VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: TG003 Observer: Goss, M. Project type: TEST Obs filename: tg003crd.* Date/Day: 2004DEC05/340 Ants Scheduled: HN NL FD LA PT KP OV BR =UT-Time===Comment===============================================MF#===%AD==AMD= 2142 Begin file VCLOCK check ok. KP at 0.043 UT1-UTC check ok (-0.49) GPS delta < 10 us LA recording Mark 5 bank B disc pack NRAO-046 KP recording Mark 5 bank B disc pack NRAO-062 Operator: T. Perreault 2142 MK wea: scattered cirrus, no precipitation Site weather (via webcam) HN, PT : clear NL, FD : overcast KP, OV, BR : mostly cloudy LA : black (webcam offline) - probably clear 2142 %KP elevated system temperatures. There is probably snow still in the dish from storms overnight. 2243 Readback check ok 2343 Readback check ok 0000 Date is 2004DEC06/341. 0021 NL wea: raining 0043 Readback check ok 0143 Readback check ok 0237 New operator is Brian Willard. 0241 All readback tests OK. 0323 %KP: occasional high winds. 0341 All readback tests OK. 0441 All readback tests OK. 0541 All readback tests OK. 0605 %KP: occasional snow. 0641 All readbacks OK. 0641 %NL: rain. 0741 All readback tests OK. 0744 %KP: continued snow. 0841 All readbacks tests OK. 0940 All readback tests OK. 1031-1033 *KP: snow dump. WEA 100 2 1033-1035 *PT: snow dump. WEA 100 2 1040 All readback tests OK. 1140 All readback tests OK. 1142-1144 *KP snow dump. WEA 100 2 1145 End. Downtime Summary: Total downtime : 6 min Percentage downtime of observing: 0.1% Average downtime per hour : 0.1 min Total scheduled observing time (# Antennas): 6744 min (8) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.