VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: MT552 Observer: Analysts, Data Project type: TEST Obs filename: mt552crd.* Date/Day: 2005DEC20/354 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Sonja Mendoza. HN writing on Mk5 disk NRAO-124, bank B. FD writing on Mk5 disk NRAO-132, bank B. LA writing on Mk5 disk NRAO-154, bank B. PT writing on Mk5 disk NRAO-100, bank A. KP writing on Mk5 disk NRAO-071, bank A. MK writing on Mk5 disk NRAO-117, bank B. Vclock, GPS delta and UT1-UTC time checks all ok. %MK WEA: Gusty winds. 1115 Begin observation. 1115-1246 *HN 20cm receiver is warm. CRYO 12 10 1115-1246 *BR Not fringing (though there maybe some 17391 100 91 fringing at 20cm). 1115-1246 *NL BBC8 intermittantly not locking; MCB errors; 17392 5 4 TSP fluctuating. 1123 Readbacks ok. 1139 Readbacks ok. 1155 Readbacks ok. 1211 Readbacks ok. 1220 Readbacks ok. 1236 Readbacks ok. 1246 End. Downtime Summary: Total downtime : 105 min Percentage downtime of observing: 11.5% Average downtime per hour : 6.9 min Total scheduled observing time (# Antennas): 910 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.