COVER INFORMATION Station: VLBA_KP (Code Kp ) Experiment: RIPL: GJ729/GJ867B Exp. Code: BB240J Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for VLBA_KP (Code Kp ) Page 2 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16 45 00 J1733-1304 14 54 24 31.0 133.4 -2.7 -39.3 0 1 1 0 16 45 00 16 53 00 =1730-130 15 02 25 32.2 135.2 -2.5 -37.9 480 F 1 31 16 45 18 17 02 29 J1845-2200 15 11 56 15.6 129.3 -3.6 -45.1 530 1 1 31 17 02 29 17 03 09 --- 15 12 36 15.7 129.4 -3.6 -45.0 40 F 1 34 17 02 47 17 03 09 J1854-2428 15 12 36 12.5 129.7 -3.7 -45.9 -12 1 1 34 17 03 09 17 04 19 --- 15 13 46 12.7 129.8 -3.7 -45.7 58 F 1 38 17 03 09 17 04 19 J1845-2200 15 13 46 15.9 129.6 -3.5 -44.9 -12 1 1 38 17 04 19 17 05 29 --- 15 14 56 16.1 129.8 -3.5 -44.7 58 F 1 43 17 04 19 17 05 29 GJ729 15 14 56 14.1 130.4 -3.6 -44.9 -10 1 1 43 17 05 29 17 08 29 --- 15 17 57 14.6 130.9 -3.5 -44.5 170 F 1 54 17 05 29 17 08 29 J1845-2200 15 17 57 16.6 130.3 -3.5 -44.3 -10 1 1 54 17 08 29 17 09 39 --- 15 19 07 16.8 130.5 -3.5 -44.1 60 F 1 59 17 08 29 17 09 39 GJ729 15 19 07 14.8 131.1 -3.5 -44.3 -10 1 1 59 17 09 39 17 12 39 --- 15 22 08 15.3 131.6 -3.5 -43.9 170 F 1 70 17 09 39 17 12 39 J1845-2200 15 22 08 17.3 131.0 -3.4 -43.7 -10 1 1 70 17 12 39 17 13 49 --- 15 23 18 17.4 131.2 -3.4 -43.5 60 F 1 75 17 12 39 17 13 49 GJ729 15 23 18 15.5 131.8 -3.5 -43.7 -10 1 1 75 17 13 49 17 16 49 --- 15 26 18 15.9 132.3 -3.4 -43.3 170 F 1 86 17 13 49 17 16 49 J1845-2200 15 26 18 17.9 131.8 -3.3 -43.1 -10 1 1 86 17 16 49 17 17 59 --- 15 27 29 18.1 132.0 -3.3 -42.9 60 F 1 91 17 16 49 17 17 59 GJ729 15 27 29 16.1 132.5 -3.4 -43.1 -10 1 1 91 17 17 59 17 20 59 --- 15 30 29 16.6 133.1 -3.3 -42.7 170 F 1 103 17 17 59 17 20 59 J1845-2200 15 30 29 18.6 132.5 -3.3 -42.4 -10 1 1 103 17 20 59 17 22 09 --- 15 31 39 18.8 132.7 -3.2 -42.3 60 F 1 107 17 20 59 Schedule for VLBA_KP (Code Kp ) Page 3 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 17 22 09 GJ729 15 31 39 16.8 133.3 -3.3 -42.5 -10 1 1 107 17 22 09 17 25 09 --- 15 34 40 17.2 133.8 -3.3 -42.0 170 F 1 119 17 22 09 17 25 09 J1845-2200 15 34 40 19.2 133.3 -3.2 -41.8 -10 1 1 119 17 25 09 17 26 19 --- 15 35 50 19.4 133.5 -3.2 -41.6 60 F 1 123 17 25 09 17 26 19 J1854-2428 15 35 50 16.2 133.6 -3.3 -42.5 -12 1 1 123 17 26 19 17 27 29 --- 15 37 00 16.4 133.8 -3.3 -42.3 58 F 1 128 17 26 19 17 28 05 J1845-2200 15 37 36 19.7 133.8 -3.1 -41.3 23 1 1 128 17 28 05 17 28 45 --- 15 38 16 19.8 133.9 -3.1 -41.2 40 F 1 130 17 28 23 17 28 45 J1854-2428 15 38 16 16.5 134.0 -3.3 -42.1 -12 1 1 130 17 28 45 17 29 55 --- 15 39 26 16.7 134.2 -3.3 -41.9 58 F 1 135 17 28 45 17 29 55 J1845-2200 15 39 26 20.0 134.1 -3.1 -41.0 -12 1 1 135 17 29 55 17 31 05 --- 15 40 36 20.1 134.4 -3.1 -40.9 58 F 1 139 17 29 55 17 31 05 GJ729 15 40 36 18.1 134.9 -3.2 -41.1 -10 1 1 139 17 31 05 17 34 05 --- 15 43 37 18.6 135.4 -3.1 -40.6 170 F 1 151 17 31 05 17 34 05 J1845-2200 15 43 37 20.6 134.9 -3.0 -40.4 -10 1 1 151 17 34 05 17 35 15 --- 15 44 47 20.8 135.1 -3.0 -40.2 60 F 1 155 17 34 05 17 35 15 GJ729 15 44 47 18.8 135.6 -3.1 -40.4 -10 1 1 155 17 35 15 17 38 15 --- 15 47 48 19.2 136.2 -3.0 -40.0 170 F 1 167 17 35 15 17 38 15 J1845-2200 15 47 48 21.2 135.7 -3.0 -39.7 -10 1 1 167 17 38 15 17 39 25 --- 15 48 58 21.4 135.9 -3.0 -39.5 60 F 1 172 17 38 15 17 39 25 GJ729 15 48 58 19.4 136.4 -3.0 -39.8 -10 1 1 172 17 39 25 17 42 25 --- 15 51 58 19.8 137.0 -3.0 -39.3 170 F 1 183 17 39 25 17 42 25 J1845-2200 15 51 58 21.8 136.5 -2.9 -39.0 -10 1 1 183 17 42 25 17 43 35 --- 15 53 09 22.0 136.8 -2.9 -38.8 60 F 1 188 17 42 25 17 43 35 GJ729 15 53 09 20.0 137.2 -3.0 -39.1 -10 1 1 188 17 43 35 17 46 35 --- 15 56 09 20.4 137.8 -2.9 -38.6 170 F 1 199 17 43 35 17 46 35 J1845-2200 15 56 09 22.4 137.3 -2.8 -38.3 -10 1 1 199 17 46 35 17 47 45 --- 15 57 19 22.6 137.6 -2.8 -38.1 60 F 1 204 17 46 35 Schedule for VLBA_KP (Code Kp ) Page 4 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 17 47 45 GJ729 15 57 19 20.6 138.0 -2.9 -38.4 -10 1 1 204 17 47 45 17 50 45 --- 16 00 20 21.0 138.6 -2.8 -37.9 170 F 1 215 17 47 45 17 50 45 J1845-2200 16 00 20 23.0 138.2 -2.8 -37.6 -10 1 1 215 17 50 45 17 51 55 --- 16 01 30 23.2 138.4 -2.7 -37.4 60 F 1 220 17 50 45 17 51 55 J1854-2428 16 01 30 20.0 138.2 -2.9 -38.4 -12 1 1 220 17 51 55 17 53 05 --- 16 02 40 20.1 138.5 -2.9 -38.2 58 F 1 225 17 51 55 17 53 40 J1845-2200 16 03 15 23.4 138.8 -2.7 -37.1 23 1 1 225 17 53 40 17 54 20 --- 16 03 56 23.5 138.9 -2.7 -37.0 40 F 1 227 17 53 58 17 54 20 J1854-2428 16 03 56 20.3 138.7 -2.9 -38.0 -12 1 1 227 17 54 20 17 55 30 --- 16 05 06 20.5 138.9 -2.8 -37.8 58 F 1 232 17 54 20 17 55 30 J1845-2200 16 05 06 23.7 139.1 -2.7 -36.8 -12 1 1 232 17 55 30 17 56 40 --- 16 06 16 23.9 139.4 -2.7 -36.6 58 F 1 236 17 55 30 17 56 40 GJ729 16 06 16 21.8 139.7 -2.7 -36.9 -10 1 1 236 17 56 40 17 59 40 --- 16 09 16 22.2 140.3 -2.7 -36.3 170 F 1 248 17 56 40 17 59 40 J1845-2200 16 09 16 24.3 140.0 -2.6 -36.0 -10 1 1 248 17 59 40 18 00 50 --- 16 10 27 24.4 140.2 -2.6 -35.8 60 F 1 252 17 59 40 18 00 50 GJ729 16 10 27 22.4 140.5 -2.7 -36.1 -10 1 1 252 18 00 50 18 03 50 --- 16 13 27 22.8 141.1 -2.6 -35.6 170 F 1 264 18 00 50 18 03 50 J1845-2200 16 13 27 24.8 140.8 -2.5 -35.3 -10 1 1 264 18 03 50 18 05 00 --- 16 14 37 25.0 141.1 -2.5 -35.1 60 F 1 268 18 03 50 18 05 00 GJ729 16 14 37 23.0 141.4 -2.6 -35.4 -10 1 1 268 18 05 00 18 08 00 --- 16 17 38 23.4 142.0 -2.5 -34.8 170 F 1 280 18 05 00 18 08 00 J1845-2200 16 17 38 25.4 141.7 -2.5 -34.5 -10 1 1 280 18 08 00 18 09 10 --- 16 18 48 25.6 142.0 -2.5 -34.3 60 F 1 284 18 08 00 18 09 10 GJ729 16 18 48 23.5 142.2 -2.5 -34.6 -10 1 1 284 18 09 10 18 12 10 --- 16 21 49 23.9 142.9 -2.5 -34.1 170 F 1 296 18 09 10 18 12 10 J1845-2200 16 21 49 25.9 142.6 -2.4 -33.8 -10 1 1 296 18 12 10 18 13 20 --- 16 22 59 26.1 142.9 -2.4 -33.5 60 F 1 301 18 12 10 Schedule for VLBA_KP (Code Kp ) Page 5 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 18 13 20 GJ729 16 22 59 24.0 143.1 -2.5 -33.8 -10 1 1 301 18 13 20 18 16 20 --- 16 25 59 24.4 143.7 -2.4 -33.3 170 F 1 312 18 13 20 18 16 20 J1845-2200 16 25 59 26.5 143.5 -2.3 -33.0 -10 1 1 312 18 16 20 18 17 30 --- 16 27 09 26.6 143.8 -2.3 -32.7 60 F 1 317 18 16 20 18 17 30 J1854-2428 16 27 09 23.4 143.3 -2.5 -33.8 -12 1 1 317 18 17 30 18 18 40 --- 16 28 20 23.6 143.6 -2.4 -33.6 58 F 1 321 18 17 30 18 19 15 J1845-2200 16 28 54 26.8 144.2 -2.3 -32.4 22 1 1 321 18 19 15 18 19 55 --- 16 29 34 26.9 144.3 -2.3 -32.3 40 F 1 324 18 19 33 18 19 55 J1854-2428 16 29 34 23.7 143.8 -2.4 -33.4 -12 1 1 324 18 19 55 18 21 05 --- 16 30 45 23.9 144.1 -2.4 -33.2 58 F 1 328 18 19 55 18 21 05 J1845-2200 16 30 45 27.1 144.6 -2.3 -32.1 -12 1 1 328 18 21 05 18 22 15 --- 16 31 55 27.2 144.8 -2.2 -31.8 58 F 1 333 18 21 05 18 22 15 GJ729 16 31 55 25.2 145.0 -2.3 -32.2 -10 1 1 333 18 22 15 18 25 15 --- 16 34 55 25.5 145.6 -2.3 -31.6 170 F 1 344 18 22 15 18 25 15 J1845-2200 16 34 55 27.6 145.5 -2.2 -31.2 -10 1 1 344 18 25 15 18 26 25 --- 16 36 05 27.7 145.7 -2.2 -31.0 60 F 1 349 18 25 15 18 26 25 GJ729 16 36 05 25.7 145.9 -2.2 -31.3 -10 1 1 349 18 26 25 18 29 25 --- 16 39 06 26.0 146.5 -2.2 -30.8 170 F 1 361 18 26 25 18 29 25 J1845-2200 16 39 06 28.1 146.4 -2.1 -30.4 -10 1 1 361 18 29 25 18 30 35 --- 16 40 16 28.2 146.7 -2.1 -30.2 60 F 1 365 18 29 25 18 30 35 GJ729 16 40 16 26.1 146.8 -2.2 -30.5 -10 1 1 365 18 30 35 18 33 35 --- 16 43 17 26.5 147.5 -2.1 -29.9 170 F 1 377 18 30 35 18 33 35 J1845-2200 16 43 17 28.6 147.4 -2.0 -29.6 -10 1 1 377 18 33 35 18 34 45 --- 16 44 27 28.7 147.6 -2.0 -29.3 60 F 1 381 18 33 35 18 34 45 GJ729 16 44 27 26.6 147.7 -2.1 -29.7 -10 1 1 381 18 34 45 18 37 45 --- 16 47 27 27.0 148.4 -2.0 -29.1 170 F 1 393 18 34 45 18 37 45 J1845-2200 16 47 27 29.0 148.3 -2.0 -28.7 -10 1 1 393 18 37 45 18 38 55 --- 16 48 38 29.2 148.6 -2.0 -28.5 60 F 1 397 18 37 45 Schedule for VLBA_KP (Code Kp ) Page 6 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 18 38 55 GJ729 16 48 38 27.1 148.7 -2.0 -28.9 -10 1 1 397 18 38 55 18 41 55 --- 16 51 38 27.4 149.3 -2.0 -28.2 170 F 1 409 18 38 55 18 41 55 J1845-2200 16 51 38 29.5 149.3 -1.9 -27.8 -10 1 1 409 18 41 55 18 43 05 --- 16 52 48 29.6 149.6 -1.9 -27.6 60 F 1 414 18 41 55 18 43 05 J1854-2428 16 52 48 26.4 148.8 -2.0 -28.9 -12 1 1 414 18 43 05 18 44 15 --- 16 53 58 26.6 149.1 -2.0 -28.6 58 F 1 418 18 43 05 18 44 15 J1845-2200 16 53 58 29.7 149.9 -1.9 -27.3 -12 1 1 418 18 44 15 18 45 25 --- 16 55 09 29.9 150.2 -1.8 -27.1 58 F 1 423 18 44 15 18 46 35 J1733-1304 16 56 18 44.1 167.4 -0.6 -11.0 35 1 1 423 18 46 35 18 48 35 =1730-130 16 58 19 44.2 168.0 -0.6 -10.4 120 F 1 430 18 46 53 18 49 43 J1845-2200 16 59 27 30.3 151.2 -1.8 -26.2 35 1 1 430 18 49 43 18 50 23 --- 17 00 08 30.4 151.3 -1.8 -26.0 40 F 1 433 18 50 01 18 50 23 J1854-2428 17 00 08 27.2 150.5 -1.9 -27.4 -12 1 1 433 18 50 23 18 51 33 --- 17 01 18 27.4 150.7 -1.9 -27.1 58 F 1 437 18 50 23 18 51 33 J1845-2200 17 01 18 30.5 151.6 -1.7 -25.8 -12 1 1 437 18 51 33 18 52 43 --- 17 02 28 30.6 151.9 -1.7 -25.5 58 F 1 442 18 51 33 18 52 43 GJ729 17 02 28 28.6 151.8 -1.8 -26.0 -10 1 1 442 18 52 43 18 55 43 --- 17 05 28 28.8 152.5 -1.7 -25.3 170 F 1 454 18 52 43 18 55 43 J1845-2200 17 05 28 30.9 152.6 -1.7 -24.9 -10 1 1 454 18 55 43 18 56 53 --- 17 06 39 31.0 152.9 -1.7 -24.6 60 F 1 458 18 55 43 18 56 53 GJ729 17 06 39 29.0 152.8 -1.7 -25.1 -10 1 1 458 18 56 53 18 59 53 --- 17 09 39 29.3 153.5 -1.7 -24.4 170 F 1 470 18 56 53 18 59 53 J1845-2200 17 09 39 31.3 153.7 -1.6 -23.9 -10 1 1 470 18 59 53 19 01 03 --- 17 10 49 31.4 154.0 -1.6 -23.7 60 F 1 474 18 59 53 19 01 03 GJ729 17 10 49 29.4 153.8 -1.7 -24.2 -10 1 1 474 19 01 03 19 04 03 --- 17 13 50 29.6 154.5 -1.6 -23.5 170 F 1 486 19 01 03 19 04 03 J1845-2200 17 13 50 31.7 154.7 -1.5 -23.0 -10 1 1 486 19 04 03 19 05 13 --- 17 15 00 31.8 155.0 -1.5 -22.7 60 F 1 490 19 04 03 Schedule for VLBA_KP (Code Kp ) Page 7 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 19 05 13 GJ729 17 15 00 29.7 154.8 -1.6 -23.2 -10 1 1 490 19 05 13 19 08 13 --- 17 18 00 30.0 155.5 -1.5 -22.6 170 F 1 502 19 05 13 19 08 13 J1845-2200 17 18 00 32.1 155.8 -1.5 -22.1 -10 1 1 502 19 08 13 19 09 23 --- 17 19 11 32.2 156.1 -1.4 -21.8 60 F 1 506 19 08 13 19 09 23 GJ729 17 19 11 30.1 155.8 -1.5 -22.3 -10 1 1 506 19 09 23 19 12 23 --- 17 22 11 30.4 156.6 -1.5 -21.6 170 F 1 518 19 09 23 19 12 23 J1845-2200 17 22 11 32.4 156.8 -1.4 -21.1 -10 1 1 518 19 12 23 19 13 33 --- 17 23 21 32.5 157.1 -1.4 -20.8 60 F 1 523 19 12 23 19 13 33 J1854-2428 17 23 21 29.5 155.9 -1.5 -22.4 -12 1 1 523 19 13 33 19 14 43 --- 17 24 31 29.6 156.2 -1.5 -22.1 58 F 1 527 19 13 33 19 15 19 J1845-2200 17 25 07 32.7 157.6 -1.4 -20.4 23 1 1 527 19 15 19 19 15 59 --- 17 25 47 32.7 157.8 -1.3 -20.3 40 F 1 530 19 15 37 19 15 59 J1854-2428 17 25 47 29.7 156.5 -1.5 -21.8 -12 1 1 530 19 15 59 19 17 09 --- 17 26 57 29.8 156.8 -1.5 -21.6 58 F 1 534 19 15 59 19 17 09 J1845-2200 17 26 57 32.8 158.1 -1.3 -20.0 -12 1 1 534 19 17 09 19 18 19 --- 17 28 07 32.9 158.4 -1.3 -19.7 58 F 1 539 19 17 09 19 18 19 GJ729 17 28 07 30.9 158.0 -1.4 -20.3 -10 1 1 539 19 18 19 19 21 19 --- 17 31 08 31.1 158.8 -1.3 -19.6 170 F 1 550 19 18 19 19 21 19 J1845-2200 17 31 08 33.1 159.2 -1.2 -19.0 -10 1 1 550 19 21 19 19 22 29 --- 17 32 18 33.2 159.5 -1.2 -18.7 60 F 1 555 19 21 19 19 22 29 GJ729 17 32 18 31.2 159.1 -1.3 -19.3 -10 1 1 555 19 22 29 19 25 29 --- 17 35 19 31.4 159.9 -1.2 -18.6 170 F 1 566 19 22 29 19 25 29 J1845-2200 17 35 19 33.4 160.3 -1.2 -18.0 -10 1 1 566 19 25 29 19 26 39 --- 17 36 29 33.5 160.6 -1.2 -17.7 60 F 1 571 19 25 29 19 26 39 GJ729 17 36 29 31.5 160.1 -1.2 -18.4 -10 1 1 571 19 26 39 19 29 39 --- 17 39 29 31.7 160.9 -1.2 -17.7 170 F 1 583 19 26 39 19 29 39 J1845-2200 17 39 29 33.7 161.4 -1.1 -17.0 -10 1 1 583 19 29 39 19 30 49 --- 17 40 39 33.8 161.7 -1.1 -16.7 60 F 1 587 19 29 39 Schedule for VLBA_KP (Code Kp ) Page 8 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 19 30 49 GJ729 17 40 39 31.8 161.2 -1.2 -17.4 -10 1 1 587 19 30 49 19 33 49 --- 17 43 40 32.0 162.0 -1.1 -16.7 170 F 1 599 19 30 49 19 33 49 J1845-2200 17 43 40 34.0 162.5 -1.0 -16.0 -10 1 1 599 19 33 49 19 34 59 --- 17 44 50 34.1 162.8 -1.0 -15.7 60 F 1 603 19 33 49 19 34 59 GJ729 17 44 50 32.1 162.3 -1.1 -16.4 -10 1 1 603 19 34 59 19 37 59 --- 17 47 51 32.3 163.1 -1.0 -15.7 170 F 1 615 19 34 59 19 37 59 J1845-2200 17 47 51 34.3 163.6 -1.0 -15.0 -10 1 1 615 19 37 59 19 39 09 --- 17 49 01 34.3 163.9 -1.0 -14.7 60 F 1 619 19 37 59 19 39 09 J1854-2428 17 49 01 31.4 162.3 -1.1 -16.5 -12 1 1 619 19 39 09 19 40 19 --- 17 50 11 31.5 162.6 -1.1 -16.2 58 F 1 624 19 39 09 19 40 54 J1845-2200 17 50 47 34.4 164.4 -0.9 -14.2 24 1 1 624 19 40 54 19 41 34 --- 17 51 27 34.5 164.6 -0.9 -14.1 40 F 1 626 19 41 12 19 41 34 J1854-2428 17 51 27 31.6 162.9 -1.1 -15.9 -12 1 1 626 19 41 34 19 42 44 --- 17 52 37 31.6 163.2 -1.0 -15.6 58 F 1 631 19 41 34 19 42 44 J1845-2200 17 52 37 34.5 164.9 -0.9 -13.8 -12 1 1 631 19 42 44 19 43 54 --- 17 53 47 34.6 165.2 -0.9 -13.5 58 F 1 635 19 42 44 19 43 54 GJ729 17 53 47 32.6 164.6 -0.9 -14.2 -10 1 1 635 19 43 54 19 46 54 --- 17 56 48 32.8 165.4 -0.9 -13.5 170 F 1 647 19 43 54 19 46 54 J1845-2200 17 56 48 34.8 166.1 -0.8 -12.7 -10 1 1 647 19 46 54 19 48 04 --- 17 57 58 34.8 166.4 -0.8 -12.5 60 F 1 652 19 46 54 19 48 04 GJ729 17 57 58 32.8 165.7 -0.9 -13.2 -10 1 1 652 19 48 04 19 51 04 --- 18 00 59 33.0 166.5 -0.8 -12.5 170 F 1 663 19 48 04 19 51 04 J1845-2200 18 00 59 35.0 167.2 -0.8 -11.7 -10 1 1 663 19 51 04 19 52 14 --- 18 02 09 35.0 167.5 -0.7 -11.4 60 F 1 668 19 51 04 19 52 14 GJ729 18 02 09 33.0 166.8 -0.8 -12.2 -10 1 1 668 19 52 14 19 55 14 --- 18 05 09 33.2 167.6 -0.8 -11.4 170 F 1 679 19 52 14 19 55 14 J1845-2200 18 05 09 35.2 168.4 -0.7 -10.6 -10 1 1 679 19 55 14 19 56 24 --- 18 06 19 35.2 168.7 -0.7 -10.3 60 F 1 684 19 55 14 Schedule for VLBA_KP (Code Kp ) Page 9 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 19 56 24 GJ729 18 06 19 33.2 168.0 -0.7 -11.2 -10 1 1 684 19 56 24 19 59 24 --- 18 09 20 33.4 168.8 -0.7 -10.4 170 F 1 695 19 56 24 19 59 24 J1845-2200 18 09 20 35.3 169.5 -0.6 -9.6 -10 1 1 695 19 59 24 20 00 34 --- 18 10 30 35.4 169.9 -0.6 -9.3 60 F 1 700 19 59 24 20 00 34 GJ729 18 10 30 33.4 169.1 -0.7 -10.1 -10 1 1 700 20 00 34 20 03 34 --- 18 13 31 33.5 169.9 -0.6 -9.4 170 F 1 712 20 00 34 20 03 34 J1845-2200 18 13 31 35.5 170.7 -0.5 -8.5 -10 1 1 712 20 03 34 20 04 44 --- 18 14 41 35.5 171.0 -0.5 -8.2 60 F 1 716 20 03 34 20 04 44 J1854-2428 18 14 41 32.7 169.0 -0.7 -10.2 -12 1 1 716 20 04 44 20 05 54 --- 18 15 51 32.8 169.3 -0.7 -10.0 58 F 1 721 20 04 44 20 06 30 J1845-2200 18 16 27 35.6 171.5 -0.5 -7.7 25 1 1 721 20 06 30 20 07 10 --- 18 17 07 35.6 171.7 -0.5 -7.6 40 F 1 723 20 06 48 20 07 10 J1854-2428 18 17 07 32.8 169.6 -0.6 -9.6 -12 1 1 723 20 07 10 20 08 20 --- 18 18 18 32.9 170.0 -0.6 -9.4 58 F 1 728 20 07 10 20 08 20 J1845-2200 18 18 18 35.6 172.1 -0.5 -7.3 -11 1 1 728 20 08 20 20 09 30 --- 18 19 28 35.7 172.4 -0.4 -7.0 59 F 1 732 20 08 20 20 09 30 GJ729 18 19 28 33.7 171.5 -0.5 -7.9 -10 1 1 732 20 09 30 20 12 30 --- 18 22 28 33.8 172.3 -0.5 -7.1 170 F 1 744 20 09 30 20 12 30 J1845-2200 18 22 28 35.7 173.2 -0.4 -6.2 -10 1 1 744 20 12 30 20 13 40 --- 18 23 38 35.8 173.6 -0.4 -5.9 60 F 1 748 20 12 30 20 13 40 GJ729 18 23 38 33.9 172.7 -0.4 -6.8 -10 1 1 748 20 13 40 20 16 40 --- 18 26 39 33.9 173.5 -0.4 -6.0 170 F 1 760 20 13 40 20 16 40 J1845-2200 18 26 39 35.8 174.4 -0.3 -5.1 -10 1 1 760 20 16 40 20 17 50 --- 18 27 49 35.9 174.8 -0.3 -4.8 60 F 1 764 20 16 40 20 17 50 GJ729 18 27 49 34.0 173.8 -0.4 -5.7 -10 1 1 764 20 17 50 20 20 50 --- 18 30 50 34.0 174.6 -0.3 -5.0 170 F 1 776 20 17 50 20 20 50 J1845-2200 18 30 50 35.9 175.6 -0.3 -4.0 -10 1 1 776 20 20 50 20 22 00 --- 18 32 00 35.9 176.0 -0.2 -3.7 60 F 1 781 20 20 50 Schedule for VLBA_KP (Code Kp ) Page 10 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 20 22 00 GJ729 18 32 00 34.0 174.9 -0.3 -4.7 -10 1 1 781 20 22 00 20 25 00 --- 18 35 00 34.1 175.8 -0.3 -3.9 170 F 1 792 20 22 00 20 25 00 J1845-2200 18 35 00 36.0 176.8 -0.2 -2.9 -10 1 1 792 20 25 00 20 26 10 --- 18 36 10 36.0 177.1 -0.2 -2.6 60 F 1 797 20 25 00 20 26 10 GJ729 18 36 10 34.1 176.1 -0.2 -3.6 -10 1 1 797 20 26 10 20 29 10 --- 18 39 11 34.2 176.9 -0.2 -2.8 170 F 1 808 20 26 10 20 29 10 J1845-2200 18 39 11 36.0 178.0 -0.1 -1.8 -10 1 1 808 20 29 10 20 30 20 --- 18 40 21 36.0 178.3 -0.1 -1.5 60 F 1 813 20 29 10 20 30 20 J1854-2428 18 40 21 33.5 175.9 -0.2 -3.8 -11 1 1 813 20 30 20 20 31 30 --- 18 41 31 33.5 176.2 -0.2 -3.5 59 F 1 817 20 30 20 20 31 30 J1845-2200 18 41 31 36.0 178.7 -0.1 -1.2 -11 1 1 817 20 31 30 20 32 40 --- 18 42 42 36.0 179.0 -0.1 -0.9 59 F 1 822 20 31 30 20 42 10 J1733-1304 18 52 13 41.2 205.8 1.3 22.3 546 1 1 822 20 42 10 20 44 10 =1730-130 18 54 13 41.0 206.4 1.3 22.8 120 F 1 830 20 42 28 20 46 52 J2234-2055 18 56 56 15.7 127.7 -3.6 -45.9 104 1 1 830 20 46 52 20 47 32 =2232-211 18 57 36 15.8 127.8 -3.6 -45.8 40 F 1 832 20 47 10 20 47 32 J2244-2027 18 57 36 14.6 125.9 -3.8 -47.1 -8 1 1 832 20 47 32 20 48 42 --- 18 58 46 14.8 126.1 -3.8 -47.0 62 F 1 837 20 47 32 20 48 42 J2234-2055 18 58 46 16.0 128.0 -3.6 -45.7 -8 1 1 837 20 48 42 20 49 52 =2232-211 18 59 56 16.2 128.2 -3.6 -45.5 62 F 1 841 20 48 42 20 49 52 GJ867B 18 59 56 15.8 127.3 -3.7 -46.1 -7 1 1 841 20 49 52 20 52 52 --- 19 02 57 16.3 127.8 -3.6 -45.7 173 F 1 853 20 49 52 20 52 52 J2234-2055 19 02 57 16.7 128.7 -3.5 -45.1 -7 1 1 853 20 52 52 20 54 02 =2232-211 19 04 07 16.9 128.9 -3.5 -44.9 63 F 1 857 20 52 52 20 54 02 GJ867B 19 04 07 16.5 128.0 -3.6 -45.5 -7 1 1 857 20 54 02 20 57 02 --- 19 07 08 17.0 128.6 -3.5 -45.1 173 F 1 869 20 54 02 20 57 02 J2234-2055 19 07 08 17.4 129.4 -3.5 -44.5 -7 1 1 869 20 57 02 20 58 12 =2232-211 19 08 18 17.6 129.7 -3.5 -44.4 63 F 1 873 20 57 02 Schedule for VLBA_KP (Code Kp ) Page 11 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 20 58 12 GJ867B 19 08 18 17.2 128.8 -3.5 -45.0 -7 1 1 873 20 58 12 21 01 12 --- 19 11 18 17.7 129.3 -3.5 -44.5 173 F 1 885 20 58 12 21 01 12 J2234-2055 19 11 18 18.1 130.2 -3.4 -43.9 -7 1 1 885 21 01 12 21 02 22 =2232-211 19 12 28 18.3 130.4 -3.4 -43.8 63 F 1 890 21 01 12 21 02 22 GJ867B 19 12 28 17.8 129.5 -3.4 -44.4 -7 1 1 890 21 02 22 21 05 22 --- 19 15 29 18.3 130.0 -3.4 -43.9 173 F 1 901 21 02 22 21 05 22 J2234-2055 19 15 29 18.7 130.9 -3.3 -43.3 -7 1 1 901 21 05 22 21 06 32 =2232-211 19 16 39 18.9 131.1 -3.3 -43.1 63 F 1 906 21 05 22 21 06 32 GJ867B 19 16 39 18.5 130.2 -3.4 -43.8 -7 1 1 906 21 06 32 21 09 32 --- 19 19 40 19.0 130.8 -3.3 -43.3 173 F 1 917 21 06 32 21 09 32 J2234-2055 19 19 40 19.4 131.7 -3.3 -42.7 -6 1 1 917 21 09 32 21 10 42 =2232-211 19 20 50 19.6 131.9 -3.2 -42.5 64 F 1 922 21 09 32 21 10 42 J2244-2027 19 20 50 18.4 129.9 -3.4 -44.0 -8 1 1 922 21 10 42 21 11 52 --- 19 22 00 18.6 130.1 -3.4 -43.8 62 F 1 926 21 10 42 21 12 27 J2234-2055 19 22 35 19.9 132.2 -3.2 -42.3 26 1 1 926 21 12 27 21 13 07 =2232-211 19 23 15 20.0 132.3 -3.2 -42.2 40 F 1 929 21 12 45 21 13 07 J2244-2027 19 23 15 18.8 130.3 -3.4 -43.6 -8 1 1 929 21 13 07 21 14 17 --- 19 24 25 19.0 130.5 -3.3 -43.5 62 F 1 933 21 13 07 21 14 17 J2234-2055 19 24 25 20.1 132.6 -3.2 -42.0 -8 1 1 933 21 14 17 21 15 27 =2232-211 19 25 35 20.3 132.8 -3.2 -41.8 62 F 1 938 21 14 17 21 15 27 GJ867B 19 25 35 20.0 131.9 -3.2 -42.5 -6 1 1 938 21 15 27 21 18 27 --- 19 28 36 20.4 132.4 -3.2 -42.0 174 F 1 950 21 15 27 21 18 27 J2234-2055 19 28 36 20.8 133.3 -3.1 -41.3 -6 1 1 950 21 18 27 21 19 37 =2232-211 19 29 46 21.0 133.6 -3.1 -41.2 64 F 1 954 21 18 27 21 19 37 GJ867B 19 29 46 20.6 132.6 -3.2 -41.8 -6 1 1 954 21 19 37 21 22 37 --- 19 32 46 21.1 133.2 -3.1 -41.4 174 F 1 966 21 19 37 21 22 37 J2234-2055 19 32 46 21.4 134.1 -3.0 -40.7 -6 1 1 966 21 22 37 21 23 47 =2232-211 19 33 57 21.6 134.3 -3.0 -40.5 64 F 1 970 21 22 37 Schedule for VLBA_KP (Code Kp ) Page 12 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 21 23 47 GJ867B 19 33 57 21.3 133.4 -3.1 -41.2 -6 1 1 970 21 23 47 21 26 47 --- 19 36 57 21.7 134.0 -3.0 -40.7 174 F 1 982 21 23 47 21 26 47 J2234-2055 19 36 57 22.1 134.9 -3.0 -40.0 -6 1 1 982 21 26 47 21 27 57 =2232-211 19 38 07 22.2 135.1 -3.0 -39.8 64 F 1 986 21 26 47 21 27 57 GJ867B 19 38 07 21.9 134.2 -3.0 -40.5 -6 1 1 986 21 27 57 21 30 57 --- 19 41 08 22.4 134.8 -3.0 -40.0 174 F 1 998 21 27 57 21 30 57 J2234-2055 19 41 08 22.7 135.7 -2.9 -39.3 -6 1 1 998 21 30 57 21 32 07 =2232-211 19 42 18 22.9 136.0 -2.9 -39.1 64 F 1 1003 21 30 57 21 32 07 GJ867B 19 42 18 22.5 135.0 -2.9 -39.8 -6 1 1 1003 21 32 07 21 35 07 --- 19 45 18 23.0 135.6 -2.9 -39.4 174 F 1 1014 21 32 07 21 35 07 J2234-2055 19 45 18 23.3 136.6 -2.8 -38.6 -6 1 1 1014 21 35 07 21 36 17 =2232-211 19 46 29 23.5 136.8 -2.8 -38.4 64 F 1 1019 21 35 07 21 36 17 J2244-2027 19 46 29 22.5 134.7 -3.0 -40.1 -8 1 1 1019 21 36 17 21 37 27 --- 19 47 39 22.7 134.9 -2.9 -39.9 62 F 1 1023 21 36 17 21 38 02 J2234-2055 19 48 14 23.7 137.1 -2.8 -38.1 27 1 1 1023 21 38 02 21 38 42 =2232-211 19 48 54 23.8 137.3 -2.8 -38.0 40 F 1 1026 21 38 20 21 38 42 J2244-2027 19 48 54 22.8 135.1 -2.9 -39.7 -8 1 1 1026 21 38 42 21 39 52 --- 19 50 04 23.0 135.4 -2.9 -39.5 62 F 1 1030 21 38 42 21 39 52 J2234-2055 19 50 04 24.0 137.5 -2.8 -37.8 -8 1 1 1030 21 39 52 21 41 02 =2232-211 19 51 14 24.2 137.7 -2.7 -37.6 62 F 1 1035 21 39 52 21 41 02 GJ867B 19 51 14 23.9 136.8 -2.8 -38.4 -6 1 1 1035 21 41 02 21 44 02 --- 19 54 15 24.3 137.4 -2.7 -37.9 174 F 1 1046 21 41 02 21 44 02 J2234-2055 19 54 15 24.6 138.4 -2.7 -37.1 -6 1 1 1046 21 44 02 21 45 12 =2232-211 19 55 25 24.8 138.6 -2.7 -36.9 64 F 1 1051 21 44 02 21 45 12 GJ867B 19 55 25 24.5 137.6 -2.7 -37.6 -6 1 1 1051 21 45 12 21 48 12 --- 19 58 25 24.9 138.2 -2.7 -37.1 174 F 1 1063 21 45 12 21 48 12 J2234-2055 19 58 25 25.2 139.2 -2.6 -36.4 -6 1 1 1063 21 48 12 21 49 22 =2232-211 19 59 35 25.3 139.5 -2.6 -36.2 64 F 1 1067 21 48 12 Schedule for VLBA_KP (Code Kp ) Page 13 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 21 49 22 GJ867B 19 59 35 25.0 138.5 -2.7 -36.9 -6 1 1 1067 21 49 22 21 52 22 --- 20 02 36 25.5 139.1 -2.6 -36.4 174 F 1 1079 21 49 22 21 52 22 J2234-2055 20 02 36 25.7 140.1 -2.5 -35.6 -6 1 1 1079 21 52 22 21 53 32 =2232-211 20 03 46 25.9 140.3 -2.5 -35.4 64 F 1 1083 21 52 22 21 53 32 GJ867B 20 03 46 25.6 139.3 -2.6 -36.2 -6 1 1 1083 21 53 32 21 56 32 --- 20 06 47 26.0 140.0 -2.5 -35.6 174 F 1 1095 21 53 32 21 56 32 J2234-2055 20 06 47 26.3 141.0 -2.5 -34.9 -6 1 1 1095 21 56 32 21 57 42 =2232-211 20 07 57 26.5 141.2 -2.5 -34.6 64 F 1 1099 21 56 32 21 57 42 GJ867B 20 07 57 26.2 140.2 -2.5 -35.4 -6 1 1 1099 21 57 42 22 00 42 --- 20 10 57 26.6 140.9 -2.5 -34.9 174 F 1 1111 21 57 42 22 00 42 J2234-2055 20 10 57 26.9 141.9 -2.4 -34.1 -6 1 1 1111 22 00 42 22 01 52 =2232-211 20 12 07 27.0 142.1 -2.4 -33.9 64 F 1 1115 22 00 42 22 01 52 J2244-2027 20 12 07 26.2 139.9 -2.5 -35.7 -8 1 1 1115 22 01 52 22 03 02 --- 20 13 18 26.3 140.1 -2.5 -35.5 62 F 1 1120 22 01 52 22 03 36 J2234-2055 20 13 52 27.2 142.5 -2.4 -33.5 27 1 1 1120 22 03 36 22 04 16 =2232-211 20 14 33 27.3 142.7 -2.3 -33.4 40 F 1 1123 22 03 54 22 04 16 J2244-2027 20 14 33 26.5 140.4 -2.5 -35.3 -8 1 1 1123 22 04 16 22 05 26 --- 20 15 43 26.7 140.6 -2.5 -35.0 62 F 1 1127 22 04 16 22 05 26 J2234-2055 20 15 43 27.5 142.9 -2.3 -33.2 -8 1 1 1127 22 05 26 22 06 36 =2232-211 20 16 53 27.6 143.2 -2.3 -33.0 62 F 1 1132 22 05 26 22 06 36 GJ867B 20 16 53 27.4 142.2 -2.4 -33.8 -6 1 1 1132 22 06 36 22 09 36 --- 20 19 53 27.8 142.8 -2.3 -33.2 174 F 1 1143 22 06 36 22 09 36 J2234-2055 20 19 53 28.0 143.9 -2.3 -32.4 -6 1 1 1143 22 09 36 22 10 46 =2232-211 20 21 04 28.2 144.1 -2.2 -32.2 64 F 1 1148 22 09 36 22 10 46 GJ867B 20 21 04 27.9 143.1 -2.3 -33.0 -6 1 1 1148 22 10 46 22 13 46 --- 20 24 04 28.3 143.8 -2.3 -32.4 174 F 1 1159 22 10 46 22 13 46 J2234-2055 20 24 04 28.5 144.8 -2.2 -31.6 -6 1 1 1159 22 13 46 22 14 56 =2232-211 20 25 14 28.7 145.1 -2.2 -31.3 64 F 1 1164 22 13 46 Schedule for VLBA_KP (Code Kp ) Page 14 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 22 14 56 GJ867B 20 25 14 28.5 144.0 -2.2 -32.2 -6 1 1 1164 22 14 56 22 17 56 --- 20 28 15 28.8 144.7 -2.2 -31.6 174 F 1 1175 22 14 56 22 17 56 J2234-2055 20 28 15 29.0 145.7 -2.1 -30.7 -6 1 1 1175 22 17 56 22 19 06 =2232-211 20 29 25 29.2 146.0 -2.1 -30.5 64 F 1 1180 22 17 56 22 19 06 GJ867B 20 29 25 29.0 145.0 -2.2 -31.4 -6 1 1 1180 22 19 06 22 22 06 --- 20 32 25 29.3 145.7 -2.1 -30.8 174 F 1 1192 22 19 06 22 22 06 J2234-2055 20 32 25 29.5 146.7 -2.0 -29.9 -6 1 1 1192 22 22 06 22 23 16 =2232-211 20 33 36 29.7 147.0 -2.0 -29.7 64 F 1 1196 22 22 06 22 23 16 GJ867B 20 33 36 29.5 145.9 -2.1 -30.5 -6 1 1 1196 22 23 16 22 26 16 --- 20 36 36 29.8 146.6 -2.0 -29.9 174 F 1 1208 22 23 16 22 26 16 J2234-2055 20 36 36 30.0 147.7 -2.0 -29.0 -6 1 1 1208 22 26 16 22 27 26 =2232-211 20 37 46 30.1 148.0 -2.0 -28.8 64 F 1 1212 22 26 16 22 27 26 J2244-2027 20 37 46 29.5 145.6 -2.1 -30.8 -8 1 1 1212 22 27 26 22 28 36 --- 20 38 57 29.6 145.8 -2.1 -30.6 62 F 1 1217 22 27 26 22 29 11 J2234-2055 20 39 31 30.3 148.4 -1.9 -28.4 27 1 1 1217 22 29 11 22 29 51 =2232-211 20 40 11 30.4 148.5 -1.9 -28.3 40 F 1 1219 22 29 29 22 29 51 J2244-2027 20 40 11 29.8 146.1 -2.1 -30.3 -8 1 1 1219 22 29 51 22 31 01 --- 20 41 21 29.9 146.4 -2.1 -30.1 62 F 1 1224 22 29 51 22 31 01 J2234-2055 20 41 21 30.5 148.8 -1.9 -28.0 -8 1 1 1224 22 31 01 22 32 11 =2232-211 20 42 32 30.7 149.1 -1.9 -27.8 62 F 1 1228 22 31 01 22 32 11 GJ867B 20 42 32 30.5 148.0 -1.9 -28.7 -6 1 1 1228 22 32 11 22 35 11 --- 20 45 32 30.8 148.7 -1.9 -28.0 174 F 1 1240 22 32 11 22 35 11 J2234-2055 20 45 32 31.0 149.8 -1.8 -27.2 -6 1 1 1240 22 35 11 22 36 21 =2232-211 20 46 42 31.1 150.1 -1.8 -26.9 64 F 1 1244 22 35 11 22 36 21 GJ867B 20 46 42 31.0 149.0 -1.9 -27.8 -6 1 1 1244 22 36 21 22 39 21 --- 20 49 43 31.3 149.8 -1.8 -27.2 174 F 1 1256 22 36 21 22 39 21 J2234-2055 20 49 43 31.4 150.8 -1.8 -26.3 -6 1 1 1256 22 39 21 22 40 31 =2232-211 20 50 53 31.5 151.1 -1.7 -26.0 64 F 1 1261 22 39 21 Schedule for VLBA_KP (Code Kp ) Page 15 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 22 40 31 GJ867B 20 50 53 31.4 150.0 -1.8 -26.9 -6 1 1 1261 22 40 31 22 43 31 --- 20 53 54 31.7 150.8 -1.8 -26.3 174 F 1 1272 22 40 31 22 43 31 J2234-2055 20 53 54 31.8 151.9 -1.7 -25.3 -6 1 1 1272 22 43 31 22 44 41 =2232-211 20 55 04 32.0 152.2 -1.7 -25.1 64 F 1 1277 22 43 31 22 44 41 GJ867B 20 55 04 31.9 151.1 -1.7 -26.0 -6 1 1 1277 22 44 41 22 47 41 --- 20 58 04 32.2 151.8 -1.7 -25.3 174 F 1 1288 22 44 41 22 47 41 J2234-2055 20 58 04 32.3 152.9 -1.6 -24.4 -6 1 1 1288 22 47 41 22 48 51 =2232-211 20 59 14 32.4 153.2 -1.6 -24.2 64 F 1 1293 22 47 41 22 48 51 GJ867B 20 59 14 32.3 152.1 -1.7 -25.1 -6 1 1 1293 22 48 51 22 51 51 --- 21 02 15 32.6 152.9 -1.6 -24.4 174 F 1 1304 22 48 51 22 51 51 J2234-2055 21 02 15 32.7 154.0 -1.6 -23.5 -6 1 1 1304 22 51 51 22 53 01 =2232-211 21 03 25 32.8 154.3 -1.5 -23.2 64 F 1 1309 22 51 51 22 53 01 J2244-2027 21 03 25 32.3 151.7 -1.7 -25.4 -8 1 1 1309 22 53 01 22 54 11 --- 21 04 35 32.4 152.0 -1.7 -25.1 62 F 1 1313 22 53 01 22 54 45 J2234-2055 21 05 10 32.9 154.7 -1.5 -22.8 27 1 1 1313 22 54 45 22 55 25 =2232-211 21 05 50 33.0 154.9 -1.5 -22.7 40 F 1 1316 22 55 03 22 55 25 J2244-2027 21 05 50 32.5 152.3 -1.6 -24.9 -8 1 1 1316 22 55 25 22 56 35 --- 21 07 00 32.7 152.6 -1.6 -24.6 62 F 1 1321 22 55 25 22 56 35 J2234-2055 21 07 00 33.1 155.2 -1.5 -22.4 -8 1 1 1321 22 56 35 22 57 45 =2232-211 21 08 10 33.2 155.5 -1.5 -22.1 62 F 1 1325 22 56 35 22 57 45 GJ867B 21 08 10 33.1 154.4 -1.5 -23.1 -6 1 1 1325 22 57 45 23 00 45 --- 21 11 11 33.4 155.2 -1.5 -22.4 174 F 1 1337 22 57 45 23 00 45 J2234-2055 21 11 11 33.4 156.3 -1.4 -21.4 -6 1 1 1337 23 00 45 23 01 55 =2232-211 21 12 21 33.5 156.6 -1.4 -21.2 64 F 1 1341 23 00 45 23 01 55 GJ867B 21 12 21 33.5 155.5 -1.4 -22.1 -6 1 1 1341 23 01 55 23 04 55 --- 21 15 21 33.8 156.2 -1.4 -21.4 174 F 1 1353 23 01 55 23 04 55 J2234-2055 21 15 21 33.8 157.4 -1.3 -20.4 -6 1 1 1353 23 04 55 23 06 05 =2232-211 21 16 32 33.9 157.7 -1.3 -20.2 64 F 1 1357 23 04 55 Schedule for VLBA_KP (Code Kp ) Page 16 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 23 06 05 GJ867B 21 16 32 33.9 156.6 -1.4 -21.1 -6 1 1 1357 23 06 05 23 09 05 --- 21 19 32 34.1 157.3 -1.3 -20.4 174 F 1 1369 23 06 05 23 09 05 J2234-2055 21 19 32 34.1 158.5 -1.3 -19.5 -6 1 1 1369 23 09 05 23 10 15 =2232-211 21 20 42 34.2 158.8 -1.2 -19.2 64 F 1 1373 23 09 05 23 10 15 GJ867B 21 20 42 34.2 157.7 -1.3 -20.2 -6 1 1 1373 23 10 15 23 13 15 --- 21 23 43 34.4 158.5 -1.3 -19.4 174 F 1 1385 23 10 15 23 13 15 J2234-2055 21 23 43 34.4 159.6 -1.2 -18.5 -6 1 1 1385 23 13 15 23 14 25 =2232-211 21 24 53 34.5 159.9 -1.2 -18.2 64 F 1 1390 23 13 15 23 14 25 GJ867B 21 24 53 34.5 158.8 -1.2 -19.2 -6 1 1 1390 23 14 25 23 17 25 --- 21 27 53 34.8 159.6 -1.2 -18.4 174 F 1 1401 23 14 25 23 17 25 J2234-2055 21 27 53 34.7 160.7 -1.1 -17.4 -6 1 1 1401 23 17 25 23 18 35 =2232-211 21 29 04 34.8 161.0 -1.1 -17.2 64 F 1 1406 23 17 25 23 18 35 J2244-2027 21 29 04 34.6 158.4 -1.3 -19.5 -8 1 1 1406 23 18 35 23 19 45 --- 21 30 14 34.7 158.7 -1.2 -19.2 62 F 1 1410 23 18 35 23 20 19 J2234-2055 21 30 48 34.9 161.5 -1.1 -16.7 26 1 1 1410 23 20 19 23 20 59 =2232-211 21 31 28 35.0 161.7 -1.1 -16.6 40 F 1 1413 23 20 37 23 20 59 J2244-2027 21 31 28 34.8 159.0 -1.2 -18.9 -8 1 1 1413 23 20 59 23 22 09 --- 21 32 38 34.9 159.3 -1.2 -18.6 62 F 1 1417 23 20 59 23 22 09 J2234-2055 21 32 38 35.1 162.0 -1.0 -16.3 -8 1 1 1417 23 22 09 23 23 19 =2232-211 21 33 48 35.1 162.3 -1.0 -16.0 62 F 1 1422 23 22 09 23 23 19 GJ867B 21 33 48 35.2 161.2 -1.1 -17.0 -6 1 1 1422 23 23 19 23 26 19 --- 21 36 49 35.4 162.0 -1.0 -16.2 174 F 1 1433 23 23 19 23 26 19 J2234-2055 21 36 49 35.3 163.2 -1.0 -15.2 -6 1 1 1433 23 26 19 23 27 29 =2232-211 21 37 59 35.4 163.5 -1.0 -15.0 64 F 1 1438 23 26 19 23 27 29 GJ867B 21 37 59 35.5 162.3 -1.0 -16.0 -6 1 1 1438 23 27 29 23 30 29 --- 21 40 59 35.7 163.2 -1.0 -15.2 174 F 1 1450 23 27 29 23 30 29 J2234-2055 21 40 59 35.6 164.3 -0.9 -14.2 -6 1 1 1450 23 30 29 23 31 39 =2232-211 21 42 10 35.7 164.7 -0.9 -13.9 64 F 1 1454 23 30 29 Schedule for VLBA_KP (Code Kp ) Page 17 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 15 Dec 2007 Day 349 --- 23 31 39 GJ867B 21 42 10 35.7 163.5 -1.0 -14.9 -6 1 1 1454 23 31 39 23 34 39 --- 21 45 10 35.9 164.3 -0.9 -14.2 174 F 1 1466 23 31 39 23 34 39 J2234-2055 21 45 10 35.8 165.5 -0.8 -13.1 -6 1 1 1466 23 34 39 23 35 49 =2232-211 21 46 20 35.9 165.8 -0.8 -12.9 64 F 1 1470 23 34 39 23 35 49 GJ867B 21 46 20 36.0 164.7 -0.9 -13.9 -6 1 1 1470 23 35 49 23 38 49 --- 21 49 21 36.1 165.5 -0.8 -13.1 174 F 1 1482 23 35 49 23 38 49 J2234-2055 21 49 21 36.0 166.7 -0.8 -12.1 -6 1 1 1482 23 38 49 23 39 59 =2232-211 21 50 31 36.1 167.0 -0.7 -11.8 64 F 1 1486 23 38 49 23 39 59 GJ867B 21 50 31 36.2 165.8 -0.8 -12.8 -6 1 1 1486 23 39 59 23 42 59 --- 21 53 32 36.3 166.7 -0.8 -12.0 174 F 1 1498 23 39 59 23 42 59 J2234-2055 21 53 32 36.2 167.9 -0.7 -11.0 -6 1 1 1498 23 42 59 23 44 09 =2232-211 21 54 42 36.3 168.2 -0.7 -10.7 64 F 1 1502 23 42 59 23 44 09 J2244-2027 21 54 42 36.3 165.5 -0.8 -13.1 -8 1 1 1502 23 44 09 23 45 19 --- 21 55 52 36.3 165.8 -0.8 -12.8 62 F 1 1507 23 44 09 23 45 53 J2234-2055 21 56 26 36.3 168.7 -0.6 -10.3 26 1 1 1507 23 45 53 23 46 33 =2232-211 21 57 06 36.4 168.9 -0.6 -10.1 40 F 1 1510 23 46 11 23 46 33 J2244-2027 21 57 06 36.4 166.1 -0.8 -12.5 -8 1 1 1510 23 46 33 23 47 43 --- 21 58 16 36.5 166.5 -0.8 -12.2 62 F 1 1514 23 46 33 23 47 43 J2234-2055 21 58 16 36.4 169.2 -0.6 -9.8 -8 1 1 1514 23 47 43 23 48 53 =2232-211 21 59 26 36.5 169.5 -0.6 -9.5 62 F 1 1519 23 47 43 23 48 53 GJ867B 21 59 26 36.6 168.4 -0.7 -10.5 -6 1 1 1519 23 48 53 23 51 53 --- 22 02 26 36.7 169.2 -0.6 -9.7 174 F 1 1530 23 48 53 23 51 53 J2234-2055 22 02 26 36.6 170.4 -0.5 -8.7 -6 1 1 1530 23 51 53 23 53 03 =2232-211 22 03 37 36.6 170.7 -0.5 -8.4 64 F 1 1535 23 51 53 23 53 03 GJ867B 22 03 37 36.8 169.6 -0.6 -9.4 -6 1 1 1535 23 53 03 23 56 03 --- 22 06 37 36.9 170.5 -0.5 -8.6 174 F 1 1546 23 53 03 23 56 03 J2234-2055 22 06 37 36.7 171.6 -0.5 -7.6 -6 1 1 1546 23 56 03 23 57 13 =2232-211 22 07 47 36.8 171.9 -0.5 -7.3 64 F 1 1551 23 56 03 Schedule for VLBA_KP (Code Kp ) Page 18 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Start: Sat 15 Dec 2007 Day 349 -- Stop: Sun 16 Dec 2007 Day 350 --- 23 57 13 GJ867B 22 07 47 36.9 170.8 -0.5 -8.3 -6 1 1 1551 23 57 13 00 00 13 --- 22 10 48 37.0 171.7 -0.5 -7.5 174 F 1 1562 23 57 13 00 00 13 J2234-2055 22 10 48 36.8 172.8 -0.4 -6.5 -6 1 1 1562 00 00 13 00 01 23 =2232-211 22 11 58 36.9 173.2 -0.4 -6.2 64 F 1 1567 00 00 13 00 01 23 GJ867B 22 11 58 37.1 172.0 -0.5 -7.2 -6 1 1 1567 00 01 23 00 04 23 --- 22 14 59 37.1 172.9 -0.4 -6.4 174 F 1 1579 00 01 23 00 04 23 J2234-2055 22 14 59 36.9 174.0 -0.3 -5.4 -6 1 1 1579 00 04 23 00 05 33 =2232-211 22 16 09 37.0 174.4 -0.3 -5.1 64 F 1 1583 00 04 23 00 05 33 GJ867B 22 16 09 37.2 173.2 -0.4 -6.1 -6 1 1 1583 00 05 33 00 08 33 --- 22 19 09 37.3 174.1 -0.3 -5.3 174 F 1 1595 00 05 33 00 08 33 J2234-2055 22 19 09 37.0 175.2 -0.3 -4.3 -6 1 1 1595 00 08 33 00 09 43 =2232-211 22 20 19 37.0 175.6 -0.3 -4.0 64 F 1 1599 00 08 33 00 09 43 J2244-2027 22 20 19 37.3 172.9 -0.4 -6.5 -8 1 1 1599 00 09 43 00 10 53 --- 22 21 30 37.3 173.2 -0.4 -6.2 62 F 1 1604 00 09 43 00 10 53 J2234-2055 22 21 30 37.1 175.9 -0.2 -3.7 -8 1 1 1604 00 10 53 00 12 03 =2232-211 22 22 40 37.1 176.3 -0.2 -3.4 62 F 1 1608 00 10 53 00 14 23 3C454.3 22 25 00 72.9 155.4 -0.5 -21.6 62 1 1 1608 00 14 23 00 16 23 --- 22 27 01 73.1 156.9 -0.5 -20.3 120 F 1 1616 00 14 41 00 18 44 J2234-2055 22 29 22 37.1 178.2 -0.1 -1.6 63 1 1 1616 00 18 44 00 19 24 =2232-211 22 30 02 37.2 178.4 -0.1 -1.4 40 F 1 1619 00 19 02 00 19 24 J2244-2027 22 30 02 37.5 175.7 -0.2 -3.9 -8 1 1 1619 00 19 24 00 20 34 --- 22 31 12 37.5 176.0 -0.2 -3.6 62 F 1 1623 00 19 24 00 20 34 J2234-2055 22 31 12 37.2 178.8 -0.1 -1.1 -8 1 1 1623 00 20 34 00 21 44 =2232-211 22 32 23 37.2 179.1 -0.1 -0.8 62 F 1 1628 00 20 34 00 21 44 GJ867B 22 32 23 37.4 178.0 -0.1 -1.8 -6 1 1 1628 00 21 44 00 24 44 --- 22 35 23 37.5 178.9 -0.1 -1.0 174 F 1 1639 00 21 44 00 24 44 J2234-2055 22 35 23 37.2 180.0 0.0 0.0 -6 1 1 1639 00 24 44 00 25 54 =2232-211 22 36 33 37.2 180.3 0.0 0.3 64 F 1 1644 00 24 44 Schedule for VLBA_KP (Code Kp ) Page 19 RIPL: GJ729/GJ867B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 16 Dec 2007 Day 350 --- 00 25 54 GJ867B 22 36 33 37.5 179.2 0.0 -0.7 -6 1 1 1644 00 25 54 00 28 54 --- 22 39 34 37.5 180.1 0.0 0.1 174 F 1 1655 00 25 54 00 28 54 J2234-2055 22 39 34 37.2 181.2 0.1 1.1 -6 1 1 1655 00 28 54 00 30 04 =2232-211 22 40 44 37.2 181.6 0.1 1.4 64 F 1 1660 00 28 54 00 30 04 GJ867B 22 40 44 37.5 180.5 0.0 0.4 -6 1 1 1660 00 30 04 00 33 04 --- 22 43 45 37.5 181.3 0.1 1.2 174 F 1 1672 00 30 04 00 33 04 J2234-2055 22 43 45 37.1 182.4 0.1 2.2 -6 1 1 1672 00 33 04 00 34 14 =2232-211 22 44 55 37.1 182.8 0.2 2.5 64 F 1 1676 00 33 04 00 34 14 GJ867B 22 44 55 37.5 181.7 0.1 1.5 -6 1 1 1676 00 34 14 00 37 14 --- 22 47 55 37.4 182.6 0.1 2.3 174 F 1 1688 00 34 14 00 37 14 J2234-2055 22 47 55 37.1 183.7 0.2 3.3 -6 1 1 1688 00 37 14 00 38 24 =2232-211 22 49 05 37.1 184.0 0.2 3.6 64 F 1 1692 00 37 14 00 38 24 GJ867B 22 49 05 37.4 182.9 0.2 2.6 -6 1 1 1692 00 38 24 00 41 24 --- 22 52 06 37.4 183.8 0.2 3.4 174 F 1 1704 00 38 24 00 41 24 J2234-2055 22 52 06 37.0 184.9 0.3 4.4 -6 1 1 1704 00 41 24 00 42 34 =2232-211 22 53 16 37.0 185.2 0.3 4.7 64 F 1 1708 00 41 24 00 42 34 J2244-2027 22 53 16 37.6 182.6 0.1 2.3 -8 1 1 1708 00 42 34 00 43 44 --- 22 54 26 37.6 182.9 0.2 2.6 62 F 1 1713 00 42 34 00 43 44 J2234-2055 22 54 26 37.0 185.6 0.3 5.1 -8 1 1 1713 00 43 44 00 44 54 =2232-211 22 55 36 36.9 185.9 0.3 5.4 62 F 1 1717 00 43 44 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 7 Station: VLBA_KP Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 7 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ729/GJ867B Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * J1854-2428 18 51 47.245372 * 18 54 50.671300 18 55 19.023247 0.00 -24 32 19.79457 *-24 28 28.73010 -24 27 59.41476 0.00 From catalog imbedded in main SCHED input file. 0.311 scan hours, 11.648 baseline hours above horizon. * GJ729 18 46 47.038189 * 18 49 49.732110 18 50 17.957315 0.00 -23 53 41.66100 *-23 50 11.96788 -23 49 45.90534 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 91.071 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 18 49 49.362500 Dec = -23 50 10.43700 Rates: RA = 637.57 mas/yr Dec = -192.47 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54449.7035 Rates: RA = 0.12722E-03 s/day Dec = -0.52695E-03 arcsec/day * J2244-2027 22 41 26.545058 * 22 44 08.617920 22 44 34.710706 0.00 -20 43 08.43707 *-20 27 22.50440 -20 24 57.37162 0.00 From catalog imbedded in main SCHED input file. 0.350 scan hours, 14.116 baseline hours above horizon. * GJ867B 22 36 02.850050 * 22 38 45.551914 22 39 11.711770 0.00 -20 52 30.46639 *-20 36 52.58518 -20 34 28.91181 0.00 From catalog imbedded in main SCHED input file. 2.250 scan hours, 107.098 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 22 38 45.310000 Dec = -20 36 52.10000 Rates: RA = 427.00 mas/yr Dec = -61.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54449.7035 Rates: RA = 0.83269E-04 s/day Dec = -0.16701E-03 arcsec/day * J1733-1304 17 30 13.535187 * 17 33 02.705785 17 33 28.710790 0.21 1730-130 -13 02 45.83975 *-13 04 49.54823 -13 05 14.94756 0.30 J1733-13 /home/arana/cwalker/sched/catalogs/sources.vlba NRAO530 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.200 scan hours, 9.666 baseline hours above horizon. * J1845-2200 18 42 39.571008 * 18 45 39.902835 18 46 07.750313 1.40 -22 03 48.51787 *-22 00 36.57988 -22 00 13.09537 2.17 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.061 scan hours, 43.347 baseline hours above horizon. * J2234-2055 22 32 14.197488 * 22 34 57.440337 22 35 23.664271 1.03 2232-211 -21 10 35.12106 *-20 55 03.23799 -20 52 40.70583 1.82 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.189 scan hours, 51.610 baseline hours above horizon. J2253+1608 22 51 29.519744 * 22 53 57.747943 22 54 21.393151 0.31 2251+158 15 52 54.34806 * 16 08 53.56089 16 11 33.90775 0.20 * 3C454.3 /home/arana/cwalker/sched/catalogs/sources.vlba J2253+16 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.033 scan hours, 1.833 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) J1854-2428 19.1 GJ729 18.0 J2244-2027 71.7 GJ867B 70.5 J1733-1304 10.2 J1845-2200 17.2 J2234-2055 69.5 3C454.3 88.1 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg