From observe@aoc.nrao.eduMon Dec 27 08:27:16 2004 Date: Mon, 27 Dec 2004 09:46:46 +0000 From: observe To: vlbiobs@nrao.edu, njj@jb.man.ac.uk Subject: 2004-12-27_0546_BJ054.txt ************************************************************************ Filename: 2004-12-27_0546_BJ054 Program: BJ054 Subarray(s): 1 Observer(s): Neal Jackson Operator(s): Tom Briscoe Date: 12/27/04 Configuration: A User #: 600 Decommissioned: 16 Source File(s): 084J054 VLBI Ref. Ant: 27 Observing Mode: Phased Array VLBI Antenna Pad: AN7 Email Address: vlbiobs@nrao.edu,njj@jb.man.ac.uk API (Atmospheric Phase Interferometer) information can be found at: http://www.vla.nrao.edu/astro/guides/api/ Adobe PDF version of this log is located at: http://www.vla.nrao.edu/operators/logs/ Visibility data is available from the online archive at: http://e2e.nrao.edu/archive/ ** Weather Information ** Time (IAT) Dew Pt Temp Wind Bar. Press API 12/27/04 05:46 -7.7 -1.3 NNE at 1.3 m/s 790.4 3.5 12/27/04 07:06 -8 -2 E at 1.3 m/s 790.2 10 Operator comments for the above weather entries 12/27/04 05:46 Sky cover 80%. Stratiform clouds. 12/27/04 07:06 Sky overcast. Stratiform clouds. ** Visibility Tape Information ** Tape # Time of Final Record: DM0008 ** Monitor Tape Information ** Tape # File # Time of Final Record: N21450 1 Total # of antennas used = 27 ** Operator Comments ** Start Time End Time Form # #Ants Downtime (in minutes) 27Dec 5:46:50 Starting program BJ054. 27Dec 5:47:30 On source 3C147 with all available antennas. The band(s) used is(are) L 12/27/04 05:46:50 12/27/04 09:46:10 C112151 1.00 239.3 Antenna(s) 13 (Data: Lost): EVLA Antenna is being used for EVLA testing. 12/27/04 05:46:50 12/27/04 09:46:10 T100268 1.00 239.3 Antenna(s) 14 (Data: Lost): EVLA Antenna is being used for EVLA testing. 27Dec 6:45:00 Inspected the VLB instrumentation. No problems found. 27Dec 6:56:00 Your new operator is: Sam Gilmore 27Dec 7:02:00 Ran a backup on the Modcomp partition. 27Dec 7:48:00 Inspected the VLB instrumentation. No problems found. 27Dec 8:57:00 Inspected the VLB instrumentation. No problems found. 27Dec 9:44:00 Inspected the VLB instrumentation. No problems found. End Time Total Program Time % Downtime Total Downtime (in minutes) (in minutes) 12/27/04 09:46:10 6462.0 7.4% 478.7