VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BS142B Observer: Sarma,A. Project type: VLBA Obs filename: bs142bcrd.* Date/Day: 2005DEC16/350 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Brian Willard. GPS Delta, UT1-UTC, Vclock values nominal. HN writing on NRAO-085, Bank A. FD writing on NRAO-134, Bank B. LA writing on NRAO-076, Bank A. PT writing on NRAO-152, Bank B. KP writing on NRAO-091, Bank B. Mk writing on NRAO-137, Bank A. 2215 Begin, All but MK on source. 2215-1012 *BR: not fringing, data not usable. 17390 100 717 2215 MK pointed. 2215-2241 *HN:FRM rotation frozen in position. WEA 100 26 2215 WEA: snow HN,BR. 2215 snow NL. 2215 WEA: scattered clouds FD,LA,PT,OV. 2215 WEA: clear KP,MK. 2235 Readbacks ok. 2240 New operator is Jim Ogle. 2241-1012 *Shutting down observing at HN; with rotation frozen WEA 100 691 in the wrong position there's no point in running the file there. 2325 OV reports clear skies. 2348 Readbacks okay. 0000 Date is 2005DEC17/351. 0010 Readbacks okay. 0013 MK reports clear skies. 0050 FD now writing to Mk5 disc pack NRAO-115 in bank A. 0138 Readbacks okay. 0355 Readbacks okay. 0419 Readbacks okay. 0431 Readbacks okay. 0559 Readbacks okay. 0621 Readbacks okay. 0630 Operator is Anthony Sowinski. 0634 Readbacks okay. 0801 Readbacks okay. 0824 Readbacks okay. 0837 Readbacks okay. 0919 Readbacks okay. 0950 Readbacks okay. 1002 End at SC 1012 End. Downtime Summary: Total downtime : 1434 min Percentage downtime of observing: 20.0% Average downtime per hour : 12.0 min Total scheduled observing time (# Antennas): 7170 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.