F 2 3191 13 38 45 G24.78_H2O 16 17 46 37.1 135.0 -2.3 -36.1 -8 1 3 3191 13 38 45 13 39 25 --- 16 18 26 37.2 135.1 -2.3 -36.0 32 F 2 3723 13 39 25 J1825 16 18 26 38.4 138.2 -2.1 -33.8 -8 1 3 3723 13 39 25 13 39 55 --- 16 18 56 38.4 138.3 -2.1 -33.7 22 F 2 4122 13 39 55 G24.78_H2O 16 18 56 37.3 135.3 -2.3 -35.9 -8 1 3 4122 13 39 55 13 40 35 --- 16 19 36 37.4 135.4 -2.3 -35.8 32 F 2 4654 Schedule for VLBA_PT (Code Pt ) Page 18 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 13 40 35 J1825 16 19 36 38.5 138.5 -2.1 -33.5 -8 1 3 4654 13 40 35 13 41 05 --- 16 20 06 38.6 138.6 -2.1 -33.5 22 F 2 5053 13 41 05 G24.78_H2O 16 20 06 37.5 135.5 -2.3 -35.7 -8 1 3 5053 13 41 05 13 41 45 --- 16 20 46 37.6 135.7 -2.3 -35.5 32 F 2 5585 13 41 45 J1825 16 20 46 38.7 138.8 -2.1 -33.3 -8 1 3 5585 13 41 45 13 42 15 --- 16 21 16 38.8 138.9 -2.1 -33.2 22 F 2 5984 13 42 15 G24.78_H2O 16 21 16 37.6 135.8 -2.3 -35.5 -8 1 3 5984 13 42 15 13 42 55 --- 16 21 56 37.7 136.0 -2.2 -35.3 32 F 2 6515 13 42 55 J1825 16 21 56 38.8 139.1 -2.1 -33.1 -8 1 3 6515 13 42 55 13 43 25 --- 16 22 26 38.9 139.2 -2.1 -33.0 22 F 2 6914 13 43 25 G24.78_H2O 16 22 26 37.8 136.1 -2.2 -35.2 -8 1 3 6914 13 43 25 13 44 05 --- 16 23 06 37.9 136.3 -2.2 -35.1 32 F 2 7446 13 44 05 J1825 16 23 06 39.0 139.4 -2.0 -32.9 -8 1 3 7446 13 44 05 13 44 35 --- 16 23 36 39.1 139.5 -2.0 -32.7 22 F 2 7845 13 44 35 G24.78_H2O 16 23 36 38.0 136.4 -2.2 -35.0 -8 1 3 7845 13 44 35 13 45 14 --- 16 24 16 38.1 136.6 -2.2 -34.9 32 F 2 8377 13 45 14 J1825 16 24 16 39.2 139.7 -2.0 -32.6 -8 1 3 8377 13 45 14 13 45 44 --- 16 24 46 39.2 139.8 -2.0 -32.5 22 F 2 8776 13 45 44 G24.78_H2O 16 24 46 38.1 136.7 -2.2 -34.8 -8 1 3 8776 13 45 44 13 46 24 --- 16 25 26 38.2 136.9 -2.2 -34.7 32 F 2 9308 13 46 24 J1825 16 25 26 39.3 140.0 -2.0 -32.4 -8 1 3 9308 13 46 24 13 46 54 --- 16 25 56 39.4 140.2 -2.0 -32.3 22 F 2 9707 13 46 54 G24.78_H2O 16 25 56 38.3 137.0 -2.2 -34.6 -8 1 3 9707 13 46 54 13 47 34 --- 16 26 36 38.4 137.2 -2.2 -34.4 32 F 2 10239 13 47 34 J1825 16 26 36 39.5 140.3 -2.0 -32.1 -8 1 3 10239 13 47 34 13 48 04 --- 16 27 06 39.5 140.5 -2.0 -32.0 22 F 2 10638 13 48 04 G24.78_H2O 16 27 06 38.5 137.4 -2.2 -34.3 -8 1 3 10638 13 48 04 13 48 44 --- 16 27 46 38.5 137.5 -2.1 -34.2 32 F 2 11169 Schedule for VLBA_PT (Code Pt ) Page 19 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 13 48 44 J1825 16 27 46 39.6 140.7 -2.0 -31.9 -8 1 3 11169 13 48 44 13 49 14 --- 16 28 16 39.7 140.8 -2.0 -31.8 22 F 2 11568 13 49 14 G24.78_H2O 16 28 16 38.6 137.7 -2.1 -34.1 -8 1 3 11568 13 49 14 13 49 54 --- 16 28 56 38.7 137.8 -2.1 -34.0 32 F 2 12100 13 49 54 J1825 16 28 56 39.8 141.0 -1.9 -31.7 -8 1 3 12100 13 49 54 13 50 24 --- 16 29 26 39.8 141.1 -1.9 -31.5 22 F 2 12499 13 50 24 G24.78_H2O 16 29 26 38.8 138.0 -2.1 -33.9 -8 1 3 12499 13 50 24 13 51 03 --- 16 30 06 38.9 138.1 -2.1 -33.8 32 F 2 13031 13 51 03 J1825 16 30 06 39.9 141.3 -1.9 -31.4 -8 1 3 13031 13 51 03 13 51 33 --- 16 30 36 40.0 141.4 -1.9 -31.3 22 F 2 13430 13 51 33 G24.78_H2O 16 30 36 38.9 138.3 -2.1 -33.7 -8 1 3 13430 13 51 33 13 52 13 --- 16 31 16 39.0 138.5 -2.1 -33.5 32 F 2 13962 13 52 13 J1825 16 31 16 40.1 141.6 -1.9 -31.2 -8 1 3 13962 13 52 13 13 52 43 --- 16 31 46 40.1 141.8 -1.9 -31.1 22 F 2 14361 13 54 43 J1751 16 33 46 59.6 139.5 -1.3 -33.0 75 1 3 14361 13 54 43 13 57 42 --- 16 36 46 60.0 140.8 -1.2 -32.0 180 F 2 16754 13 58 27 J1825 16 37 30 40.9 143.4 -1.8 -29.8 0 1 3 16754 13 58 27 13 59 02 --- 16 38 05 40.9 143.5 -1.8 -29.7 35 F 2 17219 13 59 02 G24.78_H2O 16 38 05 39.9 140.3 -2.0 -32.1 -8 1 4 17219 13 59 02 13 59 41 --- 16 38 45 40.0 140.5 -2.0 -32.0 32 R 2 16688 13 59 41 J1825 16 38 45 41.0 143.7 -1.8 -29.5 -8 1 4 16688 13 59 41 14 00 11 --- 16 39 15 41.1 143.9 -1.8 -29.4 22 R 2 16289 14 00 11 G24.78_H2O 16 39 15 40.1 140.6 -2.0 -31.9 -8 1 4 16289 14 00 11 14 00 51 --- 16 39 55 40.2 140.8 -1.9 -31.8 32 R 2 15757 14 00 51 J1825 16 39 55 41.2 144.1 -1.8 -29.3 -8 1 4 15757 14 00 51 14 01 21 --- 16 40 25 41.2 144.2 -1.8 -29.2 22 R 2 15358 14 01 21 G24.78_H2O 16 40 25 40.3 140.9 -1.9 -31.7 -8 1 4 15358 14 01 21 14 02 01 --- 16 41 05 40.3 141.1 -1.9 -31.5 32 R 2 14826 Schedule for VLBA_PT (Code Pt ) Page 20 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 14 02 01 J1825 16 41 05 41.3 144.4 -1.7 -29.0 -8 1 4 14826 14 02 01 14 02 31 --- 16 41 35 41.4 144.5 -1.7 -28.9 22 R 2 14427 14 02 31 G24.78_H2O 16 41 35 40.4 141.3 -1.9 -31.4 -8 1 4 14427 14 02 31 14 03 11 --- 16 42 15 40.5 141.4 -1.9 -31.3 32 R 2 13895 14 03 11 J1825 16 42 15 41.4 144.7 -1.7 -28.8 -8 1 4 13895 14 03 11 14 03 41 --- 16 42 45 41.5 144.9 -1.7 -28.7 22 R 2 13496 14 03 41 G24.78_H2O 16 42 45 40.6 141.6 -1.9 -31.2 -8 1 4 13496 14 03 41 14 04 21 --- 16 43 25 40.6 141.8 -1.9 -31.0 32 R 2 12964 14 04 21 J1825 16 43 25 41.6 145.1 -1.7 -28.5 -8 1 4 12964 14 04 21 14 04 51 --- 16 43 55 41.6 145.2 -1.7 -28.4 22 R 2 12566 14 04 51 G24.78_H2O 16 43 55 40.7 141.9 -1.9 -30.9 -8 1 4 12566 14 04 51 14 05 31 --- 16 44 35 40.8 142.1 -1.9 -30.8 32 R 2 12034 14 05 31 J1825 16 44 35 41.7 145.4 -1.7 -28.2 -8 1 4 12034 14 05 31 14 06 00 --- 16 45 05 41.8 145.6 -1.7 -28.1 22 R 2 11635 14 06 00 G24.78_H2O 16 45 05 40.9 142.2 -1.9 -30.7 -8 1 4 11635 14 06 00 14 06 40 --- 16 45 45 40.9 142.4 -1.8 -30.5 32 R 2 11103 14 06 40 J1825 16 45 45 41.8 145.8 -1.7 -28.0 -8 1 4 11103 14 06 40 14 07 10 --- 16 46 15 41.9 145.9 -1.7 -27.9 22 R 2 10704 14 07 10 G24.78_H2O 16 46 15 41.0 142.6 -1.8 -30.4 -8 1 4 10704 14 07 10 14 07 50 --- 16 46 55 41.1 142.8 -1.8 -30.3 32 R 2 10172 14 07 50 J1825 16 46 55 42.0 146.1 -1.6 -27.7 -8 1 4 10172 14 07 50 14 08 20 --- 16 47 25 42.0 146.2 -1.6 -27.6 22 R 2 9773 14 08 20 G24.78_H2O 16 47 25 41.1 142.9 -1.8 -30.1 -8 1 4 9773 14 08 20 14 09 00 --- 16 48 05 41.2 143.1 -1.8 -30.0 32 R 2 9241 14 09 00 J1825 16 48 05 42.1 146.4 -1.6 -27.4 -8 1 4 9241 14 09 00 14 09 30 --- 16 48 35 42.2 146.6 -1.6 -27.3 22 R 2 8842 14 09 30 G24.78_H2O 16 48 35 41.3 143.2 -1.8 -29.9 -8 1 4 8842 14 09 30 14 10 10 --- 16 49 15 41.4 143.4 -1.8 -29.7 32 R 2 8311 Schedule for VLBA_PT (Code Pt ) Page 21 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 14 10 10 J1825 16 49 15 42.3 146.8 -1.6 -27.2 -8 1 4 8311 14 10 10 14 10 40 --- 16 49 45 42.3 146.9 -1.6 -27.0 22 R 2 7912 14 10 40 G24.78_H2O 16 49 45 41.4 143.6 -1.8 -29.6 -8 1 4 7912 14 10 40 14 11 20 --- 16 50 25 41.5 143.8 -1.8 -29.5 32 R 2 7380 14 11 20 J1825 16 50 25 42.4 147.1 -1.6 -26.9 -8 1 4 7380 14 11 20 14 11 49 --- 16 50 55 42.4 147.3 -1.6 -26.8 22 R 2 6981 14 11 49 G24.78_H2O 16 50 55 41.6 143.9 -1.8 -29.4 -8 1 4 6981 14 11 49 14 12 29 --- 16 51 35 41.7 144.1 -1.7 -29.2 32 R 2 6449 14 12 29 J1825 16 51 35 42.5 147.5 -1.6 -26.6 -8 1 4 6449 14 12 29 14 12 59 --- 16 52 05 42.6 147.6 -1.6 -26.5 22 R 2 6050 14 12 59 G24.78_H2O 16 52 05 41.7 144.2 -1.7 -29.1 -8 1 4 6050 14 12 59 14 13 39 --- 16 52 45 41.8 144.4 -1.7 -29.0 32 R 2 5518 14 13 39 J1825 16 52 45 42.6 147.8 -1.6 -26.3 -8 1 4 5518 14 13 39 14 14 09 --- 16 53 15 42.7 148.0 -1.5 -26.2 22 R 2 5119 14 14 09 G24.78_H2O 16 53 15 41.9 144.6 -1.7 -28.9 -8 1 4 5119 14 14 09 14 14 49 --- 16 53 55 41.9 144.8 -1.7 -28.7 32 R 2 4587 14 14 49 J1825 16 53 55 42.8 148.2 -1.5 -26.1 -8 1 4 4587 14 14 49 14 15 19 --- 16 54 25 42.8 148.3 -1.5 -25.9 22 R 2 4189 14 15 19 G24.78_H2O 16 54 25 42.0 144.9 -1.7 -28.6 -8 1 4 4189 14 15 19 14 15 59 --- 16 55 05 42.1 145.1 -1.7 -28.4 32 R 2 3657 14 15 59 J1825 16 55 05 42.9 148.5 -1.5 -25.8 -8 1 4 3657 14 15 59 14 16 29 --- 16 55 35 42.9 148.7 -1.5 -25.7 22 R 2 3258 14 16 29 G24.78_H2O 16 55 35 42.1 145.3 -1.7 -28.3 -8 1 4 3258 14 16 29 14 17 09 --- 16 56 15 42.2 145.5 -1.7 -28.2 32 R 2 2726 14 17 09 J1825 16 56 15 43.0 148.9 -1.5 -25.5 -8 1 4 2726 14 17 09 14 17 39 --- 16 56 45 43.1 149.1 -1.5 -25.4 22 R 2 2327 14 17 39 G24.78_H2O 16 56 45 42.3 145.6 -1.7 -28.1 -8 1 4 2327 14 17 39 14 18 18 --- 16 57 25 42.3 145.8 -1.6 -27.9 32 R 2 1795 Schedule for VLBA_PT (Code Pt ) Page 22 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 14 18 18 J1825 16 57 25 43.1 149.3 -1.5 -25.2 -8 1 4 1795 14 18 18 14 18 48 --- 16 57 55 43.2 149.4 -1.5 -25.1 22 R 2 1396 14 18 48 G24.78_H2O 16 57 55 42.4 146.0 -1.6 -27.8 -8 1 4 1396 14 18 48 14 19 28 --- 16 58 35 42.5 146.2 -1.6 -27.6 32 R 2 864 14 19 28 J1825 16 58 35 43.3 149.6 -1.5 -24.9 -8 1 4 864 14 19 28 14 19 58 --- 16 59 05 43.3 149.8 -1.4 -24.8 22 R 2 465 14 19 58 G24.78_H2O 16 59 05 42.5 146.3 -1.6 -27.5 -8 1 5 465 14 19 58 14 20 38 --- 16 59 45 42.6 146.5 -1.6 -27.4 32 F 1 66 14 20 38 J1825 16 59 45 43.4 150.0 -1.4 -24.6 -8 1 5 66 14 20 38 14 21 08 --- 17 00 15 43.4 150.1 -1.4 -24.5 22 F 1 465 14 21 08 G24.78_H2O 17 00 15 42.7 146.7 -1.6 -27.2 -8 1 5 465 14 21 08 14 21 48 --- 17 00 55 42.7 146.9 -1.6 -27.1 32 F 1 997 14 21 48 J1825 17 00 55 43.5 150.3 -1.4 -24.4 -8 1 5 997 14 21 48 14 22 18 --- 17 01 25 43.6 150.5 -1.4 -24.2 22 F 1 1396 14 22 18 G24.78_H2O 17 01 25 42.8 147.0 -1.6 -27.0 -8 1 5 1396 14 22 18 14 22 58 --- 17 02 05 42.9 147.2 -1.6 -26.8 32 F 1 1928 14 22 58 J1825 17 02 05 43.6 150.7 -1.4 -24.1 -8 1 5 1928 14 22 58 14 23 28 --- 17 02 35 43.7 150.9 -1.4 -23.9 22 F 1 2327 14 23 28 G24.78_H2O 17 02 35 42.9 147.4 -1.6 -26.7 -8 1 5 2327 14 23 28 14 24 07 --- 17 03 15 43.0 147.6 -1.6 -26.5 32 F 1 2859 14 24 07 J1825 17 03 15 43.7 151.1 -1.4 -23.8 -8 1 5 2859 14 24 07 14 24 37 --- 17 03 45 43.8 151.2 -1.4 -23.6 22 F 1 3258 14 24 37 G24.78_H2O 17 03 45 43.1 147.7 -1.5 -26.4 -8 1 5 3258 14 24 37 14 25 17 --- 17 04 25 43.1 147.9 -1.5 -26.3 32 F 1 3790 14 25 17 J1825 17 04 25 43.9 151.4 -1.4 -23.5 -8 1 5 3790 14 25 17 14 25 47 --- 17 04 55 43.9 151.6 -1.3 -23.4 22 F 1 4188 14 25 47 G24.78_H2O 17 04 55 43.2 148.1 -1.5 -26.1 -8 1 5 4188 14 25 47 14 26 27 --- 17 05 35 43.3 148.3 -1.5 -26.0 32 F 1 4720 Schedule for VLBA_PT (Code Pt ) Page 23 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 14 26 27 J1825 17 05 35 44.0 151.8 -1.3 -23.2 -8 1 5 4720 14 26 27 14 26 57 --- 17 06 05 44.0 152.0 -1.3 -23.1 22 F 1 5119 14 26 57 G24.78_H2O 17 06 05 43.3 148.4 -1.5 -25.9 -8 1 5 5119 14 26 57 14 27 37 --- 17 06 45 43.4 148.6 -1.5 -25.7 32 F 1 5651 14 27 37 J1825 17 06 45 44.1 152.2 -1.3 -22.9 -8 1 5 5651 14 27 37 14 28 07 --- 17 07 15 44.1 152.3 -1.3 -22.8 22 F 1 6050 14 28 07 G24.78_H2O 17 07 15 43.4 148.8 -1.5 -25.6 -8 1 5 6050 14 28 07 14 28 47 --- 17 07 55 43.5 149.0 -1.5 -25.4 32 F 1 6582 14 28 47 J1825 17 07 55 44.2 152.6 -1.3 -22.6 -8 1 5 6582 14 28 47 14 29 17 --- 17 08 25 44.2 152.7 -1.3 -22.5 22 F 1 6981 14 29 17 G24.78_H2O 17 08 25 43.6 149.1 -1.5 -25.3 -8 1 5 6981 14 29 17 14 29 57 --- 17 09 05 43.6 149.3 -1.5 -25.1 32 F 1 7513 14 29 57 J1825 17 09 05 44.3 152.9 -1.3 -22.3 -8 1 5 7513 14 29 57 14 30 26 --- 17 09 35 44.4 153.1 -1.3 -22.2 22 F 1 7912 14 30 26 G24.78_H2O 17 09 35 43.7 149.5 -1.4 -25.0 -8 1 5 7912 14 30 26 14 31 06 --- 17 10 15 43.8 149.7 -1.4 -24.8 32 F 1 8443 14 31 06 J1825 17 10 15 44.4 153.3 -1.3 -22.0 -8 1 5 8443 14 31 06 14 31 36 --- 17 10 45 44.5 153.5 -1.3 -21.9 22 F 1 8842 14 31 36 G24.78_H2O 17 10 45 43.8 149.9 -1.4 -24.7 -8 1 5 8842 14 31 36 14 32 16 --- 17 11 25 43.9 150.1 -1.4 -24.5 31 F 1 9374 14 32 16 J1825 17 11 25 44.5 153.7 -1.2 -21.7 -8 1 5 9374 14 32 16 14 32 46 --- 17 11 55 44.6 153.8 -1.2 -21.6 22 F 1 9773 14 32 46 G24.78_H2O 17 11 55 43.9 150.2 -1.4 -24.4 -8 1 5 9773 14 32 46 14 33 26 --- 17 12 35 44.0 150.4 -1.4 -24.3 31 F 1 10305 14 33 26 J1825 17 12 35 44.6 154.1 -1.2 -21.4 -8 1 5 10305 14 33 26 14 33 56 --- 17 13 05 44.7 154.2 -1.2 -21.3 22 F 1 10704 14 33 56 G24.78_H2O 17 13 05 44.1 150.6 -1.4 -24.1 -8 1 5 10704 14 33 56 14 34 36 --- 17 13 45 44.1 150.8 -1.4 -24.0 31 F 1 11236 Schedule for VLBA_PT (Code Pt ) Page 24 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 14 34 36 J1825 17 13 45 44.7 154.4 -1.2 -21.1 -8 1 5 11236 14 34 36 14 35 06 --- 17 14 15 44.8 154.6 -1.2 -21.0 22 F 1 11635 14 35 06 G24.78_H2O 17 14 15 44.2 151.0 -1.4 -23.8 -8 1 5 11635 14 35 06 14 35 46 --- 17 14 55 44.2 151.2 -1.4 -23.7 31 F 1 12167 14 35 46 J1825 17 14 55 44.8 154.8 -1.2 -20.8 -8 1 5 12167 14 35 46 14 36 15 --- 17 15 25 44.9 155.0 -1.2 -20.6 21 F 1 12566 14 36 15 G24.78_H2O 17 15 25 44.3 151.3 -1.3 -23.5 -8 1 5 12566 14 36 15 14 36 55 --- 17 16 05 44.4 151.5 -1.3 -23.4 31 F 1 13097 14 36 55 J1825 17 16 05 44.9 155.2 -1.2 -20.5 -8 1 5 13097 14 36 55 14 37 25 --- 17 16 35 45.0 155.4 -1.2 -20.3 21 F 1 13496 14 37 25 G24.78_H2O 17 16 35 44.4 151.7 -1.3 -23.2 -8 1 5 13496 14 37 25 14 38 05 --- 17 17 15 44.5 151.9 -1.3 -23.1 31 F 1 14028 14 38 05 J1825 17 17 15 45.0 155.6 -1.1 -20.2 -8 1 5 14028 14 38 05 14 38 35 --- 17 17 45 45.1 155.7 -1.1 -20.0 21 F 1 14427 14 38 35 G24.78_H2O 17 17 45 44.5 152.1 -1.3 -22.9 -8 1 5 14427 14 38 35 14 39 15 --- 17 18 25 44.6 152.3 -1.3 -22.8 31 F 1 14959 14 39 15 J1825 17 18 25 45.1 156.0 -1.1 -19.8 -8 1 5 14959 14 39 15 14 39 45 --- 17 18 55 45.2 156.1 -1.1 -19.7 21 F 1 15358 14 39 45 G24.78_H2O 17 18 55 44.6 152.5 -1.3 -22.6 -8 1 5 15358 14 39 45 14 40 25 --- 17 19 35 44.7 152.7 -1.3 -22.5 31 F 1 15890 14 40 25 J1825 17 19 35 45.2 156.3 -1.1 -19.5 -8 1 5 15890 14 40 25 14 40 55 --- 17 20 05 45.3 156.5 -1.1 -19.4 21 F 1 16289 14 40 55 G24.78_H2O 17 20 05 44.7 152.8 -1.3 -22.3 -8 1 5 16289 14 40 55 14 41 35 --- 17 20 45 44.8 153.0 -1.3 -22.2 31 F 1 16821 14 41 35 J1825 17 20 45 45.3 156.7 -1.1 -19.2 -8 1 5 16821 14 41 35 14 42 05 --- 17 21 15 45.4 156.9 -1.1 -19.1 21 F 1 17219 14 42 05 G24.78_H2O 17 21 15 44.8 153.2 -1.3 -22.0 -8 1 6 17219 14 42 05 14 42 44 --- 17 21 55 44.9 153.4 -1.2 -21.9 31 R 1 16688 Schedule for VLBA_PT (Code Pt ) Page 25 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 14 42 44 J1825 17 21 55 45.4 157.1 -1.1 -18.9 -8 1 6 16688 14 42 44 14 43 14 --- 17 22 25 45.5 157.3 -1.1 -18.8 21 R 1 16289 14 43 14 G24.78_H2O 17 22 25 45.0 153.6 -1.2 -21.7 -8 1 6 16289 14 43 14 14 43 54 --- 17 23 05 45.0 153.8 -1.2 -21.6 31 R 1 15757 14 43 54 J1825 17 23 05 45.5 157.5 -1.0 -18.6 -8 1 6 15757 14 43 54 14 44 24 --- 17 23 35 45.6 157.7 -1.0 -18.5 21 R 1 15358 14 44 24 G24.78_H2O 17 23 35 45.1 154.0 -1.2 -21.4 -8 1 6 15358 14 44 24 14 45 04 --- 17 24 15 45.1 154.2 -1.2 -21.3 31 R 1 14826 14 45 04 J1825 17 24 15 45.6 157.9 -1.0 -18.3 -8 1 6 14826 14 45 04 14 45 34 --- 17 24 45 45.7 158.1 -1.0 -18.1 21 R 1 14427 14 45 34 G24.78_H2O 17 24 45 45.2 154.4 -1.2 -21.1 -8 1 6 14427 14 45 34 14 46 14 --- 17 25 25 45.2 154.6 -1.2 -20.9 31 R 1 13895 14 46 14 J1825 17 25 25 45.7 158.3 -1.0 -17.9 -8 1 6 13895 14 46 14 14 46 44 --- 17 25 55 45.7 158.5 -1.0 -17.8 21 R 1 13496 14 46 44 G24.78_H2O 17 25 55 45.3 154.7 -1.2 -20.8 -8 1 6 13496 14 46 44 14 47 24 --- 17 26 35 45.3 155.0 -1.2 -20.6 31 R 1 12964 14 47 24 J1825 17 26 35 45.8 158.7 -1.0 -17.6 -8 1 6 12964 14 47 24 14 47 54 --- 17 27 05 45.8 158.9 -1.0 -17.5 21 R 1 12566 14 47 54 G24.78_H2O 17 27 05 45.4 155.1 -1.2 -20.5 -8 1 6 12566 14 47 54 14 48 33 --- 17 27 45 45.4 155.3 -1.1 -20.3 31 R 1 12034 14 48 33 J1825 17 27 45 45.9 159.1 -1.0 -17.3 -8 1 6 12034 14 48 33 14 49 03 --- 17 28 15 45.9 159.3 -1.0 -17.2 21 R 1 11635 14 49 03 G24.78_H2O 17 28 15 45.5 155.5 -1.1 -20.2 -9 1 6 11635 14 49 03 14 49 43 --- 17 28 55 45.5 155.7 -1.1 -20.0 31 R 1 11103 14 49 43 J1825 17 28 55 46.0 159.5 -0.9 -17.0 -9 1 6 11103 14 49 43 14 50 13 --- 17 29 25 46.0 159.7 -0.9 -16.8 21 R 1 10704 14 50 13 G24.78_H2O 17 29 25 45.6 155.9 -1.1 -19.9 -9 1 6 10704 14 50 13 14 50 53 --- 17 30 05 45.6 156.1 -1.1 -19.7 31 R 1 10172 Schedule for VLBA_PT (Code Pt ) Page 26 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 14 50 53 J1825 17 30 05 46.0 159.9 -0.9 -16.7 -9 1 6 10172 14 50 53 14 51 23 --- 17 30 35 46.1 160.1 -0.9 -16.5 21 R 1 9773 14 51 23 G24.78_H2O 17 30 35 45.7 156.3 -1.1 -19.6 -9 1 6 9773 14 51 23 14 52 03 --- 17 31 15 45.7 156.5 -1.1 -19.4 31 R 1 9241 14 52 03 J1825 17 31 15 46.1 160.3 -0.9 -16.3 -9 1 6 9241 14 52 03 14 52 33 --- 17 31 45 46.2 160.5 -0.9 -16.2 21 R 1 8842 14 52 33 G24.78_H2O 17 31 45 45.8 156.7 -1.1 -19.3 -9 1 6 8842 14 52 33 14 53 13 --- 17 32 25 45.8 156.9 -1.1 -19.1 31 R 1 8311 14 53 13 J1825 17 32 25 46.2 160.7 -0.9 -16.0 -9 1 6 8311 14 53 13 14 53 43 --- 17 32 55 46.2 160.9 -0.9 -15.9 21 R 1 7912 14 53 43 G24.78_H2O 17 32 55 45.9 157.1 -1.1 -18.9 -9 1 6 7912 14 53 43 14 54 22 --- 17 33 35 45.9 157.3 -1.0 -18.7 31 R 1 7380 14 54 22 J1825 17 33 35 46.3 161.1 -0.9 -15.7 -9 1 6 7380 14 54 22 14 54 52 --- 17 34 05 46.3 161.3 -0.9 -15.5 21 R 1 6981 14 54 52 G24.78_H2O 17 34 05 46.0 157.5 -1.0 -18.6 -9 1 6 6981 14 54 52 14 55 32 --- 17 34 45 46.0 157.7 -1.0 -18.4 31 R 1 6449 14 55 32 J1825 17 34 45 46.4 161.5 -0.9 -15.3 -9 1 6 6449 14 55 32 14 56 02 --- 17 35 15 46.4 161.7 -0.8 -15.2 21 R 1 6050 14 56 02 G24.78_H2O 17 35 15 46.0 157.9 -1.0 -18.3 -9 1 6 6050 14 56 02 14 56 42 --- 17 35 55 46.1 158.1 -1.0 -18.1 31 R 1 5518 14 56 42 J1825 17 35 55 46.4 161.9 -0.8 -15.0 -9 1 6 5518 14 56 42 14 57 12 --- 17 36 25 46.5 162.1 -0.8 -14.9 21 R 1 5119 14 57 12 G24.78_H2O 17 36 25 46.1 158.3 -1.0 -18.0 -9 1 6 5119 14 57 12 14 57 52 --- 17 37 05 46.2 158.5 -1.0 -17.8 31 R 1 4587 14 57 52 J1825 17 37 05 46.5 162.3 -0.8 -14.7 -9 1 6 4587 14 57 52 14 58 22 --- 17 37 35 46.5 162.5 -0.8 -14.5 21 R 1 4188 14 58 22 G24.78_H2O 17 37 35 46.2 158.7 -1.0 -17.6 -9 1 6 4188 14 58 22 14 59 02 --- 17 38 15 46.3 158.9 -1.0 -17.5 31 R 1 3657 Schedule for VLBA_PT (Code Pt ) Page 27 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 14 59 02 J1825 17 38 15 46.6 162.7 -0.8 -14.3 -9 1 6 3657 14 59 02 14 59 32 --- 17 38 45 46.6 162.9 -0.8 -14.2 21 R 1 3258 14 59 32 G24.78_H2O 17 38 45 46.3 159.0 -1.0 -17.3 -9 1 6 3258 14 59 32 15 00 12 --- 17 39 25 46.4 159.3 -0.9 -17.1 31 R 1 2726 15 00 12 J1825 17 39 25 46.7 163.1 -0.8 -14.0 -9 1 6 2726 15 00 12 15 00 41 --- 17 39 55 46.7 163.3 -0.8 -13.9 21 R 1 2327 15 00 41 G24.78_H2O 17 39 55 46.4 159.5 -0.9 -17.0 -9 1 6 2327 15 00 41 15 01 21 --- 17 40 35 46.4 159.7 -0.9 -16.8 31 R 1 1795 15 01 21 J1825 17 40 35 46.7 163.5 -0.8 -13.7 -9 1 6 1795 15 01 21 15 01 51 --- 17 41 05 46.8 163.7 -0.7 -13.5 21 R 1 1396 15 01 51 G24.78_H2O 17 41 05 46.5 159.9 -0.9 -16.7 -9 1 6 1396 15 01 51 15 02 31 --- 17 41 45 46.5 160.1 -0.9 -16.5 31 R 1 864 15 02 31 J1825 17 41 45 46.8 163.9 -0.7 -13.3 -9 1 6 864 15 02 31 15 03 01 --- 17 42 15 46.8 164.1 -0.7 -13.2 21 R 1 465 15 03 01 G24.78_H2O 17 42 15 46.6 160.3 -0.9 -16.3 -9 1 5 465 15 03 01 15 03 41 --- 17 42 55 46.6 160.5 -0.9 -16.1 31 F 2 67 15 03 41 J1825 17 42 55 46.9 164.3 -0.7 -13.0 -9 1 5 67 15 03 41 15 04 11 --- 17 43 25 46.9 164.5 -0.7 -12.8 21 F 2 465 15 04 11 G24.78_H2O 17 43 25 46.6 160.7 -0.9 -16.0 -9 1 5 465 15 04 11 15 04 51 --- 17 44 05 46.7 160.9 -0.9 -15.8 31 F 2 997 15 04 51 J1825 17 44 05 46.9 164.8 -0.7 -12.7 -9 1 5 997 15 04 51 15 05 21 --- 17 44 35 47.0 164.9 -0.7 -12.5 21 F 2 1396 15 05 21 G24.78_H2O 17 44 35 46.7 161.1 -0.9 -15.7 -9 1 5 1396 15 05 21 15 06 01 --- 17 45 15 46.8 161.3 -0.9 -15.5 31 F 2 1928 15 06 01 J1825 17 45 15 47.0 165.2 -0.7 -12.3 -9 1 5 1928 15 06 01 15 06 30 --- 17 45 45 47.0 165.4 -0.7 -12.2 21 F 2 2327 15 06 30 G24.78_H2O 17 45 45 46.8 161.5 -0.8 -15.3 -9 1 5 2327 15 06 30 15 07 10 --- 17 46 25 46.8 161.7 -0.8 -15.2 31 F 2 2859 Schedule for VLBA_PT (Code Pt ) Page 28 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 15 07 10 J1825 17 46 25 47.0 165.6 -0.7 -12.0 -9 1 5 2859 15 07 10 15 07 40 --- 17 46 55 47.1 165.8 -0.6 -11.8 21 F 2 3258 15 07 40 G24.78_H2O 17 46 55 46.9 161.9 -0.8 -15.0 -9 1 5 3258 15 07 40 15 08 20 --- 17 47 35 46.9 162.1 -0.8 -14.8 31 F 2 3790 15 08 20 J1825 17 47 35 47.1 166.0 -0.6 -11.6 -9 1 5 3790 15 08 20 15 08 50 --- 17 48 05 47.1 166.2 -0.6 -11.5 21 F 2 4189 15 10 50 J1642 17 50 05 75.6 297.3 1.1 107.1 26 1 5 4189 15 10 50 15 13 49 --- 17 53 05 75.0 296.6 1.2 106.0 180 F 2 6582 15 15 33 J1825 17 54 49 47.4 168.6 -0.5 -9.5 13 1 5 6582 15 15 33 15 16 08 --- 17 55 24 47.5 168.8 -0.5 -9.3 35 F 2 7047 15 16 08 G24.78_H2O 17 55 24 47.4 164.9 -0.7 -12.5 -9 1 5 7047 15 16 08 15 16 48 --- 17 56 04 47.4 165.1 -0.7 -12.3 31 F 2 7579 15 16 48 J1825 17 56 04 47.5 169.1 -0.5 -9.1 -9 1 5 7579 15 16 48 15 17 18 --- 17 56 34 47.5 169.2 -0.5 -9.0 21 F 2 7978 15 17 18 G24.78_H2O 17 56 34 47.4 165.3 -0.7 -12.2 -9 1 5 7978 15 17 18 15 17 58 --- 17 57 14 47.5 165.5 -0.7 -12.0 31 F 2 8510 15 17 58 J1825 17 57 14 47.5 169.5 -0.5 -8.8 -9 1 5 8510 15 17 58 15 18 28 --- 17 57 44 47.5 169.7 -0.5 -8.6 21 F 2 8909 15 18 28 G24.78_H2O 17 57 44 47.5 165.7 -0.6 -11.9 -9 1 5 8909 15 18 28 15 19 08 --- 17 58 24 47.5 166.0 -0.6 -11.7 31 F 2 9441 15 19 08 J1825 17 58 24 47.6 169.9 -0.5 -8.4 -9 1 5 9441 15 19 08 15 19 38 --- 17 58 54 47.6 170.1 -0.4 -8.3 21 F 2 9840 15 19 38 G24.78_H2O 17 58 54 47.6 166.1 -0.6 -11.5 -9 1 5 9840 15 19 38 15 20 17 --- 17 59 34 47.6 166.4 -0.6 -11.3 31 F 2 10372 15 20 17 J1825 17 59 34 47.6 170.3 -0.4 -8.1 -9 1 5 10372 15 20 17 15 20 47 --- 18 00 04 47.6 170.5 -0.4 -7.9 21 F 2 10771 15 20 47 G24.78_H2O 18 00 04 47.6 166.6 -0.6 -11.2 -9 1 5 10771 15 20 47 15 21 27 --- 18 00 44 47.6 166.8 -0.6 -11.0 31 F 2 11302 Schedule for VLBA_PT (Code Pt ) Page 29 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 15 21 27 J1825 18 00 44 47.7 170.7 -0.4 -7.7 -9 1 5 11302 15 21 27 15 21 57 --- 18 01 14 47.7 170.9 -0.4 -7.5 21 F 2 11701 15 21 57 G24.78_H2O 18 01 14 47.7 167.0 -0.6 -10.8 -9 1 5 11701 15 21 57 15 22 37 --- 18 01 54 47.7 167.2 -0.6 -10.6 31 F 2 12233 15 22 37 J1825 18 01 54 47.7 171.2 -0.4 -7.3 -9 1 5 12233 15 22 37 15 23 07 --- 18 02 24 47.7 171.4 -0.4 -7.2 21 F 2 12632 15 23 07 G24.78_H2O 18 02 24 47.7 167.4 -0.6 -10.5 -9 1 5 12632 15 23 07 15 23 47 --- 18 03 04 47.8 167.6 -0.6 -10.3 31 F 2 13164 15 23 47 J1825 18 03 04 47.7 171.6 -0.4 -7.0 -9 1 5 13164 15 23 47 15 24 17 --- 18 03 34 47.7 171.8 -0.4 -6.8 21 F 2 13563 15 24 17 G24.78_H2O 18 03 34 47.8 167.8 -0.5 -10.1 -9 1 5 13563 15 24 17 15 24 57 --- 18 04 14 47.8 168.1 -0.5 -9.9 31 F 2 14095 15 24 57 J1825 18 04 14 47.8 172.0 -0.4 -6.6 -9 1 5 14095 15 24 57 15 25 27 --- 18 04 44 47.8 172.2 -0.4 -6.5 21 F 2 14494 15 25 27 G24.78_H2O 18 04 44 47.8 168.3 -0.5 -9.8 -9 1 5 14494 15 25 27 15 26 06 --- 18 05 24 47.9 168.5 -0.5 -9.6 31 F 2 15026 15 26 06 J1825 18 05 24 47.8 172.5 -0.3 -6.3 -9 1 5 15026 15 26 06 15 26 36 --- 18 05 54 47.8 172.6 -0.3 -6.1 21 F 2 15424 15 26 36 G24.78_H2O 18 05 54 47.9 168.7 -0.5 -9.4 -9 1 5 15424 15 26 36 15 27 16 --- 18 06 34 47.9 168.9 -0.5 -9.2 31 F 2 15956 15 27 16 J1825 18 06 34 47.8 172.9 -0.3 -5.9 -9 1 5 15956 15 27 16 15 27 46 --- 18 07 04 47.8 173.1 -0.3 -5.8 21 F 2 16355 15 27 46 G24.78_H2O 18 07 04 47.9 169.1 -0.5 -9.1 -9 1 5 16355 15 27 46 15 28 26 --- 18 07 44 47.9 169.3 -0.5 -8.9 31 F 2 16887 15 28 26 J1825 18 07 44 47.9 173.3 -0.3 -5.6 -9 1 5 16887 15 28 26 15 28 56 --- 18 08 14 47.9 173.5 -0.3 -5.4 21 F 2 17286 15 28 56 G24.78_H2O 18 08 14 48.0 169.5 -0.5 -8.7 -9 1 6 17286 15 28 56 15 29 36 --- 18 08 54 48.0 169.8 -0.5 -8.5 31 R 2 16754 Schedule for VLBA_PT (Code Pt ) Page 30 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 15 29 36 J1825 18 08 54 47.9 173.7 -0.3 -5.2 -9 1 6 16754 15 29 36 15 30 06 --- 18 09 24 47.9 173.9 -0.3 -5.1 21 R 2 16355 15 30 06 G24.78_H2O 18 09 24 48.0 170.0 -0.5 -8.3 -9 1 6 16355 15 30 06 15 30 46 --- 18 10 04 48.0 170.2 -0.4 -8.1 31 R 2 15823 15 30 46 J1825 18 10 04 47.9 174.2 -0.3 -4.9 -9 1 6 15823 15 30 46 15 31 16 --- 18 10 34 47.9 174.4 -0.3 -4.7 21 R 2 15424 15 31 16 G24.78_H2O 18 10 34 48.0 170.4 -0.4 -8.0 -9 1 6 15424 15 31 16 15 31 55 --- 18 11 14 48.1 170.6 -0.4 -7.8 31 R 2 14893 15 31 55 J1825 18 11 14 47.9 174.6 -0.2 -4.5 -9 1 6 14893 15 31 55 15 32 25 --- 18 11 44 47.9 174.8 -0.2 -4.3 21 R 2 14494 15 32 25 G24.78_H2O 18 11 44 48.1 170.8 -0.4 -7.6 -9 1 6 14494 15 32 25 15 33 05 --- 18 12 24 48.1 171.1 -0.4 -7.4 31 R 2 13962 15 33 05 J1825 18 12 24 48.0 175.0 -0.2 -4.1 -9 1 6 13962 15 33 05 15 33 35 --- 18 12 54 48.0 175.2 -0.2 -4.0 21 R 2 13563 15 33 35 G24.78_H2O 18 12 54 48.1 171.2 -0.4 -7.3 -9 1 6 13563 15 33 35 15 34 15 --- 18 13 34 48.1 171.5 -0.4 -7.1 31 R 2 13031 15 34 15 J1825 18 13 34 48.0 175.5 -0.2 -3.8 -9 1 6 13031 15 34 15 15 34 45 --- 18 14 04 48.0 175.6 -0.2 -3.6 21 R 2 12632 15 34 45 G24.78_H2O 18 14 04 48.2 171.7 -0.4 -6.9 -9 1 6 12632 15 34 45 15 35 25 --- 18 14 44 48.2 171.9 -0.4 -6.7 31 R 2 12100 15 35 25 J1825 18 14 44 48.0 175.9 -0.2 -3.4 -9 1 6 12100 15 35 25 15 35 55 --- 18 15 14 48.0 176.1 -0.2 -3.3 21 R 2 11701 15 35 55 G24.78_H2O 18 15 14 48.2 172.1 -0.4 -6.6 -9 1 6 11701 15 35 55 15 36 35 --- 18 15 54 48.2 172.4 -0.3 -6.4 31 R 2 11169 15 36 35 J1825 18 15 54 48.0 176.3 -0.2 -3.1 -9 1 6 11169 15 36 35 15 37 05 --- 18 16 24 48.0 176.5 -0.2 -2.9 21 R 2 10771 15 37 05 G24.78_H2O 18 16 24 48.2 172.5 -0.3 -6.2 -9 1 6 10771 15 37 05 15 37 45 --- 18 17 04 48.2 172.8 -0.3 -6.0 31 R 2 10239 Schedule for VLBA_PT (Code Pt ) Page 31 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 15 37 45 J1825 18 17 04 48.0 176.8 -0.1 -2.7 -9 1 6 10239 15 37 45 15 38 14 --- 18 17 34 48.0 176.9 -0.1 -2.5 21 R 2 9840 15 38 14 G24.78_H2O 18 17 34 48.3 173.0 -0.3 -5.8 -9 1 6 9840 15 38 14 15 38 54 --- 18 18 14 48.3 173.2 -0.3 -5.6 31 R 2 9308 15 38 54 J1825 18 18 14 48.0 177.2 -0.1 -2.3 -9 1 6 9308 15 38 54 15 39 24 --- 18 18 44 48.0 177.4 -0.1 -2.2 21 R 2 8909 15 39 24 G24.78_H2O 18 18 44 48.3 173.4 -0.3 -5.5 -9 1 6 8909 15 39 24 15 40 04 --- 18 19 24 48.3 173.7 -0.3 -5.3 31 R 2 8377 15 40 04 J1825 18 19 24 48.0 177.6 -0.1 -2.0 -9 1 6 8377 15 40 04 15 40 34 --- 18 19 54 48.0 177.8 -0.1 -1.8 21 R 2 7978 15 40 34 G24.78_H2O 18 19 54 48.3 173.8 -0.3 -5.1 -9 1 6 7978 15 40 34 15 41 14 --- 18 20 34 48.3 174.1 -0.3 -4.9 31 R 2 7446 15 41 14 J1825 18 20 34 48.1 178.1 -0.1 -1.6 -9 1 6 7446 15 41 14 15 41 44 --- 18 21 04 48.1 178.2 -0.1 -1.5 21 R 2 7047 15 41 44 G24.78_H2O 18 21 04 48.3 174.3 -0.3 -4.8 -9 1 6 7047 15 41 44 15 42 24 --- 18 21 44 48.4 174.5 -0.2 -4.6 31 R 2 6516 15 42 24 J1825 18 21 44 48.1 178.5 -0.1 -1.3 -9 1 6 6516 15 42 24 15 42 54 --- 18 22 14 48.1 178.7 -0.1 -1.1 21 R 2 6117 15 42 54 G24.78_H2O 18 22 14 48.4 174.7 -0.2 -4.4 -9 1 6 6117 15 42 54 15 43 34 --- 18 22 54 48.4 175.0 -0.2 -4.2 31 R 2 5585 15 43 34 J1825 18 22 54 48.1 178.9 0.0 -0.9 -9 1 6 5585 15 43 34 15 44 03 --- 18 23 24 48.1 179.1 0.0 -0.7 21 R 2 5186 15 44 03 G24.78_H2O 18 23 24 48.4 175.1 -0.2 -4.0 -9 1 6 5186 15 44 03 15 44 43 --- 18 24 04 48.4 175.4 -0.2 -3.8 31 R 2 4654 15 44 43 J1825 18 24 04 48.1 179.3 0.0 -0.5 -9 1 6 4654 15 44 43 15 45 13 --- 18 24 34 48.1 179.5 0.0 -0.4 21 R 2 4255 15 45 13 G24.78_H2O 18 24 34 48.4 175.6 -0.2 -3.7 -9 1 6 4255 15 45 13 15 45 53 --- 18 25 14 48.4 175.8 -0.2 -3.5 31 R 2 3723 Schedule for VLBA_PT (Code Pt ) Page 32 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 15 45 53 J1825 18 25 14 48.1 179.8 0.0 -0.2 -9 1 6 3723 15 45 53 15 46 23 --- 18 25 44 48.1 180.0 0.0 0.0 21 R 2 3324 15 46 23 G24.78_H2O 18 25 44 48.4 176.0 -0.2 -3.3 -9 1 6 3324 15 46 23 15 47 03 --- 18 26 24 48.4 176.3 -0.2 -3.1 31 R 2 2792 15 47 03 J1825 18 26 24 48.1 180.2 0.0 0.2 -9 1 6 2792 15 47 03 15 47 33 --- 18 26 54 48.1 180.4 0.0 0.3 21 R 2 2393 15 47 33 G24.78_H2O 18 26 54 48.4 176.4 -0.2 -3.0 -9 1 6 2393 15 47 33 15 48 13 --- 18 27 34 48.4 176.7 -0.1 -2.8 31 R 2 1862 15 48 13 J1825 18 27 34 48.1 180.6 0.0 0.5 -9 1 6 1862 15 48 13 15 48 43 --- 18 28 04 48.1 180.8 0.0 0.7 21 R 2 1463 15 48 43 G24.78_H2O 18 28 04 48.4 176.9 -0.1 -2.6 -9 1 6 1463 15 48 43 15 49 23 --- 18 28 44 48.5 177.1 -0.1 -2.4 31 R 2 931 15 49 23 J1825 18 28 44 48.1 181.1 0.0 0.9 -9 1 6 931 15 49 23 15 49 53 --- 18 29 14 48.1 181.3 0.1 1.1 21 R 2 532 15 49 53 G24.78_H2O 18 29 14 48.5 177.3 -0.1 -2.2 -9 1 6 532 15 49 53 15 50 32 --- 18 29 54 48.5 177.6 -0.1 -2.0 31 R 2 0 15 50 32 J1825 18 29 54 48.1 181.5 0.1 1.3 -9 1 7 0 15 50 32 15 51 02 --- 18 30 24 48.1 181.7 0.1 1.4 21 F 1 399 15 51 02 G24.78_H2O 18 30 24 48.5 177.8 -0.1 -1.9 -9 1 7 399 15 51 02 15 51 42 --- 18 31 04 48.5 178.0 -0.1 -1.7 31 F 1 931 15 51 42 J1825 18 31 04 48.1 181.9 0.1 1.6 -9 1 7 931 15 51 42 15 52 12 --- 18 31 34 48.1 182.1 0.1 1.8 21 F 1 1330 15 52 12 G24.78_H2O 18 31 34 48.5 178.2 -0.1 -1.5 -9 1 7 1330 15 52 12 15 52 52 --- 18 32 14 48.5 178.4 -0.1 -1.3 31 F 1 1862 15 52 52 J1825 18 32 14 48.0 182.4 0.1 2.0 -9 1 7 1862 15 52 52 15 53 22 --- 18 32 44 48.0 182.6 0.1 2.1 21 F 1 2261 15 53 22 G24.78_H2O 18 32 44 48.5 178.6 -0.1 -1.1 -9 1 7 2261 15 53 22 15 54 02 --- 18 33 24 48.5 178.9 -0.1 -0.9 31 F 1 2792 Schedule for VLBA_PT (Code Pt ) Page 33 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 15 54 02 J1825 18 33 24 48.0 182.8 0.1 2.3 -9 1 7 2792 15 54 02 15 54 32 --- 18 33 54 48.0 183.0 0.1 2.5 21 F 1 3191 15 54 32 G24.78_H2O 18 33 54 48.5 179.1 0.0 -0.8 -9 1 7 3191 15 54 32 15 55 12 --- 18 34 34 48.5 179.3 0.0 -0.6 31 F 1 3723 15 55 12 J1825 18 34 34 48.0 183.2 0.1 2.7 -9 1 7 3723 15 55 12 15 55 42 --- 18 35 04 48.0 183.4 0.2 2.9 21 F 1 4122 15 55 42 G24.78_H2O 18 35 04 48.5 179.5 0.0 -0.4 -9 1 7 4122 15 55 42 15 56 21 --- 18 35 44 48.5 179.7 0.0 -0.2 31 F 1 4654 15 56 21 J1825 18 35 44 48.0 183.7 0.2 3.1 -9 1 7 4654 15 56 21 15 56 51 --- 18 36 14 48.0 183.9 0.2 3.2 21 F 1 5053 15 56 51 G24.78_H2O 18 36 14 48.5 179.9 0.0 -0.1 -9 1 7 5053 15 56 51 15 57 31 --- 18 36 54 48.5 180.2 0.0 0.2 31 F 1 5585 15 57 31 J1825 18 36 54 48.0 184.1 0.2 3.4 -9 1 7 5585 15 57 31 15 58 01 --- 18 37 24 48.0 184.3 0.2 3.6 21 F 1 5984 15 58 01 G24.78_H2O 18 37 24 48.5 180.4 0.0 0.3 -9 1 7 5984 15 58 01 15 58 41 --- 18 38 04 48.5 180.6 0.0 0.5 31 F 1 6516 15 58 41 J1825 18 38 04 48.0 184.5 0.2 3.8 -9 1 7 6516 15 58 41 15 59 11 --- 18 38 34 48.0 184.7 0.2 3.9 21 F 1 6914 15 59 11 G24.78_H2O 18 38 34 48.5 180.8 0.0 0.7 -9 1 7 6914 15 59 11 15 59 51 --- 18 39 14 48.5 181.1 0.0 0.9 31 F 1 7446 15 59 51 J1825 18 39 14 48.0 185.0 0.2 4.1 -9 1 7 7446 15 59 51 16 00 21 --- 18 39 44 47.9 185.2 0.2 4.3 21 F 1 7845 16 00 21 G24.78_H2O 18 39 44 48.5 181.2 0.1 1.0 -9 1 7 7845 16 00 21 16 01 01 --- 18 40 24 48.5 181.5 0.1 1.2 31 F 1 8377 16 01 01 J1825 18 40 24 47.9 185.4 0.2 4.5 -9 1 7 8377 16 01 01 16 01 31 --- 18 40 54 47.9 185.6 0.3 4.6 21 F 1 8776 16 01 31 G24.78_H2O 18 40 54 48.5 181.7 0.1 1.4 -9 1 7 8776 16 01 31 16 02 11 --- 18 41 34 48.5 181.9 0.1 1.6 31 F 1 9308 Schedule for VLBA_PT (Code Pt ) Page 34 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 16 02 11 J1825 18 41 34 47.9 185.8 0.3 4.9 -9 1 7 9308 16 02 11 16 02 40 --- 18 42 04 47.9 186.0 0.3 5.0 21 F 1 9707 16 02 40 G24.78_H2O 18 42 04 48.5 182.1 0.1 1.8 -9 1 7 9707 16 02 40 16 03 20 --- 18 42 44 48.5 182.4 0.1 2.0 31 F 1 10239 16 03 20 J1825 18 42 44 47.9 186.3 0.3 5.2 -9 1 7 10239 16 03 20 16 03 50 --- 18 43 14 47.9 186.4 0.3 5.4 21 F 1 10638 16 03 50 G24.78_H2O 18 43 14 48.5 182.6 0.1 2.1 -9 1 7 10638 16 03 50 16 04 30 --- 18 43 54 48.5 182.8 0.1 2.3 31 F 1 11169 16 04 30 J1825 18 43 54 47.9 186.7 0.3 5.6 -9 1 7 11169 16 04 30 16 05 00 --- 18 44 24 47.8 186.9 0.3 5.7 21 F 1 11568 16 05 00 G24.78_H2O 18 44 24 48.5 183.0 0.1 2.5 -9 1 7 11568 16 05 00 16 05 40 --- 18 45 04 48.4 183.2 0.1 2.7 31 F 1 12100 16 05 40 J1825 18 45 04 47.8 187.1 0.3 5.9 -9 1 7 12100 16 05 40 16 06 10 --- 18 45 34 47.8 187.3 0.3 6.1 21 F 1 12499 16 06 10 G24.78_H2O 18 45 34 48.4 183.4 0.2 2.9 -9 1 7 12499 16 06 10 16 06 50 --- 18 46 14 48.4 183.7 0.2 3.1 31 F 1 13031 16 06 50 J1825 18 46 14 47.8 187.5 0.3 6.3 -9 1 7 13031 16 06 50 16 07 20 --- 18 46 44 47.8 187.7 0.3 6.4 21 F 1 13430 16 07 20 G24.78_H2O 18 46 44 48.4 183.9 0.2 3.2 -9 1 7 13430 16 07 20 16 08 00 --- 18 47 24 48.4 184.1 0.2 3.4 31 F 1 13962 16 08 00 J1825 18 47 24 47.8 188.0 0.4 6.6 -9 1 7 13962 16 08 00 16 08 29 --- 18 47 54 47.7 188.2 0.4 6.8 21 F 1 14361 16 08 29 G24.78_H2O 18 47 54 48.4 184.3 0.2 3.6 -9 1 7 14361 16 08 29 16 09 09 --- 18 48 34 48.4 184.5 0.2 3.8 31 F 1 14893 16 09 09 J1825 18 48 34 47.7 188.4 0.4 7.0 -9 1 7 14893 16 09 09 16 09 39 --- 18 49 04 47.7 188.6 0.4 7.1 21 F 1 15291 16 09 39 G24.78_H2O 18 49 04 48.4 184.7 0.2 3.9 -9 1 7 15291 16 09 39 16 10 19 --- 18 49 44 48.4 185.0 0.2 4.1 31 F 1 15823 Schedule for VLBA_PT (Code Pt ) Page 35 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 16 10 19 J1825 18 49 44 47.7 188.8 0.4 7.3 -9 1 7 15823 16 10 19 16 10 49 --- 18 50 14 47.7 189.0 0.4 7.5 21 F 1 16222 16 10 49 G24.78_H2O 18 50 14 48.4 185.2 0.2 4.3 -9 1 7 16222 16 10 49 16 11 29 --- 18 50 54 48.4 185.4 0.2 4.5 31 F 1 16754 16 11 29 J1825 18 50 54 47.7 189.2 0.4 7.7 -9 1 7 16754 16 11 29 16 11 59 --- 18 51 24 47.6 189.4 0.4 7.8 21 F 1 17153 16 11 59 G24.78_H2O 18 51 24 48.3 185.6 0.2 4.7 -9 1 8 17153 16 11 59 16 12 39 --- 18 52 04 48.3 185.8 0.3 4.9 31 R 1 16621 16 12 39 J1825 18 52 04 47.6 189.7 0.4 8.0 -9 1 8 16621 16 12 39 16 13 09 --- 18 52 34 47.6 189.9 0.4 8.2 21 R 1 16222 16 13 09 G24.78_H2O 18 52 34 48.3 186.0 0.3 5.0 -9 1 8 16222 16 13 09 16 13 49 --- 18 53 14 48.3 186.3 0.3 5.2 31 R 1 15690 16 13 49 J1825 18 53 14 47.6 190.1 0.5 8.4 -9 1 8 15690 16 13 49 16 14 19 --- 18 53 44 47.6 190.3 0.5 8.6 21 R 1 15291 16 14 19 G24.78_H2O 18 53 44 48.3 186.5 0.3 5.4 -9 1 8 15291 16 14 19 16 14 58 --- 18 54 24 48.3 186.7 0.3 5.6 31 R 1 14760 16 14 58 J1825 18 54 24 47.5 190.5 0.5 8.8 -9 1 8 14760 16 14 58 16 15 28 --- 18 54 54 47.5 190.7 0.5 8.9 21 R 1 14361 16 15 28 G24.78_H2O 18 54 54 48.3 186.9 0.3 5.7 -9 1 8 14361 16 15 28 16 16 08 --- 18 55 34 48.2 187.1 0.3 5.9 31 R 1 13829 16 16 08 J1825 18 55 34 47.5 190.9 0.5 9.1 -9 1 8 13829 16 16 08 16 16 38 --- 18 56 04 47.5 191.1 0.5 9.3 21 R 1 13430 16 16 38 G24.78_H2O 18 56 04 48.2 187.3 0.3 6.1 -9 1 8 13430 16 16 38 16 17 18 --- 18 56 44 48.2 187.6 0.3 6.3 31 R 1 12898 16 17 18 J1825 18 56 44 47.4 191.4 0.5 9.5 -9 1 8 12898 16 17 18 16 17 48 --- 18 57 14 47.4 191.5 0.5 9.6 21 R 1 12499 16 17 48 G24.78_H2O 18 57 14 48.2 187.8 0.3 6.5 -9 1 8 12499 16 17 48 16 18 28 --- 18 57 54 48.2 188.0 0.4 6.7 31 R 1 11967 Schedule for VLBA_PT (Code Pt ) Page 36 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 16 18 28 J1825 18 57 54 47.4 191.8 0.5 9.8 -9 1 8 11967 16 18 28 16 18 58 --- 18 58 24 47.4 192.0 0.5 10.0 21 R 1 11568 16 18 58 G24.78_H2O 18 58 24 48.2 188.2 0.4 6.8 -9 1 8 11568 16 18 58 16 19 38 --- 18 59 04 48.2 188.4 0.4 7.0 31 R 1 11036 16 19 38 J1825 18 59 04 47.3 192.2 0.6 10.1 -9 1 8 11036 16 19 38 16 20 08 --- 18 59 34 47.3 192.4 0.6 10.3 21 R 1 10638 16 20 08 G24.78_H2O 18 59 34 48.1 188.6 0.4 7.2 -9 1 8 10638 16 20 08 16 20 47 --- 19 00 14 48.1 188.9 0.4 7.4 31 R 1 10106 16 20 47 J1825 19 00 14 47.3 192.6 0.6 10.5 -9 1 8 10106 16 20 47 16 21 17 --- 19 00 44 47.3 192.8 0.6 10.6 21 R 1 9707 16 21 17 G24.78_H2O 19 00 44 48.1 189.1 0.4 7.5 -9 1 8 9707 16 21 17 16 21 57 --- 19 01 24 48.1 189.3 0.4 7.7 31 R 1 9175 16 21 57 J1825 19 01 24 47.2 193.0 0.6 10.8 -8 1 8 9175 16 21 57 16 22 27 --- 19 01 54 47.2 193.2 0.6 11.0 21 R 1 8776 16 22 27 G24.78_H2O 19 01 54 48.1 189.5 0.4 7.9 -8 1 8 8776 16 22 27 16 23 07 --- 19 02 34 48.0 189.7 0.4 8.1 31 R 1 8244 16 23 07 J1825 19 02 34 47.2 193.5 0.6 11.2 -8 1 8 8244 16 23 07 16 23 37 --- 19 03 04 47.2 193.6 0.6 11.3 21 R 1 7845 16 23 37 G24.78_H2O 19 03 04 48.0 189.9 0.4 8.2 -8 1 8 7845 16 23 37 16 24 17 --- 19 03 44 48.0 190.2 0.5 8.4 31 R 1 7313 16 24 17 J1825 19 03 44 47.1 193.9 0.6 11.5 -8 1 8 7313 16 24 17 16 24 47 --- 19 04 14 47.1 194.1 0.6 11.7 21 R 1 6914 16 24 47 G24.78_H2O 19 04 14 48.0 190.3 0.5 8.6 -8 1 8 6914 16 24 47 16 25 27 --- 19 04 54 48.0 190.6 0.5 8.8 31 R 1 6383 16 25 27 J1825 19 04 54 47.1 194.3 0.7 11.9 -8 1 8 6383 16 25 27 16 25 57 --- 19 05 24 47.0 194.5 0.7 12.0 21 R 1 5984 16 27 56 J1751 19 07 24 59.9 219.5 1.3 32.2 88 1 8 5984 16 27 56 16 30 56 --- 19 10 24 59.5 220.8 1.3 33.2 180 R 1 3590 Schedule for VLBA_PT (Code Pt ) Page 37 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 16 31 35 J1825 19 11 04 46.7 196.5 0.8 13.7 8 1 8 3590 16 31 35 16 32 10 --- 19 11 39 46.7 196.7 0.8 13.8 35 R 1 3125 16 32 10 G24.78_H2O 19 11 39 47.7 193.0 0.6 10.8 -8 1 8 3125 16 32 10 16 32 50 --- 19 12 19 47.6 193.3 0.6 11.0 31 R 1 2593 16 32 50 J1825 19 12 19 46.7 196.9 0.8 14.0 -8 1 8 2593 16 32 50 16 33 20 --- 19 12 49 46.6 197.1 0.8 14.2 21 R 1 2194 16 33 20 G24.78_H2O 19 12 49 47.6 193.5 0.6 11.2 -8 1 8 2194 16 33 20 16 34 00 --- 19 13 29 47.6 193.7 0.6 11.4 31 R 1 1662 16 34 00 J1825 19 13 29 46.6 197.3 0.8 14.4 -8 1 8 1662 16 34 00 16 34 30 --- 19 13 59 46.6 197.5 0.8 14.5 22 R 1 1263 16 34 30 G24.78_H2O 19 13 59 47.6 193.9 0.6 11.5 -8 1 8 1263 16 34 30 16 35 10 --- 19 14 39 47.5 194.1 0.6 11.7 31 R 1 731 16 35 10 J1825 19 14 39 46.5 197.7 0.8 14.7 -8 1 8 731 16 35 10 16 35 39 --- 19 15 09 46.5 197.9 0.8 14.8 22 R 1 332 16 35 39 G24.78_H2O 19 15 09 47.5 194.3 0.6 11.9 -8 1 7 332 16 35 39 16 36 19 --- 19 15 49 47.5 194.5 0.7 12.1 31 F 2 864 16 36 19 J1825 19 15 49 46.4 198.1 0.8 15.0 -8 1 7 864 16 36 19 16 36 49 --- 19 16 19 46.4 198.3 0.8 15.2 22 F 2 1263 16 36 49 G24.78_H2O 19 16 19 47.4 194.7 0.7 12.2 -8 1 7 1263 16 36 49 16 37 29 --- 19 16 59 47.4 195.0 0.7 12.4 31 F 2 1795 16 37 29 J1825 19 16 59 46.4 198.5 0.9 15.4 -8 1 7 1795 16 37 29 16 37 59 --- 19 17 29 46.3 198.7 0.9 15.5 22 F 2 2194 16 37 59 G24.78_H2O 19 17 29 47.4 195.1 0.7 12.6 -8 1 7 2194 16 37 59 16 38 39 --- 19 18 09 47.3 195.4 0.7 12.8 32 F 2 2726 16 38 39 J1825 19 18 09 46.3 198.9 0.9 15.7 -8 1 7 2726 16 38 39 16 39 09 --- 19 18 39 46.2 199.1 0.9 15.8 22 F 2 3125 16 39 09 G24.78_H2O 19 18 39 47.3 195.6 0.7 12.9 -8 1 7 3125 16 39 09 16 39 49 --- 19 19 19 47.3 195.8 0.7 13.1 32 F 2 3657 Schedule for VLBA_PT (Code Pt ) Page 38 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 16 39 49 J1825 19 19 19 46.2 199.3 0.9 16.0 -8 1 7 3657 16 39 49 16 40 19 --- 19 19 49 46.2 199.5 0.9 16.2 22 F 2 4056 16 40 19 G24.78_H2O 19 19 49 47.2 196.0 0.7 13.2 -8 1 7 4056 16 40 19 16 40 59 --- 19 20 29 47.2 196.2 0.7 13.4 32 F 2 4587 16 40 59 J1825 19 20 29 46.1 199.7 0.9 16.4 -8 1 7 4587 16 40 59 16 41 29 --- 19 20 59 46.1 199.9 0.9 16.5 22 F 2 4986 16 41 29 G24.78_H2O 19 20 59 47.2 196.4 0.7 13.6 -8 1 7 4986 16 41 29 16 42 08 --- 19 21 39 47.1 196.6 0.8 13.8 32 F 2 5518 16 42 08 J1825 19 21 39 46.0 200.1 0.9 16.7 -8 1 7 5518 16 42 08 16 42 38 --- 19 22 09 46.0 200.3 0.9 16.8 22 F 2 5917 16 42 38 G24.78_H2O 19 22 09 47.1 196.8 0.8 13.9 -8 1 7 5917 16 42 38 16 43 18 --- 19 22 49 47.1 197.0 0.8 14.1 32 F 2 6449 16 43 18 J1825 19 22 49 46.0 200.5 0.9 17.0 -8 1 7 6449 16 43 18 16 43 48 --- 19 23 19 45.9 200.7 1.0 17.1 22 F 2 6848 16 43 48 G24.78_H2O 19 23 19 47.0 197.2 0.8 14.3 -8 1 7 6848 16 43 48 16 44 28 --- 19 23 59 47.0 197.4 0.8 14.5 32 F 2 7380 16 44 28 J1825 19 23 59 45.9 200.9 1.0 17.3 -8 1 7 7380 16 44 28 16 44 58 --- 19 24 29 45.8 201.1 1.0 17.5 22 F 2 7779 16 44 58 G24.78_H2O 19 24 29 47.0 197.6 0.8 14.6 -8 1 7 7779 16 44 58 16 45 38 --- 19 25 09 46.9 197.9 0.8 14.8 32 F 2 8311 16 45 38 J1825 19 25 09 45.8 201.3 1.0 17.7 -8 1 7 8311 16 45 38 16 46 08 --- 19 25 39 45.7 201.5 1.0 17.8 22 F 2 8709 16 46 08 G24.78_H2O 19 25 39 46.9 198.0 0.8 14.9 -8 1 7 8709 16 46 08 16 46 48 --- 19 26 19 46.8 198.3 0.8 15.1 32 F 2 9241 16 46 48 J1825 19 26 19 45.7 201.7 1.0 18.0 -8 1 7 9241 16 46 48 16 47 18 --- 19 26 49 45.7 201.9 1.0 18.1 22 F 2 9640 16 47 18 G24.78_H2O 19 26 49 46.8 198.4 0.8 15.3 -8 1 7 9640 16 47 18 16 47 57 --- 19 27 29 46.8 198.7 0.9 15.5 32 F 2 10172 Schedule for VLBA_PT (Code Pt ) Page 39 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 16 47 57 J1825 19 27 29 45.6 202.1 1.0 18.3 -8 1 7 10172 16 47 57 16 48 27 --- 19 27 59 45.6 202.3 1.0 18.4 22 F 2 10571 16 48 27 G24.78_H2O 19 27 59 46.7 198.8 0.9 15.6 -8 1 7 10571 16 48 27 16 49 07 --- 19 28 39 46.7 199.1 0.9 15.8 32 F 2 11103 16 49 07 J1825 19 28 39 45.5 202.5 1.0 18.6 -8 1 7 11103 16 49 07 16 49 37 --- 19 29 09 45.5 202.7 1.1 18.7 22 F 2 11502 16 49 37 G24.78_H2O 19 29 09 46.7 199.3 0.9 15.9 -8 1 7 11502 16 49 37 16 50 17 --- 19 29 49 46.6 199.5 0.9 16.1 32 F 2 12034 16 50 17 J1825 19 29 49 45.4 202.9 1.1 18.9 -8 1 7 12034 16 50 17 16 50 47 --- 19 30 19 45.4 203.1 1.1 19.1 22 F 2 12433 16 50 47 G24.78_H2O 19 30 19 46.6 199.7 0.9 16.3 -8 1 7 12433 16 50 47 16 51 27 --- 19 30 59 46.5 199.9 0.9 16.5 31 F 2 12964 16 51 27 J1825 19 30 59 45.3 203.3 1.1 19.2 -8 1 7 12964 16 51 27 16 51 57 --- 19 31 29 45.3 203.5 1.1 19.4 22 F 2 13363 16 51 57 G24.78_H2O 19 31 29 46.5 200.1 0.9 16.6 -8 1 7 13363 16 51 57 16 52 37 --- 19 32 09 46.5 200.3 0.9 16.8 31 F 2 13895 16 52 37 J1825 19 32 09 45.2 203.7 1.1 19.6 -8 1 7 13895 16 52 37 16 53 07 --- 19 32 39 45.2 203.8 1.1 19.7 21 F 2 14294 16 53 07 G24.78_H2O 19 32 39 46.4 200.5 0.9 16.9 -8 1 7 14294 16 53 07 16 53 46 --- 19 33 19 46.4 200.7 0.9 17.1 31 F 2 14826 16 53 46 J1825 19 33 19 45.1 204.1 1.1 19.9 -8 1 7 14826 16 53 46 16 54 16 --- 19 33 49 45.1 204.2 1.1 20.0 21 F 2 15225 16 54 16 G24.78_H2O 19 33 49 46.3 200.9 1.0 17.2 -8 1 7 15225 16 54 16 16 54 56 --- 19 34 29 46.3 201.1 1.0 17.4 31 F 2 15757 16 54 56 J1825 19 34 29 45.0 204.4 1.1 20.2 -8 1 7 15757 16 54 56 16 55 26 --- 19 34 59 45.0 204.6 1.2 20.3 21 F 2 16156 16 55 26 G24.78_H2O 19 34 59 46.2 201.3 1.0 17.6 -9 1 7 16156 16 55 26 16 56 06 --- 19 35 39 46.2 201.5 1.0 17.8 31 F 2 16688 Schedule for VLBA_PT (Code Pt ) Page 40 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 16 56 06 J1825 19 35 39 44.9 204.8 1.2 20.5 -9 1 7 16688 16 56 06 16 56 36 --- 19 36 09 44.9 205.0 1.2 20.6 21 F 2 17087 16 56 36 G24.78_H2O 19 36 09 46.2 201.7 1.0 17.9 -9 1 7 17087 16 56 36 16 57 16 --- 19 36 49 46.1 201.9 1.0 18.1 31 F 2 17618 16 57 16 J1825 19 36 49 44.8 205.2 1.2 20.8 -9 1 8 17618 16 57 16 16 57 46 --- 19 37 19 44.8 205.4 1.2 20.9 21 R 2 17220 16 57 46 G24.78_H2O 19 37 19 46.1 202.1 1.0 18.2 -9 1 8 17220 16 57 46 16 58 26 --- 19 37 59 46.0 202.3 1.0 18.4 31 R 2 16688 16 58 26 J1825 19 37 59 44.7 205.6 1.2 21.1 -9 1 8 16688 16 58 26 16 58 56 --- 19 38 29 44.7 205.8 1.2 21.2 21 R 2 16289 16 58 56 G24.78_H2O 19 38 29 46.0 202.5 1.0 18.5 -9 1 8 16289 16 58 56 16 59 36 --- 19 39 09 45.9 202.7 1.0 18.7 31 R 2 15757 16 59 36 J1825 19 39 09 44.6 206.0 1.2 21.4 -9 1 8 15757 16 59 36 17 00 05 --- 19 39 39 44.6 206.1 1.2 21.5 21 R 2 15358 17 00 05 G24.78_H2O 19 39 39 45.9 202.8 1.1 18.9 -9 1 8 15358 17 00 05 17 00 45 --- 19 40 19 45.8 203.1 1.1 19.0 31 R 2 14826 17 00 45 J1825 19 40 19 44.5 206.4 1.2 21.7 -9 1 8 14826 17 00 45 17 01 15 --- 19 40 49 44.5 206.5 1.2 21.8 21 R 2 14427 17 01 15 G24.78_H2O 19 40 49 45.8 203.2 1.1 19.2 -9 1 8 14427 17 01 15 17 01 55 --- 19 41 29 45.7 203.5 1.1 19.4 31 R 2 13895 17 01 55 J1825 19 41 29 44.4 206.7 1.3 22.0 -9 1 8 13895 17 01 55 17 02 25 --- 19 41 59 44.4 206.9 1.3 22.1 21 R 2 13496 17 02 25 G24.78_H2O 19 41 59 45.7 203.6 1.1 19.5 -9 1 8 13496 17 02 25 17 03 05 --- 19 42 39 45.6 203.9 1.1 19.7 31 R 2 12965 17 03 05 J1825 19 42 39 44.3 207.1 1.3 22.3 -9 1 8 12965 17 03 05 17 03 35 --- 19 43 09 44.3 207.3 1.3 22.4 21 R 2 12566 17 03 35 G24.78_H2O 19 43 09 45.6 204.0 1.1 19.8 -9 1 8 12566 17 03 35 17 04 15 --- 19 43 49 45.5 204.2 1.1 20.0 31 R 2 12034 Schedule for VLBA_PT (Code Pt ) Page 41 H2O maser monitoring in G24.78+0.08 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 18 Feb 2004 Day 49 --- 17 04 15 J1825 19 43 49 44.2 207.5 1.3 22.6 -9 1 8 12034 17 04 15 17 04 45 --- 19 44 19 44.1 207.6 1.3 22.7 21 R 2 11635 17 04 45 G24.78_H2O 19 44 19 45.5 204.4 1.1 20.1 -9 1 8 11635 17 04 45 17 05 25 --- 19 44 59 45.4 204.6 1.1 20.3 31 R 2 11103 17 05 25 J1825 19 44 59 44.1 207.8 1.3 22.9 -9 1 8 11103 17 05 25 17 05 54 --- 19 45 29 44.0 208.0 1.3 23.0 21 R 2 10704 17 05 54 G24.78_H2O 19 45 29 45.4 204.8 1.2 20.4 -9 1 8 10704 17 05 54 17 06 34 --- 19 46 09 45.3 205.0 1.2 20.6 31 R 2 10172 17 06 34 J1825 19 46 09 44.0 208.2 1.3 23.2 -9 1 8 10172 17 06 34 17 07 04 --- 19 46 39 43.9 208.4 1.3 23.3 21 R 2 9773 17 07 04 G24.78_H2O 19 46 39 45.3 205.2 1.2 20.7 -9 1 8 9773 17 07 04 17 07 44 --- 19 47 19 45.2 205.4 1.2 20.9 31 R 2 9241 17 07 44 J1825 19 47 19 43.9 208.6 1.4 23.5 -9 1 8 9241 17 07 44 17 08 14 --- 19 47 49 43.8 208.7 1.4 23.6 21 R 2 8842 17 08 14 G24.78_H2O 19 47 49 45.2 205.6 1.2 21.1 -9 1 8 8842 17 08 14 17 08 54 --- 19 48 29 45.1 205.8 1.2 21.2 31 R 2 8311 17 08 54 J1825 19 48 29 43.7 209.0 1.4 23.8 -9 1 8 8311 17 08 54 17 09 24 --- 19 48 59 43.7 209.1 1.4 23.9 21 R 2 7912 17 09 24 G24.78_H2O 19 48 59 45.1 205.9 1.2 21.4 -9 1 8 7912 17 09 24 17 10 04 --- 19 49 39 45.0 206.2 1.2 21.5 31 R 2 7380 17 10 04 J1825 19 49 39 43.6 209.3 1.4 24.1 -9 1 8 7380 17 10 04 17 10 34 --- 19 50 09 43.6 209.5 1.4 24.2 21 R 2 6981 17 10 34 G24.78_H2O 19 50 09 45.0 206.3 1.2 21.7 -9 1 8 6981 17 10 34 17 11 14 --- 19 50 49 44.9 206