COVER INFORMATION Station: VLBA_FD (Code Fd ) Experiment: RIPL: GJ873/GJ53B Exp. Code: BB240L Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for VLBA_FD (Code Fd ) Page 2 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 29 Dec 2007 Day 363 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 19 15 00 3C454.3 18 50 40 32.9 89.9 -4.1 -63.6 0 1 1 0 19 15 00 19 23 00 --- 18 58 42 34.7 90.9 -3.9 -63.6 480 F 1 31 19 15 18 19 33 15 J2237+4216 19 08 58 47.2 59.2 -3.5 -88.2 584 1 1 31 19 33 15 19 33 55 --- 19 09 38 47.3 59.2 -3.5 -88.3 40 F 1 34 19 33 33 19 33 55 J2248+4502 19 09 38 45.3 55.1 -3.7 -89.3 -10 1 1 34 19 33 55 19 35 05 --- 19 10 48 45.5 55.1 -3.6 -89.5 60 F 1 38 19 33 55 19 35 05 J2237+4216 19 10 48 47.5 59.2 -3.4 -88.5 -10 1 1 38 19 35 05 19 36 15 --- 19 11 59 47.8 59.2 -3.4 -88.7 60 F 1 43 19 35 05 19 36 15 GJ873 19 11 59 46.0 56.2 -3.6 -89.3 -9 1 1 43 19 36 15 19 39 15 --- 19 14 59 46.6 56.2 -3.5 -89.8 171 F 1 54 19 36 15 19 39 15 J2237+4216 19 14 59 48.3 59.2 -3.4 -89.2 -10 1 1 54 19 39 15 19 40 25 --- 19 16 09 48.5 59.2 -3.4 -89.4 60 F 1 59 19 39 15 19 40 25 GJ873 19 16 09 46.8 56.2 -3.5 -90.0 -10 1 1 59 19 40 25 19 43 25 --- 19 19 10 47.3 56.2 -3.5 -90.5 170 F 1 70 19 40 25 19 43 25 J2237+4216 19 19 10 49.1 59.2 -3.3 -89.9 -10 1 1 70 19 43 25 19 44 35 --- 19 20 20 49.3 59.2 -3.3 -90.1 60 F 1 75 19 43 25 19 44 35 GJ873 19 20 20 47.5 56.2 -3.4 -90.7 -10 1 1 75 19 44 35 19 47 35 --- 19 23 20 48.1 56.1 -3.4 -91.3 170 F 1 86 19 44 35 19 47 35 J2237+4216 19 23 20 49.9 59.2 -3.2 -90.6 -10 1 1 86 19 47 35 19 48 45 --- 19 24 31 50.1 59.2 -3.2 -90.8 60 F 1 91 19 47 35 19 48 45 GJ873 19 24 31 48.3 56.1 -3.4 -91.5 -10 1 1 91 19 48 45 19 51 45 --- 19 27 31 48.8 56.1 -3.3 -92.0 170 F 1 103 19 48 45 19 51 45 J2237+4216 19 27 31 50.6 59.2 -3.2 -91.3 -10 1 1 103 19 51 45 19 52 55 --- 19 28 41 50.9 59.2 -3.1 -91.5 60 F 1 107 19 51 45 Schedule for VLBA_FD (Code Fd ) Page 3 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 29 Dec 2007 Day 363 --- 19 52 55 GJ873 19 28 41 49.0 56.1 -3.3 -92.2 -10 1 1 107 19 52 55 19 55 55 --- 19 31 42 49.5 56.1 -3.3 -92.8 170 F 1 119 19 52 55 19 55 55 J2237+4216 19 31 42 51.4 59.2 -3.1 -92.1 -10 1 1 119 19 55 55 19 57 05 --- 19 32 52 51.6 59.2 -3.1 -92.3 60 F 1 123 19 55 55 19 57 05 J2248+4502 19 32 52 49.4 55.0 -3.3 -93.5 -10 1 1 123 19 57 05 19 58 15 --- 19 34 02 49.6 55.0 -3.2 -93.8 60 F 1 128 19 57 05 19 58 15 J2237+4216 19 34 02 51.8 59.1 -3.1 -92.5 -10 1 1 128 19 58 15 19 59 25 --- 19 35 12 52.1 59.1 -3.0 -92.7 60 F 1 132 19 58 15 20 01 23 J0124+5618 19 37 11 26.7 38.3 -5.8 -74.1 61 1 1 132 20 01 23 20 02 03 =0121+560 19 37 51 26.8 38.3 -5.8 -74.3 40 F 1 135 20 01 41 20 02 03 J0110+5404 19 37 51 28.2 41.3 -5.5 -75.8 -9 1 1 135 20 02 03 20 03 13 --- 19 39 01 28.3 41.4 -5.5 -76.0 61 F 1 139 20 02 03 20 03 13 J0124+5618 19 39 01 27.0 38.3 -5.8 -74.5 -9 1 1 139 20 03 13 20 04 23 =0121+560 19 40 11 27.1 38.4 -5.7 -74.7 61 F 1 144 20 03 13 20 04 23 GJ53B 19 40 11 29.0 40.6 -5.5 -77.0 -10 1 1 144 20 04 23 20 07 23 --- 19 43 12 29.4 40.7 -5.4 -77.6 170 F 1 155 20 04 23 20 07 23 J0124+5618 19 43 12 27.5 38.5 -5.7 -75.3 -10 1 1 155 20 07 23 20 08 33 =0121+560 19 44 22 27.7 38.6 -5.7 -75.5 60 F 1 160 20 07 23 20 08 33 GJ53B 19 44 22 29.6 40.7 -5.4 -77.8 -10 1 1 160 20 08 33 20 11 33 --- 19 47 22 30.0 40.8 -5.4 -78.4 170 F 1 172 20 08 33 20 11 33 J0124+5618 19 47 22 28.1 38.7 -5.6 -76.1 -10 1 1 172 20 11 33 20 12 43 =0121+560 19 48 32 28.2 38.7 -5.6 -76.3 60 F 1 176 20 11 33 20 12 43 GJ53B 19 48 32 30.2 40.8 -5.3 -78.6 -10 1 1 176 20 12 43 20 15 43 --- 19 51 33 30.6 40.9 -5.3 -79.2 170 F 1 188 20 12 43 20 15 43 J0124+5618 19 51 33 28.6 38.8 -5.6 -76.9 -10 1 1 188 20 15 43 20 16 53 =0121+560 19 52 43 28.8 38.9 -5.5 -77.1 60 F 1 192 20 15 43 20 16 53 GJ53B 19 52 43 30.7 41.0 -5.3 -79.4 -10 1 1 192 20 16 53 20 19 53 --- 19 55 44 31.2 41.1 -5.2 -79.9 170 F 1 204 20 16 53 Schedule for VLBA_FD (Code Fd ) Page 4 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 29 Dec 2007 Day 363 --- 20 19 53 J0124+5618 19 55 44 29.2 39.0 -5.5 -77.7 -10 1 1 204 20 19 53 20 21 03 =0121+560 19 56 54 29.4 39.0 -5.5 -77.9 60 F 1 208 20 19 53 20 21 03 GJ53B 19 56 54 31.3 41.1 -5.2 -80.2 -10 1 1 208 20 21 03 20 24 03 --- 19 59 54 31.8 41.2 -5.1 -80.7 170 F 1 220 20 21 03 20 24 03 J0124+5618 19 59 54 29.8 39.1 -5.4 -78.5 -10 1 1 220 20 24 03 20 25 13 =0121+560 20 01 04 29.9 39.1 -5.4 -78.7 60 F 1 225 20 24 03 20 25 13 J0110+5404 20 01 04 31.5 42.1 -5.2 -80.1 -9 1 1 225 20 25 13 20 26 23 --- 20 02 15 31.7 42.2 -5.1 -80.3 61 F 1 229 20 25 13 20 26 23 J0124+5618 20 02 15 30.1 39.2 -5.4 -78.9 -9 1 1 229 20 26 23 20 27 33 =0121+560 20 03 25 30.3 39.2 -5.4 -79.1 61 F 1 234 20 26 23 20 29 37 J2237+4216 20 05 29 57.6 58.2 -2.5 -98.6 63 1 1 234 20 29 37 20 30 17 --- 20 06 09 57.7 58.1 -2.5 -98.7 40 F 1 236 20 29 55 20 30 17 J2248+4502 20 06 09 55.3 53.8 -2.7 -100.4 -11 1 1 236 20 30 17 20 31 27 --- 20 07 20 55.5 53.8 -2.7 -100.6 59 F 1 241 20 30 17 20 31 27 J2237+4216 20 07 20 58.0 58.1 -2.5 -99.0 -11 1 1 241 20 31 27 20 32 37 --- 20 08 30 58.2 58.0 -2.5 -99.2 59 F 1 245 20 31 27 20 32 37 GJ873 20 08 30 56.1 54.8 -2.6 -100.2 -10 1 1 245 20 32 37 20 35 37 --- 20 11 30 56.6 54.7 -2.6 -100.9 170 F 1 257 20 32 37 20 35 37 J2237+4216 20 11 30 58.7 57.8 -2.4 -99.9 -10 1 1 257 20 35 37 20 36 47 --- 20 12 40 58.9 57.8 -2.4 -100.1 60 F 1 261 20 35 37 20 36 47 GJ873 20 12 40 56.8 54.6 -2.6 -101.2 -10 1 1 261 20 36 47 20 39 47 --- 20 15 41 57.3 54.4 -2.5 -101.9 170 F 1 273 20 36 47 20 39 47 J2237+4216 20 15 41 59.5 57.6 -2.4 -100.8 -10 1 1 273 20 39 47 20 40 57 --- 20 16 51 59.7 57.5 -2.3 -101.1 60 F 1 277 20 39 47 20 40 57 GJ873 20 16 51 57.5 54.3 -2.5 -102.1 -10 1 1 277 20 40 57 20 43 57 --- 20 19 52 58.1 54.1 -2.5 -102.8 170 F 1 289 20 40 57 20 43 57 J2237+4216 20 19 52 60.2 57.3 -2.3 -101.8 -10 1 1 289 20 43 57 20 45 07 --- 20 21 02 60.4 57.2 -2.3 -102.1 60 F 1 294 20 43 57 Schedule for VLBA_FD (Code Fd ) Page 5 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 29 Dec 2007 Day 363 --- 20 45 07 GJ873 20 21 02 58.3 54.0 -2.4 -103.1 -10 1 1 294 20 45 07 20 48 07 --- 20 24 02 58.8 53.8 -2.4 -103.8 170 F 1 305 20 45 07 20 48 07 J2237+4216 20 24 02 61.0 56.9 -2.2 -102.8 -10 1 1 305 20 48 07 20 49 17 --- 20 25 12 61.2 56.8 -2.2 -103.1 60 F 1 310 20 48 07 20 49 17 GJ873 20 25 12 59.0 53.7 -2.4 -104.1 -10 1 1 310 20 49 17 20 52 17 --- 20 28 13 59.5 53.4 -2.3 -104.9 170 F 1 321 20 49 17 20 52 17 J2237+4216 20 28 13 61.7 56.6 -2.2 -103.8 -10 1 1 321 20 52 17 20 53 27 --- 20 29 23 62.0 56.4 -2.1 -104.1 60 F 1 326 20 52 17 20 53 27 J2248+4502 20 29 23 59.3 52.1 -2.3 -105.9 -11 1 1 326 20 53 27 20 54 37 --- 20 30 33 59.5 52.0 -2.3 -106.2 59 F 1 330 20 53 27 20 54 37 J2237+4216 20 30 33 62.2 56.3 -2.1 -104.4 -11 1 1 330 20 54 37 20 55 47 --- 20 31 44 62.4 56.2 -2.1 -104.7 59 F 1 335 20 54 37 20 57 52 J0124+5618 20 33 49 34.4 39.9 -4.9 -85.1 63 1 1 335 20 57 52 20 58 32 =0121+560 20 34 29 34.5 39.9 -4.8 -85.2 40 F 1 337 20 58 10 20 58 32 J0110+5404 20 34 29 36.4 42.8 -4.6 -86.5 -10 1 1 337 20 58 32 20 59 42 --- 20 35 39 36.5 42.8 -4.6 -86.7 60 F 1 342 20 58 32 20 59 42 J0124+5618 20 35 39 34.7 39.9 -4.8 -85.5 -10 1 1 342 20 59 42 21 00 52 =0121+560 20 36 49 34.8 39.9 -4.8 -85.7 60 F 1 346 20 59 42 21 00 52 GJ53B 20 36 49 37.0 41.8 -4.5 -87.9 -10 1 1 346 21 00 52 21 03 52 --- 20 39 50 37.5 41.8 -4.5 -88.6 170 F 1 358 21 00 52 21 03 52 J0124+5618 20 39 50 35.3 40.0 -4.8 -86.3 -10 1 1 358 21 03 52 21 05 02 =0121+560 20 41 00 35.4 40.0 -4.7 -86.6 60 F 1 363 21 03 52 21 05 02 GJ53B 20 41 00 37.6 41.8 -4.5 -88.8 -10 1 1 363 21 05 02 21 08 02 --- 20 44 01 38.1 41.8 -4.4 -89.4 170 F 1 374 21 05 02 21 08 02 J0124+5618 20 44 01 35.8 40.0 -4.7 -87.2 -10 1 1 374 21 08 02 21 09 12 =0121+560 20 45 11 36.0 40.0 -4.7 -87.4 60 F 1 379 21 08 02 21 09 12 GJ53B 20 45 11 38.2 41.8 -4.4 -89.6 -10 1 1 379 21 09 12 21 12 12 --- 20 48 11 38.7 41.9 -4.3 -90.3 170 F 1 390 21 09 12 Schedule for VLBA_FD (Code Fd ) Page 6 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 29 Dec 2007 Day 363 --- 21 12 12 J0124+5618 20 48 11 36.4 40.0 -4.6 -88.0 -11 1 1 390 21 12 12 21 13 22 =0121+560 20 49 21 36.6 40.1 -4.6 -88.3 59 F 1 395 21 12 12 21 13 22 GJ53B 20 49 21 38.8 41.8 -4.3 -90.5 -11 1 1 395 21 13 22 21 16 22 --- 20 52 22 39.3 41.8 -4.3 -91.1 169 F 1 406 21 13 22 21 16 22 J0124+5618 20 52 22 37.0 40.1 -4.5 -88.9 -11 1 1 406 21 16 22 21 17 32 =0121+560 20 53 32 37.2 40.1 -4.5 -89.1 59 F 1 411 21 16 22 21 17 32 GJ53B 20 53 32 39.4 41.8 -4.3 -91.4 -11 1 1 411 21 17 32 21 20 32 --- 20 56 33 39.9 41.8 -4.2 -92.0 169 F 1 423 21 17 32 21 20 32 J0124+5618 20 56 33 37.6 40.1 -4.5 -89.7 -11 1 1 423 21 20 32 21 21 42 =0121+560 20 57 43 37.7 40.1 -4.5 -90.0 59 F 1 427 21 20 32 21 21 42 J0110+5404 20 57 43 39.8 42.9 -4.2 -91.1 -10 1 1 427 21 21 42 21 22 52 --- 20 58 53 39.9 42.9 -4.2 -91.3 60 F 1 432 21 21 42 21 22 52 J0124+5618 20 58 53 37.9 40.1 -4.4 -90.2 -10 1 1 432 21 22 52 21 24 02 =0121+560 21 00 03 38.1 40.1 -4.4 -90.5 60 F 1 436 21 22 52 21 26 35 J2237+4216 21 02 37 67.8 51.7 -1.6 -114.0 88 1 1 436 21 26 35 21 27 15 --- 21 03 17 67.9 51.6 -1.6 -114.2 40 F 1 439 21 26 53 21 27 15 J2248+4502 21 03 17 64.8 47.5 -1.8 -116.0 -12 1 1 439 21 27 15 21 28 25 --- 21 04 27 65.0 47.3 -1.7 -116.4 58 F 1 443 21 27 15 21 28 25 J2237+4216 21 04 27 68.1 51.4 -1.5 -114.6 -12 1 1 443 21 28 25 21 29 35 --- 21 05 37 68.3 51.1 -1.5 -115.0 58 F 1 448 21 28 25 21 29 35 GJ873 21 05 37 65.8 48.3 -1.7 -115.9 -11 1 1 448 21 29 35 21 32 35 --- 21 08 38 66.3 47.7 -1.6 -117.0 169 F 1 459 21 29 35 21 32 35 J2237+4216 21 08 38 68.8 50.5 -1.5 -116.2 -11 1 1 459 21 32 35 21 33 45 --- 21 09 48 69.0 50.2 -1.5 -116.6 59 F 1 464 21 32 35 21 33 45 GJ873 21 09 48 66.4 47.5 -1.6 -117.4 -11 1 1 464 21 33 45 21 36 45 --- 21 12 48 66.9 46.9 -1.6 -118.5 169 F 1 475 21 33 45 21 36 45 J2237+4216 21 12 48 69.5 49.5 -1.4 -117.8 -11 1 1 475 21 36 45 21 37 55 --- 21 13 59 69.6 49.2 -1.4 -118.3 59 F 1 480 21 36 45 Schedule for VLBA_FD (Code Fd ) Page 7 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 29 Dec 2007 Day 363 --- 21 37 55 GJ873 21 13 59 67.1 46.6 -1.6 -119.0 -11 1 1 480 21 37 55 21 40 55 --- 21 16 59 67.6 45.9 -1.5 -120.1 169 F 1 492 21 37 55 21 40 55 J2237+4216 21 16 59 70.1 48.4 -1.3 -119.5 -11 1 1 492 21 40 55 21 42 05 --- 21 18 09 70.3 48.1 -1.3 -120.0 59 F 1 496 21 40 55 21 42 05 GJ873 21 18 09 67.8 45.6 -1.5 -120.6 -11 1 1 496 21 42 05 21 45 05 --- 21 21 10 68.2 44.9 -1.4 -121.8 169 F 1 508 21 42 05 21 45 05 J2237+4216 21 21 10 70.8 47.2 -1.3 -121.3 -11 1 1 508 21 45 05 21 46 15 --- 21 22 20 71.0 46.9 -1.3 -121.8 59 F 1 512 21 45 05 21 46 15 GJ873 21 22 20 68.4 44.6 -1.4 -122.3 -11 1 1 512 21 46 15 21 49 15 --- 21 25 20 68.8 43.8 -1.4 -123.6 169 F 1 524 21 46 15 21 49 15 J2237+4216 21 25 20 71.5 46.0 -1.2 -123.2 -11 1 1 524 21 49 15 21 50 25 --- 21 26 31 71.6 45.6 -1.2 -123.8 59 F 1 528 21 49 15 21 50 25 J2248+4502 21 26 31 68.4 42.3 -1.4 -124.9 -13 1 1 528 21 50 25 21 51 35 --- 21 27 41 68.6 42.0 -1.4 -125.4 57 F 1 533 21 50 25 21 51 35 J2237+4216 21 27 41 71.8 45.2 -1.2 -124.3 -13 1 1 533 21 51 35 21 52 45 --- 21 28 51 72.0 44.8 -1.1 -124.9 57 F 1 537 21 51 35 21 55 50 J0124+5618 21 31 56 42.5 39.7 -3.9 -97.4 120 1 1 537 21 55 50 21 56 30 =0121+560 21 32 37 42.5 39.7 -3.9 -97.5 40 F 1 540 21 56 08 21 56 30 J0110+5404 21 32 37 44.9 42.3 -3.6 -98.6 -11 1 1 540 21 56 30 21 57 40 --- 21 33 47 45.0 42.3 -3.6 -98.8 59 F 1 544 21 56 30 21 57 40 J0124+5618 21 33 47 42.7 39.6 -3.9 -97.8 -11 1 1 544 21 57 40 21 58 50 =0121+560 21 34 57 42.9 39.6 -3.8 -98.1 59 F 1 549 21 57 40 21 58 50 GJ53B 21 34 57 45.3 41.0 -3.6 -100.4 -11 1 1 549 21 58 50 22 01 50 --- 21 37 57 45.8 40.9 -3.5 -101.1 169 F 1 561 21 58 50 22 01 50 J0124+5618 21 37 57 43.3 39.5 -3.8 -98.7 -11 1 1 561 22 01 50 22 03 00 =0121+560 21 39 08 43.4 39.5 -3.8 -99.0 59 F 1 565 22 01 50 22 03 00 GJ53B 21 39 08 45.9 40.9 -3.5 -101.4 -11 1 1 565 22 03 00 22 06 00 --- 21 42 08 46.4 40.7 -3.4 -102.1 169 F 1 577 22 03 00 Schedule for VLBA_FD (Code Fd ) Page 8 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 29 Dec 2007 Day 363 --- 22 06 00 J0124+5618 21 42 08 43.9 39.4 -3.7 -99.7 -11 1 1 577 22 06 00 22 07 10 =0121+560 21 43 18 44.0 39.4 -3.7 -100.0 59 F 1 581 22 06 00 22 07 10 GJ53B 21 43 18 46.5 40.7 -3.4 -102.4 -11 1 1 581 22 07 10 22 10 10 --- 21 46 19 46.9 40.5 -3.4 -103.1 169 F 1 593 22 07 10 22 10 10 J0124+5618 21 46 19 44.4 39.2 -3.6 -100.7 -11 1 1 593 22 10 10 22 11 20 =0121+560 21 47 29 44.6 39.2 -3.6 -100.9 59 F 1 597 22 10 10 22 11 20 GJ53B 21 47 29 47.1 40.5 -3.4 -103.4 -11 1 1 597 22 11 20 22 14 20 --- 21 50 30 47.5 40.3 -3.3 -104.1 169 F 1 609 22 11 20 22 14 20 J0124+5618 21 50 30 45.0 39.1 -3.6 -101.6 -11 1 1 609 22 14 20 22 15 30 =0121+560 21 51 40 45.1 39.0 -3.6 -101.9 59 F 1 614 22 14 20 22 15 30 GJ53B 21 51 40 47.7 40.3 -3.3 -104.4 -11 1 1 614 22 15 30 22 18 30 --- 21 54 40 48.1 40.1 -3.2 -105.1 169 F 1 625 22 15 30 22 18 30 J0124+5618 21 54 40 45.6 38.9 -3.5 -102.6 -11 1 1 625 22 18 30 22 19 40 =0121+560 21 55 50 45.7 38.9 -3.5 -102.9 59 F 1 630 22 18 30 22 19 40 J0110+5404 21 55 50 48.2 41.4 -3.2 -104.0 -11 1 1 630 22 19 40 22 20 50 --- 21 57 01 48.4 41.3 -3.2 -104.3 59 F 1 634 22 19 40 22 20 50 J0124+5618 21 57 01 45.9 38.8 -3.5 -103.2 -11 1 1 634 22 20 50 22 22 00 =0121+560 21 58 11 46.0 38.8 -3.4 -103.5 59 F 1 639 22 20 50 22 25 23 J2237+4216 22 01 35 76.3 29.1 -0.6 -145.6 137 1 1 639 22 25 23 22 26 03 --- 22 02 15 76.4 28.6 -0.6 -146.1 40 F 1 641 22 25 41 22 26 03 J2248+4502 22 02 15 72.9 29.0 -0.8 -143.8 -13 1 1 641 22 26 03 22 27 13 --- 22 03 25 73.0 28.4 -0.8 -144.6 57 F 1 646 22 26 03 22 27 13 J2237+4216 22 03 25 76.5 27.8 -0.6 -147.1 -13 1 1 646 22 27 13 22 28 23 --- 22 04 36 76.6 27.1 -0.5 -148.0 57 F 1 650 22 27 13 22 28 23 GJ873 22 04 36 73.9 28.4 -0.7 -145.0 -11 1 1 650 22 28 23 22 31 23 --- 22 07 36 74.2 26.8 -0.7 -147.1 169 F 1 662 22 28 23 22 31 23 J2237+4216 22 07 36 76.9 25.0 -0.5 -150.6 -11 1 1 662 22 31 23 22 32 33 --- 22 08 46 77.0 24.1 -0.5 -151.6 59 F 1 666 22 31 23 Schedule for VLBA_FD (Code Fd ) Page 9 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 29 Dec 2007 Day 363 --- 22 32 33 GJ873 22 08 46 74.3 26.2 -0.6 -148.0 -11 1 1 666 22 32 33 22 35 33 --- 22 11 47 74.6 24.4 -0.6 -150.1 169 F 1 678 22 32 33 22 35 33 J2237+4216 22 11 47 77.2 21.9 -0.4 -154.2 -11 1 1 678 22 35 33 22 36 43 --- 22 12 57 77.3 21.0 -0.4 -155.3 59 F 1 683 22 35 33 22 36 43 GJ873 22 12 57 74.7 23.7 -0.6 -151.0 -11 1 1 683 22 36 43 22 39 43 --- 22 15 57 74.9 21.9 -0.5 -153.3 169 F 1 694 22 36 43 22 39 43 J2237+4216 22 15 57 77.5 18.7 -0.4 -158.1 -11 1 1 694 22 39 43 22 40 53 --- 22 17 08 77.6 17.8 -0.3 -159.2 59 F 1 699 22 39 43 22 40 53 GJ873 22 17 08 75.0 21.2 -0.5 -154.2 -11 1 1 699 22 40 53 22 43 53 --- 22 20 08 75.3 19.3 -0.5 -156.6 169 F 1 710 22 40 53 22 43 53 J2237+4216 22 20 08 77.8 15.3 -0.3 -162.1 -11 1 1 710 22 43 53 22 45 03 --- 22 21 18 77.9 14.3 -0.3 -163.3 59 F 1 715 22 43 53 22 45 03 GJ873 22 21 18 75.3 18.5 -0.4 -157.5 -11 1 1 715 22 45 03 22 48 03 --- 22 24 19 75.5 16.5 -0.4 -159.9 169 F 1 726 22 45 03 22 48 03 J2237+4216 22 24 19 78.0 11.7 -0.2 -166.3 -11 1 1 726 22 48 03 22 49 13 --- 22 25 29 78.1 10.7 -0.2 -167.5 59 F 1 731 22 48 03 22 49 13 J2248+4502 22 25 29 74.8 15.9 -0.4 -160.5 -12 1 1 731 22 49 13 22 50 23 --- 22 26 39 74.9 15.1 -0.4 -161.4 58 F 1 735 22 49 13 22 50 23 J2237+4216 22 26 39 78.1 9.7 -0.2 -168.7 -12 1 1 735 22 50 23 22 51 33 --- 22 27 49 78.2 8.7 -0.2 -169.9 58 F 1 740 22 50 23 22 54 51 J0124+5618 22 31 07 50.4 36.7 -2.9 -111.9 136 1 1 740 22 54 51 22 55 31 =0121+560 22 31 47 50.5 36.6 -2.9 -112.1 40 F 1 743 22 55 09 22 55 31 J0110+5404 22 31 47 53.2 38.7 -2.7 -113.3 -11 1 1 743 22 55 31 22 56 41 --- 22 32 57 53.3 38.6 -2.6 -113.7 59 F 1 747 22 55 31 22 56 41 J0124+5618 22 32 57 50.6 36.5 -2.9 -112.4 -11 1 1 747 22 56 41 22 57 51 =0121+560 22 34 08 50.8 36.4 -2.8 -112.7 59 F 1 752 22 56 41 22 57 51 GJ53B 22 34 08 53.4 37.0 -2.6 -115.6 -11 1 1 752 22 57 51 23 00 51 --- 22 37 08 53.8 36.7 -2.5 -116.5 169 F 1 763 22 57 51 Schedule for VLBA_FD (Code Fd ) Page 10 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 29 Dec 2007 Day 363 --- 23 00 51 J0124+5618 22 37 08 51.1 36.2 -2.8 -113.5 -11 1 1 763 23 00 51 23 02 01 =0121+560 22 38 18 51.3 36.1 -2.8 -113.9 59 F 1 768 23 00 51 23 02 01 GJ53B 22 38 18 53.9 36.5 -2.5 -116.8 -11 1 1 768 23 02 01 23 05 01 --- 22 41 19 54.3 36.2 -2.5 -117.7 169 F 1 779 23 02 01 23 05 01 J0124+5618 22 41 19 51.7 35.8 -2.7 -114.7 -11 1 1 779 23 05 01 23 06 11 =0121+560 22 42 29 51.8 35.7 -2.7 -115.0 59 F 1 784 23 05 01 23 06 11 GJ53B 22 42 29 54.5 36.1 -2.4 -118.0 -11 1 1 784 23 06 11 23 09 11 --- 22 45 29 54.9 35.7 -2.4 -119.0 169 F 1 795 23 06 11 23 09 11 J0124+5618 22 45 29 52.2 35.4 -2.7 -115.9 -11 1 1 795 23 09 11 23 10 21 =0121+560 22 46 40 52.3 35.3 -2.6 -116.2 59 F 1 800 23 09 11 23 10 21 GJ53B 22 46 40 55.0 35.6 -2.4 -119.3 -11 1 1 800 23 10 21 23 13 21 --- 22 49 40 55.4 35.2 -2.3 -120.2 169 F 1 812 23 10 21 23 13 21 J0124+5618 22 49 40 52.7 35.0 -2.6 -117.1 -11 1 1 812 23 13 21 23 14 31 =0121+560 22 50 50 52.9 34.8 -2.6 -117.4 59 F 1 816 23 13 21 23 14 31 GJ53B 22 50 50 55.5 35.1 -2.3 -120.6 -11 1 1 816 23 14 31 23 17 31 --- 22 53 51 55.9 34.7 -2.2 -121.5 169 F 1 828 23 14 31 23 17 31 J0124+5618 22 53 51 53.2 34.5 -2.5 -118.3 -11 1 1 828 23 17 31 23 18 41 =0121+560 22 55 01 53.4 34.4 -2.5 -118.7 59 F 1 832 23 17 31 23 18 41 J0110+5404 22 55 01 56.2 36.1 -2.3 -120.2 -12 1 1 832 23 18 41 23 19 51 --- 22 56 11 56.4 35.9 -2.2 -120.6 58 F 1 837 23 18 41 23 19 51 J0124+5618 22 56 11 53.5 34.3 -2.5 -119.0 -12 1 1 837 23 19 51 23 21 01 =0121+560 22 57 21 53.6 34.1 -2.5 -119.4 58 F 1 841 23 19 51 23 35 49 3C454.3 23 12 13 75.0 196.8 0.3 15.0 774 1 1 841 23 35 49 23 37 49 --- 23 14 13 74.9 198.6 0.3 16.6 120 F 1 849 23 36 07 23 39 55 J2237+4216 23 16 19 76.0 329.0 0.6 143.2 32 1 1 849 23 39 55 23 40 35 --- 23 16 59 75.9 328.6 0.7 142.7 40 F 1 852 23 40 13 23 40 35 J2248+4502 23 16 59 74.5 341.0 0.5 156.7 -14 1 1 852 23 40 35 23 41 45 --- 23 18 09 74.4 340.3 0.5 155.8 56 F 1 856 23 40 35 Schedule for VLBA_FD (Code Fd ) Page 11 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 29 Dec 2007 Day 363 --- 23 41 45 J2237+4216 23 18 09 75.8 327.9 0.7 141.8 -14 1 1 856 23 41 45 23 42 55 --- 23 19 19 75.6 327.2 0.7 141.0 56 F 1 861 23 41 45 23 42 55 GJ873 23 19 19 74.9 337.5 0.5 152.6 -13 1 1 861 23 42 55 23 45 55 --- 23 22 20 74.6 335.7 0.6 150.3 167 F 1 872 23 42 55 23 45 55 J2237+4216 23 22 20 75.3 325.5 0.7 138.8 -13 1 1 872 23 45 55 23 47 05 --- 23 23 30 75.1 324.9 0.8 138.0 57 F 1 877 23 45 55 23 47 05 GJ873 23 23 30 74.5 335.0 0.6 149.4 -13 1 1 877 23 47 05 23 50 05 --- 23 26 30 74.2 333.3 0.7 147.3 167 F 1 888 23 47 05 23 50 05 J2237+4216 23 26 30 74.7 323.3 0.8 136.0 -13 1 1 888 23 50 05 23 51 15 --- 23 27 40 74.6 322.8 0.8 135.2 57 F 1 893 23 50 05 23 51 15 GJ873 23 27 40 74.1 332.7 0.7 146.5 -13 1 1 893 23 51 15 23 54 15 --- 23 30 41 73.8 331.1 0.7 144.4 167 F 1 904 23 51 15 23 54 15 J2237+4216 23 30 41 74.2 321.3 0.9 133.3 -13 1 1 904 23 54 15 23 55 25 --- 23 31 51 74.0 320.8 0.9 132.6 57 F 1 909 23 54 15 23 55 25 GJ873 23 31 51 73.7 330.5 0.7 143.6 -12 1 1 909 23 55 25 23 58 25 --- 23 34 52 73.4 329.0 0.8 141.6 168 F 1 921 23 55 25 23 58 25 J2237+4216 23 34 52 73.6 319.5 1.0 130.8 -12 1 1 921 23 58 25 23 59 35 --- 23 36 02 73.4 319.0 1.0 130.2 58 F 1 925 23 58 25 --- Start: Sat 29 Dec 2007 Day 363 -- Stop: Sun 30 Dec 2007 Day 364 --- 23 59 35 GJ873 23 36 02 73.2 328.4 0.8 140.9 -12 1 1 925 23 59 35 00 02 35 --- 23 39 02 72.9 327.0 0.9 139.0 168 F 1 937 23 59 35 00 02 35 J2237+4216 23 39 02 73.0 317.7 1.0 128.5 -12 1 1 937 00 02 35 00 03 45 --- 23 40 12 72.8 317.3 1.0 127.9 58 F 1 941 00 02 35 00 03 45 J2248+4502 23 40 12 72.4 328.7 0.9 140.7 -14 1 1 941 00 03 45 00 04 55 --- 23 41 23 72.3 328.2 0.9 140.0 56 F 1 946 00 03 45 00 04 55 J2237+4216 23 41 23 72.7 316.8 1.1 127.2 -14 1 1 946 00 04 55 00 06 05 --- 23 42 33 72.5 316.4 1.1 126.6 56 F 1 950 00 04 55 00 08 35 J0124+5618 23 45 04 58.9 386.9 -1.7 -135.3 98 1 1 950 00 08 35 00 09 15 =0121+560 23 45 44 59.0 386.8 -1.7 -135.6 40 F 1 953 00 08 53 Schedule for VLBA_FD (Code Fd ) Page 12 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 30 Dec 2007 Day 364 --- 00 09 15 J0110+5404 23 45 44 62.0 386.9 -1.4 -138.4 -12 1 1 953 00 09 15 00 10 25 --- 23 46 54 62.1 386.6 -1.4 -138.8 58 F 1 957 00 09 15 00 10 25 J0124+5618 23 46 54 59.1 386.6 -1.6 -136.0 -12 1 1 957 00 10 25 00 11 35 =0121+560 23 48 04 59.2 386.3 -1.6 -136.4 58 F 1 962 00 10 25 00 11 35 GJ53B 23 48 04 61.7 384.7 -1.3 -141.2 -11 1 1 962 00 11 35 00 14 35 --- 23 51 05 62.0 384.0 -1.3 -142.4 169 F 1 973 00 11 35 00 14 35 J0124+5618 23 51 05 59.5 385.7 -1.6 -137.6 -11 1 1 973 00 14 35 00 15 45 =0121+560 23 52 15 59.6 385.5 -1.5 -138.0 59 F 1 978 00 14 35 00 15 45 GJ53B 23 52 15 62.1 383.7 -1.3 -142.9 -11 1 1 978 00 15 45 00 18 45 --- 23 55 16 62.4 383.0 -1.2 -144.2 169 F 1 990 00 15 45 00 18 45 J0124+5618 23 55 16 59.9 384.9 -1.5 -139.2 -11 1 1 990 00 18 45 00 19 55 =0121+560 23 56 26 60.0 384.6 -1.5 -139.6 59 F 1 994 00 18 45 00 19 55 GJ53B 23 56 26 62.5 382.7 -1.2 -144.7 -11 1 1 994 00 19 55 00 22 55 --- 23 59 26 62.7 381.9 -1.2 -146.0 169 F 1 1006 00 19 55 00 22 55 J0124+5618 23 59 26 60.2 384.0 -1.4 -140.8 -11 1 1 1006 00 22 55 00 24 05 =0121+560 00 00 37 60.3 383.7 -1.4 -141.3 59 F 1 1010 00 22 55 00 24 05 GJ53B 00 00 37 62.8 381.6 -1.1 -146.5 -11 1 1 1010 00 24 05 00 27 05 --- 00 03 37 63.0 380.8 -1.1 -147.8 169 F 1 1022 00 24 05 00 27 05 J0124+5618 00 03 37 60.6 383.1 -1.4 -142.5 -11 1 1 1022 00 27 05 00 28 15 =0121+560 00 04 47 60.7 382.8 -1.3 -143.0 59 F 1 1026 00 27 05 00 28 15 GJ53B 00 04 47 63.1 380.5 -1.1 -148.3 -11 1 1 1026 00 28 15 00 31 15 --- 00 07 48 63.4 379.7 -1.0 -149.7 169 F 1 1038 00 28 15 00 31 15 J0124+5618 00 07 48 60.9 382.1 -1.3 -144.2 -11 1 1 1038 00 31 15 00 32 25 =0121+560 00 08 58 61.0 381.9 -1.3 -144.7 59 F 1 1043 00 31 15 00 32 25 J0110+5404 00 08 58 64.0 380.9 -1.0 -148.4 -12 1 1 1043 00 32 25 00 33 35 --- 00 10 08 64.1 380.6 -1.0 -149.0 58 F 1 1047 00 32 25 00 33 35 J0124+5618 00 10 08 61.1 381.6 -1.2 -145.2 -12 1 1 1047 00 33 35 00 34 45 =0121+560 00 11 18 61.2 381.3 -1.2 -145.6 58 F 1 1052 00 33 35 Schedule for VLBA_FD (Code Fd ) Page 13 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 30 Dec 2007 Day 364 --- 00 36 54 J2237+4216 00 13 27 67.5 308.0 1.6 113.5 74 1 1 1052 00 36 54 00 37 34 --- 00 14 08 67.4 307.9 1.6 113.3 40 F 1 1054 00 37 12 00 37 34 J2248+4502 00 14 08 67.9 316.9 1.4 123.6 -12 1 1 1054 00 37 34 00 38 44 --- 00 15 18 67.8 316.6 1.4 123.1 58 F 1 1059 00 37 34 00 38 44 J2237+4216 00 15 18 67.2 307.7 1.6 112.9 -12 1 1 1059 00 38 44 00 39 54 --- 00 16 28 67.0 307.5 1.7 112.5 58 F 1 1063 00 38 44 00 39 54 GJ873 00 16 28 67.7 314.3 1.5 120.5 -11 1 1 1063 00 39 54 00 42 54 --- 00 19 28 67.2 313.6 1.5 119.3 169 F 1 1075 00 39 54 00 42 54 J2237+4216 00 19 28 66.5 306.9 1.7 111.5 -10 1 1 1075 00 42 54 00 44 04 --- 00 20 39 66.3 306.7 1.7 111.1 60 F 1 1079 00 42 54 00 44 04 GJ873 00 20 39 67.1 313.3 1.6 118.9 -10 1 1 1079 00 44 04 00 47 04 --- 00 23 39 66.6 312.7 1.6 117.8 170 F 1 1091 00 44 04 00 47 04 J2237+4216 00 23 39 65.8 306.2 1.8 110.2 -10 1 1 1091 00 47 04 00 48 14 --- 00 24 49 65.6 306.1 1.8 109.8 60 F 1 1095 00 47 04 00 48 14 GJ873 00 24 49 66.4 312.4 1.6 117.3 -10 1 1 1095 00 48 14 00 51 14 --- 00 27 50 65.9 311.8 1.7 116.3 170 F 1 1107 00 48 14 00 51 14 J2237+4216 00 27 50 65.1 305.6 1.8 108.9 -10 1 1 1107 00 51 14 00 52 24 --- 00 29 00 64.9 305.5 1.9 108.6 60 F 1 1112 00 51 14 00 52 24 GJ873 00 29 00 65.7 311.6 1.7 115.8 -10 1 1 1112 00 52 24 00 55 24 --- 00 32 00 65.2 311.1 1.7 114.8 170 F 1 1123 00 52 24 00 55 24 J2237+4216 00 32 00 64.3 305.1 1.9 107.7 -10 1 1 1123 00 55 24 00 56 34 --- 00 33 11 64.1 304.9 1.9 107.4 60 F 1 1128 00 55 24 00 56 34 GJ873 00 33 11 65.1 310.9 1.8 114.4 -10 1 1 1128 00 56 34 00 59 34 --- 00 36 11 64.6 310.3 1.8 113.4 170 F 1 1139 00 56 34 00 59 34 J2237+4216 00 36 11 63.6 304.5 2.0 106.5 -10 1 1 1139 00 59 34 01 00 44 --- 00 37 21 63.4 304.4 2.0 106.2 60 F 1 1144 00 59 34 01 00 44 J2248+4502 00 37 21 64.3 311.9 1.8 114.9 -11 1 1 1144 01 00 44 01 01 54 --- 00 38 32 64.2 311.7 1.8 114.5 59 F 1 1148 01 00 44 Schedule for VLBA_FD (Code Fd ) Page 14 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 30 Dec 2007 Day 364 --- 01 01 54 J2237+4216 00 38 32 63.2 304.3 2.0 105.9 -11 1 1 1148 01 01 54 01 03 04 --- 00 39 42 63.0 304.1 2.0 105.6 59 F 1 1153 01 01 54 01 05 01 J0124+5618 00 41 39 63.2 373.3 -0.7 -159.0 65 1 1 1153 01 05 01 01 05 41 =0121+560 00 42 19 63.2 373.1 -0.7 -159.3 40 F 1 1155 01 05 19 01 05 41 J0110+5404 00 42 19 66.0 370.3 -0.5 -164.8 -12 1 1 1155 01 05 41 01 06 51 --- 00 43 29 66.0 369.9 -0.5 -165.4 58 F 1 1160 01 05 41 01 06 51 J0124+5618 00 43 29 63.3 372.8 -0.7 -159.9 -11 1 1 1160 01 06 51 01 08 01 =0121+560 00 44 40 63.3 372.5 -0.7 -160.4 59 F 1 1164 01 06 51 01 08 01 GJ53B 00 44 40 65.3 368.3 -0.4 -167.5 -10 1 1 1164 01 08 01 01 11 01 --- 00 47 40 65.4 367.3 -0.4 -169.0 170 F 1 1176 01 08 01 01 11 01 J0124+5618 00 47 40 63.5 371.6 -0.6 -161.8 -10 1 1 1176 01 11 01 01 12 11 =0121+560 00 48 50 63.5 371.2 -0.6 -162.4 60 F 1 1181 01 11 01 01 12 11 GJ53B 00 48 50 65.4 366.9 -0.3 -169.6 -10 1 1 1181 01 12 11 01 15 11 --- 00 51 51 65.5 365.9 -0.3 -171.2 170 F 1 1192 01 12 11 01 15 11 J0124+5618 00 51 51 63.6 370.3 -0.6 -163.8 -10 1 1 1192 01 15 11 01 16 21 =0121+560 00 53 01 63.7 370.0 -0.5 -164.4 60 F 1 1197 01 15 11 01 16 21 GJ53B 00 53 01 65.5 365.5 -0.3 -171.8 -10 1 1 1197 01 16 21 01 19 21 --- 00 56 01 65.6 364.4 -0.2 -173.3 170 F 1 1208 01 16 21 01 19 21 J0124+5618 00 56 01 63.8 369.1 -0.5 -165.8 -10 1 1 1208 01 19 21 01 20 31 =0121+560 00 57 12 63.8 368.7 -0.5 -166.4 60 F 1 1213 01 19 21 01 20 31 GJ53B 00 57 12 65.6 364.0 -0.2 -173.9 -10 1 1 1213 01 20 31 01 23 31 --- 01 00 12 65.6 363.0 -0.1 -175.5 170 F 1 1224 01 20 31 01 23 31 J0124+5618 01 00 12 63.9 367.8 -0.4 -167.8 -9 1 1 1224 01 23 31 01 24 41 =0121+560 01 01 22 63.9 367.4 -0.4 -168.4 61 F 1 1229 01 23 31 01 24 41 GJ53B 01 01 22 65.6 362.6 -0.1 -176.1 -9 1 1 1229 01 24 41 01 27 41 --- 01 04 23 65.7 361.5 -0.1 -177.7 171 F 1 1241 01 24 41 01 27 41 J0124+5618 01 04 23 64.0 366.5 -0.3 -169.9 -9 1 1 1241 01 27 41 01 28 51 =0121+560 01 05 33 64.0 366.1 -0.3 -170.4 61 F 1 1245 01 27 41 Schedule for VLBA_FD (Code Fd ) Page 15 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 30 Dec 2007 Day 364 --- 01 28 51 J0110+5404 01 05 33 66.5 361.9 -0.1 -177.2 -11 1 1 1245 01 28 51 01 30 01 --- 01 06 43 66.5 361.5 -0.1 -177.8 59 F 1 1250 01 28 51 01 30 01 J0124+5618 01 06 43 64.1 365.8 -0.3 -171.0 -11 1 1 1250 01 30 01 01 31 11 =0121+560 01 07 53 64.1 365.4 -0.3 -171.6 59 F 1 1254 01 30 01 01 32 58 J2237+4216 01 09 40 57.6 301.8 2.5 98.5 58 1 1 1254 01 32 58 01 33 38 --- 01 10 21 57.4 301.8 2.5 98.4 40 F 1 1257 01 33 16 01 33 38 J2248+4502 01 10 21 58.9 307.7 2.4 105.4 -10 1 1 1257 01 33 38 01 34 48 --- 01 11 31 58.7 307.6 2.4 105.1 60 F 1 1261 01 33 38 01 34 48 J2237+4216 01 11 31 57.2 301.7 2.6 98.1 -10 1 1 1261 01 34 48 01 35 58 --- 01 12 41 57.0 301.7 2.6 97.9 60 F 1 1266 01 34 48 01 35 58 GJ873 01 12 41 58.4 306.0 2.4 103.3 -9 1 1 1266 01 35 58 01 38 58 --- 01 15 41 57.9 305.8 2.5 102.5 171 F 1 1277 01 35 58 01 38 58 J2237+4216 01 15 41 56.5 301.5 2.6 97.3 -9 1 1 1277 01 38 58 01 40 08 --- 01 16 52 56.2 301.5 2.7 97.0 61 F 1 1282 01 38 58 01 40 08 GJ873 01 16 52 57.6 305.7 2.5 102.3 -9 1 1 1282 01 40 08 01 43 08 --- 01 19 52 57.1 305.5 2.5 101.6 171 F 1 1293 01 40 08 01 43 08 J2237+4216 01 19 52 55.7 301.4 2.7 96.4 -9 1 1 1293 01 43 08 01 44 18 --- 01 21 02 55.5 301.3 2.7 96.2 61 F 1 1298 01 43 08 01 44 18 GJ873 01 21 02 56.9 305.5 2.6 101.3 -9 1 1 1298 01 44 18 01 47 18 --- 01 24 03 56.4 305.3 2.6 100.6 171 F 1 1310 01 44 18 01 47 18 J2237+4216 01 24 03 54.9 301.2 2.8 95.6 -9 1 1 1310 01 47 18 01 48 28 --- 01 25 13 54.7 301.2 2.8 95.4 61 F 1 1314 01 47 18 01 48 28 GJ873 01 25 13 56.2 305.2 2.6 100.4 -9 1 1 1314 01 48 28 01 51 28 --- 01 28 14 55.7 305.0 2.7 99.7 171 F 1 1326 01 48 28 01 51 28 J2237+4216 01 28 14 54.2 301.1 2.8 94.8 -9 1 1 1326 01 51 28 01 52 38 --- 01 29 24 53.9 301.1 2.9 94.6 61 F 1 1330 01 51 28 01 52 38 GJ873 01 29 24 55.4 305.0 2.7 99.4 -9 1 1 1330 01 52 38 01 55 38 --- 01 32 24 54.9 304.8 2.8 98.8 171 F 1 1342 01 52 38 Schedule for VLBA_FD (Code Fd ) Page 16 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 30 Dec 2007 Day 364 --- 01 55 38 J2237+4216 01 32 24 53.4 301.0 2.9 94.0 -9 1 1 1342 01 55 38 01 56 48 --- 01 33 34 53.2 301.0 2.9 93.8 61 F 1 1346 01 55 38 01 56 48 J2248+4502 01 33 34 54.9 306.1 2.7 99.9 -9 1 1 1346 01 56 48 01 57 58 --- 01 34 45 54.7 306.0 2.8 99.6 61 F 1 1351 01 56 48 01 57 58 J2237+4216 01 34 45 53.0 301.0 3.0 93.6 -9 1 1 1351 01 57 58 01 59 08 --- 01 35 55 52.7 300.9 3.0 93.4 61 F 1 1355 01 57 58 02 00 59 J0124+5618 01 37 46 64.2 355.9 0.2 173.7 69 1 1 1355 02 00 59 02 01 39 =0121+560 01 38 27 64.2 355.7 0.2 173.3 40 F 1 1358 02 01 17 02 01 39 J0110+5404 01 38 27 66.0 350.0 0.5 165.3 -10 1 1 1358 02 01 39 02 02 49 --- 01 39 37 65.9 349.6 0.5 164.7 60 F 1 1362 02 01 39 02 02 49 J0124+5618 01 39 37 64.1 355.3 0.2 172.8 -10 1 1 1362 02 02 49 02 03 59 =0121+560 01 40 47 64.1 355.0 0.3 172.2 60 F 1 1367 02 02 49 02 03 59 GJ53B 01 40 47 65.0 349.1 0.5 163.6 -10 1 1 1367 02 03 59 02 06 59 --- 01 43 47 64.9 348.1 0.6 162.1 170 F 1 1379 02 03 59 02 06 59 J0124+5618 01 43 47 64.1 354.0 0.3 170.7 -10 1 1 1379 02 06 59 02 08 09 =0121+560 01 44 58 64.0 353.7 0.3 170.1 60 F 1 1383 02 06 59 02 08 09 GJ53B 01 44 58 64.8 347.8 0.6 161.5 -10 1 1 1383 02 08 09 02 11 09 --- 01 47 58 64.7 346.8 0.7 160.0 170 F 1 1395 02 08 09 02 11 09 J0124+5618 01 47 58 64.0 352.7 0.4 168.7 -10 1 1 1395 02 11 09 02 12 19 =0121+560 01 49 08 63.9 352.4 0.4 168.1 60 F 1 1399 02 11 09 02 12 19 GJ53B 01 49 08 64.6 346.4 0.7 159.4 -10 1 1 1399 02 12 19 02 15 19 --- 01 52 09 64.5 345.5 0.7 158.0 170 F 1 1411 02 12 19 02 15 19 J0124+5618 01 52 09 63.8 351.4 0.5 166.6 -10 1 1 1411 02 15 19 02 16 29 =0121+560 01 53 19 63.8 351.1 0.5 166.1 60 F 1 1415 02 15 19 02 16 29 GJ53B 01 53 19 64.4 345.1 0.7 157.4 -10 1 1 1415 02 16 29 02 19 29 --- 01 56 20 64.2 344.2 0.8 156.0 170 F 1 1427 02 16 29 02 19 29 J0124+5618 01 56 20 63.7 350.2 0.5 164.6 -10 1 1 1427 02 19 29 02 20 39 =0121+560 01 57 30 63.6 349.8 0.5 164.1 60 F 1 1432 02 19 29 Schedule for VLBA_FD (Code Fd ) Page 17 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 30 Dec 2007 Day 364 --- 02 20 39 GJ53B 01 57 30 64.2 343.9 0.8 155.4 -10 1 1 1432 02 20 39 02 23 39 --- 02 00 30 64.0 343.0 0.9 154.0 170 F 1 1443 02 20 39 02 23 39 J0124+5618 02 00 30 63.5 348.9 0.6 162.6 -10 1 1 1443 02 23 39 02 24 49 =0121+560 02 01 40 63.5 348.6 0.6 162.1 60 F 1 1448 02 23 39 02 24 49 J0110+5404 02 01 40 64.8 342.4 0.8 153.6 -10 1 1 1448 02 24 49 02 25 59 --- 02 02 51 64.7 342.0 0.9 153.0 60 F 1 1452 02 24 49 02 25 59 J0124+5618 02 02 51 63.4 348.2 0.6 161.5 -10 1 1 1452 02 25 59 02 27 09 =0121+560 02 04 01 63.4 347.9 0.7 161.0 60 F 1 1457 02 25 59 02 30 04 J0237+2848 02 06 56 82.9 102.8 -0.5 -73.3 6 1 1 1457 02 30 04 02 32 04 =0234+285 02 08 57 83.4 103.8 -0.5 -72.5 120 F 1 1464 02 30 22 02 34 45 J2237+4216 02 11 37 46.1 -59.1 3.6 87.3 46 1 1 1464 02 34 45 02 35 25 --- 02 12 17 46.0 -59.1 3.6 87.2 40 F 1 1467 02 35 03 02 35 25 J2248+4502 02 12 17 48.1 -55.1 3.4 92.1 -10 1 1 1467 02 35 25 02 36 35 --- 02 13 28 47.9 -55.1 3.4 91.9 60 F 1 1472 02 35 25 02 36 35 J2237+4216 02 13 28 45.8 -59.1 3.6 87.0 -10 1 1 1472 02 36 35 02 37 45 --- 02 14 38 45.6 -59.1 3.6 86.8 60 F 1 1476 02 36 35 02 37 45 GJ873 02 14 38 47.4 -56.2 3.5 90.6 -10 1 1 1476 02 37 45 02 40 45 --- 02 17 38 46.9 -56.2 3.5 90.1 170 F 1 1488 02 37 45 02 40 45 J2237+4216 02 17 38 45.0 -59.0 3.7 86.4 -10 1 1 1488 02 40 45 02 41 55 --- 02 18 48 44.8 -59.0 3.7 86.2 60 F 1 1492 02 40 45 02 41 55 GJ873 02 18 48 46.7 -56.2 3.5 89.9 -10 1 1 1492 02 41 55 02 44 55 --- 02 21 49 46.1 -56.2 3.6 89.4 170 F 1 1504 02 41 55 02 44 55 J2237+4216 02 21 49 44.3 -59.0 3.7 85.7 -10 1 1 1504 02 44 55 02 46 05 --- 02 22 59 44.0 -58.9 3.8 85.5 60 F 1 1508 02 44 55 02 46 05 GJ873 02 22 59 45.9 -56.2 3.6 89.2 -10 1 1 1508 02 46 05 02 49 05 --- 02 26 00 45.4 -56.1 3.6 88.7 170 F 1 1520 02 46 05 02 49 05 J2237+4216 02 26 00 43.5 -58.9 3.8 85.1 -10 1 1 1520 02 49 05 02 50 15 --- 02 27 10 43.3 -58.9 3.8 84.9 60 F 1 1524 02 49 05 Schedule for VLBA_FD (Code Fd ) Page 18 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 30 Dec 2007 Day 364 --- 02 50 15 J2248+4502 02 27 10 45.5 -55.1 3.6 89.4 -10 1 1 1524 02 50 15 02 51 25 --- 02 28 20 45.3 -55.1 3.7 89.2 60 F 1 1529 02 50 15 02 51 25 J2237+4216 02 28 20 43.1 -58.8 3.8 84.7 -10 1 1 1529 02 51 25 02 52 35 --- 02 29 30 42.8 -58.8 3.9 84.5 60 F 1 1533 02 51 25 02 54 34 J0124+5618 02 31 30 61.8 -19.6 1.1 148.6 75 1 1 1533 02 54 34 02 55 14 =0121+560 02 32 10 61.7 -19.7 1.1 148.3 40 F 1 1536 02 54 52 02 55 14 J0110+5404 02 32 10 62.3 -26.0 1.4 139.9 -10 1 1 1536 02 55 14 02 56 24 --- 02 33 20 62.2 -26.3 1.4 139.4 60 F 1 1541 02 55 14 02 56 24 J0124+5618 02 33 20 61.6 -20.0 1.1 147.8 -10 1 1 1541 02 56 24 02 57 34 =0121+560 02 34 30 61.5 -20.3 1.2 147.4 60 F 1 1545 02 56 24 02 57 34 GJ53B 02 34 30 61.3 -25.9 1.4 139.1 -10 1 1 1545 02 57 34 03 00 34 --- 02 37 31 61.0 -26.5 1.5 137.9 170 F 1 1557 02 57 34 03 00 34 J0124+5618 02 37 31 61.3 -21.1 1.2 146.1 -10 1 1 1557 03 00 34 03 01 44 =0121+560 02 38 41 61.2 -21.3 1.2 145.6 60 F 1 1561 03 00 34 03 01 44 GJ53B 02 38 41 60.9 -26.8 1.5 137.5 -10 1 1 1561 03 01 44 03 04 44 --- 02 41 41 60.6 -27.4 1.5 136.3 170 F 1 1573 03 01 44 03 04 44 J0124+5618 02 41 41 61.0 -22.0 1.3 144.4 -10 1 1 1573 03 04 44 03 05 54 =0121+560 02 42 51 60.9 -22.3 1.3 143.9 60 F 1 1577 03 04 44 03 05 54 GJ53B 02 42 51 60.5 -27.7 1.6 135.8 -10 1 1 1577 03 05 54 03 08 54 --- 02 45 52 60.2 -28.3 1.6 134.7 170 F 1 1589 03 05 54 03 08 54 J0124+5618 02 45 52 60.6 -23.0 1.3 142.7 -10 1 1 1589 03 08 54 03 10 04 =0121+560 02 47 02 60.5 -23.3 1.4 142.2 60 F 1 1593 03 08 54 03 10 04 GJ53B 02 47 02 60.1 -28.6 1.6 134.2 -10 1 1 1593 03 10 04 03 13 04 --- 02 50 03 59.7 -29.1 1.7 133.1 170 F 1 1605 03 10 04 03 13 04 J0124+5618 02 50 03 60.3 -23.9 1.4 141.0 -9 1 1 1605 03 13 04 03 14 14 =0121+560 02 51 13 60.2 -24.2 1.4 140.5 61 F 1 1610 03 13 04 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 4 Station: VLBA_FD Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 4 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ873/GJ53B Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * J2237+4216 22 34 52.107085 * 22 37 04.209769 22 37 24.517123 0.00 42 01 12.91202 * 42 16 48.26264 42 19 30.33211 0.00 From catalog imbedded in main SCHED input file. 1.139 scan hours, 46.957 baseline hours above horizon. * J2248+4502 22 46 11.876611 * 22 48 24.886330 22 48 45.343631 0.00 44 46 37.58608 * 45 02 29.53930 45 05 15.63670 0.00 From catalog imbedded in main SCHED input file. 0.311 scan hours, 12.150 baseline hours above horizon. * GJ873 22 44 36.119553 * 22 46 49.207385 22 47 09.686628 0.00 44 04 08.93783 * 44 19 58.69603 44 22 44.17230 0.00 From catalog imbedded in main SCHED input file. 1.900 scan hours, 93.780 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 22 46 49.732300 Dec = 44 20 02.36800 Rates: RA = -704.65 mas/yr Dec = -459.41 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54463.8076 Rates: RA = -0.17981E-03 s/day Dec = -0.12578E-02 arcsec/day * J0110+5404 01 07 18.696120 * 01 10 19.597690 01 10 49.058188 0.00 53 48 29.02621 * 54 04 26.05910 54 07 20.26327 0.00 From catalog imbedded in main SCHED input file. 0.292 scan hours, 11.811 baseline hours above horizon. * GJ53B 01 05 18.603185 * 01 08 19.570539 01 08 49.011553 0.00 54 39 00.62832 * 54 55 00.20922 54 57 54.99262 0.00 From catalog imbedded in main SCHED input file. 1.950 scan hours, 93.566 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 01 08 16.400000 Dec = 54 55 13.00000 Rates: RA = 3420.00 mas/yr Dec = -1600.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54463.8076 Rates: RA = 0.10861E-02 s/day Dec = -0.43806E-02 arcsec/day * J0124+5618 01 21 16.790767 * 01 24 25.826999 01 24 56.770918 1.41 0121+560 56 03 14.82821 * 56 18 51.91807 56 21 43.47254 1.29 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.139 scan hours, 46.928 baseline hours above horizon. * J0237+2848 02 34 55.589592 * 02 37 52.405679 02 38 21.981681 0.23 0234+285 28 35 11.40780 * 28 48 08.99005 28 50 27.53014 0.40 J0237+28 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.033 scan hours, 1.833 baseline hours above horizon. J2253+1608 22 51 29.519744 * 22 53 57.747943 22 54 21.251740 0.31 2251+158 15 52 54.34806 * 16 08 53.56089 16 11 32.67887 0.20 * 3C454.3 /home/arana/cwalker/sched/catalogs/sources.vlba J2253+16 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.167 scan hours, 7.833 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) J2237+4216 86.2 J2248+4502 89.5 GJ873 88.8 J0110+5404 113.9 GJ53B 113.7 J0124+5618 116.1 J0237+2848 127.2 3C454.3 74.8 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg