VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: MT646 Observer: Data Analysts Project type: TEST Obs filename: mt646crd.* Date/Day: 2006DEC16/350 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Jim Ogle. &VCLOCK okay at all sites but PT's gps offset is 19598 0.16; a power glitch at the site threw off the station timing. Site tech has been called out to reset station time. %High wind gusts at KP. %Possible snow in dish at BR. 2350 Begin. 2350-2357 *PT not observing, leaving it out until its timing 19598 100 7 gets reset. 2354 PT timing reset. 2357 Begin at PT. 0000 Date is 2006DEC17/351. 0013-0017 *SC rotation position error. FRM 100 4 0042-0043 *KP autostowed, wind gusts. Repointed. WEA 100 1 0045-0046 *KP autostowed again. WEA 100 1 0045-0047 *SC rotation position error. FRM 100 2 0103-0104 *KP autostowed again. WEA 100 1 0121 End. Downtime Summary: Total downtime : 16 min Percentage downtime of observing: 1.8% Average downtime per hour : 1.1 min Total scheduled observing time (# Antennas): 910 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.