COVER INFORMATION Station: VLBA_FD (Code Fd ) Experiment: Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours Exp. Code: BM247E Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Alan P. Marscher Address: Dept. of Astronomy, Boston University 725 Commonwealth Ave. Boston, MA 02215 Phone: (617)353-5029 (office) or (508)788-8317 (home) EMAIL: marscher@bu.edu Fax: (617)353-5704 Phone during observation: (617)353-5029 (office) or (508)788-8317 (home) Observing mode: continuum Notes: Use all available antennas Program sources: 3C111, 3C120, 3C273, 3C279, 1510-089, BL Lac Calibrators: 0336-019, 0420-014, OJ287, 1156+295, CTA102, 3C446, Fringe finder: 3C279, 3C273, or 3C454.3 Schedule for VLBA_FD (Code Fd ) Page 2 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- Next scan frequencies: 43201.49 43201.49 43209.49 43209.49 43217.49 43217.49 43225.49 43225.49 Next BBC frequencies: 801.49 801.49 809.49 809.49 817.49 817.49 825.49 825.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 01 30 18 0420-014 00 16 42 23.3 106.5 -4.1 -55.6 0 1 1 0 01 30 18 01 35 17 --- 00 21 42 24.3 107.3 -4.0 -55.3 299 F 1 5 01 30 41 01 35 17 3C120 00 21 42 25.9 99.6 -4.2 -58.4 -11 1 1 5 01 35 17 01 40 16 --- 00 26 42 27.0 100.3 -4.1 -58.2 288 F 1 10 01 35 17 01 40 16 3C111 00 26 42 42.3 64.6 -3.9 -80.6 -37 1 1 10 01 40 16 01 46 15 --- 00 32 42 43.4 64.8 -3.8 -81.4 322 F 1 15 01 40 16 01 46 15 0336-019 00 32 42 35.0 117.2 -3.1 -49.9 -41 1 1 15 01 46 15 01 50 14 --- 00 36 42 35.7 118.0 -3.1 -49.5 198 F 1 19 01 46 15 01 50 14 0420-014 00 36 42 27.4 109.7 -3.8 -54.1 -23 1 1 19 01 50 14 01 55 14 --- 00 41 42 28.4 110.5 -3.7 -53.7 276 F 1 24 01 50 14 01 55 14 3C120 00 41 42 30.1 102.6 -3.9 -57.5 -11 1 1 24 01 55 14 02 00 13 --- 00 46 42 31.2 103.4 -3.8 -57.2 288 F 1 29 01 55 14 02 00 13 3C111 00 46 42 46.2 65.3 -3.5 -83.2 -36 1 1 29 02 00 13 02 06 12 --- 00 52 42 47.4 65.5 -3.4 -83.9 323 F 1 35 02 00 13 02 06 12 0336-019 00 52 42 38.7 121.4 -2.8 -47.3 -43 1 1 35 02 06 12 02 10 11 --- 00 56 42 39.5 122.2 -2.7 -46.7 196 F 1 39 02 06 12 02 10 11 3C454.3 00 56 42 58.6 249.6 2.0 57.1 -91 1 1 39 02 10 11 02 16 10 --- 01 02 42 57.4 251.1 2.1 58.0 268 F 1 44 02 10 11 02 16 10 CTA102 01 02 42 50.6 249.7 2.5 55.5 -20 1 1 44 02 16 10 02 20 10 --- 01 06 42 49.8 250.5 2.6 56.0 220 F 1 48 02 16 10 02 20 10 BLLAC 01 06 42 51.8 300.8 3.1 92.4 -40 1 1 48 02 20 10 02 28 08 --- 01 14 42 50.3 300.8 3.2 91.0 439 F 1 56 02 20 10 02 28 08 0420-014 01 14 42 34.9 116.5 -3.1 -50.4 -129 1 1 56 02 28 08 02 35 07 --- 01 21 42 36.2 117.9 -3.0 -49.5 290 F 1 63 02 28 08 Schedule for VLBA_FD (Code Fd ) Page 3 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 02 35 07 3C120 01 21 42 38.4 109.3 -3.2 -54.6 -12 1 1 63 02 35 07 02 40 06 --- 01 26 42 39.4 110.2 -3.1 -54.2 287 F 1 68 02 35 07 02 40 06 3C111 01 26 42 54.0 66.2 -2.9 -88.7 -35 1 1 68 02 40 06 02 46 05 --- 01 32 42 55.2 66.2 -2.8 -89.6 324 F 1 73 02 40 06 02 46 05 0420-014 01 32 42 38.3 120.1 -2.8 -48.1 -42 1 1 73 02 46 05 02 50 05 --- 01 36 42 39.1 121.0 -2.8 -47.5 197 F 1 77 02 46 05 02 50 05 3C120 01 36 42 41.4 112.2 -2.9 -53.2 -12 1 1 77 02 50 05 02 55 04 --- 01 41 42 42.4 113.2 -2.9 -52.6 287 F 1 82 02 50 05 02 55 04 3C111 01 41 42 57.0 66.2 -2.6 -91.0 -37 1 1 82 02 55 04 03 00 03 --- 01 46 42 58.0 66.2 -2.5 -91.8 262 F 1 87 02 55 04 03 00 03 0336-019 01 46 42 47.9 135.1 -1.9 -37.5 -52 1 1 87 03 00 03 03 04 02 --- 01 50 42 48.5 136.3 -1.8 -36.5 187 F 1 91 03 00 03 03 04 02 0420-014 01 50 42 41.6 124.2 -2.5 -45.4 -20 1 1 91 03 04 02 03 09 02 --- 01 55 42 42.5 125.4 -2.5 -44.6 279 F 1 96 03 04 02 03 09 02 3C120 01 55 42 45.2 116.2 -2.6 -50.9 -12 1 1 96 03 09 02 03 14 01 --- 02 00 42 46.1 117.3 -2.5 -50.2 287 F 1 100 03 09 02 03 14 01 3C111 02 00 42 60.7 65.9 -2.3 -94.2 -40 1 1 100 03 14 01 03 20 00 --- 02 06 42 61.9 65.7 -2.2 -95.3 319 F 1 106 03 14 01 03 20 00 0420-014 02 06 42 44.4 128.1 -2.3 -42.6 -48 1 1 106 03 20 00 03 24 59 --- 02 11 42 45.2 129.4 -2.2 -41.7 252 F 1 111 03 20 00 03 24 59 3C120 02 11 42 48.2 119.9 -2.4 -48.5 -12 1 1 111 03 24 59 03 29 58 --- 02 16 42 49.1 121.2 -2.3 -47.7 287 F 1 116 03 24 59 03 29 58 3C111 02 16 42 63.9 65.2 -2.0 -97.2 -43 1 1 116 03 29 58 03 35 57 --- 02 22 42 65.0 64.9 -1.9 -98.5 316 F 1 122 03 29 58 03 35 57 0336-019 02 22 42 52.8 146.9 -1.3 -28.0 -61 1 1 122 03 35 57 03 39 56 --- 02 26 42 53.2 148.4 -1.2 -26.8 179 F 1 125 03 35 57 03 41 56 0420-014 02 28 42 47.9 134.1 -1.9 -38.1 103 1 1 125 03 41 56 03 46 55 --- 02 33 42 48.7 135.6 -1.8 -37.0 299 F 1 130 03 42 19 Schedule for VLBA_FD (Code Fd ) Page 4 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 03 46 55 3C120 02 33 42 52.2 125.8 -2.0 -44.5 -13 1 1 130 03 46 55 03 51 54 --- 02 38 42 53.0 127.3 -1.9 -43.4 286 F 1 135 03 46 55 03 51 54 3C111 02 38 42 68.1 63.4 -1.7 -102.3 -49 1 1 135 03 51 54 03 57 54 --- 02 44 42 69.3 62.7 -1.6 -103.9 310 F 1 141 03 51 54 03 57 54 0420-014 02 44 42 50.3 139.1 -1.6 -34.3 -57 1 1 141 03 57 54 04 02 53 --- 02 49 42 51.0 140.7 -1.6 -33.0 242 F 1 146 03 57 54 04 02 53 3C120 02 49 42 54.9 130.7 -1.7 -40.9 -14 1 1 146 04 02 53 04 07 52 --- 02 54 42 55.7 132.4 -1.6 -39.7 285 F 1 151 04 02 53 04 07 52 3C111 02 54 42 71.2 61.1 -1.4 -106.9 -54 1 1 151 04 07 52 04 13 51 --- 03 00 42 72.3 60.0 -1.3 -108.9 306 F 1 156 04 07 52 04 13 51 0336-019 03 00 42 56.3 162.1 -0.7 -15.3 -74 1 1 156 04 13 51 04 17 50 --- 03 04 42 56.5 163.9 -0.6 -13.8 165 F 1 160 04 13 51 04 17 50 0420-014 03 04 42 52.9 145.9 -1.3 -28.8 -18 1 1 160 04 17 50 04 22 49 --- 03 09 42 53.5 147.8 -1.2 -27.3 281 F 1 165 04 17 50 04 22 49 3C120 03 09 42 58.0 137.8 -1.4 -35.5 -15 1 1 165 04 22 49 04 27 49 --- 03 14 42 58.7 139.8 -1.3 -33.9 284 F 1 170 04 22 49 04 27 49 3C111 03 14 42 74.9 56.4 -1.1 -114.5 -62 1 1 170 04 27 49 04 33 48 --- 03 20 42 75.9 54.3 -1.0 -117.4 297 F 1 176 04 27 49 04 33 48 0420-014 03 20 42 54.7 152.0 -1.0 -23.8 -71 1 1 176 04 33 48 04 37 47 --- 03 24 42 55.1 153.6 -1.0 -22.5 168 F 1 179 04 33 48 04 37 47 3C120 03 24 42 60.0 143.9 -1.1 -30.6 -16 1 1 179 04 37 47 04 42 46 --- 03 29 42 60.6 146.1 -1.1 -28.8 283 F 1 184 04 37 47 04 42 46 3C111 03 29 42 77.5 50.5 -0.8 -122.5 -70 1 1 184 04 42 46 04 47 45 --- 03 34 42 78.3 47.9 -0.7 -125.9 229 F 1 189 04 42 46 04 47 45 0336-019 03 34 42 57.6 177.6 -0.1 -2.1 -92 1 1 189 04 47 45 04 51 45 --- 03 38 42 57.6 179.4 0.0 -0.5 147 F 1 193 04 47 45 04 51 45 OJ287 03 38 42 19.1 77.5 -5.3 -63.4 -83 1 1 193 04 51 45 04 54 44 --- 03 41 42 19.7 77.8 -5.2 -63.6 96 F 1 196 04 51 45 Schedule for VLBA_FD (Code Fd ) Page 5 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 04 54 44 0420-014 03 41 42 56.5 160.7 -0.7 -16.5 -80 1 1 196 04 54 44 04 58 44 --- 03 45 42 56.8 162.5 -0.6 -15.0 160 F 1 200 04 54 44 04 58 44 3C120 03 45 42 62.3 153.6 -0.8 -22.6 -17 1 1 200 04 58 44 05 02 43 --- 03 49 42 62.7 155.6 -0.7 -20.9 222 F 1 204 04 58 44 05 02 43 3C111 03 49 42 80.5 37.1 -0.5 -138.8 -85 1 1 204 05 02 43 05 06 42 --- 03 53 42 81.0 33.3 -0.4 -143.2 154 F 1 207 05 02 43 05 06 42 OJ287 03 53 42 22.3 79.1 -5.0 -64.1 -123 1 1 207 05 06 42 05 09 42 --- 03 56 42 22.9 79.5 -5.0 -64.2 56 F 1 210 05 06 42 05 09 42 0420-014 03 56 42 57.4 167.4 -0.4 -10.8 -75 1 1 210 05 09 42 05 13 41 --- 04 00 42 57.6 169.3 -0.4 -9.2 164 F 1 214 05 09 42 05 13 41 3C120 04 00 42 63.6 161.3 -0.5 -16.1 -18 1 1 214 05 13 41 05 17 40 --- 04 04 42 63.8 163.5 -0.5 -14.2 221 F 1 218 05 13 41 05 17 40 3C111 04 04 42 82.0 20.5 -0.2 -157.5 -101 1 1 218 05 17 40 05 21 40 --- 04 08 42 82.3 15.1 -0.2 -163.5 138 F 1 222 05 17 40 05 21 40 0336-019 04 08 42 56.9 193.3 0.5 11.4 -125 1 1 222 05 21 40 05 25 39 --- 04 12 42 56.7 195.0 0.5 12.9 115 F 1 226 05 21 40 05 25 39 OJ287 04 12 42 26.3 81.2 -4.7 -64.9 -82 1 1 226 05 25 39 05 28 39 --- 04 15 42 26.9 81.6 -4.7 -65.0 98 F 1 229 05 25 39 05 28 39 0420-014 04 15 42 58.0 176.3 -0.1 -3.2 -69 1 1 229 05 28 39 05 32 38 --- 04 19 42 58.0 178.1 -0.1 -1.6 170 F 1 233 05 28 39 05 32 38 3C120 04 19 42 64.5 171.9 -0.2 -7.0 -19 1 1 233 05 32 38 05 36 37 --- 04 23 42 64.6 174.3 -0.2 -5.0 220 F 1 236 05 32 38 05 36 37 3C111 04 23 42 82.5 352.6 0.1 172.0 -125 1 1 236 05 36 37 05 40 37 --- 04 27 42 82.4 346.8 0.1 165.5 114 F 1 240 05 36 37 05 42 36 OJ287 04 29 42 29.9 443.1 -4.4 -65.4 9 1 1 240 05 42 36 05 45 36 --- 04 32 42 30.6 443.5 -4.4 -65.5 180 F 1 243 05 42 59 05 45 36 0420-014 04 32 42 58.0 184.3 0.2 3.7 -179 1 1 243 05 45 36 05 49 35 --- 04 36 42 57.9 186.1 0.2 5.3 61 F 1 247 05 45 36 Schedule for VLBA_FD (Code Fd ) Page 6 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 05 49 35 3C120 04 36 42 64.7 181.8 0.1 1.6 -20 1 1 247 05 49 35 05 53 35 --- 04 40 42 64.7 184.1 0.1 3.6 220 F 1 251 05 49 35 05 53 35 3C111 04 40 42 81.3 330.2 0.4 147.1 -103 1 1 251 05 53 35 05 57 34 --- 04 44 42 80.9 326.0 0.4 142.4 136 F 1 255 05 53 35 05 57 34 0336-019 04 44 42 54.1 208.4 1.1 24.2 -84 1 1 255 05 57 34 06 01 33 --- 04 48 42 53.7 210.0 1.1 25.5 155 F 1 259 05 57 34 06 01 33 OJ287 04 48 42 34.0 85.3 -4.1 -65.9 -89 1 1 259 06 01 33 06 04 33 --- 04 51 42 34.6 85.6 -4.1 -66.0 90 F 1 262 06 01 33 06 04 33 0420-014 04 51 42 57.4 193.1 0.5 11.2 -78 1 1 262 06 04 33 06 08 32 --- 04 55 42 57.1 194.9 0.5 12.8 162 F 1 265 06 04 33 06 08 32 3C120 04 55 42 64.2 192.7 0.4 11.0 -20 1 1 265 06 08 32 06 12 31 --- 04 59 42 64.0 195.0 0.4 12.9 219 F 1 269 06 08 32 06 12 31 3C111 04 59 42 78.8 314.1 0.7 128.3 -85 1 1 269 06 12 31 06 16 31 --- 05 03 42 78.2 311.7 0.7 125.4 154 F 1 273 06 12 31 06 16 31 OJ287 05 03 42 37.2 447.0 -3.9 -66.2 -96 1 1 273 06 16 31 06 20 30 --- 05 07 42 38.1 447.5 -3.8 -66.2 143 F 1 277 06 16 31 06 20 30 0420-014 05 07 42 56.4 200.2 0.7 17.3 -171 1 1 277 06 20 30 06 24 29 --- 05 11 42 56.1 201.9 0.8 18.7 68 F 1 281 06 20 30 06 24 29 3C120 05 11 42 63.2 201.4 0.6 18.4 -20 1 1 281 06 24 29 06 28 29 --- 05 15 42 62.9 203.5 0.7 20.2 219 F 1 285 06 24 29 06 28 29 3C111 05 15 42 76.1 306.2 0.9 118.1 -74 1 1 285 06 28 29 06 32 28 --- 05 19 42 75.4 304.7 1.0 116.1 165 F 1 289 06 28 29 06 32 28 0336-019 05 19 42 49.8 220.8 1.7 34.2 -62 1 1 289 06 32 28 06 36 27 --- 05 23 42 49.3 222.1 1.7 35.2 177 F 1 292 06 32 28 06 36 27 OJ287 05 23 42 41.5 89.5 -3.5 -66.4 -94 1 1 292 06 36 27 06 41 27 --- 05 28 42 42.6 90.1 -3.4 -66.4 205 F 1 297 06 36 27 06 41 27 0420-014 05 28 42 54.5 208.8 1.1 24.5 -85 1 1 297 06 41 27 06 45 26 --- 05 32 42 54.1 210.4 1.2 25.8 154 F 1 301 06 41 27 Schedule for VLBA_FD (Code Fd ) Page 7 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 06 45 26 3C120 05 32 42 61.2 211.8 1.0 27.1 -20 1 1 301 06 45 26 06 49 25 --- 05 36 42 60.7 213.6 1.1 28.6 219 F 1 305 06 45 26 06 49 25 3C111 05 36 42 72.4 300.1 1.3 109.0 -64 1 1 305 06 49 25 06 53 25 --- 05 40 42 71.6 299.3 1.4 107.6 176 F 1 309 06 49 25 06 53 25 OJ287 05 40 42 45.2 91.7 -3.2 -66.3 -144 1 1 309 06 53 25 06 58 24 --- 05 45 42 46.2 92.4 -3.2 -66.3 155 F 1 314 06 53 25 06 58 24 0420-014 05 45 42 52.5 215.2 1.4 29.7 -88 1 1 314 06 58 24 07 02 23 --- 05 49 42 52.0 216.6 1.4 30.9 151 F 1 317 06 58 24 07 02 23 3C120 05 49 42 59.0 219.1 1.3 33.0 -20 1 1 317 07 02 23 07 06 23 --- 05 53 42 58.5 220.7 1.3 34.3 219 F 1 321 07 02 23 07 06 23 3C111 05 53 42 69.1 297.2 1.6 103.7 -57 1 1 321 07 06 23 07 10 22 --- 05 57 42 68.4 296.7 1.6 102.6 182 F 1 325 07 06 23 07 10 22 0336-019 05 57 42 43.9 231.7 2.3 42.5 -55 1 1 325 07 10 22 07 14 21 --- 06 01 42 43.2 232.7 2.4 43.2 184 F 1 329 07 10 22 07 14 21 OJ287 06 01 42 49.7 94.6 -2.9 -65.9 -98 1 1 329 07 14 21 07 19 20 --- 06 06 42 50.7 95.4 -2.8 -65.8 201 F 1 334 07 14 21 07 19 20 0420-014 06 06 42 49.7 222.2 1.7 35.3 -91 1 1 334 07 19 20 07 23 20 --- 06 10 42 49.1 223.5 1.8 36.3 149 F 1 338 07 19 20 07 23 20 3C120 06 10 42 56.0 227.0 1.6 39.2 -20 1 1 338 07 23 20 07 27 19 --- 06 14 42 55.3 228.3 1.7 40.2 220 F 1 342 07 23 20 07 27 19 3C111 06 14 42 65.1 295.2 1.9 98.6 -51 1 1 342 07 27 19 07 31 18 --- 06 18 42 64.3 294.9 2.0 97.7 189 F 1 345 07 27 19 07 31 18 OJ287 06 18 42 53.3 97.3 -2.6 -65.3 -138 1 1 345 07 31 18 07 36 18 --- 06 23 42 54.4 98.1 -2.5 -65.1 161 F 1 350 07 31 18 07 36 18 0420-014 06 23 42 47.1 227.3 2.0 39.3 -92 1 1 350 07 36 18 07 40 17 --- 06 27 42 46.5 228.5 2.1 40.1 147 F 1 354 07 36 18 07 40 17 3C120 06 27 42 53.2 232.5 1.9 43.3 -19 1 1 354 07 40 17 07 44 16 --- 06 31 42 52.5 233.7 2.0 44.1 220 F 1 358 07 40 17 Schedule for VLBA_FD (Code Fd ) Page 8 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 07 44 16 3C111 06 31 42 61.8 294.3 2.2 95.1 -46 1 1 358 07 44 16 07 48 16 --- 06 35 42 61.0 294.1 2.3 94.4 193 F 1 362 07 44 16 07 50 15 0336-019 06 37 42 36.8 240.9 3.0 48.8 65 1 1 362 07 50 15 07 54 15 --- 06 41 42 36.0 241.7 3.0 49.3 239 F 1 366 07 50 38 07 54 15 OJ287 06 41 42 58.2 101.4 -2.2 -63.9 -100 1 1 366 07 54 15 07 59 14 --- 06 46 42 59.2 102.4 -2.1 -63.5 200 F 1 371 07 54 15 07 59 14 0420-014 06 46 42 43.3 233.4 2.4 43.7 -93 1 1 371 07 59 14 08 03 13 --- 06 50 42 42.6 234.4 2.5 44.4 146 F 1 374 07 59 14 08 03 13 3C120 06 50 42 49.1 238.9 2.3 47.7 -19 1 1 374 08 03 13 08 07 13 --- 06 54 42 48.3 239.9 2.4 48.4 220 F 1 378 08 03 13 08 07 13 3C111 06 54 42 57.2 293.8 2.6 91.2 -42 1 1 378 08 07 13 08 11 12 --- 06 58 42 56.4 293.8 2.7 90.5 197 F 1 382 08 07 13 08 11 12 OJ287 06 58 42 61.7 105.0 -1.9 -62.2 -132 1 1 382 08 11 12 08 16 11 --- 07 03 42 62.8 106.2 -1.9 -61.6 167 F 1 387 08 11 12 08 16 11 0420-014 07 03 42 40.3 237.5 2.7 46.5 -94 1 1 387 08 16 11 08 20 10 --- 07 07 42 39.6 238.4 2.7 47.1 146 F 1 391 08 16 11 08 20 10 3C120 07 07 42 45.9 243.0 2.6 50.3 -19 1 1 391 08 20 10 08 24 10 --- 07 11 42 45.1 243.9 2.6 50.9 221 F 1 395 08 20 10 08 24 10 3C111 07 11 42 53.9 293.8 2.9 88.6 -39 1 1 395 08 24 10 08 28 09 --- 07 15 42 53.1 293.8 2.9 88.0 200 F 1 399 08 24 10 08 28 09 OJ287 07 15 42 65.2 109.3 -1.7 -59.8 -129 1 1 399 08 28 09 08 33 08 --- 07 20 42 66.2 110.8 -1.6 -58.9 170 F 1 403 08 28 09 08 33 08 0420-014 07 20 42 37.2 241.1 3.0 48.9 -93 1 1 403 08 33 08 08 37 08 --- 07 24 42 36.4 241.9 3.0 49.4 146 F 1 407 08 33 08 08 37 08 3C120 07 24 42 42.6 246.7 2.9 52.5 -18 1 1 407 08 37 08 08 42 07 --- 07 29 42 41.6 247.7 2.9 53.1 281 F 1 412 08 37 08 08 42 07 3C111 07 29 42 50.4 294.1 3.2 86.0 -37 1 1 412 08 42 07 08 48 06 --- 07 35 42 49.2 294.2 3.3 85.2 322 F 1 418 08 42 07 Schedule for VLBA_FD (Code Fd ) Page 9 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 08 48 06 OJ287 07 35 42 69.2 115.8 -1.3 -55.5 -125 1 1 418 08 48 06 08 53 05 --- 07 40 42 70.2 117.8 -1.2 -54.2 174 F 1 423 08 48 06 08 53 05 0420-014 07 40 42 33.3 245.1 3.3 51.3 -91 1 1 423 08 53 05 08 57 04 --- 07 44 42 32.6 245.8 3.4 51.7 148 F 1 427 08 53 05 08 57 04 3C120 07 44 42 38.6 250.5 3.2 54.6 -18 1 1 427 08 57 04 09 02 04 --- 07 49 42 37.5 251.5 3.3 55.0 281 F 1 431 08 57 04 09 02 04 3C111 07 49 42 46.4 294.6 3.5 83.3 -35 1 1 431 09 02 04 09 08 03 --- 07 55 42 45.3 294.8 3.6 82.6 324 F 1 437 09 02 04 09 08 03 OJ287 07 55 42 72.9 124.7 -1.0 -48.9 -119 1 1 437 09 08 03 09 13 02 --- 08 00 42 73.8 127.5 -0.9 -46.6 180 F 1 442 09 08 03 09 13 02 0420-014 08 00 42 29.4 248.6 3.6 53.3 -95 1 1 442 09 13 02 09 17 01 --- 08 04 42 28.6 249.3 3.7 53.6 144 F 1 446 09 13 02 09 17 01 3C120 08 04 42 34.5 254.1 3.5 56.2 -18 1 1 446 09 17 01 09 22 00 --- 08 09 42 33.4 254.9 3.6 56.6 281 F 1 451 09 17 01 09 22 00 3C111 08 09 42 42.5 295.4 3.8 80.8 -33 1 1 451 09 22 00 09 27 59 --- 08 15 42 41.4 295.7 3.9 80.0 326 F 1 456 09 22 00 09 27 59 OJ287 08 15 42 76.2 137.5 -0.7 -38.2 -111 1 1 456 09 27 59 09 32 58 --- 08 20 42 76.9 141.6 -0.6 -34.7 188 F 1 461 09 27 59 09 32 58 0420-014 08 20 42 25.3 251.9 4.0 54.9 -109 1 1 461 09 32 58 09 36 58 --- 08 24 42 24.5 252.6 4.0 55.2 130 F 1 465 09 32 58 09 36 58 3C120 08 24 42 30.3 257.3 3.9 57.5 -18 1 1 465 09 36 58 09 41 57 --- 08 29 42 29.2 258.1 3.9 57.7 282 F 1 470 09 36 58 09 41 57 3C111 08 29 42 38.7 296.3 4.2 78.3 -32 1 1 470 09 41 57 09 47 56 --- 08 35 42 37.5 296.6 4.3 77.6 328 F 1 476 09 41 57 09 47 56 OJ287 08 35 42 78.6 156.2 -0.3 -21.7 -100 1 1 476 09 47 56 09 52 55 --- 08 40 42 79.0 161.9 -0.2 -16.5 200 F 1 481 09 47 56 09 52 55 0420-014 08 40 42 21.2 255.0 4.3 56.2 -121 1 1 481 09 52 55 09 56 55 --- 08 44 42 20.4 255.6 4.4 56.5 118 F 1 484 09 52 55 Schedule for VLBA_FD (Code Fd ) Page 10 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 09 56 55 3C120 08 44 42 26.1 260.3 4.2 58.4 -17 1 1 484 09 56 55 10 01 54 --- 08 49 42 25.0 261.0 4.3 58.6 282 F 1 489 09 56 55 10 01 54 3C111 08 49 42 34.8 297.4 4.5 75.9 -30 1 1 489 10 01 54 10 07 53 --- 08 55 42 33.7 297.8 4.6 75.2 329 F 1 495 10 01 54 10 09 52 1156+295 08 57 42 50.8 440.1 -3.0 -76.2 19 1 1 495 10 09 52 10 15 51 --- 09 03 42 52.0 440.6 -2.9 -76.6 359 F 1 501 10 10 15 10 15 51 3C273 09 03 42 33.6 110.2 -3.4 -53.9 -226 1 1 501 10 15 51 10 20 51 --- 09 08 42 34.6 111.1 -3.3 -53.5 73 F 1 506 10 15 51 10 20 51 3C279 09 08 42 24.5 113.6 -3.8 -52.4 -26 1 1 506 10 20 51 10 25 50 --- 09 13 42 25.5 114.4 -3.7 -52.0 273 F 1 511 10 20 51 10 25 50 OJ287 09 13 42 78.7 202.6 0.3 20.6 -112 1 1 511 10 25 50 10 29 49 --- 09 17 42 78.3 206.9 0.4 24.5 127 F 1 514 10 25 50 10 29 49 3C111 09 17 42 29.5 299.2 5.0 72.5 -104 1 1 514 10 29 49 10 35 48 --- 09 23 42 28.4 299.6 5.1 71.8 255 F 1 520 10 29 49 10 35 48 1156+295 09 23 42 56.3 442.3 -2.6 -77.6 -101 1 1 520 10 35 48 10 41 47 --- 09 29 42 57.6 442.8 -2.5 -77.9 258 F 1 526 10 35 48 10 41 47 3C273 09 29 42 38.8 115.1 -3.0 -51.2 -224 1 1 526 10 41 47 10 46 46 --- 09 34 42 39.8 116.1 -2.9 -50.6 75 F 1 531 10 41 47 10 46 46 3C279 09 34 42 29.6 118.1 -3.4 -49.7 -26 1 1 531 10 46 46 10 51 46 --- 09 39 42 30.5 119.1 -3.3 -49.1 273 F 1 536 10 46 46 10 51 46 OJ287 09 39 42 75.4 226.1 0.7 41.3 -96 1 1 536 10 51 46 10 55 45 --- 09 43 42 74.8 228.8 0.8 43.6 143 F 1 539 10 51 46 10 55 45 3C111 09 43 42 24.7 301.1 5.4 69.4 -106 1 1 539 10 55 45 11 01 44 --- 09 49 42 23.6 301.5 5.5 68.6 253 F 1 545 10 55 45 11 01 44 1156+295 09 49 42 61.9 444.5 -2.2 -78.9 -101 1 1 545 11 01 44 11 07 43 --- 09 55 42 63.1 445.1 -2.1 -79.1 258 F 1 551 11 01 44 11 07 43 3C273 09 55 42 43.7 120.7 -2.6 -47.8 -222 1 1 551 11 07 43 11 12 42 --- 10 00 42 44.7 121.9 -2.5 -47.0 77 F 1 556 11 07 43 Schedule for VLBA_FD (Code Fd ) Page 11 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 11 12 42 3C279 10 00 42 34.4 123.2 -2.9 -46.3 -27 1 1 556 11 12 42 11 17 41 --- 10 05 42 35.3 124.3 -2.8 -45.6 273 F 1 561 11 12 42 11 17 41 OJ287 10 05 42 70.9 240.5 1.2 52.9 -83 1 1 561 11 17 41 11 21 41 --- 10 09 42 70.2 242.2 1.2 54.1 156 F 1 565 11 17 41 11 21 41 1156+295 10 09 42 66.1 86.4 -1.8 -79.7 -110 1 1 565 11 21 41 11 27 40 --- 10 15 42 67.4 87.0 -1.7 -79.9 249 F 1 570 11 21 41 11 27 40 3C273 10 15 42 47.3 125.6 -2.2 -44.4 -46 1 1 570 11 27 40 11 32 39 --- 10 20 42 48.2 127.0 -2.1 -43.5 253 F 1 575 11 27 40 11 32 39 3C279 10 20 42 37.9 127.6 -2.6 -43.3 -27 1 1 575 11 32 39 11 37 38 --- 10 25 42 38.7 128.8 -2.5 -42.4 272 F 1 580 11 32 39 11 37 38 OJ287 10 25 42 67.1 247.9 1.5 58.1 -85 1 1 580 11 37 38 11 41 37 --- 10 29 42 66.3 249.2 1.6 58.9 154 F 1 584 11 37 38 11 41 37 1156+295 10 29 42 70.4 88.5 -1.5 -80.2 -113 1 1 584 11 41 37 11 47 36 --- 10 35 42 71.7 89.1 -1.4 -80.3 246 F 1 590 11 41 37 11 47 36 3C273 10 35 42 50.7 131.3 -1.9 -40.3 -48 1 1 590 11 47 36 11 52 36 --- 10 40 42 51.5 132.8 -1.8 -39.2 251 F 1 594 11 47 36 11 52 36 3C279 10 40 42 41.2 132.4 -2.3 -39.7 -27 1 1 594 11 52 36 11 57 35 --- 10 45 42 42.0 133.7 -2.2 -38.7 272 F 1 599 11 52 36 11 57 35 OJ287 10 45 42 63.0 253.5 1.8 61.5 -86 1 1 599 11 57 35 12 01 34 --- 10 49 42 62.2 254.5 1.9 62.0 153 F 1 603 11 57 35 12 01 34 1156+295 10 49 42 74.7 90.9 -1.2 -80.3 -115 1 1 603 12 01 34 12 07 33 --- 10 55 42 76.0 91.8 -1.1 -80.1 244 F 1 609 12 01 34 12 07 33 3C273 10 55 42 53.8 137.7 -1.6 -35.4 -50 1 1 609 12 07 33 12 12 32 --- 11 00 42 54.5 139.5 -1.5 -34.0 249 F 1 614 12 07 33 12 12 32 3C279 11 00 42 44.2 137.8 -1.9 -35.5 -27 1 1 614 12 12 32 12 17 31 --- 11 05 42 44.9 139.2 -1.8 -34.4 273 F 1 619 12 12 32 12 17 31 OJ287 11 05 42 58.8 258.0 2.2 63.6 -85 1 1 619 12 17 31 12 21 31 --- 11 09 42 58.0 258.8 2.2 64.0 154 F 1 622 12 17 31 Schedule for VLBA_FD (Code Fd ) Page 12 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 12 23 30 3C273 11 11 42 56.0 143.5 -1.3 -30.8 37 1 1 622 12 23 30 12 29 29 --- 11 17 42 56.7 145.9 -1.2 -28.9 359 F 1 628 12 23 53 12 29 29 3C279 11 17 42 46.5 142.8 -1.6 -31.5 -26 1 1 628 12 29 29 12 35 28 --- 11 23 42 47.3 144.7 -1.5 -30.0 333 F 1 634 12 29 29 12 35 28 1510-089 11 23 42 22.2 116.1 -3.8 -51.5 -56 1 1 634 12 35 28 12 41 28 --- 11 29 42 23.3 117.1 -3.7 -50.9 303 F 1 640 12 35 28 12 41 28 1156+295 11 29 42 83.3 100.4 -0.5 -75.8 -126 1 1 640 12 41 28 12 46 27 --- 11 34 42 84.4 103.1 -0.4 -73.8 173 F 1 645 12 41 28 12 46 27 3C273 11 34 42 58.6 153.0 -0.9 -23.0 -58 1 1 645 12 46 27 12 51 26 --- 11 39 42 59.0 155.3 -0.8 -21.1 242 F 1 649 12 46 27 12 51 26 3C279 11 39 42 49.2 150.0 -1.3 -25.7 -26 1 1 649 12 51 26 12 56 25 --- 11 44 42 49.7 151.7 -1.2 -24.2 273 F 1 654 12 51 26 12 56 25 1510-089 11 44 42 26.2 119.7 -3.5 -49.2 -53 1 1 654 12 56 25 13 01 24 --- 11 49 42 27.1 120.7 -3.4 -48.6 246 F 1 659 12 56 25 13 01 24 3C273 11 49 42 59.9 159.9 -0.7 -17.2 -72 1 1 659 13 01 24 13 06 23 --- 11 54 42 60.2 162.3 -0.6 -15.2 228 F 1 664 13 01 24 13 06 23 3C279 11 54 42 50.6 155.3 -1.0 -21.2 -25 1 1 664 13 06 23 13 11 23 --- 11 59 42 51.1 157.1 -0.9 -19.6 274 F 1 669 13 06 23 13 11 23 1510-089 11 59 42 28.9 122.5 -3.2 -47.3 -50 1 1 669 13 11 23 13 16 22 --- 12 04 42 29.8 123.5 -3.1 -46.6 249 F 1 674 13 11 23 13 16 22 1156+295 12 04 42 88.2 216.3 0.1 35.7 -123 1 1 674 13 16 22 13 21 21 --- 12 09 42 87.4 236.7 0.2 55.4 176 F 1 678 13 16 22 13 21 21 3C273 12 09 42 61.0 169.8 -0.3 -8.8 -59 1 1 678 13 21 21 13 26 20 --- 12 14 42 61.2 172.3 -0.2 -6.6 240 F 1 683 13 21 21 13 26 20 3C279 12 14 42 52.2 162.9 -0.7 -14.8 -24 1 1 683 13 26 20 13 31 19 --- 12 19 42 52.5 164.8 -0.6 -13.1 275 F 1 688 13 26 20 13 31 19 1510-089 12 19 42 32.5 126.5 -2.9 -44.5 -46 1 1 688 13 31 19 13 36 18 --- 12 24 42 33.3 127.6 -2.8 -43.7 253 F 1 693 13 31 19 Schedule for VLBA_FD (Code Fd ) Page 13 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 13 36 18 3C273 12 24 42 61.4 177.5 -0.1 -2.1 -62 1 1 693 13 36 18 13 41 18 --- 12 29 42 61.4 180.1 0.0 0.1 237 F 1 698 13 36 18 13 41 18 3C279 12 29 42 53.0 168.9 -0.4 -9.6 -23 1 1 698 13 41 18 13 46 17 --- 12 34 42 53.2 170.9 -0.4 -7.9 276 F 1 703 13 41 18 13 46 17 1510-089 12 34 42 35.0 129.8 -2.6 -42.1 -42 1 1 703 13 46 17 13 51 16 --- 12 39 42 35.8 130.9 -2.6 -41.2 257 F 1 707 13 46 17 13 51 16 1156+295 12 39 42 81.3 263.1 0.7 78.1 -97 1 1 707 13 51 16 13 56 15 --- 12 44 42 80.2 264.4 0.7 78.8 202 F 1 712 13 51 16 13 56 15 3C273 12 44 42 61.2 187.9 0.3 6.8 -57 1 1 712 13 56 15 14 01 14 --- 12 49 42 61.0 190.5 0.3 9.0 242 F 1 717 13 56 15 14 01 14 3C279 12 49 42 53.5 177.1 -0.1 -2.5 -21 1 1 717 14 01 14 14 06 14 --- 12 54 42 53.5 179.2 0.0 -0.7 278 F 1 722 14 01 14 14 06 14 1510-089 12 54 42 38.2 134.5 -2.3 -38.5 -37 1 1 722 14 06 14 14 11 13 --- 12 59 42 38.9 135.7 -2.2 -37.5 262 F 1 727 14 06 14 14 13 12 3C273 13 01 42 60.4 196.5 0.5 14.1 71 1 1 727 14 13 12 14 19 11 --- 13 07 42 60.0 199.4 0.6 16.6 359 F 1 732 14 13 35 14 19 11 3C279 13 07 42 53.4 184.7 0.2 4.0 -19 1 1 732 14 19 11 14 25 10 --- 13 13 42 53.3 187.2 0.3 6.2 340 F 1 738 14 19 11 14 25 10 1510-089 13 13 42 41.0 139.3 -2.0 -34.6 -38 1 1 738 14 25 10 14 31 09 --- 13 19 42 41.8 141.0 -1.9 -33.3 321 F 1 744 14 25 10 14 31 09 1156+295 13 19 42 72.7 270.3 1.3 80.3 -92 1 1 744 14 31 09 14 36 09 --- 13 24 42 71.6 270.9 1.4 80.3 207 F 1 749 14 31 09 14 36 09 3C273 13 24 42 58.5 207.2 0.9 23.2 -48 1 1 749 14 36 09 14 41 08 --- 13 29 42 58.0 209.4 1.0 25.0 251 F 1 754 14 36 09 14 41 08 3C279 13 29 42 52.7 193.7 0.6 11.8 -17 1 1 754 14 41 08 14 46 07 --- 13 34 42 52.4 195.7 0.6 13.5 283 F 1 759 14 41 08 14 46 07 1510-089 13 34 42 43.7 145.3 -1.6 -29.8 -40 1 1 759 14 46 07 14 51 06 --- 13 39 42 44.3 146.8 -1.6 -28.5 260 F 1 763 14 46 07 Schedule for VLBA_FD (Code Fd ) Page 14 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 14 51 06 3C273 13 39 42 56.9 213.5 1.2 28.4 -50 1 1 763 14 51 06 14 56 05 --- 13 44 42 56.3 215.5 1.3 30.0 249 F 1 768 14 51 06 14 56 05 3C279 13 44 42 51.8 199.6 0.8 16.9 -17 1 1 768 14 56 05 15 01 05 --- 13 49 42 51.4 201.5 0.9 18.5 283 F 1 773 14 56 05 15 01 05 1510-089 13 49 42 45.5 149.9 -1.4 -25.9 -40 1 1 773 15 01 05 15 06 04 --- 13 54 42 46.0 151.5 -1.3 -24.6 259 F 1 778 15 01 05 15 06 04 1156+295 13 54 42 65.1 274.0 1.9 79.5 -88 1 1 778 15 06 04 15 11 03 --- 13 59 42 64.1 274.5 2.0 79.3 211 F 1 783 15 06 04 15 11 03 3C273 13 59 42 54.3 221.1 1.5 34.4 -42 1 1 783 15 11 03 15 16 02 --- 14 04 42 53.6 222.8 1.6 35.8 258 F 1 787 15 11 03 15 16 02 3C279 14 04 42 50.1 207.0 1.1 23.1 -17 1 1 787 15 16 02 15 21 01 --- 14 09 42 49.6 208.8 1.2 24.6 283 F 1 792 15 16 02 15 21 01 1510-089 14 09 42 47.4 156.5 -1.1 -20.4 -41 1 1 792 15 21 01 15 26 00 --- 14 14 42 47.8 158.2 -1.0 -18.9 258 F 1 797 15 21 01 15 26 00 3C273 14 14 42 52.1 226.1 1.8 38.3 -51 1 1 797 15 26 00 15 31 00 --- 14 19 42 51.3 227.7 1.8 39.5 248 F 1 802 15 26 00 15 31 00 3C279 14 19 42 48.5 212.2 1.4 27.4 -16 1 1 802 15 31 00 15 35 59 --- 14 24 42 47.9 213.8 1.5 28.8 283 F 1 807 15 31 00 15 35 59 1510-089 14 24 42 48.6 161.7 -0.8 -15.9 -41 1 1 807 15 35 59 15 40 58 --- 14 29 42 48.9 163.5 -0.7 -14.3 258 F 1 812 15 35 59 15 40 58 1156+295 14 29 42 57.7 277.2 2.5 78.0 -82 1 1 812 15 40 58 15 45 57 --- 14 34 42 56.6 277.6 2.6 77.7 217 F 1 816 15 40 58 15 45 57 3C273 14 34 42 48.8 232.1 2.1 42.8 -36 1 1 816 15 45 57 15 50 56 --- 14 39 42 48.0 233.4 2.2 43.7 263 F 1 821 15 45 57 15 50 56 3C279 14 39 42 46.0 218.5 1.7 32.6 -16 1 1 821 15 50 56 15 55 56 --- 14 44 42 45.3 220.0 1.8 33.8 283 F 1 826 15 50 56 15 55 56 1510-089 14 44 42 49.7 169.1 -0.5 -9.5 -40 1 1 826 15 55 56 16 00 55 --- 14 49 42 49.8 171.0 -0.4 -7.8 259 F 1 831 15 55 56 Schedule for VLBA_FD (Code Fd ) Page 15 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 16 02 54 3C273 14 51 42 45.8 236.5 2.4 45.9 70 1 1 831 16 02 54 16 08 53 --- 14 57 42 44.8 238.0 2.5 46.9 359 F 1 837 16 03 17 16 08 53 3C279 14 57 42 43.4 223.7 2.0 36.7 -16 1 1 837 16 08 53 16 14 52 --- 15 03 42 42.5 225.3 2.1 38.0 343 F 1 842 16 08 53 16 14 52 1510-089 15 03 42 50.2 176.3 -0.2 -3.2 -39 1 1 842 16 14 52 16 20 51 --- 15 09 42 50.2 178.6 -0.1 -1.2 320 F 1 848 16 14 52 16 20 51 1156+295 15 09 42 49.2 280.5 3.2 75.8 -74 1 1 848 16 20 51 16 25 51 --- 15 14 42 48.1 280.9 3.2 75.5 225 F 1 853 16 20 51 16 25 51 3C273 15 14 42 41.6 241.9 2.8 49.4 -32 1 1 853 16 25 51 16 30 50 --- 15 19 42 40.6 243.0 2.8 50.1 267 F 1 858 16 25 51 16 30 50 3C279 15 19 42 40.0 229.4 2.4 41.1 -15 1 1 858 16 30 50 16 35 49 --- 15 24 42 39.2 230.6 2.5 41.9 284 F 1 863 16 30 50 16 35 49 1510-089 15 24 42 50.1 184.4 0.2 3.9 -37 1 1 863 16 35 49 16 40 48 --- 15 29 42 50.0 186.3 0.3 5.5 262 F 1 868 16 35 49 16 40 48 3C273 15 29 42 38.7 245.0 3.0 51.3 -45 1 1 868 16 40 48 16 45 47 --- 15 34 42 37.7 246.0 3.1 51.9 254 F 1 872 16 40 48 16 45 47 3C279 15 34 42 37.5 232.9 2.6 43.6 -15 1 1 872 16 45 47 16 50 47 --- 15 39 42 36.6 234.1 2.7 44.4 284 F 1 877 16 45 47 16 50 47 1510-089 15 39 42 49.7 190.1 0.4 8.8 -35 1 1 877 16 50 47 16 55 46 --- 15 44 42 49.5 192.0 0.5 10.5 264 F 1 882 16 50 47 16 55 46 1156+295 15 44 42 41.8 283.4 3.7 73.5 -67 1 1 882 16 55 46 17 00 45 --- 15 49 42 40.7 283.8 3.8 73.2 232 F 1 887 16 55 46 17 00 45 3C273 15 49 42 34.7 248.8 3.3 53.4 -29 1 1 887 17 00 45 17 05 44 --- 15 54 42 33.7 249.7 3.4 53.9 270 F 1 892 17 00 45 17 05 44 3C279 15 54 42 33.9 237.3 3.0 46.7 -14 1 1 892 17 05 44 17 10 43 --- 15 59 42 33.0 238.3 3.1 47.4 285 F 1 897 17 05 44 17 10 43 1510-089 15 59 42 48.7 197.5 0.8 15.2 -37 1 1 897 17 10 43 17 15 42 --- 16 04 42 48.4 199.3 0.9 16.8 262 F 1 901 17 10 43 Schedule for VLBA_FD (Code Fd ) Page 16 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 17 15 42 3C273 16 04 42 31.7 251.5 3.6 54.7 -41 1 1 901 17 15 42 17 20 42 --- 16 09 42 30.7 252.3 3.7 55.1 258 F 1 906 17 15 42 17 20 42 3C279 16 09 42 31.2 240.2 3.2 48.7 -14 1 1 906 17 20 42 17 25 41 --- 16 14 42 30.2 241.2 3.3 49.3 285 F 1 911 17 20 42 17 25 41 1510-089 16 14 42 47.6 202.8 1.0 19.8 -41 1 1 911 17 25 41 17 30 40 --- 16 19 42 47.2 204.5 1.1 21.2 259 F 1 916 17 25 41 17 30 40 1156+295 16 19 42 34.5 286.3 4.3 71.1 -61 1 1 916 17 30 40 17 35 39 --- 16 24 42 33.5 286.7 4.4 70.7 239 F 1 921 17 30 40 17 35 39 3C273 16 24 42 27.6 254.7 3.9 56.2 -27 1 1 921 17 35 39 17 40 38 --- 16 29 42 26.6 255.5 4.0 56.5 272 F 1 925 17 35 39 17 40 38 3C279 16 29 42 27.4 243.9 3.6 51.0 -14 1 1 925 17 40 38 17 45 38 --- 16 34 42 26.4 244.8 3.6 51.5 285 F 1 930 17 40 38 17 45 38 1510-089 16 34 42 45.7 209.5 1.4 25.4 -45 1 1 930 17 45 38 17 50 37 --- 16 39 42 45.1 211.1 1.4 26.7 255 F 1 935 17 45 38 17 52 36 BLLAC 16 41 42 26.7 54.7 -5.4 -71.8 9 1 1 935 17 52 36 18 00 35 --- 16 49 42 28.2 55.2 -5.2 -72.9 479 F 1 943 17 52 59 18 00 35 1510-089 16 49 42 44.0 214.1 1.6 29.3 -112 1 1 943 18 00 35 18 10 33 --- 16 59 42 42.7 217.0 1.8 31.7 486 F 1 952 18 00 35 18 10 33 BLLAC 16 59 42 29.9 55.8 -5.1 -74.3 -113 1 1 952 18 10 33 18 20 32 --- 17 09 42 31.7 56.4 -4.9 -75.7 485 F 1 962 18 10 33 18 20 32 1510-089 17 09 42 41.4 219.8 1.9 33.9 -115 1 1 962 18 20 32 18 30 30 --- 17 19 42 40.0 222.5 2.1 36.1 483 F 1 972 18 20 32 18 30 30 BLLAC 17 19 42 33.5 56.9 -4.7 -77.1 -116 1 1 972 18 30 30 18 40 29 --- 17 29 42 35.3 57.4 -4.6 -78.5 482 F 1 981 18 30 30 18 40 29 1510-089 17 29 42 38.5 225.0 2.3 38.1 -118 1 1 981 18 40 29 18 50 27 --- 17 39 42 36.9 227.5 2.4 40.0 481 F 1 991 18 40 29 18 50 27 BLLAC 17 39 42 37.1 57.8 -4.4 -79.9 -119 1 1 991 18 50 27 18 56 26 --- 17 45 42 38.2 58.0 -4.3 -80.8 240 F 1 997 18 50 27 Schedule for VLBA_FD (Code Fd ) Page 17 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 18 56 26 CTA102 17 45 42 21.5 88.8 -4.8 -61.5 -39 1 1 997 18 56 26 18 59 25 --- 17 48 42 22.2 89.2 -4.7 -61.5 140 F 1 1000 18 56 26 18 59 25 1510-089 17 48 42 35.5 229.6 2.6 41.5 -100 1 1 1000 18 59 25 19 07 24 --- 17 56 42 34.2 231.3 2.7 42.9 379 F 1 1007 18 59 25 19 07 24 BLLAC 17 56 42 40.2 58.4 -4.1 -82.4 -121 1 1 1007 19 07 24 19 13 23 --- 18 02 42 41.3 58.6 -4.0 -83.3 238 F 1 1013 19 07 24 19 13 23 3C446 18 02 42 17.9 107.2 -4.4 -55.6 -53 1 1 1013 19 13 23 19 16 23 --- 18 05 42 18.5 107.6 -4.3 -55.4 127 F 1 1016 19 13 23 19 16 23 CTA102 18 05 42 25.8 91.3 -4.5 -61.5 -21 1 1 1016 19 16 23 19 19 22 --- 18 08 42 26.5 91.7 -4.4 -61.5 159 F 1 1019 19 16 23 19 19 22 1510-089 18 08 42 32.1 233.9 2.9 44.8 -101 1 1 1019 19 19 22 19 27 21 --- 18 16 42 30.7 235.5 3.1 45.9 378 F 1 1027 19 19 22 19 29 20 BLLAC 18 18 42 44.3 59.0 -3.7 -85.7 -4 1 1 1027 19 29 20 19 37 19 --- 18 26 42 45.8 59.1 -3.6 -87.0 475 F 1 1035 19 29 43 19 37 19 1510-089 18 26 42 28.9 237.5 3.2 47.3 -125 1 1 1035 19 37 19 19 47 18 --- 18 36 42 27.1 239.3 3.4 48.6 473 F 1 1044 19 37 19 19 47 18 BLLAC 18 36 42 47.6 419.2 -3.4 -88.6 -126 1 1 1044 19 47 18 19 53 17 --- 18 42 42 48.7 419.2 -3.3 -89.6 233 F 1 1050 19 47 18 19 53 17 3C446 18 42 42 25.9 113.5 -3.7 -52.4 -210 1 1 1050 19 53 17 19 56 16 --- 18 45 42 26.5 114.0 -3.7 -52.1 -30 F 1 1053 19 53 17 19 56 16 CTA102 18 45 42 34.4 96.8 -3.8 -60.8 -22 1 1 1053 19 56 16 19 59 16 --- 18 48 42 35.0 97.2 -3.7 -60.7 158 F 1 1056 19 56 16 19 59 16 1510-089 18 48 42 24.8 241.5 3.6 50.0 -102 1 1 1056 19 59 16 20 07 14 --- 18 56 42 23.3 242.9 3.7 50.9 377 F 1 1063 19 59 16 20 07 14 BLLAC 18 56 42 51.3 419.2 -3.1 -92.0 -124 1 1 1063 20 07 14 20 17 13 --- 19 06 42 53.1 419.0 -2.9 -93.8 475 F 1 1073 20 07 14 20 17 13 1510-089 19 06 42 21.4 244.5 3.9 51.9 -122 1 1 1073 20 17 13 20 27 11 --- 19 16 42 19.4 246.1 4.1 52.8 476 F 1 1083 20 17 13 Schedule for VLBA_FD (Code Fd ) Page 18 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 20 27 11 BLLAC 19 16 42 55.0 418.8 -2.8 -95.7 -121 1 1 1083 20 27 11 20 35 10 --- 19 24 42 56.5 418.5 -2.6 -97.2 358 F 1 1090 20 27 11 20 35 10 3C446 19 24 42 34.0 121.3 -3.0 -47.6 -204 1 1 1090 20 35 10 20 39 09 --- 19 28 42 34.7 122.1 -3.0 -47.0 35 F 1 1094 20 35 10 20 39 09 CTA102 19 28 42 43.5 103.6 -3.1 -58.7 -24 1 1 1094 20 39 09 20 43 08 --- 19 32 42 44.3 104.3 -3.0 -58.4 216 F 1 1098 20 39 09 20 43 08 3C454.3 19 32 42 42.0 95.6 -3.4 -63.1 -12 1 1 1098 20 43 08 20 47 08 --- 19 36 42 42.8 96.2 -3.3 -63.0 228 F 1 1102 20 43 08 20 47 08 BLLAC 19 36 42 58.7 57.9 -2.4 -99.8 -38 1 1 1102 20 47 08 20 55 06 --- 19 44 42 60.1 57.3 -2.3 -101.6 441 F 1 1110 20 47 08 20 55 06 CTA102 19 44 42 46.8 106.5 -2.8 -57.4 -39 1 1 1110 20 55 06 20 59 06 --- 19 48 42 47.7 107.3 -2.7 -57.0 201 F 1 1114 20 55 06 20 59 06 3C454.3 19 48 42 45.4 98.0 -3.1 -62.5 -12 1 1 1114 20 59 06 21 03 05 --- 19 52 42 46.2 98.6 -3.0 -62.4 227 F 1 1118 20 59 06 21 03 05 BLLAC 19 52 42 61.5 56.7 -2.2 -103.5 -37 1 1 1118 21 03 05 21 11 04 --- 20 00 42 63.0 55.9 -2.0 -105.6 442 F 1 1125 21 03 05 21 11 04 3C446 20 00 42 40.3 129.2 -2.4 -42.0 -55 1 1 1125 21 11 04 21 15 03 --- 20 04 42 41.0 130.2 -2.4 -41.2 184 F 1 1129 21 11 04 21 15 03 CTA102 20 04 42 50.9 110.7 -2.5 -55.3 -26 1 1 1129 21 15 03 21 19 02 --- 20 08 42 51.7 111.6 -2.4 -54.8 213 F 1 1133 21 15 03 21 19 02 3C454.3 20 08 42 49.6 101.3 -2.8 -61.5 -13 1 1 1133 21 19 02 21 23 02 --- 20 12 42 50.5 102.0 -2.7 -61.2 227 F 1 1137 21 19 02 21 23 02 BLLAC 20 12 42 65.1 54.4 -1.8 -108.9 -38 1 1 1137 21 23 02 21 31 01 --- 20 20 42 66.5 53.1 -1.7 -111.4 441 F 1 1145 21 23 02 21 31 01 CTA102 20 20 42 54.1 114.4 -2.2 -53.2 -47 1 1 1145 21 31 01 21 35 00 --- 20 24 42 54.9 115.4 -2.1 -52.5 192 F 1 1148 21 31 01 21 35 00 3C454.3 20 24 42 53.0 104.3 -2.5 -60.2 -13 1 1 1148 21 35 00 21 38 59 --- 20 28 42 53.8 105.1 -2.4 -59.9 226 F 1 1152 21 35 00 Schedule for VLBA_FD (Code Fd ) Page 19 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 21 40 59 BLLAC 20 30 42 68.2 51.3 -1.5 -114.8 78 1 1 1152 21 40 59 21 48 58 --- 20 38 42 69.5 49.4 -1.4 -117.9 479 F 1 1160 21 41 22 21 48 58 3C446 20 38 42 46.1 139.5 -1.8 -34.1 -66 1 1 1160 21 48 58 21 51 57 --- 20 41 42 46.6 140.4 -1.7 -33.4 113 F 1 1163 21 48 58 21 51 57 CTA102 20 41 42 58.1 120.2 -1.9 -49.4 -29 1 1 1163 21 51 57 21 54 57 --- 20 44 42 58.7 121.1 -1.8 -48.8 150 F 1 1166 21 51 57 21 54 57 3C454.3 20 44 42 57.1 108.6 -2.2 -58.1 -14 1 1 1166 21 54 57 21 58 56 --- 20 48 42 57.9 109.6 -2.1 -57.6 225 F 1 1170 21 54 57 21 58 56 BLLAC 20 48 42 71.1 46.7 -1.2 -122.2 -48 1 1 1170 21 58 56 22 06 55 --- 20 56 42 72.3 44.0 -1.1 -126.0 431 F 1 1177 21 58 56 22 06 55 CTA102 20 56 42 60.8 125.1 -1.6 -46.0 -60 1 1 1177 22 06 55 22 10 54 --- 21 00 42 61.5 126.5 -1.5 -45.0 179 F 1 1181 22 06 55 22 10 54 3C454.3 21 00 42 60.3 112.6 -1.9 -55.8 -15 1 1 1181 22 10 54 22 14 53 --- 21 04 42 61.1 113.8 -1.8 -55.1 224 F 1 1185 22 10 54 22 14 53 BLLAC 21 04 42 73.5 40.9 -1.0 -130.3 -55 1 1 1185 22 14 53 22 22 52 --- 21 12 42 74.6 37.3 -0.8 -135.2 424 F 1 1193 22 14 53 22 22 52 3C446 21 12 42 50.3 150.5 -1.2 -25.1 -82 1 1 1193 22 22 52 22 26 51 --- 21 16 42 50.8 152.0 -1.2 -23.9 158 F 1 1197 22 22 52 22 26 51 CTA102 21 16 42 64.2 132.8 -1.3 -40.2 -33 1 1 1197 22 26 51 22 30 51 --- 21 20 42 64.8 134.6 -1.2 -38.8 207 F 1 1201 22 26 51 22 30 51 3C454.3 21 20 42 64.2 118.8 -1.6 -51.8 -17 1 1 1201 22 30 51 22 34 50 --- 21 24 42 65.0 120.2 -1.5 -50.8 223 F 1 1204 22 30 51 22 34 50 BLLAC 21 24 42 76.0 30.6 -0.6 -143.6 -66 1 1 1204 22 34 50 22 42 49 --- 21 32 42 76.8 25.3 -0.5 -150.1 413 F 1 1212 22 34 50 22 42 49 CTA102 21 32 42 66.5 140.3 -1.0 -34.2 -83 1 1 1212 22 42 49 22 46 48 --- 21 36 42 67.1 142.4 -0.9 -32.5 157 F 1 1216 22 42 49 22 46 48 3C454.3 21 36 42 67.1 124.8 -1.3 -47.4 -18 1 1 1216 22 46 48 22 50 47 --- 21 40 42 67.8 126.5 -1.2 -46.1 222 F 1 1220 22 46 48 Schedule for VLBA_FD (Code Fd ) Page 20 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 17 Dec 2006 Day 351 --- 22 50 47 BLLAC 21 40 42 77.5 19.4 -0.4 -157.3 -77 1 1 1220 22 50 47 22 58 46 --- 21 48 42 78.0 12.8 -0.2 -165.1 401 F 1 1228 22 50 47 22 58 46 3C446 21 48 42 53.3 164.3 -0.6 -13.6 -107 1 1 1228 22 58 46 23 02 45 --- 21 52 42 53.6 165.9 -0.6 -12.2 132 F 1 1231 22 58 46 23 02 45 CTA102 21 52 42 69.0 151.6 -0.7 -24.8 -37 1 1 1231 23 02 45 23 06 45 --- 21 56 42 69.4 154.1 -0.6 -22.6 203 F 1 1235 23 02 45 23 06 45 3C454.3 21 56 42 70.5 134.4 -1.0 -39.8 -19 1 1 1235 23 06 45 23 10 44 --- 22 00 42 71.1 136.7 -0.9 -37.9 220 F 1 1239 23 06 45 23 10 44 BLLAC 22 00 42 78.3 2.1 0.0 -177.6 -96 1 1 1239 23 10 44 23 18 43 --- 22 08 42 78.3 -5.2 0.1 174.0 383 F 1 1247 23 10 44 23 18 43 CTA102 22 08 42 70.3 162.1 -0.4 -15.6 -118 1 1 1247 23 18 43 23 22 42 --- 22 12 42 70.6 165.0 -0.3 -13.2 122 F 1 1251 23 18 43 23 22 42 3C454.3 22 12 42 72.7 144.3 -0.7 -31.5 -20 1 1 1251 23 22 42 23 26 42 --- 22 16 42 73.2 147.1 -0.6 -29.1 220 F 1 1255 23 22 42 23 28 41 BLLAC 22 18 42 77.9 -14.0 0.3 163.7 6 1 1 1255 23 28 41 23 36 40 --- 22 26 42 77.4 -20.5 0.4 156.0 479 F 1 1262 23 29 04 23 36 40 3C446 22 26 42 54.4 180.2 0.0 0.2 -140 1 1 1262 23 36 40 23 40 39 --- 22 30 42 54.4 181.9 0.1 1.7 100 F 1 1266 23 36 40 23 40 39 CTA102 22 30 42 71.1 178.3 0.0 -1.5 -39 1 1 1266 23 40 39 23 44 39 --- 22 34 42 71.1 181.3 0.0 1.2 200 F 1 1270 23 40 39 23 44 39 3C454.3 22 34 42 74.9 161.7 -0.3 -16.4 -19 1 1 1270 23 44 39 23 48 38 --- 22 38 42 75.1 165.3 -0.3 -13.2 220 F 1 1274 23 44 39 23 48 38 BLLAC 22 38 42 76.3 331.0 0.6 145.7 -116 1 1 1274 23 48 38 23 56 37 --- 22 46 42 75.4 326.2 0.7 139.6 362 F 1 1282 23 48 38 --- Start: Sun 17 Dec 2006 Day 351 -- Stop: Mon 18 Dec 2006 Day 352 --- 23 56 37 CTA102 22 46 42 70.9 190.3 0.2 9.1 -97 1 1 1282 23 56 37 00 00 36 --- 22 50 42 70.7 193.2 0.3 11.6 143 F 1 1285 23 56 37 00 00 36 3C454.3 22 50 42 75.5 176.5 -0.1 -3.1 -17 1 1 1285 00 00 36 00 04 35 --- 22 54 42 75.6 180.4 0.0 0.3 222 F 1 1289 00 00 36 Schedule for VLBA_FD (Code Fd ) Page 21 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 18 Dec 2006 Day 352 --- 00 04 35 BLLAC 22 54 42 74.4 322.0 0.9 134.3 -100 1 1 1289 00 04 35 00 12 34 --- 23 02 42 73.3 318.5 1.0 129.5 378 F 1 1297 00 04 35 00 12 34 3C446 23 02 42 53.4 195.4 0.6 13.2 -88 1 1 1297 00 12 34 00 16 33 --- 23 06 42 53.2 197.0 0.7 14.6 151 F 1 1301 00 12 34 00 16 33 CTA102 23 06 42 69.6 204.3 0.6 21.2 -39 1 1 1301 00 16 33 00 20 33 --- 23 10 42 69.2 206.9 0.6 23.4 200 F 1 1305 00 16 33 00 20 33 3C454.3 23 10 42 75.1 195.5 0.3 13.8 -18 1 1 1305 00 20 33 00 24 32 --- 23 14 42 74.8 199.0 0.3 17.0 222 F 1 1309 00 20 33 00 24 32 BLLAC 23 14 42 71.5 314.1 1.2 123.4 -83 1 1 1309 00 24 32 00 32 31 --- 23 22 42 70.3 311.8 1.3 119.8 396 F 1 1316 00 24 32 00 32 31 CTA102 23 22 42 67.9 214.1 0.8 29.5 -71 1 1 1316 00 32 31 00 36 30 --- 23 26 42 67.4 216.3 0.9 31.4 168 F 1 1320 00 32 31 00 36 30 3C454.3 23 26 42 73.8 208.9 0.5 25.7 -19 1 1 1320 00 36 30 00 40 29 --- 23 30 42 73.3 212.0 0.6 28.3 221 F 1 1324 00 36 30 00 40 29 BLLAC 23 30 42 69.0 309.8 1.5 116.5 -71 1 1 1324 00 40 29 00 48 28 --- 23 38 42 67.6 308.1 1.6 113.6 407 F 1 1332 00 40 29 00 48 28 3C446 23 38 42 50.4 209.1 1.2 24.9 -72 1 1 1332 00 48 28 00 52 27 --- 23 42 42 50.0 210.6 1.3 26.0 167 F 1 1336 00 48 28 00 52 27 CTA102 23 42 42 65.2 224.3 1.2 37.9 -36 1 1 1336 00 52 27 00 56 27 --- 23 46 42 64.6 226.1 1.2 39.3 203 F 1 1339 00 52 27 00 56 27 3C454.3 23 46 42 71.2 222.6 0.9 37.3 -19 1 1 1339 00 56 27 01 00 26 --- 23 50 42 70.6 224.9 0.9 39.2 220 F 1 1343 00 56 27 01 00 26 BLLAC 23 50 42 65.5 306.0 1.8 109.7 -60 1 1 1343 01 00 26 01 08 25 --- 23 58 42 64.1 304.9 1.9 107.4 419 F 1 1351 01 00 26 01 08 25 CTA102 23 58 42 62.6 231.1 1.4 43.1 -55 1 1 1351 01 08 25 01 12 24 --- 00 02 42 61.9 232.6 1.5 44.3 184 F 1 1355 01 08 25 01 12 24 3C454.3 00 02 42 68.7 231.1 1.1 44.2 -20 1 1 1355 01 12 24 01 16 23 --- 00 06 42 68.0 232.9 1.2 45.6 220 F 1 1359 01 12 24 Schedule for VLBA_FD (Code Fd ) Page 22 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 18 Dec 2006 Day 352 --- 01 16 23 3C446 00 06 42 47.1 218.4 1.7 32.5 -48 1 1 1359 01 16 23 01 20 23 --- 00 10 42 46.5 219.7 1.7 33.4 191 F 1 1363 01 16 23 01 20 23 BLLAC 00 10 42 62.0 303.6 2.1 104.2 -62 1 1 1363 01 20 23 01 30 21 --- 00 20 42 60.2 302.7 2.3 101.7 536 F 1 1372 01 20 23 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v7mm-128-8-1.set Matches group v7mm_c8 in /home/filehost/cwalker/sched/catalogs/freq.dat Setup group: 4 Station: VLBA_FD Total bit rate: 128 Format: VLBA1:4 Bits per sample: 1 Sample rate: 16.000 Number of channels: 8 Speedup factor: 2.00 Disk used to record data. 1st LO= 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = A C A C A C A C VLBA FE= 7mm omit 7mm omit VLBA Synth= 15.4 7.6 11.6 The following frequency sets based on this setup were used. Frequency Set: 4 Setup file default. Used pcal sets: 1 LO sum= 43201.49 43201.49 43209.49 43209.49 43217.49 43217.49 43225.49 43225.49 BBC fr= 801.49 801.49 809.49 809.49 817.49 817.49 825.49 825.49 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 6510 6510 6510 6510 PCALFR2= 510 510 510 510 6510 6510 6510 6510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_off SOURCE LIST -- Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * 3C111 04 15 00.613041 * 04 18 21.280000 04 18 50.886658 0.00 37 54 19.24071 * 38 01 35.76000 38 02 48.59677 0.00 From catalog imbedded in main SCHED input file. 2.460 scan hours, 82.683 baseline hours above horizon. J0339-0146 03 36 58.953150 * 03 39 30.937790 03 39 53.439744 0.20 * 0336-019 -01 56 16.89652 *-01 46 35.80412 -01 45 07.88530 0.30 CTA26 /home/arana/cwalker/sched/catalogs/sources.vlba J0339-01 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.731 scan hours, 21.863 baseline hours above horizon. J0423-0120 04 20 43.539852 * 04 23 15.800729 04 23 38.447583 0.20 * 0420-014 -01 27 28.70007 *-01 20 33.06537 -01 19 27.44945 0.30 J0423-01 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.961 scan hours, 54.536 baseline hours above horizon. J0433+0521 04 30 31.602060 * 04 33 11.095529 04 33 34.757261 0.30 0430+052 05 14 59.61640 * 05 21 15.61918 05 22 16.51223 0.20 * 3C120 /home/arana/cwalker/sched/catalogs/sources.vlba J0433+05 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 2.044 scan hours, 79.016 baseline hours above horizon. J0854+2006 08 51 57.250618 * 08 54 48.874930 08 55 14.008343 0.21 0851+202 20 17 58.41741 * 20 06 30.64086 20 04 54.97906 0.40 J0854+20 /home/arana/cwalker/sched/catalogs/sources.vlba * OJ287 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.629 scan hours, 40.761 baseline hours above horizon. J1159+2914 11 56 57.786209 * 11 59 31.833910 11 59 53.566911 0.23 * 1156+295 29 31 25.73874 * 29 14 43.82684 29 12 13.95250 0.40 J1159+29 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.346 scan hours, 42.516 baseline hours above horizon. J1229+0203 12 26 33.245836 * 12 29 06.699732 12 29 27.927267 0.30 1226+023 02 19 43.30565 * 02 03 08.59815 02 00 48.28680 0.20 * 3C273 /home/arana/cwalker/sched/catalogs/sources.vlba 3C273B VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro J1229+02 2.044 scan hours, 67.719 baseline hours above horizon. J1256-0547 12 53 35.831291 * 12 56 11.166559 12 56 32.432594 0.20 1253-055 -05 31 07.99586 *-05 47 21.52472 -05 49 37.01624 0.30 * 3C279 /home/arana/cwalker/sched/catalogs/sources.vlba J1256-05 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 2.044 scan hours, 78.642 baseline hours above horizon. J1512-0905 15 10 08.900180 * 15 12 50.532928 15 13 12.007223 0.20 * 1510-089 -08 54 47.61950 *-09 05 59.82965 -09 07 36.87366 0.30 J1512-09 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 2.776 scan hours, 89.812 baseline hours above horizon. J2202+4216 22 00 39.362507 * 22 02 43.291374 22 02 59.425592 0.27 2200+420 42 02 08.59081 * 42 16 39.97995 42 18 51.50826 0.40 * BLLAC /home/arana/cwalker/sched/catalogs/sources.vlba J2202+42 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro VR42220 3.490 scan hours, 127.716 baseline hours above horizon. J2225-0457 22 23 11.077768 * 22 25 47.259295 22 26 08.703676 0.20 2223-052 -05 12 17.79946 *-04 57 01.39082 -04 54 57.03937 0.30 * 3C446 /home/arana/cwalker/sched/catalogs/sources.vlba J2225-04 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.681 scan hours, 16.517 baseline hours above horizon. J2232+1143 22 30 07.803949 * 22 32 36.408907 22 32 56.687243 0.31 2230+114 11 28 22.81081 * 11 43 50.90409 11 46 02.81933 0.20 * CTA102 /home/arana/cwalker/sched/catalogs/sources.vlba J2232+11 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.263 scan hours, 41.897 baseline hours above horizon. J2253+1608 22 51 29.519744 * 22 53 57.747943 22 54 18.054536 0.31 2251+158 15 52 54.34806 * 16 08 53.56089 16 11 12.11410 0.20 * 3C454.3 /home/arana/cwalker/sched/catalogs/sources.vlba J2253+16 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.163 scan hours, 46.623 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) 3C111 157.2 0336-019 141.4 0420-014 149.1 3C120 155.9 OJ287 134.8 1156+295 97.2 3C273 79.5 3C279 70.2 1510-089 37.9 BLLAC 89.3 3C446 71.1 CTA102 79.7 3C454.3 86.3 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg