COVER INFORMATION Station: VLBA_KP (Code Kp ) Experiment: 15GHz obs of SN/SNR in ARP 220 Exp. Code: GC028B Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: John Conway Address: Onsala Space Observatory S-439 92 Onsala Sweden Phone: +46(0)31 772 5505 EMAIL: jconway@oso.chalmers.se Fax: +46(0)31 772 5590 Phone during observation: +46(0)31 772 5505 Observing mode: 15GHz @ 256 Mbps Notes: COVER LETTER: Allocated time - December 28, 0900-2300 UT, on the GBT, Effelsberg (approx 0900-1600 UT), with the phased VLA (0800-2230 VLALST), at 256 Mbits/sec, for 2cm. At GBT Arp220 sets at around 2100, so include only till then at VLA27 get above 10deg at 100O UT (approx 09:17 LST) start then - run till end of VLBA. The C-array long track nat wgt beam has FWHM = 1.8'' (perhaps another factor 1.3 for snapshot => FWHM= 2.34'') so pointing between both nuclei (sep 0.9'') should give less than 15% loss on VLA27 and 7% on baselines to VLA27 Use non-standard correlation parameters 1sec, 16 freq chans/BBC to get large enough field of view on long baselines One 13min run on bright fringe finder 1613+3412 but also multiple 3min runs on J1516+1932 (0,4Jy) can be used for fringe finding with large telescopes included Leave gaps for pointing obs at EB during periods 1000-1015 1230-1245 Schedule for VLBA_KP (Code Kp ) Page 2 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- Next scan frequencies: 15349.49 15349.49 15357.49 15357.49 15365.49 15365.49 15373.49 15373.49 Next BBC frequencies: 749.49 749.49 757.49 757.49 765.49 765.49 773.49 773.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 09 41 20 J1532+2344 08 41 47 2.3 63.3 -6.9 H -55.9 0 1 1 0 09 40 50 09 41 50 --- 08 42 17 2.4 63.4 -6.8 H -55.9 0 F 1 2 09 41 08 09 43 45 J1532+2344 08 44 12 2.8 63.6 -6.8 H -56.1 109 1 1 2 09 43 15 09 44 15 --- 08 44 42 2.9 63.7 -6.8 H -56.2 0 F 1 4 09 43 33 09 45 00 J1516+1932 08 45 27 3.8 69.3 -6.5 H -57.4 35 1 1 4 09 44 30 09 45 55 =1514+197 08 46 22 4.0 69.4 -6.5 H -57.4 0 F 1 7 09 44 48 09 46 40 J1532+2344 08 47 08 3.3 64.0 -6.8 H -56.4 35 1 1 7 09 46 10 09 47 10 --- 08 47 38 3.4 64.1 -6.8 H -56.4 0 F 1 9 09 46 28 09 47 40 ARP220 08 48 08 3.0 64.0 -6.8 H -56.3 23 1 1 9 09 47 10 09 48 35 --- 08 49 03 3.2 64.2 -6.8 H -56.4 0 F 1 11 09 47 10 09 49 05 J1532+2344 08 49 33 3.8 64.3 -6.7 H -56.6 23 1 1 11 09 48 35 09 49 35 --- 08 50 03 3.9 64.4 -6.7 H -56.7 0 F 1 13 09 48 35 09 50 05 ARP220 08 50 33 3.4 64.4 -6.7 H -56.5 23 1 1 13 09 49 35 09 51 00 --- 08 51 28 3.6 64.5 -6.7 H -56.6 0 F 1 16 09 49 35 09 51 30 J1532+2344 08 51 58 4.3 64.6 -6.7 H -56.8 23 1 1 16 09 51 00 09 52 00 --- 08 52 28 4.4 64.7 -6.7 H -56.9 0 F 1 18 09 51 00 09 52 30 ARP220 08 52 58 3.9 64.7 -6.7 H -56.7 23 1 1 18 09 52 00 09 53 25 --- 08 53 54 4.1 64.8 -6.7 H -56.8 0 F 1 21 09 52 00 09 53 55 J1532+2344 08 54 24 4.7 64.9 -6.6 H -57.1 23 1 1 21 09 53 25 09 54 25 --- 08 54 54 4.8 65.0 -6.6 H -57.1 0 F 1 23 09 53 25 09 54 55 ARP220 08 55 24 4.4 65.0 -6.7 H -56.9 23 1 1 23 09 54 25 09 55 50 --- 08 56 19 4.5 65.1 -6.6 H -57.0 0 F 1 25 09 54 25 09 56 20 J1532+2344 08 56 49 5.2 65.2 -6.6 H -57.3 23 1 1 25 09 55 50 09 56 50 --- 08 57 19 5.3 65.3 -6.6 H -57.3 0 F 1 27 09 55 50 Schedule for VLBA_KP (Code Kp ) Page 3 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 09 57 20 ARP220 08 57 49 4.8 65.3 -6.6 H -57.2 23 1 1 27 09 56 50 09 58 15 --- 08 58 44 5.0 65.4 -6.6 H -57.2 0 F 1 30 09 56 50 09 58 45 J1532+2344 08 59 15 5.7 65.5 -6.6 H -57.5 23 1 1 30 09 58 15 09 59 15 --- 08 59 45 5.8 65.6 -6.6 H -57.5 0 F 1 32 09 58 15 10 00 00 J1516+1932 09 00 30 6.8 71.2 -6.3 H -58.4 35 1 1 32 09 59 30 10 03 20 =1514+197 09 03 50 7.5 71.6 -6.2 H -58.7 0 F 1 39 09 59 48 10 04 05 J1532+2344 09 04 35 6.7 66.2 -6.5 H -58.0 35 1 1 39 10 03 35 10 04 35 --- 09 05 05 6.8 66.2 -6.5 H -58.0 0 F 1 41 10 03 53 10 05 05 ARP220 09 05 36 6.3 66.2 -6.5 H -57.8 23 1 1 41 10 04 35 10 06 00 --- 09 06 31 6.5 66.3 -6.5 H -57.9 0 F 1 44 10 04 35 10 06 30 J1532+2344 09 07 01 7.2 66.5 -6.4 H -58.2 23 1 1 44 10 06 00 10 07 00 --- 09 07 31 7.3 66.5 -6.4 H -58.2 0 F 1 46 10 06 00 10 07 30 ARP220 09 08 01 6.8 66.5 -6.5 H -58.0 23 1 1 46 10 07 00 10 08 25 --- 09 08 56 7.0 66.6 -6.4 H -58.1 0 F 1 49 10 07 00 10 08 55 J1532+2344 09 09 26 7.6 66.8 -6.4 -58.4 23 1 1 49 10 08 25 10 09 25 --- 09 09 56 7.7 66.8 -6.4 -58.4 30 F 1 51 10 08 25 10 09 55 ARP220 09 10 26 7.3 66.8 -6.4 H -58.2 23 1 1 51 10 09 25 10 10 50 --- 09 11 21 7.5 66.9 -6.4 -58.3 0 F 1 53 10 09 25 10 11 20 J1532+2344 09 11 52 8.1 67.1 -6.4 -58.6 23 1 1 53 10 10 50 10 11 50 --- 09 12 22 8.2 67.1 -6.3 -58.6 30 F 1 55 10 10 50 10 12 20 ARP220 09 12 52 7.8 67.1 -6.4 -58.5 23 1 1 55 10 11 50 10 13 15 --- 09 13 47 7.9 67.2 -6.4 -58.5 55 F 1 58 10 11 50 10 13 45 J1532+2344 09 14 17 8.6 67.3 -6.3 -58.8 23 1 1 58 10 13 15 10 14 15 --- 09 14 47 8.7 67.4 -6.3 -58.8 30 F 1 60 10 13 15 10 15 00 J1516+1932 09 15 32 9.8 73.1 -6.0 -59.4 35 1 1 60 10 14 30 10 15 55 =1514+197 09 16 27 10.0 73.2 -6.0 -59.5 55 F 1 63 10 14 48 10 16 40 J1532+2344 09 17 12 9.2 67.7 -6.3 -59.0 35 1 1 63 10 16 10 10 17 10 --- 09 17 43 9.3 67.8 -6.3 -59.1 30 F 1 65 10 16 28 Schedule for VLBA_KP (Code Kp ) Page 4 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 10 17 40 ARP220 09 18 13 8.8 67.8 -6.3 -58.9 23 1 1 65 10 17 10 10 18 35 --- 09 19 08 9.0 67.9 -6.3 -59.0 55 F 1 67 10 17 10 10 19 05 J1532+2344 09 19 38 9.6 68.0 -6.2 -59.2 23 1 1 67 10 18 35 10 19 35 --- 09 20 08 9.7 68.0 -6.2 -59.3 30 F 1 69 10 18 35 10 20 05 ARP220 09 20 38 9.3 68.0 -6.2 -59.1 23 1 1 69 10 19 35 10 21 00 --- 09 21 33 9.5 68.2 -6.2 -59.2 55 F 1 72 10 19 35 10 21 30 J1532+2344 09 22 03 10.1 68.3 -6.2 -59.4 23 1 1 72 10 21 00 10 22 00 --- 09 22 33 10.2 68.3 -6.2 -59.5 30 F 1 74 10 21 00 10 22 30 ARP220 09 23 03 9.8 68.3 -6.2 -59.3 23 1 1 74 10 22 00 10 23 25 --- 09 23 59 9.9 68.4 -6.2 -59.4 55 F 1 77 10 22 00 10 23 55 J1532+2344 09 24 29 10.6 68.6 -6.1 -59.6 23 1 1 77 10 23 25 10 24 25 --- 09 24 59 10.7 68.6 -6.1 -59.6 30 F 1 79 10 23 25 10 24 55 ARP220 09 25 29 10.2 68.6 -6.2 -59.5 23 1 1 79 10 24 25 10 25 50 --- 09 26 24 10.4 68.7 -6.1 -59.5 55 F 1 81 10 24 25 10 26 20 J1532+2344 09 26 54 11.1 68.8 -6.1 -59.8 23 1 1 81 10 25 50 10 26 50 --- 09 27 24 11.2 68.9 -6.1 -59.8 30 F 1 83 10 25 50 10 27 20 ARP220 09 27 54 10.7 68.9 -6.1 -59.7 23 1 1 83 10 26 50 10 28 15 --- 09 28 49 10.9 69.0 -6.1 -59.7 55 F 1 86 10 26 50 10 28 45 J1532+2344 09 29 19 11.5 69.1 -6.1 -60.0 23 1 1 86 10 28 15 10 29 15 --- 09 29 50 11.6 69.2 -6.1 -60.0 30 F 1 88 10 28 15 10 30 00 J1516+1932 09 30 35 12.9 74.9 -5.8 -60.3 35 1 1 88 10 29 30 10 30 55 =1514+197 09 31 30 13.1 75.0 -5.8 -60.4 55 F 1 91 10 29 48 10 31 40 J1532+2344 09 32 15 12.1 69.5 -6.0 -60.2 35 1 1 91 10 31 10 10 32 10 --- 09 32 45 12.2 69.5 -6.0 -60.2 30 F 1 93 10 31 28 10 32 40 ARP220 09 33 15 11.8 69.5 -6.0 -60.1 23 1 1 93 10 32 10 10 33 35 --- 09 34 10 12.0 69.6 -6.0 -60.1 55 F 1 95 10 32 10 10 34 05 J1532+2344 09 34 40 12.6 69.8 -6.0 -60.4 23 1 1 95 10 33 35 10 34 35 --- 09 35 10 12.7 69.8 -6.0 -60.4 30 F 1 97 10 33 35 Schedule for VLBA_KP (Code Kp ) Page 5 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 10 35 05 ARP220 09 35 40 12.3 69.8 -6.0 -60.3 23 1 1 97 10 34 35 10 36 00 --- 09 36 36 12.4 69.9 -6.0 -60.3 55 F 1 100 10 34 35 10 36 30 J1532+2344 09 37 06 13.1 70.0 -5.9 -60.6 23 1 1 100 10 36 00 10 37 00 --- 09 37 36 13.2 70.1 -5.9 -60.6 30 F 1 102 10 36 00 10 37 30 ARP220 09 38 06 12.7 70.1 -6.0 -60.4 23 1 1 102 10 37 00 10 38 25 --- 09 39 01 12.9 70.2 -5.9 -60.5 55 F 1 105 10 37 00 10 38 55 J1532+2344 09 39 31 13.6 70.3 -5.9 -60.7 23 1 1 105 10 38 25 10 39 25 --- 09 40 01 13.7 70.4 -5.9 -60.8 30 F 1 107 10 38 25 10 39 55 ARP220 09 40 31 13.2 70.4 -5.9 -60.6 23 1 1 107 10 39 25 10 40 50 --- 09 41 26 13.4 70.5 -5.9 -60.7 55 F 1 110 10 39 25 10 41 20 J1532+2344 09 41 56 14.1 70.6 -5.9 -60.9 23 1 1 110 10 40 50 10 41 50 --- 09 42 27 14.2 70.6 -5.8 -61.0 30 F 1 111 10 40 50 10 42 20 ARP220 09 42 57 13.7 70.7 -5.9 -60.8 23 1 1 111 10 41 50 10 43 15 --- 09 43 52 13.9 70.8 -5.9 -60.9 55 F 1 114 10 41 50 10 43 45 J1532+2344 09 44 22 14.5 70.9 -5.8 -61.1 23 1 1 114 10 43 15 10 44 15 --- 09 44 52 14.6 70.9 -5.8 -61.1 30 F 1 116 10 43 15 10 45 00 J1516+1932 09 45 37 16.0 76.7 -5.5 -61.1 35 1 1 116 10 44 30 10 45 55 =1514+197 09 46 32 16.2 76.8 -5.5 -61.2 55 F 1 119 10 44 48 10 46 40 J1532+2344 09 47 17 15.1 71.2 -5.8 -61.3 35 1 1 119 10 46 10 10 47 10 --- 09 47 47 15.2 71.3 -5.8 -61.3 30 F 1 121 10 46 28 10 47 40 ARP220 09 48 18 14.8 71.3 -5.8 -61.2 23 1 1 121 10 47 10 10 48 35 --- 09 49 13 15.0 71.4 -5.8 -61.2 55 F 1 124 10 47 10 10 49 05 J1532+2344 09 49 43 15.6 71.5 -5.7 -61.5 23 1 1 124 10 48 35 10 49 35 --- 09 50 13 15.7 71.5 -5.7 -61.5 30 F 1 125 10 48 35 10 50 05 ARP220 09 50 43 15.3 71.6 -5.7 -61.3 23 1 1 125 10 49 35 10 51 00 --- 09 51 38 15.5 71.7 -5.7 -61.4 55 F 1 128 10 49 35 10 51 30 J1532+2344 09 52 08 16.1 71.8 -5.7 -61.6 23 1 1 128 10 51 00 10 52 00 --- 09 52 38 16.2 71.8 -5.7 -61.7 30 F 1 130 10 51 00 Schedule for VLBA_KP (Code Kp ) Page 6 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 10 52 30 ARP220 09 53 08 15.8 71.8 -5.7 -61.5 23 1 1 130 10 52 00 10 53 25 --- 09 54 03 15.9 71.9 -5.7 -61.6 55 F 1 133 10 52 00 10 53 55 J1532+2344 09 54 34 16.6 72.0 -5.6 -61.8 23 1 1 133 10 53 25 10 54 25 --- 09 55 04 16.7 72.1 -5.6 -61.8 30 F 1 135 10 53 25 10 54 55 ARP220 09 55 34 16.2 72.1 -5.7 -61.7 23 1 1 135 10 54 25 10 55 50 --- 09 56 29 16.4 72.2 -5.6 -61.7 55 F 1 138 10 54 25 10 56 20 J1532+2344 09 56 59 17.1 72.3 -5.6 -62.0 23 1 1 138 10 55 50 10 56 50 --- 09 57 29 17.2 72.4 -5.6 -62.0 30 F 1 140 10 55 50 10 57 20 ARP220 09 57 59 16.7 72.4 -5.6 -61.8 23 1 1 140 10 56 50 10 58 15 --- 09 58 54 16.9 72.5 -5.6 -61.9 55 F 1 142 10 56 50 10 58 45 J1532+2344 09 59 24 17.6 72.6 -5.6 -62.1 23 1 1 142 10 58 15 10 59 15 --- 09 59 54 17.7 72.6 -5.6 -62.2 30 F 1 144 10 58 15 11 00 00 J1516+1932 10 00 40 19.1 78.4 -5.3 -61.9 35 1 1 144 10 59 30 11 00 55 =1514+197 10 01 35 19.3 78.5 -5.3 -61.9 55 F 1 147 10 59 48 11 01 40 J1532+2344 10 02 20 18.2 72.9 -5.5 -62.3 35 1 1 147 11 01 10 11 02 10 --- 10 02 50 18.3 73.0 -5.5 -62.4 30 F 1 149 11 01 28 11 02 40 ARP220 10 03 20 17.8 73.0 -5.5 -62.2 23 1 1 149 11 02 10 11 03 35 --- 10 04 15 18.0 73.1 -5.5 -62.3 55 F 1 152 11 02 10 11 04 05 J1532+2344 10 04 45 18.7 73.2 -5.5 -62.5 23 1 1 152 11 03 35 11 04 35 --- 10 05 15 18.8 73.2 -5.5 -62.5 30 F 1 154 11 03 35 11 05 05 ARP220 10 05 45 18.3 73.3 -5.5 -62.3 23 1 1 154 11 04 35 11 06 00 --- 10 06 41 18.5 73.4 -5.5 -62.4 55 F 1 156 11 04 35 11 06 30 J1532+2344 10 07 11 19.1 73.4 -5.4 -62.6 23 1 1 156 11 06 00 11 07 00 --- 10 07 41 19.3 73.5 -5.4 -62.7 30 F 1 158 11 06 00 11 07 30 ARP220 10 08 11 18.8 73.5 -5.5 -62.5 23 1 1 158 11 07 00 11 08 25 --- 10 09 06 19.0 73.6 -5.4 -62.6 55 F 1 161 11 07 00 11 08 55 J1532+2344 10 09 36 19.6 73.7 -5.4 -62.8 23 1 1 161 11 08 25 11 09 25 --- 10 10 06 19.7 73.8 -5.4 -62.8 30 F 1 163 11 08 25 Schedule for VLBA_KP (Code Kp ) Page 7 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 11 09 55 ARP220 10 10 36 19.3 73.8 -5.4 -62.7 23 1 1 163 11 09 25 11 10 50 --- 10 11 31 19.5 73.9 -5.4 -62.7 55 F 1 166 11 09 25 11 11 20 J1532+2344 10 12 01 20.1 74.0 -5.4 -63.0 23 1 1 166 11 10 50 11 11 50 --- 10 12 32 20.2 74.0 -5.3 -63.0 30 F 1 168 11 10 50 11 12 20 ARP220 10 13 02 19.8 74.1 -5.4 -62.8 23 1 1 168 11 11 50 11 13 15 --- 10 13 57 20.0 74.2 -5.4 -62.9 55 F 1 170 11 11 50 11 13 45 J1532+2344 10 14 27 20.6 74.2 -5.3 -63.1 23 1 1 170 11 13 15 11 14 15 --- 10 14 57 20.7 74.3 -5.3 -63.1 30 F 1 172 11 13 15 11 15 00 J1516+1932 10 15 42 22.2 80.2 -5.0 -62.5 35 1 1 172 11 14 30 11 18 20 =1514+197 10 19 03 22.9 80.6 -5.0 -62.6 200 F 1 180 11 14 48 11 19 05 J1532+2344 10 19 48 21.7 74.8 -5.2 -63.4 35 1 1 180 11 18 35 11 19 35 --- 10 20 18 21.8 74.9 -5.2 -63.5 30 F 1 182 11 18 53 11 20 05 ARP220 10 20 48 21.4 74.9 -5.2 -63.3 23 1 1 182 11 19 35 11 21 00 --- 10 21 43 21.6 75.0 -5.2 -63.3 55 F 1 184 11 19 35 11 21 30 J1532+2344 10 22 13 22.2 75.1 -5.2 -63.6 23 1 1 184 11 21 00 11 22 00 --- 10 22 43 22.3 75.2 -5.2 -63.6 30 F 1 186 11 21 00 11 22 30 ARP220 10 23 13 21.9 75.2 -5.2 -63.4 23 1 1 186 11 22 00 11 23 25 --- 10 24 08 22.1 75.3 -5.2 -63.5 55 F 1 189 11 22 00 11 23 55 J1532+2344 10 24 38 22.7 75.4 -5.1 -63.7 23 1 1 189 11 23 25 11 24 25 --- 10 25 09 22.8 75.4 -5.1 -63.7 30 F 1 191 11 23 25 11 24 55 ARP220 10 25 39 22.4 75.5 -5.2 -63.6 23 1 1 191 11 24 25 11 25 50 --- 10 26 34 22.6 75.6 -5.1 -63.6 55 F 1 194 11 24 25 11 26 20 J1532+2344 10 27 04 23.2 75.6 -5.1 -63.9 23 1 1 194 11 25 50 11 26 50 --- 10 27 34 23.3 75.7 -5.1 -63.9 30 F 1 196 11 25 50 11 27 20 ARP220 10 28 04 22.9 75.7 -5.1 -63.7 23 1 1 196 11 26 50 11 28 15 --- 10 28 59 23.1 75.8 -5.1 -63.8 55 F 1 198 11 26 50 11 28 45 J1532+2344 10 29 29 23.7 75.9 -5.1 -64.0 23 1 1 198 11 28 15 11 29 15 --- 10 29 59 23.8 76.0 -5.1 -64.0 30 F 1 200 11 28 15 Schedule for VLBA_KP (Code Kp ) Page 8 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 11 30 00 J1516+1932 10 30 44 25.4 82.0 -4.8 -63.0 35 1 1 200 11 29 30 11 30 55 =1514+197 10 31 40 25.6 82.1 -4.8 -63.1 55 F 1 203 11 29 48 11 31 40 J1532+2344 10 32 25 24.3 76.2 -5.0 -64.2 35 1 1 203 11 31 10 11 32 10 --- 10 32 55 24.4 76.3 -5.0 -64.2 30 F 1 205 11 31 28 11 32 40 ARP220 10 33 25 24.0 76.3 -5.0 -64.0 23 1 1 205 11 32 10 11 33 35 --- 10 34 20 24.2 76.4 -5.0 -64.0 55 F 1 208 11 32 10 11 34 05 J1532+2344 10 34 50 24.8 76.5 -5.0 -64.3 23 1 1 208 11 33 35 11 34 35 --- 10 35 20 24.9 76.5 -5.0 -64.3 30 F 1 210 11 33 35 11 35 05 ARP220 10 35 50 24.5 76.6 -5.0 -64.1 23 1 1 210 11 34 35 11 36 00 --- 10 36 45 24.7 76.7 -5.0 -64.2 55 F 1 212 11 34 35 11 36 30 J1532+2344 10 37 16 25.3 76.8 -4.9 -64.4 23 1 1 212 11 36 00 11 37 00 --- 10 37 46 25.4 76.8 -4.9 -64.4 30 F 1 214 11 36 00 11 37 30 ARP220 10 38 16 25.0 76.9 -4.9 -64.3 23 1 1 214 11 37 00 11 38 25 --- 10 39 11 25.2 77.0 -4.9 -64.3 55 F 1 217 11 37 00 11 38 55 J1532+2344 10 39 41 25.8 77.0 -4.9 -64.6 23 1 1 217 11 38 25 11 39 25 --- 10 40 11 25.9 77.1 -4.9 -64.6 30 F 1 219 11 38 25 11 39 55 ARP220 10 40 41 25.5 77.1 -4.9 -64.4 23 1 1 219 11 39 25 11 40 50 --- 10 41 36 25.7 77.2 -4.9 -64.4 55 F 1 222 11 39 25 11 41 20 J1532+2344 10 42 06 26.3 77.3 -4.8 -64.7 23 1 1 222 11 40 50 11 41 50 --- 10 42 36 26.4 77.3 -4.8 -64.7 30 F 1 224 11 40 50 11 42 20 ARP220 10 43 07 26.0 77.4 -4.9 -64.5 23 1 1 224 11 41 50 11 43 15 --- 10 44 02 26.2 77.5 -4.9 -64.6 55 F 1 226 11 41 50 11 43 45 J1532+2344 10 44 32 26.8 77.5 -4.8 -64.8 23 1 1 226 11 43 15 11 44 15 --- 10 45 02 26.9 77.6 -4.8 -64.8 30 F 1 228 11 43 15 11 45 00 J1516+1932 10 45 47 28.6 83.8 -4.5 -63.5 35 1 1 228 11 44 30 11 45 55 =1514+197 10 46 42 28.8 83.9 -4.5 -63.5 55 F 1 231 11 44 48 11 46 40 J1532+2344 10 47 27 27.4 77.9 -4.8 -65.0 35 1 1 231 11 46 10 11 47 10 --- 10 47 57 27.5 77.9 -4.8 -65.0 30 F 1 233 11 46 28 Schedule for VLBA_KP (Code Kp ) Page 9 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 11 47 40 ARP220 10 48 27 27.1 78.0 -4.8 -64.8 23 1 1 233 11 47 10 11 48 35 --- 10 49 23 27.3 78.1 -4.8 -64.8 55 F 1 236 11 47 10 11 49 05 J1532+2344 10 49 53 27.9 78.1 -4.7 -65.1 23 1 1 236 11 48 35 11 49 35 --- 10 50 23 28.0 78.2 -4.7 -65.1 30 F 1 238 11 48 35 11 50 05 ARP220 10 50 53 27.6 78.2 -4.7 -64.9 23 1 1 238 11 49 35 11 51 00 --- 10 51 48 27.8 78.3 -4.7 -64.9 55 F 1 240 11 49 35 11 51 30 J1532+2344 10 52 18 28.4 78.4 -4.7 -65.2 23 1 1 240 11 51 00 11 52 00 --- 10 52 48 28.5 78.4 -4.7 -65.2 30 F 1 242 11 51 00 11 52 30 ARP220 10 53 18 28.1 78.5 -4.7 -65.0 23 1 1 242 11 52 00 11 53 25 --- 10 54 13 28.3 78.6 -4.7 -65.1 55 F 1 245 11 52 00 11 53 55 J1532+2344 10 54 43 28.9 78.7 -4.6 -65.3 23 1 1 245 11 53 25 11 54 25 --- 10 55 14 29.0 78.7 -4.6 -65.3 30 F 1 247 11 53 25 11 54 55 ARP220 10 55 44 28.6 78.8 -4.7 -65.1 23 1 1 247 11 54 25 11 55 50 --- 10 56 39 28.8 78.9 -4.6 -65.2 55 F 1 250 11 54 25 11 56 20 J1532+2344 10 57 09 29.4 78.9 -4.6 -65.4 23 1 1 250 11 55 50 11 56 50 --- 10 57 39 29.5 79.0 -4.6 -65.4 30 F 1 252 11 55 50 11 57 20 ARP220 10 58 09 29.1 79.0 -4.6 -65.2 23 1 1 252 11 56 50 11 58 15 --- 10 59 04 29.3 79.1 -4.6 -65.3 55 F 1 255 11 56 50 11 58 45 J1532+2344 10 59 34 29.9 79.2 -4.6 -65.5 23 1 1 255 11 58 15 11 59 15 --- 11 00 04 30.0 79.2 -4.5 -65.6 30 F 1 256 11 58 15 12 00 00 J1516+1932 11 00 49 31.7 85.6 -4.3 -63.8 35 1 1 256 11 59 30 12 00 55 =1514+197 11 01 45 31.9 85.7 -4.3 -63.8 55 F 1 259 11 59 48 12 01 40 J1532+2344 11 02 30 30.6 79.5 -4.5 -65.7 35 1 1 259 12 01 10 12 02 10 --- 11 03 00 30.7 79.6 -4.5 -65.7 30 F 1 261 12 01 28 12 02 40 ARP220 11 03 30 30.2 79.6 -4.5 -65.5 23 1 1 261 12 02 10 12 03 35 --- 11 04 25 30.4 79.7 -4.5 -65.5 55 F 1 264 12 02 10 12 04 05 J1532+2344 11 04 55 31.1 79.8 -4.5 -65.8 23 1 1 264 12 03 35 12 04 35 --- 11 05 25 31.2 79.8 -4.5 -65.8 30 F 1 266 12 03 35 Schedule for VLBA_KP (Code Kp ) Page 10 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 12 05 05 ARP220 11 05 55 30.7 79.9 -4.5 -65.6 23 1 1 266 12 04 35 12 06 00 --- 11 06 50 30.9 80.0 -4.5 -65.6 55 F 1 269 12 04 35 12 06 30 J1532+2344 11 07 20 31.6 80.0 -4.4 -65.9 23 1 1 269 12 06 00 12 07 00 --- 11 07 51 31.7 80.1 -4.4 -65.9 30 F 1 270 12 06 00 12 07 30 ARP220 11 08 21 31.2 80.2 -4.4 -65.7 23 1 1 270 12 07 00 12 08 25 --- 11 09 16 31.4 80.3 -4.4 -65.7 55 F 1 273 12 07 00 12 08 55 J1532+2344 11 09 46 32.1 80.3 -4.4 -66.0 23 1 1 273 12 08 25 12 09 25 --- 11 10 16 32.2 80.4 -4.4 -66.0 30 F 1 275 12 08 25 12 09 55 ARP220 11 10 46 31.7 80.4 -4.4 -65.8 23 1 1 275 12 09 25 12 10 50 --- 11 11 41 31.9 80.5 -4.4 -65.8 55 F 1 278 12 09 25 12 11 20 J1532+2344 11 12 11 32.6 80.6 -4.3 -66.1 23 1 1 278 12 10 50 12 11 50 --- 11 12 41 32.7 80.6 -4.3 -66.1 30 F 1 280 12 10 50 12 12 20 ARP220 11 13 11 32.2 80.7 -4.4 -65.9 23 1 1 280 12 11 50 12 13 15 --- 11 14 07 32.4 80.8 -4.4 -65.9 55 F 1 283 12 11 50 12 13 45 J1532+2344 11 14 37 33.1 80.8 -4.3 -66.2 23 1 1 283 12 13 15 12 14 15 --- 11 15 07 33.2 80.9 -4.3 -66.2 30 F 1 284 12 13 15 12 15 00 J1516+1932 11 15 52 34.9 87.4 -4.0 -64.1 35 1 1 284 12 14 30 12 15 55 =1514+197 11 16 47 35.1 87.6 -4.0 -64.1 55 F 1 287 12 14 48 12 16 40 J1532+2344 11 17 32 33.7 81.2 -4.3 -66.3 35 1 1 287 12 16 10 12 17 10 --- 11 18 02 33.8 81.2 -4.3 -66.3 30 F 1 289 12 16 28 12 17 40 ARP220 11 18 32 33.4 81.3 -4.3 -66.1 23 1 1 289 12 17 10 12 18 35 --- 11 19 27 33.5 81.4 -4.3 -66.1 55 F 1 292 12 17 10 12 19 05 J1532+2344 11 19 58 34.2 81.4 -4.2 -66.4 23 1 1 292 12 18 35 12 19 35 --- 11 20 28 34.3 81.5 -4.2 -66.4 30 F 1 294 12 18 35 12 20 05 ARP220 11 20 58 33.9 81.6 -4.2 -66.2 23 1 1 294 12 19 35 12 21 00 --- 11 21 53 34.1 81.7 -4.2 -66.2 55 F 1 297 12 19 35 12 21 30 J1532+2344 11 22 23 34.7 81.7 -4.2 -66.5 23 1 1 297 12 21 00 12 22 00 --- 11 22 53 34.8 81.8 -4.2 -66.5 30 F 1 299 12 21 00 Schedule for VLBA_KP (Code Kp ) Page 11 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 12 22 30 ARP220 11 23 23 34.4 81.8 -4.2 -66.3 23 1 1 299 12 22 00 12 23 25 --- 11 24 18 34.6 81.9 -4.2 -66.3 55 F 1 301 12 22 00 12 23 55 J1532+2344 11 24 48 35.2 82.0 -4.1 -66.6 23 1 1 301 12 23 25 12 24 25 --- 11 25 18 35.3 82.0 -4.1 -66.6 30 F 1 303 12 23 25 12 24 55 ARP220 11 25 49 34.9 82.1 -4.2 -66.4 23 1 1 303 12 24 25 12 25 50 --- 11 26 44 35.1 82.2 -4.1 -66.4 55 F 1 306 12 24 25 12 26 20 J1532+2344 11 27 14 35.7 82.2 -4.1 -66.7 23 1 1 306 12 25 50 12 26 50 --- 11 27 44 35.8 82.3 -4.1 -66.7 30 F 1 308 12 25 50 12 27 20 ARP220 11 28 14 35.4 82.4 -4.1 -66.5 23 1 1 308 12 26 50 12 28 15 --- 11 29 09 35.6 82.5 -4.1 -66.5 55 F 1 311 12 26 50 12 28 45 J1532+2344 11 29 39 36.2 82.5 -4.1 -66.7 23 1 1 311 12 28 15 12 29 15 --- 11 30 09 36.3 82.6 -4.0 -66.8 30 F 1 313 12 28 15 12 30 00 J1516+1932 11 30 54 38.1 89.4 -3.8 -64.2 34 1 1 313 12 29 30 12 33 20 =1514+197 11 34 15 38.8 89.8 -3.7 -64.2 200 F 1 320 12 29 48 12 34 05 J1532+2344 11 35 00 37.4 83.1 -4.0 -66.9 35 1 1 320 12 33 35 12 34 35 --- 11 35 30 37.5 83.2 -4.0 -66.9 30 F 1 322 12 33 53 12 35 05 ARP220 11 36 00 37.0 83.2 -4.0 -66.7 23 1 1 322 12 34 35 12 36 00 --- 11 36 55 37.2 83.4 -4.0 -66.8 55 F 1 325 12 34 35 12 36 30 J1532+2344 11 37 25 37.9 83.4 -3.9 -67.0 23 1 1 325 12 36 00 12 37 00 --- 11 37 55 38.0 83.4 -3.9 -67.0 30 F 1 327 12 36 00 12 37 30 ARP220 11 38 26 37.5 83.5 -3.9 -66.8 23 1 1 327 12 37 00 12 38 25 --- 11 39 21 37.7 83.6 -3.9 -66.8 55 F 1 329 12 37 00 12 38 55 J1532+2344 11 39 51 38.4 83.7 -3.9 -67.1 23 1 1 329 12 38 25 12 39 25 --- 11 40 21 38.5 83.7 -3.9 -67.1 30 F 1 331 12 38 25 12 39 55 ARP220 11 40 51 38.0 83.8 -3.9 -66.9 23 1 1 331 12 39 25 12 40 50 --- 11 41 46 38.2 83.9 -3.9 -66.9 55 F 1 334 12 39 25 12 41 20 J1532+2344 11 42 16 38.9 83.9 -3.8 -67.1 23 1 1 334 12 40 50 12 41 50 --- 11 42 46 39.0 84.0 -3.8 -67.2 30 F 1 336 12 40 50 Schedule for VLBA_KP (Code Kp ) Page 12 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 12 42 20 ARP220 11 43 16 38.6 84.1 -3.9 -66.9 23 1 1 336 12 41 50 12 43 15 --- 11 44 12 38.8 84.2 -3.9 -67.0 55 F 1 339 12 41 50 12 43 45 J1532+2344 11 44 42 39.4 84.2 -3.8 -67.2 23 1 1 339 12 43 15 12 44 15 --- 11 45 12 39.5 84.3 -3.8 -67.2 30 F 1 341 12 43 15 12 45 00 J1516+1932 11 45 57 41.3 91.4 -3.5 -64.1 34 1 1 341 12 44 30 12 45 55 =1514+197 11 46 52 41.5 91.5 -3.5 -64.1 55 F 1 343 12 44 48 12 46 40 J1532+2344 11 47 37 40.0 84.6 -3.8 -67.3 34 1 1 343 12 46 10 12 47 10 --- 11 48 07 40.1 84.6 -3.7 -67.3 30 F 1 345 12 46 28 12 47 40 ARP220 11 48 37 39.7 84.7 -3.8 -67.1 23 1 1 345 12 47 10 12 48 35 --- 11 49 32 39.9 84.8 -3.8 -67.1 55 F 1 348 12 47 10 12 49 05 J1532+2344 11 50 02 40.5 84.8 -3.7 -67.4 23 1 1 348 12 48 35 12 49 35 --- 11 50 33 40.6 84.9 -3.7 -67.4 30 F 1 350 12 48 35 12 50 05 ARP220 11 51 03 40.2 85.0 -3.7 -67.1 23 1 1 350 12 49 35 12 51 00 --- 11 51 58 40.4 85.1 -3.7 -67.2 55 F 1 353 12 49 35 12 51 30 J1532+2344 11 52 28 41.1 85.1 -3.7 -67.4 23 1 1 353 12 51 00 12 52 00 --- 11 52 58 41.2 85.2 -3.7 -67.4 30 F 1 355 12 51 00 12 52 30 ARP220 11 53 28 40.7 85.3 -3.7 -67.2 23 1 1 355 12 52 00 12 53 25 --- 11 54 23 40.9 85.4 -3.7 -67.2 55 F 1 357 12 52 00 12 53 55 J1532+2344 11 54 53 41.6 85.4 -3.6 -67.5 23 1 1 357 12 53 25 12 54 25 --- 11 55 23 41.7 85.5 -3.6 -67.5 30 F 1 359 12 53 25 12 54 55 ARP220 11 55 53 41.2 85.5 -3.7 -67.3 23 1 1 359 12 54 25 12 55 50 --- 11 56 49 41.4 85.7 -3.6 -67.3 55 F 1 362 12 54 25 12 56 20 J1532+2344 11 57 19 42.1 85.7 -3.6 -67.5 23 1 1 362 12 55 50 12 56 50 --- 11 57 49 42.2 85.7 -3.6 -67.5 30 F 1 364 12 55 50 12 57 20 ARP220 11 58 19 41.7 85.8 -3.6 -67.3 23 1 1 364 12 56 50 12 58 15 --- 11 59 14 41.9 85.9 -3.6 -67.3 55 F 1 367 12 56 50 12 58 45 J1532+2344 11 59 44 42.6 86.0 -3.6 -67.6 23 1 1 367 12 58 15 12 59 15 --- 12 00 14 42.7 86.0 -3.5 -67.6 30 F 1 369 12 58 15 Schedule for VLBA_KP (Code Kp ) Page 13 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 13 00 00 J1516+1932 12 00 59 44.5 93.5 -3.3 -64.0 34 1 1 369 12 59 30 13 00 55 =1514+197 12 01 54 44.7 93.6 -3.3 -63.9 55 F 1 371 12 59 48 13 01 40 J1532+2344 12 02 40 43.2 86.3 -3.5 -67.6 34 1 1 371 13 01 10 13 02 10 --- 12 03 10 43.3 86.4 -3.5 -67.6 30 F 1 373 13 01 28 13 02 40 ARP220 12 03 40 42.9 86.5 -3.5 -67.4 23 1 1 373 13 02 10 13 03 35 --- 12 04 35 43.1 86.6 -3.5 -67.4 55 F 1 376 13 02 10 13 04 05 J1532+2344 12 05 05 43.7 86.6 -3.5 -67.7 23 1 1 376 13 03 35 13 04 35 --- 12 05 35 43.8 86.7 -3.5 -67.7 30 F 1 378 13 03 35 13 05 05 ARP220 12 06 05 43.4 86.8 -3.5 -67.4 23 1 1 378 13 04 35 13 06 00 --- 12 07 00 43.6 86.9 -3.5 -67.5 55 F 1 381 13 04 35 13 06 30 J1532+2344 12 07 30 44.2 86.9 -3.4 -67.7 23 1 1 381 13 06 00 13 07 00 --- 12 08 00 44.3 87.0 -3.4 -67.7 30 F 1 383 13 06 00 13 07 30 ARP220 12 08 31 43.9 87.1 -3.4 -67.5 23 1 1 383 13 07 00 13 08 25 --- 12 09 26 44.1 87.2 -3.4 -67.5 55 F 1 385 13 07 00 13 08 55 J1532+2344 12 09 56 44.7 87.2 -3.4 -67.8 23 1 1 385 13 08 25 13 09 25 --- 12 10 26 44.9 87.3 -3.4 -67.8 30 F 1 387 13 08 25 13 09 55 ARP220 12 10 56 44.4 87.4 -3.4 -67.5 23 1 1 387 13 09 25 13 10 50 --- 12 11 51 44.6 87.5 -3.4 -67.5 55 F 1 390 13 09 25 13 11 20 J1532+2344 12 12 21 45.3 87.5 -3.3 -67.8 23 1 1 390 13 10 50 13 11 50 --- 12 12 51 45.4 87.6 -3.3 -67.8 30 F 1 392 13 10 50 13 12 20 ARP220 12 13 21 44.9 87.7 -3.4 -67.6 23 1 1 392 13 11 50 13 13 15 --- 12 14 16 45.1 87.8 -3.3 -67.6 55 F 1 395 13 11 50 13 13 45 J1532+2344 12 14 47 45.8 87.8 -3.3 -67.8 23 1 1 395 13 13 15 13 14 15 --- 12 15 17 45.9 87.9 -3.3 -67.8 30 F 1 397 13 13 15 13 15 00 J1516+1932 12 16 02 47.7 95.8 -3.0 -63.6 34 1 1 397 13 14 30 13 15 55 =1514+197 12 16 57 47.9 95.9 -3.0 -63.6 55 F 1 399 13 14 48 13 16 40 J1532+2344 12 17 42 46.4 88.2 -3.3 -67.8 34 1 1 399 13 16 10 13 17 10 --- 12 18 12 46.5 88.2 -3.2 -67.9 30 F 1 401 13 16 28 Schedule for VLBA_KP (Code Kp ) Page 14 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 13 17 40 ARP220 12 18 42 46.1 88.3 -3.3 -67.6 23 1 1 401 13 17 10 13 18 35 --- 12 19 37 46.3 88.4 -3.3 -67.6 55 F 1 404 13 17 10 13 19 05 J1532+2344 12 20 07 46.9 88.5 -3.2 -67.9 23 1 1 404 13 18 35 13 19 35 --- 12 20 37 47.0 88.5 -3.2 -67.9 30 F 1 406 13 18 35 13 20 05 ARP220 12 21 08 46.6 88.6 -3.2 -67.6 23 1 1 406 13 19 35 13 21 00 --- 12 22 03 46.8 88.7 -3.2 -67.6 55 F 1 409 13 19 35 13 21 30 J1532+2344 12 22 33 47.4 88.8 -3.2 -67.9 23 1 1 409 13 21 00 13 22 00 --- 12 23 03 47.5 88.8 -3.2 -67.9 30 F 1 411 13 21 00 13 22 30 ARP220 12 23 33 47.1 88.9 -3.2 -67.6 23 1 1 411 13 22 00 13 23 25 --- 12 24 28 47.3 89.1 -3.2 -67.7 55 F 1 414 13 22 00 13 23 55 J1532+2344 12 24 58 47.9 89.1 -3.1 -67.9 23 1 1 414 13 23 25 13 24 25 --- 12 25 28 48.0 89.1 -3.1 -67.9 30 F 1 415 13 23 25 13 24 55 ARP220 12 25 58 47.6 89.2 -3.2 -67.7 23 1 1 415 13 24 25 13 25 50 --- 12 26 54 47.8 89.4 -3.1 -67.7 55 F 1 418 13 24 25 13 26 20 J1532+2344 12 27 24 48.4 89.4 -3.1 -67.9 23 1 1 418 13 25 50 13 26 50 --- 12 27 54 48.6 89.5 -3.1 -67.9 30 F 1 420 13 25 50 13 27 20 ARP220 12 28 24 48.1 89.6 -3.1 -67.7 23 1 1 420 13 26 50 13 28 15 --- 12 29 19 48.3 89.7 -3.1 -67.7 55 F 1 423 13 26 50 13 28 45 J1532+2344 12 29 49 49.0 89.7 -3.1 -67.9 23 1 1 423 13 28 15 13 29 15 --- 12 30 19 49.1 89.8 -3.0 -67.9 30 F 1 425 13 28 15 13 30 00 J1516+1932 12 31 04 50.8 98.2 -2.8 -63.0 33 1 1 425 13 29 30 13 30 55 =1514+197 12 31 59 51.0 98.4 -2.8 -62.9 55 F 1 428 13 29 48 13 31 40 J1532+2344 12 32 44 49.6 90.1 -3.0 -67.9 33 1 1 428 13 31 10 13 32 10 --- 12 33 15 49.7 90.2 -3.0 -67.9 30 F 1 429 13 31 28 13 32 40 ARP220 12 33 45 49.2 90.3 -3.0 -67.7 23 1 1 429 13 32 10 13 33 35 --- 12 34 40 49.4 90.4 -3.0 -67.7 55 F 1 432 13 32 10 13 34 05 J1532+2344 12 35 10 50.1 90.4 -3.0 -67.9 23 1 1 432 13 33 35 13 34 35 --- 12 35 40 50.2 90.5 -3.0 -67.9 30 F 1 434 13 33 35 Schedule for VLBA_KP (Code Kp ) Page 15 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 13 35 05 ARP220 12 36 10 49.8 90.6 -3.0 -67.7 23 1 1 434 13 34 35 13 36 00 --- 12 37 05 50.0 90.7 -3.0 -67.7 55 F 1 437 13 34 35 13 36 30 J1532+2344 12 37 35 50.6 90.7 -2.9 -67.9 23 1 1 437 13 36 00 13 37 00 --- 12 38 05 50.7 90.8 -2.9 -67.9 30 F 1 439 13 36 00 13 37 30 ARP220 12 38 35 50.3 90.9 -2.9 -67.7 23 1 1 439 13 37 00 13 38 25 --- 12 39 31 50.5 91.0 -2.9 -67.6 55 F 1 442 13 37 00 13 38 55 J1532+2344 12 40 01 51.1 91.1 -2.9 -67.9 23 1 1 442 13 38 25 13 39 25 --- 12 40 31 51.2 91.1 -2.9 -67.9 30 F 1 444 13 38 25 13 39 55 ARP220 12 41 01 50.8 91.3 -2.9 -67.6 23 1 1 444 13 39 25 13 40 50 --- 12 41 56 51.0 91.4 -2.9 -67.6 55 F 1 446 13 39 25 13 41 20 J1532+2344 12 42 26 51.6 91.4 -2.8 -67.9 23 1 1 446 13 40 50 13 41 50 --- 12 42 56 51.7 91.5 -2.8 -67.9 30 F 1 448 13 40 50 13 42 20 ARP220 12 43 26 51.3 91.6 -2.9 -67.6 23 1 1 448 13 41 50 13 43 15 --- 12 44 21 51.5 91.7 -2.8 -67.6 55 F 1 451 13 41 50 13 43 45 J1532+2344 12 44 51 52.2 91.7 -2.8 -67.9 23 1 1 451 13 43 15 13 44 15 --- 12 45 22 52.3 91.8 -2.8 -67.8 30 F 1 453 13 43 15 13 45 00 J1516+1932 12 46 07 54.0 100.9 -2.5 -62.1 33 1 1 453 13 44 30 13 45 55 =1514+197 12 47 02 54.2 101.0 -2.5 -62.1 55 F 1 456 13 44 48 13 46 40 J1532+2344 12 47 47 52.8 92.2 -2.8 -67.8 33 1 1 456 13 46 10 13 47 10 --- 12 48 17 52.9 92.2 -2.7 -67.8 30 F 1 458 13 46 28 13 47 40 ARP220 12 48 47 52.4 92.3 -2.8 -67.6 23 1 1 458 13 47 10 13 48 35 --- 12 49 42 52.6 92.5 -2.8 -67.5 55 F 1 460 13 47 10 13 49 05 J1532+2344 12 50 12 53.3 92.5 -2.7 -67.8 23 1 1 460 13 48 35 13 49 35 --- 12 50 42 53.4 92.6 -2.7 -67.8 30 F 1 462 13 48 35 13 50 05 ARP220 12 51 13 52.9 92.7 -2.7 -67.5 23 1 1 462 13 49 35 13 51 00 --- 12 52 08 53.1 92.8 -2.7 -67.5 55 F 1 465 13 49 35 13 51 30 J1532+2344 12 52 38 53.8 92.9 -2.7 -67.7 23 1 1 465 13 51 00 13 52 00 --- 12 53 08 53.9 92.9 -2.7 -67.7 30 F 1 467 13 51 00 Schedule for VLBA_KP (Code Kp ) Page 16 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 13 52 30 ARP220 12 53 38 53.5 93.1 -2.7 -67.5 23 1 1 467 13 52 00 13 53 25 --- 12 54 33 53.7 93.2 -2.7 -67.5 55 F 1 470 13 52 00 13 53 55 J1532+2344 12 55 03 54.3 93.2 -2.6 -67.7 23 1 1 470 13 53 25 13 54 25 --- 12 55 33 54.4 93.3 -2.6 -67.7 30 F 1 472 13 53 25 13 54 55 ARP220 12 56 03 54.0 93.4 -2.7 -67.4 23 1 1 472 13 54 25 13 55 50 --- 12 56 58 54.2 93.5 -2.6 -67.4 55 F 1 474 13 54 25 13 56 20 J1532+2344 12 57 29 54.8 93.6 -2.6 -67.6 23 1 1 474 13 55 50 13 56 50 --- 12 57 59 54.9 93.7 -2.6 -67.6 30 F 1 476 13 55 50 13 57 20 ARP220 12 58 29 54.5 93.8 -2.6 -67.4 23 1 1 476 13 56 50 13 58 15 --- 12 59 24 54.7 93.9 -2.6 -67.3 55 F 1 479 13 56 50 13 58 45 J1532+2344 12 59 54 55.3 94.0 -2.6 -67.6 23 1 1 479 13 58 15 13 59 15 --- 13 00 24 55.4 94.0 -2.5 -67.6 30 F 1 481 13 58 15 14 00 00 J1516+1932 13 01 09 57.1 103.9 -2.3 -60.9 32 1 1 481 13 59 30 14 00 55 =1514+197 13 02 04 57.3 104.1 -2.3 -60.8 55 F 1 484 13 59 48 14 01 40 J1532+2344 13 02 49 56.0 94.4 -2.5 -67.5 33 1 1 484 14 01 10 14 02 10 --- 13 03 19 56.1 94.5 -2.5 -67.5 30 F 1 486 14 01 28 14 02 40 ARP220 13 03 50 55.6 94.6 -2.5 -67.2 23 1 1 486 14 02 10 14 03 35 --- 13 04 45 55.8 94.7 -2.5 -67.2 55 F 1 488 14 02 10 14 04 05 J1532+2344 13 05 15 56.5 94.8 -2.5 -67.4 23 1 1 488 14 03 35 14 04 35 --- 13 05 45 56.6 94.9 -2.5 -67.4 30 F 1 490 14 03 35 14 05 05 ARP220 13 06 15 56.1 95.0 -2.5 -67.1 23 1 1 490 14 04 35 14 06 00 --- 13 07 10 56.3 95.1 -2.5 -67.1 55 F 1 493 14 04 35 14 06 30 J1532+2344 13 07 40 57.0 95.2 -2.4 -67.3 23 1 1 493 14 06 00 14 07 00 --- 13 08 10 57.1 95.3 -2.4 -67.3 30 F 1 495 14 06 00 14 07 30 ARP220 13 08 40 56.6 95.4 -2.4 -67.1 23 1 1 495 14 07 00 14 08 25 --- 13 09 36 56.8 95.5 -2.4 -67.0 55 F 1 498 14 07 00 14 08 55 J1532+2344 13 10 06 57.5 95.6 -2.4 -67.3 23 1 1 498 14 08 25 14 09 25 --- 13 10 36 57.6 95.7 -2.4 -67.2 30 F 1 500 14 08 25 Schedule for VLBA_KP (Code Kp ) Page 17 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 14 09 55 ARP220 13 11 06 57.2 95.8 -2.4 -67.0 23 1 1 500 14 09 25 14 10 50 --- 13 12 01 57.3 95.9 -2.4 -66.9 55 F 1 502 14 09 25 14 11 20 J1532+2344 13 12 31 58.0 96.0 -2.3 -67.2 23 1 1 502 14 10 50 14 11 50 --- 13 13 01 58.1 96.1 -2.3 -67.1 30 F 1 504 14 10 50 14 12 20 ARP220 13 13 31 57.7 96.2 -2.4 -66.9 23 1 1 504 14 11 50 14 13 15 --- 13 14 26 57.9 96.3 -2.3 -66.8 55 F 1 507 14 11 50 14 13 45 J1532+2344 13 14 56 58.5 96.4 -2.3 -67.1 23 1 1 507 14 13 15 14 14 15 --- 13 15 26 58.6 96.5 -2.3 -67.0 30 F 1 509 14 13 15 14 16 15 J1613+3412 13 17 27 53.2 74.2 -2.9 -80.8 99 1 1 509 14 15 45 14 29 15 =1611+343 13 30 29 55.9 74.9 -2.7 -82.1 780 F 1 535 14 16 03 14 30 00 J1516+1932 13 31 14 63.2 111.2 -1.8 -57.1 15 1 1 535 14 29 30 14 33 20 =1514+197 13 34 35 63.8 112.2 -1.7 -56.5 200 F 1 543 14 29 48 14 34 05 J1532+2344 13 35 20 62.8 100.2 -2.0 -65.8 31 1 1 543 14 33 35 14 34 35 --- 13 35 50 62.9 100.3 -2.0 -65.7 30 F 1 544 14 33 53 14 35 05 ARP220 13 36 20 62.5 100.4 -2.0 -65.5 23 1 1 544 14 34 35 14 36 00 --- 13 37 15 62.6 100.6 -2.0 -65.4 55 F 1 547 14 34 35 14 36 30 J1532+2344 13 37 45 63.3 100.7 -1.9 -65.6 23 1 1 547 14 36 00 14 37 00 --- 13 38 15 63.4 100.8 -1.9 -65.5 30 F 1 549 14 36 00 14 37 30 ARP220 13 38 45 63.0 100.9 -1.9 -65.3 23 1 1 549 14 37 00 14 38 25 --- 13 39 40 63.2 101.1 -1.9 -65.2 55 F 1 552 14 37 00 14 38 55 J1532+2344 13 40 11 63.8 101.2 -1.9 -65.4 23 1 1 552 14 38 25 14 39 25 --- 13 40 41 63.9 101.3 -1.9 -65.3 30 F 1 554 14 38 25 14 39 55 ARP220 13 41 11 63.5 101.4 -1.9 -65.0 23 1 1 554 14 39 25 14 40 50 --- 13 42 06 63.7 101.6 -1.9 -65.0 55 F 1 557 14 39 25 14 41 20 J1532+2344 13 42 36 64.3 101.7 -1.8 -65.1 23 1 1 557 14 40 50 14 41 50 --- 13 43 06 64.4 101.9 -1.8 -65.1 30 F 1 559 14 40 50 14 42 20 ARP220 13 43 36 64.0 102.0 -1.9 -64.8 23 1 1 559 14 41 50 14 43 15 --- 13 44 31 64.2 102.2 -1.8 -64.7 55 F 1 561 14 41 50 Schedule for VLBA_KP (Code Kp ) Page 18 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 14 43 45 J1532+2344 13 45 01 64.8 102.3 -1.8 -64.9 23 1 1 561 14 43 15 14 44 15 --- 13 45 31 64.9 102.4 -1.8 -64.8 30 F 1 563 14 43 15 14 45 00 J1516+1932 13 46 17 66.1 115.9 -1.5 -54.1 30 1 1 563 14 44 30 14 45 55 =1514+197 13 47 12 66.3 116.2 -1.5 -53.9 55 F 1 566 14 44 48 14 46 40 J1532+2344 13 47 57 65.4 103.0 -1.8 -64.6 30 1 1 566 14 46 10 14 47 10 --- 13 48 27 65.5 103.1 -1.7 -64.5 30 F 1 568 14 46 28 14 47 40 ARP220 13 48 57 65.1 103.2 -1.8 -64.2 23 1 1 568 14 47 10 14 48 35 --- 13 49 52 65.3 103.4 -1.8 -64.1 55 F 1 571 14 47 10 14 49 05 J1532+2344 13 50 22 65.9 103.6 -1.7 -64.3 23 1 1 571 14 48 35 14 49 35 --- 13 50 52 66.0 103.7 -1.7 -64.2 30 F 1 573 14 48 35 14 50 05 ARP220 13 51 22 65.6 103.8 -1.7 -64.0 23 1 1 573 14 49 35 14 51 00 --- 13 52 18 65.8 104.0 -1.7 -63.8 55 F 1 575 14 49 35 14 51 30 J1532+2344 13 52 48 66.4 104.2 -1.7 -64.0 23 1 1 575 14 51 00 14 52 00 --- 13 53 18 66.5 104.3 -1.7 -63.9 30 F 1 577 14 51 00 14 52 30 ARP220 13 53 48 66.1 104.4 -1.7 -63.6 23 1 1 577 14 52 00 14 53 25 --- 13 54 43 66.3 104.6 -1.7 -63.5 55 F 1 580 14 52 00 14 53 55 J1532+2344 13 55 13 66.9 104.8 -1.6 -63.6 23 1 1 580 14 53 25 14 54 25 --- 13 55 43 67.0 104.9 -1.6 -63.6 30 F 1 582 14 53 25 14 54 55 ARP220 13 56 13 66.6 105.0 -1.7 -63.3 23 1 1 582 14 54 25 14 55 50 --- 13 57 08 66.8 105.2 -1.6 -63.2 55 F 1 585 14 54 25 14 56 20 J1532+2344 13 57 38 67.4 105.4 -1.6 -63.3 23 1 1 585 14 55 50 14 56 50 --- 13 58 08 67.5 105.5 -1.6 -63.2 30 F 1 587 14 55 50 14 57 20 ARP220 13 58 39 67.1 105.6 -1.6 -63.0 23 1 1 587 14 56 50 14 58 15 --- 13 59 34 67.3 105.9 -1.6 -62.8 55 F 1 589 14 56 50 14 58 45 J1532+2344 14 00 04 67.9 106.1 -1.5 -62.9 23 1 1 589 14 58 15 14 59 15 --- 14 00 34 68.0 106.2 -1.5 -62.9 30 F 1 591 14 58 15 15 00 00 J1516+1932 14 01 19 68.9 121.6 -1.3 -50.1 29 1 1 591 14 59 30 15 00 55 =1514+197 14 02 14 69.1 122.0 -1.3 -49.8 55 F 1 594 14 59 48 Schedule for VLBA_KP (Code Kp ) Page 19 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 15 01 40 J1532+2344 14 02 59 68.5 106.9 -1.5 -62.5 29 1 1 594 15 01 10 15 02 10 --- 14 03 29 68.6 107.0 -1.5 -62.4 30 F 1 596 15 01 28 15 02 40 ARP220 14 03 59 68.2 107.1 -1.5 -62.1 23 1 1 596 15 02 10 15 03 35 --- 14 04 55 68.3 107.4 -1.5 -62.0 55 F 1 599 15 02 10 15 04 05 J1532+2344 14 05 25 69.0 107.6 -1.5 -62.0 23 1 1 599 15 03 35 15 04 35 --- 14 05 55 69.1 107.8 -1.5 -61.9 30 F 1 601 15 03 35 15 05 05 ARP220 14 06 25 68.6 107.8 -1.5 -61.7 23 1 1 601 15 04 35 15 06 00 --- 14 07 20 68.8 108.1 -1.5 -61.6 55 F 1 603 15 04 35 15 06 30 J1532+2344 14 07 50 69.5 108.3 -1.4 -61.6 23 1 1 603 15 06 00 15 07 00 --- 14 08 20 69.6 108.5 -1.4 -61.5 30 F 1 605 15 06 00 15 07 30 ARP220 14 08 50 69.1 108.6 -1.4 -61.3 23 1 1 605 15 07 00 15 08 25 --- 14 09 45 69.3 108.8 -1.4 -61.1 55 F 1 608 15 07 00 15 08 55 J1532+2344 14 10 15 70.0 109.1 -1.4 -61.1 23 1 1 608 15 08 25 15 09 25 --- 14 10 46 70.1 109.3 -1.4 -61.0 30 F 1 610 15 08 25 15 09 55 ARP220 14 11 16 69.6 109.3 -1.4 -60.8 23 1 1 610 15 09 25 15 10 50 --- 14 12 11 69.8 109.6 -1.4 -60.6 55 F 1 613 15 09 25 15 11 20 J1532+2344 14 12 41 70.5 109.9 -1.3 -60.6 23 1 1 613 15 10 50 15 11 50 --- 14 13 11 70.6 110.1 -1.3 -60.5 30 F 1 615 15 10 50 15 12 20 ARP220 14 13 41 70.1 110.1 -1.4 -60.3 23 1 1 615 15 11 50 15 13 15 --- 14 14 36 70.3 110.4 -1.3 -60.1 55 F 1 617 15 11 50 15 13 45 J1532+2344 14 15 06 70.9 110.7 -1.3 -60.1 23 1 1 617 15 13 15 15 14 15 --- 14 15 36 71.0 110.9 -1.3 -59.9 30 F 1 619 15 13 15 15 15 00 J1516+1932 14 16 21 71.5 128.7 -1.0 -44.7 27 1 1 619 15 14 30 15 15 55 =1514+197 14 17 17 71.7 129.2 -1.0 -44.3 55 F 1 622 15 14 48 15 16 40 J1532+2344 14 18 02 71.5 111.8 -1.3 -59.4 27 1 1 622 15 16 10 15 17 10 --- 14 18 32 71.6 112.0 -1.2 -59.2 30 F 1 624 15 16 28 15 17 40 ARP220 14 19 02 71.2 112.0 -1.3 -59.1 23 1 1 624 15 17 10 15 18 35 --- 14 19 57 71.3 112.3 -1.3 -58.8 55 F 1 627 15 17 10 Schedule for VLBA_KP (Code Kp ) Page 20 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 15 19 05 J1532+2344 14 20 27 72.0 112.7 -1.2 -58.7 23 1 1 627 15 18 35 15 19 35 --- 14 20 57 72.1 112.9 -1.2 -58.6 30 F 1 629 15 18 35 15 20 05 ARP220 14 21 27 71.6 112.9 -1.2 -58.5 23 1 1 629 15 19 35 15 21 00 --- 14 22 22 71.8 113.2 -1.2 -58.2 55 F 1 631 15 19 35 15 21 30 J1532+2344 14 22 53 72.5 113.7 -1.2 -58.1 23 1 1 631 15 21 00 15 22 00 --- 14 23 23 72.6 113.9 -1.2 -57.9 30 F 1 633 15 21 00 15 22 30 ARP220 14 23 53 72.1 113.8 -1.2 -57.8 23 1 1 633 15 22 00 15 23 25 --- 14 24 48 72.3 114.2 -1.2 -57.5 55 F 1 636 15 22 00 15 23 55 J1532+2344 14 25 18 72.9 114.7 -1.1 -57.4 23 1 1 636 15 23 25 15 24 25 --- 14 25 48 73.0 114.9 -1.1 -57.2 30 F 1 638 15 23 25 15 24 55 ARP220 14 26 18 72.6 114.8 -1.1 -57.1 23 1 1 638 15 24 25 15 25 50 --- 14 27 13 72.8 115.2 -1.1 -56.8 55 F 1 641 15 24 25 15 26 20 J1532+2344 14 27 43 73.4 115.7 -1.1 -56.6 23 1 1 641 15 25 50 15 26 50 --- 14 28 13 73.5 115.9 -1.1 -56.5 30 F 1 643 15 25 50 15 27 20 ARP220 14 28 43 73.0 115.8 -1.1 -56.4 23 1 1 643 15 26 50 15 28 15 --- 14 29 39 73.2 116.3 -1.1 -56.1 55 F 1 645 15 26 50 15 28 45 J1532+2344 14 30 09 73.9 116.8 -1.0 -55.8 23 1 1 645 15 28 15 15 29 15 --- 14 30 39 74.0 117.0 -1.0 -55.6 30 F 1 647 15 28 15 15 30 00 J1516+1932 14 31 24 73.9 137.7 -0.8 -37.3 25 1 1 647 15 29 30 15 30 55 =1514+197 14 32 19 74.0 138.3 -0.7 -36.8 55 F 1 650 15 29 48 15 31 40 J1532+2344 14 33 04 74.4 118.2 -1.0 -54.8 26 1 1 650 15 31 10 15 32 10 --- 14 33 34 74.5 118.4 -1.0 -54.6 30 F 1 652 15 31 28 15 32 40 ARP220 14 34 04 74.1 118.3 -1.0 -54.5 23 1 1 652 15 32 10 15 33 35 --- 14 35 00 74.2 118.8 -1.0 -54.2 55 F 1 655 15 32 10 15 34 05 J1532+2344 14 35 30 74.9 119.4 -1.0 -53.8 23 1 1 655 15 33 35 15 34 35 --- 14 36 00 74.9 119.7 -1.0 -53.6 30 F 1 657 15 33 35 15 35 05 ARP220 14 36 30 74.5 119.5 -1.0 -53.6 23 1 1 657 15 34 35 15 36 00 --- 14 37 25 74.7 120.0 -1.0 -53.3 55 F 1 659 15 34 35 Schedule for VLBA_KP (Code Kp ) Page 21 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 15 36 30 J1532+2344 14 37 55 75.3 120.7 -0.9 -52.8 23 1 1 659 15 36 00 15 37 00 --- 14 38 25 75.4 121.0 -0.9 -52.6 30 F 1 661 15 36 00 15 37 30 ARP220 14 38 55 74.9 120.8 -0.9 -52.6 23 1 1 661 15 37 00 15 38 25 --- 14 39 50 75.1 121.3 -0.9 -52.2 55 F 1 664 15 37 00 15 38 55 J1532+2344 14 40 20 75.7 122.0 -0.9 -51.8 23 1 1 664 15 38 25 15 39 25 --- 14 40 50 75.8 122.3 -0.9 -51.5 30 F 1 666 15 38 25 15 39 55 ARP220 14 41 21 75.4 122.1 -0.9 -51.6 23 1 1 666 15 39 25 15 40 50 --- 14 42 16 75.5 122.6 -0.9 -51.2 55 F 1 669 15 39 25 15 41 20 J1532+2344 14 42 46 76.2 123.5 -0.8 -50.6 23 1 1 669 15 40 50 15 41 50 --- 14 43 16 76.3 123.8 -0.8 -50.4 30 F 1 671 15 40 50 15 42 20 ARP220 14 43 46 75.8 123.5 -0.9 -50.5 23 1 1 671 15 41 50 15 43 15 --- 14 44 41 76.0 124.1 -0.8 -50.0 55 F 1 674 15 41 50 15 43 45 J1532+2344 14 45 11 76.6 125.0 -0.8 -49.4 23 1 1 674 15 43 15 15 44 15 --- 14 45 41 76.7 125.3 -0.8 -49.1 30 F 1 675 15 43 15 15 45 00 J1516+1932 14 46 26 75.8 149.1 -0.5 -27.5 23 1 1 675 15 44 30 15 45 55 =1514+197 14 47 22 75.9 149.9 -0.5 -26.9 55 F 1 678 15 44 48 15 46 40 J1532+2344 14 48 07 77.1 126.9 -0.7 -47.8 24 1 1 678 15 46 10 15 47 10 --- 14 48 37 77.2 127.3 -0.7 -47.5 30 F 1 680 15 46 28 15 47 40 ARP220 14 49 07 76.7 126.9 -0.8 -47.7 23 1 1 680 15 47 10 15 48 35 --- 14 50 02 76.9 127.5 -0.8 -47.2 55 F 1 683 15 47 10 15 49 05 J1532+2344 14 50 32 77.5 128.7 -0.7 -46.4 23 1 1 683 15 48 35 15 49 35 --- 14 51 02 77.6 129.0 -0.7 -46.0 30 F 1 685 15 48 35 15 50 05 ARP220 14 51 32 77.2 128.6 -0.7 -46.3 23 1 1 685 15 49 35 15 51 00 --- 14 52 27 77.3 129.2 -0.7 -45.8 55 F 1 688 15 49 35 15 51 30 J1532+2344 14 52 57 77.9 130.5 -0.7 -44.8 23 1 1 688 15 51 00 15 52 00 --- 14 53 28 78.0 130.9 -0.7 -44.5 30 F 1 689 15 51 00 15 52 30 ARP220 14 53 58 77.5 130.3 -0.7 -44.8 23 1 1 689 15 52 00 15 53 25 --- 14 54 53 77.7 131.1 -0.7 -44.2 55 F 1 692 15 52 00 Schedule for VLBA_KP (Code Kp ) Page 22 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 15 53 55 J1532+2344 14 55 23 78.3 132.4 -0.6 -43.2 23 1 1 692 15 53 25 15 54 25 --- 14 55 53 78.4 132.8 -0.6 -42.8 30 F 1 694 15 53 25 15 54 55 ARP220 14 56 23 77.9 132.2 -0.6 -43.2 23 1 1 694 15 54 25 15 55 50 --- 14 57 18 78.1 133.0 -0.6 -42.6 55 F 1 697 15 54 25 15 56 20 J1532+2344 14 57 48 78.7 134.5 -0.6 -41.4 23 1 1 697 15 55 50 15 56 50 --- 14 58 18 78.7 134.9 -0.6 -41.0 30 F 1 699 15 55 50 15 57 20 ARP220 14 58 48 78.3 134.2 -0.6 -41.5 23 1 1 699 15 56 50 15 58 15 --- 14 59 44 78.4 135.0 -0.6 -40.8 55 F 1 702 15 56 50 15 58 45 J1532+2344 15 00 14 79.0 136.7 -0.5 -39.5 23 1 1 702 15 58 15 15 59 15 --- 15 00 44 79.1 137.1 -0.5 -39.1 30 F 1 704 15 58 15 16 00 00 J1516+1932 15 01 29 77.1 163.2 -0.3 -15.1 22 1 1 704 15 59 30 16 00 55 =1514+197 15 02 24 77.1 164.1 -0.2 -14.3 55 F 1 706 15 59 48 16 01 40 J1532+2344 15 03 09 79.4 139.5 -0.5 -37.0 23 1 1 706 16 01 10 16 02 10 --- 15 03 39 79.5 140.0 -0.5 -36.6 30 F 1 708 16 01 28 16 02 40 ARP220 15 04 09 79.1 139.1 -0.5 -37.3 23 1 1 708 16 02 10 16 03 35 --- 15 05 04 79.2 140.0 -0.5 -36.5 55 F 1 711 16 02 10 16 04 05 J1532+2344 15 05 35 79.8 142.0 -0.5 -34.8 23 1 1 711 16 03 35 16 04 35 --- 15 06 05 79.8 142.5 -0.4 -34.4 30 F 1 713 16 03 35 16 05 05 ARP220 15 06 35 79.4 141.5 -0.5 -35.2 23 1 1 713 16 04 35 16 06 00 --- 15 07 30 79.5 142.4 -0.5 -34.3 55 F 1 716 16 04 35 16 06 30 J1532+2344 15 08 00 80.1 144.6 -0.4 -32.5 23 1 1 716 16 06 00 16 07 00 --- 15 08 30 80.1 145.2 -0.4 -32.0 30 F 1 718 16 06 00 16 07 30 ARP220 15 09 00 79.7 144.0 -0.4 -32.9 23 1 1 718 16 07 00 16 08 25 --- 15 09 55 79.8 145.0 -0.4 -32.0 55 F 1 720 16 07 00 16 08 55 J1532+2344 15 10 25 80.4 147.4 -0.4 -30.0 22 1 1 720 16 08 25 16 09 25 --- 15 10 55 80.4 148.0 -0.4 -29.4 30 F 1 722 16 08 25 16 09 55 ARP220 15 11 25 80.0 146.7 -0.4 -30.5 23 1 1 722 16 09 25 16 10 50 --- 15 12 21 80.1 147.8 -0.4 -29.6 55 F 1 725 16 09 25 Schedule for VLBA_KP (Code Kp ) Page 23 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 16 11 20 J1532+2344 15 12 51 80.6 150.3 -0.3 -27.3 22 1 1 725 16 10 50 16 11 50 --- 15 13 21 80.7 151.0 -0.3 -26.7 30 F 1 727 16 10 50 16 12 20 ARP220 15 13 51 80.3 149.5 -0.4 -28.0 23 1 1 727 16 11 50 16 13 15 --- 15 14 46 80.4 150.6 -0.3 -27.0 55 F 1 730 16 11 50 16 13 45 J1532+2344 15 15 16 80.9 153.4 -0.3 -24.5 22 1 1 730 16 13 15 16 14 15 --- 15 15 46 80.9 154.1 -0.3 -23.9 30 F 1 732 16 13 15 16 15 00 J1516+1932 15 16 31 77.6 179.2 0.0 -0.7 22 1 1 732 16 14 30 16 15 55 =1514+197 15 17 26 77.6 180.2 0.0 0.2 55 F 1 734 16 14 48 16 16 40 J1532+2344 15 18 12 81.1 157.4 -0.2 -20.9 24 1 1 734 16 16 10 16 17 10 --- 15 18 42 81.2 158.1 -0.2 -20.2 30 F 1 736 16 16 28 16 17 40 ARP220 15 19 12 80.8 156.3 -0.3 -21.8 23 1 1 736 16 17 10 16 18 35 --- 15 20 07 80.9 157.5 -0.3 -20.7 55 F 1 739 16 17 10 16 19 05 J1532+2344 15 20 37 81.3 160.8 -0.2 -17.7 22 1 1 739 16 18 35 16 19 35 --- 15 21 07 81.3 161.5 -0.2 -17.1 30 F 1 741 16 18 35 16 20 05 ARP220 15 21 37 81.0 159.6 -0.2 -18.8 23 1 1 741 16 19 35 16 21 00 --- 15 22 32 81.1 160.9 -0.2 -17.6 55 F 1 744 16 19 35 16 21 30 J1532+2344 15 23 02 81.5 164.4 -0.2 -14.5 22 1 1 744 16 21 00 16 22 00 --- 15 23 32 81.5 165.1 -0.2 -13.8 30 F 1 746 16 21 00 16 22 30 ARP220 15 24 03 81.2 163.0 -0.2 -15.7 23 1 1 746 16 22 00 16 23 25 --- 15 24 58 81.2 164.4 -0.2 -14.4 55 F 1 748 16 22 00 16 23 55 J1532+2344 15 25 28 81.6 168.0 -0.1 -11.1 22 1 1 748 16 23 25 16 24 25 --- 15 25 58 81.6 168.8 -0.1 -10.4 30 F 1 750 16 23 25 16 24 55 ARP220 15 26 28 81.3 166.6 -0.1 -12.4 23 1 1 750 16 24 25 16 25 50 --- 15 27 23 81.3 167.9 -0.1 -11.1 55 F 1 753 16 24 25 16 26 20 J1532+2344 15 27 53 81.7 171.8 -0.1 -7.6 21 1 1 753 16 25 50 16 26 50 --- 15 28 23 81.7 172.6 -0.1 -6.9 30 F 1 755 16 25 50 16 27 20 ARP220 15 28 53 81.4 170.2 -0.1 -9.1 22 1 1 755 16 26 50 16 28 15 --- 15 29 48 81.4 171.6 -0.1 -7.8 55 F 1 758 16 26 50 Schedule for VLBA_KP (Code Kp ) Page 24 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 16 28 45 J1532+2344 15 30 19 81.7 175.6 0.0 -4.1 21 1 1 758 16 28 15 16 29 15 --- 15 30 49 81.7 176.4 0.0 -3.3 30 F 1 760 16 28 15 16 30 00 J1516+1932 15 31 34 77.1 195.3 0.2 13.8 26 1 1 760 16 29 30 16 30 55 =1514+197 15 32 29 77.1 196.3 0.3 14.6 55 F 1 762 16 29 48 16 31 40 J1532+2344 15 33 14 81.8 180.3 0.0 0.3 28 1 1 762 16 31 10 16 32 10 --- 15 33 44 81.7 181.1 0.0 1.0 30 F 1 764 16 31 28 16 32 40 ARP220 15 34 14 81.5 178.4 0.0 -1.4 22 1 1 764 16 32 10 16 33 35 --- 15 35 09 81.5 179.9 0.0 -0.1 55 F 1 767 16 32 10 16 34 05 J1532+2344 15 35 39 81.7 184.1 0.0 3.8 21 1 1 767 16 33 35 16 34 35 --- 15 36 10 81.7 184.9 0.1 4.6 30 F 1 769 16 33 35 16 35 05 ARP220 15 36 40 81.5 182.2 0.0 2.0 22 1 1 769 16 34 35 16 36 00 --- 15 37 35 81.5 183.6 0.0 3.4 55 F 1 772 16 34 35 16 36 30 J1532+2344 15 38 05 81.7 188.0 0.1 7.4 21 1 1 772 16 36 00 16 37 00 --- 15 38 35 81.7 188.7 0.1 8.1 30 F 1 774 16 36 00 16 37 30 ARP220 15 39 05 81.5 186.0 0.1 5.5 22 1 1 774 16 37 00 16 38 25 --- 15 40 00 81.5 187.4 0.1 6.8 55 F 1 776 16 37 00 16 38 55 J1532+2344 15 40 30 81.6 191.7 0.1 10.9 21 1 1 776 16 38 25 16 39 25 --- 15 41 00 81.6 192.5 0.1 11.6 30 F 1 778 16 38 25 16 39 55 ARP220 15 41 30 81.4 189.7 0.1 8.9 22 1 1 778 16 39 25 16 40 50 --- 15 42 26 81.4 191.0 0.1 10.2 55 F 1 781 16 39 25 16 41 20 J1532+2344 15 42 56 81.5 195.4 0.2 14.2 21 1 1 781 16 40 50 16 41 50 --- 15 43 26 81.4 196.1 0.2 14.9 30 F 1 783 16 40 50 16 42 20 ARP220 15 43 56 81.3 193.3 0.1 12.3 22 1 1 783 16 41 50 16 43 15 --- 15 44 51 81.3 194.6 0.2 13.5 55 F 1 786 16 41 50 16 43 45 J1532+2344 15 45 21 81.3 199.0 0.2 17.5 21 1 1 786 16 43 15 16 44 15 --- 15 45 51 81.3 199.7 0.2 18.2 30 F 1 788 16 43 15 16 45 00 J1516+1932 15 46 36 75.9 209.7 0.5 26.4 28 1 1 788 16 44 30 16 45 55 =1514+197 15 47 31 75.8 210.4 0.5 27.1 55 F 1 790 16 44 48 Schedule for VLBA_KP (Code Kp ) Page 25 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 16 46 40 J1532+2344 15 48 17 81.1 203.1 0.3 21.3 28 1 1 790 16 46 10 16 47 10 --- 15 48 47 81.1 203.8 0.3 21.9 30 F 1 792 16 46 28 16 47 40 ARP220 15 49 17 81.0 201.0 0.2 19.3 22 1 1 792 16 47 10 16 48 35 --- 15 50 12 80.9 202.2 0.2 20.5 55 F 1 795 16 47 10 16 49 05 J1532+2344 15 50 42 80.9 206.4 0.3 24.3 21 1 1 795 16 48 35 16 49 35 --- 15 51 12 80.8 207.0 0.3 24.9 30 F 1 797 16 48 35 16 50 05 ARP220 15 51 42 80.8 204.2 0.3 22.3 22 1 1 797 16 49 35 16 51 00 --- 15 52 37 80.7 205.4 0.3 23.4 55 F 1 800 16 49 35 16 51 30 J1532+2344 15 53 07 80.6 209.5 0.3 27.1 21 1 1 800 16 51 00 16 52 00 --- 15 53 37 80.6 210.1 0.3 27.7 30 F 1 802 16 51 00 16 52 30 ARP220 15 54 07 80.5 207.4 0.3 25.2 22 1 1 802 16 52 00 16 53 25 --- 15 55 03 80.5 208.5 0.3 26.2 55 F 1 804 16 52 00 16 53 55 J1532+2344 15 55 33 80.4 212.4 0.4 29.8 21 1 1 804 16 53 25 16 54 25 --- 15 56 03 80.3 213.0 0.4 30.3 30 F 1 806 16 53 25 16 54 55 ARP220 15 56 33 80.3 210.4 0.4 27.9 22 1 1 806 16 54 25 16 55 50 --- 15 57 28 80.2 211.5 0.4 28.9 55 F 1 809 16 54 25 16 56 20 J1532+2344 15 57 58 80.1 215.2 0.4 32.3 21 1 1 809 16 55 50 16 56 50 --- 15 58 28 80.0 215.8 0.4 32.8 30 F 1 811 16 55 50 16 57 20 ARP220 15 58 58 80.0 213.2 0.4 30.4 22 1 1 811 16 56 50 16 58 15 --- 15 59 53 79.9 214.2 0.4 31.4 55 F 1 814 16 56 50 16 58 45 J1532+2344 16 00 23 79.8 217.9 0.5 34.7 22 1 1 814 16 58 15 16 59 15 --- 16 00 54 79.7 218.4 0.5 35.1 30 F 1 816 16 58 15 17 00 00 J1516+1932 16 01 39 74.1 221.3 0.7 36.5 28 1 1 816 16 59 30 17 00 55 =1514+197 16 02 34 73.9 222.0 0.8 37.0 55 F 1 818 16 59 48 17 01 40 J1532+2344 16 03 19 79.4 220.9 0.5 37.3 28 1 1 818 17 01 10 17 02 10 --- 16 03 49 79.3 221.4 0.5 37.8 30 F 1 820 17 01 28 17 02 40 ARP220 16 04 19 79.4 219.0 0.5 35.6 22 1 1 820 17 02 10 17 03 35 --- 16 05 14 79.2 219.9 0.5 36.4 55 F 1 823 17 02 10 Schedule for VLBA_KP (Code Kp ) Page 26 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 17 04 05 J1532+2344 16 05 44 79.0 223.2 0.5 39.4 22 1 1 823 17 03 35 17 04 35 --- 16 06 14 79.0 223.7 0.6 39.8 30 F 1 825 17 03 35 17 05 05 ARP220 16 06 45 79.0 221.3 0.5 37.7 22 1 1 825 17 04 35 17 06 00 --- 16 07 40 78.9 222.2 0.5 38.4 55 F 1 828 17 04 35 17 06 30 J1532+2344 16 08 10 78.7 225.4 0.6 41.3 22 1 1 828 17 06 00 17 07 00 --- 16 08 40 78.6 225.8 0.6 41.7 30 F 1 830 17 06 00 17 07 30 ARP220 16 09 10 78.7 223.6 0.6 39.6 23 1 1 830 17 07 00 17 08 25 --- 16 10 05 78.5 224.4 0.6 40.3 55 F 1 833 17 07 00 17 08 55 J1532+2344 16 10 35 78.3 227.5 0.6 43.1 22 1 1 833 17 08 25 17 09 25 --- 16 11 05 78.2 227.9 0.6 43.4 30 F 1 834 17 08 25 17 09 55 ARP220 16 11 35 78.3 225.7 0.6 41.5 23 1 1 834 17 09 25 17 10 50 --- 16 12 30 78.2 226.5 0.6 42.1 55 F 1 837 17 09 25 17 11 20 J1532+2344 16 13 01 77.9 229.4 0.7 44.7 22 1 1 837 17 10 50 17 11 50 --- 16 13 31 77.8 229.8 0.7 45.0 30 F 1 839 17 10 50 17 12 20 ARP220 16 14 01 77.9 227.7 0.6 43.2 23 1 1 839 17 11 50 17 13 15 --- 16 14 56 77.8 228.4 0.7 43.8 55 F 1 842 17 11 50 17 13 45 J1532+2344 16 15 26 77.5 231.2 0.7 46.3 22 1 1 842 17 13 15 17 14 15 --- 16 15 56 77.4 231.6 0.7 46.6 30 F 1 844 17 13 15 17 15 00 J1516+1932 16 16 41 71.8 230.6 1.0 44.0 28 1 1 844 17 14 30 17 15 55 =1514+197 16 17 36 71.6 231.0 1.0 44.4 55 F 1 847 17 14 48 17 16 40 J1532+2344 16 18 21 77.0 233.3 0.8 48.0 28 1 1 847 17 16 10 17 17 10 --- 16 18 52 77.0 233.6 0.8 48.3 30 F 1 848 17 16 28 17 17 40 ARP220 16 19 22 77.1 231.7 0.7 46.6 23 1 1 848 17 17 10 17 18 35 --- 16 20 17 76.9 232.4 0.8 47.1 55 F 1 851 17 17 10 17 19 05 J1532+2344 16 20 47 76.6 234.9 0.8 49.3 22 1 1 851 17 18 35 17 19 35 --- 16 21 17 76.5 235.2 0.8 49.6 30 F 1 853 17 18 35 17 20 05 ARP220 16 21 47 76.7 233.4 0.8 47.9 23 1 1 853 17 19 35 17 21 00 --- 16 22 42 76.5 234.0 0.8 48.4 55 F 1 856 17 19 35 Schedule for VLBA_KP (Code Kp ) Page 27 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 17 21 30 J1532+2344 16 23 12 76.2 236.4 0.8 50.5 22 1 1 856 17 21 00 17 22 00 --- 16 23 42 76.1 236.7 0.8 50.8 30 F 1 858 17 21 00 17 22 30 ARP220 16 24 12 76.3 234.9 0.8 49.2 23 1 1 858 17 22 00 17 23 25 --- 16 25 08 76.1 235.5 0.8 49.7 55 F 1 861 17 22 00 17 23 55 J1532+2344 16 25 38 75.8 237.9 0.9 51.7 22 1 1 861 17 23 25 17 24 25 --- 16 26 08 75.7 238.1 0.9 51.9 30 F 1 863 17 23 25 17 24 55 ARP220 16 26 38 75.8 236.4 0.9 50.4 23 1 1 863 17 24 25 17 25 50 --- 16 27 33 75.7 237.0 0.9 50.9 55 F 1 865 17 24 25 17 26 20 J1532+2344 16 28 03 75.3 239.2 0.9 52.8 23 1 1 865 17 25 50 17 26 50 --- 16 28 33 75.2 239.5 0.9 53.0 30 F 1 867 17 25 50 17 27 20 ARP220 16 29 03 75.4 237.8 0.9 51.5 23 1 1 867 17 26 50 17 28 15 --- 16 29 58 75.2 238.4 0.9 52.0 55 F 1 870 17 26 50 17 28 45 J1532+2344 16 30 28 74.9 240.5 1.0 53.8 23 1 1 870 17 28 15 17 29 15 --- 16 30 59 74.8 240.8 1.0 54.0 30 F 1 872 17 28 15 17 30 00 J1516+1932 16 31 44 69.2 237.8 1.2 49.6 28 1 1 872 17 29 30 17 30 55 =1514+197 16 32 39 69.0 238.2 1.3 49.9 55 F 1 875 17 29 48 17 31 40 J1532+2344 16 33 24 74.3 242.0 1.0 54.9 28 1 1 875 17 31 10 17 32 10 --- 16 33 54 74.2 242.2 1.0 55.1 30 F 1 877 17 31 28 17 32 40 ARP220 16 34 24 74.4 240.7 1.0 53.8 23 1 1 877 17 32 10 17 33 35 --- 16 35 19 74.3 241.2 1.0 54.1 55 F 1 879 17 32 10 17 34 05 J1532+2344 16 35 49 73.9 243.1 1.0 55.8 23 1 1 879 17 33 35 17 34 35 --- 16 36 19 73.8 243.4 1.1 55.9 30 F 1 881 17 33 35 17 35 05 ARP220 16 36 49 74.0 241.9 1.0 54.7 23 1 1 881 17 34 35 17 36 00 --- 16 37 45 73.8 242.3 1.0 55.0 55 F 1 884 17 34 35 17 36 30 J1532+2344 16 38 15 73.4 244.2 1.1 56.6 23 1 1 884 17 36 00 17 37 00 --- 16 38 45 73.3 244.5 1.1 56.7 30 F 1 886 17 36 00 17 37 30 ARP220 16 39 15 73.5 243.0 1.1 55.5 23 1 1 886 17 37 00 17 38 25 --- 16 40 10 73.3 243.4 1.1 55.8 55 F 1 889 17 37 00 Schedule for VLBA_KP (Code Kp ) Page 28 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 17 38 55 J1532+2344 16 40 40 73.0 245.3 1.1 57.3 23 1 1 889 17 38 25 17 39 25 --- 16 41 10 72.9 245.5 1.1 57.5 30 F 1 891 17 38 25 17 39 55 ARP220 16 41 40 73.1 244.1 1.1 56.3 23 1 1 891 17 39 25 17 40 50 --- 16 42 35 72.9 244.5 1.1 56.6 55 F 1 893 17 39 25 17 41 20 J1532+2344 16 43 05 72.5 246.3 1.2 58.0 23 1 1 893 17 40 50 17 41 50 --- 16 43 36 72.4 246.5 1.2 58.2 30 F 1 895 17 40 50 17 42 20 ARP220 16 44 06 72.6 245.1 1.1 57.1 23 1 1 895 17 41 50 17 43 15 --- 16 45 01 72.4 245.5 1.2 57.3 55 F 1 898 17 41 50 17 43 45 J1532+2344 16 45 31 72.0 247.2 1.2 58.7 23 1 1 898 17 43 15 17 44 15 --- 16 46 01 71.9 247.4 1.2 58.8 30 F 1 900 17 43 15 17 45 00 J1516+1932 16 46 46 66.4 243.6 1.5 53.7 28 1 1 900 17 44 30 17 45 55 =1514+197 16 47 41 66.2 243.9 1.5 54.0 55 F 1 903 17 44 48 17 46 40 J1532+2344 16 48 26 71.4 248.3 1.3 59.4 29 1 1 903 17 46 10 17 47 10 --- 16 48 56 71.3 248.5 1.3 59.6 30 F 1 905 17 46 28 17 47 40 ARP220 16 49 27 71.6 247.3 1.2 58.6 23 1 1 905 17 47 10 17 48 35 --- 16 50 22 71.4 247.6 1.3 58.8 55 F 1 907 17 47 10 17 49 05 J1532+2344 16 50 52 71.0 249.2 1.3 60.0 23 1 1 907 17 48 35 17 49 35 --- 16 51 22 70.9 249.4 1.3 60.1 30 F 1 909 17 48 35 17 50 05 ARP220 16 51 52 71.1 248.2 1.3 59.2 23 1 1 909 17 49 35 17 51 00 --- 16 52 47 70.9 248.5 1.3 59.4 55 F 1 912 17 49 35 17 51 30 J1532+2344 16 53 17 70.5 250.0 1.3 60.6 23 1 1 912 17 51 00 17 52 00 --- 16 53 47 70.4 250.2 1.3 60.7 30 F 1 914 17 51 00 17 52 30 ARP220 16 54 17 70.6 249.0 1.3 59.7 23 1 1 914 17 52 00 17 53 25 --- 16 55 12 70.4 249.3 1.3 59.9 55 F 1 917 17 52 00 17 53 55 J1532+2344 16 55 43 70.0 250.8 1.4 61.1 23 1 1 917 17 53 25 17 54 25 --- 16 56 13 69.9 251.0 1.4 61.2 30 F 1 919 17 53 25 17 54 55 ARP220 16 56 43 70.1 249.9 1.4 60.3 24 1 1 919 17 54 25 17 55 50 --- 16 57 38 69.9 250.2 1.4 60.5 55 F 1 921 17 54 25 Schedule for VLBA_KP (Code Kp ) Page 29 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 17 56 20 J1532+2344 16 58 08 69.5 251.6 1.4 61.6 23 1 1 921 17 55 50 17 56 50 --- 16 58 38 69.4 251.8 1.4 61.7 30 F 1 923 17 55 50 17 57 20 ARP220 16 59 08 69.6 250.6 1.4 60.8 24 1 1 923 17 56 50 17 58 15 --- 17 00 03 69.5 250.9 1.4 61.0 55 F 1 926 17 56 50 17 58 45 J1532+2344 17 00 33 69.0 252.3 1.5 62.0 23 1 1 926 17 58 15 17 59 15 --- 17 01 03 68.9 252.5 1.5 62.1 30 F 1 928 17 58 15 18 00 00 J1516+1932 17 01 49 63.5 248.4 1.7 56.8 28 1 1 928 17 59 30 18 00 55 =1514+197 17 02 44 63.3 248.6 1.8 57.0 55 F 1 931 17 59 48 18 01 40 J1532+2344 17 03 29 68.4 253.2 1.5 62.5 29 1 1 931 18 01 10 18 02 10 --- 17 03 59 68.3 253.3 1.5 62.6 30 F 1 933 18 01 28 18 02 40 ARP220 17 04 29 68.6 252.3 1.5 61.8 24 1 1 933 18 02 10 18 03 35 --- 17 05 24 68.4 252.6 1.5 62.0 55 F 1 935 18 02 10 18 04 05 J1532+2344 17 05 54 67.9 253.9 1.5 62.9 23 1 1 935 18 03 35 18 04 35 --- 17 06 24 67.8 254.0 1.6 63.0 30 F 1 937 18 03 35 18 05 05 ARP220 17 06 54 68.1 253.0 1.5 62.2 24 1 1 937 18 04 35 18 06 00 --- 17 07 50 67.9 253.3 1.5 62.4 55 F 1 940 18 04 35 18 06 30 J1532+2344 17 08 20 67.4 254.5 1.6 63.3 23 1 1 940 18 06 00 18 07 00 --- 17 08 50 67.3 254.7 1.6 63.3 30 F 1 942 18 06 00 18 07 30 ARP220 17 09 20 67.6 253.7 1.6 62.6 24 1 1 942 18 07 00 18 08 25 --- 17 10 15 67.4 253.9 1.6 62.7 55 F 1 945 18 07 00 18 08 55 J1532+2344 17 10 45 66.9 255.2 1.6 63.6 23 1 1 945 18 08 25 18 09 25 --- 17 11 15 66.8 255.3 1.6 63.7 30 F 1 947 18 08 25 18 09 55 ARP220 17 11 45 67.1 254.3 1.6 63.0 24 1 1 947 18 09 25 18 10 50 --- 17 12 40 66.9 254.6 1.6 63.1 55 F 1 949 18 09 25 18 11 20 J1532+2344 17 13 10 66.4 255.8 1.7 63.9 23 1 1 949 18 10 50 18 11 50 --- 17 13 41 66.3 255.9 1.7 64.0 30 F 1 951 18 10 50 18 12 20 ARP220 17 14 11 66.6 255.0 1.6 63.3 24 1 1 951 18 11 50 18 13 15 --- 17 15 06 66.4 255.2 1.7 63.4 55 F 1 954 18 11 50 Schedule for VLBA_KP (Code Kp ) Page 30 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 18 13 45 J1532+2344 17 15 36 66.0 256.4 1.7 64.2 23 1 1 954 18 13 15 18 14 15 --- 17 16 06 65.8 256.5 1.7 64.3 30 F 1 956 18 13 15 18 15 00 J1516+1932 17 16 51 60.5 252.4 2.0 59.1 28 1 1 956 18 14 30 18 15 55 =1514+197 17 17 46 60.3 252.6 2.0 59.2 55 F 1 959 18 14 48 18 16 40 J1532+2344 17 18 31 65.3 257.1 1.8 64.6 29 1 1 959 18 16 10 18 17 10 --- 17 19 01 65.2 257.2 1.8 64.7 30 F 1 961 18 16 28 18 17 40 ARP220 17 19 31 65.5 256.3 1.7 64.0 24 1 1 961 18 17 10 18 18 35 --- 17 20 27 65.3 256.5 1.8 64.1 55 F 1 963 18 17 10 18 19 05 J1532+2344 17 20 57 64.8 257.7 1.8 64.9 23 1 1 963 18 18 35 18 19 35 --- 17 21 27 64.7 257.8 1.8 64.9 30 F 1 965 18 18 35 18 20 05 ARP220 17 21 57 65.0 256.9 1.8 64.3 24 1 1 965 18 19 35 18 21 00 --- 17 22 52 64.8 257.1 1.8 64.4 55 F 1 968 18 19 35 18 21 30 J1532+2344 17 23 22 64.3 258.2 1.8 65.1 23 1 1 968 18 21 00 18 22 00 --- 17 23 52 64.2 258.3 1.8 65.2 30 F 1 970 18 21 00 18 22 30 ARP220 17 24 22 64.5 257.5 1.8 64.6 24 1 1 970 18 22 00 18 23 25 --- 17 25 17 64.3 257.7 1.8 64.6 55 F 1 973 18 22 00 18 23 55 J1532+2344 17 25 47 63.8 258.7 1.9 65.3 23 1 1 973 18 23 25 18 24 25 --- 17 26 18 63.7 258.9 1.9 65.4 30 F 1 975 18 23 25 18 24 55 ARP220 17 26 48 64.0 258.0 1.9 64.8 24 1 1 975 18 24 25 18 25 50 --- 17 27 43 63.8 258.2 1.9 64.9 55 F 1 978 18 24 25 18 26 20 J1532+2344 17 28 13 63.3 259.3 1.9 65.6 23 1 1 978 18 25 50 18 26 50 --- 17 28 43 63.2 259.4 1.9 65.6 30 F 1 979 18 25 50 18 27 20 ARP220 17 29 13 63.5 258.5 1.9 65.0 24 1 1 979 18 26 50 18 28 15 --- 17 30 08 63.3 258.7 1.9 65.1 55 F 1 982 18 26 50 18 28 45 J1532+2344 17 30 38 62.8 259.8 2.0 65.8 23 1 1 982 18 28 15 18 29 15 --- 17 31 08 62.7 259.9 2.0 65.8 30 F 1 984 18 28 15 18 30 00 J1516+1932 17 31 53 57.4 255.8 2.2 60.8 28 1 1 984 18 29 30 18 33 20 =1514+197 17 35 14 56.7 256.5 2.3 61.1 200 F 1 992 18 29 48 Schedule for VLBA_KP (Code Kp ) Page 31 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 18 34 05 J1532+2344 17 35 59 61.7 260.8 2.0 66.2 29 1 1 992 18 33 35 18 34 35 --- 17 36 29 61.6 260.9 2.1 66.2 30 F 1 993 18 33 53 18 35 05 ARP220 17 36 59 61.9 260.2 2.0 65.7 24 1 1 993 18 34 35 18 36 00 --- 17 37 54 61.7 260.3 2.0 65.8 55 F 1 996 18 34 35 18 36 30 J1532+2344 17 38 25 61.2 261.3 2.1 66.4 23 1 1 996 18 36 00 18 37 00 --- 17 38 55 61.1 261.4 2.1 66.4 30 F 1 998 18 36 00 18 37 30 ARP220 17 39 25 61.4 260.6 2.1 65.9 24 1 1 998 18 37 00 18 38 25 --- 17 40 20 61.2 260.8 2.1 65.9 55 F 1 1001 18 37 00 18 38 55 J1532+2344 17 40 50 60.7 261.8 2.1 66.5 23 1 1 1001 18 38 25 18 39 25 --- 17 41 20 60.6 261.9 2.1 66.5 30 F 1 1003 18 38 25 18 39 55 ARP220 17 41 50 60.8 261.1 2.1 66.1 24 1 1 1003 18 39 25 18 40 50 --- 17 42 45 60.7 261.3 2.1 66.1 55 F 1 1006 18 39 25 18 41 20 J1532+2344 17 43 15 60.2 262.2 2.2 66.7 23 1 1 1006 18 40 50 18 41 50 --- 17 43 45 60.1 262.3 2.2 66.7 30 F 1 1008 18 40 50 18 42 20 ARP220 17 44 16 60.3 261.6 2.2 66.2 24 1 1 1008 18 41 50 18 43 15 --- 17 45 11 60.1 261.7 2.2 66.3 55 F 1 1010 18 41 50 18 43 45 J1532+2344 17 45 41 59.7 262.7 2.2 66.8 23 1 1 1010 18 43 15 18 44 15 --- 17 46 11 59.6 262.7 2.2 66.8 30 F 1 1012 18 43 15 18 45 00 J1516+1932 17 46 56 54.3 258.9 2.5 62.0 28 1 1 1012 18 44 30 18 45 55 =1514+197 17 47 51 54.1 259.0 2.5 62.1 55 F 1 1015 18 44 48 18 46 40 J1532+2344 17 48 36 59.1 263.2 2.3 66.9 29 1 1 1015 18 46 10 18 47 10 --- 17 49 06 59.0 263.3 2.3 67.0 30 F 1 1017 18 46 28 18 47 40 ARP220 17 49 36 59.2 262.5 2.2 66.5 24 1 1 1017 18 47 10 18 48 35 --- 17 50 32 59.0 262.7 2.3 66.6 55 F 1 1020 18 47 10 18 49 05 J1532+2344 17 51 02 58.5 263.6 2.3 67.1 23 1 1 1020 18 48 35 18 49 35 --- 17 51 32 58.4 263.7 2.3 67.1 30 F 1 1022 18 48 35 18 50 05 ARP220 17 52 02 58.7 263.0 2.3 66.6 24 1 1 1022 18 49 35 18 51 00 --- 17 52 57 58.5 263.1 2.3 66.7 55 F 1 1024 18 49 35 Schedule for VLBA_KP (Code Kp ) Page 32 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 18 51 30 J1532+2344 17 53 27 58.0 264.0 2.3 67.2 23 1 1 1024 18 51 00 18 52 00 --- 17 53 57 57.9 264.1 2.3 67.2 30 F 1 1026 18 51 00 18 52 30 ARP220 17 54 27 58.2 263.4 2.3 66.8 24 1 1 1026 18 52 00 18 53 25 --- 17 55 22 58.0 263.6 2.3 66.8 55 F 1 1029 18 52 00 18 53 55 J1532+2344 17 55 52 57.5 264.4 2.4 67.3 23 1 1 1029 18 53 25 18 54 25 --- 17 56 23 57.4 264.5 2.4 67.3 30 F 1 1031 18 53 25 18 54 55 ARP220 17 56 53 57.7 263.8 2.4 66.9 24 1 1 1031 18 54 25 18 55 50 --- 17 57 48 57.5 264.0 2.4 66.9 55 F 1 1034 18 54 25 18 56 20 J1532+2344 17 58 18 57.0 264.8 2.4 67.3 23 1 1 1034 18 55 50 18 56 50 --- 17 58 48 56.9 264.9 2.4 67.4 30 F 1 1036 18 55 50 18 57 20 ARP220 17 59 18 57.2 264.2 2.4 67.0 24 1 1 1036 18 56 50 18 58 15 --- 18 00 13 57.0 264.4 2.4 67.0 55 F 1 1038 18 56 50 18 58 45 J1532+2344 18 00 43 56.5 265.2 2.5 67.4 23 1 1 1038 18 58 15 18 59 15 --- 18 01 13 56.4 265.3 2.5 67.4 30 F 1 1040 18 58 15 19 00 00 J1516+1932 18 01 58 51.1 261.6 2.7 62.9 28 1 1 1040 18 59 30 19 00 55 =1514+197 18 02 54 50.9 261.7 2.8 63.0 55 F 1 1043 18 59 48 19 01 40 J1532+2344 18 03 39 55.9 265.6 2.5 67.5 29 1 1 1043 19 01 10 19 02 10 --- 18 04 09 55.8 265.7 2.5 67.5 30 F 1 1045 19 01 28 19 02 40 ARP220 18 04 39 56.0 265.1 2.5 67.2 24 1 1 1045 19 02 10 19 03 35 --- 18 05 34 55.9 265.2 2.5 67.2 55 F 1 1048 19 02 10 19 04 05 J1532+2344 18 06 04 55.4 266.0 2.6 67.6 23 1 1 1048 19 03 35 19 04 35 --- 18 06 34 55.3 266.1 2.6 67.6 30 F 1 1050 19 03 35 19 05 05 ARP220 18 07 04 55.5 265.5 2.5 67.2 24 1 1 1050 19 04 35 19 06 00 --- 18 07 59 55.3 265.6 2.5 67.3 55 F 1 1052 19 04 35 19 06 30 J1532+2344 18 08 29 54.9 266.4 2.6 67.6 23 1 1 1052 19 06 00 19 07 00 --- 18 09 00 54.8 266.5 2.6 67.7 30 F 1 1054 19 06 00 19 07 30 ARP220 18 09 30 55.0 265.8 2.6 67.3 24 1 1 1054 19 07 00 19 08 25 --- 18 10 25 54.8 266.0 2.6 67.3 55 F 1 1057 19 07 00 Schedule for VLBA_KP (Code Kp ) Page 33 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 19 08 55 J1532+2344 18 10 55 54.3 266.8 2.6 67.7 23 1 1 1057 19 08 25 19 09 25 --- 18 11 25 54.2 266.8 2.6 67.7 30 F 1 1059 19 08 25 19 09 55 ARP220 18 11 55 54.5 266.2 2.6 67.4 24 1 1 1059 19 09 25 19 10 50 --- 18 12 50 54.3 266.3 2.6 67.4 55 F 1 1062 19 09 25 19 11 20 J1532+2344 18 13 20 53.8 267.1 2.7 67.7 23 1 1 1062 19 10 50 19 11 50 --- 18 13 50 53.7 267.2 2.7 67.7 30 F 1 1064 19 10 50 19 12 20 ARP220 18 14 20 54.0 266.6 2.7 67.4 24 1 1 1064 19 11 50 19 13 15 --- 18 15 16 53.8 266.7 2.7 67.4 55 F 1 1066 19 11 50 19 13 45 J1532+2344 18 15 46 53.3 267.5 2.7 67.8 23 1 1 1066 19 13 15 19 14 15 --- 18 16 16 53.2 267.5 2.7 67.8 30 F 1 1068 19 13 15 19 15 00 J1516+1932 18 17 01 48.0 264.0 3.0 63.5 29 1 1 1068 19 14 30 19 15 55 =1514+197 18 17 56 47.8 264.2 3.0 63.6 55 F 1 1071 19 14 48 19 16 40 J1532+2344 18 18 41 52.7 267.9 2.8 67.8 29 1 1 1071 19 16 10 19 17 10 --- 18 19 11 52.6 268.0 2.8 67.8 30 F 1 1073 19 16 28 19 17 40 ARP220 18 19 41 52.9 267.4 2.7 67.5 24 1 1 1073 19 17 10 19 18 35 --- 18 20 36 52.7 267.5 2.8 67.5 55 F 1 1076 19 17 10 19 19 05 J1532+2344 18 21 07 52.2 268.2 2.8 67.9 23 1 1 1076 19 18 35 19 19 35 --- 18 21 37 52.1 268.3 2.8 67.9 30 F 1 1078 19 18 35 19 20 05 ARP220 18 22 07 52.3 267.7 2.8 67.6 24 1 1 1078 19 19 35 19 21 00 --- 18 23 02 52.2 267.8 2.8 67.6 55 F 1 1080 19 19 35 19 21 30 J1532+2344 18 23 32 51.7 268.6 2.8 67.9 23 1 1 1080 19 21 00 19 22 00 --- 18 24 02 51.6 268.6 2.8 67.9 30 F 1 1082 19 21 00 19 22 30 ARP220 18 24 32 51.8 268.1 2.8 67.6 24 1 1 1082 19 22 00 19 23 25 --- 18 25 27 51.6 268.2 2.8 67.6 55 F 1 1085 19 22 00 19 23 55 J1532+2344 18 25 57 51.2 268.9 2.9 67.9 23 1 1 1085 19 23 25 19 24 25 --- 18 26 27 51.1 269.0 2.9 67.9 30 F 1 1087 19 23 25 19 24 55 ARP220 18 26 58 51.3 268.4 2.9 67.6 24 1 1 1087 19 24 25 19 25 50 --- 18 27 53 51.1 268.5 2.9 67.6 55 F 1 1090 19 24 25 Schedule for VLBA_KP (Code Kp ) Page 34 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 19 26 20 J1532+2344 18 28 23 50.6 269.2 2.9 67.9 23 1 1 1090 19 25 50 19 26 50 --- 18 28 53 50.5 269.3 2.9 67.9 30 F 1 1092 19 25 50 19 27 20 ARP220 18 29 23 50.8 268.7 2.9 67.6 24 1 1 1092 19 26 50 19 28 15 --- 18 30 18 50.6 268.9 2.9 67.6 55 F 1 1094 19 26 50 19 28 45 J1532+2344 18 30 48 50.1 269.6 3.0 67.9 23 1 1 1094 19 28 15 19 29 15 --- 18 31 18 50.0 269.6 3.0 67.9 30 F 1 1096 19 28 15 19 30 00 J1516+1932 18 32 03 44.8 266.3 3.2 63.9 29 1 1 1096 19 29 30 19 30 55 =1514+197 18 32 58 44.6 266.4 3.3 63.9 55 F 1 1099 19 29 48 19 31 40 J1532+2344 18 33 44 49.5 270.0 3.0 67.9 29 1 1 1099 19 31 10 19 32 10 --- 18 34 14 49.4 270.0 3.0 67.9 30 F 1 1101 19 31 28 19 32 40 ARP220 18 34 44 49.7 269.5 3.0 67.7 24 1 1 1101 19 32 10 19 33 35 --- 18 35 39 49.5 269.6 3.0 67.7 55 F 1 1104 19 32 10 19 34 05 J1532+2344 18 36 09 49.0 270.3 3.1 67.9 23 1 1 1104 19 33 35 19 34 35 --- 18 36 39 48.9 270.3 3.1 67.9 30 F 1 1106 19 33 35 19 35 05 ARP220 18 37 09 49.2 269.8 3.0 67.7 24 1 1 1106 19 34 35 19 36 00 --- 18 38 04 49.0 269.9 3.0 67.7 55 F 1 1108 19 34 35 19 36 30 J1532+2344 18 38 34 48.5 270.6 3.1 67.9 23 1 1 1108 19 36 00 19 37 00 --- 18 39 04 48.4 270.7 3.1 67.9 30 F 1 1110 19 36 00 19 37 30 ARP220 18 39 35 48.6 270.1 3.1 67.7 24 1 1 1110 19 37 00 19 38 25 --- 18 40 30 48.5 270.2 3.1 67.7 55 F 1 1113 19 37 00 19 38 55 J1532+2344 18 41 00 48.0 270.9 3.1 67.9 23 1 1 1113 19 38 25 19 39 25 --- 18 41 30 47.9 271.0 3.1 67.9 30 F 1 1115 19 38 25 19 39 55 ARP220 18 42 00 48.1 270.4 3.1 67.7 24 1 1 1115 19 39 25 19 40 50 --- 18 42 55 47.9 270.5 3.1 67.7 55 F 1 1118 19 39 25 19 41 20 J1532+2344 18 43 25 47.5 271.2 3.2 67.9 23 1 1 1118 19 40 50 19 41 50 --- 18 43 55 47.3 271.3 3.2 67.9 30 F 1 1120 19 40 50 19 42 20 ARP220 18 44 25 47.6 270.7 3.2 67.7 24 1 1 1120 19 41 50 19 43 15 --- 18 45 21 47.4 270.9 3.2 67.7 55 F 1 1123 19 41 50 Schedule for VLBA_KP (Code Kp ) Page 35 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 19 43 45 J1532+2344 18 45 51 46.9 271.5 3.2 67.9 23 1 1 1123 19 43 15 19 44 15 --- 18 46 21 46.8 271.6 3.2 67.9 30 F 1 1124 19 43 15 19 45 00 J1516+1932 18 47 06 41.6 268.4 3.5 64.1 29 1 1 1124 19 44 30 19 45 55 =1514+197 18 48 01 41.4 268.5 3.5 64.1 55 F 1 1127 19 44 48 19 46 40 J1532+2344 18 48 46 46.3 271.9 3.3 67.8 29 1 1 1127 19 46 10 19 47 10 --- 18 49 16 46.2 271.9 3.3 67.8 30 F 1 1129 19 46 28 19 47 40 ARP220 18 49 46 46.5 271.4 3.2 67.6 24 1 1 1129 19 47 10 19 48 35 --- 18 50 41 46.3 271.5 3.3 67.6 55 F 1 1132 19 47 10 19 49 05 J1532+2344 18 51 11 45.8 272.2 3.3 67.8 23 1 1 1132 19 48 35 19 49 35 --- 18 51 42 45.7 272.3 3.3 67.8 30 F 1 1134 19 48 35 19 50 05 ARP220 18 52 12 46.0 271.7 3.3 67.6 24 1 1 1134 19 49 35 19 51 00 --- 18 53 07 45.8 271.8 3.3 67.6 55 F 1 1137 19 49 35 19 51 30 J1532+2344 18 53 37 45.3 272.5 3.3 67.8 23 1 1 1137 19 51 00 19 52 00 --- 18 54 07 45.2 272.5 3.4 67.8 30 F 1 1138 19 51 00 19 52 30 ARP220 18 54 37 45.5 272.0 3.3 67.6 24 1 1 1138 19 52 00 19 53 25 --- 18 55 32 45.3 272.2 3.3 67.6 55 F 1 1141 19 52 00 19 53 55 J1532+2344 18 56 02 44.8 272.8 3.4 67.8 23 1 1 1141 19 53 25 19 54 25 --- 18 56 32 44.7 272.8 3.4 67.7 30 F 1 1143 19 53 25 19 54 55 ARP220 18 57 02 44.9 272.3 3.4 67.6 24 1 1 1143 19 54 25 19 55 50 --- 18 57 58 44.7 272.5 3.4 67.5 55 F 1 1146 19 54 25 19 56 20 J1532+2344 18 58 28 44.3 273.1 3.4 67.7 23 1 1 1146 19 55 50 19 56 50 --- 18 58 58 44.2 273.1 3.4 67.7 30 F 1 1148 19 55 50 19 57 20 ARP220 18 59 28 44.4 272.6 3.4 67.5 24 1 1 1148 19 56 50 19 58 15 --- 19 00 23 44.2 272.7 3.4 67.5 55 F 1 1151 19 56 50 19 58 45 J1532+2344 19 00 53 43.8 273.4 3.5 67.7 23 1 1 1151 19 58 15 19 59 15 --- 19 01 23 43.6 273.4 3.5 67.7 30 F 1 1153 19 58 15 20 00 00 J1516+1932 19 02 08 38.4 270.4 3.7 64.2 29 1 1 1153 19 59 30 20 00 55 =1514+197 19 03 03 38.2 270.6 3.8 64.2 55 F 1 1155 19 59 48 Schedule for VLBA_KP (Code Kp ) Page 36 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 20 01 40 J1532+2344 19 03 49 43.1 273.7 3.5 67.6 29 1 1 1155 20 01 10 20 02 10 --- 19 04 19 43.0 273.8 3.5 67.6 30 F 1 1157 20 01 28 20 02 40 ARP220 19 04 49 43.3 273.3 3.5 67.4 24 1 1 1157 20 02 10 20 03 35 --- 19 05 44 43.1 273.4 3.5 67.4 55 F 1 1160 20 02 10 20 04 05 J1532+2344 19 06 14 42.6 274.0 3.6 67.6 23 1 1 1160 20 03 35 20 04 35 --- 19 06 44 42.5 274.1 3.6 67.6 30 F 1 1162 20 03 35 20 05 05 ARP220 19 07 14 42.8 273.6 3.5 67.4 24 1 1 1162 20 04 35 20 06 00 --- 19 08 09 42.6 273.7 3.5 67.4 55 F 1 1165 20 04 35 20 06 30 J1532+2344 19 08 39 42.1 274.3 3.6 67.5 23 1 1 1165 20 06 00 20 07 00 --- 19 09 09 42.0 274.4 3.6 67.5 30 F 1 1167 20 06 00 20 07 30 ARP220 19 09 40 42.3 273.9 3.6 67.4 24 1 1 1167 20 07 00 20 08 25 --- 19 10 35 42.1 274.0 3.6 67.3 55 F 1 1169 20 07 00 20 08 55 J1532+2344 19 11 05 41.6 274.6 3.6 67.5 23 1 1 1169 20 08 25 20 09 25 --- 19 11 35 41.5 274.6 3.6 67.5 30 F 1 1171 20 08 25 20 09 55 ARP220 19 12 05 41.8 274.2 3.6 67.3 24 1 1 1171 20 09 25 20 10 50 --- 19 13 00 41.6 274.3 3.6 67.3 55 F 1 1174 20 09 25 20 11 20 J1532+2344 19 13 30 41.1 274.9 3.7 67.4 23 1 1 1174 20 10 50 20 11 50 --- 19 14 00 41.0 274.9 3.7 67.4 30 F 1 1176 20 10 50 20 12 20 ARP220 19 14 30 41.2 274.4 3.7 67.3 24 1 1 1176 20 11 50 20 13 15 --- 19 15 25 41.0 274.6 3.7 67.2 55 F 1 1179 20 11 50 20 13 45 J1532+2344 19 15 56 40.6 275.1 3.7 67.4 23 1 1 1179 20 13 15 20 14 15 --- 19 16 26 40.5 275.2 3.7 67.3 30 F 1 1181 20 13 15 20 15 00 J1516+1932 19 17 11 35.2 272.4 4.0 64.1 29 1 1 1181 20 14 30 20 15 55 =1514+197 19 18 06 35.0 272.5 4.0 64.1 55 F 1 1183 20 14 48 20 16 40 J1532+2344 19 18 51 40.0 275.5 3.8 67.3 29 1 1 1183 20 16 10 20 17 10 --- 19 19 21 39.8 275.5 3.8 67.3 30 F 1 1185 20 16 28 20 17 40 ARP220 19 19 51 40.1 275.1 3.7 67.1 24 1 1 1185 20 17 10 20 18 35 --- 19 20 46 39.9 275.2 3.8 67.1 55 F 1 1188 20 17 10 Schedule for VLBA_KP (Code Kp ) Page 37 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 20 19 05 J1532+2344 19 21 16 39.4 275.8 3.8 67.2 23 1 1 1188 20 18 35 20 19 35 --- 19 21 46 39.3 275.8 3.8 67.2 30 F 1 1190 20 18 35 20 20 05 ARP220 19 22 17 39.6 275.4 3.8 67.1 24 1 1 1190 20 19 35 20 21 00 --- 19 23 12 39.4 275.5 3.8 67.0 55 F 1 1193 20 19 35 20 21 30 J1532+2344 19 23 42 38.9 276.0 3.8 67.1 23 1 1 1193 20 21 00 20 22 00 --- 19 24 12 38.8 276.1 3.9 67.1 30 F 1 1195 20 21 00 20 22 30 ARP220 19 24 42 39.1 275.6 3.8 67.0 24 1 1 1195 20 22 00 20 23 25 --- 19 25 37 38.9 275.7 3.8 67.0 55 F 1 1197 20 22 00 20 23 55 J1532+2344 19 26 07 38.4 276.3 3.9 67.1 23 1 1 1197 20 23 25 20 24 25 --- 19 26 37 38.3 276.4 3.9 67.1 30 F 1 1199 20 23 25 20 24 55 ARP220 19 27 07 38.6 275.9 3.9 66.9 24 1 1 1199 20 24 25 20 25 50 --- 19 28 03 38.4 276.0 3.9 66.9 55 F 1 1202 20 24 25 20 26 20 J1532+2344 19 28 33 37.9 276.6 3.9 67.0 23 1 1 1202 20 25 50 20 26 50 --- 19 29 03 37.8 276.7 3.9 67.0 30 F 1 1204 20 25 50 20 27 20 ARP220 19 29 33 38.1 276.2 3.9 66.9 24 1 1 1204 20 26 50 20 28 15 --- 19 30 28 37.9 276.3 3.9 66.8 55 F 1 1207 20 26 50 20 28 45 J1532+2344 19 30 58 37.4 276.9 4.0 66.9 23 1 1 1207 20 28 15 20 29 15 --- 19 31 28 37.3 276.9 4.0 66.9 30 F 1 1209 20 28 15 20 30 00 J1516+1932 19 32 13 32.0 274.2 4.2 63.9 28 1 1 1209 20 29 30 20 30 55 =1514+197 19 33 08 31.8 274.3 4.3 63.8 55 F 1 1211 20 29 48 20 31 40 J1532+2344 19 33 53 36.8 277.2 4.0 66.8 29 1 1 1211 20 31 10 20 32 10 --- 19 34 24 36.7 277.3 4.0 66.8 30 F 1 1213 20 31 28 20 32 40 ARP220 19 34 54 36.9 276.8 4.0 66.7 24 1 1 1213 20 32 10 20 33 35 --- 19 35 49 36.7 276.9 4.0 66.7 55 F 1 1216 20 32 10 20 34 05 J1532+2344 19 36 19 36.3 277.5 4.1 66.7 23 1 1 1216 20 33 35 20 34 35 --- 19 36 49 36.2 277.5 4.1 66.7 30 F 1 1218 20 33 35 20 35 05 ARP220 19 37 19 36.4 277.1 4.0 66.6 24 1 1 1218 20 34 35 20 36 00 --- 19 38 14 36.2 277.2 4.0 66.6 55 F 1 1221 20 34 35 Schedule for VLBA_KP (Code Kp ) Page 38 15GHz obs of SN/SNR in ARP 220 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 28 Dec 2006 Day 362 --- 20 36 30 J1532+2344 19 38 44 35.8 277.7 4.1 66.7 23 1 1 1221 20 36 00 20 37 00 --- 19 39 14 35.7 277.8 4.1 66.6 30 F 1 1223 20 36 00 20 37 30 ARP220 19 39 44 35.9 277.3 4.1 66.6 24 1 1 1223 20 37 00 20 38 25 --- 19 40 40 35.7 277.5 4.1 66.5 55 F 1 1225 20 37 00 20 38 55 J1532+2344 19 41 10 35.3 278.0 4.1 66.6 23 1 1 1225 20 38 25 20 39 25 --- 19 41 40 35.1 278.1 4.1 66.6 30 F 1 1227 20 38 25 20 39 55 ARP220 19 42 10 35.4 277.6 4.1 66.5 24 1 1 1227 20 39 25 20 40 50 --- 19 43 05 35.2 277.7 4.1 66.4 55 F 1 1230 20 39 25 20 41 20 J1532+2344 19 43 35 34.7 278.3 4.2 66.5 23 1 1 1230 20 40 50 20 41 50 --- 19 44 05 34.6 278.3 4.2 66.5 30 F 1 1232 20 40 50 20 42 20 ARP220 19 44 35 34.9 277.9 4.2 66.4 24 1 1 1232 20 41 50 20 43 15 --- 19 45 30 34.7 278.0 4.2 66.4 55 F 1 1235 20 41 50 20 43 45 J1532+2344 19 46 00 34.2 278.6 4.2 66.4 23 1 1 1235 20 43 15 20 44 15 --- 19 46 31 34.1 278.6 4.2 66.4 30 F 1 1237 20 43 15 20 45 00 J1516+1932 19 47 16 28.9 276.1 4.5 63.5 28 1 1 1237 20 44 30 20 45 55 =1514+197 19 48 11 28.7 276.2 4.5 63.5 55 F 1 1239 20 44 48 20 46 40 J1532+2344 19 48 56 33.6 278.9 4.3 66.3 29 1 1 1239 20 46 10 20 47 10 --- 19 49 26 33.5 278.9 4.3 66.3 30 F 1 1241 20 46 28 20 47 40 ARP220 19 49 56 33.8 278.5 4.2 66.2 24 1 1 1241 20 47 10 20 48 35 --- 19 50 51 33.6 278.6 4.3 66.2 55 F 1 1244 20 47 10 20 49 05 J1532+2344 19 51 21 33.1 279.1 4.3 66.2 23