COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: RIPL: GJ803/4247 Exp. Code: BB240H Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for VLBA_PT (Code Pt ) Page 2 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 17 00 00 3C345 14 28 13 62.7 68.4 -2.3 -90.8 0 1 1 0 17 00 00 17 08 00 --- 14 36 14 64.2 68.3 -2.1 -92.2 480 F 1 31 17 00 18 17 20 26 J2205+2926 14 48 42 2.2 55.3 -7.3 D -51.3 616 1 1 31 17 20 26 17 21 06 --- 14 49 22 2.4 55.4 -7.3 -51.3 0 F 1 34 17 20 44 17 22 16 J2205+2926 14 50 32 2.6 55.5 -7.3 -51.5 64 1 1 34 17 22 16 17 23 26 --- 14 51 42 2.8 55.7 -7.2 -51.6 70 F 1 38 17 22 34 17 23 26 GJ4247 14 51 42 2.8 57.2 -7.2 -52.1 -7 1 1 38 17 23 26 17 26 26 --- 14 54 43 3.4 57.6 -7.1 -52.4 173 F 1 50 17 23 26 17 26 26 J2205+2926 14 54 43 3.3 56.1 -7.2 -52.0 -7 1 1 50 17 26 26 17 27 36 --- 14 55 53 3.5 56.2 -7.2 -52.1 63 F 1 54 17 26 26 17 27 36 GJ4247 14 55 53 3.6 57.8 -7.1 -52.6 -7 1 1 54 17 27 36 17 30 36 --- 14 58 54 4.1 58.2 -7.0 -52.9 173 F 1 66 17 27 36 17 30 36 J2205+2926 14 58 54 4.0 56.6 -7.1 -52.4 -7 1 1 66 17 30 36 17 31 46 --- 15 00 04 4.2 56.8 -7.1 -52.6 63 F 1 70 17 30 36 17 31 46 GJ4247 15 00 04 4.3 58.3 -7.0 -53.0 -7 1 1 70 17 31 46 17 34 46 --- 15 03 04 4.8 58.7 -7.0 -53.3 173 F 1 82 17 31 46 17 34 46 J2205+2926 15 03 04 4.7 57.2 -7.1 -52.9 -7 1 1 82 17 34 46 17 35 56 --- 15 04 14 4.9 57.3 -7.0 -53.0 63 F 1 86 17 34 46 17 35 56 GJ4247 15 04 14 5.0 58.9 -7.0 -53.5 -7 1 1 86 17 35 56 17 38 56 --- 15 07 15 5.6 59.3 -6.9 -53.8 173 F 1 98 17 35 56 17 38 56 J2205+2926 15 07 15 5.4 57.7 -7.0 -53.4 -7 1 1 98 17 38 56 17 40 06 --- 15 08 25 5.6 57.9 -7.0 -53.5 63 F 1 103 17 38 56 17 40 06 GJ4247 15 08 25 5.8 59.4 -6.9 -53.9 -7 1 1 103 17 40 06 17 43 06 --- 15 11 26 6.3 59.8 -6.8 -54.2 173 F 1 114 17 40 06 Schedule for VLBA_PT (Code Pt ) Page 3 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 17 43 06 J2205+2926 15 11 26 6.2 58.3 -6.9 -53.8 -7 1 1 114 17 43 06 17 44 16 --- 15 12 36 6.4 58.4 -6.9 -54.0 63 F 1 119 17 43 06 17 44 16 J2203+2811 15 12 36 5.9 59.7 -6.9 -54.0 -7 1 1 119 17 44 16 17 45 26 --- 15 13 46 6.2 59.8 -6.8 -54.2 63 F 1 123 17 44 16 17 45 56 J2205+2926 15 14 17 6.7 58.7 -6.9 -54.1 24 1 1 123 17 45 56 17 46 36 --- 15 14 57 6.8 58.7 -6.9 -54.2 40 F 1 126 17 46 14 17 46 36 J2203+2811 15 14 57 6.4 60.0 -6.8 -54.3 -7 1 1 126 17 46 36 17 47 46 --- 15 16 07 6.6 60.1 -6.8 -54.4 63 F 1 130 17 46 36 17 47 46 J2205+2926 15 16 07 7.0 58.9 -6.8 -54.3 -7 1 1 130 17 47 46 17 48 56 --- 15 17 17 7.2 59.0 -6.8 -54.5 63 F 1 135 17 47 46 17 48 56 GJ4247 15 17 17 7.4 60.6 -6.7 -54.8 -7 1 1 135 17 48 56 17 51 56 --- 15 20 18 7.9 60.9 -6.7 -55.1 173 F 1 146 17 48 56 17 51 56 J2205+2926 15 20 18 7.7 59.4 -6.8 -54.8 -7 1 1 146 17 51 56 17 53 06 --- 15 21 28 7.9 59.6 -6.7 -54.9 63 F 1 151 17 51 56 17 53 06 GJ4247 15 21 28 8.1 61.1 -6.7 -55.3 -7 1 1 151 17 53 06 17 56 06 --- 15 24 28 8.6 61.5 -6.6 -55.6 173 F 1 163 17 53 06 17 56 06 J2205+2926 15 24 28 8.5 59.9 -6.7 -55.2 -7 1 1 163 17 56 06 17 57 16 --- 15 25 39 8.7 60.1 -6.7 -55.4 63 F 1 167 17 56 06 17 57 16 GJ4247 15 25 39 8.9 61.6 -6.6 -55.7 -7 1 1 167 17 57 16 18 00 16 --- 15 28 39 9.4 62.0 -6.5 -56.0 173 F 1 179 17 57 16 18 00 16 J2205+2926 15 28 39 9.2 60.5 -6.6 -55.7 -7 1 1 179 18 00 16 18 01 26 --- 15 29 49 9.4 60.6 -6.6 -55.8 63 F 1 183 18 00 16 18 01 26 GJ4247 15 29 49 9.6 62.1 -6.5 -56.1 -7 1 1 183 18 01 26 18 04 26 --- 15 32 50 10.2 62.5 -6.5 -56.4 173 F 1 195 18 01 26 18 04 26 J2205+2926 15 32 50 10.0 61.0 -6.6 -56.1 -7 1 1 195 18 04 26 18 05 36 --- 15 34 00 10.2 61.1 -6.5 -56.2 63 F 1 199 18 04 26 18 05 36 GJ4247 15 34 00 10.4 62.7 -6.5 -56.5 -7 1 1 199 18 05 36 18 08 36 --- 15 37 00 10.9 63.0 -6.4 -56.8 173 F 1 211 18 05 36 Schedule for VLBA_PT (Code Pt ) Page 4 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 18 08 36 J2205+2926 15 37 00 10.7 61.5 -6.5 -56.5 -7 1 1 211 18 08 36 18 09 46 --- 15 38 11 10.9 61.6 -6.5 -56.6 63 F 1 215 18 08 36 18 09 46 J2203+2811 15 38 11 10.6 62.9 -6.4 -56.6 -7 1 1 215 18 09 46 18 10 56 --- 15 39 21 10.8 63.1 -6.4 -56.7 63 F 1 220 18 09 46 18 11 27 J2205+2926 15 39 52 11.3 61.8 -6.4 -56.8 24 1 1 220 18 11 27 18 12 07 --- 15 40 32 11.4 61.9 -6.4 -56.9 40 F 1 223 18 11 45 18 12 07 J2203+2811 15 40 32 11.0 63.2 -6.4 -56.8 -7 1 1 223 18 12 07 18 13 17 --- 15 41 42 11.2 63.4 -6.4 -56.9 63 F 1 227 18 12 07 18 13 17 J2205+2926 15 41 42 11.6 62.1 -6.4 -57.0 -7 1 1 227 18 13 17 18 14 27 --- 15 42 52 11.8 62.2 -6.4 -57.1 63 F 1 232 18 13 17 18 14 27 GJ4247 15 42 52 12.0 63.7 -6.3 -57.3 -7 1 1 232 18 14 27 18 17 27 --- 15 45 53 12.6 64.1 -6.3 -57.6 173 F 1 243 18 14 27 18 17 27 J2205+2926 15 45 53 12.4 62.6 -6.3 -57.4 -7 1 1 243 18 17 27 18 18 37 --- 15 47 03 12.6 62.7 -6.3 -57.5 63 F 1 248 18 17 27 18 18 37 GJ4247 15 47 03 12.8 64.2 -6.2 -57.7 -7 1 1 248 18 18 37 18 21 37 --- 15 50 03 13.4 64.6 -6.2 -58.0 173 F 1 259 18 18 37 18 21 37 J2205+2926 15 50 03 13.1 63.1 -6.3 -57.8 -7 1 1 259 18 21 37 18 22 47 --- 15 51 14 13.3 63.2 -6.2 -57.9 63 F 1 264 18 21 37 18 22 47 GJ4247 15 51 14 13.6 64.8 -6.2 -58.1 -7 1 1 264 18 22 47 18 25 47 --- 15 54 14 14.1 65.1 -6.1 -58.4 173 F 1 275 18 22 47 18 25 47 J2205+2926 15 54 14 13.9 63.6 -6.2 -58.2 -7 1 1 275 18 25 47 18 26 57 --- 15 55 24 14.1 63.7 -6.2 -58.3 63 F 1 280 18 25 47 18 26 57 GJ4247 15 55 24 14.4 65.2 -6.1 -58.5 -7 1 1 280 18 26 57 18 29 57 --- 15 58 25 14.9 65.6 -6.1 -58.7 173 F 1 292 18 26 57 18 29 57 J2205+2926 15 58 25 14.7 64.1 -6.1 -58.6 -7 1 1 292 18 29 57 18 31 07 --- 15 59 35 14.9 64.2 -6.1 -58.7 63 F 1 296 18 29 57 18 31 07 GJ4247 15 59 35 15.1 65.7 -6.0 -58.8 -7 1 1 296 18 31 07 18 34 07 --- 16 02 36 15.7 66.1 -6.0 -59.1 173 F 1 308 18 31 07 Schedule for VLBA_PT (Code Pt ) Page 5 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 18 34 07 J2205+2926 16 02 36 15.4 64.5 -6.1 -59.0 -7 1 1 308 18 34 07 18 35 17 --- 16 03 46 15.7 64.7 -6.0 -59.1 63 F 1 312 18 34 07 18 35 17 J2203+2811 16 03 46 15.4 66.0 -6.0 -58.9 -7 1 1 312 18 35 17 18 36 27 --- 16 04 56 15.6 66.2 -6.0 -59.0 63 F 1 317 18 35 17 18 36 59 J2205+2926 16 05 27 16.0 64.9 -6.0 -59.2 25 1 1 317 18 36 59 18 37 39 --- 16 06 07 16.1 65.0 -6.0 -59.3 40 F 1 319 18 37 17 18 37 39 J2203+2811 16 06 07 15.8 66.3 -6.0 -59.1 -7 1 1 319 18 37 39 18 38 49 --- 16 07 18 16.0 66.4 -6.0 -59.2 63 F 1 324 18 37 39 18 38 49 J2205+2926 16 07 18 16.3 65.1 -6.0 -59.4 -7 1 1 324 18 38 49 18 39 59 --- 16 08 28 16.5 65.2 -6.0 -59.5 63 F 1 328 18 38 49 18 39 59 GJ4247 16 08 28 16.8 66.8 -5.9 -59.6 -7 1 1 328 18 39 59 18 42 59 --- 16 11 28 17.4 67.1 -5.8 -59.9 173 F 1 340 18 39 59 18 42 59 J2205+2926 16 11 28 17.1 65.6 -5.9 -59.8 -7 1 1 340 18 42 59 18 44 09 --- 16 12 38 17.3 65.7 -5.9 -59.9 63 F 1 344 18 42 59 18 44 09 GJ4247 16 12 38 17.6 67.3 -5.8 -60.0 -7 1 1 344 18 44 09 18 47 09 --- 16 15 39 18.2 67.6 -5.8 -60.2 173 F 1 356 18 44 09 18 47 09 J2205+2926 16 15 39 17.9 66.1 -5.8 -60.2 -7 1 1 356 18 47 09 18 48 19 --- 16 16 49 18.1 66.2 -5.8 -60.3 63 F 1 361 18 47 09 18 48 19 GJ4247 16 16 49 18.4 67.7 -5.7 -60.3 -7 1 1 361 18 48 19 18 51 19 --- 16 19 50 19.0 68.1 -5.7 -60.6 173 F 1 372 18 48 19 18 51 19 J2205+2926 16 19 50 18.7 66.5 -5.8 -60.5 -7 1 1 372 18 51 19 18 52 29 --- 16 21 00 18.9 66.7 -5.8 -60.6 63 F 1 377 18 51 19 18 52 29 GJ4247 16 21 00 19.2 68.2 -5.7 -60.7 -7 1 1 377 18 52 29 18 55 29 --- 16 24 00 19.8 68.6 -5.6 -60.9 173 F 1 388 18 52 29 18 55 29 J2205+2926 16 24 00 19.5 67.0 -5.7 -60.9 -7 1 1 388 18 55 29 18 56 39 --- 16 25 11 19.7 67.1 -5.7 -61.0 63 F 1 393 18 55 29 18 56 39 GJ4247 16 25 11 20.0 68.7 -5.6 -61.0 -7 1 1 393 18 56 39 18 59 39 --- 16 28 11 20.6 69.0 -5.6 -61.2 173 F 1 404 18 56 39 Schedule for VLBA_PT (Code Pt ) Page 6 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 18 59 39 J2205+2926 16 28 11 20.3 67.5 -5.6 -61.2 -7 1 1 404 18 59 39 19 00 49 --- 16 29 21 20.5 67.6 -5.6 -61.3 63 F 1 409 18 59 39 19 00 49 J2203+2811 16 29 21 20.2 69.0 -5.6 -61.1 -7 1 1 409 19 00 49 19 01 59 --- 16 30 31 20.5 69.1 -5.6 -61.2 63 F 1 414 19 00 49 19 01 59 J2205+2926 16 30 31 20.7 67.7 -5.6 -61.4 -7 1 1 414 19 01 59 19 03 09 --- 16 31 42 20.9 67.9 -5.6 -61.5 63 F 1 418 19 01 59 19 06 12 J2043-3049 16 34 46 2.4 130.5 -4.1 -47.0 136 1 1 418 19 06 12 19 07 22 --- 16 35 56 2.6 130.7 -4.1 -46.9 70 F 1 423 19 06 30 19 08 32 GJ803 16 37 06 2.1 130.9 -4.1 D -47.0 64 1 1 423 19 08 32 19 11 32 --- 16 40 07 2.6 131.3 -4.1 -46.5 0 F 1 434 19 08 50 19 11 32 J2042-3152 16 40 07 2.6 132.1 -4.1 -46.2 -6 1 1 434 19 11 32 19 12 42 --- 16 41 17 2.8 132.3 -4.0 -46.0 64 F 1 439 19 11 32 19 12 42 GJ803 16 41 17 2.8 131.5 -4.1 -46.4 -6 1 1 439 19 12 42 19 15 42 --- 16 44 17 3.2 132.0 -4.0 -46.0 174 F 1 450 19 12 42 19 15 42 J2042-3152 16 44 17 3.2 132.7 -4.0 -45.6 -6 1 1 450 19 15 42 19 16 52 --- 16 45 28 3.4 132.9 -4.0 -45.5 64 F 1 455 19 15 42 19 16 52 GJ803 16 45 28 3.4 132.1 -4.0 -45.8 -6 1 1 455 19 16 52 19 19 52 --- 16 48 28 3.9 132.6 -4.0 -45.4 174 F 1 466 19 16 52 19 19 52 J2042-3152 16 48 28 3.9 133.3 -3.9 -45.0 -6 1 1 466 19 19 52 19 21 02 --- 16 49 38 4.0 133.5 -3.9 -44.9 64 F 1 471 19 19 52 19 21 02 GJ803 16 49 38 4.0 132.8 -3.9 -45.2 -6 1 1 471 19 21 02 19 24 02 --- 16 52 39 4.5 133.2 -3.9 -44.8 174 F 1 483 19 21 02 19 24 02 J2042-3152 16 52 39 4.5 134.0 -3.8 -44.4 -6 1 1 483 19 24 02 19 25 12 --- 16 53 49 4.7 134.1 -3.8 -44.3 64 F 1 487 19 24 02 19 25 12 GJ803 16 53 49 4.7 133.4 -3.9 -44.6 -6 1 1 487 19 25 12 19 28 12 --- 16 56 49 5.1 133.9 -3.8 -44.2 174 F 1 499 19 25 12 19 28 12 J2042-3152 16 56 49 5.1 134.6 -3.8 -43.8 -6 1 1 499 19 28 12 19 29 22 --- 16 58 00 5.3 134.8 -3.8 -43.7 64 F 1 503 19 28 12 Schedule for VLBA_PT (Code Pt ) Page 7 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 19 29 22 J2043-3049 16 58 00 6.0 134.0 -3.8 -43.8 -7 1 1 503 19 29 22 19 30 32 --- 16 59 10 6.2 134.2 -3.7 -43.6 63 F 1 508 19 29 22 19 31 01 J2042-3152 16 59 38 5.5 135.0 -3.7 -43.4 21 1 1 508 19 31 01 19 31 41 --- 17 00 19 5.6 135.1 -3.7 -43.3 40 F 1 510 19 31 19 19 31 41 J2043-3049 17 00 19 6.3 134.4 -3.7 -43.4 -7 1 1 510 19 31 41 19 32 51 --- 17 01 29 6.5 134.5 -3.7 -43.3 63 F 1 515 19 31 41 19 32 51 J2042-3152 17 01 29 5.8 135.3 -3.7 -43.1 -7 1 1 515 19 32 51 19 34 01 --- 17 02 39 5.9 135.5 -3.7 -43.0 63 F 1 519 19 32 51 19 34 01 GJ803 17 02 39 6.0 134.8 -3.7 -43.4 -6 1 1 519 19 34 01 19 37 01 --- 17 05 39 6.4 135.2 -3.7 -42.9 174 F 1 531 19 34 01 19 37 01 J2042-3152 17 05 39 6.4 136.0 -3.6 -42.5 -6 1 1 531 19 37 01 19 38 11 --- 17 06 50 6.5 136.2 -3.6 -42.3 64 F 1 535 19 37 01 19 38 11 GJ803 17 06 50 6.6 135.4 -3.6 -42.7 -6 1 1 535 19 38 11 19 41 11 --- 17 09 50 7.0 135.9 -3.6 -42.3 174 F 1 547 19 38 11 19 41 11 J2042-3152 17 09 50 7.0 136.6 -3.6 -41.9 -6 1 1 547 19 41 11 19 42 21 --- 17 11 00 7.1 136.8 -3.5 -41.7 64 F 1 552 19 41 11 19 42 21 GJ803 17 11 00 7.2 136.1 -3.6 -42.1 -6 1 1 552 19 42 21 19 45 21 --- 17 14 01 7.6 136.6 -3.5 -41.7 174 F 1 563 19 42 21 19 45 21 J2042-3152 17 14 01 7.6 137.3 -3.5 -41.3 -6 1 1 563 19 45 21 19 46 31 --- 17 15 11 7.7 137.5 -3.5 -41.1 64 F 1 568 19 45 21 19 46 31 GJ803 17 15 11 7.8 136.8 -3.5 -41.5 -6 1 1 568 19 46 31 19 49 31 --- 17 18 11 8.2 137.2 -3.5 -41.0 174 F 1 579 19 46 31 19 49 31 J2042-3152 17 18 11 8.1 138.0 -3.4 -40.6 -6 1 1 579 19 49 31 19 50 41 --- 17 19 22 8.3 138.2 -3.4 -40.4 64 F 1 584 19 49 31 19 50 41 GJ803 17 19 22 8.4 137.4 -3.4 -40.9 -6 1 1 584 19 50 41 19 53 41 --- 17 22 22 8.8 137.9 -3.4 -40.4 174 F 1 595 19 50 41 19 53 41 J2042-3152 17 22 22 8.7 138.7 -3.3 -40.0 -6 1 1 595 19 53 41 19 54 51 --- 17 23 32 8.9 138.9 -3.3 -39.8 64 F 1 600 19 53 41 Schedule for VLBA_PT (Code Pt ) Page 8 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 19 54 51 J2043-3049 17 23 32 9.6 138.1 -3.3 -39.9 -7 1 1 600 19 54 51 19 56 01 --- 17 24 42 9.8 138.3 -3.3 -39.8 63 F 1 604 19 54 51 19 56 30 J2042-3152 17 25 11 9.1 139.1 -3.3 -39.5 21 1 1 604 19 56 30 19 57 10 --- 17 25 51 9.2 139.2 -3.3 -39.4 40 F 1 607 19 56 48 19 57 10 J2043-3049 17 25 51 10.0 138.5 -3.3 -39.6 -7 1 1 607 19 57 10 19 58 20 --- 17 27 02 10.1 138.7 -3.3 -39.4 63 F 1 612 19 57 10 19 58 20 J2042-3152 17 27 02 9.3 139.4 -3.3 -39.2 -8 1 1 612 19 58 20 19 59 30 --- 17 28 12 9.5 139.6 -3.3 -39.0 62 F 1 616 19 58 20 19 59 30 GJ803 17 28 12 9.6 138.9 -3.3 -39.5 -6 1 1 616 19 59 30 20 02 30 --- 17 31 12 10.0 139.4 -3.2 -39.0 174 F 1 628 19 59 30 20 02 30 J2042-3152 17 31 12 9.9 140.1 -3.2 -38.6 -6 1 1 628 20 02 30 20 03 40 --- 17 32 22 10.1 140.3 -3.2 -38.4 64 F 1 632 20 02 30 20 03 40 GJ803 17 32 22 10.2 139.6 -3.2 -38.8 -6 1 1 632 20 03 40 20 06 40 --- 17 35 23 10.6 140.1 -3.2 -38.3 174 F 1 644 20 03 40 20 06 40 J2042-3152 17 35 23 10.5 140.8 -3.1 -37.9 -6 1 1 644 20 06 40 20 07 50 --- 17 36 33 10.6 141.0 -3.1 -37.7 64 F 1 648 20 06 40 20 07 50 GJ803 17 36 33 10.7 140.3 -3.2 -38.1 -6 1 1 648 20 07 50 20 10 50 --- 17 39 34 11.1 140.8 -3.1 -37.7 174 F 1 660 20 07 50 20 10 50 J2042-3152 17 39 34 11.0 141.6 -3.1 -37.2 -6 1 1 660 20 10 50 20 12 00 --- 17 40 44 11.1 141.8 -3.0 -37.0 64 F 1 664 20 10 50 20 12 00 GJ803 17 40 44 11.3 141.0 -3.1 -37.5 -6 1 1 664 20 12 00 20 15 00 --- 17 43 44 11.7 141.5 -3.0 -37.0 174 F 1 676 20 12 00 20 15 00 J2042-3152 17 43 44 11.5 142.3 -3.0 -36.5 -6 1 1 676 20 15 00 20 16 10 --- 17 44 55 11.7 142.5 -3.0 -36.3 64 F 1 681 20 15 00 20 16 10 GJ803 17 44 55 11.8 141.7 -3.0 -36.8 -6 1 1 681 20 16 10 20 19 10 --- 17 47 55 12.2 142.3 -3.0 -36.3 174 F 1 692 20 16 10 20 19 10 J2042-3152 17 47 55 12.1 143.0 -2.9 -35.8 -6 1 1 692 20 19 10 20 20 20 --- 17 49 05 12.2 143.2 -2.9 -35.6 64 F 1 697 20 19 10 Schedule for VLBA_PT (Code Pt ) Page 9 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 20 20 20 J2043-3049 17 49 05 13.0 142.5 -2.9 -35.8 -8 1 1 697 20 20 20 20 21 30 --- 17 50 15 13.2 142.7 -2.9 -35.6 62 F 1 701 20 20 20 20 21 58 J2042-3152 17 50 44 12.4 143.5 -2.9 -35.3 21 1 1 701 20 21 58 20 22 38 --- 17 51 25 12.5 143.6 -2.9 -35.2 40 F 1 704 20 22 16 20 22 38 J2043-3049 17 51 25 13.3 142.9 -2.9 -35.4 -8 1 1 704 20 22 38 20 23 48 --- 17 52 35 13.4 143.2 -2.9 -35.2 62 F 1 708 20 22 38 20 23 48 J2042-3152 17 52 35 12.6 143.8 -2.8 -35.0 -8 1 1 708 20 23 48 20 24 58 --- 17 53 45 12.8 144.1 -2.8 -34.8 62 F 1 713 20 23 48 20 24 58 GJ803 17 53 45 12.9 143.3 -2.9 -35.3 -6 1 1 713 20 24 58 20 27 58 --- 17 56 45 13.3 143.9 -2.8 -34.8 174 F 1 724 20 24 58 20 27 58 J2042-3152 17 56 45 13.1 144.6 -2.8 -34.3 -6 1 1 724 20 27 58 20 29 08 --- 17 57 56 13.3 144.8 -2.8 -34.1 64 F 1 729 20 27 58 20 29 08 GJ803 17 57 56 13.4 144.1 -2.8 -34.6 -6 1 1 729 20 29 08 20 32 08 --- 18 00 56 13.8 144.6 -2.7 -34.1 174 F 1 741 20 29 08 20 32 08 J2042-3152 18 00 56 13.6 145.3 -2.7 -33.6 -6 1 1 741 20 32 08 20 33 18 --- 18 02 06 13.8 145.6 -2.7 -33.4 64 F 1 745 20 32 08 20 33 18 GJ803 18 02 06 13.9 144.8 -2.7 -33.9 -6 1 1 745 20 33 18 20 36 18 --- 18 05 07 14.3 145.4 -2.7 -33.3 174 F 1 757 20 33 18 20 36 18 J2042-3152 18 05 07 14.1 146.1 -2.6 -32.8 -6 1 1 757 20 36 18 20 37 28 --- 18 06 17 14.2 146.3 -2.6 -32.6 64 F 1 761 20 36 18 20 37 28 GJ803 18 06 17 14.4 145.6 -2.7 -33.1 -6 1 1 761 20 37 28 20 40 28 --- 18 09 17 14.8 146.1 -2.6 -32.6 174 F 1 773 20 37 28 20 40 28 J2042-3152 18 09 17 14.6 146.9 -2.6 -32.1 -6 1 1 773 20 40 28 20 41 38 --- 18 10 28 14.7 147.1 -2.5 -31.9 64 F 1 777 20 40 28 20 41 38 GJ803 18 10 28 14.9 146.4 -2.6 -32.4 -6 1 1 777 20 41 38 20 44 38 --- 18 13 28 15.2 146.9 -2.5 -31.8 174 F 1 789 20 41 38 20 44 38 J2042-3152 18 13 28 15.1 147.7 -2.5 -31.3 -6 1 1 789 20 44 38 20 45 48 --- 18 14 38 15.2 147.9 -2.5 -31.1 64 F 1 793 20 44 38 Schedule for VLBA_PT (Code Pt ) Page 10 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 20 45 48 J2043-3049 18 14 38 16.0 147.3 -2.5 -31.3 -8 1 1 793 20 45 48 20 46 58 --- 18 15 49 16.2 147.5 -2.5 -31.1 62 F 1 798 20 45 48 20 46 58 J2042-3152 18 15 49 15.3 148.1 -2.5 -30.9 -8 1 1 798 20 46 58 20 48 08 --- 18 16 59 15.4 148.3 -2.4 -30.7 62 F 1 803 20 46 58 21 00 17 3C345 18 29 09 68.2 292.4 1.8 96.2 617 1 1 803 21 00 17 21 02 17 --- 18 31 10 67.9 292.3 1.8 95.8 120 F 1 810 21 00 35 21 05 58 J2042-3152 18 34 51 17.3 151.8 -2.1 -27.4 114 1 1 810 21 05 58 21 06 38 --- 18 35 31 17.3 151.9 -2.1 -27.2 40 F 1 813 21 06 16 21 06 38 J2043-3049 18 35 31 18.2 151.3 -2.1 -27.5 -8 1 1 813 21 06 38 21 07 48 --- 18 36 41 18.4 151.6 -2.1 -27.2 62 F 1 817 21 06 38 21 07 48 J2042-3152 18 36 41 17.5 152.2 -2.1 -27.0 -8 1 1 817 21 07 48 21 08 58 --- 18 37 52 17.6 152.4 -2.1 -26.8 62 F 1 822 21 07 48 21 08 58 GJ803 18 37 52 17.8 151.7 -2.1 -27.3 -6 1 1 822 21 08 58 21 11 58 --- 18 40 52 18.1 152.3 -2.1 -26.8 174 F 1 833 21 08 58 21 11 58 J2042-3152 18 40 52 17.9 153.0 -2.0 -26.2 -6 1 1 833 21 11 58 21 13 08 --- 18 42 02 18.0 153.2 -2.0 -26.0 64 F 1 838 21 11 58 21 13 08 GJ803 18 42 02 18.2 152.5 -2.1 -26.5 -6 1 1 838 21 13 08 21 16 08 --- 18 45 03 18.5 153.1 -2.0 -25.9 174 F 1 850 21 13 08 21 16 08 J2042-3152 18 45 03 18.2 153.8 -2.0 -25.4 -6 1 1 850 21 16 08 21 17 18 --- 18 46 13 18.3 154.1 -2.0 -25.2 64 F 1 854 21 16 08 21 17 18 GJ803 18 46 13 18.6 153.3 -2.0 -25.7 -6 1 1 854 21 17 18 21 20 18 --- 18 49 13 18.9 153.9 -1.9 -25.1 174 F 1 866 21 17 18 21 20 18 J2042-3152 18 49 13 18.6 154.7 -1.9 -24.6 -6 1 1 866 21 20 18 21 21 28 --- 18 50 24 18.7 154.9 -1.9 -24.4 64 F 1 870 21 20 18 21 21 28 GJ803 18 50 24 19.0 154.2 -1.9 -24.9 -6 1 1 870 21 21 28 21 24 28 --- 18 53 24 19.3 154.8 -1.9 -24.3 174 F 1 882 21 21 28 21 24 28 J2042-3152 18 53 24 19.0 155.5 -1.8 -23.8 -6 1 1 882 21 24 28 21 25 38 --- 18 54 34 19.1 155.8 -1.8 -23.5 64 F 1 886 21 24 28 Schedule for VLBA_PT (Code Pt ) Page 11 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 21 25 38 GJ803 18 54 34 19.4 155.0 -1.9 -24.1 -6 1 1 886 21 25 38 21 28 38 --- 18 57 35 19.6 155.7 -1.8 -23.5 174 F 1 898 21 25 38 21 28 38 J2042-3152 18 57 35 19.3 156.4 -1.8 -22.9 -6 1 1 898 21 28 38 21 29 48 --- 18 58 45 19.4 156.6 -1.7 -22.7 64 F 1 903 21 28 38 21 29 48 J2043-3049 18 58 45 20.4 156.1 -1.7 -22.9 -8 1 1 903 21 29 48 21 30 58 --- 18 59 55 20.5 156.4 -1.7 -22.7 62 F 1 907 21 29 48 21 30 58 J2042-3152 18 59 55 19.5 156.9 -1.7 -22.5 -8 1 1 907 21 30 58 21 32 08 --- 19 01 05 19.6 157.1 -1.7 -22.2 62 F 1 912 21 30 58 21 35 33 J2205+2926 19 04 31 51.5 84.3 -3.0 -70.8 135 1 1 912 21 35 33 21 36 13 --- 19 05 11 51.6 84.3 -3.0 -70.8 40 F 1 914 21 35 51 21 36 13 J2203+2811 19 05 11 51.5 86.5 -3.0 -69.4 -7 1 1 914 21 36 13 21 37 23 --- 19 06 21 51.8 86.6 -3.0 -69.4 63 F 1 919 21 36 13 21 37 23 J2205+2926 19 06 21 51.8 84.5 -3.0 -70.8 -7 1 1 919 21 37 23 21 38 33 --- 19 07 31 52.1 84.6 -3.0 -70.9 63 F 1 923 21 37 23 21 38 33 GJ4247 19 07 31 52.6 86.9 -2.9 -69.6 -8 1 1 923 21 38 33 21 41 33 --- 19 10 32 53.3 87.3 -2.9 -69.7 172 F 1 935 21 38 33 21 41 33 J2205+2926 19 10 32 52.7 85.0 -2.9 -71.0 -8 1 1 935 21 41 33 21 42 43 --- 19 11 42 52.9 85.1 -2.9 -71.0 62 F 1 939 21 41 33 21 42 43 GJ4247 19 11 42 53.5 87.5 -2.8 -69.7 -8 1 1 939 21 42 43 21 45 43 --- 19 14 42 54.1 87.8 -2.8 -69.7 172 F 1 951 21 42 43 21 45 43 J2205+2926 19 14 42 53.6 85.5 -2.9 -71.1 -8 1 1 951 21 45 43 21 46 53 --- 19 15 52 53.8 85.6 -2.8 -71.1 62 F 1 955 21 45 43 21 46 53 GJ4247 19 15 52 54.4 88.0 -2.8 -69.7 -8 1 1 955 21 46 53 21 49 53 --- 19 18 53 55.0 88.4 -2.7 -69.8 172 F 1 967 21 46 53 21 49 53 J2205+2926 19 18 53 54.4 86.0 -2.8 -71.2 -8 1 1 967 21 49 53 21 51 03 --- 19 20 03 54.7 86.1 -2.8 -71.2 62 F 1 972 21 49 53 21 51 03 GJ4247 19 20 03 55.2 88.5 -2.7 -69.8 -8 1 1 972 21 51 03 21 54 03 --- 19 23 04 55.8 89.0 -2.6 -69.8 172 F 1 983 21 51 03 Schedule for VLBA_PT (Code Pt ) Page 12 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 21 54 03 J2205+2926 19 23 04 55.3 86.5 -2.7 -71.3 -8 1 1 983 21 54 03 21 55 13 --- 19 24 14 55.5 86.6 -2.7 -71.3 62 F 1 988 21 54 03 21 55 13 GJ4247 19 24 14 56.1 89.1 -2.6 -69.8 -8 1 1 988 21 55 13 21 58 13 --- 19 27 14 56.7 89.5 -2.6 -69.8 172 F 1 999 21 55 13 21 58 13 J2205+2926 19 27 14 56.1 87.0 -2.6 -71.4 -8 1 1 999 21 58 13 21 59 23 --- 19 28 24 56.4 87.1 -2.6 -71.4 62 F 1 1004 21 58 13 21 59 23 J2203+2811 19 28 24 56.3 89.5 -2.6 -69.6 -8 1 1 1004 21 59 23 22 00 33 --- 19 29 35 56.6 89.7 -2.6 -69.7 62 F 1 1008 21 59 23 22 00 33 J2205+2926 19 29 35 56.6 87.3 -2.6 -71.4 -8 1 1 1008 22 00 33 22 01 43 --- 19 30 45 56.9 87.4 -2.6 -71.5 62 F 1 1013 22 00 33 22 05 24 J2042-3152 19 34 27 21.9 164.3 -1.1 -15.3 145 1 1 1013 22 05 24 22 06 04 --- 19 35 07 21.9 164.4 -1.1 -15.1 40 F 1 1015 22 05 42 22 06 04 J2043-3049 19 35 07 22.9 164.1 -1.1 -15.3 -8 1 1 1015 22 06 04 22 07 14 --- 19 36 17 23.0 164.3 -1.1 -15.1 62 F 1 1020 22 06 04 22 07 14 J2042-3152 19 36 17 22.0 164.7 -1.1 -14.9 -8 1 1 1020 22 07 14 22 08 24 --- 19 37 27 22.1 165.0 -1.1 -14.6 62 F 1 1024 22 07 14 22 08 24 GJ803 19 37 27 22.4 164.3 -1.1 -15.2 -6 1 1 1024 22 08 24 22 11 24 --- 19 40 28 22.6 164.9 -1.1 -14.5 174 F 1 1036 22 08 24 22 11 24 J2042-3152 19 40 28 22.2 165.6 -1.0 -14.0 -7 1 1 1036 22 11 24 22 12 34 --- 19 41 38 22.3 165.9 -1.0 -13.7 63 F 1 1041 22 11 24 22 12 34 GJ803 19 41 38 22.7 165.2 -1.1 -14.3 -7 1 1 1041 22 12 34 22 15 34 --- 19 44 38 22.8 165.9 -1.0 -13.6 173 F 1 1052 22 12 34 22 15 34 J2042-3152 19 44 38 22.4 166.6 -1.0 -13.1 -7 1 1 1052 22 15 34 22 16 44 --- 19 45 48 22.5 166.8 -1.0 -12.8 63 F 1 1057 22 15 34 22 16 44 GJ803 19 45 48 22.9 166.1 -1.0 -13.4 -7 1 1 1057 22 16 44 22 19 44 --- 19 48 49 23.0 166.8 -0.9 -12.7 173 F 1 1068 22 16 44 22 19 44 J2042-3152 19 48 49 22.6 167.5 -0.9 -12.2 -7 1 1 1068 22 19 44 22 20 54 --- 19 49 59 22.7 167.8 -0.9 -11.9 63 F 1 1073 22 19 44 Schedule for VLBA_PT (Code Pt ) Page 13 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 22 20 54 GJ803 19 49 59 23.1 167.1 -0.9 -12.5 -7 1 1 1073 22 20 54 22 23 54 --- 19 53 00 23.2 167.8 -0.9 -11.8 173 F 1 1084 22 20 54 22 23 54 J2042-3152 19 53 00 22.8 168.4 -0.8 -11.2 -7 1 1 1084 22 23 54 22 25 04 --- 19 54 10 22.8 168.7 -0.8 -11.0 63 F 1 1089 22 23 54 22 25 04 GJ803 19 54 10 23.3 168.0 -0.9 -11.6 -7 1 1 1089 22 25 04 22 28 04 --- 19 57 10 23.4 168.7 -0.8 -10.9 173 F 1 1101 22 25 04 22 28 04 J2042-3152 19 57 10 23.0 169.4 -0.8 -10.3 -7 1 1 1101 22 28 04 22 29 14 --- 19 58 20 23.0 169.6 -0.7 -10.1 63 F 1 1105 22 28 04 22 29 14 J2043-3049 19 58 20 24.0 169.4 -0.8 -10.2 -8 1 1 1105 22 29 14 22 30 24 --- 19 59 31 24.1 169.6 -0.7 -10.0 62 F 1 1110 22 29 14 22 30 24 J2042-3152 19 59 31 23.1 169.9 -0.7 -9.8 -8 1 1 1110 22 30 24 22 31 34 --- 20 00 41 23.1 170.2 -0.7 -9.5 62 F 1 1114 22 30 24 22 35 30 J2205+2926 20 04 38 63.9 92.2 -2.0 -71.5 149 1 1 1114 22 35 30 22 36 10 --- 20 05 18 64.0 92.3 -2.0 -71.5 40 F 1 1117 22 35 48 22 36 10 J2203+2811 20 05 18 63.9 95.3 -2.0 -69.0 -8 1 1 1117 22 36 10 22 37 20 --- 20 06 28 64.2 95.5 -2.0 -69.0 62 F 1 1121 22 36 10 22 37 20 J2205+2926 20 06 28 64.2 92.4 -2.0 -71.5 -8 1 1 1121 22 37 20 22 38 30 --- 20 07 38 64.5 92.6 -2.0 -71.5 62 F 1 1126 22 37 20 22 38 30 GJ4247 20 07 38 65.0 95.9 -1.9 -69.0 -8 1 1 1126 22 38 30 22 41 30 --- 20 10 39 65.7 96.5 -1.8 -68.8 172 F 1 1137 22 38 30 22 41 30 J2205+2926 20 10 39 65.1 93.1 -1.9 -71.4 -8 1 1 1137 22 41 30 22 42 40 --- 20 11 49 65.3 93.3 -1.9 -71.3 62 F 1 1142 22 41 30 22 42 40 GJ4247 20 11 49 65.9 96.7 -1.8 -68.8 -8 1 1 1142 22 42 40 22 45 40 --- 20 14 49 66.5 97.3 -1.8 -68.6 172 F 1 1153 22 42 40 22 45 40 J2205+2926 20 14 49 66.0 93.8 -1.9 -71.3 -8 1 1 1153 22 45 40 22 46 50 --- 20 16 00 66.2 94.0 -1.8 -71.2 62 F 1 1158 22 45 40 22 46 50 GJ4247 20 16 00 66.8 97.6 -1.8 -68.5 -8 1 1 1158 22 46 50 22 49 50 --- 20 19 00 67.4 98.2 -1.7 -68.3 172 F 1 1170 22 46 50 Schedule for VLBA_PT (Code Pt ) Page 14 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 22 49 50 J2205+2926 20 19 00 66.8 94.6 -1.8 -71.1 -8 1 1 1170 22 49 50 22 51 00 --- 20 20 10 67.1 94.8 -1.8 -71.0 62 F 1 1174 22 49 50 22 51 00 GJ4247 20 20 10 67.6 98.4 -1.7 -68.2 -8 1 1 1174 22 51 00 22 54 00 --- 20 23 11 68.2 99.1 -1.6 -67.9 172 F 1 1186 22 51 00 22 54 00 J2205+2926 20 23 11 67.7 95.3 -1.7 -70.9 -9 1 1 1186 22 54 00 22 55 10 --- 20 24 21 67.9 95.5 -1.7 -70.8 61 F 1 1190 22 54 00 22 55 10 GJ4247 20 24 21 68.5 99.4 -1.6 -67.8 -9 1 1 1190 22 55 10 22 58 10 --- 20 27 21 69.1 100.1 -1.6 -67.6 171 F 1 1202 22 55 10 22 58 10 J2205+2926 20 27 21 68.5 96.1 -1.6 -70.7 -9 1 1 1202 22 58 10 22 59 20 --- 20 28 32 68.8 96.4 -1.6 -70.6 61 F 1 1206 22 58 10 22 59 20 J2203+2811 20 28 32 68.7 100.0 -1.6 -67.4 -8 1 1 1206 22 59 20 23 00 30 --- 20 29 42 68.9 100.3 -1.6 -67.3 62 F 1 1211 22 59 20 23 00 30 J2205+2926 20 29 42 69.0 96.6 -1.6 -70.5 -8 1 1 1211 23 00 30 23 01 40 --- 20 30 52 69.3 96.8 -1.6 -70.4 62 F 1 1215 23 00 30 23 05 42 J2042-3152 20 34 54 23.8 178.1 -0.1 -1.9 145 1 1 1215 23 05 42 23 06 22 --- 20 35 35 23.8 178.2 -0.1 -1.7 40 F 1 1218 23 06 00 23 06 22 J2043-3049 20 35 35 24.9 178.1 -0.1 -1.8 -8 1 1 1218 23 06 22 23 07 32 --- 20 36 45 24.9 178.4 -0.1 -1.6 62 F 1 1223 23 06 22 23 07 32 J2042-3152 20 36 45 23.8 178.5 -0.1 -1.5 -8 1 1 1223 23 07 32 23 08 42 --- 20 37 55 23.8 178.8 -0.1 -1.2 62 F 1 1227 23 07 32 23 08 42 GJ803 20 37 55 24.4 178.2 -0.1 -1.8 -7 1 1 1227 23 08 42 23 11 42 --- 20 40 55 24.4 178.9 -0.1 -1.1 173 F 1 1239 23 08 42 23 11 42 J2042-3152 20 40 55 23.8 179.5 0.0 -0.5 -7 1 1 1239 23 11 42 23 12 52 --- 20 42 06 23.8 179.7 0.0 -0.3 63 F 1 1243 23 11 42 23 12 52 GJ803 20 42 06 24.4 179.2 -0.1 -0.8 -7 1 1 1243 23 12 52 23 15 52 --- 20 45 06 24.4 179.9 0.0 -0.1 173 F 1 1255 23 12 52 23 15 52 J2042-3152 20 45 06 23.8 180.4 0.0 0.4 -7 1 1 1255 23 15 52 23 17 02 --- 20 46 16 23.8 180.7 0.1 0.7 63 F 1 1259 23 15 52 Schedule for VLBA_PT (Code Pt ) Page 15 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 23 17 02 GJ803 20 46 16 24.4 180.1 0.0 0.1 -7 1 1 1259 23 17 02 23 20 02 --- 20 49 17 24.4 180.9 0.1 0.8 173 F 1 1271 23 17 02 23 20 02 J2042-3152 20 49 17 23.8 181.4 0.1 1.4 -7 1 1 1271 23 20 02 23 21 12 --- 20 50 27 23.8 181.7 0.1 1.6 63 F 1 1275 23 20 02 23 21 12 GJ803 20 50 27 24.4 181.1 0.1 1.1 -7 1 1 1275 23 21 12 23 24 12 --- 20 53 27 24.4 181.8 0.1 1.8 173 F 1 1287 23 21 12 23 24 12 J2042-3152 20 53 27 23.8 182.4 0.2 2.3 -7 1 1 1287 23 24 12 23 25 22 --- 20 54 38 23.8 182.6 0.2 2.6 63 F 1 1292 23 24 12 23 25 22 GJ803 20 54 38 24.3 182.1 0.1 2.0 -7 1 1 1292 23 25 22 23 28 22 --- 20 57 38 24.3 182.8 0.2 2.7 173 F 1 1303 23 25 22 23 28 22 J2042-3152 20 57 38 23.8 183.3 0.2 3.2 -7 1 1 1303 23 28 22 23 29 32 --- 20 58 48 23.7 183.6 0.3 3.5 63 F 1 1308 23 28 22 23 29 32 J2043-3049 20 58 48 24.8 183.6 0.3 3.5 -8 1 1 1308 23 29 32 23 30 42 --- 20 59 59 24.8 183.9 0.3 3.7 62 F 1 1312 23 29 32 23 30 42 J2042-3152 20 59 59 23.7 183.9 0.3 3.8 -8 1 1 1312 23 30 42 23 31 52 --- 21 01 09 23.7 184.1 0.3 4.0 62 F 1 1317 23 30 42 23 35 46 J2205+2926 21 05 04 76.2 106.2 -1.0 -65.7 124 1 1 1317 23 35 46 23 36 26 --- 21 05 44 76.3 106.4 -1.0 -65.5 40 F 1 1319 23 36 04 23 36 26 J2203+2811 21 05 44 76.1 111.9 -1.0 -60.5 -10 1 1 1319 23 36 26 23 37 36 --- 21 06 54 76.3 112.4 -1.0 -60.1 60 F 1 1324 23 36 26 23 37 36 J2205+2926 21 06 54 76.6 106.9 -1.0 -65.2 -10 1 1 1324 23 37 36 23 38 46 --- 21 08 05 76.8 107.4 -1.0 -64.9 60 F 1 1328 23 37 36 23 38 46 GJ4247 21 08 05 77.1 113.9 -0.9 -59.1 -10 1 1 1328 23 38 46 23 41 46 --- 21 11 05 77.7 115.5 -0.8 -57.9 170 F 1 1340 23 38 46 23 41 46 J2205+2926 21 11 05 77.4 108.6 -0.9 -64.1 -11 1 1 1340 23 41 46 23 42 56 --- 21 12 15 77.6 109.1 -0.9 -63.7 59 F 1 1344 23 41 46 23 42 56 GJ4247 21 12 15 77.9 116.1 -0.8 -57.4 -11 1 1 1344 23 42 56 23 45 56 --- 21 15 16 78.5 117.9 -0.8 -56.0 169 F 1 1356 23 42 56 Schedule for VLBA_PT (Code Pt ) Page 16 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 23 45 56 J2205+2926 21 15 16 78.2 110.5 -0.8 -62.7 -11 1 1 1356 23 45 56 23 47 06 --- 21 16 26 78.4 111.1 -0.8 -62.3 59 F 1 1361 23 45 56 23 47 06 GJ4247 21 16 26 78.7 118.7 -0.8 -55.5 -11 1 1 1361 23 47 06 23 50 06 --- 21 19 26 79.2 120.7 -0.7 -53.9 169 F 1 1372 23 47 06 23 50 06 J2205+2926 21 19 26 79.0 112.7 -0.8 -61.1 -11 1 1 1372 23 50 06 23 51 16 --- 21 20 37 79.2 113.4 -0.8 -60.6 59 F 1 1377 23 50 06 23 51 16 GJ4247 21 20 37 79.4 121.5 -0.7 -53.2 -11 1 1 1377 23 51 16 23 54 16 --- 21 23 37 80.0 123.7 -0.6 -51.3 169 F 1 1388 23 51 16 23 54 16 J2205+2926 21 23 37 79.8 115.2 -0.7 -59.2 -12 1 1 1388 23 54 16 23 55 26 --- 21 24 47 80.0 115.9 -0.7 -58.6 58 F 1 1393 23 54 16 23 55 26 GJ4247 21 24 47 80.2 124.7 -0.6 -50.5 -12 1 1 1393 23 55 26 23 58 26 --- 21 27 48 80.7 127.3 -0.6 -48.3 168 F 1 1404 23 55 26 23 58 26 J2205+2926 21 27 48 80.6 118.0 -0.6 -56.9 -12 1 1 1404 23 58 26 23 59 36 --- 21 28 58 80.8 118.9 -0.6 -56.2 58 F 1 1409 23 58 26 --- Start: Sat 1 Dec 2007 Day 335 -- Stop: Sun 2 Dec 2007 Day 336 --- 23 59 36 J2203+2811 21 28 58 80.3 126.4 -0.6 -49.0 -11 1 1 1409 23 59 36 00 00 46 --- 21 30 08 80.5 127.4 -0.6 -48.1 59 F 1 1413 23 59 36 00 00 46 J2205+2926 21 30 08 81.0 119.8 -0.6 -55.5 -11 1 1 1413 00 00 46 00 01 56 --- 21 31 18 81.2 120.7 -0.6 -54.7 59 F 1 1418 00 00 46 00 05 48 J2042-3152 21 35 10 22.7 191.9 0.9 11.6 108 1 1 1418 00 05 48 00 06 28 --- 21 35 50 22.7 192.1 0.9 11.8 40 F 1 1421 00 06 06 00 06 28 J2043-3049 21 35 50 23.8 192.2 0.9 11.8 -8 1 1 1421 00 06 28 00 07 38 --- 21 37 01 23.7 192.5 0.9 12.0 62 F 1 1425 00 06 28 00 07 38 J2042-3152 21 37 01 22.7 192.4 0.9 12.0 -8 1 1 1425 00 07 38 00 08 48 --- 21 38 11 22.6 192.6 0.9 12.3 62 F 1 1430 00 07 38 00 08 48 GJ803 21 38 11 23.2 192.2 0.9 11.8 -7 1 1 1430 00 08 48 00 11 48 --- 21 41 11 23.1 192.9 0.9 12.4 173 F 1 1441 00 08 48 00 11 48 J2042-3152 21 41 11 22.5 193.3 1.0 12.9 -7 1 1 1441 00 11 48 00 12 58 --- 21 42 22 22.4 193.6 1.0 13.2 63 F 1 1446 00 11 48 Schedule for VLBA_PT (Code Pt ) Page 17 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 2 Dec 2007 Day 336 --- 00 12 58 GJ803 21 42 22 23.0 193.1 0.9 12.7 -7 1 1 1446 00 12 58 00 15 58 --- 21 45 22 22.9 193.8 1.0 13.4 173 F 1 1457 00 12 58 00 15 58 J2042-3152 21 45 22 22.3 194.2 1.0 13.8 -7 1 1 1457 00 15 58 00 17 08 --- 21 46 32 22.2 194.5 1.1 14.1 63 F 1 1462 00 15 58 00 17 08 GJ803 21 46 32 22.8 194.1 1.0 13.6 -7 1 1 1462 00 17 08 00 20 08 --- 21 49 33 22.7 194.8 1.1 14.3 173 F 1 1473 00 17 08 00 20 08 J2042-3152 21 49 33 22.0 195.2 1.1 14.7 -7 1 1 1473 00 20 08 00 21 18 --- 21 50 43 22.0 195.4 1.1 15.0 63 F 1 1478 00 20 08 00 21 18 GJ803 21 50 43 22.6 195.0 1.1 14.5 -7 1 1 1478 00 21 18 00 24 18 --- 21 53 43 22.5 195.7 1.1 15.2 173 F 1 1490 00 21 18 00 24 18 J2042-3152 21 53 43 21.8 196.1 1.2 15.6 -7 1 1 1490 00 24 18 00 25 28 --- 21 54 54 21.7 196.3 1.2 15.9 63 F 1 1494 00 24 18 00 25 28 GJ803 21 54 54 22.4 196.0 1.2 15.4 -7 1 1 1494 00 25 28 00 28 28 --- 21 57 54 22.2 196.6 1.2 16.1 173 F 1 1506 00 25 28 00 28 28 J2042-3152 21 57 54 21.6 197.0 1.2 16.5 -7 1 1 1506 00 28 28 00 29 38 --- 21 59 04 21.5 197.2 1.3 16.8 63 F 1 1510 00 28 28 00 29 38 J2043-3049 21 59 04 22.5 197.5 1.3 16.8 -8 1 1 1510 00 29 38 00 30 48 --- 22 00 14 22.4 197.8 1.3 17.1 62 F 1 1515 00 29 38 00 30 48 J2042-3152 22 00 14 21.4 197.5 1.3 17.0 -8 1 1 1515 00 30 48 00 31 58 --- 22 01 25 21.3 197.8 1.3 17.3 62 F 1 1519 00 30 48 00 35 38 J2205+2926 22 05 06 85.2 177.3 0.0 -2.5 87 1 1 1519 00 35 38 00 36 18 --- 22 05 46 85.2 179.1 0.0 -0.9 40 F 1 1522 00 35 56 00 36 18 J2203+2811 22 05 46 83.9 183.0 0.0 2.8 -9 1 1 1522 00 36 18 00 37 28 --- 22 06 56 83.9 185.4 0.0 5.0 61 F 1 1526 00 36 18 00 37 28 J2205+2926 22 06 56 85.2 182.1 0.0 2.0 -9 1 1 1526 00 37 28 00 38 38 --- 22 08 06 85.2 185.1 0.0 4.9 61 F 1 1531 00 37 28 00 38 38 GJ4247 22 08 06 83.9 193.6 0.1 12.8 -12 1 1 1531 00 38 38 00 41 38 --- 22 11 07 83.7 199.5 0.2 18.3 168 F 1 1542 00 38 38 Schedule for VLBA_PT (Code Pt ) Page 18 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 2 Dec 2007 Day 336 --- 00 41 38 J2205+2926 22 11 07 85.1 192.7 0.1 12.1 -11 1 1 1542 00 41 38 00 42 48 --- 22 12 17 85.0 195.6 0.1 14.8 59 F 1 1547 00 41 38 00 42 48 GJ4247 22 12 17 83.6 201.7 0.2 20.3 -10 1 1 1547 00 42 48 00 45 48 --- 22 15 18 83.4 207.1 0.2 25.3 170 F 1 1559 00 42 48 00 45 48 J2205+2926 22 15 18 84.8 202.6 0.2 21.4 -9 1 1 1559 00 45 48 00 46 58 --- 22 16 28 84.7 205.2 0.2 23.8 61 F 1 1563 00 45 48 00 46 58 GJ4247 22 16 28 83.3 209.1 0.2 27.2 -9 1 1 1563 00 46 58 00 49 58 --- 22 19 28 82.9 213.9 0.3 31.6 171 F 1 1575 00 46 58 00 49 58 J2205+2926 22 19 28 84.4 211.4 0.2 29.6 -9 1 1 1575 00 49 58 00 51 08 --- 22 20 38 84.3 213.6 0.2 31.7 61 F 1 1579 00 49 58 00 51 08 GJ4247 22 20 38 82.8 215.6 0.3 33.2 -9 1 1 1579 00 51 08 00 54 08 --- 22 23 39 82.4 219.8 0.4 37.0 171 F 1 1591 00 51 08 00 54 08 J2205+2926 22 23 39 83.9 218.9 0.3 36.6 -9 1 1 1591 00 54 08 00 55 18 --- 22 24 49 83.8 220.8 0.3 38.3 61 F 1 1595 00 54 08 00 55 18 GJ4247 22 24 49 82.3 221.4 0.4 38.3 -9 1 1 1595 00 55 18 00 58 18 --- 22 27 50 81.8 225.0 0.4 41.6 171 F 1 1607 00 55 18 00 58 18 J2205+2926 22 27 50 83.3 225.2 0.4 42.3 -9 1 1 1607 00 58 18 01 00 18 --- 22 29 50 83.0 227.9 0.4 44.7 111 F 1 1615 00 58 18 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 6 Station: VLBA_PT Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 6 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ803/4247 Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * GJ4247 21 58 57.453506 * 22 01 13.346939 22 01 34.723645 0.00 28 03 57.17781 * 28 18 25.15075 28 20 53.83897 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 80.299 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 22 01 13.123900 Dec = 28 18 24.86200 Rates: RA = 372.11 mas/yr Dec = 36.48 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54435.7139 Rates: RA = 0.77144E-04 s/day Dec = 0.99877E-04 arcsec/day * J2205+2926 22 03 30.827948 * 22 05 46.506429 22 06 07.863352 0.00 29 12 17.38655 * 29 26 55.13118 29 29 25.87383 0.00 From catalog imbedded in main SCHED input file. 1.114 scan hours, 40.401 baseline hours above horizon. * J2203+2811 22 01 42.793253 * 22 03 59.147974 22 04 20.617852 0.00 27 56 47.93108 * 28 11 21.86919 28 13 51.57981 0.00 From catalog imbedded in main SCHED input file. 0.292 scan hours, 9.927 baseline hours above horizon. * GJ803 20 42 05.055474 * 20 45 09.705033 20 45 38.816734 0.00 -31 31 26.41068 *-31 20 30.08565 -31 18 55.99955 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 71.769 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 20 45 09.531800 Dec = -31 20 27.23600 Rates: RA = 280.37 mas/yr Dec = -360.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54435.7139 Rates: RA = 0.59917E-04 s/day Dec = -0.98563E-03 arcsec/day * J2042-3152 20 39 40.825570 * 20 42 46.406520 20 43 15.650395 0.00 -32 03 16.96459 *-31 52 28.59420 -31 50 55.92876 0.00 From catalog imbedded in main SCHED input file. 1.119 scan hours, 36.886 baseline hours above horizon. * J2043-3049 20 40 03.445142 * 20 43 07.697350 20 43 36.732178 0.00 -31 00 04.47315 *-30 49 14.88550 -30 47 41.72539 0.00 From catalog imbedded in main SCHED input file. 0.311 scan hours, 10.019 baseline hours above horizon. J1642+3948 16 41 17.606231 * 16 42 58.809968 16 43 13.474419 0.26 1641+399 39 54 10.81494 * 39 48 36.99400 39 47 38.64518 0.40 * 3C345 /home/arana/cwalker/sched/catalogs/sources.vlba J1642+39 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.167 scan hours, 9.166 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) GJ4247 94.3 J2205+2926 95.6 J2203+2811 94.8 GJ803 57.1 J2042-3152 56.5 J2043-3049 56.7 3C345 61.7 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg