COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: RIPL: GJ729/GJ867B Exp. Code: BB240J Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for VLBA_PT (Code Pt ) Page 2 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16 45 00 J1733-1304 15 08 22 31.4 137.5 -2.4 -34.9 0 1 1 0 16 45 00 16 53 00 =1730-130 15 16 23 32.5 139.4 -2.3 -33.5 480 F 1 31 16 45 18 17 02 29 J1845-2200 15 25 54 16.3 132.2 -3.3 -41.3 531 1 1 31 17 02 29 17 03 09 --- 15 26 34 16.4 132.3 -3.3 -41.2 40 F 1 34 17 02 47 17 03 09 J1854-2428 15 26 34 13.2 132.4 -3.5 -42.1 -12 1 1 34 17 03 09 17 04 19 --- 15 27 45 13.3 132.6 -3.5 -41.9 58 F 1 38 17 03 09 17 04 19 J1845-2200 15 27 45 16.6 132.6 -3.3 -41.0 -12 1 1 38 17 04 19 17 05 29 --- 15 28 55 16.8 132.8 -3.3 -40.9 58 F 1 43 17 04 19 17 05 29 GJ729 15 28 55 14.7 133.3 -3.4 -41.1 -10 1 1 43 17 05 29 17 08 29 --- 15 31 55 15.2 133.8 -3.3 -40.7 170 F 1 54 17 05 29 17 08 29 J1845-2200 15 31 55 17.2 133.3 -3.2 -40.4 -10 1 1 54 17 08 29 17 09 39 --- 15 33 06 17.4 133.5 -3.2 -40.2 60 F 1 59 17 08 29 17 09 39 GJ729 15 33 06 15.4 134.0 -3.3 -40.5 -10 1 1 59 17 09 39 17 12 39 --- 15 36 06 15.8 134.6 -3.2 -40.1 170 F 1 70 17 09 39 17 12 39 J1845-2200 15 36 06 17.8 134.1 -3.2 -39.8 -10 1 1 70 17 12 39 17 13 49 --- 15 37 16 18.0 134.3 -3.1 -39.6 60 F 1 75 17 12 39 17 13 49 GJ729 15 37 16 16.0 134.8 -3.2 -39.9 -10 1 1 75 17 13 49 17 16 49 --- 15 40 17 16.4 135.3 -3.2 -39.4 170 F 1 86 17 13 49 17 16 49 J1845-2200 15 40 17 18.4 134.9 -3.1 -39.1 -10 1 1 86 17 16 49 17 17 59 --- 15 41 27 18.6 135.1 -3.1 -39.0 60 F 1 91 17 16 49 17 17 59 GJ729 15 41 27 16.6 135.5 -3.1 -39.2 -10 1 1 91 17 17 59 17 20 59 --- 15 44 27 17.0 136.1 -3.1 -38.8 170 F 1 103 17 17 59 17 20 59 J1845-2200 15 44 27 19.1 135.7 -3.0 -38.5 -10 1 1 103 17 20 59 17 22 09 --- 15 45 38 19.2 135.9 -3.0 -38.3 60 F 1 107 17 20 59 Schedule for VLBA_PT (Code Pt ) Page 3 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 17 22 09 GJ729 15 45 38 17.2 136.3 -3.1 -38.6 -10 1 1 107 17 22 09 17 25 09 --- 15 48 38 17.6 136.9 -3.0 -38.1 170 F 1 119 17 22 09 17 25 09 J1845-2200 15 48 38 19.7 136.5 -3.0 -37.8 -10 1 1 119 17 25 09 17 26 19 --- 15 49 48 19.8 136.7 -2.9 -37.7 60 F 1 123 17 25 09 17 26 19 J1854-2428 15 49 48 16.6 136.6 -3.1 -38.6 -12 1 1 123 17 26 19 17 27 29 --- 15 50 58 16.7 136.8 -3.1 -38.4 58 F 1 128 17 26 19 17 28 05 J1845-2200 15 51 34 20.1 137.1 -2.9 -37.4 23 1 1 128 17 28 05 17 28 45 --- 15 52 14 20.2 137.2 -2.9 -37.3 40 F 1 130 17 28 23 17 28 45 J1854-2428 15 52 14 16.9 137.0 -3.1 -38.2 -12 1 1 130 17 28 45 17 29 55 --- 15 53 25 17.1 137.2 -3.0 -38.0 58 F 1 135 17 28 45 17 29 55 J1845-2200 15 53 25 20.3 137.4 -2.9 -37.1 -12 1 1 135 17 29 55 17 31 05 --- 15 54 35 20.5 137.7 -2.9 -36.9 58 F 1 139 17 29 55 17 31 05 GJ729 15 54 35 18.5 138.0 -2.9 -37.2 -10 1 1 139 17 31 05 17 34 05 --- 15 57 35 18.9 138.6 -2.9 -36.7 170 F 1 151 17 31 05 17 34 05 J1845-2200 15 57 35 20.9 138.3 -2.8 -36.4 -10 1 1 151 17 34 05 17 35 15 --- 15 58 46 21.1 138.5 -2.8 -36.2 60 F 1 155 17 34 05 17 35 15 GJ729 15 58 46 19.0 138.8 -2.9 -36.5 -10 1 1 155 17 35 15 17 38 15 --- 16 01 46 19.4 139.4 -2.8 -36.0 170 F 1 167 17 35 15 17 38 15 J1845-2200 16 01 46 21.5 139.1 -2.7 -35.7 -10 1 1 167 17 38 15 17 39 25 --- 16 02 56 21.6 139.3 -2.7 -35.5 60 F 1 172 17 38 15 17 39 25 GJ729 16 02 56 19.6 139.6 -2.8 -35.8 -10 1 1 172 17 39 25 17 42 25 --- 16 05 57 20.0 140.2 -2.7 -35.3 170 F 1 183 17 39 25 17 42 25 J1845-2200 16 05 57 22.0 139.9 -2.7 -35.0 -10 1 1 183 17 42 25 17 43 35 --- 16 07 07 22.2 140.2 -2.7 -34.8 60 F 1 188 17 42 25 17 43 35 GJ729 16 07 07 20.1 140.5 -2.7 -35.1 -10 1 1 188 17 43 35 17 46 35 --- 16 10 07 20.5 141.1 -2.7 -34.6 170 F 1 199 17 43 35 17 46 35 J1845-2200 16 10 07 22.6 140.8 -2.6 -34.3 -10 1 1 199 17 46 35 17 47 45 --- 16 11 18 22.7 141.0 -2.6 -34.1 60 F 1 204 17 46 35 Schedule for VLBA_PT (Code Pt ) Page 4 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 17 47 45 GJ729 16 11 18 20.7 141.3 -2.7 -34.4 -10 1 1 204 17 47 45 17 50 45 --- 16 14 18 21.1 141.9 -2.6 -33.9 170 F 1 215 17 47 45 17 50 45 J1845-2200 16 14 18 23.1 141.7 -2.5 -33.5 -10 1 1 215 17 50 45 17 51 55 --- 16 15 28 23.3 141.9 -2.5 -33.3 60 F 1 220 17 50 45 17 51 55 J1854-2428 16 15 28 20.1 141.5 -2.7 -34.4 -12 1 1 220 17 51 55 17 53 05 --- 16 16 38 20.2 141.7 -2.6 -34.2 58 F 1 225 17 51 55 17 53 40 J1845-2200 16 17 14 23.5 142.3 -2.5 -33.0 23 1 1 225 17 53 40 17 54 20 --- 16 17 54 23.6 142.4 -2.5 -32.9 40 F 1 227 17 53 58 17 54 20 J1854-2428 16 17 54 20.4 142.0 -2.6 -34.0 -12 1 1 227 17 54 20 17 55 30 --- 16 19 04 20.5 142.2 -2.6 -33.8 58 F 1 232 17 54 20 17 55 30 J1845-2200 16 19 04 23.7 142.7 -2.5 -32.7 -12 1 1 232 17 55 30 17 56 40 --- 16 20 14 23.9 142.9 -2.4 -32.5 58 F 1 236 17 55 30 17 56 40 GJ729 16 20 14 21.8 143.1 -2.5 -32.8 -10 1 1 236 17 56 40 17 59 40 --- 16 23 15 22.2 143.8 -2.5 -32.3 170 F 1 248 17 56 40 17 59 40 J1845-2200 16 23 15 24.2 143.6 -2.4 -31.9 -10 1 1 248 17 59 40 18 00 50 --- 16 24 25 24.4 143.8 -2.4 -31.7 60 F 1 252 17 59 40 18 00 50 GJ729 16 24 25 22.3 144.0 -2.4 -32.1 -10 1 1 252 18 00 50 18 03 50 --- 16 27 26 22.7 144.6 -2.4 -31.5 170 F 1 264 18 00 50 18 03 50 J1845-2200 16 27 26 24.8 144.5 -2.3 -31.2 -10 1 1 264 18 03 50 18 05 00 --- 16 28 36 24.9 144.7 -2.3 -31.0 60 F 1 268 18 03 50 18 05 00 GJ729 16 28 36 22.8 144.9 -2.4 -31.3 -10 1 1 268 18 05 00 18 08 00 --- 16 31 36 23.2 145.5 -2.3 -30.7 170 F 1 280 18 05 00 18 08 00 J1845-2200 16 31 36 25.3 145.4 -2.2 -30.4 -10 1 1 280 18 08 00 18 09 10 --- 16 32 46 25.4 145.7 -2.2 -30.2 60 F 1 284 18 08 00 18 09 10 GJ729 16 32 46 23.3 145.8 -2.3 -30.5 -10 1 1 284 18 09 10 18 12 10 --- 16 35 47 23.7 146.4 -2.2 -30.0 170 F 1 296 18 09 10 18 12 10 J1845-2200 16 35 47 25.7 146.3 -2.2 -29.6 -10 1 1 296 18 12 10 18 13 20 --- 16 36 57 25.9 146.6 -2.2 -29.4 60 F 1 301 18 12 10 Schedule for VLBA_PT (Code Pt ) Page 5 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 18 13 20 GJ729 16 36 57 23.8 146.7 -2.2 -29.7 -10 1 1 301 18 13 20 18 16 20 --- 16 39 58 24.1 147.3 -2.2 -29.2 170 F 1 312 18 13 20 18 16 20 J1845-2200 16 39 58 26.2 147.3 -2.1 -28.8 -10 1 1 312 18 16 20 18 17 30 --- 16 41 08 26.3 147.5 -2.1 -28.6 60 F 1 317 18 16 20 18 17 30 J1854-2428 16 41 08 23.2 146.8 -2.2 -29.8 -12 1 1 317 18 17 30 18 18 40 --- 16 42 18 23.3 147.1 -2.2 -29.5 58 F 1 321 18 17 30 18 19 15 J1845-2200 16 42 53 26.5 147.9 -2.1 -28.2 22 1 1 321 18 19 15 18 19 55 --- 16 43 33 26.6 148.1 -2.0 -28.1 40 F 1 324 18 19 33 18 19 55 J1854-2428 16 43 33 23.4 147.4 -2.2 -29.3 -12 1 1 324 18 19 55 18 21 05 --- 16 44 43 23.6 147.6 -2.2 -29.1 58 F 1 328 18 19 55 18 21 05 J1845-2200 16 44 43 26.7 148.4 -2.0 -27.9 -12 1 1 328 18 21 05 18 22 15 --- 16 45 53 26.9 148.6 -2.0 -27.6 58 F 1 333 18 21 05 18 22 15 GJ729 16 45 53 24.8 148.6 -2.1 -28.0 -10 1 1 333 18 22 15 18 25 15 --- 16 48 54 25.1 149.3 -2.0 -27.5 170 F 1 344 18 22 15 18 25 15 J1845-2200 16 48 54 27.2 149.3 -2.0 -27.0 -10 1 1 344 18 25 15 18 26 25 --- 16 50 04 27.3 149.6 -1.9 -26.8 60 F 1 349 18 25 15 18 26 25 GJ729 16 50 04 25.2 149.6 -2.0 -27.2 -10 1 1 349 18 26 25 18 29 25 --- 16 53 04 25.5 150.2 -2.0 -26.6 170 F 1 361 18 26 25 18 29 25 J1845-2200 16 53 04 27.6 150.3 -1.9 -26.2 -10 1 1 361 18 29 25 18 30 35 --- 16 54 15 27.7 150.6 -1.9 -26.0 60 F 1 365 18 29 25 18 30 35 GJ729 16 54 15 25.7 150.5 -1.9 -26.4 -10 1 1 365 18 30 35 18 33 35 --- 16 57 15 26.0 151.2 -1.9 -25.8 170 F 1 377 18 30 35 18 33 35 J1845-2200 16 57 15 28.0 151.3 -1.8 -25.3 -10 1 1 377 18 33 35 18 34 45 --- 16 58 25 28.1 151.6 -1.8 -25.1 60 F 1 381 18 33 35 18 34 45 GJ729 16 58 25 26.1 151.5 -1.9 -25.6 -10 1 1 381 18 34 45 18 37 45 --- 17 01 26 26.4 152.2 -1.8 -24.9 170 F 1 393 18 34 45 18 37 45 J1845-2200 17 01 26 28.4 152.3 -1.7 -24.5 -10 1 1 393 18 37 45 18 38 55 --- 17 02 36 28.6 152.6 -1.7 -24.2 60 F 1 397 18 37 45 Schedule for VLBA_PT (Code Pt ) Page 6 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 18 38 55 GJ729 17 02 36 26.5 152.4 -1.8 -24.7 -10 1 1 397 18 38 55 18 41 55 --- 17 05 36 26.8 153.1 -1.7 -24.1 170 F 1 409 18 38 55 18 41 55 J1845-2200 17 05 36 28.8 153.3 -1.7 -23.6 -10 1 1 409 18 41 55 18 43 05 --- 17 06 47 28.9 153.6 -1.7 -23.4 60 F 1 414 18 41 55 18 43 05 J1854-2428 17 06 47 25.8 152.5 -1.8 -24.7 -12 1 1 414 18 43 05 18 44 15 --- 17 07 57 25.9 152.8 -1.8 -24.5 58 F 1 418 18 43 05 18 44 15 J1845-2200 17 07 57 29.0 153.9 -1.6 -23.1 -12 1 1 418 18 44 15 18 45 25 --- 17 09 07 29.2 154.1 -1.6 -22.9 58 F 1 423 18 44 15 18 46 35 J1733-1304 17 10 17 42.3 172.4 -0.4 -6.5 37 1 1 423 18 46 35 18 48 35 =1730-130 17 12 17 42.3 173.0 -0.4 -5.9 120 F 1 430 18 46 53 18 49 43 J1845-2200 17 13 26 29.5 155.2 -1.5 -21.9 37 1 1 430 18 49 43 18 50 23 --- 17 14 06 29.6 155.4 -1.5 -21.8 40 F 1 433 18 50 01 18 50 23 J1854-2428 17 14 06 26.5 154.2 -1.7 -23.2 -12 1 1 433 18 50 23 18 51 33 --- 17 15 16 26.6 154.5 -1.7 -23.0 58 F 1 437 18 50 23 18 51 33 J1845-2200 17 15 16 29.7 155.7 -1.5 -21.5 -12 1 1 437 18 51 33 18 52 43 --- 17 16 26 29.8 156.0 -1.5 -21.3 58 F 1 442 18 51 33 18 52 43 GJ729 17 16 26 27.7 155.7 -1.6 -21.8 -10 1 1 442 18 52 43 18 55 43 --- 17 19 27 28.0 156.4 -1.5 -21.2 170 F 1 454 18 52 43 18 55 43 J1845-2200 17 19 27 30.0 156.7 -1.4 -20.6 -10 1 1 454 18 55 43 18 56 53 --- 17 20 37 30.1 157.0 -1.4 -20.4 60 F 1 458 18 55 43 18 56 53 GJ729 17 20 37 28.1 156.7 -1.5 -20.9 -10 1 1 458 18 56 53 18 59 53 --- 17 23 37 28.3 157.4 -1.4 -20.3 170 F 1 470 18 56 53 18 59 53 J1845-2200 17 23 37 30.4 157.8 -1.4 -19.7 -10 1 1 470 18 59 53 19 01 03 --- 17 24 48 30.5 158.1 -1.4 -19.5 60 F 1 474 18 59 53 19 01 03 GJ729 17 24 48 28.4 157.7 -1.4 -20.0 -10 1 1 474 19 01 03 19 04 03 --- 17 27 48 28.7 158.5 -1.4 -19.4 170 F 1 486 19 01 03 19 04 03 J1845-2200 17 27 48 30.7 158.8 -1.3 -18.8 -10 1 1 486 19 04 03 19 05 13 --- 17 28 58 30.8 159.1 -1.3 -18.5 60 F 1 490 19 04 03 Schedule for VLBA_PT (Code Pt ) Page 7 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 19 05 13 GJ729 17 28 58 28.7 158.7 -1.4 -19.1 -10 1 1 490 19 05 13 19 08 13 --- 17 31 59 29.0 159.5 -1.3 -18.4 170 F 1 502 19 05 13 19 08 13 J1845-2200 17 31 59 31.0 159.9 -1.2 -17.8 -10 1 1 502 19 08 13 19 09 23 --- 17 33 09 31.1 160.2 -1.2 -17.6 60 F 1 506 19 08 13 19 09 23 GJ729 17 33 09 29.1 159.8 -1.3 -18.2 -10 1 1 506 19 09 23 19 12 23 --- 17 36 09 29.3 160.5 -1.2 -17.5 170 F 1 518 19 09 23 19 12 23 J1845-2200 17 36 09 31.3 161.0 -1.2 -16.9 -10 1 1 518 19 12 23 19 13 33 --- 17 37 20 31.4 161.3 -1.1 -16.6 60 F 1 523 19 12 23 19 13 33 J1854-2428 17 37 20 28.4 159.8 -1.3 -18.3 -12 1 1 523 19 13 33 19 14 43 --- 17 38 30 28.5 160.1 -1.3 -18.0 58 F 1 527 19 13 33 19 15 19 J1845-2200 17 39 05 31.5 161.7 -1.1 -16.2 23 1 1 527 19 15 19 19 15 59 --- 17 39 45 31.5 161.9 -1.1 -16.1 40 F 1 530 19 15 37 19 15 59 J1854-2428 17 39 45 28.6 160.4 -1.3 -17.7 -12 1 1 530 19 15 59 19 17 09 --- 17 40 56 28.6 160.7 -1.2 -17.5 58 F 1 534 19 15 59 19 17 09 J1845-2200 17 40 56 31.6 162.2 -1.1 -15.8 -12 1 1 534 19 17 09 19 18 19 --- 17 42 06 31.7 162.5 -1.1 -15.5 58 F 1 539 19 17 09 19 18 19 GJ729 17 42 06 29.7 162.0 -1.1 -16.2 -10 1 1 539 19 18 19 19 21 19 --- 17 45 06 29.8 162.8 -1.1 -15.5 170 F 1 550 19 18 19 19 21 19 J1845-2200 17 45 06 31.9 163.3 -1.0 -14.8 -10 1 1 550 19 21 19 19 22 29 --- 17 46 16 31.9 163.6 -1.0 -14.6 60 F 1 555 19 21 19 19 22 29 GJ729 17 46 16 29.9 163.1 -1.1 -15.2 -10 1 1 555 19 22 29 19 25 29 --- 17 49 17 30.1 163.8 -1.0 -14.5 170 F 1 566 19 22 29 19 25 29 J1845-2200 17 49 17 32.1 164.4 -0.9 -13.9 -10 1 1 566 19 25 29 19 26 39 --- 17 50 27 32.2 164.7 -0.9 -13.6 60 F 1 571 19 25 29 19 26 39 GJ729 17 50 27 30.2 164.1 -1.0 -14.3 -10 1 1 571 19 26 39 19 29 39 --- 17 53 28 30.3 164.9 -0.9 -13.6 170 F 1 583 19 26 39 19 29 39 J1845-2200 17 53 28 32.3 165.5 -0.9 -12.9 -10 1 1 583 19 29 39 19 30 49 --- 17 54 38 32.4 165.8 -0.9 -12.6 60 F 1 587 19 29 39 Schedule for VLBA_PT (Code Pt ) Page 8 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 19 30 49 GJ729 17 54 38 30.4 165.2 -0.9 -13.3 -10 1 1 587 19 30 49 19 33 49 --- 17 57 38 30.5 166.0 -0.9 -12.6 170 F 1 599 19 30 49 19 33 49 J1845-2200 17 57 38 32.5 166.6 -0.8 -11.9 -10 1 1 599 19 33 49 19 34 59 --- 17 58 49 32.6 167.0 -0.8 -11.6 60 F 1 603 19 33 49 19 34 59 GJ729 17 58 49 30.6 166.3 -0.9 -12.3 -10 1 1 603 19 34 59 19 37 59 --- 18 01 49 30.7 167.1 -0.8 -11.6 170 F 1 615 19 34 59 19 37 59 J1845-2200 18 01 49 32.7 167.8 -0.7 -10.9 -10 1 1 615 19 37 59 19 39 09 --- 18 02 59 32.8 168.1 -0.7 -10.6 60 F 1 619 19 37 59 19 39 09 J1854-2428 18 02 59 29.9 166.2 -0.9 -12.5 -12 1 1 619 19 39 09 19 40 19 --- 18 04 09 30.0 166.5 -0.9 -12.2 58 F 1 624 19 39 09 19 40 54 J1845-2200 18 04 45 32.8 168.6 -0.7 -10.2 24 1 1 624 19 40 54 19 41 34 --- 18 05 25 32.9 168.8 -0.7 -10.0 40 F 1 626 19 41 12 19 41 34 J1854-2428 18 05 25 30.1 166.9 -0.8 -11.9 -12 1 1 626 19 41 34 19 42 44 --- 18 06 36 30.1 167.2 -0.8 -11.6 58 F 1 631 19 41 34 19 42 44 J1845-2200 18 06 36 32.9 169.1 -0.7 -9.7 -12 1 1 631 19 42 44 19 43 54 --- 18 07 46 33.0 169.4 -0.6 -9.4 58 F 1 635 19 42 44 19 43 54 GJ729 18 07 46 31.0 168.6 -0.7 -10.2 -10 1 1 635 19 43 54 19 46 54 --- 18 10 46 31.1 169.4 -0.7 -9.5 170 F 1 647 19 43 54 19 46 54 J1845-2200 18 10 46 33.1 170.2 -0.6 -8.7 -10 1 1 647 19 46 54 19 48 04 --- 18 11 56 33.1 170.5 -0.6 -8.4 60 F 1 652 19 46 54 19 48 04 GJ729 18 11 56 31.2 169.7 -0.6 -9.3 -10 1 1 652 19 48 04 19 51 04 --- 18 14 57 31.3 170.5 -0.6 -8.5 170 F 1 663 19 48 04 19 51 04 J1845-2200 18 14 57 33.2 171.4 -0.5 -7.7 -10 1 1 663 19 51 04 19 52 14 --- 18 16 07 33.2 171.7 -0.5 -7.4 60 F 1 668 19 51 04 19 52 14 GJ729 18 16 07 31.3 170.8 -0.6 -8.3 -10 1 1 668 19 52 14 19 55 14 --- 18 19 08 31.4 171.6 -0.5 -7.5 170 F 1 679 19 52 14 19 55 14 J1845-2200 18 19 08 33.3 172.5 -0.5 -6.7 -10 1 1 679 19 55 14 19 56 24 --- 18 20 18 33.4 172.8 -0.4 -6.4 60 F 1 684 19 55 14 Schedule for VLBA_PT (Code Pt ) Page 9 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 19 56 24 GJ729 18 20 18 31.4 172.0 -0.5 -7.3 -10 1 1 684 19 56 24 19 59 24 --- 18 23 18 31.5 172.8 -0.4 -6.5 170 F 1 695 19 56 24 19 59 24 J1845-2200 18 23 18 33.4 173.7 -0.4 -5.6 -10 1 1 695 19 59 24 20 00 34 --- 18 24 29 33.5 174.0 -0.4 -5.4 60 F 1 700 19 59 24 20 00 34 GJ729 18 24 29 31.5 173.1 -0.4 -6.3 -10 1 1 700 20 00 34 20 03 34 --- 18 27 29 31.6 173.9 -0.4 -5.5 170 F 1 712 20 00 34 20 03 34 J1845-2200 18 27 29 33.5 174.8 -0.3 -4.6 -10 1 1 712 20 03 34 20 04 44 --- 18 28 39 33.5 175.1 -0.3 -4.3 60 F 1 716 20 03 34 20 04 44 J1854-2428 18 28 39 30.9 172.9 -0.4 -6.4 -11 1 1 716 20 04 44 20 05 54 --- 18 29 49 30.9 173.2 -0.4 -6.1 59 F 1 721 20 04 44 20 06 30 J1845-2200 18 30 26 33.6 175.6 -0.3 -3.9 25 1 1 721 20 06 30 20 07 10 --- 18 31 06 33.6 175.8 -0.3 -3.7 40 F 1 723 20 06 48 20 07 10 J1854-2428 18 31 06 31.0 173.6 -0.4 -5.8 -11 1 1 723 20 07 10 20 08 20 --- 18 32 16 31.0 173.9 -0.4 -5.6 59 F 1 728 20 07 10 20 08 20 J1845-2200 18 32 16 33.6 176.1 -0.2 -3.4 -11 1 1 728 20 08 20 20 09 30 --- 18 33 26 33.6 176.5 -0.2 -3.1 59 F 1 732 20 08 20 20 09 30 GJ729 18 33 26 31.7 175.5 -0.3 -4.1 -10 1 1 732 20 09 30 20 12 30 --- 18 36 27 31.8 176.3 -0.2 -3.4 170 F 1 744 20 09 30 20 12 30 J1845-2200 18 36 27 33.6 177.3 -0.2 -2.4 -10 1 1 744 20 12 30 20 13 40 --- 18 37 37 33.7 177.6 -0.1 -2.1 60 F 1 748 20 12 30 20 13 40 GJ729 18 37 37 31.8 176.6 -0.2 -3.1 -10 1 1 748 20 13 40 20 16 40 --- 18 40 37 31.8 177.4 -0.2 -2.4 170 F 1 760 20 13 40 20 16 40 J1845-2200 18 40 37 33.7 178.5 -0.1 -1.4 -10 1 1 760 20 16 40 20 17 50 --- 18 41 47 33.7 178.8 -0.1 -1.1 60 F 1 764 20 16 40 20 17 50 GJ729 18 41 47 31.8 177.7 -0.1 -2.1 -10 1 1 764 20 17 50 20 20 50 --- 18 44 48 31.9 178.5 -0.1 -1.3 170 F 1 776 20 17 50 20 20 50 J1845-2200 18 44 48 33.7 179.6 0.0 -0.3 -10 1 1 776 20 20 50 20 22 00 --- 18 45 58 33.7 180.0 0.0 0.0 60 F 1 781 20 20 50 Schedule for VLBA_PT (Code Pt ) Page 10 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 20 22 00 GJ729 18 45 58 31.9 178.8 -0.1 -1.1 -10 1 1 781 20 22 00 20 25 00 --- 18 48 59 31.9 179.6 0.0 -0.3 170 F 1 792 20 22 00 20 25 00 J1845-2200 18 48 59 33.7 180.8 0.0 0.7 -10 1 1 792 20 25 00 20 26 10 --- 18 50 09 33.7 181.1 0.1 1.0 60 F 1 797 20 25 00 20 26 10 GJ729 18 50 09 31.9 180.0 0.0 0.0 -10 1 1 797 20 26 10 20 29 10 --- 18 53 09 31.9 180.8 0.0 0.7 170 F 1 808 20 26 10 20 29 10 J1845-2200 18 53 09 33.7 182.0 0.1 1.7 -10 1 1 808 20 29 10 20 30 20 --- 18 54 20 33.7 182.3 0.1 2.0 60 F 1 813 20 29 10 20 30 20 J1854-2428 18 54 20 31.2 179.7 0.0 -0.2 -11 1 1 813 20 30 20 20 31 30 --- 18 55 30 31.2 180.0 0.0 0.0 59 F 1 817 20 30 20 20 31 30 J1845-2200 18 55 30 33.7 182.6 0.2 2.3 -11 1 1 817 20 31 30 20 32 40 --- 18 56 40 33.6 182.9 0.2 2.6 59 F 1 822 20 31 30 20 42 10 J1733-1304 19 06 11 37.7 209.0 1.5 24.3 546 1 1 822 20 42 10 20 44 10 =1730-130 19 08 11 37.5 209.6 1.6 24.7 120 F 1 830 20 42 28 20 46 52 J2234-2055 19 10 54 16.5 130.7 -3.4 -42.1 104 1 1 830 20 46 52 20 47 32 =2232-211 19 11 34 16.6 130.8 -3.4 -42.0 40 F 1 832 20 47 10 20 47 32 J2244-2027 19 11 34 15.5 128.8 -3.6 -43.4 -8 1 1 832 20 47 32 20 48 42 --- 19 12 45 15.7 129.0 -3.5 -43.2 62 F 1 837 20 47 32 20 48 42 J2234-2055 19 12 45 16.8 131.0 -3.4 -41.9 -8 1 1 837 20 48 42 20 49 52 =2232-211 19 13 55 16.9 131.2 -3.4 -41.7 62 F 1 841 20 48 42 20 49 52 GJ867B 19 13 55 16.6 130.3 -3.4 -42.3 -6 1 1 841 20 49 52 20 52 52 --- 19 16 55 17.0 130.9 -3.4 -41.9 174 F 1 853 20 49 52 20 52 52 J2234-2055 19 16 55 17.4 131.8 -3.3 -41.3 -6 1 1 853 20 52 52 20 54 02 =2232-211 19 18 05 17.6 132.0 -3.3 -41.1 64 F 1 857 20 52 52 20 54 02 GJ867B 19 18 05 17.2 131.1 -3.4 -41.7 -6 1 1 857 20 54 02 20 57 02 --- 19 21 06 17.7 131.6 -3.3 -41.3 174 F 1 869 20 54 02 20 57 02 J2234-2055 19 21 06 18.1 132.5 -3.2 -40.7 -6 1 1 869 20 57 02 20 58 12 =2232-211 19 22 16 18.2 132.8 -3.2 -40.5 64 F 1 873 20 57 02 Schedule for VLBA_PT (Code Pt ) Page 11 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 20 58 12 GJ867B 19 22 16 17.9 131.8 -3.3 -41.1 -6 1 1 873 20 58 12 21 01 12 --- 19 25 17 18.3 132.4 -3.2 -40.7 174 F 1 885 20 58 12 21 01 12 J2234-2055 19 25 17 18.7 133.3 -3.2 -40.0 -6 1 1 885 21 01 12 21 02 22 =2232-211 19 26 27 18.9 133.5 -3.1 -39.9 64 F 1 890 21 01 12 21 02 22 GJ867B 19 26 27 18.5 132.6 -3.2 -40.5 -6 1 1 890 21 02 22 21 05 22 --- 19 29 27 19.0 133.2 -3.2 -40.0 174 F 1 901 21 02 22 21 05 22 J2234-2055 19 29 27 19.3 134.1 -3.1 -39.4 -6 1 1 901 21 05 22 21 06 32 =2232-211 19 30 38 19.5 134.3 -3.1 -39.2 64 F 1 906 21 05 22 21 06 32 GJ867B 19 30 38 19.1 133.4 -3.1 -39.9 -6 1 1 906 21 06 32 21 09 32 --- 19 33 38 19.6 134.0 -3.1 -39.4 174 F 1 917 21 06 32 21 09 32 J2234-2055 19 33 38 19.9 134.9 -3.0 -38.8 -6 1 1 917 21 09 32 21 10 42 =2232-211 19 34 48 20.1 135.1 -3.0 -38.6 64 F 1 922 21 09 32 21 10 42 J2244-2027 19 34 48 19.1 133.1 -3.2 -40.1 -8 1 1 922 21 10 42 21 11 52 --- 19 35 58 19.3 133.3 -3.1 -39.9 62 F 1 926 21 10 42 21 12 27 J2234-2055 19 36 33 20.3 135.5 -3.0 -38.3 26 1 1 926 21 12 27 21 13 07 =2232-211 19 37 13 20.4 135.6 -3.0 -38.2 40 F 1 929 21 12 45 21 13 07 J2244-2027 19 37 13 19.5 133.5 -3.1 -39.7 -8 1 1 929 21 13 07 21 14 17 --- 19 38 23 19.6 133.8 -3.1 -39.5 62 F 1 933 21 13 07 21 14 17 J2234-2055 19 38 23 20.6 135.8 -3.0 -38.0 -8 1 1 933 21 14 17 21 15 27 =2232-211 19 39 34 20.8 136.1 -2.9 -37.8 62 F 1 938 21 14 17 21 15 27 GJ867B 19 39 34 20.5 135.1 -3.0 -38.5 -6 1 1 938 21 15 27 21 18 27 --- 19 42 34 20.9 135.7 -2.9 -38.0 174 F 1 950 21 15 27 21 18 27 J2234-2055 19 42 34 21.2 136.7 -2.9 -37.3 -6 1 1 950 21 18 27 21 19 37 =2232-211 19 43 44 21.4 136.9 -2.9 -37.2 64 F 1 954 21 18 27 21 19 37 GJ867B 19 43 44 21.1 136.0 -2.9 -37.8 -6 1 1 954 21 19 37 21 22 37 --- 19 46 45 21.5 136.6 -2.9 -37.4 174 F 1 966 21 19 37 21 22 37 J2234-2055 19 46 45 21.8 137.5 -2.8 -36.7 -6 1 1 966 21 22 37 21 23 47 =2232-211 19 47 55 22.0 137.7 -2.8 -36.5 64 F 1 970 21 22 37 Schedule for VLBA_PT (Code Pt ) Page 12 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 21 23 47 GJ867B 19 47 55 21.7 136.8 -2.9 -37.2 -6 1 1 970 21 23 47 21 26 47 --- 19 50 55 22.1 137.4 -2.8 -36.7 174 F 1 982 21 23 47 21 26 47 J2234-2055 19 50 55 22.4 138.4 -2.7 -36.0 -6 1 1 982 21 26 47 21 27 57 =2232-211 19 52 06 22.5 138.6 -2.7 -35.8 64 F 1 986 21 26 47 21 27 57 GJ867B 19 52 06 22.3 137.6 -2.8 -36.5 -6 1 1 986 21 27 57 21 30 57 --- 19 55 06 22.7 138.2 -2.7 -36.0 174 F 1 998 21 27 57 21 30 57 J2234-2055 19 55 06 22.9 139.2 -2.7 -35.3 -6 1 1 998 21 30 57 21 32 07 =2232-211 19 56 16 23.1 139.5 -2.7 -35.1 64 F 1 1003 21 30 57 21 32 07 GJ867B 19 56 16 22.8 138.5 -2.7 -35.8 -6 1 1 1003 21 32 07 21 35 07 --- 19 59 17 23.2 139.1 -2.7 -35.3 174 F 1 1014 21 32 07 21 35 07 J2234-2055 19 59 17 23.5 140.1 -2.6 -34.6 -6 1 1 1014 21 35 07 21 36 17 =2232-211 20 00 27 23.7 140.3 -2.6 -34.4 64 F 1 1019 21 35 07 21 36 17 J2244-2027 20 00 27 22.8 138.1 -2.7 -36.0 -8 1 1 1019 21 36 17 21 37 27 --- 20 01 37 23.0 138.4 -2.7 -35.8 62 F 1 1023 21 36 17 21 38 02 J2234-2055 20 02 12 23.9 140.7 -2.6 -34.1 27 1 1 1023 21 38 02 21 38 42 =2232-211 20 02 52 24.0 140.8 -2.5 -33.9 40 F 1 1026 21 38 20 21 38 42 J2244-2027 20 02 52 23.1 138.6 -2.7 -35.6 -8 1 1 1026 21 38 42 21 39 52 --- 20 04 02 23.3 138.9 -2.7 -35.4 62 F 1 1030 21 38 42 21 39 52 J2234-2055 20 04 02 24.1 141.1 -2.5 -33.7 -8 1 1 1030 21 39 52 21 41 02 =2232-211 20 05 12 24.3 141.3 -2.5 -33.5 62 F 1 1035 21 39 52 21 41 02 GJ867B 20 05 12 24.0 140.4 -2.6 -34.3 -6 1 1 1035 21 41 02 21 44 02 --- 20 08 13 24.4 141.0 -2.5 -33.7 174 F 1 1046 21 41 02 21 44 02 J2234-2055 20 08 13 24.7 142.0 -2.5 -33.0 -6 1 1 1046 21 44 02 21 45 12 =2232-211 20 09 23 24.8 142.2 -2.4 -32.8 64 F 1 1051 21 44 02 21 45 12 GJ867B 20 09 23 24.6 141.2 -2.5 -33.5 -6 1 1 1051 21 45 12 21 48 12 --- 20 12 24 25.0 141.9 -2.4 -33.0 174 F 1 1063 21 45 12 21 48 12 J2234-2055 20 12 24 25.2 142.9 -2.4 -32.2 -6 1 1 1063 21 48 12 21 49 22 =2232-211 20 13 34 25.3 143.2 -2.4 -32.0 64 F 1 1067 21 48 12 Schedule for VLBA_PT (Code Pt ) Page 13 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 21 49 22 GJ867B 20 13 34 25.1 142.1 -2.4 -32.8 -6 1 1 1067 21 49 22 21 52 22 --- 20 16 34 25.5 142.8 -2.4 -32.2 174 F 1 1079 21 49 22 21 52 22 J2234-2055 20 16 34 25.7 143.8 -2.3 -31.5 -6 1 1 1079 21 52 22 21 53 32 =2232-211 20 17 44 25.8 144.1 -2.3 -31.2 64 F 1 1083 21 52 22 21 53 32 GJ867B 20 17 44 25.6 143.1 -2.4 -32.0 -6 1 1 1083 21 53 32 21 56 32 --- 20 20 45 26.0 143.7 -2.3 -31.5 174 F 1 1095 21 53 32 21 56 32 J2234-2055 20 20 45 26.2 144.7 -2.2 -30.7 -6 1 1 1095 21 56 32 21 57 42 =2232-211 20 21 55 26.3 145.0 -2.2 -30.5 64 F 1 1099 21 56 32 21 57 42 GJ867B 20 21 55 26.1 144.0 -2.3 -31.3 -6 1 1 1099 21 57 42 22 00 42 --- 20 24 56 26.5 144.7 -2.2 -30.7 174 F 1 1111 21 57 42 22 00 42 J2234-2055 20 24 56 26.7 145.7 -2.2 -29.9 -6 1 1 1111 22 00 42 22 01 52 =2232-211 20 26 06 26.8 146.0 -2.2 -29.7 64 F 1 1115 22 00 42 22 01 52 J2244-2027 20 26 06 26.1 143.6 -2.3 -31.5 -8 1 1 1115 22 01 52 22 03 02 --- 20 27 16 26.3 143.9 -2.3 -31.3 62 F 1 1120 22 01 52 22 03 36 J2234-2055 20 27 51 27.0 146.4 -2.1 -29.3 27 1 1 1120 22 03 36 22 04 16 =2232-211 20 28 31 27.1 146.5 -2.1 -29.2 40 F 1 1123 22 03 54 22 04 16 J2244-2027 20 28 31 26.4 144.2 -2.3 -31.1 -8 1 1 1123 22 04 16 22 05 26 --- 20 29 41 26.6 144.4 -2.2 -30.9 62 F 1 1127 22 04 16 22 05 26 J2234-2055 20 29 41 27.2 146.8 -2.1 -29.0 -8 1 1 1127 22 05 26 22 06 36 =2232-211 20 30 51 27.4 147.0 -2.1 -28.8 62 F 1 1132 22 05 26 22 06 36 GJ867B 20 30 51 27.2 146.0 -2.1 -29.6 -6 1 1 1132 22 06 36 22 09 36 --- 20 33 52 27.6 146.7 -2.1 -29.0 174 F 1 1143 22 06 36 22 09 36 J2234-2055 20 33 52 27.7 147.7 -2.0 -28.2 -6 1 1 1143 22 09 36 22 10 46 =2232-211 20 35 02 27.8 148.0 -2.0 -27.9 64 F 1 1148 22 09 36 22 10 46 GJ867B 20 35 02 27.7 147.0 -2.1 -28.8 -6 1 1 1148 22 10 46 22 13 46 --- 20 38 02 28.0 147.7 -2.0 -28.2 174 F 1 1159 22 10 46 22 13 46 J2234-2055 20 38 02 28.2 148.7 -2.0 -27.3 -6 1 1 1159 22 13 46 22 14 56 =2232-211 20 39 13 28.3 149.0 -1.9 -27.1 64 F 1 1164 22 13 46 Schedule for VLBA_PT (Code Pt ) Page 14 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 22 14 56 GJ867B 20 39 13 28.1 147.9 -2.0 -27.9 -6 1 1 1164 22 14 56 22 17 56 --- 20 42 13 28.5 148.6 -1.9 -27.3 174 F 1 1175 22 14 56 22 17 56 J2234-2055 20 42 13 28.6 149.7 -1.9 -26.5 -6 1 1 1175 22 17 56 22 19 06 =2232-211 20 43 23 28.7 150.0 -1.9 -26.2 64 F 1 1180 22 17 56 22 19 06 GJ867B 20 43 23 28.6 148.9 -1.9 -27.1 -6 1 1 1180 22 19 06 22 22 06 --- 20 46 24 28.9 149.6 -1.9 -26.5 174 F 1 1192 22 19 06 22 22 06 J2234-2055 20 46 24 29.0 150.7 -1.8 -25.6 -6 1 1 1192 22 22 06 22 23 16 =2232-211 20 47 34 29.2 151.0 -1.8 -25.4 64 F 1 1196 22 22 06 22 23 16 GJ867B 20 47 34 29.0 149.9 -1.9 -26.2 -6 1 1 1196 22 23 16 22 26 16 --- 20 50 35 29.3 150.6 -1.8 -25.6 174 F 1 1208 22 23 16 22 26 16 J2234-2055 20 50 35 29.5 151.7 -1.7 -24.8 -6 1 1 1208 22 26 16 22 27 26 =2232-211 20 51 45 29.6 152.0 -1.7 -24.5 64 F 1 1212 22 26 16 22 27 26 J2244-2027 20 51 45 29.1 149.6 -1.9 -26.5 -8 1 1 1212 22 27 26 22 28 36 --- 20 52 55 29.2 149.8 -1.9 -26.3 62 F 1 1217 22 27 26 22 29 11 J2234-2055 20 53 30 29.7 152.4 -1.7 -24.2 27 1 1 1217 22 29 11 22 29 51 =2232-211 20 54 10 29.8 152.6 -1.7 -24.0 40 F 1 1219 22 29 29 22 29 51 J2244-2027 20 54 10 29.3 150.1 -1.8 -26.0 -8 1 1 1219 22 29 51 22 31 01 --- 20 55 20 29.4 150.4 -1.8 -25.8 62 F 1 1224 22 29 51 22 31 01 J2234-2055 20 55 20 29.9 152.9 -1.7 -23.8 -8 1 1 1224 22 31 01 22 32 11 =2232-211 20 56 30 30.0 153.2 -1.6 -23.5 62 F 1 1228 22 31 01 22 32 11 GJ867B 20 56 30 29.9 152.1 -1.7 -24.4 -6 1 1 1228 22 32 11 22 35 11 --- 20 59 31 30.2 152.8 -1.7 -23.8 174 F 1 1240 22 32 11 22 35 11 J2234-2055 20 59 31 30.3 153.9 -1.6 -22.9 -6 1 1 1240 22 35 11 22 36 21 =2232-211 21 00 41 30.4 154.2 -1.6 -22.6 64 F 1 1244 22 35 11 22 36 21 GJ867B 21 00 41 30.3 153.1 -1.6 -23.5 -6 1 1 1244 22 36 21 22 39 21 --- 21 03 41 30.6 153.9 -1.6 -22.9 174 F 1 1256 22 36 21 22 39 21 J2234-2055 21 03 41 30.7 155.0 -1.5 -22.0 -6 1 1 1256 22 39 21 22 40 31 =2232-211 21 04 51 30.8 155.3 -1.5 -21.7 64 F 1 1261 22 39 21 Schedule for VLBA_PT (Code Pt ) Page 15 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 22 40 31 GJ867B 21 04 51 30.7 154.2 -1.6 -22.6 -6 1 1 1261 22 40 31 22 43 31 --- 21 07 52 31.0 154.9 -1.5 -22.0 174 F 1 1272 22 40 31 22 43 31 J2234-2055 21 07 52 31.0 156.0 -1.5 -21.1 -6 1 1 1272 22 43 31 22 44 41 =2232-211 21 09 02 31.1 156.3 -1.4 -20.8 64 F 1 1277 22 43 31 22 44 41 GJ867B 21 09 02 31.1 155.2 -1.5 -21.7 -6 1 1 1277 22 44 41 22 47 41 --- 21 12 03 31.3 156.0 -1.5 -21.0 174 F 1 1288 22 44 41 22 47 41 J2234-2055 21 12 03 31.4 157.1 -1.4 -20.1 -6 1 1 1288 22 47 41 22 48 51 =2232-211 21 13 13 31.5 157.4 -1.4 -19.9 64 F 1 1293 22 47 41 22 48 51 GJ867B 21 13 13 31.4 156.3 -1.4 -20.8 -6 1 1 1293 22 48 51 22 51 51 --- 21 16 13 31.7 157.1 -1.4 -20.1 174 F 1 1304 22 48 51 22 51 51 J2234-2055 21 16 13 31.7 158.2 -1.3 -19.2 -6 1 1 1304 22 51 51 22 53 01 =2232-211 21 17 23 31.8 158.5 -1.3 -18.9 64 F 1 1309 22 51 51 22 53 01 J2244-2027 21 17 23 31.5 155.9 -1.5 -21.1 -8 1 1 1309 22 53 01 22 54 11 --- 21 18 34 31.6 156.2 -1.4 -20.8 62 F 1 1313 22 53 01 22 54 45 J2234-2055 21 19 08 31.9 158.9 -1.3 -18.5 26 1 1 1313 22 54 45 22 55 25 =2232-211 21 19 48 32.0 159.1 -1.3 -18.4 40 F 1 1316 22 55 03 22 55 25 J2244-2027 21 19 48 31.7 156.5 -1.4 -20.5 -8 1 1 1316 22 55 25 22 56 35 --- 21 20 58 31.8 156.8 -1.4 -20.3 62 F 1 1321 22 55 25 22 56 35 J2234-2055 21 20 58 32.1 159.4 -1.2 -18.1 -8 1 1 1321 22 56 35 22 57 45 =2232-211 21 22 09 32.1 159.7 -1.2 -17.9 62 F 1 1325 22 56 35 22 57 45 GJ867B 21 22 09 32.1 158.6 -1.3 -18.8 -6 1 1 1325 22 57 45 23 00 45 --- 21 25 09 32.4 159.4 -1.2 -18.1 174 F 1 1337 22 57 45 23 00 45 J2234-2055 21 25 09 32.3 160.5 -1.2 -17.2 -6 1 1 1337 23 00 45 23 01 55 =2232-211 21 26 19 32.4 160.8 -1.2 -16.9 64 F 1 1341 23 00 45 23 01 55 GJ867B 21 26 19 32.5 159.7 -1.2 -17.8 -6 1 1 1341 23 01 55 23 04 55 --- 21 29 20 32.7 160.5 -1.2 -17.1 174 F 1 1353 23 01 55 23 04 55 J2234-2055 21 29 20 32.6 161.6 -1.1 -16.2 -6 1 1 1353 23 04 55 23 06 05 =2232-211 21 30 30 32.7 161.9 -1.1 -15.9 64 F 1 1357 23 04 55 Schedule for VLBA_PT (Code Pt ) Page 16 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 23 06 05 GJ867B 21 30 30 32.7 160.8 -1.1 -16.9 -6 1 1 1357 23 06 05 23 09 05 --- 21 33 30 32.9 161.6 -1.1 -16.2 174 F 1 1369 23 06 05 23 09 05 J2234-2055 21 33 30 32.9 162.7 -1.0 -15.2 -6 1 1 1369 23 09 05 23 10 15 =2232-211 21 34 41 33.0 163.0 -1.0 -14.9 64 F 1 1373 23 09 05 23 10 15 GJ867B 21 34 41 33.0 161.9 -1.1 -15.9 -6 1 1 1373 23 10 15 23 13 15 --- 21 37 41 33.2 162.7 -1.0 -15.2 174 F 1 1385 23 10 15 23 13 15 J2234-2055 21 37 41 33.1 163.9 -1.0 -14.2 -6 1 1 1385 23 13 15 23 14 25 =2232-211 21 38 51 33.2 164.2 -0.9 -14.0 64 F 1 1390 23 13 15 23 14 25 GJ867B 21 38 51 33.3 163.1 -1.0 -14.9 -6 1 1 1390 23 14 25 23 17 25 --- 21 41 52 33.5 163.9 -1.0 -14.2 174 F 1 1401 23 14 25 23 17 25 J2234-2055 21 41 52 33.4 165.0 -0.9 -13.2 -6 1 1 1401 23 17 25 23 18 35 =2232-211 21 43 02 33.4 165.3 -0.9 -13.0 64 F 1 1406 23 17 25 23 18 35 J2244-2027 21 43 02 33.4 162.7 -1.0 -15.2 -8 1 1 1406 23 18 35 23 19 45 --- 21 44 12 33.4 163.0 -1.0 -14.9 62 F 1 1410 23 18 35 23 20 19 J2234-2055 21 44 46 33.5 165.8 -0.8 -12.5 26 1 1 1410 23 20 19 23 20 59 =2232-211 21 45 26 33.6 166.0 -0.8 -12.4 40 F 1 1413 23 20 37 23 20 59 J2244-2027 21 45 26 33.5 163.3 -1.0 -14.6 -8 1 1 1413 23 20 59 23 22 09 --- 21 46 36 33.6 163.7 -1.0 -14.4 62 F 1 1417 23 20 59 23 22 09 J2234-2055 21 46 36 33.6 166.3 -0.8 -12.1 -8 1 1 1417 23 22 09 23 23 19 =2232-211 21 47 47 33.7 166.6 -0.8 -11.8 62 F 1 1422 23 22 09 23 23 19 GJ867B 21 47 47 33.8 165.5 -0.9 -12.8 -6 1 1 1422 23 23 19 23 26 19 --- 21 50 47 33.9 166.3 -0.8 -12.0 174 F 1 1433 23 23 19 23 26 19 J2234-2055 21 50 47 33.8 167.4 -0.7 -11.1 -6 1 1 1433 23 26 19 23 27 29 =2232-211 21 51 57 33.9 167.8 -0.7 -10.8 64 F 1 1438 23 26 19 23 27 29 GJ867B 21 51 57 34.0 166.6 -0.8 -11.8 -6 1 1 1438 23 27 29 23 30 29 --- 21 54 58 34.1 167.5 -0.7 -11.0 174 F 1 1450 23 27 29 23 30 29 J2234-2055 21 54 58 34.0 168.6 -0.7 -10.1 -6 1 1 1450 23 30 29 23 31 39 =2232-211 21 56 08 34.0 168.9 -0.7 -9.8 64 F 1 1454 23 30 29 Schedule for VLBA_PT (Code Pt ) Page 17 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 23 31 39 GJ867B 21 56 08 34.2 167.8 -0.7 -10.7 -6 1 1 1454 23 31 39 23 34 39 --- 21 59 09 34.3 168.6 -0.7 -10.0 174 F 1 1466 23 31 39 23 34 39 J2234-2055 21 59 09 34.2 169.8 -0.6 -9.0 -6 1 1 1466 23 34 39 23 35 49 =2232-211 22 00 19 34.2 170.1 -0.6 -8.8 64 F 1 1470 23 34 39 23 35 49 GJ867B 22 00 19 34.4 169.0 -0.6 -9.7 -6 1 1 1470 23 35 49 23 38 49 --- 22 03 19 34.5 169.8 -0.6 -9.0 174 F 1 1482 23 35 49 23 38 49 J2234-2055 22 03 19 34.3 170.9 -0.5 -8.0 -6 1 1 1482 23 38 49 23 39 59 =2232-211 22 04 29 34.3 171.3 -0.5 -7.7 64 F 1 1486 23 38 49 23 39 59 GJ867B 22 04 29 34.5 170.1 -0.6 -8.7 -6 1 1 1486 23 39 59 23 42 59 --- 22 07 30 34.6 171.0 -0.5 -8.0 174 F 1 1498 23 39 59 23 42 59 J2234-2055 22 07 30 34.4 172.1 -0.5 -7.0 -6 1 1 1498 23 42 59 23 44 09 =2232-211 22 08 40 34.5 172.4 -0.4 -6.7 64 F 1 1502 23 42 59 23 44 09 J2244-2027 22 08 40 34.6 169.8 -0.6 -9.0 -8 1 1 1502 23 44 09 23 45 19 --- 22 09 50 34.7 170.1 -0.6 -8.7 62 F 1 1507 23 44 09 23 45 53 J2234-2055 22 10 24 34.5 172.9 -0.4 -6.3 26 1 1 1507 23 45 53 23 46 33 =2232-211 22 11 04 34.5 173.1 -0.4 -6.1 40 F 1 1510 23 46 11 23 46 33 J2244-2027 22 11 04 34.7 170.4 -0.6 -8.4 -8 1 1 1510 23 46 33 23 47 43 --- 22 12 14 34.7 170.8 -0.5 -8.1 62 F 1 1514 23 46 33 23 47 43 J2234-2055 22 12 14 34.5 173.4 -0.4 -5.8 -8 1 1 1514 23 47 43 23 48 53 =2232-211 22 13 24 34.6 173.8 -0.4 -5.5 62 F 1 1519 23 47 43 23 48 53 GJ867B 22 13 24 34.8 172.6 -0.4 -6.5 -6 1 1 1519 23 48 53 23 51 53 --- 22 16 25 34.9 173.5 -0.4 -5.7 174 F 1 1530 23 48 53 23 51 53 J2234-2055 22 16 25 34.6 174.6 -0.3 -4.8 -6 1 1 1530 23 51 53 23 53 03 =2232-211 22 17 35 34.7 174.9 -0.3 -4.5 64 F 1 1535 23 51 53 23 53 03 GJ867B 22 17 35 34.9 173.8 -0.4 -5.4 -6 1 1 1535 23 53 03 23 56 03 --- 22 20 36 34.9 174.7 -0.3 -4.7 174 F 1 1546 23 53 03 23 56 03 J2234-2055 22 20 36 34.7 175.8 -0.2 -3.7 -6 1 1 1546 23 56 03 23 57 13 =2232-211 22 21 46 34.7 176.1 -0.2 -3.4 64 F 1 1551 23 56 03 Schedule for VLBA_PT (Code Pt ) Page 18 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Start: Sat 15 Dec 2007 Day 349 -- Stop: Sun 16 Dec 2007 Day 350 --- 23 57 13 GJ867B 22 21 46 35.0 175.0 -0.3 -4.4 -6 1 1 1551 23 57 13 00 00 13 --- 22 24 46 35.0 175.9 -0.2 -3.6 174 F 1 1562 23 57 13 00 00 13 J2234-2055 22 24 46 34.8 177.0 -0.2 -2.7 -6 1 1 1562 00 00 13 00 01 23 =2232-211 22 25 56 34.8 177.3 -0.2 -2.4 64 F 1 1567 00 00 13 00 01 23 GJ867B 22 25 56 35.0 176.2 -0.2 -3.3 -6 1 1 1567 00 01 23 00 04 23 --- 22 28 57 35.1 177.1 -0.2 -2.6 174 F 1 1579 00 01 23 00 04 23 J2234-2055 22 28 57 34.8 178.2 -0.1 -1.6 -6 1 1 1579 00 04 23 00 05 33 =2232-211 22 30 07 34.8 178.5 -0.1 -1.3 64 F 1 1583 00 04 23 00 05 33 GJ867B 22 30 07 35.1 177.4 -0.2 -2.3 -6 1 1 1583 00 05 33 00 08 33 --- 22 33 08 35.1 178.3 -0.1 -1.5 174 F 1 1595 00 05 33 00 08 33 J2234-2055 22 33 08 34.8 179.4 0.0 -0.6 -6 1 1 1595 00 08 33 00 09 43 =2232-211 22 34 18 34.8 179.7 0.0 -0.3 64 F 1 1599 00 08 33 00 09 43 J2244-2027 22 34 18 35.2 177.1 -0.2 -2.6 -8 1 1 1599 00 09 43 00 10 53 --- 22 35 28 35.2 177.4 -0.2 -2.3 62 F 1 1604 00 09 43 00 10 53 J2234-2055 22 35 28 34.8 180.0 0.0 0.0 -8 1 1 1604 00 10 53 00 12 03 =2232-211 22 36 38 34.8 180.4 0.0 0.3 62 F 1 1608 00 10 53 00 14 23 3C454.3 22 38 59 71.6 168.2 -0.3 -10.1 61 1 1 1608 00 14 23 00 16 23 --- 22 40 59 71.6 169.8 -0.2 -8.8 120 F 1 1616 00 14 41 00 18 44 J2234-2055 22 43 21 34.8 182.3 0.1 2.0 62 1 1 1616 00 18 44 00 19 24 =2232-211 22 44 01 34.8 182.5 0.1 2.2 40 F 1 1619 00 19 02 00 19 24 J2244-2027 22 44 01 35.3 179.8 0.0 -0.1 -8 1 1 1619 00 19 24 00 20 34 --- 22 45 11 35.3 180.2 0.0 0.2 62 F 1 1623 00 19 24 00 20 34 J2234-2055 22 45 11 34.8 182.8 0.2 2.5 -8 1 1 1623 00 20 34 00 21 44 =2232-211 22 46 21 34.8 183.1 0.2 2.8 62 F 1 1628 00 20 34 00 21 44 GJ867B 22 46 21 35.1 182.0 0.1 1.8 -6 1 1 1628 00 21 44 00 24 44 --- 22 49 22 35.1 182.9 0.2 2.6 174 F 1 1639 00 21 44 00 24 44 J2234-2055 22 49 22 34.7 184.0 0.2 3.5 -6 1 1 1639 00 24 44 00 25 54 =2232-211 22 50 32 34.7 184.3 0.3 3.8 64 F 1 1644 00 24 44 Schedule for VLBA_PT (Code Pt ) Page 19 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 16 Dec 2007 Day 350 --- 00 25 54 GJ867B 22 50 32 35.1 183.2 0.2 2.9 -6 1 1 1644 00 25 54 00 28 54 --- 22 53 32 35.0 184.1 0.2 3.6 174 F 1 1655 00 25 54 00 28 54 J2234-2055 22 53 32 34.7 185.2 0.3 4.6 -6 1 1 1655 00 28 54 00 30 04 =2232-211 22 54 42 34.6 185.5 0.3 4.8 64 F 1 1660 00 28 54 00 30 04 GJ867B 22 54 42 35.0 184.4 0.3 3.9 -6 1 1 1660 00 30 04 00 33 04 --- 22 57 43 34.9 185.3 0.3 4.7 174 F 1 1672 00 30 04 00 33 04 J2234-2055 22 57 43 34.6 186.3 0.4 5.6 -6 1 1 1672 00 33 04 00 34 14 =2232-211 22 58 53 34.5 186.7 0.4 5.9 64 F 1 1676 00 33 04 00 34 14 GJ867B 22 58 53 34.9 185.6 0.3 5.0 -6 1 1 1676 00 34 14 00 37 14 --- 23 01 54 34.9 186.5 0.4 5.7 174 F 1 1688 00 34 14 00 37 14 J2234-2055 23 01 54 34.5 187.5 0.4 6.6 -7 1 1 1688 00 37 14 00 38 24 =2232-211 23 03 04 34.4 187.8 0.5 6.9 63 F 1 1692 00 37 14 00 38 24 GJ867B 23 03 04 34.8 186.8 0.4 6.0 -7 1 1 1692 00 38 24 00 41 24 --- 23 06 04 34.8 187.7 0.4 6.8 173 F 1 1704 00 38 24 00 41 24 J2234-2055 23 06 04 34.3 188.7 0.5 7.7 -7 1 1 1704 00 41 24 00 42 34 =2232-211 23 07 14 34.3 189.0 0.5 8.0 63 F 1 1708 00 41 24 00 42 34 J2244-2027 23 07 14 35.0 186.5 0.4 5.7 -8 1 1 1708 00 42 34 00 43 44 --- 23 08 25 35.0 186.8 0.4 6.0 62 F 1 1713 00 42 34 00 43 44 J2234-2055 23 08 25 34.3 189.3 0.6 8.3 -8 1 1 1713 00 43 44 00 44 54 =2232-211 23 09 35 34.2 189.7 0.6 8.5 62 F 1 1717 00 43 44 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 6 Station: VLBA_PT Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 6 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ729/GJ867B Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * J1854-2428 18 51 47.245372 * 18 54 50.671300 18 55 19.023247 0.00 -24 32 19.79457 *-24 28 28.73010 -24 27 59.41476 0.00 From catalog imbedded in main SCHED input file. 0.311 scan hours, 11.648 baseline hours above horizon. * GJ729 18 46 47.038189 * 18 49 49.732110 18 50 17.957315 0.00 -23 53 41.66100 *-23 50 11.96788 -23 49 45.90534 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 91.071 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 18 49 49.362500 Dec = -23 50 10.43700 Rates: RA = 637.57 mas/yr Dec = -192.47 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54449.7035 Rates: RA = 0.12722E-03 s/day Dec = -0.52695E-03 arcsec/day * J2244-2027 22 41 26.545058 * 22 44 08.617920 22 44 34.710706 0.00 -20 43 08.43707 *-20 27 22.50440 -20 24 57.37162 0.00 From catalog imbedded in main SCHED input file. 0.350 scan hours, 14.116 baseline hours above horizon. * GJ867B 22 36 02.850050 * 22 38 45.551914 22 39 11.711770 0.00 -20 52 30.46639 *-20 36 52.58518 -20 34 28.91181 0.00 From catalog imbedded in main SCHED input file. 2.250 scan hours, 107.098 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 22 38 45.310000 Dec = -20 36 52.10000 Rates: RA = 427.00 mas/yr Dec = -61.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54449.7035 Rates: RA = 0.83269E-04 s/day Dec = -0.16701E-03 arcsec/day * J1733-1304 17 30 13.535187 * 17 33 02.705785 17 33 28.710790 0.21 1730-130 -13 02 45.83975 *-13 04 49.54823 -13 05 14.94756 0.30 J1733-13 /home/arana/cwalker/sched/catalogs/sources.vlba NRAO530 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.200 scan hours, 9.666 baseline hours above horizon. * J1845-2200 18 42 39.571008 * 18 45 39.902835 18 46 07.750313 1.40 -22 03 48.51787 *-22 00 36.57988 -22 00 13.09537 2.17 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.061 scan hours, 43.347 baseline hours above horizon. * J2234-2055 22 32 14.197488 * 22 34 57.440337 22 35 23.664271 1.03 2232-211 -21 10 35.12106 *-20 55 03.23799 -20 52 40.70583 1.82 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.189 scan hours, 51.610 baseline hours above horizon. J2253+1608 22 51 29.519744 * 22 53 57.747943 22 54 21.393151 0.31 2251+158 15 52 54.34806 * 16 08 53.56089 16 11 33.90775 0.20 * 3C454.3 /home/arana/cwalker/sched/catalogs/sources.vlba J2253+16 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.033 scan hours, 1.833 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) J1854-2428 19.1 GJ729 18.0 J2244-2027 71.7 GJ867B 70.5 J1733-1304 10.2 J1845-2200 17.2 J2234-2055 69.5 3C454.3 88.1 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg