COVER INFORMATION Station: VLBA_KP (Code Kp ) Experiment: RIPL: GJ803/4247 Exp. Code: BB240H Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for VLBA_KP (Code Kp ) Page 2 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 17 00 00 3C345 14 14 14 59.1 64.8 -2.5 -92.9 0 1 1 0 17 00 00 17 08 00 --- 14 22 16 60.6 64.6 -2.3 -94.3 480 F 1 31 17 00 18 17 40 06 GJ4247 14 54 27 2.0 57.5 -7.1 D -54.4 1803 1 1 31 17 40 06 17 43 06 --- 14 57 27 2.6 57.9 -7.1 H -54.7 0 F 1 43 17 40 24 17 43 06 J2205+2926 14 57 27 2.4 56.3 -7.1 H -54.2 -7 1 1 43 17 43 06 17 44 16 --- 14 58 37 2.6 56.5 -7.1 H -54.4 0 F 1 47 17 43 06 17 44 16 J2203+2811 14 58 37 2.2 57.7 -7.1 D -54.5 -7 1 1 47 17 44 16 17 45 26 --- 14 59 48 2.4 57.9 -7.1 H -54.7 0 F 1 52 17 44 16 17 45 56 J2205+2926 15 00 18 2.9 56.7 -7.1 H -54.6 24 1 1 52 17 45 56 17 46 36 --- 15 00 58 3.1 56.8 -7.1 H -54.6 0 F 1 54 17 46 14 17 46 36 J2203+2811 15 00 58 2.7 58.0 -7.1 H -54.8 -7 1 1 54 17 46 36 17 47 46 --- 15 02 09 2.9 58.2 -7.0 H -54.9 0 F 1 59 17 46 36 17 47 46 J2205+2926 15 02 09 3.3 56.9 -7.1 H -54.8 -7 1 1 59 17 47 46 17 48 56 --- 15 03 19 3.5 57.1 -7.0 H -54.9 0 F 1 63 17 47 46 17 48 56 GJ4247 15 03 19 3.6 58.6 -7.0 H -55.4 -7 1 1 63 17 48 56 17 51 56 --- 15 06 19 4.2 59.0 -6.9 H -55.7 0 F 1 75 17 48 56 17 51 56 J2205+2926 15 06 19 4.0 57.5 -7.0 H -55.3 -7 1 1 75 17 51 56 17 53 06 --- 15 07 30 4.2 57.6 -7.0 H -55.4 0 F 1 79 17 51 56 17 53 06 GJ4247 15 07 30 4.4 59.1 -6.9 H -55.8 -7 1 1 79 17 53 06 17 56 06 --- 15 10 30 4.9 59.5 -6.9 H -56.2 0 F 1 91 17 53 06 17 56 06 J2205+2926 15 10 30 4.8 58.0 -6.9 H -55.7 -7 1 1 91 17 56 06 17 57 16 --- 15 11 40 5.0 58.1 -6.9 H -55.9 0 F 1 95 17 56 06 17 57 16 GJ4247 15 11 40 5.2 59.6 -6.8 H -56.3 -7 1 1 95 17 57 16 18 00 16 --- 15 14 41 5.7 60.0 -6.8 H -56.6 0 F 1 107 17 57 16 Schedule for VLBA_KP (Code Kp ) Page 3 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 18 00 16 J2205+2926 15 14 41 5.5 58.5 -6.9 H -56.2 -7 1 1 107 18 00 16 18 01 26 --- 15 15 51 5.7 58.6 -6.8 H -56.3 0 F 1 112 18 00 16 18 01 26 GJ4247 15 15 51 5.9 60.1 -6.8 H -56.7 -7 1 1 112 18 01 26 18 04 26 --- 15 18 51 6.5 60.5 -6.7 H -57.0 0 F 1 123 18 01 26 18 04 26 J2205+2926 15 18 51 6.3 59.0 -6.8 H -56.7 -7 1 1 123 18 04 26 18 05 36 --- 15 20 02 6.5 59.1 -6.8 H -56.8 0 F 1 128 18 04 26 18 05 36 GJ4247 15 20 02 6.7 60.6 -6.7 H -57.2 -7 1 1 128 18 05 36 18 08 36 --- 15 23 02 7.3 61.0 -6.6 -57.5 0 F 1 139 18 05 36 18 08 36 J2205+2926 15 23 02 7.0 59.5 -6.7 -57.1 -7 1 1 139 18 08 36 18 09 46 --- 15 24 12 7.2 59.6 -6.7 -57.2 63 F 1 144 18 08 36 18 09 46 J2203+2811 15 24 12 6.9 60.9 -6.7 H -57.3 -7 1 1 144 18 09 46 18 10 56 --- 15 25 22 7.1 61.1 -6.6 -57.4 0 F 1 148 18 09 46 18 11 27 J2205+2926 15 25 53 7.6 59.8 -6.7 -57.4 24 1 1 148 18 11 27 18 12 07 --- 15 26 34 7.7 59.9 -6.7 -57.5 40 F 1 151 18 11 45 18 12 07 J2203+2811 15 26 34 7.3 61.2 -6.6 -57.5 -7 1 1 151 18 12 07 18 13 17 --- 15 27 44 7.6 61.3 -6.6 -57.7 63 F 1 155 18 12 07 18 13 17 J2205+2926 15 27 44 7.9 60.1 -6.6 -57.6 -7 1 1 155 18 13 17 18 14 27 --- 15 28 54 8.1 60.2 -6.6 -57.8 63 F 1 160 18 13 17 18 14 27 GJ4247 15 28 54 8.3 61.7 -6.5 -58.1 -7 1 1 160 18 14 27 18 17 27 --- 15 31 54 8.9 62.1 -6.5 -58.4 173 F 1 172 18 14 27 18 17 27 J2205+2926 15 31 54 8.7 60.5 -6.6 -58.1 -7 1 1 172 18 17 27 18 18 37 --- 15 33 05 8.9 60.7 -6.6 -58.2 63 F 1 176 18 17 27 18 18 37 GJ4247 15 33 05 9.1 62.2 -6.5 -58.5 -7 1 1 176 18 18 37 18 21 37 --- 15 36 05 9.7 62.5 -6.4 -58.8 173 F 1 188 18 18 37 18 21 37 J2205+2926 15 36 05 9.4 61.0 -6.5 -58.5 -7 1 1 188 18 21 37 18 22 47 --- 15 37 15 9.7 61.2 -6.5 -58.6 63 F 1 192 18 21 37 18 22 47 GJ4247 15 37 15 9.9 62.7 -6.4 -58.9 -7 1 1 192 18 22 47 18 25 47 --- 15 40 16 10.5 63.0 -6.4 -59.2 173 F 1 204 18 22 47 Schedule for VLBA_KP (Code Kp ) Page 4 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 18 25 47 J2205+2926 15 40 16 10.2 61.5 -6.4 -58.9 -7 1 1 204 18 25 47 18 26 57 --- 15 41 26 10.4 61.6 -6.4 -59.1 63 F 1 208 18 25 47 18 26 57 GJ4247 15 41 26 10.7 63.2 -6.3 -59.3 -7 1 1 208 18 26 57 18 29 57 --- 15 44 26 11.3 63.5 -6.3 -59.6 173 F 1 220 18 26 57 18 29 57 J2205+2926 15 44 26 11.0 62.0 -6.4 -59.4 -7 1 1 220 18 29 57 18 31 07 --- 15 45 37 11.2 62.1 -6.3 -59.5 63 F 1 225 18 29 57 18 31 07 GJ4247 15 45 37 11.5 63.6 -6.3 -59.7 -7 1 1 225 18 31 07 18 34 07 --- 15 48 37 12.1 64.0 -6.2 -60.0 173 F 1 236 18 31 07 18 34 07 J2205+2926 15 48 37 11.8 62.4 -6.3 -59.8 -7 1 1 236 18 34 07 18 35 17 --- 15 49 47 12.0 62.6 -6.3 -59.9 63 F 1 241 18 34 07 18 35 17 J2203+2811 15 49 47 11.7 63.9 -6.2 -59.9 -7 1 1 241 18 35 17 18 36 27 --- 15 50 58 11.9 64.0 -6.2 -60.0 63 F 1 245 18 35 17 18 36 59 J2205+2926 15 51 29 12.3 62.8 -6.2 -60.1 25 1 1 245 18 36 59 18 37 39 --- 15 52 09 12.4 62.8 -6.2 -60.1 40 F 1 248 18 37 17 18 37 39 J2203+2811 15 52 09 12.2 64.2 -6.2 -60.1 -7 1 1 248 18 37 39 18 38 49 --- 15 53 19 12.4 64.3 -6.2 -60.2 63 F 1 252 18 37 39 18 38 49 J2205+2926 15 53 19 12.7 63.0 -6.2 -60.3 -7 1 1 252 18 38 49 18 39 59 --- 15 54 29 12.9 63.1 -6.2 -60.4 63 F 1 257 18 38 49 18 39 59 GJ4247 15 54 29 13.2 64.6 -6.1 -60.6 -7 1 1 257 18 39 59 18 42 59 --- 15 57 30 13.8 65.0 -6.1 -60.9 173 F 1 268 18 39 59 18 42 59 J2205+2926 15 57 30 13.5 63.4 -6.1 -60.7 -7 1 1 268 18 42 59 18 44 09 --- 15 58 40 13.7 63.6 -6.1 -60.8 63 F 1 273 18 42 59 18 44 09 GJ4247 15 58 40 14.0 65.1 -6.0 -61.0 -7 1 1 273 18 44 09 18 47 09 --- 16 01 41 14.6 65.4 -6.0 -61.2 173 F 1 284 18 44 09 18 47 09 J2205+2926 16 01 41 14.3 63.9 -6.1 -61.1 -7 1 1 284 18 47 09 18 48 19 --- 16 02 51 14.5 64.0 -6.1 -61.2 63 F 1 289 18 47 09 18 48 19 GJ4247 16 02 51 14.8 65.5 -6.0 -61.3 -7 1 1 289 18 48 19 18 51 19 --- 16 05 51 15.4 65.9 -5.9 -61.6 173 F 1 301 18 48 19 Schedule for VLBA_KP (Code Kp ) Page 5 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 18 51 19 J2205+2926 16 05 51 15.0 64.3 -6.0 -61.5 -7 1 1 301 18 51 19 18 52 29 --- 16 07 01 15.3 64.5 -6.0 -61.6 63 F 1 305 18 51 19 18 52 29 GJ4247 16 07 01 15.6 66.0 -5.9 -61.7 -7 1 1 305 18 52 29 18 55 29 --- 16 10 02 16.2 66.3 -5.9 -62.0 173 F 1 317 18 52 29 18 55 29 J2205+2926 16 10 02 15.9 64.8 -5.9 -61.9 -7 1 1 317 18 55 29 18 56 39 --- 16 11 12 16.1 64.9 -5.9 -62.0 63 F 1 321 18 55 29 18 56 39 GJ4247 16 11 12 16.4 66.4 -5.8 -62.1 -7 1 1 321 18 56 39 18 59 39 --- 16 14 13 17.0 66.8 -5.8 -62.4 173 F 1 333 18 56 39 18 59 39 J2205+2926 16 14 13 16.7 65.2 -5.9 -62.3 -7 1 1 333 18 59 39 19 00 49 --- 16 15 23 16.9 65.4 -5.8 -62.4 63 F 1 337 18 59 39 19 00 49 J2203+2811 16 15 23 16.6 66.7 -5.8 -62.2 -7 1 1 337 19 00 49 19 01 59 --- 16 16 33 16.9 66.8 -5.8 -62.3 63 F 1 342 19 00 49 19 01 59 J2205+2926 16 16 33 17.1 65.5 -5.8 -62.5 -7 1 1 342 19 01 59 19 03 09 --- 16 17 43 17.3 65.6 -5.8 -62.6 63 F 1 346 19 01 59 19 12 42 GJ803 16 27 18 2.1 129.5 -4.3 D -50.1 525 1 1 346 19 12 42 19 15 42 --- 16 30 19 2.6 129.9 -4.3 -49.7 0 F 1 358 19 13 00 19 15 42 J2042-3152 16 30 19 2.6 130.6 -4.2 -49.3 -6 1 1 358 19 15 42 19 16 52 --- 16 31 29 2.8 130.8 -4.2 -49.2 64 F 1 363 19 15 42 19 16 52 GJ803 16 31 29 2.7 130.0 -4.2 -49.5 -6 1 1 363 19 16 52 19 19 52 --- 16 34 30 3.2 130.4 -4.2 -49.1 174 F 1 374 19 16 52 19 19 52 J2042-3152 16 34 30 3.3 131.2 -4.1 -48.7 -6 1 1 374 19 19 52 19 21 02 --- 16 35 40 3.5 131.4 -4.1 -48.6 64 F 1 379 19 19 52 19 21 02 GJ803 16 35 40 3.4 130.6 -4.2 -48.9 -6 1 1 379 19 21 02 19 24 02 --- 16 38 40 3.9 131.0 -4.1 -48.5 174 F 1 390 19 21 02 19 24 02 J2042-3152 16 38 40 3.9 131.8 -4.1 -48.1 -6 1 1 390 19 24 02 19 25 12 --- 16 39 51 4.1 131.9 -4.1 -48.0 64 F 1 395 19 24 02 19 25 12 GJ803 16 39 51 4.1 131.2 -4.1 -48.3 -6 1 1 395 19 25 12 19 28 12 --- 16 42 51 4.6 131.6 -4.0 -47.9 174 F 1 406 19 25 12 Schedule for VLBA_KP (Code Kp ) Page 6 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 19 28 12 J2042-3152 16 42 51 4.6 132.4 -4.0 -47.6 -6 1 1 406 19 28 12 19 29 22 --- 16 44 01 4.8 132.5 -4.0 -47.4 64 F 1 411 19 28 12 19 29 22 J2043-3049 16 44 01 5.4 131.7 -4.0 -47.5 -7 1 1 411 19 29 22 19 30 32 --- 16 45 11 5.6 131.9 -4.0 -47.3 63 F 1 415 19 29 22 19 31 01 J2042-3152 16 45 40 5.0 132.8 -4.0 -47.1 21 1 1 415 19 31 01 19 31 41 --- 16 46 20 5.1 132.9 -3.9 -47.1 40 F 1 418 19 31 19 19 31 41 J2043-3049 16 46 20 5.8 132.1 -4.0 -47.2 -7 1 1 418 19 31 41 19 32 51 --- 16 47 30 6.0 132.2 -3.9 -47.0 63 F 1 423 19 31 41 19 32 51 J2042-3152 16 47 30 5.3 133.0 -3.9 -46.9 -7 1 1 423 19 32 51 19 34 01 --- 16 48 41 5.5 133.2 -3.9 -46.7 63 F 1 427 19 32 51 19 34 01 GJ803 16 48 41 5.5 132.5 -3.9 -47.1 -6 1 1 427 19 34 01 19 37 01 --- 16 51 41 6.0 132.9 -3.9 -46.7 174 F 1 439 19 34 01 19 37 01 J2042-3152 16 51 41 6.0 133.7 -3.9 -46.3 -6 1 1 439 19 37 01 19 38 11 --- 16 52 51 6.1 133.8 -3.8 -46.1 64 F 1 443 19 37 01 19 38 11 GJ803 16 52 51 6.1 133.1 -3.9 -46.5 -6 1 1 443 19 38 11 19 41 11 --- 16 55 52 6.6 133.5 -3.8 -46.0 174 F 1 455 19 38 11 19 41 11 J2042-3152 16 55 52 6.6 134.3 -3.8 -45.7 -6 1 1 455 19 41 11 19 42 21 --- 16 57 02 6.8 134.5 -3.8 -45.5 64 F 1 459 19 41 11 19 42 21 GJ803 16 57 02 6.8 133.7 -3.8 -45.9 -6 1 1 459 19 42 21 19 45 21 --- 17 00 02 7.2 134.2 -3.8 -45.4 174 F 1 471 19 42 21 19 45 21 J2042-3152 17 00 02 7.2 134.9 -3.7 -45.0 -6 1 1 471 19 45 21 19 46 31 --- 17 01 13 7.4 135.1 -3.7 -44.8 64 F 1 475 19 45 21 19 46 31 GJ803 17 01 13 7.4 134.3 -3.7 -45.3 -6 1 1 475 19 46 31 19 49 31 --- 17 04 13 7.9 134.8 -3.7 -44.8 174 F 1 487 19 46 31 19 49 31 J2042-3152 17 04 13 7.8 135.5 -3.7 -44.4 -6 1 1 487 19 49 31 19 50 41 --- 17 05 23 8.0 135.7 -3.6 -44.2 64 F 1 492 19 49 31 19 50 41 GJ803 17 05 23 8.0 135.0 -3.7 -44.6 -6 1 1 492 19 50 41 19 53 41 --- 17 08 24 8.5 135.4 -3.6 -44.2 174 F 1 503 19 50 41 Schedule for VLBA_KP (Code Kp ) Page 7 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 19 53 41 J2042-3152 17 08 24 8.5 136.2 -3.6 -43.7 -6 1 1 503 19 53 41 19 54 51 --- 17 09 34 8.6 136.4 -3.6 -43.6 64 F 1 508 19 53 41 19 54 51 J2043-3049 17 09 34 9.3 135.6 -3.6 -43.7 -7 1 1 508 19 54 51 19 56 01 --- 17 10 44 9.5 135.8 -3.5 -43.6 63 F 1 512 19 54 51 19 56 30 J2042-3152 17 11 13 8.9 136.6 -3.5 -43.3 22 1 1 512 19 56 30 19 57 10 --- 17 11 53 9.0 136.7 -3.5 -43.2 40 F 1 515 19 56 48 19 57 10 J2043-3049 17 11 53 9.7 135.9 -3.5 -43.4 -7 1 1 515 19 57 10 19 58 20 --- 17 13 03 9.9 136.1 -3.5 -43.2 63 F 1 519 19 57 10 19 58 20 J2042-3152 17 13 03 9.1 136.9 -3.5 -43.0 -7 1 1 519 19 58 20 19 59 30 --- 17 14 13 9.3 137.1 -3.5 -42.8 63 F 1 524 19 58 20 19 59 30 GJ803 17 14 13 9.4 136.4 -3.5 -43.3 -6 1 1 524 19 59 30 20 02 30 --- 17 17 14 9.8 136.8 -3.5 -42.8 174 F 1 535 19 59 30 20 02 30 J2042-3152 17 17 14 9.7 137.6 -3.4 -42.4 -6 1 1 535 20 02 30 20 03 40 --- 17 18 24 9.9 137.8 -3.4 -42.2 64 F 1 540 20 02 30 20 03 40 GJ803 17 18 24 10.0 137.0 -3.5 -42.6 -6 1 1 540 20 03 40 20 06 40 --- 17 21 25 10.4 137.5 -3.4 -42.1 174 F 1 552 20 03 40 20 06 40 J2042-3152 17 21 25 10.3 138.2 -3.4 -41.7 -6 1 1 552 20 06 40 20 07 50 --- 17 22 35 10.5 138.4 -3.3 -41.5 64 F 1 556 20 06 40 20 07 50 GJ803 17 22 35 10.6 137.7 -3.4 -42.0 -6 1 1 556 20 07 50 20 10 50 --- 17 25 35 11.0 138.2 -3.3 -41.5 174 F 1 568 20 07 50 20 10 50 J2042-3152 17 25 35 10.9 138.9 -3.3 -41.0 -6 1 1 568 20 10 50 20 12 00 --- 17 26 45 11.1 139.1 -3.3 -40.8 64 F 1 572 20 10 50 20 12 00 GJ803 17 26 45 11.2 138.4 -3.3 -41.3 -6 1 1 572 20 12 00 20 15 00 --- 17 29 46 11.6 138.9 -3.3 -40.8 174 F 1 584 20 12 00 20 15 00 J2042-3152 17 29 46 11.5 139.6 -3.2 -40.3 -6 1 1 584 20 15 00 20 16 10 --- 17 30 56 11.7 139.8 -3.2 -40.1 64 F 1 588 20 15 00 20 16 10 GJ803 17 30 56 11.7 139.1 -3.2 -40.6 -6 1 1 588 20 16 10 20 19 10 --- 17 33 57 12.2 139.6 -3.2 -40.1 174 F 1 600 20 16 10 Schedule for VLBA_KP (Code Kp ) Page 8 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 20 19 10 J2042-3152 17 33 57 12.1 140.3 -3.2 -39.6 -6 1 1 600 20 19 10 20 20 20 --- 17 35 07 12.2 140.5 -3.1 -39.4 64 F 1 604 20 19 10 20 20 20 J2043-3049 17 35 07 13.0 139.8 -3.1 -39.7 -7 1 1 604 20 20 20 20 21 30 --- 17 36 17 13.2 140.0 -3.1 -39.5 63 F 1 609 20 20 20 20 21 58 J2042-3152 17 36 46 12.5 140.8 -3.1 -39.2 22 1 1 609 20 21 58 20 22 38 --- 17 37 26 12.5 140.9 -3.1 -39.1 40 F 1 612 20 22 16 20 22 38 J2043-3049 17 37 26 13.3 140.1 -3.1 -39.3 -8 1 1 612 20 22 38 20 23 48 --- 17 38 36 13.5 140.4 -3.1 -39.1 62 F 1 616 20 22 38 20 23 48 J2042-3152 17 38 36 12.7 141.1 -3.1 -38.9 -8 1 1 616 20 23 48 20 24 58 --- 17 39 47 12.9 141.3 -3.1 -38.7 62 F 1 621 20 23 48 20 24 58 GJ803 17 39 47 13.0 140.5 -3.1 -39.1 -6 1 1 621 20 24 58 20 27 58 --- 17 42 47 13.4 141.1 -3.0 -38.6 174 F 1 632 20 24 58 20 27 58 J2042-3152 17 42 47 13.3 141.8 -3.0 -38.1 -6 1 1 632 20 27 58 20 29 08 --- 17 43 57 13.4 142.0 -3.0 -37.9 64 F 1 637 20 27 58 20 29 08 GJ803 17 43 57 13.5 141.3 -3.0 -38.4 -6 1 1 637 20 29 08 20 32 08 --- 17 46 58 13.9 141.8 -3.0 -37.9 174 F 1 648 20 29 08 20 32 08 J2042-3152 17 46 58 13.8 142.5 -2.9 -37.4 -6 1 1 648 20 32 08 20 33 18 --- 17 48 08 13.9 142.7 -2.9 -37.2 64 F 1 653 20 32 08 20 33 18 GJ803 17 48 08 14.1 142.0 -3.0 -37.7 -6 1 1 653 20 33 18 20 36 18 --- 17 51 08 14.5 142.5 -2.9 -37.2 174 F 1 664 20 33 18 20 36 18 J2042-3152 17 51 08 14.3 143.3 -2.9 -36.7 -6 1 1 664 20 36 18 20 37 28 --- 17 52 19 14.5 143.5 -2.8 -36.5 64 F 1 669 20 36 18 20 37 28 GJ803 17 52 19 14.6 142.7 -2.9 -37.0 -6 1 1 669 20 37 28 20 40 28 --- 17 55 19 15.0 143.2 -2.8 -36.5 174 F 1 681 20 37 28 20 40 28 J2042-3152 17 55 19 14.9 144.0 -2.8 -36.0 -6 1 1 681 20 40 28 20 41 38 --- 17 56 29 15.0 144.2 -2.8 -35.8 64 F 1 685 20 40 28 20 41 38 GJ803 17 56 29 15.1 143.5 -2.8 -36.3 -6 1 1 685 20 41 38 20 44 38 --- 17 59 30 15.5 144.0 -2.8 -35.7 174 F 1 697 20 41 38 Schedule for VLBA_KP (Code Kp ) Page 9 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 20 44 38 J2042-3152 17 59 30 15.4 144.7 -2.7 -35.2 -6 1 1 697 20 44 38 20 45 48 --- 18 00 40 15.5 145.0 -2.7 -35.0 64 F 1 701 20 44 38 20 45 48 J2043-3049 18 00 40 16.3 144.3 -2.7 -35.2 -8 1 1 701 20 45 48 20 46 58 --- 18 01 50 16.5 144.5 -2.7 -35.0 62 F 1 706 20 45 48 20 46 58 J2042-3152 18 01 50 15.7 145.2 -2.7 -34.8 -8 1 1 706 20 46 58 20 48 08 --- 18 03 00 15.8 145.4 -2.7 -34.6 62 F 1 710 20 46 58 21 00 17 3C345 18 15 11 69.9 299.3 1.5 105.7 614 1 1 710 21 00 17 21 02 17 --- 18 17 11 69.5 299.0 1.6 105.1 120 F 1 718 21 00 35 21 05 58 J2042-3152 18 20 53 17.9 148.7 -2.4 -31.3 112 1 1 718 21 05 58 21 06 38 --- 18 21 33 17.9 148.8 -2.4 -31.1 40 F 1 721 21 06 16 21 06 38 J2043-3049 18 21 33 18.8 148.2 -2.4 -31.4 -8 1 1 721 21 06 38 21 07 48 --- 18 22 43 18.9 148.4 -2.3 -31.2 62 F 1 725 21 06 38 21 07 48 J2042-3152 18 22 43 18.1 149.1 -2.3 -30.9 -8 1 1 725 21 07 48 21 08 58 --- 18 23 53 18.2 149.3 -2.3 -30.7 62 F 1 730 21 07 48 21 08 58 GJ803 18 23 53 18.4 148.5 -2.4 -31.2 -6 1 1 730 21 08 58 21 11 58 --- 18 26 54 18.7 149.1 -2.3 -30.7 174 F 1 741 21 08 58 21 11 58 J2042-3152 18 26 54 18.5 149.9 -2.3 -30.1 -6 1 1 741 21 11 58 21 13 08 --- 18 28 04 18.6 150.1 -2.3 -29.9 64 F 1 746 21 11 58 21 13 08 GJ803 18 28 04 18.8 149.3 -2.3 -30.4 -6 1 1 746 21 13 08 21 16 08 --- 18 31 04 19.2 149.9 -2.2 -29.8 174 F 1 757 21 13 08 21 16 08 J2042-3152 18 31 04 19.0 150.7 -2.2 -29.3 -6 1 1 757 21 16 08 21 17 18 --- 18 32 15 19.1 150.9 -2.2 -29.1 64 F 1 762 21 16 08 21 17 18 GJ803 18 32 15 19.3 150.2 -2.2 -29.6 -6 1 1 762 21 17 18 21 20 18 --- 18 35 15 19.6 150.8 -2.2 -29.0 174 F 1 773 21 17 18 21 20 18 J2042-3152 18 35 15 19.4 151.5 -2.1 -28.5 -6 1 1 773 21 20 18 21 21 28 --- 18 36 25 19.5 151.7 -2.1 -28.2 64 F 1 778 21 20 18 21 21 28 GJ803 18 36 25 19.7 151.0 -2.2 -28.8 -6 1 1 778 21 21 28 21 24 28 --- 18 39 26 20.0 151.6 -2.1 -28.2 174 F 1 790 21 21 28 Schedule for VLBA_KP (Code Kp ) Page 10 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 21 24 28 J2042-3152 18 39 26 19.8 152.3 -2.1 -27.6 -6 1 1 790 21 24 28 21 25 38 --- 18 40 36 19.9 152.6 -2.0 -27.4 64 F 1 794 21 24 28 21 25 38 GJ803 18 40 36 20.2 151.8 -2.1 -28.0 -6 1 1 794 21 25 38 21 28 38 --- 18 43 36 20.5 152.4 -2.0 -27.4 174 F 1 806 21 25 38 21 28 38 J2042-3152 18 43 36 20.2 153.2 -2.0 -26.8 -6 1 1 806 21 28 38 21 29 48 --- 18 44 47 20.3 153.4 -2.0 -26.6 64 F 1 810 21 28 38 21 29 48 J2043-3049 18 44 47 21.2 152.8 -2.0 -26.8 -8 1 1 810 21 29 48 21 30 58 --- 18 45 57 21.3 153.1 -2.0 -26.6 62 F 1 815 21 29 48 21 30 58 J2042-3152 18 45 57 20.4 153.6 -2.0 -26.3 -8 1 1 815 21 30 58 21 32 08 --- 18 47 07 20.5 153.9 -1.9 -26.1 62 F 1 819 21 30 58 21 35 33 J2205+2926 18 50 32 48.2 80.1 -3.3 -73.8 143 1 1 819 21 35 33 21 36 13 --- 18 51 12 48.4 80.1 -3.2 -73.8 40 F 1 822 21 35 51 21 36 13 J2203+2811 18 51 12 48.4 82.1 -3.2 -72.5 -7 1 1 822 21 36 13 21 37 23 --- 18 52 23 48.6 82.2 -3.2 -72.6 63 F 1 826 21 36 13 21 37 23 J2205+2926 18 52 23 48.6 80.2 -3.2 -73.9 -7 1 1 826 21 37 23 21 38 33 --- 18 53 33 48.9 80.3 -3.2 -73.9 63 F 1 831 21 37 23 21 38 33 GJ4247 18 53 33 49.5 82.5 -3.1 -72.9 -7 1 1 831 21 38 33 21 41 33 --- 18 56 33 50.1 82.8 -3.1 -73.0 173 F 1 843 21 38 33 21 41 33 J2205+2926 18 56 33 49.5 80.6 -3.2 -74.1 -7 1 1 843 21 41 33 21 42 43 --- 18 57 43 49.8 80.7 -3.1 -74.2 63 F 1 847 21 41 33 21 42 43 GJ4247 18 57 43 50.4 82.9 -3.1 -73.1 -7 1 1 847 21 42 43 21 45 43 --- 19 00 44 51.0 83.2 -3.0 -73.2 173 F 1 859 21 42 43 21 45 43 J2205+2926 19 00 44 50.4 81.0 -3.1 -74.3 -7 1 1 859 21 45 43 21 46 53 --- 19 01 54 50.6 81.1 -3.1 -74.4 63 F 1 863 21 45 43 21 46 53 GJ4247 19 01 54 51.3 83.3 -3.0 -73.2 -7 1 1 863 21 46 53 21 49 53 --- 19 04 55 51.9 83.6 -2.9 -73.3 173 F 1 875 21 46 53 21 49 53 J2205+2926 19 04 55 51.3 81.4 -3.0 -74.5 -7 1 1 875 21 49 53 21 51 03 --- 19 06 05 51.5 81.5 -3.0 -74.6 63 F 1 879 21 49 53 Schedule for VLBA_KP (Code Kp ) Page 11 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 21 51 03 GJ4247 19 06 05 52.1 83.7 -2.9 -73.4 -7 1 1 879 21 51 03 21 54 03 --- 19 09 05 52.8 84.0 -2.9 -73.5 173 F 1 891 21 51 03 21 54 03 J2205+2926 19 09 05 52.1 81.8 -3.0 -74.7 -7 1 1 891 21 54 03 21 55 13 --- 19 10 15 52.4 81.9 -2.9 -74.8 63 F 1 895 21 54 03 21 55 13 GJ4247 19 10 15 53.0 84.2 -2.9 -73.5 -7 1 1 895 21 55 13 21 58 13 --- 19 13 16 53.7 84.5 -2.8 -73.7 173 F 1 907 21 55 13 21 58 13 J2205+2926 19 13 16 53.0 82.2 -2.9 -74.9 -7 1 1 907 21 58 13 21 59 23 --- 19 14 26 53.3 82.3 -2.9 -75.0 63 F 1 912 21 58 13 21 59 23 J2203+2811 19 14 26 53.3 84.5 -2.8 -73.4 -7 1 1 912 21 59 23 22 00 33 --- 19 15 36 53.5 84.6 -2.8 -73.5 63 F 1 916 21 59 23 22 00 33 J2205+2926 19 15 36 53.5 82.4 -2.8 -75.1 -7 1 1 916 22 00 33 22 01 43 --- 19 16 46 53.8 82.5 -2.8 -75.1 63 F 1 921 22 00 33 22 05 24 J2042-3152 19 20 28 23.3 160.9 -1.4 -19.1 154 1 1 921 22 05 24 22 06 04 --- 19 21 08 23.3 161.1 -1.4 -18.9 40 F 1 923 22 05 42 22 06 04 J2043-3049 19 21 08 24.3 160.6 -1.4 -19.1 -8 1 1 923 22 06 04 22 07 14 --- 19 22 19 24.4 160.9 -1.4 -18.9 62 F 1 928 22 06 04 22 07 14 J2042-3152 19 22 19 23.4 161.3 -1.3 -18.6 -8 1 1 928 22 07 14 22 08 24 --- 19 23 29 23.5 161.6 -1.3 -18.4 62 F 1 932 22 07 14 22 08 24 GJ803 19 23 29 23.8 160.9 -1.4 -19.0 -6 1 1 932 22 08 24 22 11 24 --- 19 26 29 24.0 161.5 -1.3 -18.3 174 F 1 944 22 08 24 22 11 24 J2042-3152 19 26 29 23.7 162.2 -1.3 -17.7 -6 1 1 944 22 11 24 22 12 34 --- 19 27 39 23.7 162.5 -1.3 -17.5 64 F 1 948 22 11 24 22 12 34 GJ803 19 27 39 24.1 161.8 -1.3 -18.1 -6 1 1 948 22 12 34 22 15 34 --- 19 30 40 24.3 162.5 -1.2 -17.4 174 F 1 960 22 12 34 22 15 34 J2042-3152 19 30 40 23.9 163.2 -1.2 -16.8 -6 1 1 960 22 15 34 22 16 44 --- 19 31 50 24.0 163.4 -1.2 -16.5 64 F 1 964 22 15 34 22 16 44 GJ803 19 31 50 24.4 162.7 -1.2 -17.1 -6 1 1 964 22 16 44 22 19 44 --- 19 34 51 24.5 163.4 -1.2 -16.5 174 F 1 976 22 16 44 Schedule for VLBA_KP (Code Kp ) Page 12 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 22 19 44 J2042-3152 19 34 51 24.2 164.1 -1.1 -15.9 -6 1 1 976 22 19 44 22 20 54 --- 19 36 01 24.2 164.4 -1.1 -15.6 64 F 1 981 22 19 44 22 20 54 GJ803 19 36 01 24.6 163.7 -1.2 -16.2 -6 1 1 981 22 20 54 22 23 54 --- 19 39 01 24.8 164.4 -1.1 -15.5 174 F 1 992 22 20 54 22 23 54 J2042-3152 19 39 01 24.4 165.0 -1.1 -14.9 -6 1 1 992 22 23 54 22 25 04 --- 19 40 11 24.5 165.3 -1.1 -14.7 64 F 1 997 22 23 54 22 25 04 GJ803 19 40 11 24.9 164.6 -1.1 -15.3 -6 1 1 997 22 25 04 22 28 04 --- 19 43 12 25.0 165.3 -1.0 -14.6 174 F 1 1008 22 25 04 22 28 04 J2042-3152 19 43 12 24.6 166.0 -1.0 -14.0 -7 1 1 1008 22 28 04 22 29 14 --- 19 44 22 24.7 166.3 -1.0 -13.7 63 F 1 1013 22 28 04 22 29 14 J2043-3049 19 44 22 25.7 165.9 -1.0 -13.9 -8 1 1 1013 22 29 14 22 30 24 --- 19 45 32 25.8 166.2 -1.0 -13.7 62 F 1 1017 22 29 14 22 30 24 J2042-3152 19 45 32 24.8 166.5 -1.0 -13.5 -8 1 1 1017 22 30 24 22 31 34 --- 19 46 43 24.8 166.8 -0.9 -13.2 62 F 1 1022 22 30 24 22 35 30 J2205+2926 19 50 39 60.9 85.9 -2.3 -76.5 158 1 1 1022 22 35 30 22 36 10 --- 19 51 19 61.0 85.9 -2.2 -76.5 40 F 1 1024 22 35 48 22 36 10 J2203+2811 19 51 19 61.1 88.6 -2.2 -74.3 -8 1 1 1024 22 36 10 22 37 20 --- 19 52 30 61.3 88.8 -2.2 -74.3 62 F 1 1029 22 36 10 22 37 20 J2205+2926 19 52 30 61.3 86.0 -2.2 -76.5 -8 1 1 1029 22 37 20 22 38 30 --- 19 53 40 61.5 86.2 -2.2 -76.5 62 F 1 1033 22 37 20 22 38 30 GJ4247 19 53 40 62.2 89.0 -2.1 -74.6 -8 1 1 1033 22 38 30 22 41 30 --- 19 56 40 62.9 89.4 -2.1 -74.6 172 F 1 1045 22 38 30 22 41 30 J2205+2926 19 56 40 62.2 86.5 -2.2 -76.6 -8 1 1 1045 22 41 30 22 42 40 --- 19 57 51 62.4 86.6 -2.1 -76.7 62 F 1 1050 22 41 30 22 42 40 GJ4247 19 57 51 63.1 89.6 -2.1 -74.6 -8 1 1 1050 22 42 40 22 45 40 --- 20 00 51 63.7 90.0 -2.0 -74.6 172 F 1 1061 22 42 40 22 45 40 J2205+2926 20 00 51 63.1 86.9 -2.1 -76.7 -8 1 1 1061 22 45 40 22 46 50 --- 20 02 01 63.3 87.1 -2.1 -76.8 62 F 1 1066 22 45 40 Schedule for VLBA_KP (Code Kp ) Page 13 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 22 46 50 GJ4247 20 02 01 64.0 90.1 -2.0 -74.6 -8 1 1 1066 22 46 50 22 49 50 --- 20 05 02 64.6 90.5 -1.9 -74.6 172 F 1 1077 22 46 50 22 49 50 J2205+2926 20 05 02 63.9 87.4 -2.0 -76.8 -8 1 1 1077 22 49 50 22 51 00 --- 20 06 12 64.2 87.5 -2.0 -76.9 62 F 1 1082 22 49 50 22 51 00 GJ4247 20 06 12 64.9 90.7 -1.9 -74.6 -8 1 1 1082 22 51 00 22 54 00 --- 20 09 12 65.5 91.1 -1.9 -74.6 172 F 1 1093 22 51 00 22 54 00 J2205+2926 20 09 12 64.8 87.9 -1.9 -76.9 -8 1 1 1093 22 54 00 22 55 10 --- 20 10 23 65.1 88.0 -1.9 -76.9 62 F 1 1098 22 54 00 22 55 10 GJ4247 20 10 23 65.8 91.3 -1.9 -74.5 -8 1 1 1098 22 55 10 22 58 10 --- 20 13 23 66.4 91.7 -1.8 -74.5 172 F 1 1110 22 55 10 22 58 10 J2205+2926 20 13 23 65.7 88.4 -1.9 -77.0 -8 1 1 1110 22 58 10 22 59 20 --- 20 14 33 66.0 88.5 -1.9 -77.0 62 F 1 1114 22 58 10 22 59 20 J2203+2811 20 14 33 66.0 91.8 -1.8 -74.3 -8 1 1 1114 22 59 20 23 00 30 --- 20 15 43 66.3 91.9 -1.8 -74.2 62 F 1 1119 22 59 20 23 00 30 J2205+2926 20 15 43 66.2 88.7 -1.8 -77.0 -8 1 1 1119 23 00 30 23 01 40 --- 20 16 54 66.5 88.8 -1.8 -77.0 62 F 1 1123 23 00 30 23 05 42 J2042-3152 20 20 56 26.0 174.7 -0.4 -5.3 155 1 1 1123 23 05 42 23 06 22 --- 20 21 36 26.0 174.9 -0.4 -5.1 40 F 1 1126 23 06 00 23 06 22 J2043-3049 20 21 36 27.0 174.7 -0.4 -5.2 -8 1 1 1126 23 06 22 23 07 32 --- 20 22 46 27.1 175.0 -0.3 -5.0 62 F 1 1130 23 06 22 23 07 32 J2042-3152 20 22 46 26.0 175.2 -0.3 -4.8 -8 1 1 1130 23 07 32 23 08 42 --- 20 23 57 26.0 175.4 -0.3 -4.6 62 F 1 1135 23 07 32 23 08 42 GJ803 20 23 57 26.5 174.8 -0.4 -5.1 -7 1 1 1135 23 08 42 23 11 42 --- 20 26 57 26.6 175.5 -0.3 -4.4 173 F 1 1146 23 08 42 23 11 42 J2042-3152 20 26 57 26.1 176.1 -0.3 -3.9 -7 1 1 1146 23 11 42 23 12 52 --- 20 28 07 26.1 176.4 -0.3 -3.6 63 F 1 1151 23 11 42 23 12 52 GJ803 20 28 07 26.6 175.8 -0.3 -4.2 -7 1 1 1151 23 12 52 23 15 52 --- 20 31 08 26.6 176.5 -0.2 -3.4 173 F 1 1163 23 12 52 Schedule for VLBA_KP (Code Kp ) Page 14 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 23 15 52 J2042-3152 20 31 08 26.1 177.1 -0.2 -2.9 -7 1 1 1163 23 15 52 23 17 02 --- 20 32 18 26.1 177.4 -0.2 -2.6 63 F 1 1167 23 15 52 23 17 02 GJ803 20 32 18 26.6 176.8 -0.2 -3.2 -7 1 1 1167 23 17 02 23 20 02 --- 20 35 18 26.7 177.5 -0.2 -2.5 173 F 1 1179 23 17 02 23 20 02 J2042-3152 20 35 18 26.2 178.1 -0.1 -1.9 -7 1 1 1179 23 20 02 23 21 12 --- 20 36 29 26.2 178.4 -0.1 -1.6 63 F 1 1183 23 20 02 23 21 12 GJ803 20 36 29 26.7 177.8 -0.2 -2.2 -7 1 1 1183 23 21 12 23 24 12 --- 20 39 29 26.7 178.5 -0.1 -1.5 173 F 1 1195 23 21 12 23 24 12 J2042-3152 20 39 29 26.2 179.1 -0.1 -0.9 -7 1 1 1195 23 24 12 23 25 22 --- 20 40 39 26.2 179.4 0.0 -0.6 63 F 1 1199 23 24 12 23 25 22 GJ803 20 40 39 26.7 178.8 -0.1 -1.2 -7 1 1 1199 23 25 22 23 28 22 --- 20 43 40 26.7 179.5 0.0 -0.5 173 F 1 1211 23 25 22 23 28 22 J2042-3152 20 43 40 26.2 180.1 0.0 0.1 -7 1 1 1211 23 28 22 23 29 32 --- 20 44 50 26.2 180.4 0.0 0.4 63 F 1 1215 23 28 22 23 29 32 J2043-3049 20 44 50 27.2 180.3 0.0 0.3 -8 1 1 1215 23 29 32 23 30 42 --- 20 46 00 27.2 180.6 0.0 0.6 62 F 1 1220 23 29 32 23 30 42 J2042-3152 20 46 00 26.2 180.6 0.0 0.6 -8 1 1 1220 23 30 42 23 31 52 --- 20 47 10 26.2 180.9 0.1 0.9 62 F 1 1224 23 30 42 23 35 46 J2205+2926 20 51 06 73.7 93.8 -1.3 -76.6 134 1 1 1224 23 35 46 23 36 26 --- 20 51 46 73.8 93.9 -1.2 -76.5 40 F 1 1227 23 36 04 23 36 26 J2203+2811 20 51 46 73.9 98.7 -1.2 -72.2 -9 1 1 1227 23 36 26 23 37 36 --- 20 52 56 74.1 98.9 -1.2 -72.0 61 F 1 1232 23 36 26 23 37 36 J2205+2926 20 52 56 74.1 94.1 -1.2 -76.5 -9 1 1 1232 23 37 36 23 38 46 --- 20 54 06 74.3 94.3 -1.2 -76.4 61 F 1 1236 23 37 36 23 38 46 GJ4247 20 54 06 75.0 99.5 -1.1 -71.9 -9 1 1 1236 23 38 46 23 41 46 --- 20 57 07 75.6 100.4 -1.1 -71.5 171 F 1 1248 23 38 46 23 41 46 J2205+2926 20 57 07 75.0 94.9 -1.2 -76.2 -10 1 1 1248 23 41 46 23 42 56 --- 20 58 17 75.2 95.2 -1.1 -76.1 60 F 1 1252 23 41 46 Schedule for VLBA_KP (Code Kp ) Page 15 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 23 42 56 GJ4247 20 58 17 75.9 100.7 -1.1 -71.3 -10 1 1 1252 23 42 56 23 45 56 --- 21 01 17 76.5 101.6 -1.0 -70.8 170 F 1 1264 23 42 56 23 45 56 J2205+2926 21 01 17 75.9 95.8 -1.1 -75.9 -10 1 1 1264 23 45 56 23 47 06 --- 21 02 28 76.1 96.1 -1.1 -75.8 60 F 1 1268 23 45 56 23 47 06 GJ4247 21 02 28 76.7 102.0 -1.0 -70.6 -10 1 1 1268 23 47 06 23 50 06 --- 21 05 28 77.4 102.9 -0.9 -70.0 170 F 1 1280 23 47 06 23 50 06 J2205+2926 21 05 28 76.7 96.8 -1.0 -75.5 -10 1 1 1280 23 50 06 23 51 16 --- 21 06 38 77.0 97.0 -1.0 -75.3 60 F 1 1284 23 50 06 23 51 16 GJ4247 21 06 38 77.6 103.4 -0.9 -69.7 -10 1 1 1284 23 51 16 23 54 16 --- 21 09 39 78.2 104.5 -0.9 -69.0 170 F 1 1296 23 51 16 23 54 16 J2205+2926 21 09 39 77.6 97.8 -0.9 -75.0 -10 1 1 1296 23 54 16 23 55 26 --- 21 10 49 77.9 98.1 -0.9 -74.8 60 F 1 1301 23 54 16 23 55 26 GJ4247 21 10 49 78.5 104.9 -0.8 -68.7 -11 1 1 1301 23 55 26 23 58 26 --- 21 13 49 79.1 106.2 -0.8 -67.8 169 F 1 1312 23 55 26 23 58 26 J2205+2926 21 13 49 78.5 99.0 -0.9 -74.3 -11 1 1 1312 23 58 26 23 59 36 --- 21 15 00 78.7 99.3 -0.9 -74.1 59 F 1 1317 23 58 26 --- Start: Sat 1 Dec 2007 Day 335 -- Stop: Sun 2 Dec 2007 Day 336 --- 23 59 36 J2203+2811 21 15 00 78.7 106.1 -0.8 -67.7 -10 1 1 1317 23 59 36 00 00 46 --- 21 16 10 78.9 106.6 -0.8 -67.4 60 F 1 1321 23 59 36 00 00 46 J2205+2926 21 16 10 79.0 99.7 -0.8 -73.9 -11 1 1 1321 00 00 46 00 01 56 --- 21 17 20 79.2 100.1 -0.8 -73.7 59 F 1 1326 00 00 46 00 05 48 J2042-3152 21 21 12 25.6 188.9 0.6 8.9 118 1 1 1326 00 05 48 00 06 28 --- 21 21 52 25.5 189.1 0.6 9.1 40 F 1 1328 00 06 06 00 06 28 J2043-3049 21 21 52 26.6 189.2 0.6 9.1 -8 1 1 1328 00 06 28 00 07 38 --- 21 23 02 26.6 189.5 0.7 9.3 62 F 1 1333 00 06 28 00 07 38 J2042-3152 21 23 02 25.5 189.4 0.7 9.3 -8 1 1 1333 00 07 38 00 08 48 --- 21 24 12 25.5 189.6 0.7 9.6 62 F 1 1337 00 07 38 00 08 48 GJ803 21 24 12 26.1 189.2 0.6 9.1 -7 1 1 1337 00 08 48 00 11 48 --- 21 27 13 26.0 189.9 0.7 9.8 173 F 1 1349 00 08 48 Schedule for VLBA_KP (Code Kp ) Page 16 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 2 Dec 2007 Day 336 --- 00 11 48 J2042-3152 21 27 13 25.4 190.3 0.7 10.3 -7 1 1 1349 00 11 48 00 12 58 --- 21 28 23 25.3 190.6 0.8 10.6 63 F 1 1353 00 11 48 00 12 58 GJ803 21 28 23 25.9 190.1 0.7 10.1 -7 1 1 1353 00 12 58 00 15 58 --- 21 31 24 25.8 190.8 0.8 10.8 173 F 1 1365 00 12 58 00 15 58 J2042-3152 21 31 24 25.2 191.3 0.8 11.3 -7 1 1 1365 00 15 58 00 17 08 --- 21 32 34 25.1 191.6 0.8 11.5 63 F 1 1370 00 15 58 00 17 08 GJ803 21 32 34 25.8 191.1 0.8 11.0 -7 1 1 1370 00 17 08 00 20 08 --- 21 35 34 25.6 191.8 0.8 11.7 173 F 1 1381 00 17 08 00 20 08 J2042-3152 21 35 34 25.0 192.2 0.9 12.2 -7 1 1 1381 00 20 08 00 21 18 --- 21 36 45 25.0 192.5 0.9 12.5 63 F 1 1386 00 20 08 00 21 18 GJ803 21 36 45 25.6 192.1 0.9 12.0 -7 1 1 1386 00 21 18 00 24 18 --- 21 39 45 25.4 192.8 0.9 12.7 173 F 1 1397 00 21 18 00 24 18 J2042-3152 21 39 45 24.8 193.2 0.9 13.2 -7 1 1 1397 00 24 18 00 25 28 --- 21 40 55 24.8 193.5 1.0 13.4 63 F 1 1402 00 24 18 00 25 28 GJ803 21 40 55 25.4 193.1 0.9 13.0 -7 1 1 1402 00 25 28 00 28 28 --- 21 43 56 25.2 193.7 1.0 13.6 173 F 1 1413 00 25 28 00 28 28 J2042-3152 21 43 56 24.6 194.1 1.0 14.1 -7 1 1 1413 00 28 28 00 29 38 --- 21 45 06 24.5 194.4 1.0 14.4 63 F 1 1418 00 28 28 00 29 38 J2043-3049 21 45 06 25.6 194.6 1.0 14.4 -8 1 1 1418 00 29 38 00 30 48 --- 21 46 16 25.5 194.9 1.0 14.7 62 F 1 1422 00 29 38 00 30 48 J2042-3152 21 46 16 24.5 194.7 1.1 14.7 -8 1 1 1422 00 30 48 00 31 58 --- 21 47 26 24.4 194.9 1.1 14.9 62 F 1 1427 00 30 48 00 35 38 J2205+2926 21 51 07 85.9 126.4 -0.3 -51.7 92 1 1 1427 00 35 38 00 36 18 --- 21 51 48 86.1 127.7 -0.2 -50.4 40 F 1 1430 00 35 56 00 36 18 J2203+2811 21 51 48 85.4 143.1 -0.2 -35.3 -16 1 1 1430 00 36 18 00 37 28 --- 21 52 58 85.5 145.8 -0.2 -32.8 54 F 1 1434 00 36 18 00 37 28 J2205+2926 21 52 58 86.2 130.2 -0.2 -48.1 -16 1 1 1434 00 37 28 00 38 38 --- 21 54 08 86.4 132.9 -0.2 -45.5 54 F 1 1439 00 37 28 Schedule for VLBA_KP (Code Kp ) Page 17 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 2 Dec 2007 Day 336 --- 00 38 38 GJ4247 21 54 08 86.0 155.5 -0.1 -23.6 -21 1 1 1439 00 38 38 00 41 38 --- 21 57 08 86.3 164.8 -0.1 -14.6 159 F 1 1450 00 38 38 00 41 38 J2205+2926 21 57 08 86.9 141.3 -0.1 -37.5 -22 1 1 1450 00 41 38 00 42 48 --- 21 58 19 87.0 145.2 -0.1 -33.8 48 F 1 1455 00 41 38 00 42 48 GJ4247 21 58 19 86.3 168.7 -0.1 -10.9 -22 1 1 1455 00 42 48 00 45 48 --- 22 01 19 86.4 179.1 0.0 -0.9 158 F 1 1466 00 42 48 00 45 48 J2205+2926 22 01 19 87.3 156.9 -0.1 -22.4 -21 1 1 1466 00 45 48 00 46 58 --- 22 02 29 87.4 162.2 -0.1 -17.4 49 F 1 1471 00 45 48 00 46 58 GJ4247 22 02 29 86.4 183.2 0.0 3.1 -20 1 1 1471 00 46 58 00 49 58 --- 22 05 30 86.3 193.5 0.1 13.0 160 F 1 1482 00 46 58 00 49 58 J2205+2926 22 05 30 87.5 176.8 0.0 -3.1 -17 1 1 1482 00 49 58 00 51 08 --- 22 06 40 87.5 182.7 0.0 2.6 53 F 1 1487 00 49 58 00 51 08 GJ4247 22 06 40 86.2 197.3 0.1 16.6 -16 1 1 1487 00 51 08 00 54 08 --- 22 09 41 86.0 206.4 0.1 25.4 164 F 1 1499 00 51 08 00 54 08 J2205+2926 22 09 41 87.4 197.4 0.1 16.9 -12 1 1 1499 00 54 08 00 55 18 --- 22 10 51 87.3 202.6 0.1 22.0 58 F 1 1503 00 54 08 00 55 18 GJ4247 22 10 51 85.9 209.6 0.2 28.5 -11 1 1 1503 00 55 18 00 58 18 --- 22 13 51 85.5 217.1 0.2 35.6 169 F 1 1515 00 55 18 00 58 18 J2205+2926 22 13 51 87.0 214.4 0.1 33.5 -9 1 1 1515 00 58 18 01 00 18 --- 22 15 52 86.8 220.9 0.2 39.7 111 F 1 1522 00 58 18 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 7 Station: VLBA_KP Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 7 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ803/4247 Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * GJ4247 21 58 57.453506 * 22 01 13.346939 22 01 34.723645 0.00 28 03 57.17781 * 28 18 25.15075 28 20 53.83897 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 80.299 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 22 01 13.123900 Dec = 28 18 24.86200 Rates: RA = 372.11 mas/yr Dec = 36.48 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54435.7139 Rates: RA = 0.77144E-04 s/day Dec = 0.99877E-04 arcsec/day * J2205+2926 22 03 30.827948 * 22 05 46.506429 22 06 07.863352 0.00 29 12 17.38655 * 29 26 55.13118 29 29 25.87383 0.00 From catalog imbedded in main SCHED input file. 1.114 scan hours, 40.401 baseline hours above horizon. * J2203+2811 22 01 42.793253 * 22 03 59.147974 22 04 20.617852 0.00 27 56 47.93108 * 28 11 21.86919 28 13 51.57981 0.00 From catalog imbedded in main SCHED input file. 0.292 scan hours, 9.927 baseline hours above horizon. * GJ803 20 42 05.055474 * 20 45 09.705033 20 45 38.816734 0.00 -31 31 26.41068 *-31 20 30.08565 -31 18 55.99955 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 71.769 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 20 45 09.531800 Dec = -31 20 27.23600 Rates: RA = 280.37 mas/yr Dec = -360.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54435.7139 Rates: RA = 0.59917E-04 s/day Dec = -0.98563E-03 arcsec/day * J2042-3152 20 39 40.825570 * 20 42 46.406520 20 43 15.650395 0.00 -32 03 16.96459 *-31 52 28.59420 -31 50 55.92876 0.00 From catalog imbedded in main SCHED input file. 1.119 scan hours, 36.886 baseline hours above horizon. * J2043-3049 20 40 03.445142 * 20 43 07.697350 20 43 36.732178 0.00 -31 00 04.47315 *-30 49 14.88550 -30 47 41.72539 0.00 From catalog imbedded in main SCHED input file. 0.311 scan hours, 10.019 baseline hours above horizon. J1642+3948 16 41 17.606231 * 16 42 58.809968 16 43 13.474419 0.26 1641+399 39 54 10.81494 * 39 48 36.99400 39 47 38.64518 0.40 * 3C345 /home/arana/cwalker/sched/catalogs/sources.vlba J1642+39 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.167 scan hours, 9.166 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) GJ4247 94.3 J2205+2926 95.6 J2203+2811 94.8 GJ803 57.1 J2042-3152 56.5 J2043-3049 56.7 3C345 61.7 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg