VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BI032C Observer: Impellizzeri, V. Project type: VLBA Obs filename: bi032ccrd.* Date/Day: 2005DEC06/340 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 0112 Begin file; MK joins later VCLOCK check ok. SC at -0.171 UT1-UTC check ok (-0.65) GPS delta < 10 us Mark 5 recording status: HN bank B pack NRAO-092 FD bank A pack NRAO-149 LA bank A pack NRAO-066 PT bank A pack VIPSU-05 KP bank A pack NRAO-086 MK bank B pack NRAO-022 Operator: T. Perreault 0112-0810 *BR: not fringing, data not usable. 17390 100 418 0120 SC contacted site tech to let him know that he needs to go mount tape for this observation. 0155 MK wea: raining 0234 MK joins 0248 FD recording Mark 5 bank B pack NRAO-121 0309-0313 *PT autostowed. Power glitch. Repointed. COM 100 4 0456 KP recording Mark 5 bank B pack NRAO-150 0540 Readback check ok 0541 LA recording Mark 5 bank B pack NRAO-019 0634 Readback check ok 0635 New operator is Jim Ogle. 0713 Readbacks okay. 0810 End. Downtime Summary: Total downtime : 422 min Percentage downtime of observing: 10.1% Average downtime per hour : 6.1 min Total scheduled observing time (# Antennas): 4180 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.