COVER INFORMATION Station: VLBA_HN (Code Hn ) Experiment: Parallaxes to Water Masers Exp. Code: BM272IB Schedule Version: 2.00 Processed by SCHED version: 6.05 June 2006 PI: Karl M. Menten Address: MPIfR Auf dem Huegel 69 53121 Bonn Germany Phone: +49 228 525 377 EMAIL: kmenten@mpifr-bonn.mpg.de Fax: +49 228 525 229 Phone during observation: +49 228 525 377 Observing mode: VLBA 256-8-2 1.3cm Notes: Schedule for VLBA_HN (Code Hn ) Page 2 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- Next scan frequencies: 22020.49 22045.49 22107.99 22207.99 22370.49 22420.49 22457.99 22470.49 Next BBC frequencies: 520.49 545.49 607.99 707.99 870.49 920.49 957.99 970.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 19 29 39 0753+535 17 24 32 11.9 -21.4 9.5 27.0 0 1 1 0 19 29 39 19 30 39 --- 17 25 32 11.9 -21.3 9.5 26.8 60 F 1 2 19 29 57 19 30 52 0808+495 17 25 44 9.4 -25.3 9.3 29.1 2 1 1 2 19 30 39 19 31 51 --- 17 26 44 9.3 -25.2 9.3 28.9 60 F 1 4 19 30 39 19 33 46 0927+390 17 28 40 8.2 -42.7 8.0 39.7 97 1 1 4 19 33 46 19 34 46 --- 17 29 40 8.0 -42.5 8.0 39.6 60 F 1 6 19 34 04 19 35 51 1048+714 17 30 44 37.2 -22.8 6.7 64.7 0 1 1 6 19 35 51 19 36 50 --- 17 31 44 37.2 -22.8 6.7 64.5 60 F 1 8 19 36 09 19 42 46 1153+805 17 37 41 42.9 -12.4 5.7 85.5 338 1 1 8 19 42 46 19 43 46 --- 17 38 41 42.9 -12.4 5.8 85.3 60 F 1 10 19 43 04 19 45 16 1310+322 17 40 11 37.0 -77.7 4.5 57.8 41 1 1 10 19 45 16 19 46 16 --- 17 41 11 36.9 -77.6 4.5 57.8 60 F 1 12 19 45 34 19 47 45 1357+764 17 42 41 49.2 -17.0 3.7 111.5 43 1 1 12 19 47 45 19 48 45 --- 17 43 41 49.1 -17.1 3.8 111.2 60 F 1 14 19 48 03 19 51 47 1557-000 17 46 43 40.6 216.9 1.8 26.1 20 1 1 14 19 51 47 19 52 47 --- 17 47 43 40.5 217.2 1.8 26.3 60 F 1 16 19 52 05 19 54 14 1640+394 17 49 11 76.8 261.9 1.1 70.6 9 1 1 16 19 54 14 19 55 14 --- 17 50 11 76.6 262.2 1.2 70.7 60 F 1 18 19 54 32 19 56 52 1743-035 17 51 49 43.2 182.5 0.1 1.9 25 1 1 18 19 56 52 19 57 52 --- 17 52 49 43.2 182.9 0.1 2.1 60 F 1 20 19 57 10 19 58 25 1751+093 17 53 22 56.7 180.7 0.0 0.5 0 1 1 20 19 58 25 19 59 24 --- 17 54 22 56.7 181.1 0.0 0.8 60 F 1 22 19 58 43 20 01 30 1800+782 17 56 28 54.5 360.3 -0.1 -178.8 0 1 1 22 20 01 30 20 02 30 --- 17 57 28 54.5 360.2 0.0 -179.1 60 F 1 24 20 01 48 Schedule for VLBA_HN (Code Hn ) Page 3 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 03 17 0019+732 17 58 15 39.3 381.4 -6.4 -70.3 11 1 1 24 20 03 17 20 04 17 --- 17 59 15 39.4 381.4 -6.3 -70.5 60 F 1 25 20 03 35 20 04 54 0102+582 17 59 52 28.4 394.9 -7.1 -53.2 9 1 1 25 20 04 54 20 05 54 --- 18 00 52 28.5 395.0 -7.0 -53.4 60 F 1 27 20 05 12 20 06 27 0217+734 18 01 25 32.7 375.8 -8.3 -46.0 14 1 1 27 20 06 27 20 07 26 --- 18 02 25 32.7 375.9 -8.3 -46.2 60 F 1 29 20 06 45 20 10 28 1310+322 18 05 27 32.6 285.8 4.9 56.5 115 1 1 29 20 10 28 20 11 28 --- 18 06 27 32.4 285.9 4.9 56.4 60 F 1 31 20 10 46 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 20 14 56 3C345G 18 09 55 73.5 266.4 1.4 72.0 120 1 1 31 20 14 56 20 16 55 --- 18 11 55 73.1 266.8 1.5 72.1 120 F 1 35 20 15 14 Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 20 17 00 3C345O 18 12 01 73.1 266.9 1.5 72.1 1 1 1 35 20 16 55 20 19 00 --- 18 14 01 72.7 267.3 1.5 72.1 120 F 1 39 20 17 28 20 20 53 ON1 18 15 54 64.7 107.2 -1.9 -55.2 0 1 1 39 20 20 53 20 21 23 --- 18 16 24 64.8 107.3 -1.9 -55.1 30 F 1 40 20 21 11 20 21 23 J2003+3034 18 16 24 65.4 111.1 -1.8 -52.5 -9 1 1 40 20 21 23 20 21 52 --- 18 16 54 65.4 111.3 -1.8 -52.4 21 F 1 41 20 21 23 20 21 52 ON1 18 16 54 64.9 107.5 -1.9 -55.0 -9 1 1 41 20 21 52 20 22 22 --- 18 17 24 64.9 107.6 -1.9 -55.0 21 F 1 42 20 21 52 20 22 22 20092+30494 18 17 24 64.7 109.2 -1.9 -53.6 -7 1 1 42 20 22 22 20 22 52 --- 18 17 54 64.8 109.4 -1.9 -53.6 23 F 1 43 20 22 22 20 22 52 ON1 18 17 54 65.0 107.8 -1.9 -54.9 -7 1 1 43 20 22 52 20 23 22 --- 18 18 24 65.1 107.9 -1.9 -54.8 23 F 1 44 20 22 52 Schedule for VLBA_HN (Code Hn ) Page 4 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 23 22 20134+31264 18 18 24 64.5 107.1 -1.9 -55.1 -7 1 1 44 20 23 22 20 23 52 --- 18 18 54 64.6 107.3 -1.9 -55.1 23 F 1 45 20 23 22 20 23 52 ON1 18 18 54 65.2 108.0 -1.9 -54.8 -7 1 1 45 20 23 52 20 24 22 --- 18 19 24 65.3 108.2 -1.9 -54.7 23 F 1 46 20 23 52 20 24 22 J2003+3034 18 19 24 65.9 112.1 -1.7 -52.0 -9 1 1 46 20 24 22 20 24 52 --- 18 19 54 66.0 112.3 -1.7 -51.9 21 F 1 47 20 24 22 20 24 52 ON1 18 19 54 65.4 108.3 -1.8 -54.6 -9 1 1 47 20 24 52 20 25 22 --- 18 20 24 65.5 108.5 -1.8 -54.6 21 F 1 48 20 24 52 20 25 22 20092+30494 18 20 24 65.2 110.1 -1.8 -53.2 -7 1 1 48 20 25 22 20 25 52 --- 18 20 54 65.3 110.3 -1.8 -53.1 23 F 1 49 20 25 22 20 25 52 ON1 18 20 54 65.6 108.6 -1.8 -54.5 -7 1 1 49 20 25 52 20 26 22 --- 18 21 24 65.6 108.8 -1.8 -54.4 23 F 1 50 20 25 52 20 26 22 20134+31264 18 21 24 65.0 108.0 -1.9 -54.7 -7 1 1 50 20 26 22 20 26 52 --- 18 21 54 65.1 108.1 -1.9 -54.7 23 F 1 51 20 26 22 20 26 52 ON1 18 21 54 65.7 108.9 -1.8 -54.4 -7 1 1 51 20 26 52 20 27 22 --- 18 22 24 65.8 109.1 -1.8 -54.3 23 F 1 52 20 26 52 20 27 22 J2003+3034 18 22 24 66.4 113.1 -1.7 -51.5 -9 1 1 52 20 27 22 20 27 51 --- 18 22 54 66.5 113.3 -1.7 -51.4 21 F 1 53 20 27 22 20 27 51 ON1 18 22 54 65.9 109.2 -1.8 -54.2 -9 1 1 53 20 27 51 20 28 21 --- 18 23 24 66.0 109.4 -1.8 -54.1 21 F 1 54 20 27 51 20 28 21 20092+30494 18 23 24 65.7 111.0 -1.8 -52.7 -7 1 1 54 20 28 21 20 28 51 --- 18 23 54 65.8 111.2 -1.8 -52.7 23 F 1 55 20 28 21 20 28 51 ON1 18 23 54 66.1 109.6 -1.8 -54.1 -7 1 1 55 20 28 51 20 29 21 --- 18 24 24 66.2 109.7 -1.8 -54.0 23 F 1 56 20 28 51 20 29 21 20134+31264 18 24 24 65.5 108.9 -1.8 -54.3 -7 1 1 56 20 29 21 20 29 51 --- 18 24 54 65.6 109.0 -1.8 -54.2 23 F 1 57 20 29 21 20 29 51 ON1 18 24 54 66.2 109.9 -1.8 -53.9 -7 1 1 57 20 29 51 20 30 21 --- 18 25 24 66.3 110.0 -1.8 -53.8 23 F 1 58 20 29 51 20 30 21 J2003+3034 18 25 24 66.9 114.1 -1.6 -50.9 -9 1 1 58 20 30 21 20 30 51 --- 18 25 54 67.0 114.3 -1.6 -50.8 21 F 1 58 20 30 21 Schedule for VLBA_HN (Code Hn ) Page 5 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 30 51 ON1 18 25 54 66.4 110.2 -1.7 -53.8 -9 1 1 58 20 30 51 20 31 21 --- 18 26 24 66.5 110.3 -1.7 -53.7 21 F 1 59 20 30 51 20 31 21 20092+30494 18 26 24 66.2 112.0 -1.7 -52.2 -7 1 1 59 20 31 21 20 31 51 --- 18 26 54 66.3 112.2 -1.7 -52.2 23 F 1 60 20 31 21 20 31 51 ON1 18 26 54 66.6 110.5 -1.7 -53.6 -7 1 1 60 20 31 51 20 32 21 --- 18 27 24 66.7 110.6 -1.7 -53.5 23 F 1 61 20 31 51 20 32 21 20134+31264 18 27 24 66.1 109.8 -1.8 -53.9 -7 1 1 61 20 32 21 20 32 51 --- 18 27 54 66.2 109.9 -1.8 -53.8 23 F 1 62 20 32 21 20 32 51 ON1 18 27 54 66.8 110.8 -1.7 -53.4 -7 1 1 62 20 32 51 20 33 21 --- 18 28 24 66.8 111.0 -1.7 -53.3 23 F 1 63 20 32 51 20 33 21 J2003+3034 18 28 24 67.4 115.2 -1.6 -50.3 -9 1 1 63 20 33 21 20 33 50 --- 18 28 54 67.5 115.3 -1.6 -50.2 21 F 1 64 20 33 21 20 33 50 ON1 18 28 54 66.9 111.1 -1.7 -53.3 -9 1 1 64 20 33 50 20 34 20 --- 18 29 24 67.0 111.3 -1.7 -53.2 21 F 1 65 20 33 50 20 34 20 20092+30494 18 29 24 66.7 113.0 -1.7 -51.7 -7 1 1 65 20 34 20 20 34 50 --- 18 29 54 66.8 113.2 -1.7 -51.6 23 F 1 66 20 34 20 20 34 50 ON1 18 29 54 67.1 111.5 -1.7 -53.1 -7 1 1 66 20 34 50 20 35 20 --- 18 30 24 67.2 111.6 -1.7 -53.0 23 F 1 67 20 34 50 20 35 20 20134+31264 18 30 24 66.6 110.7 -1.7 -53.4 -7 1 1 67 20 35 20 20 35 50 --- 18 30 54 66.7 110.9 -1.7 -53.3 23 F 1 68 20 35 20 20 35 50 ON1 18 30 54 67.3 111.8 -1.7 -52.9 -7 1 1 68 20 35 50 20 36 20 --- 18 31 24 67.4 112.0 -1.7 -52.8 23 F 1 69 20 35 50 20 36 20 J2003+3034 18 31 24 67.9 116.2 -1.5 -49.7 -9 1 1 69 20 36 20 20 36 50 --- 18 31 54 68.0 116.4 -1.5 -49.6 21 F 1 70 20 36 20 20 36 50 ON1 18 31 54 67.4 112.1 -1.6 -52.7 -9 1 1 70 20 36 50 20 37 20 --- 18 32 24 67.5 112.3 -1.6 -52.6 21 F 1 71 20 36 50 20 37 20 20092+30494 18 32 24 67.2 114.0 -1.6 -51.2 -7 1 1 71 20 37 20 20 37 50 --- 18 32 54 67.3 114.2 -1.6 -51.1 23 F 1 72 20 37 20 20 37 50 ON1 18 32 54 67.6 112.5 -1.6 -52.6 -7 1 1 72 20 37 50 20 38 20 --- 18 33 24 67.7 112.6 -1.6 -52.5 23 F 1 73 20 37 50 Schedule for VLBA_HN (Code Hn ) Page 6 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 38 20 20134+31264 18 33 24 67.1 111.7 -1.7 -52.9 -7 1 1 73 20 38 20 20 38 50 --- 18 33 54 67.2 111.9 -1.7 -52.8 23 F 1 74 20 38 20 20 38 50 ON1 18 33 54 67.8 112.8 -1.6 -52.4 -7 1 1 74 20 38 50 20 39 20 --- 18 34 24 67.9 113.0 -1.6 -52.3 23 F 1 75 20 38 50 20 39 20 J2003+3034 18 34 24 68.4 117.4 -1.5 -49.1 -9 1 1 75 20 39 20 20 39 49 --- 18 34 54 68.4 117.6 -1.5 -48.9 21 F 1 76 20 39 20 20 39 49 ON1 18 34 54 68.0 113.2 -1.6 -52.2 -9 1 1 76 20 39 49 20 40 19 --- 18 35 24 68.0 113.3 -1.6 -52.1 21 F 1 77 20 39 49 20 40 19 20092+30494 18 35 24 67.7 115.1 -1.6 -50.6 -7 1 1 77 20 40 19 20 40 49 --- 18 35 54 67.8 115.3 -1.6 -50.5 23 F 1 78 20 40 19 20 40 49 ON1 18 35 54 68.1 113.5 -1.6 -52.0 -7 1 1 78 20 40 49 20 41 19 --- 18 36 24 68.2 113.7 -1.6 -51.9 23 F 1 79 20 40 49 20 41 19 20134+31264 18 36 24 67.6 112.7 -1.6 -52.4 -7 1 1 79 20 41 19 20 41 49 --- 18 36 54 67.7 112.9 -1.6 -52.3 23 F 1 80 20 41 19 20 41 49 ON1 18 36 54 68.3 113.9 -1.6 -51.8 -7 1 1 80 20 41 49 20 42 19 --- 18 37 24 68.4 114.0 -1.6 -51.7 23 F 1 81 20 41 49 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 20 42 37 G75.76 18 37 41 69.4 96.6 -1.7 -66.4 0 1 1 81 20 42 19 20 43 07 --- 18 38 11 69.5 96.7 -1.7 -66.3 30 F 1 82 20 42 52 20 43 07 J2015+3710 18 38 11 70.6 98.9 -1.6 -65.3 -8 1 1 82 20 43 07 20 43 37 --- 18 38 41 70.6 99.0 -1.6 -65.2 22 F 1 83 20 43 07 20 43 37 G75.76 18 38 41 69.6 96.8 -1.7 -66.3 -8 1 1 83 20 43 37 20 44 06 --- 18 39 11 69.7 97.0 -1.7 -66.3 22 F 1 84 20 43 37 20 44 06 J2018+3812 18 39 11 70.6 95.5 -1.7 -68.1 -8 1 1 84 20 44 06 20 44 36 --- 18 39 41 70.6 95.6 -1.7 -68.1 22 F 1 85 20 44 06 20 44 36 G75.76 18 39 41 69.8 97.1 -1.7 -66.2 -8 1 1 85 20 44 36 20 45 06 --- 18 40 11 69.9 97.2 -1.7 -66.2 22 F 1 86 20 44 36 Schedule for VLBA_HN (Code Hn ) Page 7 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 45 06 J2015+3710 18 40 11 70.9 99.4 -1.6 -65.1 -8 1 1 86 20 45 06 20 45 36 --- 18 40 41 71.0 99.5 -1.6 -65.1 22 F 1 87 20 45 06 20 45 36 G75.76 18 40 41 70.0 97.3 -1.7 -66.2 -8 1 1 87 20 45 36 20 46 06 --- 18 41 11 70.1 97.4 -1.7 -66.1 22 F 1 88 20 45 36 20 46 06 J2018+3812 18 41 11 70.9 95.9 -1.6 -68.0 -8 1 1 88 20 46 06 20 46 36 --- 18 41 41 71.0 96.1 -1.6 -68.0 22 F 1 89 20 46 06 20 46 36 G75.76 18 41 41 70.2 97.5 -1.7 -66.1 -8 1 1 89 20 46 36 20 47 06 --- 18 42 11 70.3 97.7 -1.7 -66.1 22 F 1 90 20 46 36 20 47 06 J2015+3710 18 42 11 71.3 99.9 -1.6 -64.9 -8 1 1 90 20 47 06 20 47 36 --- 18 42 41 71.4 100.0 -1.6 -64.9 22 F 1 91 20 47 06 20 47 36 G75.76 18 42 41 70.3 97.8 -1.7 -66.0 -8 1 1 91 20 47 36 20 48 06 --- 18 43 11 70.4 97.9 -1.6 -66.0 22 F 1 92 20 47 36 20 48 06 J2018+3812 18 43 11 71.3 96.4 -1.6 -67.9 -8 1 1 92 20 48 06 20 48 36 --- 18 43 41 71.4 96.5 -1.6 -67.8 22 F 1 93 20 48 06 20 48 36 G75.76 18 43 41 70.5 98.0 -1.6 -66.0 -8 1 1 93 20 48 36 20 49 06 --- 18 44 11 70.6 98.1 -1.6 -65.9 22 F 1 94 20 48 36 20 49 06 J2015+3710 18 44 11 71.6 100.4 -1.5 -64.7 -8 1 1 94 20 49 06 20 49 36 --- 18 44 41 71.7 100.6 -1.5 -64.7 22 F 1 95 20 49 06 20 49 36 G75.76 18 44 41 70.7 98.3 -1.6 -65.9 -8 1 1 95 20 49 36 20 50 05 --- 18 45 11 70.8 98.4 -1.6 -65.8 22 F 1 96 20 49 36 20 50 05 J2018+3812 18 45 11 71.6 96.9 -1.6 -67.7 -8 1 1 96 20 50 05 20 50 35 --- 18 45 41 71.7 97.0 -1.6 -67.7 22 F 1 97 20 50 05 20 50 35 G75.76 18 45 41 70.9 98.5 -1.6 -65.8 -8 1 1 97 20 50 35 20 51 05 --- 18 46 11 71.0 98.6 -1.6 -65.8 22 F 1 98 20 50 35 20 51 05 J2015+3710 18 46 11 72.0 101.0 -1.5 -64.5 -8 1 1 98 20 51 05 20 51 35 --- 18 46 41 72.1 101.1 -1.5 -64.4 22 F 1 99 20 51 05 20 51 35 G75.76 18 46 41 71.1 98.8 -1.6 -65.7 -8 1 1 99 20 51 35 20 52 05 --- 18 47 11 71.2 98.9 -1.6 -65.7 22 F 1 100 20 51 35 20 52 05 J2018+3812 18 47 11 72.0 97.3 -1.5 -67.6 -8 1 1 100 20 52 05 20 52 35 --- 18 47 41 72.1 97.5 -1.5 -67.6 22 F 1 101 20 52 05 Schedule for VLBA_HN (Code Hn ) Page 8 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 20 52 35 G75.76 18 47 41 71.3 99.0 -1.6 -65.6 -8 1 1 101 20 52 35 20 53 05 --- 18 48 11 71.3 99.1 -1.6 -65.6 22 F 1 101 20 52 35 20 53 05 J2015+3710 18 48 11 72.4 101.5 -1.5 -64.3 -8 1 1 101 20 53 05 20 53 35 --- 18 48 41 72.4 101.7 -1.5 -64.2 22 F 1 102 20 53 05 20 53 35 G75.76 18 48 41 71.4 99.3 -1.6 -65.5 -8 1 1 102 20 53 35 20 54 05 --- 18 49 11 71.5 99.4 -1.5 -65.5 22 F 1 103 20 53 35 20 54 05 J2018+3812 18 49 11 72.4 97.8 -1.5 -67.4 -8 1 1 103 20 54 05 20 54 35 --- 18 49 41 72.5 98.0 -1.5 -67.4 22 F 1 104 20 54 05 20 54 35 G75.76 18 49 41 71.6 99.5 -1.5 -65.4 -8 1 1 104 20 54 35 20 55 05 --- 18 50 11 71.7 99.7 -1.5 -65.4 22 F 1 105 20 54 35 20 55 05 J2015+3710 18 50 11 72.7 102.1 -1.4 -64.0 -8 1 1 105 20 55 05 20 55 35 --- 18 50 41 72.8 102.3 -1.4 -63.9 22 F 1 106 20 55 05 20 55 35 G75.76 18 50 41 71.8 99.8 -1.5 -65.4 -8 1 1 106 20 55 35 20 56 04 --- 18 51 11 71.9 99.9 -1.5 -65.3 22 F 1 107 20 55 35 20 56 04 J2018+3812 18 51 11 72.7 98.3 -1.5 -67.3 -8 1 1 107 20 56 04 20 56 34 --- 18 51 41 72.8 98.5 -1.5 -67.2 22 F 1 108 20 56 04 20 56 34 G75.76 18 51 41 72.0 100.1 -1.5 -65.3 -8 1 1 108 20 56 34 20 57 04 --- 18 52 11 72.1 100.2 -1.5 -65.2 22 F 1 109 20 56 34 20 57 04 J2015+3710 18 52 11 73.1 102.7 -1.4 -63.7 -8 1 1 109 20 57 04 20 57 34 --- 18 52 41 73.2 102.9 -1.4 -63.7 22 F 1 110 20 57 04 20 57 34 G75.76 18 52 41 72.2 100.3 -1.5 -65.1 -8 1 1 110 20 57 34 20 58 04 --- 18 53 11 72.2 100.5 -1.5 -65.1 22 F 1 111 20 57 34 20 58 04 J2018+3812 18 53 11 73.1 98.9 -1.4 -67.1 -8 1 1 111 20 58 04 20 58 34 --- 18 53 41 73.2 99.0 -1.4 -67.0 22 F 1 112 20 58 04 20 58 34 G75.76 18 53 41 72.3 100.6 -1.5 -65.0 -8 1 1 112 20 58 34 20 59 04 --- 18 54 11 72.4 100.7 -1.5 -65.0 22 F 1 113 20 58 34 20 59 04 J2015+3710 18 54 11 73.4 103.3 -1.4 -63.5 -8 1 1 113 20 59 04 20 59 34 --- 18 54 41 73.5 103.5 -1.4 -63.4 22 F 1 114 20 59 04 20 59 34 G75.76 18 54 41 72.5 100.9 -1.5 -64.9 -8 1 1 114 20 59 34 21 00 04 --- 18 55 11 72.6 101.0 -1.4 -64.9 22 F 1 115 20 59 34 Schedule for VLBA_HN (Code Hn ) Page 9 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 00 04 J2018+3812 18 55 11 73.5 99.4 -1.4 -66.9 -8 1 1 115 21 00 04 21 00 34 --- 18 55 41 73.5 99.5 -1.4 -66.8 22 F 1 116 21 00 04 21 00 34 G75.76 18 55 41 72.7 101.2 -1.4 -64.8 -8 1 1 116 21 00 34 21 01 04 --- 18 56 11 72.8 101.3 -1.4 -64.7 22 F 1 117 21 00 34 21 01 04 J2015+3710 18 56 11 73.8 104.0 -1.3 -63.1 -8 1 1 117 21 01 04 21 01 34 --- 18 56 41 73.9 104.1 -1.3 -63.1 22 F 1 118 21 01 04 21 01 34 G75.76 18 56 41 72.9 101.4 -1.4 -64.7 -8 1 1 118 21 01 34 21 02 03 --- 18 57 11 73.0 101.6 -1.4 -64.6 22 F 1 119 21 01 34 21 02 03 J2018+3812 18 57 11 73.8 99.9 -1.4 -66.7 -8 1 1 119 21 02 03 21 02 33 --- 18 57 41 73.9 100.1 -1.4 -66.6 22 F 1 120 21 02 03 21 02 33 G75.76 18 57 41 73.1 101.7 -1.4 -64.6 -8 1 1 120 21 02 33 21 03 03 --- 18 58 11 73.1 101.9 -1.4 -64.5 22 F 1 121 21 02 33 Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 21 03 23 ON1 18 58 31 71.8 122.7 -1.2 -46.3 0 1 1 121 21 03 03 21 03 53 --- 18 59 01 71.9 122.9 -1.2 -46.1 30 F 1 122 21 03 36 21 03 53 J2003+3034 18 59 01 72.2 128.4 -1.1 -41.8 -10 1 1 122 21 03 53 21 04 23 --- 18 59 31 72.2 128.7 -1.1 -41.6 20 F 1 123 21 03 53 21 04 23 ON1 18 59 31 71.9 123.2 -1.2 -46.0 -10 1 1 123 21 04 23 21 04 53 --- 19 00 01 72.0 123.4 -1.2 -45.8 20 F 1 124 21 04 23 21 04 53 20092+30494 19 00 01 71.6 125.4 -1.2 -44.0 -7 1 1 124 21 04 53 21 05 23 --- 19 00 31 71.7 125.7 -1.2 -43.9 23 F 1 125 21 04 53 21 05 23 ON1 19 00 31 72.1 123.7 -1.2 -45.7 -7 1 1 125 21 05 23 21 05 53 --- 19 01 01 72.2 123.9 -1.2 -45.5 23 F 1 126 21 05 23 21 05 53 20134+31264 19 01 01 71.6 122.5 -1.2 -46.4 -7 1 1 126 21 05 53 21 06 23 --- 19 01 31 71.7 122.8 -1.2 -46.2 23 F 1 127 21 05 53 21 06 23 ON1 19 01 31 72.2 124.1 -1.1 -45.3 -7 1 1 127 21 06 23 21 06 53 --- 19 02 01 72.3 124.4 -1.1 -45.2 23 F 1 128 21 06 23 Schedule for VLBA_HN (Code Hn ) Page 10 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 06 53 J2003+3034 19 02 01 72.6 130.0 -1.0 -40.7 -10 1 1 128 21 06 53 21 07 23 --- 19 02 31 72.7 130.3 -1.0 -40.5 20 F 1 129 21 06 53 21 07 23 ON1 19 02 31 72.4 124.6 -1.1 -45.0 -10 1 1 129 21 07 23 21 07 52 --- 19 03 01 72.5 124.9 -1.1 -44.8 20 F 1 130 21 07 23 21 07 52 20092+30494 19 03 01 72.1 126.9 -1.1 -43.0 -7 1 1 130 21 07 52 21 08 22 --- 19 03 31 72.2 127.2 -1.1 -42.8 23 F 1 131 21 07 52 21 08 22 ON1 19 03 31 72.5 125.1 -1.1 -44.6 -7 1 1 131 21 08 22 21 08 52 --- 19 04 01 72.6 125.4 -1.1 -44.5 23 F 1 132 21 08 22 21 08 52 20134+31264 19 04 01 72.1 124.0 -1.2 -45.4 -7 1 1 132 21 08 52 21 09 22 --- 19 04 31 72.1 124.2 -1.2 -45.2 23 F 1 133 21 08 52 21 09 22 ON1 19 04 31 72.7 125.7 -1.1 -44.3 -7 1 1 133 21 09 22 21 09 52 --- 19 05 01 72.8 125.9 -1.1 -44.1 23 F 1 134 21 09 22 21 09 52 J2003+3034 19 05 01 73.0 131.7 -1.0 -39.4 -10 1 1 134 21 09 52 21 10 22 --- 19 05 31 73.1 132.0 -1.0 -39.2 20 F 1 135 21 09 52 21 10 22 ON1 19 05 31 72.8 126.2 -1.1 -43.9 -10 1 1 135 21 10 22 21 10 52 --- 19 06 01 72.9 126.4 -1.1 -43.7 20 F 1 136 21 10 22 21 10 52 20092+30494 19 06 01 72.5 128.5 -1.1 -41.9 -7 1 1 136 21 10 52 21 11 22 --- 19 06 31 72.6 128.8 -1.1 -41.7 23 F 1 137 21 10 52 21 11 22 ON1 19 06 31 73.0 126.7 -1.1 -43.5 -7 1 1 137 21 11 22 21 11 52 --- 19 07 01 73.1 127.0 -1.1 -43.4 23 F 1 138 21 11 22 21 11 52 20134+31264 19 07 01 72.5 125.5 -1.1 -44.4 -7 1 1 138 21 11 52 21 12 22 --- 19 07 31 72.6 125.7 -1.1 -44.2 23 F 1 139 21 11 52 21 12 22 ON1 19 07 31 73.1 127.2 -1.0 -43.2 -7 1 1 139 21 12 22 21 12 52 --- 19 08 01 73.2 127.5 -1.0 -43.0 23 F 1 140 21 12 22 21 12 52 J2003+3034 19 08 01 73.4 133.4 -0.9 -38.2 -10 1 1 140 21 12 52 21 13 22 --- 19 08 31 73.5 133.7 -0.9 -37.9 20 F 1 141 21 12 52 21 13 22 ON1 19 08 31 73.3 127.8 -1.0 -42.8 -10 1 1 141 21 13 22 21 13 51 --- 19 09 01 73.3 128.0 -1.0 -42.6 20 F 1 142 21 13 22 21 13 51 20092+30494 19 09 01 72.9 130.1 -1.0 -40.7 -7 1 1 142 21 13 51 21 14 21 --- 19 09 31 73.0 130.4 -1.0 -40.5 23 F 1 143 21 13 51 Schedule for VLBA_HN (Code Hn ) Page 11 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 14 21 ON1 19 09 31 73.4 128.3 -1.0 -42.4 -7 1 1 143 21 14 21 21 14 51 --- 19 10 01 73.5 128.6 -1.0 -42.2 23 F 1 144 21 14 21 21 14 51 20134+31264 19 10 01 73.0 127.0 -1.1 -43.3 -7 1 1 144 21 14 51 21 15 21 --- 19 10 31 73.0 127.3 -1.1 -43.1 23 F 1 145 21 14 51 21 15 21 ON1 19 10 31 73.6 128.9 -1.0 -42.0 -7 1 1 145 21 15 21 21 15 51 --- 19 11 01 73.6 129.1 -1.0 -41.8 23 F 1 146 21 15 21 21 15 51 J2003+3034 19 11 01 73.8 135.2 -0.9 -36.8 -10 1 1 146 21 15 51 21 16 21 --- 19 11 31 73.9 135.5 -0.9 -36.6 20 F 1 147 21 15 51 21 16 21 ON1 19 11 31 73.7 129.4 -1.0 -41.6 -10 1 1 147 21 16 21 21 16 51 --- 19 12 01 73.8 129.7 -1.0 -41.4 20 F 1 147 21 16 21 21 16 51 20092+30494 19 12 01 73.4 131.8 -1.0 -39.5 -7 1 1 147 21 16 51 21 17 21 --- 19 12 31 73.4 132.1 -1.0 -39.2 23 F 1 148 21 16 51 21 17 21 ON1 19 12 31 73.8 130.0 -1.0 -41.2 -7 1 1 148 21 17 21 21 17 51 --- 19 13 01 73.9 130.3 -1.0 -40.9 23 F 1 149 21 17 21 21 17 51 20134+31264 19 13 01 73.4 128.6 -1.0 -42.1 -7 1 1 149 21 17 51 21 18 21 --- 19 13 31 73.5 128.9 -1.0 -41.9 23 F 1 150 21 17 51 21 18 21 ON1 19 13 31 74.0 130.6 -0.9 -40.7 -7 1 1 150 21 18 21 21 18 51 --- 19 14 01 74.1 130.9 -0.9 -40.5 23 F 1 151 21 18 21 21 18 51 J2003+3034 19 14 01 74.2 137.1 -0.8 -35.4 -10 1 1 151 21 18 51 21 19 21 --- 19 14 31 74.2 137.4 -0.8 -35.1 20 F 1 152 21 18 51 21 19 21 ON1 19 14 31 74.1 131.2 -0.9 -40.3 -10 1 1 152 21 19 21 21 19 51 --- 19 15 01 74.2 131.5 -0.9 -40.1 20 F 1 153 21 19 21 21 19 51 20092+30494 19 15 01 73.8 133.6 -0.9 -38.1 -7 1 1 153 21 19 51 21 20 20 --- 19 15 31 73.8 133.9 -0.9 -37.9 23 F 1 154 21 19 51 21 20 20 ON1 19 15 31 74.3 131.8 -0.9 -39.9 -7 1 1 154 21 20 20 21 20 50 --- 19 16 01 74.3 132.1 -0.9 -39.6 23 F 1 155 21 20 20 21 20 50 20134+31264 19 16 01 73.8 130.3 -1.0 -40.9 -7 1 1 155 21 20 50 21 21 20 --- 19 16 31 73.9 130.6 -1.0 -40.7 23 F 1 156 21 20 50 21 21 20 ON1 19 16 31 74.4 132.4 -0.9 -39.4 -7 1 1 156 21 21 20 21 21 50 --- 19 17 01 74.5 132.7 -0.9 -39.2 23 F 1 157 21 21 20 Schedule for VLBA_HN (Code Hn ) Page 12 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 21 22 12 G75.76 19 17 23 76.5 108.6 -1.1 -61.0 0 1 1 157 21 22 12 21 22 42 --- 19 17 53 76.6 108.8 -1.1 -60.8 30 F 1 158 21 22 30 21 22 42 J2015+3710 19 17 53 77.6 112.5 -1.0 -58.1 -9 1 1 158 21 22 42 21 23 12 --- 19 18 23 77.6 112.8 -1.0 -58.0 21 F 1 159 21 22 42 21 23 12 G75.76 19 18 23 76.7 109.0 -1.1 -60.7 -9 1 1 159 21 23 12 21 23 42 --- 19 18 53 76.8 109.2 -1.1 -60.6 21 F 1 160 21 23 12 21 23 42 J2018+3812 19 18 53 77.7 107.3 -1.0 -62.9 -8 1 1 160 21 23 42 21 24 12 --- 19 19 23 77.8 107.5 -1.0 -62.7 22 F 1 161 21 23 42 21 24 12 G75.76 19 19 23 76.9 109.4 -1.0 -60.4 -8 1 1 161 21 24 12 21 24 42 --- 19 19 53 77.0 109.6 -1.0 -60.3 22 F 1 162 21 24 12 21 24 42 J2015+3710 19 19 53 77.9 113.5 -0.9 -57.5 -9 1 1 162 21 24 42 21 25 12 --- 19 20 23 78.0 113.8 -0.9 -57.3 21 F 1 163 21 24 42 21 25 12 G75.76 19 20 23 77.1 109.8 -1.0 -60.2 -9 1 1 163 21 25 12 21 25 42 --- 19 20 53 77.1 110.1 -1.0 -60.0 21 F 1 164 21 25 12 21 25 42 J2018+3812 19 20 53 78.0 108.2 -1.0 -62.3 -8 1 1 164 21 25 42 21 26 12 --- 19 21 23 78.1 108.4 -1.0 -62.2 22 F 1 165 21 25 42 21 26 12 G75.76 19 21 23 77.2 110.3 -1.0 -59.9 -8 1 1 165 21 26 12 21 26 42 --- 19 21 53 77.3 110.5 -1.0 -59.7 22 F 1 166 21 26 12 21 26 42 J2015+3710 19 21 53 78.2 114.6 -0.9 -56.7 -9 1 1 166 21 26 42 21 27 11 --- 19 22 23 78.3 114.8 -0.9 -56.5 21 F 1 167 21 26 42 21 27 11 G75.76 19 22 23 77.4 110.7 -1.0 -59.6 -9 1 1 167 21 27 11 21 27 41 --- 19 22 53 77.5 111.0 -1.0 -59.5 21 F 1 168 21 27 11 21 27 41 J2018+3812 19 22 53 78.4 109.1 -0.9 -61.8 -8 1 1 168 21 27 41 21 28 11 --- 19 23 23 78.5 109.3 -0.9 -61.6 22 F 1 169 21 27 41 21 28 11 G75.76 19 23 23 77.6 111.2 -1.0 -59.3 -8 1 1 169 21 28 11 21 28 41 --- 19 23 53 77.7 111.4 -1.0 -59.1 22 F 1 170 21 28 11 Schedule for VLBA_HN (Code Hn ) Page 13 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 28 41 J2015+3710 19 23 53 78.6 115.7 -0.9 -56.0 -9 1 1 170 21 28 41 21 29 11 --- 19 24 23 78.6 115.9 -0.9 -55.8 21 F 1 171 21 28 41 21 29 11 G75.76 19 24 23 77.7 111.7 -1.0 -59.0 -9 1 1 171 21 29 11 21 29 41 --- 19 24 53 77.8 111.9 -1.0 -58.8 21 F 1 172 21 29 11 21 29 41 J2018+3812 19 24 53 78.7 110.0 -0.9 -61.1 -8 1 1 172 21 29 41 21 30 11 --- 19 25 23 78.8 110.3 -0.9 -61.0 22 F 1 173 21 29 41 21 30 11 G75.76 19 25 23 77.9 112.2 -0.9 -58.7 -8 1 1 173 21 30 11 21 30 41 --- 19 25 53 78.0 112.4 -0.9 -58.5 22 F 1 174 21 30 11 21 30 41 J2015+3710 19 25 53 78.9 116.8 -0.8 -55.1 -9 1 1 174 21 30 41 21 31 11 --- 19 26 23 79.0 117.1 -0.8 -54.9 21 F 1 175 21 30 41 21 31 11 G75.76 19 26 23 78.1 112.7 -0.9 -58.3 -9 1 1 175 21 31 11 21 31 41 --- 19 26 53 78.2 112.9 -0.9 -58.2 21 F 1 175 21 31 11 21 31 41 J2018+3812 19 26 53 79.1 111.0 -0.9 -60.5 -8 1 1 175 21 31 41 21 32 11 --- 19 27 23 79.2 111.3 -0.9 -60.3 22 F 1 176 21 31 41 21 32 11 G75.76 19 27 23 78.2 113.2 -0.9 -58.0 -8 1 1 176 21 32 11 21 32 41 --- 19 27 53 78.3 113.4 -0.9 -57.8 22 F 1 177 21 32 11 21 32 41 J2015+3710 19 27 53 79.2 118.0 -0.8 -54.2 -9 1 1 177 21 32 41 21 33 10 --- 19 28 23 79.3 118.3 -0.8 -54.0 21 F 1 178 21 32 41 21 33 10 G75.76 19 28 23 78.4 113.7 -0.9 -57.6 -9 1 1 178 21 33 10 21 33 40 --- 19 28 53 78.5 114.0 -0.9 -57.4 21 F 1 179 21 33 10 21 33 40 J2018+3812 19 28 53 79.4 112.1 -0.8 -59.7 -8 1 1 179 21 33 40 21 34 10 --- 19 29 23 79.5 112.3 -0.8 -59.6 22 F 1 180 21 33 40 21 34 10 G75.76 19 29 23 78.6 114.2 -0.9 -57.2 -8 1 1 180 21 34 10 21 34 40 --- 19 29 53 78.7 114.5 -0.9 -57.1 22 F 1 181 21 34 10 21 34 40 J2015+3710 19 29 53 79.5 119.3 -0.8 -53.3 -9 1 1 181 21 34 40 21 35 10 --- 19 30 23 79.6 119.6 -0.8 -53.0 21 F 1 182 21 34 40 21 35 10 G75.76 19 30 23 78.7 114.8 -0.9 -56.9 -9 1 1 182 21 35 10 21 35 40 --- 19 30 53 78.8 115.1 -0.9 -56.7 21 F 1 183 21 35 10 21 35 40 J2018+3812 19 30 53 79.7 113.2 -0.8 -59.0 -8 1 1 183 21 35 40 21 36 10 --- 19 31 23 79.8 113.5 -0.8 -58.8 22 F 1 184 21 35 40 Schedule for VLBA_HN (Code Hn ) Page 14 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 36 10 G75.76 19 31 23 78.9 115.3 -0.8 -56.5 -8 1 1 184 21 36 10 21 36 40 --- 19 31 53 79.0 115.6 -0.8 -56.3 22 F 1 185 21 36 10 21 36 40 J2015+3710 19 31 53 79.9 120.6 -0.7 -52.3 -9 1 1 185 21 36 40 21 37 10 --- 19 32 23 79.9 121.0 -0.7 -52.0 21 F 1 186 21 36 40 21 37 10 G75.76 19 32 23 79.1 115.9 -0.8 -56.0 -9 1 1 186 21 37 10 21 37 40 --- 19 32 53 79.2 116.2 -0.8 -55.8 21 F 1 187 21 37 10 21 37 40 J2018+3812 19 32 53 80.1 114.4 -0.8 -58.1 -8 1 1 187 21 37 40 21 38 10 --- 19 33 23 80.2 114.7 -0.8 -57.9 22 F 1 188 21 37 40 21 38 10 G75.76 19 33 23 79.2 116.5 -0.8 -55.6 -8 1 1 188 21 38 10 21 38 40 --- 19 33 53 79.3 116.8 -0.8 -55.4 22 F 1 189 21 38 10 21 38 40 J2015+3710 19 33 53 80.2 122.1 -0.7 -51.2 -10 1 1 189 21 38 40 21 39 09 --- 19 34 23 80.2 122.4 -0.7 -50.9 20 F 1 190 21 38 40 21 39 09 G75.76 19 34 23 79.4 117.1 -0.8 -55.2 -10 1 1 190 21 39 09 21 39 39 --- 19 34 53 79.5 117.4 -0.8 -54.9 20 F 1 191 21 39 09 21 39 39 J2018+3812 19 34 53 80.4 115.6 -0.7 -57.2 -8 1 1 191 21 39 39 21 40 09 --- 19 35 23 80.5 115.9 -0.7 -57.0 22 F 1 192 21 39 39 21 40 09 G75.76 19 35 23 79.6 117.8 -0.8 -54.7 -8 1 1 192 21 40 09 21 40 39 --- 19 35 53 79.6 118.1 -0.8 -54.5 22 F 1 193 21 40 09 21 40 39 J2015+3710 19 35 53 80.5 123.6 -0.7 -50.0 -10 1 1 193 21 40 39 21 41 09 --- 19 36 23 80.6 124.0 -0.7 -49.7 20 F 1 194 21 40 39 21 41 09 G75.76 19 36 23 79.7 118.4 -0.8 -54.2 -10 1 1 194 21 41 09 21 41 39 --- 19 36 53 79.8 118.7 -0.8 -54.0 20 F 1 195 21 41 09 21 41 39 J2018+3812 19 36 53 80.7 116.9 -0.7 -56.2 -8 1 1 195 21 41 39 21 42 09 --- 19 37 23 80.8 117.2 -0.7 -56.0 22 F 1 196 21 41 39 21 42 09 G75.76 19 37 23 79.9 119.1 -0.7 -53.7 -8 1 1 196 21 42 09 21 42 39 --- 19 37 53 80.0 119.4 -0.7 -53.5 22 F 1 197 21 42 09 Schedule for VLBA_HN (Code Hn ) Page 15 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 21 43 04 ON1 19 38 19 77.0 148.1 -0.5 -27.0 0 1 1 197 21 43 04 21 43 34 --- 19 38 49 77.0 148.5 -0.5 -26.6 30 F 1 198 21 43 22 21 43 34 J2003+3034 19 38 49 76.7 156.0 -0.4 -20.3 -11 1 1 198 21 43 34 21 44 04 --- 19 39 19 76.7 156.4 -0.4 -19.9 19 F 1 199 21 43 34 21 44 04 ON1 19 39 19 77.1 149.0 -0.5 -26.3 -11 1 1 199 21 44 04 21 44 34 --- 19 39 49 77.1 149.4 -0.5 -25.9 19 F 1 200 21 44 04 21 44 34 20092+30494 19 39 49 76.5 151.4 -0.5 -24.1 -7 1 1 200 21 44 34 21 45 04 --- 19 40 19 76.6 151.9 -0.5 -23.7 23 F 1 201 21 44 34 21 45 04 ON1 19 40 19 77.1 149.8 -0.5 -25.6 -7 1 1 201 21 45 04 21 45 34 --- 19 40 49 77.2 150.3 -0.5 -25.2 23 F 1 202 21 45 04 21 45 34 20134+31264 19 40 49 76.8 147.7 -0.5 -27.3 -8 1 1 202 21 45 34 21 46 04 --- 19 41 19 76.9 148.1 -0.5 -27.0 22 F 1 203 21 45 34 21 46 04 ON1 19 41 19 77.2 150.7 -0.5 -24.9 -8 1 1 203 21 46 04 21 46 33 --- 19 41 49 77.3 151.1 -0.5 -24.5 22 F 1 203 21 46 04 21 46 33 J2003+3034 19 41 49 76.9 158.6 -0.4 -18.1 -11 1 1 203 21 46 33 21 47 03 --- 19 42 19 76.9 159.1 -0.4 -17.7 19 F 1 204 21 46 33 21 47 03 ON1 19 42 19 77.3 151.6 -0.5 -24.1 -11 1 1 204 21 47 03 21 47 33 --- 19 42 49 77.4 152.0 -0.5 -23.8 19 F 1 205 21 47 03 21 47 33 20092+30494 19 42 49 76.8 154.0 -0.4 -22.0 -7 1 1 205 21 47 33 21 48 03 --- 19 43 19 76.8 154.4 -0.4 -21.6 23 F 1 206 21 47 33 21 48 03 ON1 19 43 19 77.4 152.5 -0.5 -23.4 -7 1 1 206 21 48 03 21 48 33 --- 19 43 49 77.5 152.9 -0.4 -23.0 23 F 1 207 21 48 03 21 48 33 20134+31264 19 43 49 77.1 150.2 -0.5 -25.3 -8 1 1 207 21 48 33 21 49 03 --- 19 44 19 77.1 150.6 -0.5 -24.9 22 F 1 208 21 48 33 21 49 03 ON1 19 44 19 77.5 153.4 -0.4 -22.6 -8 1 1 208 21 49 03 21 49 33 --- 19 44 49 77.5 153.8 -0.4 -22.3 22 F 1 209 21 49 03 Schedule for VLBA_HN (Code Hn ) Page 16 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 49 33 J2003+3034 19 44 49 77.1 161.4 -0.3 -15.8 -11 1 1 209 21 49 33 21 50 03 --- 19 45 19 77.1 161.8 -0.3 -15.4 19 F 1 210 21 49 33 21 50 03 ON1 19 45 19 77.6 154.3 -0.4 -21.9 -11 1 1 210 21 50 03 21 50 33 --- 19 45 49 77.6 154.7 -0.4 -21.5 19 F 1 211 21 50 03 21 50 33 20092+30494 19 45 49 77.0 156.7 -0.4 -19.7 -7 1 1 211 21 50 33 21 51 03 --- 19 46 19 77.1 157.1 -0.4 -19.4 23 F 1 212 21 50 33 21 51 03 ON1 19 46 19 77.7 155.2 -0.4 -21.1 -7 1 1 212 21 51 03 21 51 33 --- 19 46 49 77.7 155.7 -0.4 -20.7 23 F 1 213 21 51 03 21 51 33 20134+31264 19 46 49 77.4 152.8 -0.4 -23.1 -8 1 1 213 21 51 33 21 52 03 --- 19 47 19 77.4 153.3 -0.4 -22.7 22 F 1 214 21 51 33 21 52 03 ON1 19 47 19 77.7 156.1 -0.4 -20.3 -8 1 1 214 21 52 03 21 52 32 --- 19 47 49 77.8 156.6 -0.4 -19.9 22 F 1 215 21 52 03 21 52 32 J2003+3034 19 47 49 77.3 164.2 -0.3 -13.4 -11 1 1 215 21 52 32 21 53 02 --- 19 48 19 77.3 164.7 -0.3 -13.0 19 F 1 216 21 52 32 21 53 02 ON1 19 48 19 77.8 157.1 -0.4 -19.5 -11 1 1 216 21 53 02 21 53 32 --- 19 48 49 77.8 157.6 -0.4 -19.1 19 F 1 217 21 53 02 21 53 32 20092+30494 19 48 49 77.2 159.4 -0.3 -17.5 -7 1 1 217 21 53 32 21 54 02 --- 19 49 19 77.3 159.9 -0.3 -17.1 23 F 1 218 21 53 32 21 54 02 ON1 19 49 19 77.9 158.0 -0.4 -18.7 -7 1 1 218 21 54 02 21 54 32 --- 19 49 49 77.9 158.5 -0.3 -18.3 23 F 1 219 21 54 02 21 54 32 20134+31264 19 49 49 77.6 155.6 -0.4 -20.8 -8 1 1 219 21 54 32 21 55 02 --- 19 50 19 77.6 156.0 -0.4 -20.4 22 F 1 220 21 54 32 21 55 02 ON1 19 50 19 77.9 159.0 -0.3 -17.9 -8 1 1 220 21 55 02 21 55 32 --- 19 50 49 78.0 159.5 -0.3 -17.5 22 F 1 221 21 55 02 21 55 32 J2003+3034 19 50 49 77.4 167.1 -0.2 -11.0 -11 1 1 221 21 55 32 21 56 02 --- 19 51 19 77.4 167.6 -0.2 -10.6 19 F 1 222 21 55 32 21 56 02 ON1 19 51 19 78.0 160.0 -0.3 -17.1 -11 1 1 222 21 56 02 21 56 32 --- 19 51 49 78.0 160.5 -0.3 -16.7 19 F 1 223 21 56 02 21 56 32 20092+30494 19 51 49 77.4 162.2 -0.3 -15.1 -7 1 1 223 21 56 32 21 57 02 --- 19 52 19 77.4 162.7 -0.3 -14.7 23 F 1 224 21 56 32 Schedule for VLBA_HN (Code Hn ) Page 17 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 21 57 02 ON1 19 52 19 78.1 161.0 -0.3 -16.3 -7 1 1 224 21 57 02 21 57 32 --- 19 52 49 78.1 161.5 -0.3 -15.8 23 F 1 225 21 57 02 21 57 32 20134+31264 19 52 49 77.8 158.4 -0.3 -18.4 -8 1 1 225 21 57 32 21 58 02 --- 19 53 19 77.8 158.9 -0.3 -18.0 22 F 1 226 21 57 32 21 58 02 ON1 19 53 19 78.1 162.0 -0.3 -15.4 -8 1 1 226 21 58 02 21 58 32 --- 19 53 49 78.2 162.5 -0.3 -15.0 22 F 1 227 21 58 02 21 58 32 J2003+3034 19 53 49 77.5 170.0 -0.2 -8.5 -11 1 1 227 21 58 32 21 59 01 --- 19 54 19 77.5 170.5 -0.2 -8.1 19 F 1 228 21 58 32 21 59 01 ON1 19 54 19 78.2 163.0 -0.3 -14.6 -11 1 1 228 21 59 01 21 59 31 --- 19 54 49 78.2 163.5 -0.3 -14.1 19 F 1 229 21 59 01 21 59 31 20092+30494 19 54 49 77.6 165.1 -0.2 -12.7 -7 1 1 229 21 59 31 22 00 01 --- 19 55 19 77.6 165.6 -0.2 -12.3 23 F 1 230 21 59 31 22 00 01 ON1 19 55 19 78.2 164.0 -0.3 -13.7 -7 1 1 230 22 00 01 22 00 31 --- 19 55 49 78.3 164.5 -0.2 -13.3 23 F 1 230 22 00 01 22 00 31 20134+31264 19 55 49 78.0 161.3 -0.3 -16.0 -8 1 1 230 22 00 31 22 01 01 --- 19 56 19 78.0 161.8 -0.3 -15.5 22 F 1 231 22 00 31 22 01 01 ON1 19 56 19 78.3 165.0 -0.2 -12.9 -8 1 1 231 22 01 01 22 01 31 --- 19 56 49 78.3 165.5 -0.2 -12.4 22 F 1 232 22 01 01 22 01 31 J2003+3034 19 56 49 77.6 173.0 -0.1 -6.0 -11 1 1 232 22 01 31 22 02 01 --- 19 57 19 77.6 173.5 -0.1 -5.6 19 F 1 233 22 01 31 22 02 01 ON1 19 57 19 78.3 166.0 -0.2 -12.0 -11 1 1 233 22 02 01 22 02 31 --- 19 57 49 78.3 166.5 -0.2 -11.5 19 F 1 234 22 02 01 22 02 31 20092+30494 19 57 49 77.7 168.0 -0.2 -10.2 -7 1 1 234 22 02 31 22 03 01 --- 19 58 19 77.7 168.5 -0.2 -9.8 23 F 1 235 22 02 31 22 03 01 ON1 19 58 19 78.4 167.1 -0.2 -11.1 -7 1 1 235 22 03 01 22 03 31 --- 19 58 49 78.4 167.6 -0.2 -10.7 23 F 1 236 22 03 01 22 03 31 20134+31264 19 58 49 78.2 164.3 -0.2 -13.4 -8 1 1 236 22 03 31 22 04 01 --- 19 59 19 78.2 164.8 -0.2 -13.0 22 F 1 237 22 03 31 22 04 01 ON1 19 59 19 78.4 168.1 -0.2 -10.2 -8 1 1 237 22 04 01 22 04 31 --- 19 59 49 78.4 168.6 -0.2 -9.8 22 F 1 238 22 04 01 Schedule for VLBA_HN (Code Hn ) Page 18 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 22 04 55 G75.76 20 00 13 83.1 141.0 -0.4 -35.5 0 1 1 238 22 04 55 22 05 25 --- 20 00 43 83.2 141.7 -0.4 -34.9 30 F 1 239 22 05 13 22 05 25 J2015+3710 20 00 43 83.6 152.1 -0.3 -25.5 -13 1 1 239 22 05 25 22 05 55 --- 20 01 13 83.6 152.9 -0.2 -24.8 17 F 1 240 22 05 25 22 05 55 G75.76 20 01 13 83.2 142.4 -0.3 -34.2 -13 1 1 240 22 05 55 22 06 25 --- 20 01 43 83.3 143.1 -0.3 -33.6 17 F 1 241 22 05 55 22 06 25 J2018+3812 20 01 43 84.3 143.6 -0.3 -33.6 -8 1 1 241 22 06 25 22 06 55 --- 20 02 13 84.3 144.4 -0.3 -32.8 22 F 1 242 22 06 25 22 06 55 G75.76 20 02 13 83.4 143.8 -0.3 -33.0 -8 1 1 242 22 06 55 22 07 25 --- 20 02 43 83.4 144.5 -0.3 -32.3 22 F 1 243 22 06 55 22 07 25 J2015+3710 20 02 43 83.8 155.4 -0.2 -22.5 -13 1 1 243 22 07 25 22 07 54 --- 20 03 13 83.8 156.2 -0.2 -21.8 17 F 1 244 22 07 25 22 07 54 G75.76 20 03 13 83.5 145.3 -0.3 -31.7 -13 1 1 244 22 07 54 22 08 24 --- 20 03 43 83.5 146.0 -0.3 -31.0 17 F 1 245 22 07 54 22 08 24 J2018+3812 20 03 43 84.5 147.0 -0.3 -30.5 -8 1 1 245 22 08 24 22 08 54 --- 20 04 13 84.5 147.9 -0.2 -29.7 22 F 1 246 22 08 24 22 08 54 G75.76 20 04 13 83.6 146.8 -0.3 -30.3 -8 1 1 246 22 08 54 22 09 24 --- 20 04 43 83.6 147.6 -0.3 -29.7 22 F 1 247 22 08 54 22 09 24 J2015+3710 20 04 43 83.9 158.8 -0.2 -19.4 -14 1 1 247 22 09 24 22 09 54 --- 20 05 13 83.9 159.7 -0.2 -18.6 16 F 1 248 22 09 24 22 09 54 G75.76 20 05 13 83.7 148.3 -0.3 -29.0 -14 1 1 248 22 09 54 22 10 24 --- 20 05 43 83.7 149.1 -0.3 -28.3 16 F 1 249 22 09 54 22 10 24 J2018+3812 20 05 43 84.7 150.7 -0.2 -27.2 -8 1 1 249 22 10 24 22 10 54 --- 20 06 13 84.7 151.6 -0.2 -26.3 22 F 1 250 22 10 24 22 10 54 G75.76 20 06 13 83.8 149.9 -0.3 -27.5 -8 1 1 250 22 10 54 22 11 24 --- 20 06 43 83.8 150.7 -0.3 -26.8 22 F 1 251 22 10 54 Schedule for VLBA_HN (Code Hn ) Page 19 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 11 24 J2015+3710 20 06 43 84.0 162.4 -0.2 -16.1 -14 1 1 251 22 11 24 22 11 54 --- 20 07 13 84.0 163.4 -0.1 -15.3 16 F 1 252 22 11 24 22 11 54 G75.76 20 07 13 83.8 151.6 -0.2 -26.1 -14 1 1 252 22 11 54 22 12 24 --- 20 07 43 83.9 152.4 -0.2 -25.3 16 F 1 253 22 11 54 22 12 24 J2018+3812 20 07 43 84.8 154.5 -0.2 -23.6 -8 1 1 253 22 12 24 22 12 54 --- 20 08 13 84.9 155.5 -0.2 -22.7 22 F 1 254 22 12 24 22 12 54 G75.76 20 08 13 83.9 153.2 -0.2 -24.5 -8 1 1 254 22 12 54 22 13 24 --- 20 08 43 84.0 154.1 -0.2 -23.8 22 F 1 255 22 12 54 22 13 24 J2015+3710 20 08 43 84.1 166.2 -0.1 -12.7 -14 1 1 255 22 13 24 22 13 53 --- 20 09 13 84.1 167.1 -0.1 -11.8 16 F 1 256 22 13 24 22 13 53 G75.76 20 09 13 84.0 155.0 -0.2 -23.0 -14 1 1 256 22 13 53 22 14 23 --- 20 09 43 84.0 155.9 -0.2 -22.2 16 F 1 257 22 13 53 22 14 23 J2018+3812 20 09 43 85.0 158.7 -0.2 -19.8 -8 1 1 257 22 14 23 22 14 53 --- 20 10 13 85.0 159.7 -0.1 -18.9 22 F 1 258 22 14 23 22 14 53 G75.76 20 10 13 84.1 156.7 -0.2 -21.4 -8 1 1 258 22 14 53 22 15 23 --- 20 10 43 84.1 157.7 -0.2 -20.5 22 F 1 258 22 14 53 22 15 23 J2015+3710 20 10 43 84.2 170.0 -0.1 -9.2 -14 1 1 258 22 15 23 22 15 53 --- 20 11 13 84.2 171.0 -0.1 -8.3 16 F 1 259 22 15 23 22 15 53 G75.76 20 11 13 84.2 158.6 -0.2 -19.7 -14 1 1 259 22 15 53 22 16 23 --- 20 11 43 84.2 159.5 -0.2 -18.9 16 F 1 260 22 15 53 22 16 23 J2018+3812 20 11 43 85.1 163.0 -0.1 -15.8 -8 1 1 260 22 16 23 22 16 53 --- 20 12 13 85.1 164.1 -0.1 -14.8 22 F 1 261 22 16 23 22 16 53 G75.76 20 12 13 84.2 160.4 -0.2 -18.0 -8 1 1 261 22 16 53 22 17 23 --- 20 12 43 84.2 161.4 -0.2 -17.1 21 F 1 262 22 16 53 22 17 23 J2015+3710 20 12 43 84.2 173.9 -0.1 -5.6 -14 1 1 262 22 17 23 22 17 53 --- 20 13 13 84.3 174.9 0.0 -4.7 16 F 1 263 22 17 23 22 17 53 G75.76 20 13 13 84.3 162.3 -0.1 -16.3 -14 1 1 263 22 17 53 22 18 23 --- 20 13 43 84.3 163.3 -0.1 -15.4 16 F 1 264 22 17 53 22 18 23 J2018+3812 20 13 43 85.2 167.5 -0.1 -11.6 -9 1 1 264 22 18 23 22 18 53 --- 20 14 13 85.2 168.7 -0.1 -10.6 21 F 1 265 22 18 23 Schedule for VLBA_HN (Code Hn ) Page 20 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 18 53 G75.76 20 14 13 84.3 164.2 -0.1 -14.5 -9 1 1 265 22 18 53 22 19 23 --- 20 14 43 84.4 165.2 -0.1 -13.6 21 F 1 266 22 18 53 22 19 23 J2015+3710 20 14 43 84.3 177.9 0.0 -1.9 -14 1 1 266 22 19 23 22 19 52 --- 20 15 13 84.3 178.9 0.0 -1.0 15 F 1 267 22 19 23 22 19 52 G75.76 20 15 13 84.4 166.2 -0.1 -12.7 -14 1 1 267 22 19 52 22 20 22 --- 20 15 43 84.4 167.2 -0.1 -11.8 15 F 1 268 22 19 52 22 20 22 J2018+3812 20 15 43 85.3 172.2 -0.1 -7.3 -9 1 1 268 22 20 22 22 20 52 --- 20 16 13 85.3 173.3 0.0 -6.2 21 F 1 269 22 20 22 22 20 52 G75.76 20 16 13 84.4 168.2 -0.1 -10.9 -9 1 1 269 22 20 52 22 21 22 --- 20 16 43 84.4 169.2 -0.1 -10.0 20 F 1 270 22 20 52 22 21 22 J2015+3710 20 16 43 84.3 181.9 0.0 1.7 -14 1 1 270 22 21 22 22 21 52 --- 20 17 13 84.3 182.9 0.0 2.7 15 F 1 271 22 21 22 22 21 52 G75.76 20 17 13 84.4 170.2 -0.1 -9.0 -14 1 1 271 22 21 52 22 22 22 --- 20 17 43 84.5 171.2 -0.1 -8.1 15 F 1 272 22 21 52 22 22 22 J2018+3812 20 17 43 85.3 176.9 0.0 -2.9 -10 1 1 272 22 22 22 22 22 52 --- 20 18 13 85.3 178.1 0.0 -1.8 20 F 1 273 22 22 22 22 22 52 G75.76 20 18 13 84.5 172.2 -0.1 -7.2 -10 1 1 273 22 22 52 22 23 22 --- 20 18 43 84.5 173.3 -0.1 -6.2 20 F 1 274 22 22 52 22 23 22 J2015+3710 20 18 43 84.2 185.9 0.0 5.4 -14 1 1 274 22 23 22 22 23 52 --- 20 19 13 84.2 186.9 0.1 6.3 16 F 1 275 22 23 22 22 23 52 G75.76 20 19 13 84.5 174.3 0.0 -5.3 -14 1 1 275 22 23 52 22 24 22 --- 20 19 43 84.5 175.3 0.0 -4.3 16 F 1 276 22 23 52 22 24 22 J2018+3812 20 19 43 85.3 181.7 0.0 1.6 -10 1 1 276 22 24 22 22 24 52 --- 20 20 13 85.3 182.9 0.0 2.7 20 F 1 277 22 24 22 22 24 52 G75.76 20 20 13 84.5 176.4 0.0 -3.4 -10 1 1 277 22 24 52 22 25 22 --- 20 20 43 84.5 177.4 0.0 -2.4 20 F 1 278 22 24 52 Schedule for VLBA_HN (Code Hn ) Page 21 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 22 25 43 ON1 20 21 04 78.4 191.3 0.2 9.7 3 1 1 278 22 25 43 22 26 12 --- 20 21 34 78.4 191.9 0.2 10.2 30 F 1 279 22 26 01 22 26 12 J2003+3034 20 21 34 77.2 197.5 0.3 14.8 -10 1 1 279 22 26 12 22 26 42 --- 20 22 04 77.1 197.9 0.3 15.2 20 F 1 280 22 26 12 22 26 42 ON1 20 22 04 78.4 192.4 0.2 10.6 -10 1 1 280 22 26 42 22 27 12 --- 20 22 34 78.4 192.9 0.2 11.1 20 F 1 281 22 26 42 22 27 12 20092+30494 20 22 34 77.6 193.1 0.2 11.2 -7 1 1 281 22 27 12 22 27 42 --- 20 23 04 77.6 193.6 0.2 11.6 23 F 1 282 22 27 12 22 27 42 ON1 20 23 04 78.3 193.4 0.2 11.5 -7 1 1 282 22 27 42 22 28 12 --- 20 23 34 78.3 193.9 0.2 11.9 23 F 1 283 22 27 42 22 28 12 20134+31264 20 23 34 78.4 190.5 0.2 9.0 -8 1 1 283 22 28 12 22 28 42 --- 20 24 04 78.4 191.0 0.2 9.4 22 F 1 284 22 28 12 22 28 42 ON1 20 24 04 78.3 194.4 0.2 12.4 -8 1 1 284 22 28 42 22 29 12 --- 20 24 34 78.3 195.0 0.2 12.8 22 F 1 285 22 28 42 22 29 12 J2003+3034 20 24 34 77.0 200.2 0.3 17.1 -10 1 1 285 22 29 12 22 29 42 --- 20 25 04 77.0 200.7 0.4 17.5 20 F 1 285 22 29 12 22 29 42 ON1 20 25 04 78.3 195.5 0.2 13.2 -9 1 1 285 22 29 42 22 30 12 --- 20 25 34 78.2 196.0 0.3 13.7 20 F 1 286 22 29 42 22 30 12 20092+30494 20 25 34 77.5 196.0 0.3 13.6 -7 1 1 286 22 30 12 22 30 42 --- 20 26 04 77.5 196.5 0.3 14.0 23 F 1 287 22 30 12 22 30 42 ON1 20 26 04 78.2 196.5 0.3 14.1 -7 1 1 287 22 30 42 22 31 12 --- 20 26 34 78.2 197.0 0.3 14.5 23 F 1 288 22 30 42 22 31 12 20134+31264 20 26 34 78.3 193.6 0.2 11.6 -8 1 1 288 22 31 12 22 31 42 --- 20 27 04 78.2 194.1 0.2 12.0 22 F 1 289 22 31 12 22 31 42 ON1 20 27 04 78.2 197.5 0.3 15.0 -8 1 1 289 22 31 42 22 32 11 --- 20 27 34 78.1 198.0 0.3 15.4 22 F 1 290 22 31 42 Schedule for VLBA_HN (Code Hn ) Page 22 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 32 11 J2003+3034 20 27 34 76.8 202.9 0.4 19.4 -9 1 1 290 22 32 11 22 32 41 --- 20 28 04 76.8 203.4 0.4 19.7 21 F 1 291 22 32 11 22 32 41 ON1 20 28 04 78.1 198.5 0.3 15.8 -9 1 1 291 22 32 41 22 33 11 --- 20 28 34 78.1 199.0 0.3 16.2 21 F 1 292 22 32 41 22 33 11 20092+30494 20 28 34 77.3 198.9 0.3 16.0 -7 1 1 292 22 33 11 22 33 41 --- 20 29 04 77.3 199.4 0.3 16.4 23 F 1 293 22 33 11 22 33 41 ON1 20 29 04 78.0 199.5 0.3 16.6 -7 1 1 293 22 33 41 22 34 11 --- 20 29 34 78.0 200.0 0.3 17.1 23 F 1 294 22 33 41 22 34 11 20134+31264 20 29 34 78.1 196.6 0.3 14.2 -8 1 1 294 22 34 11 22 34 41 --- 20 30 04 78.1 197.1 0.3 14.6 22 F 1 295 22 34 11 22 34 41 ON1 20 30 04 78.0 200.5 0.3 17.5 -8 1 1 295 22 34 41 22 35 11 --- 20 30 34 77.9 200.9 0.3 17.9 22 F 1 296 22 34 41 22 35 11 J2003+3034 20 30 34 76.6 205.6 0.4 21.5 -9 1 1 296 22 35 11 22 35 41 --- 20 31 04 76.5 206.0 0.5 21.9 21 F 1 297 22 35 11 22 35 41 ON1 20 31 04 77.9 201.4 0.3 18.3 -9 1 1 297 22 35 41 22 36 11 --- 20 31 34 77.9 201.9 0.4 18.7 21 F 1 298 22 35 41 22 36 11 20092+30494 20 31 34 77.2 201.7 0.4 18.4 -7 1 1 298 22 36 11 22 36 41 --- 20 32 04 77.1 202.1 0.4 18.7 23 F 1 299 22 36 11 22 36 41 ON1 20 32 04 77.8 202.4 0.4 19.1 -7 1 1 299 22 36 41 22 37 11 --- 20 32 34 77.8 202.9 0.4 19.5 23 F 1 300 22 36 41 22 37 11 20134+31264 20 32 34 77.9 199.6 0.3 16.7 -8 1 1 300 22 37 11 22 37 41 --- 20 33 04 77.9 200.1 0.3 17.1 22 F 1 301 22 37 11 22 37 41 ON1 20 33 04 77.8 203.3 0.4 19.9 -8 1 1 301 22 37 41 22 38 10 --- 20 33 34 77.7 203.8 0.4 20.3 22 F 1 302 22 37 41 22 38 10 J2003+3034 20 33 34 76.3 208.1 0.5 23.6 -9 1 1 302 22 38 10 22 38 40 --- 20 34 04 76.3 208.5 0.5 24.0 21 F 1 303 22 38 10 22 38 40 ON1 20 34 04 77.7 204.3 0.4 20.7 -9 1 1 303 22 38 40 22 39 10 --- 20 34 34 77.7 204.7 0.4 21.1 21 F 1 304 22 38 40 22 39 10 20092+30494 20 34 34 76.9 204.4 0.4 20.6 -7 1 1 304 22 39 10 22 39 40 --- 20 35 04 76.9 204.8 0.4 21.0 23 F 1 305 22 39 10 Schedule for VLBA_HN (Code Hn ) Page 23 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 39 40 ON1 20 35 04 77.6 205.2 0.4 21.5 -7 1 1 305 22 39 40 22 40 10 --- 20 35 34 77.6 205.7 0.4 21.8 23 F 1 306 22 39 40 22 40 10 20134+31264 20 35 34 77.7 202.5 0.4 19.1 -8 1 1 306 22 40 10 22 40 40 --- 20 36 04 77.7 202.9 0.4 19.5 22 F 1 307 22 40 10 22 40 40 ON1 20 36 04 77.5 206.1 0.4 22.2 -8 1 1 307 22 40 40 22 41 10 --- 20 36 34 77.5 206.6 0.4 22.6 22 F 1 308 22 40 40 22 41 10 J2003+3034 20 36 34 76.0 210.6 0.5 25.6 -9 1 1 308 22 41 10 22 41 40 --- 20 37 04 76.0 211.0 0.6 25.9 21 F 1 309 22 41 10 22 41 40 ON1 20 37 04 77.5 207.0 0.4 23.0 -9 1 1 309 22 41 40 22 42 10 --- 20 37 34 77.4 207.5 0.5 23.4 21 F 1 310 22 41 40 22 42 10 20092+30494 20 37 34 76.7 207.0 0.5 22.8 -7 1 1 310 22 42 10 22 42 40 --- 20 38 04 76.7 207.4 0.5 23.1 23 F 1 311 22 42 10 22 42 40 ON1 20 38 04 77.4 207.9 0.5 23.7 -7 1 1 311 22 42 40 22 43 10 --- 20 38 34 77.3 208.4 0.5 24.1 23 F 1 312 22 42 40 22 43 10 20134+31264 20 38 34 77.5 205.3 0.4 21.5 -8 1 1 312 22 43 10 22 43 40 --- 20 39 04 77.5 205.7 0.4 21.9 22 F 1 313 22 43 10 22 43 40 ON1 20 39 04 77.3 208.8 0.5 24.5 -8 1 1 313 22 43 40 22 44 09 --- 20 39 34 77.2 209.3 0.5 24.8 22 F 1 313 22 43 40 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 22 44 33 G75.76 20 39 58 83.5 213.6 0.3 30.7 5 1 1 313 22 44 33 22 45 03 --- 20 40 28 83.5 214.3 0.3 31.3 30 F 1 314 22 44 51 22 45 03 J2015+3710 20 40 28 82.6 221.6 0.4 37.6 -11 1 1 314 22 45 03 22 45 33 --- 20 40 58 82.5 222.2 0.4 38.1 19 F 1 315 22 45 03 22 45 33 G75.76 20 40 58 83.4 215.1 0.3 32.0 -11 1 1 315 22 45 33 22 46 03 --- 20 41 28 83.4 215.8 0.3 32.7 19 F 1 316 22 45 33 22 46 03 J2018+3812 20 41 28 83.7 224.1 0.4 40.5 -12 1 1 316 22 46 03 22 46 33 --- 20 41 58 83.6 224.8 0.4 41.0 18 F 1 317 22 46 03 Schedule for VLBA_HN (Code Hn ) Page 24 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 46 33 G75.76 20 41 58 83.3 216.5 0.3 33.3 -12 1 1 317 22 46 33 22 47 03 --- 20 42 28 83.3 217.2 0.3 33.9 18 F 1 318 22 46 33 22 47 03 J2015+3710 20 42 28 82.3 223.9 0.4 39.6 -10 1 1 318 22 47 03 22 47 33 --- 20 42 58 82.3 224.5 0.5 40.1 19 F 1 319 22 47 03 22 47 33 G75.76 20 42 58 83.2 217.9 0.3 34.5 -10 1 1 319 22 47 33 22 48 03 --- 20 43 28 83.2 218.6 0.4 35.1 20 F 1 320 22 47 33 22 48 03 J2018+3812 20 43 28 83.4 226.7 0.4 42.7 -11 1 1 320 22 48 03 22 48 33 --- 20 43 58 83.3 227.3 0.4 43.3 19 F 1 321 22 48 03 22 48 33 G75.76 20 43 58 83.1 219.3 0.4 35.7 -11 1 1 321 22 48 33 22 49 03 --- 20 44 28 83.0 220.0 0.4 36.3 19 F 1 322 22 48 33 22 49 03 J2015+3710 20 44 28 82.1 226.2 0.5 41.5 -10 1 1 322 22 49 03 22 49 32 --- 20 44 58 82.0 226.7 0.5 42.0 20 F 1 323 22 49 03 22 49 32 G75.76 20 44 58 83.0 220.6 0.4 36.9 -10 1 1 323 22 49 32 22 50 02 --- 20 45 28 82.9 221.3 0.4 37.5 20 F 1 324 22 49 32 22 50 02 J2018+3812 20 45 28 83.1 229.1 0.4 44.8 -11 1 1 324 22 50 02 22 50 32 --- 20 45 58 83.1 229.7 0.4 45.3 19 F 1 325 22 50 02 22 50 32 G75.76 20 45 58 82.9 221.9 0.4 38.0 -11 1 1 325 22 50 32 22 51 02 --- 20 46 28 82.8 222.5 0.4 38.6 19 F 1 326 22 50 32 22 51 02 J2015+3710 20 46 28 81.8 228.3 0.5 43.3 -10 1 1 326 22 51 02 22 51 32 --- 20 46 58 81.7 228.8 0.5 43.7 20 F 1 327 22 51 02 22 51 32 G75.76 20 46 58 82.7 223.1 0.4 39.1 -10 1 1 327 22 51 32 22 52 02 --- 20 47 28 82.7 223.7 0.4 39.6 20 F 1 328 22 51 32 22 52 02 J2018+3812 20 47 28 82.8 231.4 0.5 46.7 -11 1 1 328 22 52 02 22 52 32 --- 20 47 58 82.8 231.9 0.5 47.2 19 F 1 329 22 52 02 22 52 32 G75.76 20 47 58 82.6 224.3 0.4 40.1 -11 1 1 329 22 52 32 22 53 02 --- 20 48 28 82.5 224.9 0.4 40.6 19 F 1 330 22 52 32 22 53 02 J2015+3710 20 48 28 81.5 230.2 0.5 45.0 -10 1 1 330 22 53 02 22 53 32 --- 20 48 58 81.5 230.7 0.6 45.4 20 F 1 331 22 53 02 22 53 32 G75.76 20 48 58 82.5 225.5 0.4 41.1 -9 1 1 331 22 53 32 22 54 02 --- 20 49 28 82.4 226.1 0.5 41.6 20 F 1 332 22 53 32 Schedule for VLBA_HN (Code Hn ) Page 25 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 22 54 02 J2018+3812 20 49 28 82.6 233.5 0.5 48.5 -11 1 1 332 22 54 02 22 54 32 --- 20 49 58 82.5 234.0 0.5 48.9 19 F 1 333 22 54 02 22 54 32 G75.76 20 49 58 82.4 226.6 0.5 42.1 -11 1 1 333 22 54 32 22 55 02 --- 20 50 28 82.3 227.2 0.5 42.6 19 F 1 334 22 54 32 22 55 02 J2015+3710 20 50 28 81.2 232.1 0.6 46.5 -9 1 1 334 22 55 02 22 55 31 --- 20 50 58 81.2 232.5 0.6 46.9 21 F 1 335 22 55 02 22 55 31 G75.76 20 50 58 82.2 227.7 0.5 43.0 -9 1 1 335 22 55 31 22 56 01 --- 20 51 28 82.2 228.2 0.5 43.5 21 F 1 336 22 55 31 22 56 01 J2018+3812 20 51 28 82.3 235.4 0.5 50.1 -11 1 1 336 22 56 01 22 56 31 --- 20 51 58 82.2 235.9 0.5 50.5 19 F 1 337 22 56 01 22 56 31 G75.76 20 51 58 82.1 228.8 0.5 43.9 -11 1 1 337 22 56 31 22 57 01 --- 20 52 28 82.0 229.3 0.5 44.3 19 F 1 338 22 56 31 22 57 01 J2015+3710 20 52 28 81.0 233.8 0.6 47.9 -9 1 1 338 22 57 01 22 57 31 --- 20 52 58 80.9 234.3 0.6 48.3 21 F 1 339 22 57 01 22 57 31 G75.76 20 52 58 81.9 229.8 0.5 44.8 -9 1 1 339 22 57 31 22 58 01 --- 20 53 28 81.9 230.3 0.5 45.2 21 F 1 340 22 57 31 22 58 01 J2018+3812 20 53 28 82.0 237.2 0.6 51.6 -11 1 1 340 22 58 01 22 58 31 --- 20 53 58 81.9 237.6 0.6 51.9 19 F 1 341 22 58 01 22 58 31 G75.76 20 53 58 81.8 230.8 0.5 45.6 -11 1 1 341 22 58 31 22 59 01 --- 20 54 28 81.7 231.2 0.5 46.0 19 F 1 341 22 58 31 22 59 01 J2015+3710 20 54 28 80.7 235.5 0.6 49.2 -9 1 1 341 22 59 01 22 59 31 --- 20 54 58 80.6 235.9 0.7 49.6 21 F 1 342 22 59 01 22 59 31 G75.76 20 54 58 81.7 231.7 0.5 46.4 -9 1 1 342 22 59 31 23 00 01 --- 20 55 28 81.6 232.2 0.6 46.8 21 F 1 343 22 59 31 23 00 01 J2018+3812 20 55 28 81.6 238.9 0.6 53.0 -10 1 1 343 23 00 01 23 00 31 --- 20 55 58 81.6 239.3 0.6 53.3 19 F 1 344 23 00 01 23 00 31 G75.76 20 55 58 81.5 232.7 0.6 47.2 -10 1 1 344 23 00 31 23 01 01 --- 20 56 28 81.4 233.1 0.6 47.5 19 F 1 345 23 00 31 23 01 01 J2015+3710 20 56 28 80.3 237.0 0.7 50.5 -9 1 1 345 23 01 01 23 01 31 --- 20 56 58 80.3 237.4 0.7 50.8 21 F 1 346 23 01 01 Schedule for VLBA_HN (Code Hn ) Page 26 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 01 31 G75.76 20 56 58 81.4 233.6 0.6 47.9 -9 1 1 346 23 01 31 23 02 00 --- 20 57 28 81.3 234.0 0.6 48.3 21 F 1 347 23 01 31 23 02 00 J2018+3812 20 57 28 81.3 240.5 0.6 54.2 -10 1 1 347 23 02 00 23 02 30 --- 20 57 58 81.2 240.8 0.6 54.5 20 F 1 348 23 02 00 23 02 30 G75.76 20 57 58 81.2 234.4 0.6 48.6 -10 1 1 348 23 02 30 23 03 00 --- 20 58 28 81.1 234.9 0.6 49.0 20 F 1 349 23 02 30 23 03 00 J2015+3710 20 58 28 80.0 238.5 0.7 51.6 -8 1 1 349 23 03 00 23 03 30 --- 20 58 58 80.0 238.9 0.7 51.9 21 F 1 350 23 03 00 23 03 30 G75.76 20 58 58 81.1 235.3 0.6 49.3 -8 1 1 350 23 03 30 23 04 00 --- 20 59 28 81.0 235.7 0.6 49.6 22 F 1 351 23 03 30 23 04 00 J2018+3812 20 59 28 81.0 241.9 0.7 55.4 -10 1 1 351 23 04 00 23 04 30 --- 20 59 58 80.9 242.3 0.7 55.6 20 F 1 352 23 04 00 23 04 30 G75.76 20 59 58 80.9 236.1 0.6 50.0 -10 1 1 352 23 04 30 23 05 00 --- 21 00 28 80.8 236.5 0.6 50.3 20 F 1 353 23 04 30 Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 23 05 28 ON1 21 00 56 74.9 225.4 0.8 37.7 10 1 1 353 23 05 28 23 05 58 --- 21 01 26 74.8 225.8 0.8 38.0 30 F 1 354 23 05 46 23 05 58 J2003+3034 21 01 26 73.2 227.7 1.0 39.0 -9 1 1 354 23 05 58 23 06 28 --- 21 01 56 73.1 227.9 1.0 39.2 21 F 1 355 23 05 58 23 06 28 ON1 21 01 56 74.7 226.1 0.9 38.2 -9 1 1 355 23 06 28 23 06 58 --- 21 02 26 74.7 226.4 0.9 38.5 21 F 1 356 23 06 28 23 06 58 20092+30494 21 02 26 74.0 225.3 0.9 37.3 -7 1 1 356 23 06 58 23 07 28 --- 21 02 56 73.9 225.6 0.9 37.6 23 F 1 357 23 06 58 23 07 28 ON1 21 02 56 74.6 226.7 0.9 38.7 -7 1 1 357 23 07 28 23 07 58 --- 21 03 26 74.5 227.0 0.9 38.9 23 F 1 358 23 07 28 23 07 58 20134+31264 21 03 26 74.9 224.7 0.8 37.2 -7 1 1 358 23 07 58 23 08 27 --- 21 03 56 74.8 225.1 0.8 37.4 22 F 1 359 23 07 58 Schedule for VLBA_HN (Code Hn ) Page 27 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 08 27 ON1 21 03 56 74.5 227.3 0.9 39.2 -7 1 1 359 23 08 27 23 08 57 --- 21 04 26 74.4 227.6 0.9 39.4 22 F 1 360 23 08 27 23 08 57 J2003+3034 21 04 26 72.7 229.3 1.0 40.2 -9 1 1 360 23 08 57 23 09 27 --- 21 04 56 72.7 229.6 1.0 40.4 21 F 1 361 23 08 57 23 09 27 ON1 21 04 56 74.3 227.9 0.9 39.6 -9 1 1 361 23 09 27 23 09 57 --- 21 05 26 74.3 228.2 0.9 39.9 21 F 1 362 23 09 27 23 09 57 20092+30494 21 05 26 73.6 227.2 0.9 38.7 -7 1 1 362 23 09 57 23 10 27 --- 21 05 56 73.5 227.4 0.9 38.9 23 F 1 363 23 09 57 23 10 27 ON1 21 05 56 74.2 228.5 0.9 40.1 -7 1 1 363 23 10 27 23 10 57 --- 21 06 26 74.1 228.8 0.9 40.3 23 F 1 364 23 10 27 23 10 57 20134+31264 21 06 26 74.5 226.6 0.9 38.6 -7 1 1 364 23 10 57 23 11 27 --- 21 06 56 74.4 227.0 0.9 38.9 22 F 1 365 23 10 57 23 11 27 ON1 21 06 56 74.0 229.1 0.9 40.5 -7 1 1 365 23 11 27 23 11 57 --- 21 07 26 74.0 229.4 0.9 40.7 23 F 1 366 23 11 27 23 11 57 J2003+3034 21 07 26 72.3 231.0 1.1 41.4 -9 1 1 366 23 11 57 23 12 27 --- 21 07 56 72.3 231.2 1.1 41.6 21 F 1 367 23 11 57 23 12 27 ON1 21 07 56 73.9 229.7 1.0 41.0 -9 1 1 367 23 12 27 23 12 57 --- 21 08 26 73.8 230.0 1.0 41.2 21 F 1 368 23 12 27 23 12 57 20092+30494 21 08 26 73.2 228.9 1.0 40.0 -7 1 1 368 23 12 57 23 13 27 --- 21 08 56 73.1 229.2 1.0 40.2 23 F 1 368 23 12 57 23 13 27 ON1 21 08 56 73.8 230.3 1.0 41.4 -7 1 1 368 23 13 27 23 13 57 --- 21 09 26 73.7 230.6 1.0 41.6 23 F 1 369 23 13 27 23 13 57 20134+31264 21 09 26 74.1 228.5 0.9 40.0 -7 1 1 369 23 13 57 23 14 26 --- 21 09 56 74.0 228.8 0.9 40.2 23 F 1 370 23 13 57 23 14 26 ON1 21 09 56 73.6 230.9 1.0 41.8 -7 1 1 370 23 14 26 23 14 56 --- 21 10 26 73.6 231.1 1.0 42.0 23 F 1 371 23 14 26 23 14 56 J2003+3034 21 10 26 71.9 232.5 1.1 42.5 -9 1 1 371 23 14 56 23 15 26 --- 21 10 56 71.8 232.8 1.1 42.6 21 F 1 372 23 14 56 23 15 26 ON1 21 10 56 73.5 231.4 1.0 42.2 -9 1 1 372 23 15 26 23 15 56 --- 21 11 26 73.4 231.7 1.0 42.4 21 F 1 373 23 15 26 Schedule for VLBA_HN (Code Hn ) Page 28 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 15 56 20092+30494 21 11 26 72.8 230.6 1.0 41.2 -7 1 1 373 23 15 56 23 16 26 --- 21 11 56 72.7 230.8 1.0 41.4 23 F 1 374 23 15 56 23 16 26 ON1 21 11 56 73.3 232.0 1.0 42.6 -7 1 1 374 23 16 26 23 16 56 --- 21 12 26 73.3 232.3 1.0 42.8 23 F 1 375 23 16 26 23 16 56 20134+31264 21 12 26 73.7 230.2 1.0 41.3 -7 1 1 375 23 16 56 23 17 26 --- 21 12 56 73.6 230.5 1.0 41.5 23 F 1 376 23 16 56 23 17 26 ON1 21 12 56 73.2 232.5 1.0 43.0 -7 1 1 376 23 17 26 23 17 56 --- 21 13 26 73.1 232.8 1.0 43.2 23 F 1 377 23 17 26 23 17 56 J2003+3034 21 13 26 71.5 234.0 1.2 43.5 -9 1 1 377 23 17 56 23 18 26 --- 21 13 56 71.4 234.3 1.2 43.7 21 F 1 378 23 17 56 23 18 26 ON1 21 13 56 73.1 233.1 1.1 43.4 -9 1 1 378 23 18 26 23 18 56 --- 21 14 26 73.0 233.3 1.1 43.6 21 F 1 379 23 18 26 23 18 56 20092+30494 21 14 26 72.3 232.2 1.1 42.3 -7 1 1 379 23 18 56 23 19 26 --- 21 14 56 72.3 232.4 1.1 42.5 23 F 1 380 23 18 56 23 19 26 ON1 21 14 56 72.9 233.6 1.1 43.7 -7 1 1 380 23 19 26 23 19 56 --- 21 15 26 72.8 233.8 1.1 43.9 23 F 1 381 23 19 26 23 19 56 20134+31264 21 15 26 73.2 231.9 1.0 42.5 -7 1 1 381 23 19 56 23 20 26 --- 21 15 56 73.2 232.2 1.0 42.7 23 F 1 382 23 19 56 23 20 26 ON1 21 15 56 72.8 234.1 1.1 44.1 -7 1 1 382 23 20 26 23 20 55 --- 21 16 26 72.7 234.4 1.1 44.3 23 F 1 383 23 20 26 23 20 55 J2003+3034 21 16 26 71.0 235.5 1.2 44.5 -9 1 1 383 23 20 55 23 21 25 --- 21 16 56 70.9 235.7 1.2 44.7 21 F 1 384 23 20 55 23 21 25 ON1 21 16 56 72.6 234.6 1.1 44.5 -9 1 1 384 23 21 25 23 21 55 --- 21 17 26 72.5 234.9 1.1 44.6 21 F 1 385 23 21 25 23 21 55 20092+30494 21 17 26 71.9 233.7 1.1 43.4 -7 1 1 385 23 21 55 23 22 25 --- 21 17 56 71.8 234.0 1.1 43.6 23 F 1 386 23 21 55 23 22 25 ON1 21 17 56 72.5 235.1 1.1 44.8 -7 1 1 386 23 22 25 23 22 55 --- 21 18 26 72.4 235.4 1.1 45.0 23 F 1 387 23 22 25 23 22 55 20134+31264 21 18 26 72.8 233.5 1.1 43.6 -7 1 1 387 23 22 55 23 23 25 --- 21 18 56 72.7 233.8 1.1 43.8 23 F 1 388 23 22 55 Schedule for VLBA_HN (Code Hn ) Page 29 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 23 25 ON1 21 18 56 72.3 235.6 1.1 45.2 -7 1 1 388 23 23 25 23 23 55 --- 21 19 26 72.2 235.9 1.1 45.3 23 F 1 389 23 23 25 23 23 55 J2003+3034 21 19 26 70.5 236.9 1.3 45.4 -9 1 1 389 23 23 55 23 24 25 --- 21 19 56 70.5 237.1 1.3 45.6 21 F 1 390 23 23 55 23 24 25 ON1 21 19 56 72.2 236.1 1.2 45.5 -9 1 1 390 23 24 25 23 24 55 --- 21 20 26 72.1 236.4 1.2 45.7 21 F 1 391 23 24 25 23 24 55 20092+30494 21 20 26 71.5 235.2 1.2 44.4 -7 1 1 391 23 24 55 23 25 25 --- 21 20 56 71.4 235.4 1.2 44.6 23 F 1 392 23 24 55 23 25 25 ON1 21 20 56 72.0 236.6 1.2 45.8 -7 1 1 392 23 25 25 23 25 55 --- 21 21 26 71.9 236.8 1.2 46.0 23 F 1 393 23 25 25 23 25 55 20134+31264 21 21 26 72.4 235.0 1.1 44.7 -7 1 1 393 23 25 55 23 26 25 --- 21 21 56 72.3 235.3 1.1 44.9 23 F 1 394 23 25 55 23 26 25 ON1 21 21 56 71.9 237.1 1.2 46.1 -7 1 1 394 23 26 25 23 26 54 --- 21 22 26 71.8 237.3 1.2 46.3 23 F 1 395 23 26 25 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 23 27 22 G75.76 21 22 53 77.2 249.9 1.0 60.0 10 1 1 395 23 27 22 23 27 51 --- 21 23 23 77.1 250.1 1.0 60.1 30 F 1 396 23 27 40 23 27 51 J2015+3710 21 23 23 75.9 251.8 1.1 60.8 -8 1 1 396 23 27 51 23 28 21 --- 21 23 53 75.8 252.0 1.1 60.9 22 F 1 396 23 27 51 23 28 21 G75.76 21 23 53 77.0 250.3 1.0 60.3 -8 1 1 396 23 28 21 23 28 51 --- 21 24 23 76.9 250.5 1.0 60.4 22 F 1 397 23 28 21 23 28 51 J2018+3812 21 24 23 76.8 254.8 1.1 64.1 -9 1 1 397 23 28 51 23 29 21 --- 21 24 53 76.7 255.0 1.1 64.2 21 F 1 398 23 28 51 23 29 21 G75.76 21 24 53 76.8 250.7 1.0 60.5 -9 1 1 398 23 29 21 23 29 51 --- 21 25 23 76.7 250.9 1.1 60.7 21 F 1 399 23 29 21 23 29 51 J2015+3710 21 25 23 75.5 252.6 1.2 61.3 -8 1 1 399 23 29 51 23 30 21 --- 21 25 53 75.5 252.7 1.2 61.4 22 F 1 400 23 29 51 Schedule for VLBA_HN (Code Hn ) Page 30 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 30 21 G75.76 21 25 53 76.7 251.2 1.1 60.8 -8 1 1 400 23 30 21 23 30 51 --- 21 26 23 76.6 251.4 1.1 60.9 22 F 1 401 23 30 21 23 30 51 J2018+3812 21 26 23 76.4 255.5 1.1 64.5 -9 1 1 401 23 30 51 23 31 21 --- 21 26 53 76.3 255.7 1.1 64.6 21 F 1 402 23 30 51 23 31 21 G75.76 21 26 53 76.5 251.6 1.1 61.0 -9 1 1 402 23 31 21 23 31 51 --- 21 27 23 76.4 251.8 1.1 61.2 21 F 1 403 23 31 21 23 31 51 J2015+3710 21 27 23 75.2 253.3 1.2 61.7 -8 1 1 403 23 31 51 23 32 21 --- 21 27 53 75.1 253.5 1.2 61.8 22 F 1 404 23 31 51 23 32 21 G75.76 21 27 53 76.3 252.0 1.1 61.3 -8 1 1 404 23 32 21 23 32 51 --- 21 28 23 76.2 252.2 1.1 61.4 22 F 1 405 23 32 21 23 32 51 J2018+3812 21 28 23 76.0 256.2 1.2 64.9 -9 1 1 405 23 32 51 23 33 21 --- 21 28 53 76.0 256.4 1.2 64.9 21 F 1 406 23 32 51 23 33 21 G75.76 21 28 53 76.1 252.4 1.1 61.5 -9 1 1 406 23 33 21 23 33 50 --- 21 29 23 76.0 252.6 1.1 61.6 21 F 1 407 23 33 21 23 33 50 J2015+3710 21 29 23 74.8 254.0 1.2 62.1 -8 1 1 407 23 33 50 23 34 20 --- 21 29 53 74.8 254.2 1.2 62.2 22 F 1 408 23 33 50 23 34 20 G75.76 21 29 53 76.0 252.8 1.1 61.8 -8 1 1 408 23 34 20 23 34 50 --- 21 30 23 75.9 253.0 1.1 61.9 22 F 1 409 23 34 20 23 34 50 J2018+3812 21 30 23 75.7 256.9 1.2 65.2 -9 1 1 409 23 34 50 23 35 20 --- 21 30 53 75.6 257.0 1.2 65.3 21 F 1 410 23 34 50 23 35 20 G75.76 21 30 53 75.8 253.2 1.1 62.0 -9 1 1 410 23 35 20 23 35 50 --- 21 31 23 75.7 253.3 1.2 62.1 21 F 1 411 23 35 20 23 35 50 J2015+3710 21 31 23 74.5 254.7 1.3 62.5 -8 1 1 411 23 35 50 23 36 20 --- 21 31 53 74.4 254.9 1.3 62.6 22 F 1 412 23 35 50 23 36 20 G75.76 21 31 53 75.6 253.5 1.2 62.2 -8 1 1 412 23 36 20 23 36 50 --- 21 32 23 75.5 253.7 1.2 62.3 22 F 1 413 23 36 20 23 36 50 J2018+3812 21 32 23 75.3 257.5 1.2 65.5 -9 1 1 413 23 36 50 23 37 20 --- 21 32 53 75.2 257.7 1.2 65.6 21 F 1 414 23 36 50 23 37 20 G75.76 21 32 53 75.4 253.9 1.2 62.4 -9 1 1 414 23 37 20 23 37 50 --- 21 33 23 75.3 254.1 1.2 62.5 21 F 1 415 23 37 20 Schedule for VLBA_HN (Code Hn ) Page 31 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 37 50 J2015+3710 21 33 23 74.1 255.4 1.3 62.8 -8 1 1 415 23 37 50 23 38 20 --- 21 33 53 74.0 255.6 1.3 62.9 22 F 1 416 23 37 50 23 38 20 G75.76 21 33 53 75.3 254.3 1.2 62.6 -8 1 1 416 23 38 20 23 38 50 --- 21 34 23 75.2 254.4 1.2 62.7 21 F 1 417 23 38 20 23 38 50 J2018+3812 21 34 23 75.0 258.2 1.3 65.8 -8 1 1 417 23 38 50 23 39 20 --- 21 34 53 74.9 258.3 1.3 65.9 21 F 1 418 23 38 50 23 39 20 G75.76 21 34 53 75.1 254.6 1.2 62.8 -8 1 1 418 23 39 20 23 39 50 --- 21 35 23 75.0 254.8 1.2 62.9 21 F 1 419 23 39 20 23 39 50 J2015+3710 21 35 23 73.8 256.1 1.3 63.2 -8 1 1 419 23 39 50 23 40 19 --- 21 35 53 73.7 256.2 1.3 63.2 21 F 1 420 23 39 50 23 40 19 G75.76 21 35 53 74.9 255.0 1.2 63.0 -8 1 1 420 23 40 19 23 40 49 --- 21 36 23 74.8 255.1 1.2 63.1 21 F 1 421 23 40 19 23 40 49 J2018+3812 21 36 23 74.6 258.8 1.3 66.1 -8 1 1 421 23 40 49 23 41 19 --- 21 36 53 74.5 258.9 1.3 66.2 21 F 1 422 23 40 49 23 41 19 G75.76 21 36 53 74.7 255.3 1.2 63.1 -8 1 1 422 23 41 19 23 41 49 --- 21 37 23 74.6 255.5 1.3 63.2 22 F 1 423 23 41 19 23 41 49 J2015+3710 21 37 23 73.4 256.7 1.4 63.5 -8 1 1 423 23 41 49 23 42 19 --- 21 37 53 73.3 256.8 1.4 63.5 21 F 1 423 23 41 49 23 42 19 G75.76 21 37 53 74.5 255.6 1.3 63.3 -8 1 1 423 23 42 19 23 42 49 --- 21 38 23 74.5 255.8 1.3 63.4 21 F 1 424 23 42 19 23 42 49 J2018+3812 21 38 23 74.3 259.4 1.3 66.4 -8 1 1 424 23 42 49 23 43 19 --- 21 38 53 74.2 259.5 1.3 66.4 22 F 1 425 23 42 49 23 43 19 G75.76 21 38 53 74.4 256.0 1.3 63.5 -8 1 1 425 23 43 19 23 43 49 --- 21 39 23 74.3 256.1 1.3 63.6 22 F 1 426 23 43 19 23 43 49 J2015+3710 21 39 23 73.1 257.3 1.4 63.7 -8 1 1 426 23 43 49 23 44 19 --- 21 39 53 73.0 257.5 1.4 63.8 21 F 1 427 23 43 49 23 44 19 G75.76 21 39 53 74.2 256.3 1.3 63.6 -8 1 1 427 23 44 19 23 44 49 --- 21 40 23 74.1 256.5 1.3 63.7 21 F 1 428 23 44 19 23 44 49 J2018+3812 21 40 23 73.9 259.9 1.4 66.6 -8 1 1 428 23 44 49 23 45 19 --- 21 40 53 73.8 260.1 1.4 66.7 22 F 1 429 23 44 49 Schedule for VLBA_HN (Code Hn ) Page 32 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 Nov 2007 Day 305 --- 23 45 19 G75.76 21 40 53 74.0 256.6 1.3 63.8 -8 1 1 429 23 45 19 23 45 49 --- 21 41 23 73.9 256.8 1.3 63.9 22 F 1 430 23 45 19 23 45 49 J2015+3710 21 41 23 72.7 257.9 1.4 64.0 -8 1 1 430 23 45 49 23 46 18 --- 21 41 53 72.6 258.0 1.4 64.1 21 F 1 431 23 45 49 23 46 18 G75.76 21 41 53 73.8 256.9 1.3 64.0 -8 1 1 431 23 46 18 23 46 48 --- 21 42 23 73.7 257.1 1.3 64.0 21 F 1 432 23 46 18 23 46 48 J2018+3812 21 42 23 73.5 260.5 1.4 66.8 -8 1 1 432 23 46 48 23 47 18 --- 21 42 53 73.4 260.6 1.4 66.9 22 F 1 433 23 46 48 23 47 18 G75.76 21 42 53 73.7 257.3 1.3 64.1 -8 1 1 433 23 47 18 23 47 48 --- 21 43 23 73.6 257.4 1.4 64.2 22 F 1 434 23 47 18 Next scan frequencies: 22020.49 22045.49 22107.99 22207.99 22370.49 22420.49 22457.99 22470.49 Next BBC frequencies: 520.49 545.49 607.99 707.99 870.49 920.49 957.99 970.49 23 49 49 1743-035 21 45 24 18.5 246.0 4.0 42.1 4 1 1 434 23 49 49 23 50 48 --- 21 46 24 18.3 246.2 4.0 42.2 60 F 1 436 23 50 07 23 51 22 1751+093 21 46 57 29.2 255.0 3.9 45.8 5 1 1 436 23 51 22 23 52 21 --- 21 47 57 29.1 255.2 3.9 45.9 60 F 1 438 23 51 40 23 54 26 2236+282 21 50 02 72.8 143.0 -0.8 -30.1 31 1 1 438 23 54 26 23 55 26 --- 21 51 02 72.9 143.7 -0.8 -29.6 60 F 1 440 23 54 44 23 57 19 0017+813 21 52 55 49.5 7.6 -2.4 -138.3 16 1 1 440 23 57 19 23 58 19 --- 21 53 55 49.5 7.6 -2.4 -138.6 60 F 1 442 23 57 37 23 58 39 0019+732 21 54 15 55.1 17.2 -2.4 -130.4 2 1 1 442 23 58 19 23 59 38 --- 21 55 15 55.2 17.1 -2.4 -130.7 60 F 1 444 23 58 19 --- Fri 2 Nov 2007 Day 306 --- 00 00 45 0303+471 21 56 22 37.8 56.7 -5.1 -64.5 26 1 1 444 00 00 45 00 01 45 --- 21 57 22 37.9 56.8 -5.1 -64.6 60 F 1 446 00 01 03 00 02 30 0958+653 21 58 07 18.5 -0.1 12.0 0.2 0 1 1 446 00 02 30 00 03 30 --- 21 59 07 18.5 0.0 12.0 0.1 60 F 1 448 00 02 48 Schedule for VLBA_HN (Code Hn ) Page 33 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- 00 04 08 1058+811 21 59 45 34.4 -2.7 11.0 13.1 0 1 1 448 00 04 08 00 05 07 --- 22 00 45 34.4 -2.7 11.0 12.9 60 F 1 450 00 04 26 00 05 47 1302+574 22 01 25 17.6 -23.5 9.0 33.2 0 1 1 450 00 05 47 00 06 47 --- 22 02 25 17.5 -23.4 9.0 33.0 60 F 1 452 00 06 05 00 07 14 1419+542 22 02 53 21.6 -34.4 7.7 45.2 13 1 1 452 00 07 14 00 08 14 --- 22 03 53 21.5 -34.3 7.7 45.0 60 F 1 454 00 07 32 00 14 30 1638+572 22 10 09 38.5 -43.2 5.5 68.1 335 1 1 454 00 14 30 00 15 30 --- 22 11 09 38.3 -43.1 5.5 67.9 60 F 1 456 00 14 48 00 15 56 1740+521 22 11 36 45.1 -53.5 4.5 73.7 7 1 1 456 00 15 56 00 16 56 --- 22 12 36 45.0 -53.4 4.5 73.5 60 F 1 458 00 16 14 00 17 26 1746+622 22 13 05 47.5 -39.0 4.4 85.0 14 1 1 458 00 17 26 00 18 25 --- 22 14 05 47.4 -39.0 4.5 84.8 60 F 1 460 00 17 44 00 21 05 2148+065 22 16 46 53.5 191.9 0.5 8.7 0 1 1 460 00 21 05 00 22 05 --- 22 17 46 53.5 192.3 0.5 9.0 60 F 1 462 00 21 23 00 23 25 2236+282 22 19 06 75.2 164.7 -0.3 -12.7 31 1 1 462 00 23 25 00 24 25 --- 22 20 06 75.2 165.5 -0.3 -12.0 60 F 1 464 00 23 43 00 26 18 0017+813 22 21 59 50.1 6.3 -1.9 -146.5 0 1 1 464 00 26 18 00 27 18 --- 22 22 59 50.1 6.3 -1.9 -146.8 60 F 1 466 00 26 36 00 27 38 0019+732 22 23 20 56.6 14.6 -1.9 -139.5 2 1 1 466 00 27 38 00 28 38 --- 22 24 20 56.6 14.5 -1.9 -139.9 60 F 1 468 00 27 56 00 31 46 0121+114 22 27 28 41.2 116.1 -2.9 -42.2 114 1 1 468 00 31 46 00 32 46 --- 22 28 28 41.3 116.4 -2.9 -42.1 60 F 1 469 00 32 04 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 00 34 14 3C454.3G 22 29 57 62.8 167.1 -0.4 -9.8 40 1 1 469 00 34 14 00 36 14 --- 22 31 57 62.8 168.1 -0.4 -9.0 120 F 1 473 00 34 32 Schedule for VLBA_HN (Code Hn ) Page 34 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- Next scan frequencies: 22214.06 22214.06 22222.06 22222.06 22230.06 22230.06 22238.07 22238.07 Next BBC frequencies: 714.06 714.06 722.06 722.06 730.06 730.06 738.07 738.07 00 36 19 3C454.3O 22 32 02 62.8 168.2 -0.4 -9.0 1 1 1 473 00 36 14 00 38 19 --- 22 34 02 62.9 169.2 -0.3 -8.2 120 F 1 477 00 36 47 00 40 25 ON1 22 36 08 59.1 260.6 2.4 57.9 59 1 1 477 00 40 25 00 40 55 --- 22 36 38 59.1 260.7 2.4 58.0 30 F 1 478 00 40 43 00 40 55 J2003+3034 22 36 38 57.3 260.6 2.5 57.1 -9 1 1 478 00 40 55 00 41 25 --- 22 37 08 57.3 260.7 2.6 57.1 20 F 1 479 00 40 55 00 41 25 ON1 22 37 08 59.0 260.8 2.4 58.0 -9 1 1 479 00 41 25 00 41 55 --- 22 37 38 58.9 260.9 2.5 58.0 20 F 1 480 00 41 25 00 41 55 20092+30494 22 37 38 58.3 260.0 2.5 57.1 -7 1 1 480 00 41 55 00 42 24 --- 22 38 08 58.3 260.1 2.5 57.1 23 F 1 481 00 41 55 00 42 24 ON1 22 38 08 58.8 261.0 2.5 58.1 -7 1 1 481 00 42 24 00 42 54 --- 22 38 38 58.7 261.1 2.5 58.1 23 F 1 482 00 42 24 00 42 54 20134+31264 22 38 38 59.2 260.3 2.4 57.8 -7 1 1 482 00 42 54 00 43 24 --- 22 39 08 59.2 260.4 2.4 57.8 23 F 1 483 00 42 54 00 43 24 ON1 22 39 08 58.6 261.2 2.5 58.1 -7 1 1 483 00 43 24 00 43 54 --- 22 39 38 58.5 261.3 2.5 58.1 23 F 1 484 00 43 24 00 43 54 J2003+3034 22 39 38 56.8 261.3 2.6 57.2 -9 1 1 484 00 43 54 00 44 24 --- 22 40 08 56.7 261.4 2.6 57.2 20 F 1 485 00 43 54 00 44 24 ON1 22 40 08 58.4 261.4 2.5 58.2 -9 1 1 485 00 44 24 00 44 54 --- 22 40 38 58.3 261.6 2.5 58.2 20 F 1 486 00 44 24 00 44 54 20092+30494 22 40 38 57.8 260.6 2.5 57.3 -7 1 1 486 00 44 54 00 45 24 --- 22 41 08 57.7 260.7 2.5 57.3 23 F 1 487 00 44 54 00 45 24 ON1 22 41 08 58.2 261.7 2.5 58.2 -7 1 1 487 00 45 24 00 45 54 --- 22 41 38 58.2 261.8 2.5 58.2 23 F 1 488 00 45 24 00 45 54 20134+31264 22 41 38 58.7 260.9 2.5 58.0 -7 1 1 488 00 45 54 00 46 24 --- 22 42 08 58.6 261.0 2.5 58.0 23 F 1 489 00 45 54 Schedule for VLBA_HN (Code Hn ) Page 35 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- 00 46 24 ON1 22 42 08 58.1 261.9 2.5 58.3 -7 1 1 489 00 46 24 00 46 54 --- 22 42 38 58.0 262.0 2.5 58.3 23 F 1 490 00 46 24 00 46 54 J2003+3034 22 42 38 56.3 261.9 2.6 57.4 -9 1 1 490 00 46 54 00 47 24 --- 22 43 08 56.2 262.0 2.7 57.4 20 F 1 491 00 46 54 00 47 24 ON1 22 43 08 57.9 262.1 2.5 58.3 -9 1 1 491 00 47 24 00 47 54 --- 22 43 38 57.8 262.2 2.6 58.3 20 F 1 492 00 47 24 00 47 54 20092+30494 22 43 38 57.3 261.3 2.6 57.4 -7 1 1 492 00 47 54 00 48 23 --- 22 44 08 57.2 261.4 2.6 57.5 23 F 1 493 00 47 54 00 48 23 ON1 22 44 08 57.7 262.3 2.6 58.4 -7 1 1 493 00 48 23 00 48 53 --- 22 44 38 57.6 262.4 2.6 58.4 23 F 1 494 00 48 23 00 48 53 20134+31264 22 44 38 58.2 261.6 2.5 58.1 -7 1 1 494 00 48 53 00 49 23 --- 22 45 08 58.1 261.7 2.5 58.1 23 F 1 495 00 48 53 00 49 23 ON1 22 45 08 57.5 262.5 2.6 58.4 -7 1 1 495 00 49 23 00 49 53 --- 22 45 38 57.4 262.6 2.6 58.4 23 F 1 496 00 49 23 00 49 53 J2003+3034 22 45 38 55.7 262.5 2.7 57.5 -9 1 1 496 00 49 53 00 50 23 --- 22 46 08 55.6 262.6 2.7 57.5 20 F 1 497 00 49 53 00 50 23 ON1 22 46 08 57.3 262.7 2.6 58.5 -9 1 1 497 00 50 23 00 50 53 --- 22 46 38 57.2 262.8 2.6 58.5 20 F 1 498 00 50 23 00 50 53 20092+30494 22 46 38 56.7 261.9 2.6 57.6 -7 1 1 498 00 50 53 00 51 23 --- 22 47 08 56.6 262.0 2.6 57.6 23 F 1 499 00 50 53 00 51 23 ON1 22 47 08 57.2 262.9 2.6 58.5 -7 1 1 499 00 51 23 00 51 53 --- 22 47 38 57.1 263.0 2.6 58.5 23 F 1 500 00 51 23 00 51 53 20134+31264 22 47 38 57.6 262.2 2.6 58.3 -7 1 1 500 00 51 53 00 52 23 --- 22 48 08 57.5 262.3 2.6 58.3 23 F 1 501 00 51 53 00 52 23 ON1 22 48 08 57.0 263.1 2.6 58.5 -7 1 1 501 00 52 23 00 52 53 --- 22 48 38 56.9 263.2 2.6 58.6 23 F 1 502 00 52 23 00 52 53 J2003+3034 22 48 38 55.2 263.1 2.7 57.6 -9 1 1 502 00 52 53 00 53 23 --- 22 49 08 55.1 263.2 2.8 57.6 20 F 1 502 00 52 53 00 53 23 ON1 22 49 08 56.8 263.3 2.6 58.6 -9 1 1 502 00 53 23 00 53 53 --- 22 49 38 56.7 263.4 2.7 58.6 20 F 1 503 00 53 23 Schedule for VLBA_HN (Code Hn ) Page 36 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- 00 53 53 20092+30494 22 49 38 56.2 262.5 2.7 57.7 -7 1 1 503 00 53 53 00 54 22 --- 22 50 08 56.1 262.6 2.7 57.8 23 F 1 504 00 53 53 00 54 22 ON1 22 50 08 56.6 263.5 2.7 58.6 -7 1 1 504 00 54 22 00 54 52 --- 22 50 38 56.5 263.6 2.7 58.6 23 F 1 505 00 54 22 00 54 52 20134+31264 22 50 38 57.1 262.8 2.6 58.4 -7 1 1 505 00 54 52 00 55 22 --- 22 51 08 57.0 262.9 2.6 58.4 23 F 1 506 00 54 52 00 55 22 ON1 22 51 08 56.4 263.7 2.7 58.7 -7 1 1 506 00 55 22 00 55 52 --- 22 51 38 56.3 263.8 2.7 58.7 23 F 1 507 00 55 22 00 55 52 J2003+3034 22 51 38 54.6 263.7 2.8 57.7 -9 1 1 507 00 55 52 00 56 22 --- 22 52 08 54.5 263.8 2.8 57.7 20 F 1 508 00 55 52 00 56 22 ON1 22 52 08 56.2 263.9 2.7 58.7 -9 1 1 508 00 56 22 00 56 52 --- 22 52 38 56.2 264.0 2.7 58.7 20 F 1 509 00 56 22 00 56 52 20092+30494 22 52 38 55.6 263.1 2.7 57.9 -7 1 1 509 00 56 52 00 57 22 --- 22 53 08 55.5 263.2 2.7 57.9 23 F 1 510 00 56 52 00 57 22 ON1 22 53 08 56.1 264.1 2.7 58.7 -7 1 1 510 00 57 22 00 57 52 --- 22 53 38 56.0 264.2 2.7 58.7 23 F 1 511 00 57 22 00 57 52 20134+31264 22 53 38 56.5 263.4 2.7 58.5 -7 1 1 511 00 57 52 00 58 22 --- 22 54 08 56.4 263.5 2.7 58.5 23 F 1 512 00 57 52 00 58 22 ON1 22 54 08 55.9 264.3 2.7 58.8 -7 1 1 512 00 58 22 00 58 52 --- 22 54 38 55.8 264.4 2.7 58.8 23 F 1 513 00 58 22 Next scan frequencies: 22214.52 22214.52 22222.52 22222.52 22230.52 22230.52 22238.52 22238.52 Next BBC frequencies: 714.52 714.52 722.52 722.52 730.52 730.52 738.52 738.52 01 00 16 G75.76 22 56 03 60.3 272.6 2.6 67.1 69 1 1 513 01 00 16 01 00 46 --- 22 56 33 60.2 272.6 2.6 67.1 30 F 1 514 01 00 34 01 00 46 J2015+3710 22 56 33 59.0 273.2 2.7 66.6 -8 1 1 514 01 00 46 01 01 16 --- 22 57 03 58.9 273.2 2.7 66.6 21 F 1 515 01 00 46 01 01 16 G75.76 22 57 03 60.2 272.7 2.6 67.1 -8 1 1 515 01 01 16 01 01 46 --- 22 57 33 60.1 272.8 2.6 67.1 21 F 1 516 01 01 16 Schedule for VLBA_HN (Code Hn ) Page 37 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- 01 01 46 J2018+3812 22 57 33 59.8 274.7 2.6 68.3 -7 1 1 516 01 01 46 01 02 16 --- 22 58 03 59.7 274.8 2.7 68.3 23 F 1 517 01 01 46 01 02 16 G75.76 22 58 03 60.0 272.9 2.6 67.1 -7 1 1 517 01 02 16 01 02 45 --- 22 58 33 59.9 273.0 2.6 67.1 23 F 1 518 01 02 16 01 02 45 J2015+3710 22 58 33 58.7 273.5 2.7 66.6 -8 1 1 518 01 02 45 01 03 15 --- 22 59 03 58.6 273.5 2.7 66.6 21 F 1 519 01 02 45 01 03 15 G75.76 22 59 03 59.8 273.0 2.6 67.1 -8 1 1 519 01 03 15 01 03 45 --- 22 59 33 59.7 273.1 2.6 67.1 21 F 1 520 01 03 15 01 03 45 J2018+3812 22 59 33 59.5 275.0 2.7 68.2 -7 1 1 520 01 03 45 01 04 15 --- 23 00 03 59.4 275.1 2.7 68.2 23 F 1 521 01 03 45 01 04 15 G75.76 23 00 03 59.6 273.2 2.6 67.1 -7 1 1 521 01 04 15 01 04 45 --- 23 00 33 59.5 273.3 2.6 67.0 23 F 1 522 01 04 15 01 04 45 J2015+3710 23 00 33 58.3 273.8 2.7 66.5 -8 1 1 522 01 04 45 01 05 15 --- 23 01 03 58.2 273.8 2.8 66.5 21 F 1 523 01 04 45 01 05 15 G75.76 23 01 03 59.4 273.3 2.7 67.0 -8 1 1 523 01 05 15 01 05 45 --- 23 01 33 59.3 273.4 2.7 67.0 21 F 1 524 01 05 15 01 05 45 J2018+3812 23 01 33 59.1 275.3 2.7 68.2 -7 1 1 524 01 05 45 01 06 15 --- 23 02 03 59.0 275.3 2.7 68.1 23 F 1 525 01 05 45 01 06 15 G75.76 23 02 03 59.2 273.5 2.7 67.0 -7 1 1 525 01 06 15 01 06 45 --- 23 02 33 59.2 273.6 2.7 67.0 23 F 1 526 01 06 15 01 06 45 J2015+3710 23 02 33 57.9 274.1 2.8 66.5 -8 1 1 526 01 06 45 01 07 15 --- 23 03 03 57.8 274.1 2.8 66.5 21 F 1 527 01 06 45 01 07 15 G75.76 23 03 03 59.1 273.6 2.7 67.0 -8 1 1 527 01 07 15 01 07 45 --- 23 03 33 59.0 273.7 2.7 67.0 21 F 1 528 01 07 15 01 07 45 J2018+3812 23 03 33 58.7 275.6 2.7 68.1 -7 1 1 528 01 07 45 01 08 15 --- 23 04 03 58.6 275.6 2.8 68.1 23 F 1 529 01 07 45 01 08 15 G75.76 23 04 03 58.9 273.8 2.7 67.0 -7 1 1 529 01 08 15 01 08 44 --- 23 04 33 58.8 273.9 2.7 67.0 23 F 1 529 01 08 15 01 08 44 J2015+3710 23 04 33 57.6 274.4 2.8 66.4 -8 1 1 529 01 08 44 01 09 14 --- 23 05 03 57.5 274.4 2.8 66.4 21 F 1 530 01 08 44 Schedule for VLBA_HN (Code Hn ) Page 38 Parallaxes to Water Masers UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Fri 2 Nov 2007 Day 306 --- 01 09 14 G75.76 23 05 03 58.7 273.9 2.7 66.9 -8 1 1 530 01 09 14 01 09 44 --- 23 05 33 58.6 274.0 2.7 66.9 21 F 1 531 01 09 14 01 09 44 J2018+3812 23 05 33 58.4 275.8 2.8 68.0 -7 1 1 531 01 09 44 01 10 14 --- 23 06 03 58.3 275.9 2.8 68.0 23 F 1 532 01 09 44 01 10 14 G75.76 23 06 03 58.5 274.1 2.7 66.9 -7 1 1 532 01 10 14 01 10 44 --- 23 06 33 58.4 274.2 2.7 66.9 23 F 1 533 01 10 14 01 10 44 J2015+3710 23 06 33 57.2 274.7 2.8 66.4 -8 1 1 533 01 10 44 01 11 14 --- 23 07 03 57.1 274.7 2.9 66.4 21 F 1 534 01 10 44 01 11 14 G75.76 23 07 03 58.3 274.2 2.8 66.9 -8 1 1 534 01 11 14 01 11 44 --- 23 07 33 58.2 274.3 2.8 66.9 21 F 1 535 01 11 14 01 11 44 J2018+3812 23 07 33 58.0 276.1 2.8 68.0 -7 1 1 535 01 11 44 01 12 14 --- 23 08 03 57.9 276.2 2.8 67.9 23 F 1 536 01 11 44 01 12 14 G75.76 23 08 03 58.1 274.4 2.8 66.9 -7 1 1 536 01 12 14 01 12 44 --- 23 08 33 58.1 274.5 2.8 66.9 23 F 1 537 01 12 14 01 12 44 J2015+3710 23 08 33 56.8 275.0 2.9 66.3 -8 1 1 537 01 12 44 01 13 14 --- 23 09 03 56.7 275.0 2.9 66.3 21 F 1 538 01 12 44 01 13 14 G75.76 23 09 03 58.0 274.5 2.8 66.8 -8 1 1 538 01 13 14 01 13 44 --- 23 09 33 57.9 274.6 2.8 66.8 21 F 1 539 01 13 14 01 13 44 J2018+3812 23 09 33 57.6 276.4 2.8 67.9 -7 1 1 539 01 13 44 01 14 14 --- 23 10 03 57.5 276.5 2.9 67.9 23 F 1 540 01 13 44 01 14 14 G75.76 23 10 03 57.8 274.7 2.8 66.8 -7 1 1 540 01 14 14 01 14 43 --- 23 10 33 57.7 274.8 2.8 66.8 23 F 1 541 01 14 14 01 14 43 J2015+3710 23 10 33 56.5 275.2 2.9 66.3 -8 1 1 541 01 14 43 01 15 13 --- 23 11 03 56.4 275.3 2.9 66.3 21 F 1 542 01 14 43 01 15 13 G75.76 23 11 03 57.6 274.8 2.8 66.8 -8 1 1 542 01 15 13 01 15 43 --- 23 11 33 57.5 274.9 2.8 66.8 21 F 1 543 01 15 13