COVER INFORMATION Station: VLBA_NL (Code Nl ) Experiment: Parallaxes to Water Masers Exp. Code: BM272IB Schedule Version: 2.00 Processed by SCHED version: 6.05 June 2006 PI: Karl M. Menten Address: MPIfR Auf dem Huegel 69 53121 Bonn Germany Phone: +49 228 525 377 EMAIL: kmenten@mpifr-bonn.mpg.de Fax: +49 228 525 229 Phone during observation: +49 228 525 377 Observing mode: VLBA 256-8-2 1.3cm Notes: Schedule for VLBA_NL (Code Nl ) Page 2 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- Next scan frequencies: 22020.49 22045.49 22107.99 22207.99 22370.49 22420.49 22457.99 22470.49 Next BBC frequencies: 520.49 545.49 607.99 707.99 870.49 920.49 957.99 970.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 19 29 39 0753+535 16 06 11 17.3 -31.2 8.2 40.9 0 1 1 0 19 29 39 19 30 39 --- 16 07 11 17.2 -31.0 8.2 40.7 60 F 1 2 19 29 57 19 30 52 0808+495 16 07 23 15.8 -35.7 8.0 42.4 3 1 1 2 19 30 39 19 31 51 --- 16 08 23 15.7 -35.6 8.0 42.2 60 F 1 4 19 30 39 19 32 11 0808+405 16 08 43 8.9 -41.6 8.0 40.9 0 1 1 4 19 31 51 19 33 11 --- 16 09 43 8.8 -41.5 8.0 40.8 60 F 1 7 19 31 51 19 33 46 0927+390 16 10 19 18.2 -53.5 6.7 50.5 11 1 1 7 19 33 46 19 34 46 --- 16 11 19 18.0 -53.4 6.7 50.4 60 F 1 9 19 34 04 19 35 51 1048+714 16 12 23 42.0 -24.7 5.4 82.5 10 1 1 9 19 35 51 19 36 50 --- 16 13 23 42.0 -24.7 5.4 82.3 60 F 1 11 19 36 09 19 42 46 1153+805 16 19 20 44.8 -11.8 4.4 105.5 341 1 1 11 19 42 46 19 43 46 --- 16 20 20 44.8 -11.8 4.4 105.2 60 F 1 13 19 43 04 19 45 16 1310+322 16 21 50 51.2 -88.2 3.2 61.9 33 1 1 13 19 45 16 19 46 16 --- 16 22 50 51.1 -88.0 3.2 61.9 60 F 1 15 19 45 34 19 47 45 1357+764 16 24 20 51.8 -12.8 2.4 134.0 33 1 1 15 19 47 45 19 48 45 --- 16 25 20 51.8 -12.9 2.5 133.7 60 F 1 16 19 48 03 19 51 47 1557-000 16 28 22 47.6 191.2 0.5 8.3 40 1 1 16 19 51 47 19 52 47 --- 16 29 22 47.6 191.6 0.5 8.6 60 F 1 18 19 52 05 19 54 14 1640+394 16 30 50 87.3 136.1 -0.2 -42.3 2 1 1 18 19 54 14 19 55 14 --- 16 31 50 87.4 139.2 -0.1 -39.3 60 F 1 20 19 54 32 19 56 52 1743-035 16 33 28 41.6 156.0 -1.2 -17.7 0 1 1 20 19 56 52 19 57 52 --- 16 34 28 41.7 156.3 -1.2 -17.5 60 F 1 22 19 57 10 19 58 25 1751+093 16 35 01 53.7 146.8 -1.3 -24.5 3 1 1 22 19 58 25 19 59 24 --- 16 36 01 53.8 147.1 -1.3 -24.2 60 F 1 24 19 58 43 Schedule for VLBA_NL (Code Nl ) Page 3 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 01 30 1800+782 16 38 07 52.4 6.6 -1.4 -154.6 26 1 1 24 20 01 30 20 02 30 --- 16 39 07 52.4 6.5 -1.4 -154.9 60 F 1 26 20 01 48 20 03 17 0019+732 16 39 54 33.3 17.9 -7.7 -53.9 3 1 1 26 20 03 17 20 04 17 --- 16 40 54 33.4 18.0 -7.7 -54.1 60 F 1 28 20 03 35 20 04 54 0102+582 16 41 31 20.0 27.0 -8.4 -40.3 4 1 1 28 20 04 54 20 05 54 --- 16 42 31 20.0 27.1 -8.3 -40.5 60 F 1 30 20 05 12 20 06 27 0217+734 16 43 04 28.2 10.7 -9.6 -30.0 10 1 1 30 20 06 27 20 07 26 --- 16 44 04 28.2 10.8 -9.6 -30.2 60 F 1 32 20 06 45 20 10 28 1310+322 16 47 06 46.5 -84.3 3.6 61.4 112 1 1 32 20 10 28 20 11 28 --- 16 48 06 46.4 -84.2 3.6 61.4 60 F 1 34 20 10 46 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 20 14 56 3C345G 16 51 34 87.5 219.4 0.1 38.0 0 1 1 34 20 14 56 20 16 55 --- 16 53 34 87.2 225.6 0.2 43.9 120 F 1 38 20 15 14 Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 20 17 00 3C345O 16 53 40 87.2 225.9 0.2 44.2 0 1 1 38 20 16 55 20 19 00 --- 16 55 40 86.9 231.0 0.2 49.0 120 F 1 42 20 17 28 20 20 53 ON1 16 57 33 50.5 88.9 -3.2 -61.0 12 1 1 42 20 20 53 20 21 23 --- 16 58 03 50.6 89.0 -3.2 -61.1 30 F 1 43 20 21 11 20 21 23 J2003+3034 16 58 03 51.4 91.4 -3.1 -60.0 -8 1 1 43 20 21 23 20 21 52 --- 16 58 33 51.5 91.5 -3.1 -60.0 22 F 1 44 20 21 23 20 21 52 ON1 16 58 33 50.7 89.1 -3.2 -61.1 -8 1 1 44 20 21 52 20 22 22 --- 16 59 03 50.8 89.2 -3.2 -61.1 22 F 1 45 20 21 52 20 22 22 20092+30494 16 59 03 50.6 90.3 -3.2 -60.3 -6 1 1 45 20 22 22 20 22 52 --- 16 59 33 50.7 90.3 -3.2 -60.3 23 F 1 46 20 22 22 Schedule for VLBA_NL (Code Nl ) Page 4 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 22 52 ON1 16 59 33 50.9 89.2 -3.2 -61.1 -6 1 1 46 20 22 52 20 23 22 --- 17 00 03 51.0 89.3 -3.2 -61.1 23 F 1 47 20 22 52 20 23 22 20134+31264 17 00 03 50.3 88.9 -3.2 -61.0 -7 1 1 47 20 23 22 20 23 52 --- 17 00 33 50.4 89.0 -3.2 -61.0 23 F 1 48 20 23 22 20 23 52 ON1 17 00 33 51.1 89.4 -3.2 -61.1 -7 1 1 48 20 23 52 20 24 22 --- 17 01 03 51.2 89.5 -3.2 -61.1 23 F 1 48 20 23 52 20 24 22 J2003+3034 17 01 03 52.0 91.9 -3.0 -60.0 -8 1 1 48 20 24 22 20 24 52 --- 17 01 33 52.0 92.0 -3.0 -60.0 22 F 1 49 20 24 22 20 24 52 ON1 17 01 33 51.3 89.6 -3.1 -61.1 -8 1 1 49 20 24 52 20 25 22 --- 17 02 03 51.4 89.6 -3.1 -61.1 22 F 1 50 20 24 52 20 25 22 20092+30494 17 02 03 51.2 90.8 -3.1 -60.3 -6 1 1 50 20 25 22 20 25 52 --- 17 02 33 51.3 90.9 -3.1 -60.3 23 F 1 51 20 25 22 20 25 52 ON1 17 02 33 51.5 89.7 -3.1 -61.1 -6 1 1 51 20 25 52 20 26 22 --- 17 03 03 51.6 89.8 -3.1 -61.1 23 F 1 52 20 25 52 20 26 22 20134+31264 17 03 03 50.9 89.4 -3.2 -61.0 -7 1 1 52 20 26 22 20 26 52 --- 17 03 33 51.0 89.5 -3.2 -61.0 23 F 1 53 20 26 22 20 26 52 ON1 17 03 33 51.6 89.9 -3.1 -61.1 -7 1 1 53 20 26 52 20 27 22 --- 17 04 03 51.7 90.0 -3.1 -61.1 23 F 1 54 20 26 52 20 27 22 J2003+3034 17 04 03 52.5 92.5 -3.0 -60.0 -8 1 1 54 20 27 22 20 27 51 --- 17 04 33 52.6 92.6 -3.0 -60.0 22 F 1 55 20 27 22 20 27 51 ON1 17 04 33 51.8 90.1 -3.1 -61.1 -8 1 1 55 20 27 51 20 28 21 --- 17 05 03 51.9 90.1 -3.1 -61.1 22 F 1 56 20 27 51 20 28 21 20092+30494 17 05 03 51.7 91.3 -3.1 -60.3 -6 1 1 56 20 28 21 20 28 51 --- 17 05 33 51.8 91.4 -3.1 -60.3 23 F 1 57 20 28 21 20 28 51 ON1 17 05 33 52.0 90.2 -3.1 -61.1 -6 1 1 57 20 28 51 20 29 21 --- 17 06 03 52.1 90.3 -3.1 -61.1 23 F 1 58 20 28 51 20 29 21 20134+31264 17 06 03 51.5 89.9 -3.1 -61.0 -7 1 1 58 20 29 21 20 29 51 --- 17 06 33 51.6 90.0 -3.1 -61.0 23 F 1 59 20 29 21 20 29 51 ON1 17 06 33 52.2 90.4 -3.1 -61.1 -7 1 1 59 20 29 51 20 30 21 --- 17 07 03 52.3 90.5 -3.1 -61.1 23 F 1 60 20 29 51 Schedule for VLBA_NL (Code Nl ) Page 5 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 30 21 J2003+3034 17 07 03 53.1 93.0 -2.9 -59.9 -8 1 1 60 20 30 21 20 30 51 --- 17 07 33 53.2 93.1 -2.9 -59.9 22 F 1 61 20 30 21 20 30 51 ON1 17 07 33 52.4 90.6 -3.0 -61.1 -8 1 1 61 20 30 51 20 31 21 --- 17 08 03 52.5 90.6 -3.0 -61.1 22 F 1 62 20 30 51 20 31 21 20092+30494 17 08 03 52.3 91.8 -3.0 -60.3 -6 1 1 62 20 31 21 20 31 51 --- 17 08 33 52.4 91.9 -3.0 -60.3 23 F 1 63 20 31 21 20 31 51 ON1 17 08 33 52.6 90.7 -3.0 -61.1 -6 1 1 63 20 31 51 20 32 21 --- 17 09 03 52.7 90.8 -3.0 -61.1 23 F 1 64 20 31 51 20 32 21 20134+31264 17 09 03 52.0 90.4 -3.1 -61.0 -7 1 1 64 20 32 21 20 32 51 --- 17 09 33 52.1 90.5 -3.1 -61.0 23 F 1 65 20 32 21 20 32 51 ON1 17 09 33 52.8 90.9 -3.0 -61.1 -7 1 1 65 20 32 51 20 33 21 --- 17 10 03 52.9 91.0 -3.0 -61.1 23 F 1 66 20 32 51 20 33 21 J2003+3034 17 10 03 53.6 93.5 -2.9 -59.9 -8 1 1 66 20 33 21 20 33 50 --- 17 10 33 53.7 93.6 -2.9 -59.9 22 F 1 67 20 33 21 20 33 50 ON1 17 10 33 53.0 91.1 -3.0 -61.1 -8 1 1 67 20 33 50 20 34 20 --- 17 11 03 53.0 91.2 -3.0 -61.0 22 F 1 68 20 33 50 20 34 20 20092+30494 17 11 03 52.9 92.3 -3.0 -60.2 -6 1 1 68 20 34 20 20 34 50 --- 17 11 33 53.0 92.4 -3.0 -60.2 23 F 1 69 20 34 20 20 34 50 ON1 17 11 33 53.1 91.2 -3.0 -61.0 -6 1 1 69 20 34 50 20 35 20 --- 17 12 03 53.2 91.3 -3.0 -61.0 23 F 1 70 20 34 50 20 35 20 20134+31264 17 12 03 52.6 90.9 -3.0 -61.0 -7 1 1 70 20 35 20 20 35 50 --- 17 12 33 52.7 91.0 -3.0 -61.0 23 F 1 71 20 35 20 20 35 50 ON1 17 12 33 53.3 91.4 -3.0 -61.0 -7 1 1 71 20 35 50 20 36 20 --- 17 13 03 53.4 91.5 -3.0 -61.0 23 F 1 72 20 35 50 20 36 20 J2003+3034 17 13 03 54.2 94.1 -2.8 -59.8 -8 1 1 72 20 36 20 20 36 50 --- 17 13 33 54.3 94.2 -2.8 -59.8 22 F 1 73 20 36 20 20 36 50 ON1 17 13 33 53.5 91.6 -2.9 -61.0 -8 1 1 73 20 36 50 20 37 20 --- 17 14 03 53.6 91.7 -2.9 -61.0 22 F 1 74 20 36 50 20 37 20 20092+30494 17 14 03 53.4 92.9 -2.9 -60.2 -7 1 1 74 20 37 20 20 37 50 --- 17 14 33 53.5 92.9 -2.9 -60.2 23 F 1 75 20 37 20 Schedule for VLBA_NL (Code Nl ) Page 6 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 37 50 ON1 17 14 33 53.7 91.8 -2.9 -61.0 -7 1 1 75 20 37 50 20 38 20 --- 17 15 03 53.8 91.9 -2.9 -61.0 23 F 1 75 20 37 50 20 38 20 20134+31264 17 15 03 53.1 91.4 -3.0 -60.9 -7 1 1 75 20 38 20 20 38 50 --- 17 15 33 53.2 91.5 -3.0 -60.9 23 F 1 76 20 38 20 20 38 50 ON1 17 15 33 53.9 91.9 -2.9 -61.0 -7 1 1 76 20 38 50 20 39 20 --- 17 16 03 54.0 92.0 -2.9 -61.0 23 F 1 77 20 38 50 20 39 20 J2003+3034 17 16 03 54.7 94.7 -2.8 -59.7 -8 1 1 77 20 39 20 20 39 49 --- 17 16 33 54.8 94.7 -2.8 -59.7 22 F 1 78 20 39 20 20 39 49 ON1 17 16 33 54.1 92.1 -2.9 -61.0 -8 1 1 78 20 39 49 20 40 19 --- 17 17 03 54.2 92.2 -2.9 -61.0 22 F 1 79 20 39 49 20 40 19 20092+30494 17 17 03 54.0 93.4 -2.9 -60.1 -7 1 1 79 20 40 19 20 40 49 --- 17 17 33 54.1 93.5 -2.9 -60.1 23 F 1 80 20 40 19 20 40 49 ON1 17 17 33 54.3 92.3 -2.9 -61.0 -7 1 1 80 20 40 49 20 41 19 --- 17 18 03 54.4 92.4 -2.9 -61.0 23 F 1 81 20 40 49 20 41 19 20134+31264 17 18 03 53.7 91.9 -2.9 -60.9 -7 1 1 81 20 41 19 20 41 49 --- 17 18 33 53.8 92.0 -2.9 -60.9 23 F 1 82 20 41 19 20 41 49 ON1 17 18 33 54.4 92.5 -2.9 -61.0 -7 1 1 82 20 41 49 20 42 19 --- 17 19 03 54.5 92.6 -2.9 -61.0 23 F 1 83 20 41 49 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 20 42 37 G75.76 17 19 20 55.0 81.6 -3.0 -68.3 4 1 1 83 20 42 19 20 43 07 --- 17 19 50 55.1 81.7 -3.0 -68.4 30 F 1 85 20 42 52 20 43 07 J2015+3710 17 19 50 56.1 82.9 -2.9 -68.3 -8 1 1 85 20 43 07 20 43 37 --- 17 20 20 56.2 82.9 -2.9 -68.3 22 F 1 86 20 43 07 20 43 37 G75.76 17 20 20 55.2 81.7 -3.0 -68.4 -8 1 1 86 20 43 37 20 44 06 --- 17 20 50 55.3 81.8 -3.0 -68.4 22 F 1 87 20 43 37 20 44 06 J2018+3812 17 20 50 56.1 80.9 -3.0 -69.6 -8 1 1 87 20 44 06 20 44 36 --- 17 21 20 56.2 80.9 -3.0 -69.7 22 F 1 88 20 44 06 Schedule for VLBA_NL (Code Nl ) Page 7 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 44 36 G75.76 17 21 20 55.3 81.8 -3.0 -68.4 -8 1 1 88 20 44 36 20 45 06 --- 17 21 50 55.4 81.9 -3.0 -68.5 22 F 1 89 20 44 36 20 45 06 J2015+3710 17 21 50 56.5 83.1 -2.9 -68.4 -8 1 1 89 20 45 06 20 45 36 --- 17 22 20 56.6 83.2 -2.9 -68.4 22 F 1 90 20 45 06 20 45 36 G75.76 17 22 20 55.5 82.0 -3.0 -68.5 -8 1 1 90 20 45 36 20 46 06 --- 17 22 50 55.6 82.0 -3.0 -68.5 22 F 1 91 20 45 36 20 46 06 J2018+3812 17 22 50 56.5 81.1 -2.9 -69.7 -8 1 1 91 20 46 06 20 46 36 --- 17 23 20 56.5 81.2 -2.9 -69.8 22 F 1 92 20 46 06 20 46 36 G75.76 17 23 20 55.7 82.1 -3.0 -68.5 -8 1 1 92 20 46 36 20 47 06 --- 17 23 50 55.8 82.2 -3.0 -68.6 22 F 1 92 20 46 36 20 47 06 J2015+3710 17 23 50 56.9 83.4 -2.9 -68.5 -8 1 1 92 20 47 06 20 47 36 --- 17 24 20 57.0 83.5 -2.9 -68.5 22 F 1 93 20 47 06 20 47 36 G75.76 17 24 20 55.9 82.2 -3.0 -68.6 -8 1 1 93 20 47 36 20 48 06 --- 17 24 50 56.0 82.3 -3.0 -68.6 22 F 1 94 20 47 36 20 48 06 J2018+3812 17 24 50 56.8 81.3 -2.9 -69.8 -8 1 1 94 20 48 06 20 48 36 --- 17 25 20 56.9 81.4 -2.9 -69.9 22 F 1 95 20 48 06 20 48 36 G75.76 17 25 20 56.1 82.4 -2.9 -68.6 -8 1 1 95 20 48 36 20 49 06 --- 17 25 50 56.2 82.4 -2.9 -68.6 22 F 1 96 20 48 36 20 49 06 J2015+3710 17 25 50 57.2 83.7 -2.8 -68.5 -8 1 1 96 20 49 06 20 49 36 --- 17 26 20 57.3 83.7 -2.8 -68.6 22 F 1 97 20 49 06 20 49 36 G75.76 17 26 20 56.3 82.5 -2.9 -68.7 -8 1 1 97 20 49 36 20 50 05 --- 17 26 50 56.4 82.6 -2.9 -68.7 22 F 1 98 20 49 36 20 50 05 J2018+3812 17 26 50 57.2 81.6 -2.9 -69.9 -8 1 1 98 20 50 05 20 50 35 --- 17 27 20 57.3 81.7 -2.9 -70.0 22 F 1 99 20 50 05 20 50 35 G75.76 17 27 20 56.5 82.6 -2.9 -68.7 -8 1 1 99 20 50 35 20 51 05 --- 17 27 50 56.5 82.7 -2.9 -68.7 22 F 1 100 20 50 35 20 51 05 J2015+3710 17 27 50 57.6 83.9 -2.8 -68.6 -8 1 1 100 20 51 05 20 51 35 --- 17 28 20 57.7 84.0 -2.8 -68.6 22 F 1 101 20 51 05 20 51 35 G75.76 17 28 20 56.6 82.7 -2.9 -68.8 -8 1 1 101 20 51 35 20 52 05 --- 17 28 50 56.7 82.8 -2.9 -68.8 22 F 1 102 20 51 35 Schedule for VLBA_NL (Code Nl ) Page 8 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 52 05 J2018+3812 17 28 50 57.6 81.8 -2.8 -70.0 -8 1 1 102 20 52 05 20 52 35 --- 17 29 20 57.6 81.9 -2.8 -70.1 22 F 1 103 20 52 05 20 52 35 G75.76 17 29 20 56.8 82.9 -2.9 -68.8 -8 1 1 103 20 52 35 20 53 05 --- 17 29 50 56.9 82.9 -2.9 -68.8 22 F 1 104 20 52 35 20 53 05 J2015+3710 17 29 50 58.0 84.2 -2.8 -68.7 -8 1 1 104 20 53 05 20 53 35 --- 17 30 20 58.1 84.3 -2.8 -68.7 22 F 1 105 20 53 05 20 53 35 G75.76 17 30 20 57.0 83.0 -2.9 -68.8 -8 1 1 105 20 53 35 20 54 05 --- 17 30 50 57.1 83.1 -2.9 -68.9 22 F 1 106 20 53 35 20 54 05 J2018+3812 17 30 50 57.9 82.1 -2.8 -70.1 -8 1 1 106 20 54 05 20 54 35 --- 17 31 20 58.0 82.2 -2.8 -70.2 22 F 1 107 20 54 05 20 54 35 G75.76 17 31 20 57.2 83.1 -2.8 -68.9 -8 1 1 107 20 54 35 20 55 05 --- 17 31 50 57.3 83.2 -2.8 -68.9 22 F 1 108 20 54 35 20 55 05 J2015+3710 17 31 50 58.3 84.5 -2.7 -68.8 -8 1 1 108 20 55 05 20 55 35 --- 17 32 20 58.4 84.5 -2.7 -68.8 22 F 1 109 20 55 05 20 55 35 G75.76 17 32 20 57.4 83.3 -2.8 -68.9 -8 1 1 109 20 55 35 20 56 04 --- 17 32 50 57.5 83.3 -2.8 -68.9 22 F 1 110 20 55 35 20 56 04 J2018+3812 17 32 50 58.3 82.3 -2.8 -70.2 -8 1 1 110 20 56 04 20 56 34 --- 17 33 20 58.4 82.4 -2.8 -70.3 22 F 1 111 20 56 04 20 56 34 G75.76 17 33 20 57.6 83.4 -2.8 -69.0 -8 1 1 111 20 56 34 20 57 04 --- 17 33 50 57.7 83.5 -2.8 -69.0 22 F 1 112 20 56 34 20 57 04 J2015+3710 17 33 50 58.7 84.8 -2.7 -68.8 -8 1 1 112 20 57 04 20 57 34 --- 17 34 20 58.8 84.8 -2.7 -68.8 22 F 1 113 20 57 04 20 57 34 G75.76 17 34 20 57.7 83.5 -2.8 -69.0 -8 1 1 113 20 57 34 20 58 04 --- 17 34 50 57.8 83.6 -2.8 -69.0 22 F 1 114 20 57 34 20 58 04 J2018+3812 17 34 50 58.7 82.6 -2.7 -70.3 -8 1 1 114 20 58 04 20 58 34 --- 17 35 20 58.8 82.7 -2.7 -70.4 22 F 1 115 20 58 04 20 58 34 G75.76 17 35 20 57.9 83.7 -2.8 -69.0 -8 1 1 115 20 58 34 20 59 04 --- 17 35 50 58.0 83.7 -2.8 -69.1 22 F 1 116 20 58 34 20 59 04 J2015+3710 17 35 50 59.1 85.0 -2.7 -68.9 -8 1 1 116 20 59 04 20 59 34 --- 17 36 20 59.2 85.1 -2.7 -68.9 22 F 1 117 20 59 04 Schedule for VLBA_NL (Code Nl ) Page 9 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 59 34 G75.76 17 36 20 58.1 83.8 -2.8 -69.1 -8 1 1 117 20 59 34 21 00 04 --- 17 36 50 58.2 83.9 -2.8 -69.1 22 F 1 118 20 59 34 21 00 04 J2018+3812 17 36 50 59.0 82.9 -2.7 -70.4 -8 1 1 118 21 00 04 21 00 34 --- 17 37 20 59.1 82.9 -2.7 -70.4 22 F 1 119 21 00 04 21 00 34 G75.76 17 37 20 58.3 83.9 -2.7 -69.1 -8 1 1 119 21 00 34 21 01 04 --- 17 37 50 58.4 84.0 -2.7 -69.1 22 F 1 119 21 00 34 21 01 04 J2015+3710 17 37 50 59.5 85.3 -2.6 -69.0 -8 1 1 119 21 01 04 21 01 34 --- 17 38 20 59.6 85.4 -2.6 -69.0 22 F 1 120 21 01 04 21 01 34 G75.76 17 38 20 58.5 84.1 -2.7 -69.1 -8 1 1 120 21 01 34 21 02 03 --- 17 38 50 58.6 84.1 -2.7 -69.2 22 F 1 121 21 01 34 21 02 03 J2018+3812 17 38 50 59.4 83.1 -2.7 -70.5 -8 1 1 121 21 02 03 21 02 33 --- 17 39 20 59.5 83.2 -2.7 -70.5 22 F 1 122 21 02 03 21 02 33 G75.76 17 39 20 58.7 84.2 -2.7 -69.2 -8 1 1 122 21 02 33 21 03 03 --- 17 39 50 58.8 84.3 -2.7 -69.2 22 F 1 123 21 02 33 Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 21 03 23 ON1 17 40 10 58.5 96.5 -2.5 -60.4 6 1 1 123 21 03 03 21 03 53 --- 17 40 40 58.6 96.6 -2.5 -60.4 30 F 1 125 21 03 36 21 03 53 J2003+3034 17 40 40 59.3 99.6 -2.4 -58.7 -8 1 1 125 21 03 53 21 04 23 --- 17 41 10 59.4 99.7 -2.4 -58.6 22 F 1 126 21 03 53 21 04 23 ON1 17 41 10 58.6 96.8 -2.5 -60.4 -8 1 1 126 21 04 23 21 04 53 --- 17 41 40 58.7 96.9 -2.5 -60.3 22 F 1 127 21 04 23 21 04 53 20092+30494 17 41 40 58.5 98.2 -2.5 -59.3 -7 1 1 127 21 04 53 21 05 23 --- 17 42 10 58.6 98.3 -2.5 -59.3 23 F 1 128 21 04 53 21 05 23 ON1 17 42 10 58.8 97.0 -2.5 -60.3 -7 1 1 128 21 05 23 21 05 53 --- 17 42 40 58.9 97.1 -2.5 -60.3 23 F 1 129 21 05 23 21 05 53 20134+31264 17 42 40 58.3 96.5 -2.5 -60.3 -7 1 1 129 21 05 53 21 06 23 --- 17 43 10 58.4 96.6 -2.5 -60.3 23 F 1 130 21 05 53 Schedule for VLBA_NL (Code Nl ) Page 10 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 06 23 ON1 17 43 10 59.0 97.2 -2.5 -60.3 -7 1 1 130 21 06 23 21 06 53 --- 17 43 40 59.1 97.3 -2.4 -60.2 23 F 1 131 21 06 23 21 06 53 J2003+3034 17 43 40 59.9 100.3 -2.3 -58.5 -8 1 1 131 21 06 53 21 07 23 --- 17 44 10 59.9 100.4 -2.3 -58.5 22 F 1 132 21 06 53 21 07 23 ON1 17 44 10 59.2 97.4 -2.4 -60.2 -8 1 1 132 21 07 23 21 07 52 --- 17 44 40 59.3 97.5 -2.4 -60.2 22 F 1 133 21 07 23 21 07 52 20092+30494 17 44 40 59.1 98.8 -2.4 -59.1 -7 1 1 133 21 07 52 21 08 22 --- 17 45 10 59.2 98.9 -2.4 -59.1 23 F 1 134 21 07 52 21 08 22 ON1 17 45 10 59.4 97.6 -2.4 -60.2 -7 1 1 134 21 08 22 21 08 52 --- 17 45 40 59.5 97.7 -2.4 -60.2 23 F 1 135 21 08 22 21 08 52 20134+31264 17 45 40 58.8 97.1 -2.5 -60.2 -7 1 1 135 21 08 52 21 09 22 --- 17 46 10 58.9 97.2 -2.5 -60.2 23 F 1 136 21 08 52 21 09 22 ON1 17 46 10 59.6 97.8 -2.4 -60.1 -7 1 1 136 21 09 22 21 09 52 --- 17 46 40 59.7 97.9 -2.4 -60.1 23 F 1 137 21 09 22 21 09 52 J2003+3034 17 46 40 60.4 101.0 -2.3 -58.3 -8 1 1 137 21 09 52 21 10 22 --- 17 47 10 60.5 101.1 -2.3 -58.2 22 F 1 138 21 09 52 21 10 22 ON1 17 47 10 59.8 98.0 -2.4 -60.1 -8 1 1 138 21 10 22 21 10 52 --- 17 47 40 59.9 98.1 -2.4 -60.1 22 F 1 138 21 10 22 21 10 52 20092+30494 17 47 40 59.7 99.5 -2.4 -59.0 -7 1 1 138 21 10 52 21 11 22 --- 17 48 10 59.7 99.6 -2.4 -58.9 23 F 1 139 21 10 52 21 11 22 ON1 17 48 10 59.9 98.2 -2.4 -60.0 -7 1 1 139 21 11 22 21 11 52 --- 17 48 40 60.0 98.3 -2.4 -60.0 23 F 1 140 21 11 22 21 11 52 20134+31264 17 48 40 59.4 97.8 -2.4 -60.0 -7 1 1 140 21 11 52 21 12 22 --- 17 49 10 59.5 97.9 -2.4 -60.0 23 F 1 141 21 11 52 21 12 22 ON1 17 49 10 60.1 98.4 -2.4 -60.0 -7 1 1 141 21 12 22 21 12 52 --- 17 49 40 60.2 98.5 -2.3 -59.9 23 F 1 142 21 12 22 21 12 52 J2003+3034 17 49 40 60.9 101.7 -2.2 -58.1 -8 1 1 142 21 12 52 21 13 22 --- 17 50 10 61.0 101.8 -2.2 -58.0 22 F 1 143 21 12 52 21 13 22 ON1 17 50 10 60.3 98.6 -2.3 -59.9 -8 1 1 143 21 13 22 21 13 51 --- 17 50 40 60.4 98.7 -2.3 -59.9 22 F 1 144 21 13 22 Schedule for VLBA_NL (Code Nl ) Page 11 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 13 51 20092+30494 17 50 40 60.2 100.1 -2.3 -58.8 -7 1 1 144 21 13 51 21 14 21 --- 17 51 10 60.3 100.3 -2.3 -58.7 23 F 1 145 21 13 51 21 14 21 ON1 17 51 10 60.5 98.8 -2.3 -59.9 -7 1 1 145 21 14 21 21 14 51 --- 17 51 40 60.6 99.0 -2.3 -59.8 23 F 1 146 21 14 21 21 14 51 20134+31264 17 51 40 59.9 98.4 -2.4 -59.9 -7 1 1 146 21 14 51 21 15 21 --- 17 52 10 60.0 98.5 -2.4 -59.9 23 F 1 147 21 14 51 21 15 21 ON1 17 52 10 60.7 99.1 -2.3 -59.8 -7 1 1 147 21 15 21 21 15 51 --- 17 52 40 60.8 99.2 -2.3 -59.8 23 F 1 148 21 15 21 21 15 51 J2003+3034 17 52 40 61.5 102.4 -2.2 -57.8 -8 1 1 148 21 15 51 21 16 21 --- 17 53 10 61.6 102.5 -2.2 -57.8 22 F 1 149 21 15 51 21 16 21 ON1 17 53 10 60.9 99.3 -2.3 -59.7 -8 1 1 149 21 16 21 21 16 51 --- 17 53 40 61.0 99.4 -2.3 -59.7 22 F 1 150 21 16 21 21 16 51 20092+30494 17 53 40 60.8 100.8 -2.3 -58.6 -7 1 1 150 21 16 51 21 17 21 --- 17 54 10 60.8 100.9 -2.3 -58.5 23 F 1 151 21 16 51 21 17 21 ON1 17 54 10 61.0 99.5 -2.3 -59.7 -7 1 1 151 21 17 21 21 17 51 --- 17 54 40 61.1 99.6 -2.3 -59.6 23 F 1 152 21 17 21 21 17 51 20134+31264 17 54 40 60.5 99.0 -2.3 -59.7 -7 1 1 152 21 17 51 21 18 21 --- 17 55 10 60.6 99.2 -2.3 -59.7 23 F 1 153 21 17 51 21 18 21 ON1 17 55 10 61.2 99.7 -2.3 -59.6 -7 1 1 153 21 18 21 21 18 51 --- 17 55 40 61.3 99.8 -2.2 -59.6 23 F 1 154 21 18 21 21 18 51 J2003+3034 17 55 40 62.0 103.1 -2.1 -57.5 -8 1 1 154 21 18 51 21 19 21 --- 17 56 10 62.1 103.2 -2.1 -57.5 22 F 1 155 21 18 51 21 19 21 ON1 17 56 10 61.4 100.0 -2.2 -59.5 -8 1 1 155 21 19 21 21 19 51 --- 17 56 40 61.5 100.1 -2.2 -59.5 22 F 1 156 21 19 21 21 19 51 20092+30494 17 56 40 61.3 101.5 -2.2 -58.3 -7 1 1 156 21 19 51 21 20 20 --- 17 57 10 61.4 101.6 -2.2 -58.3 23 F 1 157 21 19 51 21 20 20 ON1 17 57 10 61.6 100.2 -2.2 -59.5 -7 1 1 157 21 20 20 21 20 50 --- 17 57 40 61.7 100.3 -2.2 -59.4 23 F 1 158 21 20 20 21 20 50 20134+31264 17 57 40 61.0 99.7 -2.3 -59.5 -7 1 1 158 21 20 50 21 21 20 --- 17 58 10 61.1 99.8 -2.3 -59.5 23 F 1 159 21 20 50 Schedule for VLBA_NL (Code Nl ) Page 12 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 21 20 ON1 17 58 10 61.8 100.4 -2.2 -59.4 -7 1 1 159 21 21 20 21 21 50 --- 17 58 40 61.9 100.5 -2.2 -59.4 23 F 1 160 21 21 20 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 21 22 12 G75.76 17 59 02 62.3 87.0 -2.4 -69.8 7 1 1 160 21 22 12 21 22 42 --- 17 59 32 62.4 87.1 -2.4 -69.8 30 F 1 161 21 22 30 21 22 42 J2015+3710 17 59 32 63.5 88.5 -2.3 -69.4 -8 1 1 161 21 22 42 21 23 12 --- 18 00 02 63.6 88.6 -2.3 -69.4 22 F 1 162 21 22 42 21 23 12 G75.76 18 00 02 62.5 87.1 -2.4 -69.8 -8 1 1 162 21 23 12 21 23 42 --- 18 00 32 62.6 87.2 -2.4 -69.8 22 F 1 163 21 23 12 21 23 42 J2018+3812 18 00 32 63.4 86.0 -2.3 -71.3 -8 1 1 163 21 23 42 21 24 12 --- 18 01 02 63.5 86.1 -2.3 -71.3 22 F 1 164 21 23 42 21 24 12 G75.76 18 01 02 62.7 87.3 -2.3 -69.8 -8 1 1 164 21 24 12 21 24 42 --- 18 01 32 62.8 87.4 -2.3 -69.8 22 F 1 165 21 24 12 21 24 42 J2015+3710 18 01 32 63.9 88.8 -2.2 -69.4 -8 1 1 165 21 24 42 21 25 12 --- 18 02 02 64.0 88.9 -2.2 -69.4 22 F 1 165 21 24 42 21 25 12 G75.76 18 02 02 62.9 87.4 -2.3 -69.8 -8 1 1 165 21 25 12 21 25 42 --- 18 02 32 63.0 87.5 -2.3 -69.8 22 F 1 166 21 25 12 21 25 42 J2018+3812 18 02 32 63.8 86.3 -2.3 -71.4 -8 1 1 166 21 25 42 21 26 12 --- 18 03 02 63.9 86.4 -2.3 -71.4 22 F 1 167 21 25 42 21 26 12 G75.76 18 03 02 63.1 87.6 -2.3 -69.8 -8 1 1 167 21 26 12 21 26 42 --- 18 03 32 63.2 87.7 -2.3 -69.8 22 F 1 168 21 26 12 21 26 42 J2015+3710 18 03 32 64.2 89.2 -2.2 -69.4 -8 1 1 168 21 26 42 21 27 11 --- 18 04 02 64.3 89.2 -2.2 -69.5 22 F 1 169 21 26 42 21 27 11 G75.76 18 04 02 63.3 87.7 -2.3 -69.9 -8 1 1 169 21 27 11 21 27 41 --- 18 04 32 63.4 87.8 -2.3 -69.9 22 F 1 170 21 27 11 21 27 41 J2018+3812 18 04 32 64.2 86.6 -2.2 -71.4 -8 1 1 170 21 27 41 21 28 11 --- 18 05 02 64.3 86.7 -2.2 -71.4 22 F 1 171 21 27 41 Schedule for VLBA_NL (Code Nl ) Page 13 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 28 11 G75.76 18 05 02 63.5 87.9 -2.3 -69.9 -8 1 1 171 21 28 11 21 28 41 --- 18 05 32 63.5 88.0 -2.3 -69.9 22 F 1 172 21 28 11 21 28 41 J2015+3710 18 05 32 64.6 89.5 -2.2 -69.5 -8 1 1 172 21 28 41 21 29 11 --- 18 06 02 64.7 89.6 -2.2 -69.5 22 F 1 173 21 28 41 21 29 11 G75.76 18 06 02 63.6 88.1 -2.3 -69.9 -8 1 1 173 21 29 11 21 29 41 --- 18 06 32 63.7 88.1 -2.3 -69.9 22 F 1 174 21 29 11 21 29 41 J2018+3812 18 06 32 64.5 86.9 -2.2 -71.5 -8 1 1 174 21 29 41 21 30 11 --- 18 07 02 64.6 87.0 -2.2 -71.5 22 F 1 175 21 29 41 21 30 11 G75.76 18 07 02 63.8 88.2 -2.2 -69.9 -8 1 1 175 21 30 11 21 30 41 --- 18 07 32 63.9 88.3 -2.2 -69.9 22 F 1 176 21 30 11 21 30 41 J2015+3710 18 07 32 65.0 89.8 -2.1 -69.5 -8 1 1 176 21 30 41 21 31 11 --- 18 08 02 65.1 89.9 -2.1 -69.5 22 F 1 177 21 30 41 21 31 11 G75.76 18 08 02 64.0 88.4 -2.2 -69.9 -8 1 1 177 21 31 11 21 31 41 --- 18 08 32 64.1 88.4 -2.2 -69.9 22 F 1 178 21 31 11 21 31 41 J2018+3812 18 08 32 64.9 87.2 -2.2 -71.5 -8 1 1 178 21 31 41 21 32 11 --- 18 09 02 65.0 87.2 -2.2 -71.5 22 F 1 179 21 31 41 21 32 11 G75.76 18 09 02 64.2 88.5 -2.2 -69.9 -8 1 1 179 21 32 11 21 32 41 --- 18 09 32 64.3 88.6 -2.2 -69.9 22 F 1 180 21 32 11 21 32 41 J2015+3710 18 09 32 65.4 90.1 -2.1 -69.5 -8 1 1 180 21 32 41 21 33 10 --- 18 10 02 65.5 90.2 -2.1 -69.5 22 F 1 181 21 32 41 21 33 10 G75.76 18 10 02 64.4 88.7 -2.2 -69.9 -8 1 1 181 21 33 10 21 33 40 --- 18 10 32 64.5 88.8 -2.2 -69.9 22 F 1 182 21 33 10 21 33 40 J2018+3812 18 10 32 65.3 87.5 -2.1 -71.6 -8 1 1 182 21 33 40 21 34 10 --- 18 11 02 65.4 87.5 -2.1 -71.6 22 F 1 183 21 33 40 21 34 10 G75.76 18 11 02 64.6 88.8 -2.2 -69.9 -8 1 1 183 21 34 10 21 34 40 --- 18 11 32 64.7 88.9 -2.2 -69.9 22 F 1 184 21 34 10 21 34 40 J2015+3710 18 11 32 65.7 90.5 -2.1 -69.5 -8 1 1 184 21 34 40 21 35 10 --- 18 12 02 65.8 90.6 -2.1 -69.5 22 F 1 185 21 34 40 21 35 10 G75.76 18 12 02 64.8 89.0 -2.2 -69.9 -8 1 1 185 21 35 10 21 35 40 --- 18 12 32 64.9 89.1 -2.2 -70.0 22 F 1 186 21 35 10 Schedule for VLBA_NL (Code Nl ) Page 14 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 35 40 J2018+3812 18 12 32 65.7 87.8 -2.1 -71.6 -8 1 1 186 21 35 40 21 36 10 --- 18 13 02 65.8 87.8 -2.1 -71.6 22 F 1 187 21 35 40 21 36 10 G75.76 18 13 02 64.9 89.2 -2.1 -70.0 -8 1 1 187 21 36 10 21 36 40 --- 18 13 32 65.0 89.2 -2.1 -70.0 22 F 1 188 21 36 10 21 36 40 J2015+3710 18 13 32 66.1 90.8 -2.0 -69.4 -8 1 1 188 21 36 40 21 37 10 --- 18 14 02 66.2 90.9 -2.0 -69.4 22 F 1 189 21 36 40 21 37 10 G75.76 18 14 02 65.1 89.3 -2.1 -70.0 -8 1 1 189 21 37 10 21 37 40 --- 18 14 32 65.2 89.4 -2.1 -70.0 22 F 1 190 21 37 10 21 37 40 J2018+3812 18 14 32 66.0 88.1 -2.1 -71.6 -8 1 1 190 21 37 40 21 38 10 --- 18 15 02 66.1 88.1 -2.1 -71.6 22 F 1 191 21 37 40 21 38 10 G75.76 18 15 02 65.3 89.5 -2.1 -70.0 -8 1 1 191 21 38 10 21 38 40 --- 18 15 32 65.4 89.6 -2.1 -70.0 22 F 1 192 21 38 10 21 38 40 J2015+3710 18 15 32 66.5 91.2 -2.0 -69.4 -8 1 1 192 21 38 40 21 39 09 --- 18 16 02 66.6 91.3 -2.0 -69.4 22 F 1 193 21 38 40 21 39 09 G75.76 18 16 02 65.5 89.6 -2.1 -70.0 -8 1 1 193 21 39 09 21 39 39 --- 18 16 32 65.6 89.7 -2.1 -70.0 22 F 1 193 21 39 09 21 39 39 J2018+3812 18 16 32 66.4 88.4 -2.0 -71.7 -8 1 1 193 21 39 39 21 40 09 --- 18 17 02 66.5 88.5 -2.0 -71.7 22 F 1 194 21 39 39 21 40 09 G75.76 18 17 02 65.7 89.8 -2.1 -70.0 -8 1 1 194 21 40 09 21 40 39 --- 18 17 32 65.8 89.9 -2.1 -70.0 22 F 1 195 21 40 09 21 40 39 J2015+3710 18 17 32 66.9 91.5 -2.0 -69.4 -8 1 1 195 21 40 39 21 41 09 --- 18 18 02 67.0 91.6 -2.0 -69.4 22 F 1 196 21 40 39 21 41 09 G75.76 18 18 02 65.9 90.0 -2.1 -70.0 -8 1 1 196 21 41 09 21 41 39 --- 18 18 32 66.0 90.1 -2.1 -70.0 22 F 1 197 21 41 09 21 41 39 J2018+3812 18 18 32 66.8 88.7 -2.0 -71.7 -8 1 1 197 21 41 39 21 42 09 --- 18 19 02 66.9 88.8 -2.0 -71.7 22 F 1 198 21 41 39 21 42 09 G75.76 18 19 02 66.1 90.1 -2.0 -70.0 -8 1 1 198 21 42 09 21 42 39 --- 18 19 32 66.2 90.2 -2.0 -70.0 22 F 1 199 21 42 09 Schedule for VLBA_NL (Code Nl ) Page 15 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 21 43 04 ON1 18 19 57 65.7 105.9 -1.8 -57.3 9 1 1 199 21 43 04 21 43 34 --- 18 20 27 65.8 106.1 -1.8 -57.3 30 F 1 200 21 43 22 21 43 34 J2003+3034 18 20 27 66.5 110.0 -1.7 -54.5 -9 1 1 200 21 43 34 21 44 04 --- 18 20 57 66.6 110.1 -1.7 -54.4 21 F 1 201 21 43 34 21 44 04 ON1 18 20 57 65.9 106.2 -1.8 -57.2 -9 1 1 201 21 44 04 21 44 34 --- 18 21 27 66.0 106.3 -1.8 -57.1 21 F 1 202 21 44 04 21 44 34 20092+30494 18 21 27 65.8 108.0 -1.8 -55.7 -7 1 1 202 21 44 34 21 45 04 --- 18 21 57 65.9 108.2 -1.8 -55.6 23 F 1 203 21 44 34 21 45 04 ON1 18 21 57 66.1 106.5 -1.8 -57.1 -7 1 1 203 21 45 04 21 45 34 --- 18 22 27 66.2 106.6 -1.8 -57.0 23 F 1 204 21 45 04 21 45 34 20134+31264 18 22 27 65.6 105.9 -1.9 -57.2 -7 1 1 204 21 45 34 21 46 04 --- 18 22 57 65.6 106.0 -1.8 -57.2 23 F 1 205 21 45 34 21 46 04 ON1 18 22 57 66.3 106.8 -1.8 -56.9 -7 1 1 205 21 46 04 21 46 33 --- 18 23 27 66.4 106.9 -1.8 -56.9 23 F 1 206 21 46 04 21 46 33 J2003+3034 18 23 27 67.0 110.9 -1.7 -54.0 -9 1 1 206 21 46 33 21 47 03 --- 18 23 57 67.1 111.1 -1.7 -53.9 21 F 1 207 21 46 33 21 47 03 ON1 18 23 57 66.5 107.1 -1.8 -56.8 -9 1 1 207 21 47 03 21 47 33 --- 18 24 27 66.5 107.2 -1.8 -56.7 21 F 1 208 21 47 03 21 47 33 20092+30494 18 24 27 66.3 108.9 -1.8 -55.3 -7 1 1 208 21 47 33 21 48 03 --- 18 24 57 66.4 109.1 -1.7 -55.2 23 F 1 209 21 47 33 21 48 03 ON1 18 24 57 66.6 107.4 -1.8 -56.7 -7 1 1 209 21 48 03 21 48 33 --- 18 25 27 66.7 107.5 -1.8 -56.6 23 F 1 210 21 48 03 21 48 33 20134+31264 18 25 27 66.1 106.7 -1.8 -56.9 -7 1 1 210 21 48 33 21 49 03 --- 18 25 57 66.2 106.9 -1.8 -56.8 23 F 1 211 21 48 33 21 49 03 ON1 18 25 57 66.8 107.7 -1.7 -56.5 -7 1 1 211 21 49 03 21 49 33 --- 18 26 27 66.9 107.8 -1.7 -56.4 23 F 1 212 21 49 03 Schedule for VLBA_NL (Code Nl ) Page 16 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 49 33 J2003+3034 18 26 27 67.5 111.9 -1.6 -53.5 -9 1 1 212 21 49 33 21 50 03 --- 18 26 57 67.6 112.1 -1.6 -53.4 21 F 1 213 21 49 33 21 50 03 ON1 18 26 57 67.0 108.0 -1.7 -56.4 -9 1 1 213 21 50 03 21 50 33 --- 18 27 27 67.1 108.1 -1.7 -56.3 21 F 1 214 21 50 03 21 50 33 20092+30494 18 27 27 66.8 109.8 -1.7 -54.8 -7 1 1 214 21 50 33 21 51 03 --- 18 27 57 66.9 110.0 -1.7 -54.7 23 F 1 215 21 50 33 21 51 03 ON1 18 27 57 67.2 108.3 -1.7 -56.2 -7 1 1 215 21 51 03 21 51 33 --- 18 28 27 67.3 108.4 -1.7 -56.1 23 F 1 216 21 51 03 21 51 33 20134+31264 18 28 27 66.6 107.6 -1.8 -56.5 -7 1 1 216 21 51 33 21 52 03 --- 18 28 57 66.7 107.8 -1.7 -56.4 23 F 1 217 21 51 33 21 52 03 ON1 18 28 57 67.3 108.6 -1.7 -56.1 -7 1 1 217 21 52 03 21 52 32 --- 18 29 27 67.4 108.7 -1.7 -56.0 23 F 1 218 21 52 03 21 52 32 J2003+3034 18 29 27 68.0 112.9 -1.6 -52.9 -9 1 1 218 21 52 32 21 53 02 --- 18 29 57 68.1 113.1 -1.6 -52.8 21 F 1 219 21 52 32 21 53 02 ON1 18 29 57 67.5 108.9 -1.7 -55.9 -9 1 1 219 21 53 02 21 53 32 --- 18 30 27 67.6 109.0 -1.7 -55.8 21 F 1 220 21 53 02 21 53 32 20092+30494 18 30 27 67.4 110.8 -1.7 -54.3 -7 1 1 220 21 53 32 21 54 02 --- 18 30 57 67.4 111.0 -1.6 -54.2 23 F 1 220 21 53 32 21 54 02 ON1 18 30 57 67.7 109.2 -1.7 -55.7 -7 1 1 220 21 54 02 21 54 32 --- 18 31 27 67.8 109.3 -1.7 -55.7 23 F 1 221 21 54 02 21 54 32 20134+31264 18 31 27 67.2 108.5 -1.7 -56.0 -7 1 1 221 21 54 32 21 55 02 --- 18 31 57 67.2 108.7 -1.7 -55.9 23 F 1 222 21 54 32 21 55 02 ON1 18 31 57 67.9 109.5 -1.6 -55.6 -7 1 1 222 21 55 02 21 55 32 --- 18 32 27 68.0 109.7 -1.6 -55.5 23 F 1 223 21 55 02 21 55 32 J2003+3034 18 32 27 68.5 114.0 -1.5 -52.3 -9 1 1 223 21 55 32 21 56 02 --- 18 32 57 68.6 114.2 -1.5 -52.2 21 F 1 224 21 55 32 21 56 02 ON1 18 32 57 68.0 109.8 -1.6 -55.4 -9 1 1 224 21 56 02 21 56 32 --- 18 33 27 68.1 110.0 -1.6 -55.3 21 F 1 225 21 56 02 21 56 32 20092+30494 18 33 27 67.9 111.8 -1.6 -53.8 -7 1 1 225 21 56 32 21 57 02 --- 18 33 57 68.0 112.0 -1.6 -53.7 23 F 1 226 21 56 32 Schedule for VLBA_NL (Code Nl ) Page 17 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 57 02 ON1 18 33 57 68.2 110.2 -1.6 -55.2 -7 1 1 226 21 57 02 21 57 32 --- 18 34 27 68.3 110.3 -1.6 -55.2 23 F 1 227 21 57 02 21 57 32 20134+31264 18 34 27 67.7 109.4 -1.7 -55.5 -7 1 1 227 21 57 32 21 58 02 --- 18 34 57 67.8 109.6 -1.6 -55.5 23 F 1 228 21 57 32 21 58 02 ON1 18 34 57 68.4 110.5 -1.6 -55.1 -7 1 1 228 21 58 02 21 58 32 --- 18 35 27 68.5 110.6 -1.6 -55.0 23 F 1 229 21 58 02 21 58 32 J2003+3034 18 35 27 69.1 115.1 -1.5 -51.7 -9 1 1 229 21 58 32 21 59 01 --- 18 35 57 69.1 115.3 -1.5 -51.6 21 F 1 230 21 58 32 21 59 01 ON1 18 35 57 68.6 110.8 -1.6 -54.9 -9 1 1 230 21 59 01 21 59 31 --- 18 36 27 68.7 111.0 -1.6 -54.8 21 F 1 231 21 59 01 21 59 31 20092+30494 18 36 27 68.4 112.8 -1.6 -53.2 -7 1 1 231 21 59 31 22 00 01 --- 18 36 57 68.5 113.0 -1.5 -53.1 23 F 1 232 21 59 31 22 00 01 ON1 18 36 57 68.7 111.2 -1.6 -54.7 -7 1 1 232 22 00 01 22 00 31 --- 18 37 27 68.8 111.3 -1.6 -54.6 23 F 1 233 22 00 01 22 00 31 20134+31264 18 37 27 68.2 110.4 -1.6 -55.0 -7 1 1 233 22 00 31 22 01 01 --- 18 37 57 68.3 110.6 -1.6 -54.9 23 F 1 234 22 00 31 22 01 01 ON1 18 37 57 68.9 111.5 -1.5 -54.5 -7 1 1 234 22 01 01 22 01 31 --- 18 38 27 69.0 111.7 -1.5 -54.4 23 F 1 235 22 01 01 22 01 31 J2003+3034 18 38 27 69.6 116.2 -1.4 -51.0 -9 1 1 235 22 01 31 22 02 01 --- 18 38 57 69.6 116.4 -1.4 -50.9 21 F 1 236 22 01 31 22 02 01 ON1 18 38 57 69.1 111.8 -1.5 -54.3 -9 1 1 236 22 02 01 22 02 31 --- 18 39 27 69.2 112.0 -1.5 -54.2 21 F 1 237 22 02 01 22 02 31 20092+30494 18 39 27 68.9 113.9 -1.5 -52.6 -7 1 1 237 22 02 31 22 03 01 --- 18 39 57 69.0 114.1 -1.5 -52.5 23 F 1 238 22 02 31 22 03 01 ON1 18 39 57 69.3 112.2 -1.5 -54.1 -7 1 1 238 22 03 01 22 03 31 --- 18 40 27 69.4 112.4 -1.5 -54.0 23 F 1 239 22 03 01 22 03 31 20134+31264 18 40 27 68.7 111.4 -1.6 -54.5 -7 1 1 239 22 03 31 22 04 01 --- 18 40 57 68.8 111.6 -1.5 -54.4 23 F 1 240 22 03 31 22 04 01 ON1 18 40 57 69.4 112.5 -1.5 -53.9 -7 1 1 240 22 04 01 22 04 31 --- 18 41 27 69.5 112.7 -1.5 -53.8 23 F 1 241 22 04 01 Schedule for VLBA_NL (Code Nl ) Page 18 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 22 04 55 G75.76 18 41 52 70.3 94.4 -1.7 -69.5 6 1 1 241 22 04 55 22 05 25 --- 18 42 22 70.4 94.5 -1.7 -69.5 30 F 1 242 22 05 13 22 05 25 J2015+3710 18 42 22 71.5 96.5 -1.6 -68.5 -8 1 1 242 22 05 25 22 05 55 --- 18 42 52 71.6 96.6 -1.5 -68.5 22 F 1 243 22 05 25 22 05 55 G75.76 18 42 52 70.5 94.6 -1.7 -69.5 -8 1 1 243 22 05 55 22 06 25 --- 18 43 22 70.6 94.7 -1.6 -69.5 22 F 1 244 22 05 55 22 06 25 J2018+3812 18 43 22 71.4 93.0 -1.6 -71.5 -8 1 1 244 22 06 25 22 06 55 --- 18 43 52 71.5 93.1 -1.6 -71.5 22 F 1 245 22 06 25 22 06 55 G75.76 18 43 52 70.7 94.8 -1.6 -69.4 -8 1 1 245 22 06 55 22 07 25 --- 18 44 22 70.8 94.9 -1.6 -69.4 22 F 1 246 22 06 55 22 07 25 J2015+3710 18 44 22 71.8 97.0 -1.5 -68.4 -8 1 1 246 22 07 25 22 07 54 --- 18 44 52 71.9 97.1 -1.5 -68.3 22 F 1 247 22 07 25 22 07 54 G75.76 18 44 52 70.9 95.0 -1.6 -69.4 -8 1 1 247 22 07 54 22 08 24 --- 18 45 22 71.0 95.1 -1.6 -69.4 22 F 1 248 22 07 54 22 08 24 J2018+3812 18 45 22 71.8 93.4 -1.6 -71.4 -8 1 1 248 22 08 24 22 08 54 --- 18 45 52 71.9 93.5 -1.6 -71.4 22 F 1 248 22 08 24 22 08 54 G75.76 18 45 52 71.1 95.2 -1.6 -69.3 -8 1 1 248 22 08 54 22 09 24 --- 18 46 22 71.2 95.3 -1.6 -69.3 22 F 1 249 22 08 54 22 09 24 J2015+3710 18 46 22 72.2 97.5 -1.5 -68.2 -8 1 1 249 22 09 24 22 09 54 --- 18 46 52 72.3 97.6 -1.5 -68.2 22 F 1 250 22 09 24 22 09 54 G75.76 18 46 52 71.2 95.4 -1.6 -69.3 -8 1 1 250 22 09 54 22 10 24 --- 18 47 22 71.3 95.5 -1.6 -69.3 22 F 1 251 22 09 54 22 10 24 J2018+3812 18 47 22 72.2 93.8 -1.5 -71.3 -8 1 1 251 22 10 24 22 10 54 --- 18 47 52 72.2 93.9 -1.5 -71.3 22 F 1 252 22 10 24 22 10 54 G75.76 18 47 52 71.4 95.6 -1.6 -69.2 -8 1 1 252 22 10 54 22 11 24 --- 18 48 22 71.5 95.7 -1.6 -69.2 22 F 1 253 22 10 54 Schedule for VLBA_NL (Code Nl ) Page 19 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 11 24 J2015+3710 18 48 22 72.6 98.0 -1.5 -68.0 -8 1 1 253 22 11 24 22 11 54 --- 18 48 52 72.7 98.1 -1.4 -68.0 22 F 1 254 22 11 24 22 11 54 G75.76 18 48 52 71.6 95.9 -1.6 -69.2 -8 1 1 254 22 11 54 22 12 24 --- 18 49 22 71.7 96.0 -1.5 -69.1 22 F 1 255 22 11 54 22 12 24 J2018+3812 18 49 22 72.5 94.2 -1.5 -71.3 -8 1 1 255 22 12 24 22 12 54 --- 18 49 52 72.6 94.3 -1.5 -71.2 22 F 1 256 22 12 24 22 12 54 G75.76 18 49 52 71.8 96.1 -1.5 -69.1 -8 1 1 256 22 12 54 22 13 24 --- 18 50 22 71.9 96.2 -1.5 -69.1 22 F 1 257 22 12 54 22 13 24 J2015+3710 18 50 22 73.0 98.5 -1.4 -67.9 -8 1 1 257 22 13 24 22 13 53 --- 18 50 52 73.0 98.6 -1.4 -67.8 22 F 1 258 22 13 24 22 13 53 G75.76 18 50 52 72.0 96.3 -1.5 -69.0 -8 1 1 258 22 13 53 22 14 23 --- 18 51 22 72.1 96.4 -1.5 -69.0 22 F 1 259 22 13 53 22 14 23 J2018+3812 18 51 22 72.9 94.6 -1.5 -71.2 -8 1 1 259 22 14 23 22 14 53 --- 18 51 52 73.0 94.8 -1.5 -71.1 22 F 1 260 22 14 23 22 14 53 G75.76 18 51 52 72.2 96.5 -1.5 -69.0 -8 1 1 260 22 14 53 22 15 23 --- 18 52 22 72.3 96.7 -1.5 -68.9 22 F 1 261 22 14 53 22 15 23 J2015+3710 18 52 22 73.3 99.0 -1.4 -67.7 -8 1 1 261 22 15 23 22 15 53 --- 18 52 52 73.4 99.1 -1.4 -67.6 22 F 1 262 22 15 23 22 15 53 G75.76 18 52 52 72.4 96.8 -1.5 -68.9 -8 1 1 262 22 15 53 22 16 23 --- 18 53 22 72.5 96.9 -1.5 -68.9 22 F 1 263 22 15 53 22 16 23 J2018+3812 18 53 22 73.3 95.1 -1.4 -71.1 -8 1 1 263 22 16 23 22 16 53 --- 18 53 52 73.4 95.2 -1.4 -71.0 22 F 1 264 22 16 23 22 16 53 G75.76 18 53 52 72.5 97.0 -1.5 -68.8 -8 1 1 264 22 16 53 22 17 23 --- 18 54 22 72.6 97.1 -1.5 -68.8 22 F 1 265 22 16 53 22 17 23 J2015+3710 18 54 22 73.7 99.5 -1.4 -67.5 -8 1 1 265 22 17 23 22 17 53 --- 18 54 52 73.8 99.6 -1.3 -67.4 22 F 1 266 22 17 23 22 17 53 G75.76 18 54 52 72.7 97.3 -1.5 -68.7 -8 1 1 266 22 17 53 22 18 23 --- 18 55 22 72.8 97.4 -1.4 -68.7 22 F 1 267 22 17 53 22 18 23 J2018+3812 18 55 22 73.6 95.5 -1.4 -70.9 -8 1 1 267 22 18 23 22 18 53 --- 18 55 52 73.7 95.6 -1.4 -70.9 22 F 1 268 22 18 23 Schedule for VLBA_NL (Code Nl ) Page 20 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 18 53 G75.76 18 55 52 72.9 97.5 -1.4 -68.7 -8 1 1 268 22 18 53 22 19 23 --- 18 56 22 73.0 97.6 -1.4 -68.6 22 F 1 269 22 18 53 22 19 23 J2015+3710 18 56 22 74.1 100.1 -1.3 -67.2 -8 1 1 269 22 19 23 22 19 52 --- 18 56 52 74.1 100.2 -1.3 -67.2 22 F 1 270 22 19 23 22 19 52 G75.76 18 56 52 73.1 97.7 -1.4 -68.6 -8 1 1 270 22 19 52 22 20 22 --- 18 57 22 73.2 97.9 -1.4 -68.5 22 F 1 271 22 19 52 22 20 22 J2018+3812 18 57 22 74.0 96.0 -1.4 -70.8 -8 1 1 271 22 20 22 22 20 52 --- 18 57 52 74.1 96.1 -1.4 -70.8 22 F 1 272 22 20 22 22 20 52 G75.76 18 57 52 73.3 98.0 -1.4 -68.5 -8 1 1 272 22 20 52 22 21 22 --- 18 58 22 73.4 98.1 -1.4 -68.4 22 F 1 273 22 20 52 22 21 22 J2015+3710 18 58 22 74.4 100.6 -1.3 -67.0 -8 1 1 273 22 21 22 22 21 52 --- 18 58 52 74.5 100.8 -1.3 -66.9 22 F 1 274 22 21 22 22 21 52 G75.76 18 58 52 73.5 98.3 -1.4 -68.4 -8 1 1 274 22 21 52 22 22 22 --- 18 59 22 73.6 98.4 -1.4 -68.4 22 F 1 275 22 21 52 22 22 22 J2018+3812 18 59 22 74.4 96.5 -1.3 -70.6 -8 1 1 275 22 22 22 22 22 52 --- 18 59 52 74.5 96.6 -1.3 -70.6 22 F 1 276 22 22 22 22 22 52 G75.76 18 59 52 73.7 98.5 -1.4 -68.3 -8 1 1 276 22 22 52 22 23 22 --- 19 00 22 73.7 98.6 -1.4 -68.3 22 F 1 276 22 22 52 22 23 22 J2015+3710 19 00 22 74.8 101.2 -1.3 -66.7 -8 1 1 276 22 23 22 22 23 52 --- 19 00 52 74.9 101.4 -1.2 -66.6 22 F 1 277 22 23 22 22 23 52 G75.76 19 00 52 73.8 98.8 -1.4 -68.2 -8 1 1 277 22 23 52 22 24 22 --- 19 01 22 73.9 98.9 -1.3 -68.2 22 F 1 278 22 23 52 22 24 22 J2018+3812 19 01 22 74.8 97.0 -1.3 -70.5 -8 1 1 278 22 24 22 22 24 52 --- 19 01 52 74.8 97.1 -1.3 -70.4 22 F 1 279 22 24 22 22 24 52 G75.76 19 01 52 74.0 99.0 -1.3 -68.1 -8 1 1 279 22 24 52 22 25 22 --- 19 02 22 74.1 99.2 -1.3 -68.0 22 F 1 280 22 24 52 Schedule for VLBA_NL (Code Nl ) Page 21 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 22 25 43 ON1 19 02 43 73.1 121.6 -1.1 -48.2 0 1 1 280 22 25 43 22 26 12 --- 19 03 13 73.1 121.9 -1.1 -48.0 30 F 1 281 22 26 01 22 26 12 J2003+3034 19 03 13 73.5 127.7 -1.0 -43.3 -10 1 1 281 22 26 12 22 26 42 --- 19 03 43 73.6 128.0 -1.0 -43.1 20 F 1 282 22 26 12 22 26 42 ON1 19 03 43 73.2 122.1 -1.1 -47.9 -10 1 1 282 22 26 42 22 27 12 --- 19 04 13 73.3 122.3 -1.1 -47.7 20 F 1 283 22 26 42 22 27 12 20092+30494 19 04 13 72.9 124.5 -1.1 -45.7 -7 1 1 283 22 27 12 22 27 42 --- 19 04 43 73.0 124.8 -1.1 -45.5 22 F 1 284 22 27 12 22 27 42 ON1 19 04 43 73.4 122.6 -1.1 -47.5 -7 1 1 284 22 27 42 22 28 12 --- 19 05 13 73.4 122.9 -1.1 -47.3 22 F 1 285 22 27 42 22 28 12 20134+31264 19 05 13 72.9 121.5 -1.1 -48.2 -7 1 1 285 22 28 12 22 28 42 --- 19 05 43 73.0 121.7 -1.1 -48.1 23 F 1 286 22 28 12 22 28 42 ON1 19 05 43 73.5 123.1 -1.1 -47.1 -7 1 1 286 22 28 42 22 29 12 --- 19 06 13 73.6 123.4 -1.1 -47.0 23 F 1 287 22 28 42 22 29 12 J2003+3034 19 06 13 73.9 129.4 -1.0 -42.0 -10 1 1 287 22 29 12 22 29 42 --- 19 06 43 74.0 129.7 -1.0 -41.8 20 F 1 288 22 29 12 22 29 42 ON1 19 06 43 73.7 123.6 -1.1 -46.8 -10 1 1 288 22 29 42 22 30 12 --- 19 07 13 73.8 123.9 -1.1 -46.6 20 F 1 289 22 29 42 22 30 12 20092+30494 19 07 13 73.4 126.1 -1.0 -44.6 -7 1 1 289 22 30 12 22 30 42 --- 19 07 43 73.5 126.4 -1.0 -44.4 22 F 1 290 22 30 12 22 30 42 ON1 19 07 43 73.8 124.1 -1.0 -46.4 -7 1 1 290 22 30 42 22 31 12 --- 19 08 13 73.9 124.4 -1.0 -46.2 22 F 1 291 22 30 42 22 31 12 20134+31264 19 08 13 73.3 122.9 -1.1 -47.2 -7 1 1 291 22 31 12 22 31 42 --- 19 08 43 73.4 123.2 -1.1 -47.0 23 F 1 292 22 31 12 22 31 42 ON1 19 08 43 74.0 124.7 -1.0 -46.0 -7 1 1 292 22 31 42 22 32 11 --- 19 09 13 74.1 124.9 -1.0 -45.8 23 F 1 293 22 31 42 Schedule for VLBA_NL (Code Nl ) Page 22 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 32 11 J2003+3034 19 09 13 74.3 131.2 -0.9 -40.7 -10 1 1 293 22 32 11 22 32 41 --- 19 09 43 74.4 131.5 -0.9 -40.5 20 F 1 294 22 32 11 22 32 41 ON1 19 09 43 74.1 125.2 -1.0 -45.6 -10 1 1 294 22 32 41 22 33 11 --- 19 10 13 74.2 125.5 -1.0 -45.4 20 F 1 295 22 32 41 22 33 11 20092+30494 19 10 13 73.8 127.8 -1.0 -43.4 -7 1 1 295 22 33 11 22 33 41 --- 19 10 43 73.9 128.0 -1.0 -43.2 22 F 1 296 22 33 11 22 33 41 ON1 19 10 43 74.3 125.8 -1.0 -45.2 -7 1 1 296 22 33 41 22 34 11 --- 19 11 13 74.4 126.0 -1.0 -45.0 22 F 1 297 22 33 41 22 34 11 20134+31264 19 11 13 73.8 124.5 -1.0 -46.1 -7 1 1 297 22 34 11 22 34 41 --- 19 11 43 73.9 124.8 -1.0 -45.9 23 F 1 298 22 34 11 22 34 41 ON1 19 11 43 74.4 126.3 -1.0 -44.8 -7 1 1 298 22 34 41 22 35 11 --- 19 12 13 74.5 126.6 -1.0 -44.6 23 F 1 299 22 34 41 22 35 11 J2003+3034 19 12 13 74.8 133.0 -0.9 -39.3 -10 1 1 299 22 35 11 22 35 41 --- 19 12 43 74.8 133.3 -0.9 -39.1 20 F 1 300 22 35 11 22 35 41 ON1 19 12 43 74.6 126.9 -1.0 -44.4 -10 1 1 300 22 35 41 22 36 11 --- 19 13 13 74.7 127.2 -1.0 -44.2 20 F 1 301 22 35 41 22 36 11 20092+30494 19 13 13 74.3 129.5 -0.9 -42.1 -8 1 1 301 22 36 11 22 36 41 --- 19 13 43 74.4 129.8 -0.9 -41.9 22 F 1 302 22 36 11 22 36 41 ON1 19 13 43 74.7 127.5 -0.9 -44.0 -8 1 1 302 22 36 41 22 37 11 --- 19 14 13 74.8 127.8 -0.9 -43.8 22 F 1 303 22 36 41 22 37 11 20134+31264 19 14 13 74.3 126.1 -1.0 -44.9 -7 1 1 303 22 37 11 22 37 41 --- 19 14 43 74.3 126.4 -1.0 -44.7 23 F 1 303 22 37 11 22 37 41 ON1 19 14 43 74.9 128.1 -0.9 -43.6 -7 1 1 303 22 37 41 22 38 10 --- 19 15 13 75.0 128.4 -0.9 -43.3 23 F 1 304 22 37 41 22 38 10 J2003+3034 19 15 13 75.2 135.0 -0.8 -37.8 -10 1 1 304 22 38 10 22 38 40 --- 19 15 43 75.2 135.3 -0.8 -37.6 20 F 1 305 22 38 10 22 38 40 ON1 19 15 43 75.0 128.7 -0.9 -43.1 -10 1 1 305 22 38 40 22 39 10 --- 19 16 13 75.1 129.0 -0.9 -42.9 19 F 1 306 22 38 40 22 39 10 20092+30494 19 16 13 74.7 131.3 -0.9 -40.8 -8 1 1 306 22 39 10 22 39 40 --- 19 16 43 74.8 131.6 -0.9 -40.5 22 F 1 307 22 39 10 Schedule for VLBA_NL (Code Nl ) Page 23 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 39 40 ON1 19 16 43 75.2 129.3 -0.9 -42.7 -8 1 1 307 22 39 40 22 40 10 --- 19 17 13 75.3 129.6 -0.9 -42.4 22 F 1 308 22 39 40 22 40 10 20134+31264 19 17 13 74.7 127.8 -0.9 -43.7 -7 1 1 308 22 40 10 22 40 40 --- 19 17 43 74.8 128.1 -0.9 -43.5 23 F 1 309 22 40 10 22 40 40 ON1 19 17 43 75.3 129.9 -0.9 -42.2 -7 1 1 309 22 40 40 22 41 10 --- 19 18 13 75.4 130.2 -0.9 -42.0 23 F 1 310 22 40 40 22 41 10 J2003+3034 19 18 13 75.6 137.0 -0.8 -36.2 -11 1 1 310 22 41 10 22 41 40 --- 19 18 43 75.6 137.3 -0.8 -35.9 19 F 1 311 22 41 10 22 41 40 ON1 19 18 43 75.5 130.5 -0.9 -41.7 -11 1 1 311 22 41 40 22 42 10 --- 19 19 13 75.5 130.8 -0.9 -41.5 19 F 1 312 22 41 40 22 42 10 20092+30494 19 19 13 75.1 133.2 -0.8 -39.3 -8 1 1 312 22 42 10 22 42 40 --- 19 19 43 75.2 133.5 -0.8 -39.1 22 F 1 313 22 42 10 22 42 40 ON1 19 19 43 75.6 131.1 -0.8 -41.2 -8 1 1 313 22 42 40 22 43 10 --- 19 20 13 75.7 131.5 -0.8 -41.0 22 F 1 314 22 42 40 22 43 10 20134+31264 19 20 13 75.2 129.6 -0.9 -42.3 -7 1 1 314 22 43 10 22 43 40 --- 19 20 43 75.2 129.9 -0.9 -42.1 23 F 1 315 22 43 10 22 43 40 ON1 19 20 43 75.7 131.8 -0.8 -40.7 -7 1 1 315 22 43 40 22 44 09 --- 19 21 13 75.8 132.1 -0.8 -40.5 23 F 1 316 22 43 40 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 22 44 33 G75.76 19 21 37 77.6 105.4 -1.0 -64.9 0 1 1 316 22 44 33 22 45 03 --- 19 22 07 77.7 105.6 -1.0 -64.8 30 F 1 317 22 44 51 22 45 03 J2015+3710 19 22 07 78.7 109.4 -0.9 -62.0 -9 1 1 317 22 45 03 22 45 33 --- 19 22 37 78.8 109.6 -0.9 -61.9 21 F 1 318 22 45 03 22 45 33 G75.76 19 22 37 77.8 105.8 -1.0 -64.7 -9 1 1 318 22 45 33 22 46 03 --- 19 23 07 77.9 106.0 -1.0 -64.6 21 F 1 319 22 45 33 22 46 03 J2018+3812 19 23 07 78.7 103.7 -0.9 -67.3 -8 1 1 319 22 46 03 22 46 33 --- 19 23 37 78.8 103.9 -0.9 -67.2 22 F 1 320 22 46 03 Schedule for VLBA_NL (Code Nl ) Page 24 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 46 33 G75.76 19 23 37 78.0 106.2 -1.0 -64.4 -8 1 1 320 22 46 33 22 47 03 --- 19 24 07 78.1 106.4 -1.0 -64.3 22 F 1 321 22 46 33 22 47 03 J2015+3710 19 24 07 79.1 110.4 -0.9 -61.4 -9 1 1 321 22 47 03 22 47 33 --- 19 24 37 79.1 110.6 -0.9 -61.2 21 F 1 322 22 47 03 22 47 33 G75.76 19 24 37 78.2 106.6 -1.0 -64.2 -9 1 1 322 22 47 33 22 48 03 --- 19 25 07 78.2 106.9 -0.9 -64.1 21 F 1 323 22 47 33 22 48 03 J2018+3812 19 25 07 79.1 104.5 -0.9 -66.8 -8 1 1 323 22 48 03 22 48 33 --- 19 25 37 79.2 104.7 -0.9 -66.7 22 F 1 324 22 48 03 22 48 33 G75.76 19 25 37 78.3 107.1 -0.9 -63.9 -8 1 1 324 22 48 33 22 49 03 --- 19 26 07 78.4 107.3 -0.9 -63.8 22 F 1 325 22 48 33 22 49 03 J2015+3710 19 26 07 79.4 111.4 -0.8 -60.7 -9 1 1 325 22 49 03 22 49 32 --- 19 26 37 79.5 111.7 -0.8 -60.5 21 F 1 326 22 49 03 22 49 32 G75.76 19 26 37 78.5 107.5 -0.9 -63.6 -9 1 1 326 22 49 32 22 50 02 --- 19 27 07 78.6 107.7 -0.9 -63.5 21 F 1 327 22 49 32 22 50 02 J2018+3812 19 27 07 79.5 105.3 -0.9 -66.3 -8 1 1 327 22 50 02 22 50 32 --- 19 27 37 79.6 105.5 -0.9 -66.2 22 F 1 328 22 50 02 22 50 32 G75.76 19 27 37 78.7 108.0 -0.9 -63.4 -8 1 1 328 22 50 32 22 51 02 --- 19 28 07 78.8 108.2 -0.9 -63.2 22 F 1 329 22 50 32 22 51 02 J2015+3710 19 28 07 79.7 112.5 -0.8 -59.9 -9 1 1 329 22 51 02 22 51 32 --- 19 28 37 79.8 112.8 -0.8 -59.7 21 F 1 330 22 51 02 22 51 32 G75.76 19 28 37 78.9 108.4 -0.9 -63.1 -9 1 1 330 22 51 32 22 52 02 --- 19 29 07 79.0 108.6 -0.9 -62.9 21 F 1 331 22 51 32 22 52 02 J2018+3812 19 29 07 79.8 106.2 -0.8 -65.8 -8 1 1 331 22 52 02 22 52 32 --- 19 29 37 79.9 106.4 -0.8 -65.6 22 F 1 331 22 52 02 22 52 32 G75.76 19 29 37 79.0 108.9 -0.9 -62.7 -8 1 1 331 22 52 32 22 53 02 --- 19 30 07 79.1 109.1 -0.9 -62.6 22 F 1 332 22 52 32 22 53 02 J2015+3710 19 30 07 80.1 113.7 -0.8 -59.1 -9 1 1 332 22 53 02 22 53 32 --- 19 30 37 80.2 114.0 -0.8 -58.8 21 F 1 333 22 53 02 22 53 32 G75.76 19 30 37 79.2 109.4 -0.9 -62.4 -9 1 1 333 22 53 32 22 54 02 --- 19 31 07 79.3 109.6 -0.8 -62.3 21 F 1 334 22 53 32 Schedule for VLBA_NL (Code Nl ) Page 25 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 54 02 J2018+3812 19 31 07 80.2 107.1 -0.8 -65.2 -8 1 1 334 22 54 02 22 54 32 --- 19 31 37 80.3 107.4 -0.8 -65.0 22 F 1 335 22 54 02 22 54 32 G75.76 19 31 37 79.4 109.9 -0.8 -62.1 -8 1 1 335 22 54 32 22 55 02 --- 19 32 07 79.5 110.1 -0.8 -61.9 22 F 1 336 22 54 32 22 55 02 J2015+3710 19 32 07 80.4 114.9 -0.7 -58.2 -9 1 1 336 22 55 02 22 55 31 --- 19 32 37 80.5 115.2 -0.7 -57.9 21 F 1 337 22 55 02 22 55 31 G75.76 19 32 37 79.6 110.4 -0.8 -61.7 -9 1 1 337 22 55 31 22 56 01 --- 19 33 07 79.7 110.6 -0.8 -61.5 21 F 1 338 22 55 31 22 56 01 J2018+3812 19 33 07 80.5 108.1 -0.8 -64.5 -8 1 1 338 22 56 01 22 56 31 --- 19 33 37 80.6 108.4 -0.8 -64.3 22 F 1 339 22 56 01 22 56 31 G75.76 19 33 37 79.7 110.9 -0.8 -61.4 -8 1 1 339 22 56 31 22 57 01 --- 19 34 07 79.8 111.2 -0.8 -61.2 22 F 1 340 22 56 31 22 57 01 J2015+3710 19 34 07 80.8 116.2 -0.7 -57.2 -9 1 1 340 22 57 01 22 57 31 --- 19 34 37 80.9 116.5 -0.7 -56.9 21 F 1 341 22 57 01 22 57 31 G75.76 19 34 37 79.9 111.4 -0.8 -61.0 -9 1 1 341 22 57 31 22 58 01 --- 19 35 07 80.0 111.7 -0.8 -60.8 21 F 1 342 22 57 31 22 58 01 J2018+3812 19 35 07 80.9 109.2 -0.7 -63.7 -8 1 1 342 22 58 01 22 58 31 --- 19 35 37 81.0 109.5 -0.7 -63.5 22 F 1 343 22 58 01 22 58 31 G75.76 19 35 37 80.1 112.0 -0.8 -60.6 -8 1 1 343 22 58 31 22 59 01 --- 19 36 07 80.2 112.3 -0.8 -60.4 22 F 1 344 22 58 31 22 59 01 J2015+3710 19 36 07 81.1 117.6 -0.7 -56.1 -10 1 1 344 22 59 01 22 59 31 --- 19 36 37 81.2 117.9 -0.7 -55.8 20 F 1 345 22 59 01 22 59 31 G75.76 19 36 37 80.3 112.6 -0.8 -60.2 -10 1 1 345 22 59 31 23 00 01 --- 19 37 07 80.4 112.9 -0.7 -60.0 20 F 1 346 22 59 31 23 00 01 J2018+3812 19 37 07 81.2 110.3 -0.7 -62.9 -8 1 1 346 23 00 01 23 00 31 --- 19 37 37 81.3 110.6 -0.7 -62.7 22 F 1 347 23 00 01 23 00 31 G75.76 19 37 37 80.4 113.2 -0.7 -59.7 -8 1 1 347 23 00 31 23 01 01 --- 19 38 07 80.5 113.5 -0.7 -59.5 22 F 1 348 23 00 31 23 01 01 J2015+3710 19 38 07 81.4 119.1 -0.6 -54.9 -10 1 1 348 23 01 01 23 01 31 --- 19 38 37 81.5 119.4 -0.6 -54.6 20 F 1 349 23 01 01 Schedule for VLBA_NL (Code Nl ) Page 26 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 01 31 G75.76 19 38 37 80.6 113.8 -0.7 -59.3 -10 1 1 349 23 01 31 23 02 00 --- 19 39 07 80.7 114.1 -0.7 -59.1 20 F 1 350 23 01 31 23 02 00 J2018+3812 19 39 07 81.6 111.5 -0.7 -62.0 -8 1 1 350 23 02 00 23 02 30 --- 19 39 37 81.7 111.9 -0.7 -61.8 22 F 1 351 23 02 00 23 02 30 G75.76 19 39 37 80.8 114.4 -0.7 -58.8 -8 1 1 351 23 02 30 23 03 00 --- 19 40 07 80.9 114.7 -0.7 -58.6 22 F 1 352 23 02 30 23 03 00 J2015+3710 19 40 07 81.8 120.6 -0.6 -53.7 -10 1 1 352 23 03 00 23 03 30 --- 19 40 37 81.8 121.1 -0.6 -53.3 20 F 1 353 23 03 00 23 03 30 G75.76 19 40 37 81.0 115.1 -0.7 -58.3 -10 1 1 353 23 03 30 23 04 00 --- 19 41 07 81.0 115.4 -0.7 -58.1 20 F 1 354 23 03 30 23 04 00 J2018+3812 19 41 07 81.9 112.9 -0.6 -61.0 -8 1 1 354 23 04 00 23 04 30 --- 19 41 37 82.0 113.2 -0.6 -60.8 22 F 1 355 23 04 00 23 04 30 G75.76 19 41 37 81.1 115.7 -0.7 -57.8 -8 1 1 355 23 04 30 23 05 00 --- 19 42 07 81.2 116.1 -0.7 -57.5 22 F 1 356 23 04 30 Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 23 05 28 ON1 19 42 35 78.4 149.2 -0.5 -26.7 0 1 1 356 23 05 28 23 05 58 --- 19 43 05 78.4 149.6 -0.5 -26.3 30 F 1 357 23 05 46 23 05 58 J2003+3034 19 43 05 78.1 157.9 -0.3 -19.0 -12 1 1 357 23 05 58 23 06 28 --- 19 43 35 78.1 158.4 -0.3 -18.6 18 F 1 358 23 05 58 23 06 28 ON1 19 43 35 78.5 150.1 -0.4 -25.9 -12 1 1 358 23 06 28 23 06 58 --- 19 44 05 78.5 150.6 -0.4 -25.5 18 F 1 358 23 06 28 23 06 58 20092+30494 19 44 05 77.9 152.8 -0.4 -23.4 -7 1 1 358 23 06 58 23 07 28 --- 19 44 35 78.0 153.3 -0.4 -23.0 22 F 1 359 23 06 58 23 07 28 ON1 19 44 35 78.5 151.1 -0.4 -25.0 -7 1 1 359 23 07 28 23 07 58 --- 19 45 05 78.6 151.6 -0.4 -24.6 22 F 1 360 23 07 28 23 07 58 20134+31264 19 45 05 78.2 148.6 -0.5 -27.1 -8 1 1 360 23 07 58 23 08 27 --- 19 45 35 78.3 149.1 -0.5 -26.7 22 F 1 361 23 07 58 Schedule for VLBA_NL (Code Nl ) Page 27 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 08 27 ON1 19 45 35 78.6 152.1 -0.4 -24.2 -8 1 1 361 23 08 27 23 08 57 --- 19 46 05 78.7 152.6 -0.4 -23.8 22 F 1 362 23 08 27 23 08 57 J2003+3034 19 46 05 78.3 160.9 -0.3 -16.5 -12 1 1 362 23 08 57 23 09 27 --- 19 46 35 78.3 161.4 -0.3 -16.0 18 F 1 363 23 08 57 23 09 27 ON1 19 46 35 78.7 153.1 -0.4 -23.4 -12 1 1 363 23 09 27 23 09 57 --- 19 47 05 78.8 153.6 -0.4 -22.9 18 F 1 364 23 09 27 23 09 57 20092+30494 19 47 05 78.2 155.7 -0.4 -20.9 -7 1 1 364 23 09 57 23 10 27 --- 19 47 35 78.2 156.2 -0.4 -20.5 23 F 1 365 23 09 57 23 10 27 ON1 19 47 35 78.8 154.1 -0.4 -22.5 -7 1 1 365 23 10 27 23 10 57 --- 19 48 05 78.8 154.6 -0.4 -22.1 23 F 1 366 23 10 27 23 10 57 20134+31264 19 48 05 78.5 151.5 -0.4 -24.7 -8 1 1 366 23 10 57 23 11 27 --- 19 48 35 78.5 152.0 -0.4 -24.3 22 F 1 367 23 10 57 23 11 27 ON1 19 48 35 78.9 155.1 -0.4 -21.6 -8 1 1 367 23 11 27 23 11 57 --- 19 49 05 78.9 155.6 -0.4 -21.2 22 F 1 368 23 11 27 23 11 57 J2003+3034 19 49 05 78.4 164.0 -0.2 -13.8 -12 1 1 368 23 11 57 23 12 27 --- 19 49 35 78.5 164.5 -0.2 -13.4 18 F 1 369 23 11 57 23 12 27 ON1 19 49 35 79.0 156.1 -0.3 -20.8 -12 1 1 369 23 12 27 23 12 57 --- 19 50 05 79.0 156.6 -0.3 -20.3 18 F 1 370 23 12 27 23 12 57 20092+30494 19 50 05 78.4 158.7 -0.3 -18.4 -7 1 1 370 23 12 57 23 13 27 --- 19 50 35 78.4 159.2 -0.3 -18.0 23 F 1 371 23 12 57 23 13 27 ON1 19 50 35 79.0 157.2 -0.3 -19.9 -7 1 1 371 23 13 27 23 13 57 --- 19 51 05 79.1 157.7 -0.3 -19.4 23 F 1 372 23 13 27 23 13 57 20134+31264 19 51 05 78.7 154.5 -0.4 -22.2 -8 1 1 372 23 13 57 23 14 26 --- 19 51 35 78.8 155.0 -0.4 -21.7 22 F 1 373 23 13 57 23 14 26 ON1 19 51 35 79.1 158.2 -0.3 -19.0 -8 1 1 373 23 14 26 23 14 56 --- 19 52 05 79.1 158.8 -0.3 -18.5 22 F 1 374 23 14 26 23 14 56 J2003+3034 19 52 05 78.6 167.1 -0.2 -11.1 -12 1 1 374 23 14 56 23 15 26 --- 19 52 35 78.6 167.7 -0.2 -10.7 18 F 1 375 23 14 56 23 15 26 ON1 19 52 35 79.2 159.3 -0.3 -18.0 -12 1 1 375 23 15 26 23 15 56 --- 19 53 05 79.2 159.8 -0.3 -17.6 18 F 1 376 23 15 26 Schedule for VLBA_NL (Code Nl ) Page 28 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 15 56 20092+30494 19 53 05 78.6 161.8 -0.3 -15.8 -7 1 1 376 23 15 56 23 16 26 --- 19 53 35 78.6 162.3 -0.3 -15.3 23 F 1 377 23 15 56 23 16 26 ON1 19 53 35 79.2 160.4 -0.3 -17.1 -7 1 1 377 23 16 26 23 16 56 --- 19 54 05 79.3 160.9 -0.3 -16.6 23 F 1 378 23 16 26 23 16 56 20134+31264 19 54 05 79.0 157.5 -0.3 -19.5 -8 1 1 378 23 16 56 23 17 26 --- 19 54 35 79.0 158.1 -0.3 -19.1 22 F 1 379 23 16 56 23 17 26 ON1 19 54 35 79.3 161.5 -0.3 -16.1 -8 1 1 379 23 17 26 23 17 56 --- 19 55 05 79.3 162.0 -0.3 -15.7 22 F 1 380 23 17 26 23 17 56 J2003+3034 19 55 05 78.7 170.4 -0.1 -8.3 -12 1 1 380 23 17 56 23 18 26 --- 19 55 35 78.7 170.9 -0.1 -7.9 18 F 1 381 23 17 56 23 18 26 ON1 19 55 35 79.4 162.6 -0.2 -15.2 -12 1 1 381 23 18 26 23 18 56 --- 19 56 05 79.4 163.1 -0.2 -14.7 18 F 1 382 23 18 26 23 18 56 20092+30494 19 56 05 78.7 165.0 -0.2 -13.0 -7 1 1 382 23 18 56 23 19 26 --- 19 56 35 78.8 165.5 -0.2 -12.6 23 F 1 383 23 18 56 23 19 26 ON1 19 56 35 79.4 163.7 -0.2 -14.2 -7 1 1 383 23 19 26 23 19 56 --- 19 57 05 79.4 164.3 -0.2 -13.7 23 F 1 384 23 19 26 23 19 56 20134+31264 19 57 05 79.2 160.8 -0.3 -16.8 -8 1 1 384 23 19 56 23 20 26 --- 19 57 35 79.2 161.3 -0.3 -16.3 22 F 1 385 23 19 56 23 20 26 ON1 19 57 35 79.5 164.8 -0.2 -13.2 -8 1 1 385 23 20 26 23 20 55 --- 19 58 05 79.5 165.4 -0.2 -12.7 22 F 1 386 23 20 26 23 20 55 J2003+3034 19 58 05 78.8 173.7 -0.1 -5.5 -12 1 1 386 23 20 55 23 21 25 --- 19 58 35 78.8 174.2 -0.1 -5.0 18 F 1 386 23 20 55 23 21 25 ON1 19 58 35 79.5 166.0 -0.2 -12.3 -11 1 1 386 23 21 25 23 21 55 --- 19 59 05 79.5 166.5 -0.2 -11.8 18 F 1 387 23 21 25 23 21 55 20092+30494 19 59 05 78.9 168.2 -0.2 -10.2 -7 1 1 387 23 21 55 23 22 25 --- 19 59 35 78.9 168.8 -0.2 -9.7 23 F 1 388 23 21 55 23 22 25 ON1 19 59 35 79.6 167.1 -0.2 -11.3 -7 1 1 388 23 22 25 23 22 55 --- 20 00 05 79.6 167.7 -0.2 -10.8 23 F 1 389 23 22 25 23 22 55 20134+31264 20 00 05 79.3 164.1 -0.2 -13.9 -8 1 1 389 23 22 55 23 23 25 --- 20 00 35 79.4 164.6 -0.2 -13.4 22 F 1 390 23 22 55 Schedule for VLBA_NL (Code Nl ) Page 29 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 23 25 ON1 20 00 35 79.6 168.3 -0.2 -10.2 -8 1 1 390 23 23 25 23 23 55 --- 20 01 05 79.6 168.9 -0.2 -9.7 21 F 1 391 23 23 25 23 23 55 J2003+3034 20 01 05 78.8 177.0 0.0 -2.6 -11 1 1 391 23 23 55 23 24 25 --- 20 01 35 78.8 177.5 0.0 -2.1 19 F 1 392 23 23 55 23 24 25 ON1 20 01 35 79.6 169.4 -0.1 -9.2 -11 1 1 392 23 24 25 23 24 55 --- 20 02 05 79.6 170.0 -0.1 -8.7 19 F 1 393 23 24 25 23 24 55 20092+30494 20 02 05 79.0 171.5 -0.1 -7.4 -7 1 1 393 23 24 55 23 25 25 --- 20 02 35 79.0 172.1 -0.1 -6.9 23 F 1 394 23 24 55 23 25 25 ON1 20 02 35 79.7 170.6 -0.1 -8.2 -7 1 1 394 23 25 25 23 25 55 --- 20 03 05 79.7 171.2 -0.1 -7.7 23 F 1 395 23 25 25 23 25 55 20134+31264 20 03 05 79.5 167.5 -0.2 -10.9 -8 1 1 395 23 25 55 23 26 25 --- 20 03 35 79.5 168.0 -0.2 -10.4 21 F 1 396 23 25 55 23 26 25 ON1 20 03 35 79.7 171.8 -0.1 -7.2 -8 1 1 396 23 26 25 23 26 54 --- 20 04 05 79.7 172.4 -0.1 -6.7 21 F 1 397 23 26 25 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 23 27 22 G75.76 20 04 32 84.5 140.7 -0.3 -36.5 0 1 1 397 23 27 22 23 27 51 --- 20 05 02 84.6 141.5 -0.3 -35.8 30 F 1 398 23 27 40 23 27 51 J2015+3710 20 05 02 85.0 154.7 -0.2 -23.6 -15 1 1 398 23 27 51 23 28 21 --- 20 05 32 85.0 155.8 -0.2 -22.6 15 F 1 399 23 27 51 23 28 21 G75.76 20 05 32 84.7 142.4 -0.3 -35.0 -15 1 1 399 23 28 21 23 28 51 --- 20 06 02 84.7 143.3 -0.3 -34.2 15 F 1 400 23 28 21 23 28 51 J2018+3812 20 06 02 85.7 143.8 -0.2 -34.1 -8 1 1 400 23 28 51 23 29 21 --- 20 06 32 85.7 144.9 -0.2 -33.1 22 F 1 401 23 28 51 23 29 21 G75.76 20 06 32 84.8 144.2 -0.3 -33.4 -8 1 1 401 23 29 21 23 29 51 --- 20 07 02 84.8 145.1 -0.2 -32.5 22 F 1 402 23 29 21 23 29 51 J2015+3710 20 07 02 85.1 159.0 -0.1 -19.6 -15 1 1 402 23 29 51 23 30 21 --- 20 07 32 85.2 160.1 -0.1 -18.6 15 F 1 403 23 29 51 Schedule for VLBA_NL (Code Nl ) Page 30 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 30 21 G75.76 20 07 32 84.9 146.0 -0.2 -31.7 -15 1 1 403 23 30 21 23 30 51 --- 20 08 02 84.9 147.0 -0.2 -30.8 15 F 1 404 23 30 21 23 30 51 J2018+3812 20 08 02 85.9 148.4 -0.2 -29.9 -8 1 1 404 23 30 51 23 31 21 --- 20 08 32 85.9 149.6 -0.2 -28.7 22 F 1 405 23 30 51 23 31 21 G75.76 20 08 32 85.0 148.0 -0.2 -29.9 -8 1 1 405 23 31 21 23 31 51 --- 20 09 02 85.0 149.0 -0.2 -29.0 22 F 1 406 23 31 21 23 31 51 J2015+3710 20 09 02 85.3 163.6 -0.1 -15.4 -16 1 1 406 23 31 51 23 32 21 --- 20 09 32 85.3 164.7 -0.1 -14.3 14 F 1 407 23 31 51 23 32 21 G75.76 20 09 32 85.1 150.0 -0.2 -28.1 -16 1 1 407 23 32 21 23 32 51 --- 20 10 02 85.1 151.0 -0.2 -27.1 14 F 1 408 23 32 21 23 32 51 J2018+3812 20 10 02 86.1 153.4 -0.1 -25.2 -8 1 1 408 23 32 51 23 33 21 --- 20 10 32 86.1 154.7 -0.1 -24.0 22 F 1 409 23 32 51 23 33 21 G75.76 20 10 32 85.2 152.0 -0.2 -26.1 -8 1 1 409 23 33 21 23 33 50 --- 20 11 02 85.2 153.1 -0.2 -25.2 22 F 1 410 23 33 21 23 33 50 J2015+3710 20 11 02 85.3 168.3 -0.1 -10.9 -16 1 1 410 23 33 50 23 34 20 --- 20 11 32 85.4 169.5 -0.1 -9.8 14 F 1 411 23 33 50 23 34 20 G75.76 20 11 32 85.2 154.2 -0.2 -24.2 -16 1 1 411 23 34 20 23 34 50 --- 20 12 02 85.3 155.3 -0.2 -23.1 14 F 1 412 23 34 20 23 34 50 J2018+3812 20 12 02 86.2 158.7 -0.1 -20.1 -8 1 1 412 23 34 50 23 35 20 --- 20 12 32 86.3 160.2 -0.1 -18.8 22 F 1 413 23 34 50 23 35 20 G75.76 20 12 32 85.3 156.4 -0.2 -22.1 -9 1 1 413 23 35 20 23 35 50 --- 20 13 02 85.4 157.5 -0.1 -21.0 21 F 1 414 23 35 20 23 35 50 J2015+3710 20 13 02 85.4 173.2 0.0 -6.4 -16 1 1 414 23 35 50 23 36 20 --- 20 13 32 85.4 174.4 0.0 -5.2 13 F 1 414 23 35 50 23 36 20 G75.76 20 13 32 85.4 158.7 -0.1 -20.0 -16 1 1 414 23 36 20 23 36 50 --- 20 14 02 85.4 159.9 -0.1 -18.9 13 F 1 415 23 36 20 23 36 50 J2018+3812 20 14 02 86.3 164.5 -0.1 -14.7 -9 1 1 415 23 36 50 23 37 20 --- 20 14 32 86.4 166.0 -0.1 -13.2 21 F 1 416 23 36 50 23 37 20 G75.76 20 14 32 85.5 161.0 -0.1 -17.8 -9 1 1 416 23 37 20 23 37 50 --- 20 15 02 85.5 162.2 -0.1 -16.7 21 F 1 417 23 37 20 Schedule for VLBA_NL (Code Nl ) Page 31 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 37 50 J2015+3710 20 15 02 85.4 178.2 0.0 -1.7 -17 1 1 417 23 37 50 23 38 20 --- 20 15 32 85.4 179.4 0.0 -0.5 13 F 1 418 23 37 50 23 38 20 G75.76 20 15 32 85.5 163.5 -0.1 -15.5 -17 1 1 418 23 38 20 23 38 50 --- 20 16 02 85.5 164.7 -0.1 -14.4 13 F 1 419 23 38 20 23 38 50 J2018+3812 20 16 02 86.4 170.6 0.0 -8.9 -10 1 1 419 23 38 50 23 39 20 --- 20 16 32 86.4 172.2 0.0 -7.4 20 F 1 420 23 38 50 23 39 20 G75.76 20 16 32 85.6 165.9 -0.1 -13.2 -10 1 1 420 23 39 20 23 39 50 --- 20 17 02 85.6 167.2 -0.1 -12.0 20 F 1 421 23 39 20 23 39 50 J2015+3710 20 17 02 85.4 183.2 0.0 3.0 -17 1 1 421 23 39 50 23 40 19 --- 20 17 32 85.4 184.4 0.0 4.1 13 F 1 422 23 39 50 23 40 19 G75.76 20 17 32 85.6 168.4 -0.1 -10.9 -17 1 1 422 23 40 19 23 40 49 --- 20 18 02 85.6 169.7 -0.1 -9.7 13 F 1 423 23 40 19 23 40 49 J2018+3812 20 18 02 86.5 176.9 0.0 -2.9 -11 1 1 423 23 40 49 23 41 19 --- 20 18 32 86.5 178.5 0.0 -1.4 19 F 1 424 23 40 49 23 41 19 G75.76 20 18 32 85.6 171.0 -0.1 -8.4 -11 1 1 424 23 41 19 23 41 49 --- 20 19 02 85.6 172.3 0.0 -7.2 19 F 1 425 23 41 19 23 41 49 J2015+3710 20 19 02 85.4 188.1 0.1 7.6 -17 1 1 425 23 41 49 23 42 19 --- 20 19 32 85.4 189.4 0.1 8.8 13 F 1 426 23 41 49 23 42 19 G75.76 20 19 32 85.7 173.6 0.0 -6.0 -17 1 1 426 23 42 19 23 42 49 --- 20 20 02 85.7 174.9 0.0 -4.8 13 F 1 427 23 42 19 23 42 49 J2018+3812 20 20 02 86.5 183.3 0.0 3.1 -12 1 1 427 23 42 49 23 43 19 --- 20 20 32 86.5 184.9 0.0 4.6 18 F 1 428 23 42 49 23 43 19 G75.76 20 20 32 85.7 176.2 0.0 -3.6 -12 1 1 428 23 43 19 23 43 49 --- 20 21 02 85.7 177.5 0.0 -2.3 18 F 1 429 23 43 19 23 43 49 J2015+3710 20 21 02 85.3 193.0 0.1 12.1 -16 1 1 429 23 43 49 23 44 19 --- 20 21 32 85.3 194.2 0.1 13.3 14 F 1 430 23 43 49 23 44 19 G75.76 20 21 32 85.7 178.8 0.0 -1.1 -16 1 1 430 23 44 19 23 44 49 --- 20 22 02 85.7 180.2 0.0 0.2 14 F 1 431 23 44 19 23 44 49 J2018+3812 20 22 02 86.4 189.6 0.1 9.1 -12 1 1 431 23 44 49 23 45 19 --- 20 22 32 86.4 191.1 0.1 10.6 18 F 1 432 23 44 49 Schedule for VLBA_NL (Code Nl ) Page 32 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 45 19 G75.76 20 22 32 85.7 181.5 0.0 1.4 -12 1 1 432 23 45 19 23 45 49 --- 20 23 02 85.7 182.8 0.0 2.6 17 F 1 433 23 45 19 23 45 49 J2015+3710 20 23 02 85.2 197.7 0.1 16.5 -16 1 1 433 23 45 49 23 46 18 --- 20 23 32 85.2 198.8 0.1 17.6 14 F 1 434 23 45 49 23 46 18 G75.76 20 23 32 85.7 184.1 0.0 3.9 -16 1 1 434 23 46 18 23 46 48 --- 20 24 02 85.7 185.4 0.0 5.1 14 F 1 435 23 46 18 23 46 48 J2018+3812 20 24 02 86.3 195.7 0.1 14.9 -13 1 1 435 23 46 48 23 47 18 --- 20 24 32 86.3 197.2 0.1 16.3 17 F 1 436 23 46 48 23 47 18 G75.76 20 24 32 85.7 186.7 0.0 6.3 -13 1 1 436 23 47 18 23 47 48 --- 20 25 02 85.6 188.0 0.1 7.5 17 F 1 437 23 47 18 Next scan frequencies: 22020.49 22045.49 22107.99 22207.99 22370.49 22420.49 22457.99 22470.49 Next BBC frequencies: 520.49 545.49 607.99 707.99 870.49 920.49 957.99 970.49 23 49 49 1743-035 20 27 03 31.3 229.6 2.7 34.7 6 1 1 437 23 49 49 23 50 48 --- 20 28 03 31.2 229.8 2.7 34.8 60 F 1 439 23 50 07 23 51 22 1751+093 20 28 36 43.0 238.3 2.6 40.1 4 1 1 439 23 51 22 23 52 21 --- 20 29 36 42.8 238.6 2.6 40.2 60 F 1 441 23 51 40 23 54 26 2236+282 20 31 41 61.4 107.5 -2.1 -54.0 31 1 1 441 23 54 26 23 55 26 --- 20 32 41 61.6 107.8 -2.1 -53.9 60 F 1 442 23 54 44 23 57 19 0017+813 20 34 34 46.1 10.0 -3.7 -117.3 42 1 1 442 23 57 19 23 58 19 --- 20 35 34 46.1 10.0 -3.7 -117.5 60 F 1 444 23 57 37 23 58 39 0019+732 20 35 54 49.2 21.1 -3.7 -108.7 6 1 1 444 23 58 19 23 59 38 --- 20 36 54 49.3 21.1 -3.7 -109.0 60 F 1 447 23 58 19 --- Fri 2 Nov 2007 Day 306 --- 00 00 45 0303+471 20 38 01 25.6 48.3 -6.4 -55.2 13 1 1 447 00 00 45 00 01 45 --- 20 39 01 25.7 48.4 -6.4 -55.4 60 F 1 449 00 01 03 00 02 30 0958+653 20 39 46 18.4 -8.5 10.7 15.5 1 1 1 449 00 02 30 00 03 30 --- 20 40 46 18.4 -8.4 10.7 15.3 60 F 1 451 00 02 48 Schedule for VLBA_NL (Code Nl ) Page 33 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- 00 04 08 1058+811 20 41 24 34.3 -6.0 9.7 30.7 0 1 1 451 00 04 08 00 05 07 --- 20 42 24 34.3 -6.0 9.7 30.4 60 F 1 453 00 04 26 00 05 47 1302+574 20 43 04 23.3 -31.8 7.7 47.4 12 1 1 453 00 05 47 00 06 47 --- 20 44 04 23.2 -31.7 7.7 47.2 60 F 1 455 00 06 05 00 07 14 1419+542 20 44 32 29.7 -41.8 6.4 58.6 9 1 1 455 00 07 14 00 08 14 --- 20 45 32 29.5 -41.7 6.4 58.4 60 F 1 457 00 07 32 00 11 40 1557-000 20 48 58 12.8 258.2 4.8 46.9 0 1 1 457 00 11 40 00 12 40 --- 20 49 58 12.6 258.4 4.9 46.9 60 F 1 459 00 11 58 00 14 30 1638+572 20 51 48 47.8 314.0 4.2 83.3 33 1 1 459 00 14 30 00 15 30 --- 20 52 48 47.7 314.1 4.2 83.1 60 F 1 460 00 14 48 00 15 56 1740+521 20 53 15 56.3 304.8 3.2 88.5 3 1 1 460 00 15 56 00 16 56 --- 20 54 15 56.1 304.8 3.2 88.3 60 F 1 462 00 16 14 00 17 26 1746+622 20 54 44 55.6 323.1 3.1 104.5 11 1 1 462 00 17 26 00 18 25 --- 20 55 44 55.5 323.1 3.2 104.3 60 F 1 464 00 17 44 00 21 05 2148+065 20 58 25 53.5 158.8 -0.8 -15.8 44 1 1 464 00 21 05 00 22 05 --- 20 59 25 53.6 159.2 -0.8 -15.5 60 F 1 466 00 21 23 00 23 25 2236+282 21 00 45 66.5 116.5 -1.6 -49.4 46 1 1 466 00 23 25 00 24 25 --- 21 01 45 66.6 116.9 -1.6 -49.2 60 F 1 468 00 23 43 00 26 18 0017+813 21 03 38 47.0 9.2 -3.2 -125.0 35 1 1 468 00 26 18 00 27 18 --- 21 04 38 47.0 9.2 -3.2 -125.3 60 F 1 470 00 26 36 00 27 38 0019+732 21 04 59 51.1 19.9 -3.3 -116.7 7 1 1 470 00 27 38 00 28 38 --- 21 05 59 51.2 19.8 -3.2 -116.9 60 F 1 472 00 27 56 00 31 46 0121+114 21 09 07 27.7 99.1 -4.2 -48.8 129 1 1 472 00 31 46 00 32 46 --- 21 10 07 27.9 99.3 -4.2 -48.8 60 F 1 474 00 32 04 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 00 34 14 3C454.3G 21 11 36 56.2 131.5 -1.7 -35.6 26 1 1 474 00 34 14 00 36 14 --- 21 13 36 56.5 132.2 -1.7 -35.1 120 F 1 478 00 34 32 Schedule for VLBA_NL (Code Nl ) Page 34 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 00 36 19 3C454.3O 21 13 41 56.5 132.3 -1.7 -35.1 1 1 1 478 00 36 14 00 38 19 --- 21 15 41 56.8 133.0 -1.6 -34.6 120 F 1 482 00 36 47 00 40 25 ON1 21 17 47 73.1 238.2 1.1 48.0 50 1 1 482 00 40 25 00 40 55 --- 21 18 17 73.0 238.4 1.1 48.2 30 F 1 483 00 40 43 00 40 55 J2003+3034 21 18 17 71.3 239.2 1.2 48.1 -9 1 1 483 00 40 55 00 41 25 --- 21 18 47 71.3 239.4 1.2 48.3 21 F 1 484 00 40 55 00 41 25 ON1 21 18 47 73.0 238.7 1.1 48.4 -9 1 1 484 00 41 25 00 41 55 --- 21 19 17 72.9 238.9 1.1 48.5 21 F 1 485 00 41 25 00 41 55 20092+30494 21 19 17 72.3 237.6 1.2 47.2 -7 1 1 485 00 41 55 00 42 24 --- 21 19 47 72.2 237.8 1.2 47.3 23 F 1 486 00 41 55 00 42 24 ON1 21 19 47 72.8 239.2 1.2 48.7 -7 1 1 486 00 42 24 00 42 54 --- 21 20 17 72.7 239.4 1.2 48.9 23 F 1 487 00 42 24 00 42 54 20134+31264 21 20 17 73.2 237.6 1.1 47.6 -7 1 1 487 00 42 54 00 43 24 --- 21 20 47 73.1 237.8 1.1 47.7 23 F 1 488 00 42 54 00 43 24 ON1 21 20 47 72.6 239.6 1.2 49.0 -7 1 1 488 00 43 24 00 43 54 --- 21 21 17 72.6 239.9 1.2 49.2 23 F 1 489 00 43 24 00 43 54 J2003+3034 21 21 17 70.9 240.5 1.3 49.0 -9 1 1 489 00 43 54 00 44 24 --- 21 21 47 70.8 240.7 1.3 49.1 21 F 1 490 00 43 54 00 44 24 ON1 21 21 47 72.5 240.1 1.2 49.3 -9 1 1 490 00 44 24 00 44 54 --- 21 22 17 72.4 240.3 1.2 49.5 21 F 1 491 00 44 24 00 44 54 20092+30494 21 22 17 71.8 239.0 1.2 48.1 -7 1 1 491 00 44 54 00 45 24 --- 21 22 47 71.7 239.2 1.2 48.3 23 F 1 492 00 44 54 00 45 24 ON1 21 22 47 72.3 240.5 1.2 49.6 -7 1 1 492 00 45 24 00 45 54 --- 21 23 17 72.2 240.8 1.2 49.8 23 F 1 492 00 45 24 00 45 54 20134+31264 21 23 17 72.7 239.0 1.2 48.6 -7 1 1 492 00 45 54 00 46 24 --- 21 23 47 72.6 239.3 1.2 48.7 23 F 1 493 00 45 54 Schedule for VLBA_NL (Code Nl ) Page 35 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- 00 46 24 ON1 21 23 47 72.2 241.0 1.2 49.9 -7 1 1 493 00 46 24 00 46 54 --- 21 24 17 72.1 241.2 1.2 50.1 23 F 1 494 00 46 24 00 46 54 J2003+3034 21 24 17 70.4 241.8 1.3 49.8 -9 1 1 494 00 46 54 00 47 24 --- 21 24 47 70.3 242.0 1.3 49.9 21 F 1 495 00 46 54 00 47 24 ON1 21 24 47 72.0 241.4 1.2 50.2 -9 1 1 495 00 47 24 00 47 54 --- 21 25 17 71.9 241.7 1.2 50.4 21 F 1 496 00 47 24 00 47 54 20092+30494 21 25 17 71.3 240.3 1.3 49.0 -7 1 1 496 00 47 54 00 48 23 --- 21 25 47 71.2 240.6 1.3 49.2 23 F 1 497 00 47 54 00 48 23 ON1 21 25 47 71.8 241.9 1.3 50.5 -7 1 1 497 00 48 23 00 48 53 --- 21 26 17 71.7 242.1 1.3 50.7 23 F 1 498 00 48 23 00 48 53 20134+31264 21 26 17 72.2 240.4 1.2 49.5 -7 1 1 498 00 48 53 00 49 23 --- 21 26 47 72.1 240.7 1.2 49.7 23 F 1 499 00 48 53 00 49 23 ON1 21 26 47 71.7 242.3 1.3 50.8 -7 1 1 499 00 49 23 00 49 53 --- 21 27 17 71.6 242.5 1.3 50.9 23 F 1 500 00 49 23 00 49 53 J2003+3034 21 27 17 69.9 243.0 1.4 50.5 -9 1 1 500 00 49 53 00 50 23 --- 21 27 47 69.8 243.2 1.4 50.7 21 F 1 501 00 49 53 00 50 23 ON1 21 27 47 71.5 242.7 1.3 51.1 -9 1 1 501 00 50 23 00 50 53 --- 21 28 17 71.4 242.9 1.3 51.2 21 F 1 502 00 50 23 00 50 53 20092+30494 21 28 17 70.8 241.6 1.3 49.8 -7 1 1 502 00 50 53 00 51 23 --- 21 28 47 70.7 241.8 1.3 50.0 23 F 1 503 00 50 53 00 51 23 ON1 21 28 47 71.3 243.2 1.3 51.3 -7 1 1 503 00 51 23 00 51 53 --- 21 29 17 71.2 243.4 1.3 51.5 23 F 1 504 00 51 23 00 51 53 20134+31264 21 29 17 71.7 241.8 1.3 50.4 -7 1 1 504 00 51 53 00 52 23 --- 21 29 47 71.7 242.0 1.3 50.5 23 F 1 505 00 51 53 00 52 23 ON1 21 29 47 71.2 243.6 1.3 51.6 -7 1 1 505 00 52 23 00 52 53 --- 21 30 17 71.1 243.8 1.3 51.7 23 F 1 506 00 52 23 00 52 53 J2003+3034 21 30 17 69.4 244.2 1.4 51.3 -9 1 1 506 00 52 53 00 53 23 --- 21 30 47 69.3 244.4 1.4 51.4 21 F 1 507 00 52 53 00 53 23 ON1 21 30 47 71.0 244.0 1.3 51.9 -9 1 1 507 00 53 23 00 53 53 --- 21 31 17 70.9 244.2 1.3 52.0 21 F 1 508 00 53 23 Schedule for VLBA_NL (Code Nl ) Page 36 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- 00 53 53 20092+30494 21 31 17 70.3 242.9 1.4 50.6 -7 1 1 508 00 53 53 00 54 22 --- 21 31 47 70.2 243.1 1.4 50.8 23 F 1 509 00 53 53 00 54 22 ON1 21 31 47 70.8 244.4 1.4 52.1 -7 1 1 509 00 54 22 00 54 52 --- 21 32 17 70.7 244.6 1.4 52.2 23 F 1 510 00 54 22 00 54 52 20134+31264 21 32 17 71.2 243.0 1.3 51.2 -7 1 1 510 00 54 52 00 55 22 --- 21 32 47 71.2 243.2 1.3 51.3 23 F 1 511 00 54 52 00 55 22 ON1 21 32 47 70.7 244.8 1.4 52.3 -7 1 1 511 00 55 22 00 55 52 --- 21 33 17 70.6 245.0 1.4 52.5 23 F 1 512 00 55 22 00 55 52 J2003+3034 21 33 17 68.9 245.3 1.5 51.9 -9 1 1 512 00 55 52 00 56 22 --- 21 33 47 68.8 245.5 1.5 52.0 21 F 1 513 00 55 52 00 56 22 ON1 21 33 47 70.5 245.2 1.4 52.6 -9 1 1 513 00 56 22 00 56 52 --- 21 34 17 70.4 245.4 1.4 52.7 21 F 1 514 00 56 22 00 56 52 20092+30494 21 34 17 69.8 244.1 1.4 51.4 -7 1 1 514 00 56 52 00 57 22 --- 21 34 47 69.7 244.2 1.4 51.5 23 F 1 515 00 56 52 00 57 22 ON1 21 34 47 70.3 245.5 1.4 52.8 -7 1 1 515 00 57 22 00 57 52 --- 21 35 17 70.2 245.7 1.4 52.9 23 F 1 516 00 57 22 00 57 52 20134+31264 21 35 17 70.7 244.3 1.4 52.0 -7 1 1 516 00 57 52 00 58 22 --- 21 35 47 70.7 244.5 1.4 52.1 23 F 1 517 00 57 52 00 58 22 ON1 21 35 47 70.2 245.9 1.4 53.0 -7 1 1 517 00 58 22 00 58 52 --- 21 36 17 70.1 246.1 1.4 53.2 23 F 1 518 00 58 22 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 01 00 16 G75.76 21 37 42 74.8 259.7 1.3 67.6 69 1 1 518 01 00 16 01 00 46 --- 21 38 12 74.7 259.9 1.3 67.7 30 F 1 519 01 00 34 01 00 46 J2015+3710 21 38 12 73.5 260.8 1.4 67.6 -8 1 1 519 01 00 46 01 01 16 --- 21 38 42 73.4 260.9 1.4 67.6 21 F 1 519 01 00 46 01 01 16 G75.76 21 38 42 74.6 260.0 1.3 67.7 -8 1 1 519 01 01 16 01 01 46 --- 21 39 12 74.6 260.2 1.3 67.8 21 F 1 520 01 01 16 Schedule for VLBA_NL (Code Nl ) Page 37 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- 01 01 46 J2018+3812 21 39 12 74.3 263.7 1.3 70.7 -8 1 1 520 01 01 46 01 02 16 --- 21 39 42 74.2 263.8 1.3 70.7 22 F 1 521 01 01 46 01 02 16 G75.76 21 39 42 74.5 260.3 1.3 67.8 -8 1 1 521 01 02 16 01 02 45 --- 21 40 12 74.4 260.4 1.3 67.9 22 F 1 522 01 02 16 01 02 45 J2015+3710 21 40 12 73.1 261.3 1.4 67.8 -8 1 1 522 01 02 45 01 03 15 --- 21 40 42 73.0 261.4 1.4 67.8 21 F 1 523 01 02 45 01 03 15 G75.76 21 40 42 74.3 260.6 1.3 68.0 -8 1 1 523 01 03 15 01 03 45 --- 21 41 12 74.2 260.7 1.3 68.0 21 F 1 524 01 03 15 01 03 45 J2018+3812 21 41 12 73.9 264.1 1.4 70.8 -8 1 1 524 01 03 45 01 04 15 --- 21 41 42 73.8 264.3 1.4 70.9 22 F 1 525 01 03 45 01 04 15 G75.76 21 41 42 74.1 260.9 1.3 68.1 -8 1 1 525 01 04 15 01 04 45 --- 21 42 12 74.0 261.0 1.3 68.1 22 F 1 526 01 04 15 01 04 45 J2015+3710 21 42 12 72.8 261.8 1.4 68.0 -8 1 1 526 01 04 45 01 05 15 --- 21 42 42 72.7 261.9 1.4 68.0 21 F 1 527 01 04 45 01 05 15 G75.76 21 42 42 73.9 261.1 1.3 68.2 -8 1 1 527 01 05 15 01 05 45 --- 21 43 12 73.8 261.3 1.4 68.2 21 F 1 528 01 05 15 01 05 45 J2018+3812 21 43 12 73.5 264.6 1.4 71.0 -8 1 1 528 01 05 45 01 06 15 --- 21 43 42 73.4 264.7 1.4 71.0 22 F 1 529 01 05 45 01 06 15 G75.76 21 43 42 73.7 261.4 1.4 68.3 -8 1 1 529 01 06 15 01 06 45 --- 21 44 12 73.6 261.5 1.4 68.3 22 F 1 530 01 06 15 01 06 45 J2015+3710 21 44 12 72.4 262.3 1.5 68.1 -8 1 1 530 01 06 45 01 07 15 --- 21 44 42 72.3 262.4 1.5 68.2 21 F 1 531 01 06 45 01 07 15 G75.76 21 44 42 73.5 261.6 1.4 68.4 -8 1 1 531 01 07 15 01 07 45 --- 21 45 12 73.4 261.8 1.4 68.4 21 F 1 532 01 07 15 01 07 45 J2018+3812 21 45 12 73.2 265.0 1.4 71.1 -8 1 1 532 01 07 45 01 08 15 --- 21 45 42 73.1 265.2 1.4 71.1 22 F 1 533 01 07 45 01 08 15 G75.76 21 45 42 73.4 261.9 1.4 68.5 -8 1 1 533 01 08 15 01 08 44 --- 21 46 12 73.3 262.0 1.4 68.5 22 F 1 534 01 08 15 01 08 44 J2015+3710 21 46 12 72.0 262.8 1.5 68.3 -8 1 1 534 01 08 44 01 09 14 --- 21 46 42 71.9 262.9 1.5 68.3 21 F 1 535 01 08 44 Schedule for VLBA_NL (Code Nl ) Page 38 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- 01 09 14 G75.76 21 46 42 73.2 262.2 1.4 68.5 -8 1 1 535 01 09 14 01 09 44 --- 21 47 12 73.1 262.3 1.4 68.6 21 F 1 536 01 09 14 01 09 44 J2018+3812 21 47 12 72.8 265.5 1.5 71.2 -8 1 1 536 01 09 44 01 10 14 --- 21 47 42 72.7 265.6 1.5 71.2 22 F 1 537 01 09 44 01 10 14 G75.76 21 47 42 73.0 262.4 1.4 68.6 -8 1 1 537 01 10 14 01 10 44 --- 21 48 12 72.9 262.5 1.4 68.7 22 F 1 538 01 10 14 01 10 44 J2015+3710 21 48 12 71.7 263.3 1.5 68.4 -8 1 1 538 01 10 44 01 11 14 --- 21 48 42 71.6 263.4 1.5 68.5 21 F 1 539 01 10 44 01 11 14 G75.76 21 48 42 72.8 262.6 1.4 68.7 -8 1 1 539 01 11 14 01 11 44 --- 21 49 12 72.7 262.8 1.5 68.8 21 F 1 540 01 11 14 01 11 44 J2018+3812 21 49 12 72.4 265.9 1.5 71.3 -8 1 1 540 01 11 44 01 12 14 --- 21 49 42 72.3 266.0 1.5 71.3 22 F 1 541 01 11 44 01 12 14 G75.76 21 49 42 72.6 262.9 1.5 68.8 -8 1 1 541 01 12 14 01 12 44 --- 21 50 12 72.5 263.0 1.5 68.8 22 F 1 542 01 12 14 01 12 44 J2015+3710 21 50 12 71.3 263.7 1.6 68.6 -8 1 1 542 01 12 44 01 13 14 --- 21 50 42 71.2 263.8 1.6 68.6 21 F 1 543 01 12 44 01 13 14 G75.76 21 50 42 72.4 263.1 1.5 68.9 -8 1 1 543 01 13 14 01 13 44 --- 21 51 12 72.3 263.2 1.5 68.9 21 F 1 544 01 13 14 01 13 44 J2018+3812 21 51 12 72.1 266.3 1.5 71.4 -8 1 1 544 01 13 44 01 14 14 --- 21 51 42 72.0 266.4 1.5 71.4 22 F 1 545 01 13 44 01 14 14 G75.76 21 51 42 72.2 263.4 1.5 68.9 -8 1 1 545 01 14 14 01 14 43 --- 21 52 12 72.2 263.5 1.5 69.0 22 F 1 546 01 14 14