COVER INFORMATION Station: VLBA_BR (Code Br ) Experiment: RIPL: GJ803/4247 Exp. Code: BB240H Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for VLBA_BR (Code Br ) Page 2 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 17 00 00 3C345 13 41 57 56.8 87.4 -3.0 -60.2 0 1 1 0 17 00 00 17 08 00 --- 13 49 59 58.2 88.8 -2.9 -60.3 480 F 1 31 17 00 18 17 20 26 J2205+2926 14 02 27 3.9 48.5 -8.1 H -35.0 631 1 1 31 17 20 26 17 21 06 --- 14 03 07 4.0 48.6 -8.1 H -35.1 0 F 1 34 17 20 44 17 21 06 J2203+2811 14 03 07 3.2 49.6 -8.0 H -35.2 -8 1 1 34 17 21 06 17 22 16 --- 14 04 17 3.3 49.8 -8.0 H -35.4 0 F 1 38 17 21 06 17 22 16 J2205+2926 14 04 17 4.1 48.8 -8.0 -35.2 -8 1 1 38 17 22 16 17 23 26 --- 14 05 27 4.3 49.0 -8.0 -35.4 62 F 1 43 17 22 16 17 23 26 GJ4247 14 05 27 3.9 50.5 -7.9 H -35.8 -7 1 1 43 17 23 26 17 26 26 --- 14 08 28 4.3 51.0 -7.9 -36.1 0 F 1 54 17 23 26 17 26 26 J2205+2926 14 08 28 4.7 49.5 -8.0 -35.7 -7 1 1 54 17 26 26 17 27 36 --- 14 09 38 4.8 49.7 -7.9 -35.8 63 F 1 59 17 26 26 17 27 36 GJ4247 14 09 38 4.5 51.2 -7.9 -36.2 -7 1 1 59 17 27 36 17 30 36 --- 14 12 38 4.9 51.8 -7.8 -36.6 173 F 1 70 17 27 36 17 30 36 J2205+2926 14 12 38 5.2 50.3 -7.9 -36.1 -7 1 1 70 17 30 36 17 31 46 --- 14 13 48 5.3 50.5 -7.9 -36.3 63 F 1 75 17 30 36 17 31 46 GJ4247 14 13 48 5.0 52.0 -7.8 -36.7 -7 1 1 75 17 31 46 17 34 46 --- 14 16 49 5.4 52.5 -7.7 -37.0 173 F 1 86 17 31 46 17 34 46 J2205+2926 14 16 49 5.7 51.0 -7.8 -36.6 -7 1 1 86 17 34 46 17 35 56 --- 14 17 59 5.9 51.2 -7.8 -36.7 63 F 1 91 17 34 46 17 35 56 GJ4247 14 17 59 5.6 52.7 -7.7 -37.1 -7 1 1 91 17 35 56 17 38 56 --- 14 21 00 6.0 53.2 -7.7 -37.4 173 F 1 103 17 35 56 17 38 56 J2205+2926 14 21 00 6.3 51.7 -7.8 -37.0 -7 1 1 103 17 38 56 17 40 06 --- 14 22 10 6.4 51.9 -7.7 -37.1 63 F 1 107 17 38 56 Schedule for VLBA_BR (Code Br ) Page 3 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 17 40 06 GJ4247 14 22 10 6.1 53.4 -7.7 -37.5 -7 1 1 107 17 40 06 17 43 06 --- 14 25 10 6.5 54.0 -7.6 -37.8 173 F 1 119 17 40 06 17 43 06 J2205+2926 14 25 10 6.8 52.5 -7.7 -37.4 -7 1 1 119 17 43 06 17 44 16 --- 14 26 20 7.0 52.7 -7.7 -37.6 63 F 1 123 17 43 06 17 44 16 J2203+2811 14 26 20 6.2 53.8 -7.6 -37.7 -7 1 1 123 17 44 16 17 45 26 --- 14 27 31 6.4 54.0 -7.6 -37.8 63 F 1 128 17 44 16 17 45 56 J2205+2926 14 28 01 7.2 53.0 -7.6 -37.7 23 1 1 128 17 45 56 17 46 36 --- 14 28 41 7.3 53.1 -7.6 -37.8 40 F 1 130 17 46 14 17 46 36 J2203+2811 14 28 41 6.5 54.2 -7.6 -37.9 -7 1 1 130 17 46 36 17 47 46 --- 14 29 52 6.7 54.4 -7.6 -38.0 63 F 1 135 17 46 36 17 47 46 J2205+2926 14 29 52 7.5 53.3 -7.6 -37.9 -7 1 1 135 17 47 46 17 48 56 --- 14 31 02 7.6 53.5 -7.6 -38.0 63 F 1 139 17 47 46 17 48 56 GJ4247 14 31 02 7.3 55.0 -7.5 -38.4 -7 1 1 139 17 48 56 17 51 56 --- 14 34 02 7.7 55.5 -7.5 -38.7 173 F 1 151 17 48 56 17 51 56 J2205+2926 14 34 02 8.0 54.0 -7.5 -38.3 -7 1 1 151 17 51 56 17 53 06 --- 14 35 13 8.2 54.2 -7.5 -38.5 63 F 1 155 17 51 56 17 53 06 GJ4247 14 35 13 7.9 55.7 -7.4 -38.8 -7 1 1 155 17 53 06 17 56 06 --- 14 38 13 8.3 56.2 -7.4 -39.1 173 F 1 167 17 53 06 17 56 06 J2205+2926 14 38 13 8.6 54.7 -7.5 -38.7 -7 1 1 167 17 56 06 17 57 16 --- 14 39 23 8.7 54.9 -7.4 -38.9 63 F 1 172 17 56 06 17 57 16 GJ4247 14 39 23 8.5 56.4 -7.4 -39.2 -7 1 1 172 17 57 16 18 00 16 --- 14 42 24 8.9 56.9 -7.3 -39.5 173 F 1 183 17 57 16 18 00 16 J2205+2926 14 42 24 9.1 55.4 -7.4 -39.2 -7 1 1 183 18 00 16 18 01 26 --- 14 43 34 9.3 55.6 -7.4 -39.3 63 F 1 188 18 00 16 18 01 26 GJ4247 14 43 34 9.1 57.1 -7.3 -39.6 -7 1 1 188 18 01 26 18 04 26 --- 14 46 34 9.5 57.7 -7.3 -39.8 173 F 1 199 18 01 26 18 04 26 J2205+2926 14 46 34 9.7 56.1 -7.3 -39.6 -7 1 1 199 18 04 26 18 05 36 --- 14 47 45 9.9 56.3 -7.3 -39.7 63 F 1 204 18 04 26 Schedule for VLBA_BR (Code Br ) Page 4 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 18 05 36 GJ4247 14 47 45 9.6 57.9 -7.2 -40.0 -7 1 1 204 18 05 36 18 08 36 --- 14 50 45 10.1 58.4 -7.2 -40.2 173 F 1 215 18 05 36 18 08 36 J2205+2926 14 50 45 10.3 56.9 -7.3 -39.9 -7 1 1 215 18 08 36 18 09 46 --- 14 51 55 10.5 57.1 -7.2 -40.1 63 F 1 220 18 08 36 18 09 46 J2203+2811 14 51 55 9.8 58.2 -7.2 -40.1 -7 1 1 220 18 09 46 18 10 56 --- 14 53 05 9.9 58.4 -7.2 -40.2 63 F 1 225 18 09 46 18 11 27 J2205+2926 14 53 36 10.7 57.3 -7.2 -40.2 23 1 1 225 18 11 27 18 12 07 --- 14 54 17 10.8 57.5 -7.2 -40.3 40 F 1 227 18 11 45 18 12 07 J2203+2811 14 54 17 10.1 58.6 -7.2 -40.3 -7 1 1 227 18 12 07 18 13 17 --- 14 55 27 10.3 58.8 -7.1 -40.4 63 F 1 232 18 12 07 18 13 17 J2205+2926 14 55 27 11.0 57.6 -7.2 -40.4 -7 1 1 232 18 13 17 18 14 27 --- 14 56 37 11.1 57.8 -7.2 -40.5 63 F 1 236 18 13 17 18 14 27 GJ4247 14 56 37 10.9 59.4 -7.1 -40.7 -7 1 1 236 18 14 27 18 17 27 --- 14 59 37 11.3 59.9 -7.0 -41.0 173 F 1 248 18 14 27 18 17 27 J2205+2926 14 59 37 11.6 58.4 -7.1 -40.7 -7 1 1 248 18 17 27 18 18 37 --- 15 00 48 11.7 58.6 -7.1 -40.9 63 F 1 252 18 17 27 18 18 37 GJ4247 15 00 48 11.5 60.1 -7.0 -41.1 -7 1 1 252 18 18 37 18 21 37 --- 15 03 48 12.0 60.6 -7.0 -41.3 173 F 1 264 18 18 37 18 21 37 J2205+2926 15 03 48 12.2 59.1 -7.0 -41.1 -7 1 1 264 18 21 37 18 22 47 --- 15 04 58 12.3 59.3 -7.0 -41.2 63 F 1 268 18 21 37 18 22 47 GJ4247 15 04 58 12.1 60.8 -6.9 -41.4 -7 1 1 268 18 22 47 18 25 47 --- 15 07 59 12.6 61.3 -6.9 -41.7 173 F 1 280 18 22 47 18 25 47 J2205+2926 15 07 59 12.8 59.8 -7.0 -41.5 -7 1 1 280 18 25 47 18 26 57 --- 15 09 09 12.9 60.0 -6.9 -41.6 63 F 1 284 18 25 47 18 26 57 GJ4247 15 09 09 12.7 61.5 -6.9 -41.8 -7 1 1 284 18 26 57 18 29 57 --- 15 12 09 13.2 62.0 -6.8 -42.0 173 F 1 296 18 26 57 18 29 57 J2205+2926 15 12 09 13.4 60.5 -6.9 -41.8 -7 1 1 296 18 29 57 18 31 07 --- 15 13 20 13.5 60.6 -6.9 -41.9 63 F 1 301 18 29 57 Schedule for VLBA_BR (Code Br ) Page 5 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 18 31 07 GJ4247 15 13 20 13.3 62.2 -6.8 -42.1 -7 1 1 301 18 31 07 18 34 07 --- 15 16 20 13.8 62.7 -6.8 -42.4 173 F 1 312 18 31 07 18 34 07 J2205+2926 15 16 20 14.0 61.1 -6.8 -42.2 -7 1 1 312 18 34 07 18 35 17 --- 15 17 30 14.1 61.3 -6.8 -42.3 63 F 1 317 18 34 07 18 35 17 J2203+2811 15 17 30 13.5 62.5 -6.8 -42.2 -7 1 1 317 18 35 17 18 36 27 --- 15 18 41 13.6 62.7 -6.8 -42.3 63 F 1 321 18 35 17 18 36 59 J2205+2926 15 19 12 14.4 61.6 -6.8 -42.4 24 1 1 321 18 36 59 18 37 39 --- 15 19 52 14.5 61.7 -6.8 -42.5 40 F 1 324 18 37 17 18 37 39 J2203+2811 15 19 52 13.8 62.9 -6.7 -42.4 -7 1 1 324 18 37 39 18 38 49 --- 15 21 02 14.0 63.1 -6.7 -42.5 63 F 1 328 18 37 39 18 38 49 J2205+2926 15 21 02 14.7 61.9 -6.8 -42.6 -7 1 1 328 18 38 49 18 39 59 --- 15 22 12 14.8 62.1 -6.7 -42.7 63 F 1 333 18 38 49 18 39 59 GJ4247 15 22 12 14.7 63.7 -6.7 -42.8 -7 1 1 333 18 39 59 18 42 59 --- 15 25 13 15.1 64.2 -6.6 -43.1 173 F 1 344 18 39 59 18 42 59 J2205+2926 15 25 13 15.3 62.6 -6.7 -42.9 -7 1 1 344 18 42 59 18 44 09 --- 15 26 23 15.4 62.8 -6.7 -43.0 63 F 1 349 18 42 59 18 44 09 GJ4247 15 26 23 15.3 64.4 -6.6 -43.1 -7 1 1 349 18 44 09 18 47 09 --- 15 29 24 15.7 64.9 -6.5 -43.4 173 F 1 361 18 44 09 18 47 09 J2205+2926 15 29 24 15.9 63.3 -6.6 -43.2 -7 1 1 361 18 47 09 18 48 19 --- 15 30 34 16.1 63.5 -6.6 -43.3 63 F 1 365 18 47 09 18 48 19 GJ4247 15 30 34 15.9 65.1 -6.5 -43.4 -7 1 1 365 18 48 19 18 51 19 --- 15 33 34 16.4 65.6 -6.5 -43.7 173 F 1 377 18 48 19 18 51 19 J2205+2926 15 33 34 16.5 64.0 -6.5 -43.6 -7 1 1 377 18 51 19 18 52 29 --- 15 34 44 16.7 64.2 -6.5 -43.7 63 F 1 381 18 51 19 18 52 29 GJ4247 15 34 44 16.6 65.8 -6.4 -43.8 -7 1 1 381 18 52 29 18 55 29 --- 15 37 45 17.0 66.3 -6.4 -44.0 173 F 1 393 18 52 29 18 55 29 J2205+2926 15 37 45 17.1 64.7 -6.5 -43.9 -7 1 1 393 18 55 29 18 56 39 --- 15 38 55 17.3 64.9 -6.5 -44.0 63 F 1 397 18 55 29 Schedule for VLBA_BR (Code Br ) Page 6 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 18 56 39 GJ4247 15 38 55 17.2 66.5 -6.4 -44.0 -7 1 1 397 18 56 39 18 59 39 --- 15 41 56 17.7 67.0 -6.3 -44.3 173 F 1 409 18 56 39 18 59 39 J2205+2926 15 41 56 17.8 65.4 -6.4 -44.2 -7 1 1 409 18 59 39 19 00 49 --- 15 43 06 18.0 65.6 -6.4 -44.3 63 F 1 414 18 59 39 19 00 49 J2203+2811 15 43 06 17.3 66.8 -6.4 -44.1 -7 1 1 414 19 00 49 19 01 59 --- 15 44 16 17.5 67.0 -6.3 -44.2 63 F 1 418 19 00 49 19 01 59 J2205+2926 15 44 16 18.1 65.8 -6.4 -44.4 -7 1 1 418 19 01 59 19 03 09 --- 15 45 26 18.3 65.9 -6.3 -44.4 63 F 1 423 19 01 59 21 00 17 3C345 17 42 54 76.4 237.6 1.0 47.1 6906 1 1 423 21 00 17 21 02 17 --- 17 44 54 76.2 238.7 1.0 47.9 120 F 1 430 21 00 35 21 17 18 GJ803 17 59 58 2.3 145.6 -2.8 H -26.2 747 1 1 430 21 17 18 21 20 18 --- 18 02 58 2.6 146.1 -2.7 H -25.8 0 F 1 442 21 17 36 21 20 18 J2042-3152 18 02 58 2.3 146.8 -2.7 H -25.5 -6 1 1 442 21 20 18 21 21 28 --- 18 04 08 2.4 147.0 -2.7 H -25.3 0 F 1 446 21 20 18 21 21 28 GJ803 18 04 08 2.7 146.4 -2.7 H -25.6 -6 1 1 446 21 21 28 21 24 28 --- 18 07 09 3.0 146.9 -2.6 H -25.2 0 F 1 458 21 21 28 21 24 28 J2042-3152 18 07 09 2.7 147.6 -2.6 H -24.9 -6 1 1 458 21 24 28 21 25 38 --- 18 08 19 2.8 147.8 -2.6 H -24.7 0 F 1 463 21 24 28 21 25 38 GJ803 18 08 19 3.1 147.2 -2.6 -25.1 -6 1 1 463 21 25 38 21 28 38 --- 18 11 19 3.4 147.7 -2.6 -24.6 174 F 1 474 21 25 38 21 28 38 J2042-3152 18 11 19 3.1 148.4 -2.5 -24.3 -6 1 1 474 21 28 38 21 29 48 --- 18 12 30 3.2 148.7 -2.5 -24.1 64 F 1 479 21 28 38 21 29 48 J2043-3049 18 12 30 4.1 148.2 -2.5 -24.2 -8 1 1 479 21 29 48 21 30 58 --- 18 13 40 4.2 148.4 -2.5 -24.0 62 F 1 483 21 29 48 21 30 58 J2042-3152 18 13 40 3.3 148.9 -2.5 -24.0 -8 1 1 483 21 30 58 21 32 08 --- 18 14 50 3.4 149.1 -2.5 -23.8 62 F 1 488 21 30 58 21 35 33 J2205+2926 18 18 15 43.1 91.9 -3.8 -50.0 119 1 1 488 21 35 33 21 36 13 --- 18 18 55 43.2 92.1 -3.8 -50.0 40 F 1 490 21 35 51 Schedule for VLBA_BR (Code Br ) Page 7 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 21 36 13 J2203+2811 18 18 55 42.7 93.7 -3.8 -49.1 -7 1 1 490 21 36 13 21 37 23 --- 18 20 05 42.9 94.0 -3.7 -49.1 63 F 1 495 21 36 13 21 37 23 J2205+2926 18 20 05 43.4 92.3 -3.8 -50.0 -7 1 1 495 21 37 23 21 38 33 --- 18 21 16 43.6 92.5 -3.7 -50.0 63 F 1 499 21 37 23 21 38 33 GJ4247 18 21 16 43.6 94.6 -3.7 -49.1 -7 1 1 499 21 38 33 21 41 33 --- 18 24 16 44.1 95.2 -3.6 -49.0 173 F 1 511 21 38 33 21 41 33 J2205+2926 18 24 16 44.1 93.1 -3.7 -50.0 -7 1 1 511 21 41 33 21 42 43 --- 18 25 26 44.3 93.3 -3.7 -49.9 63 F 1 515 21 41 33 21 42 43 GJ4247 18 25 26 44.3 95.5 -3.6 -49.0 -7 1 1 515 21 42 43 21 45 43 --- 18 28 27 44.8 96.1 -3.6 -48.9 173 F 1 527 21 42 43 21 45 43 J2205+2926 18 28 27 44.8 93.9 -3.6 -49.9 -7 1 1 527 21 45 43 21 46 53 --- 18 29 37 45.0 94.2 -3.6 -49.9 63 F 1 532 21 45 43 21 46 53 GJ4247 18 29 37 45.0 96.3 -3.5 -48.9 -7 1 1 532 21 46 53 21 49 53 --- 18 32 38 45.5 96.9 -3.5 -48.8 173 F 1 543 21 46 53 21 49 53 J2205+2926 18 32 38 45.5 94.8 -3.6 -49.8 -7 1 1 543 21 49 53 21 51 03 --- 18 33 48 45.7 95.0 -3.5 -49.8 63 F 1 548 21 49 53 21 51 03 GJ4247 18 33 48 45.7 97.2 -3.5 -48.8 -7 1 1 548 21 51 03 21 54 03 --- 18 36 48 46.2 97.8 -3.4 -48.7 173 F 1 559 21 51 03 21 54 03 J2205+2926 18 36 48 46.2 95.6 -3.5 -49.7 -7 1 1 559 21 54 03 21 55 13 --- 18 37 58 46.4 95.8 -3.5 -49.7 63 F 1 564 21 54 03 21 55 13 GJ4247 18 37 58 46.4 98.0 -3.4 -48.7 -7 1 1 564 21 55 13 21 58 13 --- 18 40 59 46.9 98.7 -3.3 -48.6 173 F 1 575 21 55 13 21 58 13 J2205+2926 18 40 59 46.9 96.5 -3.4 -49.6 -7 1 1 575 21 58 13 21 59 23 --- 18 42 09 47.1 96.7 -3.4 -49.6 63 F 1 580 21 58 13 21 59 23 J2203+2811 18 42 09 46.5 98.5 -3.4 -48.5 -7 1 1 580 21 59 23 22 00 33 --- 18 43 19 46.7 98.7 -3.4 -48.5 63 F 1 584 21 59 23 22 00 33 J2205+2926 18 43 19 47.3 96.9 -3.4 -49.6 -7 1 1 584 22 00 33 22 01 43 --- 18 44 29 47.5 97.2 -3.4 -49.5 63 F 1 589 22 00 33 Schedule for VLBA_BR (Code Br ) Page 8 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 22 05 24 J2042-3152 18 48 11 6.0 155.7 -1.9 -18.8 132 1 1 589 22 05 24 22 06 04 --- 18 48 51 6.0 155.9 -1.9 -18.7 40 F 1 592 22 05 42 22 06 04 J2043-3049 18 48 51 7.0 155.5 -1.9 -18.8 -8 1 1 592 22 06 04 22 07 14 --- 18 50 02 7.1 155.7 -1.9 -18.7 62 F 1 596 22 06 04 22 07 14 J2042-3152 18 50 02 6.1 156.1 -1.9 -18.6 -8 1 1 596 22 07 14 22 08 24 --- 18 51 12 6.2 156.3 -1.9 -18.4 62 F 1 601 22 07 14 22 08 24 GJ803 18 51 12 6.5 155.7 -1.9 -18.8 -6 1 1 601 22 08 24 22 11 24 --- 18 54 12 6.7 156.3 -1.9 -18.3 174 F 1 612 22 08 24 22 11 24 J2042-3152 18 54 12 6.4 156.9 -1.8 -17.9 -6 1 1 612 22 11 24 22 12 34 --- 18 55 22 6.4 157.2 -1.8 -17.7 64 F 1 617 22 11 24 22 12 34 GJ803 18 55 22 6.8 156.5 -1.8 -18.1 -6 1 1 617 22 12 34 22 15 34 --- 18 58 23 7.0 157.2 -1.8 -17.7 174 F 1 628 22 12 34 22 15 34 J2042-3152 18 58 23 6.6 157.8 -1.7 -17.3 -6 1 1 628 22 15 34 22 16 44 --- 18 59 33 6.7 158.0 -1.7 -17.1 64 F 1 633 22 15 34 22 16 44 GJ803 18 59 33 7.1 157.4 -1.8 -17.5 -6 1 1 633 22 16 44 22 19 44 --- 19 02 34 7.3 158.0 -1.7 -17.0 174 F 1 644 22 16 44 22 19 44 J2042-3152 19 02 34 6.9 158.7 -1.7 -16.6 -6 1 1 644 22 19 44 22 20 54 --- 19 03 44 7.0 158.9 -1.7 -16.4 64 F 1 649 22 19 44 22 20 54 GJ803 19 03 44 7.3 158.3 -1.7 -16.8 -6 1 1 649 22 20 54 22 23 54 --- 19 06 44 7.5 158.9 -1.6 -16.4 174 F 1 661 22 20 54 22 23 54 J2042-3152 19 06 44 7.1 159.5 -1.6 -16.0 -6 1 1 661 22 23 54 22 25 04 --- 19 07 54 7.2 159.8 -1.6 -15.8 64 F 1 665 22 23 54 22 25 04 GJ803 19 07 54 7.6 159.1 -1.6 -16.2 -6 1 1 665 22 25 04 22 28 04 --- 19 10 55 7.8 159.7 -1.6 -15.7 174 F 1 677 22 25 04 22 28 04 J2042-3152 19 10 55 7.4 160.4 -1.5 -15.3 -6 1 1 677 22 28 04 22 29 14 --- 19 12 05 7.5 160.6 -1.5 -15.1 64 F 1 681 22 28 04 22 29 14 J2043-3049 19 12 05 8.5 160.3 -1.5 -15.2 -8 1 1 681 22 29 14 22 30 24 --- 19 13 15 8.5 160.5 -1.5 -15.0 62 F 1 686 22 29 14 Schedule for VLBA_BR (Code Br ) Page 9 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 22 30 24 J2042-3152 19 13 15 7.5 160.9 -1.5 -14.9 -8 1 1 686 22 30 24 22 31 34 --- 19 14 25 7.6 161.1 -1.5 -14.7 62 F 1 690 22 30 24 22 35 30 J2205+2926 19 18 22 53.0 104.8 -2.8 -47.8 139 1 1 690 22 35 30 22 36 10 --- 19 19 02 53.1 105.0 -2.8 -47.8 40 F 1 693 22 35 48 22 36 10 J2203+2811 19 19 02 52.5 106.9 -2.8 -46.4 -7 1 1 693 22 36 10 22 37 20 --- 19 20 13 52.7 107.2 -2.7 -46.4 63 F 1 697 22 36 10 22 37 20 J2205+2926 19 20 13 53.3 105.2 -2.8 -47.7 -7 1 1 697 22 37 20 22 38 30 --- 19 21 23 53.5 105.5 -2.7 -47.6 63 F 1 702 22 37 20 22 38 30 GJ4247 19 21 23 53.4 108.1 -2.7 -46.1 -8 1 1 702 22 38 30 22 41 30 --- 19 24 23 53.9 108.8 -2.6 -45.9 172 F 1 714 22 38 30 22 41 30 J2205+2926 19 24 23 54.0 106.3 -2.7 -47.4 -8 1 1 714 22 41 30 22 42 40 --- 19 25 34 54.2 106.6 -2.7 -47.3 62 F 1 718 22 41 30 22 42 40 GJ4247 19 25 34 54.1 109.2 -2.6 -45.8 -8 1 1 718 22 42 40 22 45 40 --- 19 28 34 54.6 109.9 -2.6 -45.5 172 F 1 730 22 42 40 22 45 40 J2205+2926 19 28 34 54.6 107.3 -2.6 -47.1 -8 1 1 730 22 45 40 22 46 50 --- 19 29 44 54.8 107.6 -2.6 -46.9 62 F 1 734 22 45 40 22 46 50 GJ4247 19 29 44 54.8 110.3 -2.5 -45.4 -8 1 1 734 22 46 50 22 49 50 --- 19 32 45 55.2 111.1 -2.5 -45.0 172 F 1 746 22 46 50 22 49 50 J2205+2926 19 32 45 55.3 108.4 -2.6 -46.7 -8 1 1 746 22 49 50 22 51 00 --- 19 33 55 55.5 108.7 -2.5 -46.6 62 F 1 750 22 49 50 22 51 00 GJ4247 19 33 55 55.4 111.4 -2.5 -44.9 -8 1 1 750 22 51 00 22 54 00 --- 19 36 55 55.9 112.2 -2.4 -44.6 172 F 1 762 22 51 00 22 54 00 J2205+2926 19 36 55 56.0 109.5 -2.5 -46.3 -8 1 1 762 22 54 00 22 55 10 --- 19 38 06 56.2 109.8 -2.5 -46.2 62 F 1 766 22 54 00 22 55 10 GJ4247 19 38 06 56.1 112.6 -2.4 -44.5 -8 1 1 766 22 55 10 22 58 10 --- 19 41 06 56.5 113.4 -2.3 -44.1 172 F 1 778 22 55 10 22 58 10 J2205+2926 19 41 06 56.6 110.7 -2.4 -45.8 -8 1 1 778 22 58 10 22 59 20 --- 19 42 16 56.8 111.0 -2.4 -45.7 62 F 1 783 22 58 10 Schedule for VLBA_BR (Code Br ) Page 10 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 22 59 20 J2203+2811 19 42 16 56.2 113.1 -2.4 -44.2 -7 1 1 783 22 59 20 23 00 30 --- 19 43 26 56.4 113.4 -2.3 -44.0 63 F 1 787 22 59 20 23 00 30 J2205+2926 19 43 26 57.0 111.3 -2.4 -45.6 -7 1 1 787 23 00 30 23 01 40 --- 19 44 37 57.2 111.6 -2.4 -45.5 63 F 1 792 23 00 30 23 05 42 J2042-3152 19 48 39 9.1 168.3 -0.9 -9.2 140 1 1 792 23 05 42 23 06 22 --- 19 49 19 9.1 168.4 -0.9 -9.1 40 F 1 794 23 06 00 23 06 22 J2043-3049 19 49 19 10.1 168.2 -0.9 -9.2 -8 1 1 794 23 06 22 23 07 32 --- 19 50 29 10.2 168.4 -0.9 -9.0 62 F 1 799 23 06 22 23 07 32 J2042-3152 19 50 29 9.2 168.7 -0.9 -8.9 -8 1 1 799 23 07 32 23 08 42 --- 19 51 40 9.2 168.9 -0.9 -8.7 62 F 1 803 23 07 32 23 08 42 GJ803 19 51 40 9.6 168.3 -0.9 -9.1 -7 1 1 803 23 08 42 23 11 42 --- 19 54 40 9.7 169.0 -0.8 -8.6 173 F 1 815 23 08 42 23 11 42 J2042-3152 19 54 40 9.3 169.6 -0.8 -8.2 -7 1 1 815 23 11 42 23 12 52 --- 19 55 50 9.3 169.8 -0.8 -8.0 63 F 1 819 23 11 42 23 12 52 GJ803 19 55 50 9.8 169.2 -0.8 -8.4 -7 1 1 819 23 12 52 23 15 52 --- 19 58 51 9.9 169.9 -0.8 -7.9 173 F 1 831 23 12 52 23 15 52 J2042-3152 19 58 51 9.4 170.5 -0.7 -7.5 -7 1 1 831 23 15 52 23 17 02 --- 20 00 01 9.4 170.7 -0.7 -7.3 63 F 1 835 23 15 52 23 17 02 GJ803 20 00 01 9.9 170.1 -0.8 -7.7 -7 1 1 835 23 17 02 23 20 02 --- 20 03 01 10.0 170.8 -0.7 -7.2 173 F 1 847 23 17 02 23 20 02 J2042-3152 20 03 01 9.5 171.3 -0.7 -6.8 -7 1 1 847 23 20 02 23 21 12 --- 20 04 12 9.5 171.6 -0.7 -6.6 63 F 1 852 23 20 02 23 21 12 GJ803 20 04 12 10.0 171.0 -0.7 -7.0 -7 1 1 852 23 21 12 23 24 12 --- 20 07 12 10.1 171.7 -0.6 -6.5 173 F 1 863 23 21 12 23 24 12 J2042-3152 20 07 12 9.6 172.2 -0.6 -6.1 -7 1 1 863 23 24 12 23 25 22 --- 20 08 22 9.6 172.5 -0.6 -5.9 63 F 1 868 23 24 12 23 25 22 GJ803 20 08 22 10.1 171.9 -0.6 -6.3 -7 1 1 868 23 25 22 23 28 22 --- 20 11 23 10.2 172.6 -0.6 -5.8 173 F 1 879 23 25 22 Schedule for VLBA_BR (Code Br ) Page 11 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 23 28 22 J2042-3152 20 11 23 9.7 173.1 -0.5 -5.4 -7 1 1 879 23 28 22 23 29 32 --- 20 12 33 9.7 173.4 -0.5 -5.2 63 F 1 884 23 28 22 23 29 32 J2043-3049 20 12 33 10.8 173.2 -0.5 -5.3 -8 1 1 884 23 29 32 23 30 42 --- 20 13 43 10.8 173.5 -0.5 -5.1 62 F 1 888 23 29 32 23 30 42 J2042-3152 20 13 43 9.7 173.6 -0.5 -5.0 -8 1 1 888 23 30 42 23 31 52 --- 20 14 53 9.8 173.9 -0.5 -4.8 62 F 1 893 23 30 42 23 35 46 J2205+2926 20 18 49 62.3 122.5 -1.8 -40.3 124 1 1 893 23 35 46 23 36 26 --- 20 19 29 62.3 122.7 -1.8 -40.2 40 F 1 895 23 36 04 23 36 26 J2203+2811 20 19 29 61.6 125.0 -1.7 -38.3 -8 1 1 895 23 36 26 23 37 36 --- 20 20 39 61.8 125.5 -1.7 -38.1 62 F 1 900 23 36 26 23 37 36 J2205+2926 20 20 39 62.5 123.1 -1.8 -40.0 -8 1 1 900 23 37 36 23 38 46 --- 20 21 49 62.7 123.5 -1.7 -39.7 62 F 1 904 23 37 36 23 38 46 GJ4247 20 21 49 62.4 126.8 -1.7 -37.4 -8 1 1 904 23 38 46 23 41 46 --- 20 24 50 62.8 127.9 -1.6 -36.7 172 F 1 916 23 38 46 23 41 46 J2205+2926 20 24 50 63.1 124.6 -1.7 -39.1 -8 1 1 916 23 41 46 23 42 56 --- 20 26 00 63.2 125.1 -1.7 -38.9 62 F 1 921 23 41 46 23 42 56 GJ4247 20 26 00 63.0 128.4 -1.6 -36.5 -8 1 1 921 23 42 56 23 45 56 --- 20 29 00 63.3 129.6 -1.5 -35.8 172 F 1 932 23 42 56 23 45 56 J2205+2926 20 29 00 63.7 126.2 -1.6 -38.2 -8 1 1 932 23 45 56 23 47 06 --- 20 30 11 63.8 126.7 -1.6 -37.9 62 F 1 937 23 45 56 23 47 06 GJ4247 20 30 11 63.5 130.0 -1.5 -35.5 -8 1 1 937 23 47 06 23 50 06 --- 20 33 11 63.9 131.2 -1.5 -34.8 172 F 1 948 23 47 06 23 50 06 J2205+2926 20 33 11 64.2 127.9 -1.5 -37.3 -8 1 1 948 23 50 06 23 51 16 --- 20 34 21 64.4 128.3 -1.5 -37.0 62 F 1 953 23 50 06 23 51 16 GJ4247 20 34 21 64.0 131.7 -1.5 -34.5 -8 1 1 953 23 51 16 23 54 16 --- 20 37 22 64.4 133.0 -1.4 -33.7 172 F 1 964 23 51 16 23 54 16 J2205+2926 20 37 22 64.8 129.6 -1.5 -36.2 -8 1 1 964 23 54 16 23 55 26 --- 20 38 32 64.9 130.0 -1.5 -35.9 62 F 1 969 23 54 16 Schedule for VLBA_BR (Code Br ) Page 12 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 1 Dec 2007 Day 335 --- 23 55 26 GJ4247 20 38 32 64.5 133.5 -1.4 -33.4 -8 1 1 969 23 55 26 23 58 26 --- 20 41 32 64.9 134.8 -1.3 -32.6 172 F 1 981 23 55 26 23 58 26 J2205+2926 20 41 32 65.3 131.3 -1.4 -35.2 -8 1 1 981 23 58 26 23 59 36 --- 20 42 43 65.4 131.8 -1.4 -34.9 62 F 1 985 23 58 26 --- Start: Sat 1 Dec 2007 Day 335 -- Stop: Sun 2 Dec 2007 Day 336 --- 23 59 36 J2203+2811 20 42 43 64.6 134.2 -1.4 -32.9 -8 1 1 985 23 59 36 00 00 46 --- 20 43 53 64.7 134.7 -1.3 -32.5 62 F 1 990 23 59 36 00 00 46 J2205+2926 20 43 53 65.6 132.3 -1.4 -34.5 -8 1 1 990 00 00 46 00 01 56 --- 20 45 03 65.7 132.8 -1.4 -34.2 62 F 1 994 00 00 46 00 05 48 J2042-3152 20 48 55 10.0 181.2 0.1 1.0 114 1 1 994 00 05 48 00 06 28 --- 20 49 35 10.0 181.4 0.1 1.1 40 F 1 997 00 06 06 00 06 28 J2043-3049 20 49 35 11.1 181.3 0.1 1.0 -8 1 1 997 00 06 28 00 07 38 --- 20 50 45 11.1 181.6 0.1 1.2 62 F 1 1001 00 06 28 00 07 38 J2042-3152 20 50 45 10.0 181.6 0.1 1.3 -8 1 1 1001 00 07 38 00 08 48 --- 20 51 55 10.0 181.9 0.1 1.5 62 F 1 1006 00 07 38 00 08 48 GJ803 20 51 55 10.5 181.4 0.1 1.1 -7 1 1 1006 00 08 48 00 11 48 --- 20 54 56 10.5 182.0 0.2 1.6 173 F 1 1017 00 08 48 00 11 48 J2042-3152 20 54 56 10.0 182.5 0.2 2.0 -7 1 1 1017 00 11 48 00 12 58 --- 20 56 06 10.0 182.8 0.2 2.2 63 F 1 1022 00 11 48 00 12 58 GJ803 20 56 06 10.5 182.3 0.2 1.8 -7 1 1 1022 00 12 58 00 15 58 --- 20 59 07 10.5 182.9 0.2 2.3 173 F 1 1033 00 12 58 00 15 58 J2042-3152 20 59 07 9.9 183.4 0.3 2.7 -7 1 1 1033 00 15 58 00 17 08 --- 21 00 17 9.9 183.7 0.3 2.9 63 F 1 1038 00 15 58 00 17 08 GJ803 21 00 17 10.5 183.2 0.2 2.5 -7 1 1 1038 00 17 08 00 20 08 --- 21 03 17 10.5 183.8 0.3 3.0 173 F 1 1050 00 17 08 00 20 08 J2042-3152 21 03 17 9.9 184.3 0.3 3.4 -7 1 1 1050 00 20 08 00 21 18 --- 21 04 28 9.9 184.6 0.4 3.6 63 F 1 1054 00 20 08 00 21 18 GJ803 21 04 28 10.4 184.1 0.3 3.2 -7 1 1 1054 00 21 18 00 24 18 --- 21 07 28 10.4 184.7 0.4 3.7 173 F 1 1066 00 21 18 Schedule for VLBA_BR (Code Br ) Page 13 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 2 Dec 2007 Day 336 --- 00 24 18 J2042-3152 21 07 28 9.8 185.2 0.4 4.1 -7 1 1 1066 00 24 18 00 25 28 --- 21 08 38 9.8 185.5 0.4 4.3 63 F 1 1070 00 24 18 00 25 28 GJ803 21 08 38 10.4 185.0 0.4 3.9 -7 1 1 1070 00 25 28 00 28 28 --- 21 11 39 10.3 185.6 0.4 4.4 173 F 1 1082 00 25 28 00 28 28 J2042-3152 21 11 39 9.8 186.1 0.5 4.8 -7 1 1 1082 00 28 28 00 29 38 --- 21 12 49 9.7 186.4 0.5 5.0 63 F 1 1086 00 28 28 00 29 38 J2043-3049 21 12 49 10.8 186.4 0.5 5.0 -8 1 1 1086 00 29 38 00 30 48 --- 21 13 59 10.8 186.6 0.5 5.2 62 F 1 1091 00 29 38 00 30 48 J2042-3152 21 13 59 9.7 186.6 0.5 5.2 -8 1 1 1091 00 30 48 00 31 58 --- 21 15 09 9.7 186.9 0.5 5.4 62 F 1 1095 00 30 48 00 35 38 J2205+2926 21 18 50 69.3 149.8 -0.8 -22.7 96 1 1 1095 00 35 38 00 36 18 --- 21 19 31 69.3 150.1 -0.8 -22.4 40 F 1 1098 00 35 56 00 36 18 J2203+2811 21 19 31 68.3 152.4 -0.7 -20.5 -8 1 1 1098 00 36 18 00 37 28 --- 21 20 41 68.4 153.1 -0.7 -20.1 62 F 1 1103 00 36 18 00 37 28 J2205+2926 21 20 41 69.4 150.8 -0.8 -22.0 -8 1 1 1103 00 37 28 00 38 38 --- 21 21 51 69.5 151.5 -0.7 -21.5 62 F 1 1107 00 37 28 00 38 38 GJ4247 21 21 51 68.8 155.2 -0.7 -18.5 -8 1 1 1107 00 38 38 00 41 38 --- 21 24 51 69.0 157.0 -0.6 -17.3 172 F 1 1119 00 38 38 00 41 38 J2205+2926 21 24 51 69.7 153.2 -0.7 -20.2 -8 1 1 1119 00 41 38 00 42 48 --- 21 26 02 69.8 153.9 -0.7 -19.7 62 F 1 1123 00 41 38 00 42 48 GJ4247 21 26 02 69.1 157.6 -0.6 -16.8 -8 1 1 1123 00 42 48 00 45 48 --- 21 29 02 69.2 159.4 -0.5 -15.5 172 F 1 1135 00 42 48 00 45 48 J2205+2926 21 29 02 70.0 155.7 -0.6 -18.4 -8 1 1 1135 00 45 48 00 46 58 --- 21 30 12 70.1 156.4 -0.6 -17.8 62 F 1 1139 00 45 48 00 46 58 GJ4247 21 30 12 69.3 160.1 -0.5 -14.9 -8 1 1 1139 00 46 58 00 49 58 --- 21 33 13 69.5 162.0 -0.5 -13.6 172 F 1 1151 00 46 58 00 49 58 J2205+2926 21 33 13 70.3 158.3 -0.5 -16.5 -8 1 1 1151 00 49 58 00 51 08 --- 21 34 23 70.4 159.0 -0.5 -15.9 62 F 1 1155 00 49 58 Schedule for VLBA_BR (Code Br ) Page 14 RIPL: GJ803/4247 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 2 Dec 2007 Day 336 --- 00 51 08 GJ4247 21 34 23 69.5 162.7 -0.5 -13.1 -8 1 1 1155 00 51 08 00 54 08 --- 21 37 24 69.7 164.5 -0.4 -11.7 172 F 1 1167 00 51 08 00 54 08 J2205+2926 21 37 24 70.6 160.9 -0.5 -14.5 -8 1 1 1167 00 54 08 00 55 18 --- 21 38 34 70.6 161.7 -0.5 -14.0 62 F 1 1172 00 54 08 00 55 18 GJ4247 21 38 34 69.7 165.3 -0.4 -11.1 -8 1 1 1172 00 55 18 00 58 18 --- 21 41 34 69.8 167.1 -0.3 -9.7 172 F 1 1183 00 55 18 00 58 18 J2205+2926 21 41 34 70.8 163.6 -0.4 -12.5 -8 1 1 1183 00 58 18 01 00 18 --- 21 43 35 70.9 164.9 -0.4 -11.5 112 F 1 1191 00 58 18 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 9 Station: VLBA_BR Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 9 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ803/4247 Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * GJ4247 21 58 57.453506 * 22 01 13.346939 22 01 34.723645 0.00 28 03 57.17781 * 28 18 25.15075 28 20 53.83897 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 80.299 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 22 01 13.123900 Dec = 28 18 24.86200 Rates: RA = 372.11 mas/yr Dec = 36.48 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54435.7139 Rates: RA = 0.77144E-04 s/day Dec = 0.99877E-04 arcsec/day * J2205+2926 22 03 30.827948 * 22 05 46.506429 22 06 07.863352 0.00 29 12 17.38655 * 29 26 55.13118 29 29 25.87383 0.00 From catalog imbedded in main SCHED input file. 1.114 scan hours, 40.401 baseline hours above horizon. * J2203+2811 22 01 42.793253 * 22 03 59.147974 22 04 20.617852 0.00 27 56 47.93108 * 28 11 21.86919 28 13 51.57981 0.00 From catalog imbedded in main SCHED input file. 0.292 scan hours, 9.927 baseline hours above horizon. * GJ803 20 42 05.055474 * 20 45 09.705033 20 45 38.816734 0.00 -31 31 26.41068 *-31 20 30.08565 -31 18 55.99955 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 71.769 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 20 45 09.531800 Dec = -31 20 27.23600 Rates: RA = 280.37 mas/yr Dec = -360.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54435.7139 Rates: RA = 0.59917E-04 s/day Dec = -0.98563E-03 arcsec/day * J2042-3152 20 39 40.825570 * 20 42 46.406520 20 43 15.650395 0.00 -32 03 16.96459 *-31 52 28.59420 -31 50 55.92876 0.00 From catalog imbedded in main SCHED input file. 1.119 scan hours, 36.886 baseline hours above horizon. * J2043-3049 20 40 03.445142 * 20 43 07.697350 20 43 36.732178 0.00 -31 00 04.47315 *-30 49 14.88550 -30 47 41.72539 0.00 From catalog imbedded in main SCHED input file. 0.311 scan hours, 10.019 baseline hours above horizon. J1642+3948 16 41 17.606231 * 16 42 58.809968 16 43 13.474419 0.26 1641+399 39 54 10.81494 * 39 48 36.99400 39 47 38.64518 0.40 * 3C345 /home/arana/cwalker/sched/catalogs/sources.vlba J1642+39 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.167 scan hours, 9.166 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) GJ4247 94.3 J2205+2926 95.6 J2203+2811 94.8 GJ803 57.1 J2042-3152 56.5 J2043-3049 56.7 3C345 61.7 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg