COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: Proper motions in the Virgo Cluster Exp. Code: BB258A Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Andreas Brunthaler Address: MPIfR Auf dem Huegel 69 53121 Bonn Germany Phone: +49 228 525 377 EMAIL: brunthal@mpifr-bonn.mpg.de Fax: +49 228 525 229 Phone during observation: +49 228 525 377 Observing mode: VLBA 256-8-2 1.3cm Notes: Schedule for VLBA_PT (Code Pt ) Page 2 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- Next scan frequencies: 23020.49 23045.49 23107.99 23207.99 23370.49 23420.49 23457.99 23470.49 Next BBC frequencies: 520.49 545.49 607.99 707.99 870.49 920.49 957.99 970.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 00 05 17 0231+132 07 30 00 20.3 -87.3 5.0 58.0 0 1 1 0 00 04 57 00 06 17 --- 07 31 00 20.0 -87.1 5.0 58.0 60 F 1 3 00 05 15 Source only 1.9 degrees from the Sun. 00 10 09 0339-014 07 34 52 24.3 249.6 3.9 50.8 1 1 1 3 00 09 49 00 11 08 --- 07 35 52 24.1 249.8 3.9 50.9 60 F 1 5 00 10 07 00 12 21 0530+133 07 37 04 54.8 241.6 2.1 48.4 5 1 1 5 00 12 01 00 13 20 --- 07 38 04 54.6 241.9 2.1 48.5 60 F 1 8 00 12 19 00 14 47 0646+445 07 39 31 75.4 320.3 0.9 131.9 28 1 1 8 00 14 27 00 15 46 --- 07 40 31 75.3 319.8 0.9 131.3 60 F 1 10 00 14 45 00 17 32 0753+535 07 42 16 70.3 365.0 -0.2 -173.0 69 1 1 10 00 17 12 00 18 31 --- 07 43 16 70.3 364.6 -0.2 -173.6 60 F 1 13 00 17 30 00 19 13 0818+422 07 43 57 79.4 397.7 -0.6 -136.9 13 1 1 13 00 18 53 00 20 12 --- 07 44 57 79.6 397.0 -0.6 -137.8 60 F 1 15 00 19 11 00 23 42 0854+200 07 48 28 69.5 129.6 -1.1 -42.7 26 1 1 15 00 23 22 00 24 42 --- 07 49 28 69.6 130.1 -1.1 -42.3 60 F 1 18 00 23 40 00 26 10 0958+472 07 50 56 62.8 51.6 -2.1 -107.0 29 1 1 18 00 25 50 00 27 10 --- 07 51 56 62.9 51.5 -2.1 -107.3 60 F 1 21 00 26 08 00 28 22 1058+811 07 53 08 40.1 8.3 -3.1 -128.5 20 1 1 21 00 28 02 00 29 21 --- 07 54 08 40.1 8.3 -3.1 -128.7 60 F 1 23 00 28 20 00 32 11 1104+381 07 56 58 52.3 70.1 -3.1 -81.1 123 1 1 23 00 31 51 00 33 11 --- 07 57 58 52.5 70.1 -3.1 -81.2 60 F 1 26 00 32 09 00 33 33 1146+395 07 58 21 44.8 65.3 -3.8 -78.2 1 1 1 26 00 33 11 00 34 33 --- 07 59 21 45.0 65.4 -3.8 -78.3 60 F 1 28 00 33 11 Schedule for VLBA_PT (Code Pt ) Page 3 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 00 35 42 1222+041 08 00 30 22.4 100.7 -4.4 -54.5 18 1 1 28 00 35 22 00 36 42 --- 08 01 30 22.6 100.9 -4.4 -54.4 60 F 1 31 00 35 40 00 38 09 1357+764 08 02 57 33.5 16.0 -5.9 -82.2 24 1 1 31 00 37 49 00 39 09 --- 08 03 57 33.6 16.0 -5.9 -82.5 60 F 1 34 00 38 07 00 40 02 1638+572 08 04 51 11.4 25.6 -8.6 -41.3 3 1 1 34 00 39 42 00 41 02 --- 08 05 51 11.5 25.7 -8.5 -41.5 60 F 1 36 00 40 00 00 41 23 1746+622 08 06 11 10.7 15.7 -9.7 -28.8 8 1 1 36 00 41 02 00 42 23 --- 08 07 11 10.8 15.8 -9.7 -29.0 60 F 1 39 00 41 02 00 42 59 1800+782 08 07 47 24.3 6.7 -9.9 -28.6 3 1 1 39 00 42 39 00 43 58 --- 08 08 47 24.3 6.7 -9.9 -28.8 60 F 1 41 00 42 57 00 44 36 0019+732 08 09 25 25.6 -16.3 7.8 54.5 17 1 1 41 00 44 16 00 45 36 --- 08 10 25 25.6 -16.2 7.8 54.3 60 F 1 44 00 44 34 00 46 19 0136+475 08 11 09 19.7 -44.8 6.6 60.2 18 1 1 44 00 45 59 00 47 19 --- 08 12 09 19.6 -44.7 6.6 60.1 60 F 1 46 00 46 17 00 51 01 0238+163 08 15 51 14.0 -79.2 5.6 57.9 193 1 1 46 00 50 41 00 52 01 --- 08 16 51 13.8 -79.1 5.6 57.8 60 F 1 49 00 50 59 Source only 1.8 degrees from the Sun. 00 53 43 0555+394 08 18 33 61.2 -68.4 2.4 89.7 1 1 1 49 00 53 23 00 54 42 --- 08 19 33 61.1 -68.4 2.4 89.5 60 F 1 52 00 53 41 Next scan frequencies: 23789.49 23789.49 23797.49 23797.49 23805.49 23805.49 23813.49 23813.49 Next BBC frequencies: 789.49 789.49 797.49 797.49 805.49 805.49 813.49 813.49 00 54 42 M87 08 19 33 29.2 94.9 -4.2 -57.4 -115 1 1 52 00 54 42 00 57 22 --- 08 22 13 29.7 95.3 -4.2 -57.4 45 F 1 57 00 55 15 00 57 22 M89 08 22 13 28.8 94.4 -4.2 -57.5 -8 1 1 57 00 57 22 00 58 02 --- 08 22 53 29.0 94.5 -4.2 -57.5 32 F 1 58 00 57 22 00 58 02 M87 08 22 53 29.9 95.4 -4.1 -57.3 -8 1 1 58 00 58 02 00 58 42 --- 08 23 33 30.0 95.5 -4.1 -57.3 32 F 1 59 00 58 02 Schedule for VLBA_PT (Code Pt ) Page 4 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 00 58 42 M58 08 23 33 28.3 95.0 -4.2 -57.2 -9 1 1 59 00 58 42 00 59 22 --- 08 24 13 28.4 95.1 -4.2 -57.2 30 F 1 61 00 58 42 00 59 22 M87 08 24 13 30.1 95.6 -4.1 -57.3 -9 1 1 61 00 59 22 01 00 01 --- 08 24 53 30.3 95.7 -4.1 -57.3 30 F 1 62 00 59 22 01 00 01 M89 08 24 53 29.4 94.8 -4.2 -57.5 -8 1 1 62 01 00 01 01 00 41 --- 08 25 33 29.5 94.9 -4.2 -57.5 32 F 1 63 01 00 01 01 00 41 M87 08 25 33 30.4 95.8 -4.1 -57.3 -8 1 1 63 01 00 41 01 01 21 --- 08 26 13 30.6 95.9 -4.1 -57.3 32 F 1 64 01 00 41 01 01 21 M58 08 26 13 28.8 95.4 -4.2 -57.2 -9 1 1 64 01 01 21 01 02 01 --- 08 26 53 29.0 95.5 -4.2 -57.1 30 F 1 66 01 01 21 01 02 01 M87 08 26 53 30.7 96.0 -4.1 -57.3 -9 1 1 66 01 02 01 01 02 41 --- 08 27 33 30.8 96.1 -4.1 -57.2 30 F 1 67 01 02 01 01 02 41 M89 08 27 33 29.9 95.2 -4.1 -57.4 -8 1 1 67 01 02 41 01 03 21 --- 08 28 13 30.1 95.3 -4.1 -57.4 32 F 1 68 01 02 41 01 03 21 M87 08 28 13 31.0 96.2 -4.1 -57.2 -8 1 1 68 01 03 21 01 04 01 --- 08 28 53 31.1 96.3 -4.0 -57.2 32 F 1 70 01 03 21 01 04 01 M58 08 28 53 29.4 95.8 -4.2 -57.1 -9 1 1 70 01 04 01 01 04 41 --- 08 29 33 29.5 95.9 -4.1 -57.1 30 F 1 71 01 04 01 01 04 41 M87 08 29 33 31.2 96.4 -4.0 -57.2 -9 1 1 71 01 04 41 01 05 21 --- 08 30 13 31.4 96.5 -4.0 -57.2 30 F 1 72 01 04 41 01 05 21 M89 08 30 13 30.5 95.6 -4.1 -57.4 -8 1 1 72 01 05 21 01 06 00 --- 08 30 53 30.6 95.7 -4.1 -57.4 32 F 1 73 01 05 21 01 06 00 M87 08 30 53 31.5 96.6 -4.0 -57.1 -8 1 1 73 01 06 00 01 06 40 --- 08 31 33 31.7 96.7 -4.0 -57.1 32 F 1 75 01 06 00 01 06 40 M58 08 31 33 29.9 96.2 -4.1 -57.0 -9 1 1 75 01 06 40 01 07 20 --- 08 32 13 30.1 96.3 -4.1 -57.0 30 F 1 76 01 06 40 01 07 20 M87 08 32 13 31.8 96.8 -4.0 -57.1 -9 1 1 76 01 07 20 01 08 00 --- 08 32 53 31.9 96.9 -4.0 -57.1 30 F 1 77 01 07 20 Schedule for VLBA_PT (Code Pt ) Page 5 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 08 00 M89 08 32 53 31.0 96.0 -4.1 -57.3 -8 1 1 77 01 08 00 01 08 40 --- 08 33 33 31.2 96.1 -4.0 -57.3 32 F 1 79 01 08 00 01 08 40 M87 08 33 33 32.1 97.0 -4.0 -57.1 -8 1 1 79 01 08 40 01 09 20 --- 08 34 13 32.2 97.1 -4.0 -57.0 32 F 1 80 01 08 40 01 09 20 M58 08 34 13 30.5 96.6 -4.1 -57.0 -9 1 1 80 01 09 20 01 10 00 --- 08 34 53 30.6 96.7 -4.1 -56.9 30 F 1 81 01 09 20 01 10 00 M87 08 34 53 32.3 97.2 -3.9 -57.0 -9 1 1 81 01 10 00 01 10 40 --- 08 35 33 32.5 97.3 -3.9 -57.0 30 F 1 82 01 10 00 01 10 40 M89 08 35 33 31.6 96.4 -4.0 -57.2 -8 1 1 82 01 10 40 01 11 20 --- 08 36 13 31.7 96.5 -4.0 -57.2 32 F 1 84 01 10 40 01 11 20 M87 08 36 13 32.6 97.4 -3.9 -57.0 -8 1 1 84 01 11 20 01 12 00 --- 08 36 53 32.7 97.5 -3.9 -57.0 32 F 1 85 01 11 20 01 12 00 M58 08 36 53 31.0 97.0 -4.0 -56.9 -9 1 1 85 01 12 00 01 12 39 --- 08 37 33 31.2 97.1 -4.0 -56.9 30 F 1 86 01 12 00 01 12 39 M87 08 37 33 32.9 97.6 -3.9 -56.9 -9 1 1 86 01 12 39 01 13 19 --- 08 38 13 33.0 97.7 -3.9 -56.9 30 F 1 88 01 12 39 01 13 19 M89 08 38 13 32.1 96.8 -4.0 -57.2 -8 1 1 88 01 13 19 01 13 59 --- 08 38 53 32.3 96.9 -4.0 -57.1 32 F 1 89 01 13 19 01 13 59 M87 08 38 53 33.2 97.9 -3.9 -56.9 -8 1 1 89 01 13 59 01 14 39 --- 08 39 33 33.3 98.0 -3.9 -56.9 32 F 1 90 01 13 59 01 14 39 M58 08 39 33 31.6 97.4 -4.0 -56.8 -9 1 1 90 01 14 39 01 15 19 --- 08 40 13 31.7 97.5 -4.0 -56.8 30 F 1 91 01 14 39 01 15 19 M87 08 40 13 33.4 98.1 -3.9 -56.9 -9 1 1 91 01 15 19 01 15 59 --- 08 40 53 33.6 98.2 -3.8 -56.8 30 F 1 93 01 15 19 01 15 59 M89 08 40 53 32.7 97.2 -3.9 -57.1 -8 1 1 93 01 15 59 01 16 39 --- 08 41 33 32.8 97.3 -3.9 -57.1 32 F 1 94 01 15 59 01 16 39 M87 08 41 33 33.7 98.3 -3.8 -56.8 -8 1 1 94 01 16 39 01 17 19 --- 08 42 13 33.8 98.4 -3.8 -56.8 32 F 1 95 01 16 39 Schedule for VLBA_PT (Code Pt ) Page 6 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 17 19 M58 08 42 13 32.1 97.9 -3.9 -56.7 -9 1 1 95 01 17 19 01 17 59 --- 08 42 53 32.3 98.0 -3.9 -56.7 30 F 1 97 01 17 19 01 17 59 M87 08 42 53 34.0 98.5 -3.8 -56.8 -9 1 1 97 01 17 59 01 18 38 --- 08 43 33 34.1 98.6 -3.8 -56.7 30 F 1 98 01 17 59 01 18 38 M89 08 43 33 33.2 97.7 -3.9 -57.0 -8 1 1 98 01 18 38 01 19 18 --- 08 44 13 33.3 97.8 -3.9 -57.0 32 F 1 99 01 18 38 01 19 18 M87 08 44 13 34.2 98.7 -3.8 -56.7 -8 1 1 99 01 19 18 01 19 58 --- 08 44 53 34.4 98.8 -3.8 -56.7 32 F 1 100 01 19 18 01 19 58 M58 08 44 53 32.7 98.3 -3.9 -56.6 -9 1 1 100 01 19 58 01 20 38 --- 08 45 33 32.8 98.4 -3.9 -56.6 30 F 1 102 01 19 58 01 20 38 M87 08 45 33 34.5 98.9 -3.8 -56.7 -9 1 1 102 01 20 38 01 21 18 --- 08 46 13 34.7 99.0 -3.8 -56.6 30 F 1 103 01 20 38 01 21 18 M89 08 46 13 33.8 98.1 -3.8 -56.9 -8 1 1 103 01 21 18 01 21 58 --- 08 46 53 33.9 98.2 -3.8 -56.9 32 F 1 104 01 21 18 01 21 58 M87 08 46 53 34.8 99.1 -3.7 -56.6 -8 1 1 104 01 21 58 01 22 38 --- 08 47 33 34.9 99.3 -3.7 -56.6 32 F 1 106 01 21 58 01 22 38 M58 08 47 33 33.2 98.7 -3.8 -56.5 -9 1 1 106 01 22 38 01 23 18 --- 08 48 13 33.3 98.8 -3.8 -56.5 30 F 1 107 01 22 38 01 23 18 M87 08 48 13 35.1 99.4 -3.7 -56.6 -9 1 1 107 01 23 18 01 23 58 --- 08 48 53 35.2 99.5 -3.7 -56.5 30 F 1 108 01 23 18 01 23 58 M89 08 48 53 34.3 98.5 -3.8 -56.8 -8 1 1 108 01 23 58 01 24 37 --- 08 49 33 34.4 98.6 -3.8 -56.8 32 F 1 109 01 23 58 01 24 37 M87 08 49 33 35.3 99.6 -3.7 -56.5 -8 1 1 109 01 24 37 01 25 17 --- 08 50 13 35.5 99.7 -3.7 -56.5 32 F 1 111 01 24 37 01 25 17 M58 08 50 13 33.7 99.1 -3.8 -56.4 -9 1 1 111 01 25 17 01 25 57 --- 08 50 53 33.9 99.2 -3.8 -56.4 30 F 1 112 01 25 17 01 25 57 M87 08 50 53 35.6 99.8 -3.7 -56.4 -9 1 1 112 01 25 57 01 26 37 --- 08 51 33 35.7 99.9 -3.7 -56.4 30 F 1 113 01 25 57 Schedule for VLBA_PT (Code Pt ) Page 7 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 26 37 M89 08 51 33 34.8 98.9 -3.7 -56.7 -8 1 1 113 01 26 37 01 27 17 --- 08 52 13 35.0 99.1 -3.7 -56.7 32 F 1 115 01 26 37 01 27 17 M87 08 52 13 35.9 100.0 -3.7 -56.4 -8 1 1 115 01 27 17 01 27 57 --- 08 52 53 36.0 100.1 -3.6 -56.4 32 F 1 116 01 27 17 01 27 57 M58 08 52 53 34.3 99.6 -3.8 -56.3 -9 1 1 116 01 27 57 01 28 37 --- 08 53 33 34.4 99.7 -3.7 -56.3 30 F 1 117 01 27 57 01 28 37 M87 08 53 33 36.1 100.2 -3.6 -56.3 -9 1 1 117 01 28 37 01 29 17 --- 08 54 13 36.3 100.4 -3.6 -56.3 30 F 1 118 01 28 37 01 29 17 M89 08 54 13 35.4 99.4 -3.7 -56.6 -8 1 1 118 01 29 17 01 29 57 --- 08 54 53 35.5 99.5 -3.7 -56.6 32 F 1 120 01 29 17 01 29 57 M87 08 54 53 36.4 100.5 -3.6 -56.3 -8 1 1 120 01 29 57 01 30 36 --- 08 55 33 36.6 100.6 -3.6 -56.2 32 F 1 121 01 29 57 01 30 36 M58 08 55 33 34.8 100.0 -3.7 -56.2 -9 1 1 121 01 30 36 01 31 16 --- 08 56 13 35.0 100.1 -3.7 -56.2 30 F 1 122 01 30 36 01 31 16 M87 08 56 13 36.7 100.7 -3.6 -56.2 -9 1 1 122 01 31 16 01 31 56 --- 08 56 53 36.8 100.8 -3.6 -56.2 30 F 1 124 01 31 16 01 31 56 M89 08 56 53 35.9 99.8 -3.7 -56.5 -8 1 1 124 01 31 56 01 32 36 --- 08 57 33 36.1 99.9 -3.6 -56.5 32 F 1 125 01 31 56 01 32 36 M87 08 57 33 37.0 100.9 -3.6 -56.1 -8 1 1 125 01 32 36 01 33 16 --- 08 58 13 37.1 101.0 -3.6 -56.1 32 F 1 126 01 32 36 01 33 16 M58 08 58 13 35.4 100.5 -3.7 -56.1 -9 1 1 126 01 33 16 01 33 56 --- 08 58 53 35.5 100.6 -3.7 -56.0 30 F 1 128 01 33 16 01 33 56 M87 08 58 53 37.2 101.2 -3.5 -56.1 -9 1 1 128 01 33 56 01 34 36 --- 08 59 33 37.4 101.3 -3.5 -56.0 30 F 1 129 01 33 56 01 34 36 M89 08 59 33 36.5 100.3 -3.6 -56.4 -8 1 1 129 01 34 36 01 35 16 --- 09 00 13 36.6 100.4 -3.6 -56.3 32 F 1 130 01 34 36 01 35 16 M87 09 00 13 37.5 101.4 -3.5 -56.0 -8 1 1 130 01 35 16 01 35 56 --- 09 00 53 37.6 101.5 -3.5 -56.0 32 F 1 131 01 35 16 Schedule for VLBA_PT (Code Pt ) Page 8 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 35 56 M58 09 00 53 35.9 100.9 -3.6 -56.0 -9 1 1 131 01 35 56 01 36 35 --- 09 01 33 36.1 101.0 -3.6 -55.9 30 F 1 133 01 35 56 01 36 35 M87 09 01 33 37.8 101.6 -3.5 -55.9 -9 1 1 133 01 36 35 01 37 15 --- 09 02 13 37.9 101.7 -3.5 -55.9 30 F 1 134 01 36 35 01 37 15 M89 09 02 13 37.0 100.7 -3.6 -56.2 -8 1 1 134 01 37 15 01 37 55 --- 09 02 53 37.2 100.8 -3.6 -56.2 32 F 1 135 01 37 15 01 37 55 M87 09 02 53 38.0 101.8 -3.5 -55.9 -8 1 1 135 01 37 55 01 38 35 --- 09 03 33 38.2 102.0 -3.5 -55.8 32 F 1 137 01 37 55 01 38 35 M58 09 03 33 36.5 101.4 -3.6 -55.8 -9 1 1 137 01 38 35 01 39 15 --- 09 04 13 36.6 101.5 -3.6 -55.8 30 F 1 138 01 38 35 01 39 15 M87 09 04 13 38.3 102.1 -3.5 -55.8 -9 1 1 138 01 39 15 01 39 55 --- 09 04 53 38.4 102.2 -3.4 -55.7 30 F 1 139 01 39 15 01 39 55 M89 09 04 53 37.6 101.2 -3.5 -56.1 -8 1 1 139 01 39 55 01 40 35 --- 09 05 33 37.7 101.3 -3.5 -56.1 32 F 1 140 01 39 55 01 40 35 M87 09 05 33 38.6 102.3 -3.4 -55.7 -8 1 1 140 01 40 35 01 41 15 --- 09 06 13 38.7 102.4 -3.4 -55.7 32 F 1 142 01 40 35 01 41 15 M58 09 06 13 37.0 101.8 -3.5 -55.7 -9 1 1 142 01 41 15 01 41 55 --- 09 06 53 37.1 101.9 -3.5 -55.6 30 F 1 143 01 41 15 01 41 55 M87 09 06 53 38.8 102.5 -3.4 -55.6 -9 1 1 143 01 41 55 01 42 34 --- 09 07 33 39.0 102.7 -3.4 -55.6 30 F 1 144 01 41 55 01 42 34 M89 09 07 33 38.1 101.6 -3.5 -56.0 -8 1 1 144 01 42 34 01 43 14 --- 09 08 13 38.2 101.8 -3.5 -55.9 32 F 1 146 01 42 34 01 43 14 M87 09 08 13 39.1 102.8 -3.4 -55.6 -8 1 1 146 01 43 14 01 43 54 --- 09 08 53 39.3 102.9 -3.4 -55.5 32 F 1 147 01 43 14 01 43 54 M58 09 08 53 37.5 102.3 -3.5 -55.5 -9 1 1 147 01 43 54 01 44 34 --- 09 09 33 37.7 102.4 -3.5 -55.5 30 F 1 148 01 43 54 01 44 34 M87 09 09 33 39.4 103.0 -3.4 -55.5 -9 1 1 148 01 44 34 01 45 14 --- 09 10 13 39.5 103.1 -3.4 -55.4 30 F 1 149 01 44 34 Schedule for VLBA_PT (Code Pt ) Page 9 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 45 14 M89 09 10 13 38.6 102.1 -3.4 -55.8 -8 1 1 149 01 45 14 01 45 54 --- 09 10 53 38.8 102.2 -3.4 -55.8 32 F 1 151 01 45 14 01 45 54 M87 09 10 53 39.7 103.3 -3.3 -55.4 -8 1 1 151 01 45 54 01 46 34 --- 09 11 33 39.8 103.4 -3.3 -55.4 32 F 1 152 01 45 54 01 46 34 M58 09 11 33 38.1 102.8 -3.4 -55.4 -9 1 1 152 01 46 34 01 47 14 --- 09 12 13 38.2 102.9 -3.4 -55.3 30 F 1 153 01 46 34 01 47 14 M87 09 12 13 39.9 103.5 -3.3 -55.3 -9 1 1 153 01 47 14 01 47 54 --- 09 12 53 40.1 103.6 -3.3 -55.3 30 F 1 155 01 47 14 01 47 54 M89 09 12 53 39.2 102.6 -3.4 -55.7 -8 1 1 155 01 47 54 01 48 34 --- 09 13 33 39.3 102.7 -3.4 -55.6 32 F 1 156 01 47 54 01 48 34 M87 09 13 33 40.2 103.7 -3.3 -55.2 -8 1 1 156 01 48 34 01 49 13 --- 09 14 13 40.3 103.9 -3.3 -55.2 32 F 1 157 01 48 34 01 49 13 M58 09 14 13 38.6 103.2 -3.4 -55.2 -9 1 1 157 01 49 13 01 49 53 --- 09 14 53 38.7 103.3 -3.4 -55.2 30 F 1 158 01 49 13 01 49 53 M87 09 14 53 40.5 104.0 -3.3 -55.1 -9 1 1 158 01 49 53 01 50 33 --- 09 15 33 40.6 104.1 -3.3 -55.1 30 F 1 160 01 49 53 01 50 33 M89 09 15 33 39.7 103.0 -3.3 -55.5 -8 1 1 160 01 50 33 01 51 13 --- 09 16 13 39.8 103.2 -3.3 -55.5 32 F 1 161 01 50 33 01 51 13 M87 09 16 13 40.7 104.2 -3.3 -55.1 -8 1 1 161 01 51 13 01 51 53 --- 09 16 53 40.9 104.4 -3.2 -55.0 32 F 1 162 01 51 13 01 51 53 M58 09 16 53 39.1 103.7 -3.4 -55.1 -9 1 1 162 01 51 53 01 52 33 --- 09 17 33 39.3 103.8 -3.3 -55.0 30 F 1 164 01 51 53 01 52 33 M87 09 17 33 41.0 104.5 -3.2 -55.0 -9 1 1 164 01 52 33 01 53 13 --- 09 18 13 41.1 104.6 -3.2 -54.9 30 F 1 165 01 52 33 01 53 13 M89 09 18 13 40.2 103.5 -3.3 -55.4 -8 1 1 165 01 53 13 01 53 53 --- 09 18 53 40.4 103.7 -3.3 -55.3 32 F 1 166 01 53 13 01 53 53 M87 09 18 53 41.3 104.7 -3.2 -54.9 -8 1 1 166 01 53 53 01 54 33 --- 09 19 33 41.4 104.8 -3.2 -54.8 32 F 1 167 01 53 53 Schedule for VLBA_PT (Code Pt ) Page 10 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 54 33 M58 09 19 33 39.7 104.2 -3.3 -54.9 -9 1 1 167 01 54 33 01 55 12 --- 09 20 13 39.8 104.3 -3.3 -54.9 30 F 1 169 01 54 33 01 55 12 M87 09 20 13 41.5 105.0 -3.2 -54.8 -9 1 1 169 01 55 12 01 55 52 --- 09 20 53 41.7 105.1 -3.2 -54.7 30 F 1 170 01 55 12 01 55 52 M89 09 20 53 40.8 104.0 -3.3 -55.2 -8 1 1 170 01 55 52 01 56 32 --- 09 21 33 40.9 104.1 -3.2 -55.1 32 F 1 171 01 55 52 01 56 32 M87 09 21 33 41.8 105.2 -3.2 -54.7 -8 1 1 171 01 56 32 01 57 12 --- 09 22 13 41.9 105.4 -3.2 -54.6 32 F 1 173 01 56 32 01 57 12 M58 09 22 13 40.2 104.7 -3.3 -54.7 -9 1 1 173 01 57 12 01 57 52 --- 09 22 53 40.3 104.8 -3.3 -54.7 30 F 1 174 01 57 12 01 57 52 M87 09 22 53 42.1 105.5 -3.1 -54.6 -9 1 1 174 01 57 52 01 58 32 --- 09 23 33 42.2 105.6 -3.1 -54.5 30 F 1 175 01 57 52 01 58 32 M89 09 23 33 41.3 104.5 -3.2 -55.0 -8 1 1 175 01 58 32 01 59 12 --- 09 24 13 41.4 104.6 -3.2 -55.0 32 F 1 176 01 58 32 01 59 12 M87 09 24 13 42.3 105.7 -3.1 -54.5 -8 1 1 176 01 59 12 01 59 52 --- 09 24 53 42.5 105.9 -3.1 -54.4 32 F 1 178 01 59 12 01 59 52 M58 09 24 53 40.7 105.2 -3.2 -54.5 -9 1 1 178 01 59 52 02 00 32 --- 09 25 33 40.9 105.3 -3.2 -54.5 30 F 1 179 01 59 52 02 00 32 M87 09 25 33 42.6 106.0 -3.1 -54.4 -9 1 1 179 02 00 32 02 01 11 --- 09 26 13 42.7 106.1 -3.1 -54.3 30 F 1 180 02 00 32 02 01 11 M89 09 26 13 41.8 105.0 -3.2 -54.8 -8 1 1 180 02 01 11 02 01 51 --- 09 26 53 42.0 105.1 -3.2 -54.8 32 F 1 182 02 01 11 02 01 51 M87 09 26 53 42.8 106.2 -3.1 -54.3 -8 1 1 182 02 01 51 02 02 31 --- 09 27 33 43.0 106.4 -3.1 -54.2 32 F 1 183 02 01 51 02 02 31 M58 09 27 33 41.3 105.7 -3.2 -54.3 -9 1 1 183 02 02 31 02 03 11 --- 09 28 13 41.4 105.8 -3.2 -54.3 30 F 1 184 02 02 31 02 03 11 M87 09 28 13 43.1 106.5 -3.1 -54.2 -9 1 1 184 02 03 11 02 03 51 --- 09 28 53 43.2 106.6 -3.0 -54.1 30 F 1 185 02 03 11 Schedule for VLBA_PT (Code Pt ) Page 11 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 03 51 M89 09 28 53 42.4 105.5 -3.1 -54.6 -8 1 1 185 02 03 51 02 04 31 --- 09 29 33 42.5 105.6 -3.1 -54.6 32 F 1 187 02 03 51 02 04 31 M87 09 29 33 43.4 106.8 -3.0 -54.1 -8 1 1 187 02 04 31 02 05 11 --- 09 30 13 43.5 106.9 -3.0 -54.0 32 F 1 188 02 04 31 02 05 11 M58 09 30 13 41.8 106.2 -3.1 -54.1 -9 1 1 188 02 05 11 02 05 51 --- 09 30 53 41.9 106.3 -3.1 -54.1 30 F 1 189 02 05 11 02 05 51 M87 09 30 53 43.6 107.0 -3.0 -54.0 -9 1 1 189 02 05 51 02 06 31 --- 09 31 33 43.8 107.2 -3.0 -53.9 30 F 1 191 02 05 51 02 06 31 M89 09 31 33 42.9 106.0 -3.1 -54.4 -8 1 1 191 02 06 31 02 07 10 --- 09 32 13 43.0 106.2 -3.1 -54.4 32 F 1 192 02 06 31 02 07 10 M87 09 32 13 43.9 107.3 -3.0 -53.8 -8 1 1 192 02 07 10 02 07 50 --- 09 32 53 44.0 107.4 -3.0 -53.8 32 F 1 193 02 07 10 02 07 50 M58 09 32 53 42.3 106.7 -3.1 -53.9 -9 1 1 193 02 07 50 02 08 30 --- 09 33 33 42.5 106.8 -3.1 -53.9 30 F 1 194 02 07 50 02 08 30 M87 09 33 33 44.2 107.6 -3.0 -53.7 -9 1 1 194 02 08 30 02 09 10 --- 09 34 13 44.3 107.7 -3.0 -53.7 30 F 1 196 02 08 30 02 09 10 M89 09 34 13 43.4 106.6 -3.0 -54.2 -8 1 1 196 02 09 10 02 09 50 --- 09 34 53 43.6 106.7 -3.0 -54.1 32 F 1 197 02 09 10 02 09 50 M87 09 34 53 44.4 107.8 -2.9 -53.6 -8 1 1 197 02 09 50 02 10 30 --- 09 35 33 44.6 108.0 -2.9 -53.5 32 F 1 198 02 09 50 02 10 30 M58 09 35 33 42.9 107.2 -3.0 -53.7 -9 1 1 198 02 10 30 02 11 10 --- 09 36 13 43.0 107.4 -3.0 -53.6 30 F 1 200 02 10 30 02 11 10 M87 09 36 13 44.7 108.1 -2.9 -53.5 -9 1 1 200 02 11 10 02 11 50 --- 09 36 53 44.8 108.2 -2.9 -53.4 30 F 1 201 02 11 10 02 11 50 M89 09 36 53 44.0 107.1 -3.0 -54.0 -8 1 1 201 02 11 50 02 12 30 --- 09 37 33 44.1 107.2 -3.0 -53.9 32 F 1 202 02 11 50 02 12 30 M87 09 37 33 45.0 108.4 -2.9 -53.4 -8 1 1 202 02 12 30 02 13 09 --- 09 38 13 45.1 108.5 -2.9 -53.3 32 F 1 203 02 12 30 Schedule for VLBA_PT (Code Pt ) Page 12 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 13 09 M58 09 38 13 43.4 107.8 -3.0 -53.5 -9 1 1 203 02 13 09 02 13 49 --- 09 38 53 43.5 107.9 -3.0 -53.4 30 F 1 205 02 13 09 02 13 49 M87 09 38 53 45.2 108.7 -2.9 -53.2 -9 1 1 205 02 13 49 02 14 29 --- 09 39 33 45.3 108.8 -2.9 -53.2 30 F 1 206 02 13 49 02 14 29 M89 09 39 33 44.5 107.6 -2.9 -53.8 -8 1 1 206 02 14 29 02 15 09 --- 09 40 13 44.6 107.8 -2.9 -53.7 32 F 1 207 02 14 29 02 15 09 M87 09 40 13 45.5 108.9 -2.9 -53.1 -8 1 1 207 02 15 09 02 15 49 --- 09 40 53 45.6 109.1 -2.8 -53.1 32 F 1 209 02 15 09 02 15 49 M58 09 40 53 43.9 108.3 -3.0 -53.2 -9 1 1 209 02 15 49 02 16 29 --- 09 41 33 44.0 108.4 -2.9 -53.2 31 F 1 210 02 15 49 02 16 29 M87 09 41 33 45.7 109.2 -2.8 -53.0 -9 1 1 210 02 16 29 02 17 09 --- 09 42 13 45.9 109.4 -2.8 -52.9 31 F 1 211 02 16 29 Next scan frequencies: 8405.49 8405.49 8413.49 8413.49 8421.49 8421.49 8429.49 8429.49 Next BBC frequencies: 805.49 805.49 813.49 813.49 821.49 821.49 829.49 829.49 02 17 09 M87 09 42 13 45.9 109.4 -2.8 -52.9 -4 1 1 211 02 17 09 02 17 49 --- 09 42 53 46.0 109.5 -2.8 -52.9 36 F 1 212 02 17 09 02 17 49 M89 09 42 53 45.1 108.3 -2.9 -53.5 -8 1 1 212 02 17 49 02 18 29 --- 09 43 33 45.3 108.4 -2.9 -53.4 32 F 1 214 02 17 49 02 18 29 M87 09 43 33 46.1 109.6 -2.8 -52.8 -8 1 1 214 02 18 29 02 19 08 --- 09 44 13 46.3 109.8 -2.8 -52.7 32 F 1 215 02 18 29 02 19 08 M58 09 44 13 44.6 109.0 -2.9 -52.9 -9 1 1 215 02 19 08 02 19 48 --- 09 44 53 44.7 109.1 -2.9 -52.9 31 F 1 216 02 19 08 02 19 48 M87 09 44 53 46.4 109.9 -2.8 -52.7 -9 1 1 216 02 19 48 02 20 28 --- 09 45 33 46.5 110.1 -2.8 -52.6 31 F 1 218 02 19 48 02 20 28 M89 09 45 33 45.7 108.9 -2.8 -53.2 -8 1 1 218 02 20 28 02 21 08 --- 09 46 13 45.8 109.0 -2.8 -53.1 32 F 1 219 02 20 28 02 21 08 M87 09 46 13 46.6 110.2 -2.8 -52.5 -8 1 1 219 02 21 08 02 21 48 --- 09 46 53 46.8 110.4 -2.7 -52.4 32 F 1 220 02 21 08 Schedule for VLBA_PT (Code Pt ) Page 13 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 21 48 M58 09 46 53 45.1 109.5 -2.9 -52.7 -9 1 1 220 02 21 48 02 22 28 --- 09 47 33 45.2 109.7 -2.8 -52.6 31 F 1 221 02 21 48 02 22 28 M87 09 47 33 46.9 110.5 -2.7 -52.4 -9 1 1 221 02 22 28 02 23 08 --- 09 48 13 47.0 110.6 -2.7 -52.3 31 F 1 223 02 22 28 02 23 08 M89 09 48 13 46.2 109.4 -2.8 -52.9 -8 1 1 223 02 23 08 02 23 48 --- 09 48 53 46.3 109.6 -2.8 -52.9 32 F 1 224 02 23 08 02 23 48 M87 09 48 53 47.2 110.8 -2.7 -52.2 -8 1 1 224 02 23 48 02 24 28 --- 09 49 33 47.3 110.9 -2.7 -52.2 32 F 1 225 02 23 48 02 24 28 M58 09 49 33 45.6 110.1 -2.8 -52.4 -9 1 1 225 02 24 28 02 25 07 --- 09 50 13 45.7 110.2 -2.8 -52.3 31 F 1 227 02 24 28 02 25 07 M87 09 50 13 47.4 111.1 -2.7 -52.1 -9 1 1 227 02 25 07 02 25 47 --- 09 50 53 47.5 111.2 -2.7 -52.0 31 F 1 228 02 25 07 02 25 47 M89 09 50 53 46.7 110.0 -2.8 -52.7 -8 1 1 228 02 25 47 02 26 27 --- 09 51 33 46.8 110.1 -2.7 -52.6 32 F 1 229 02 25 47 02 26 27 M87 09 51 33 47.7 111.4 -2.7 -51.9 -8 1 1 229 02 26 27 02 27 07 --- 09 52 13 47.8 111.5 -2.7 -51.9 32 F 1 230 02 26 27 02 27 07 M58 09 52 13 46.1 110.7 -2.8 -52.1 -9 1 1 230 02 27 07 02 27 47 --- 09 52 53 46.2 110.8 -2.8 -52.1 31 F 1 232 02 27 07 02 27 47 M87 09 52 53 47.9 111.7 -2.6 -51.8 -9 1 1 232 02 27 47 02 28 27 --- 09 53 33 48.1 111.8 -2.6 -51.7 31 F 1 233 02 27 47 02 28 27 M89 09 53 33 47.2 110.6 -2.7 -52.4 -8 1 1 233 02 28 27 02 29 07 --- 09 54 13 47.4 110.7 -2.7 -52.3 32 F 1 234 02 28 27 02 29 07 M87 09 54 13 48.2 112.0 -2.6 -51.6 -8 1 1 234 02 29 07 02 29 47 --- 09 54 53 48.3 112.1 -2.6 -51.6 32 F 1 236 02 29 07 02 29 47 M58 09 54 53 46.6 111.3 -2.7 -51.9 -9 1 1 236 02 29 47 02 30 27 --- 09 55 33 46.8 111.4 -2.7 -51.8 31 F 1 237 02 29 47 02 30 27 M87 09 55 33 48.4 112.3 -2.6 -51.5 -9 1 1 237 02 30 27 02 31 07 --- 09 56 13 48.6 112.4 -2.6 -51.4 31 F 1 238 02 30 27 Schedule for VLBA_PT (Code Pt ) Page 14 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 31 07 M89 09 56 13 47.7 111.2 -2.7 -52.1 -8 1 1 238 02 31 07 02 31 46 --- 09 56 53 47.9 111.3 -2.7 -52.0 32 F 1 239 02 31 07 02 31 46 M87 09 56 53 48.7 112.6 -2.6 -51.3 -8 1 1 239 02 31 46 02 32 26 --- 09 57 33 48.8 112.8 -2.6 -51.2 32 F 1 241 02 31 46 02 32 26 M58 09 57 33 47.1 111.8 -2.7 -51.6 -9 1 1 241 02 32 26 02 33 06 --- 09 58 13 47.3 112.0 -2.7 -51.5 31 F 1 242 02 32 26 02 33 06 M87 09 58 13 48.9 112.9 -2.6 -51.2 -9 1 1 242 02 33 06 02 33 46 --- 09 58 53 49.1 113.1 -2.5 -51.1 31 F 1 243 02 33 06 02 33 46 M89 09 58 53 48.3 111.8 -2.6 -51.8 -8 1 1 243 02 33 46 02 34 26 --- 09 59 33 48.4 111.9 -2.6 -51.7 32 F 1 245 02 33 46 02 34 26 M87 09 59 33 49.2 113.2 -2.5 -51.0 -8 1 1 245 02 34 26 02 35 06 --- 10 00 13 49.3 113.4 -2.5 -50.9 32 F 1 246 02 34 26 02 35 06 M58 10 00 13 47.7 112.5 -2.6 -51.2 -9 1 1 246 02 35 06 02 35 46 --- 10 00 53 47.8 112.6 -2.6 -51.2 31 F 1 247 02 35 06 02 35 46 M87 10 00 53 49.5 113.5 -2.5 -50.8 -9 1 1 247 02 35 46 02 36 26 --- 10 01 33 49.6 113.7 -2.5 -50.7 31 F 1 248 02 35 46 02 36 26 M89 10 01 33 48.8 112.4 -2.6 -51.5 -8 1 1 248 02 36 26 02 37 06 --- 10 02 13 48.9 112.5 -2.6 -51.4 32 F 1 250 02 36 26 02 37 06 M87 10 02 13 49.7 113.9 -2.5 -50.7 -8 1 1 250 02 37 06 02 37 45 --- 10 02 53 49.8 114.0 -2.5 -50.6 32 F 1 251 02 37 06 02 37 45 M58 10 02 53 48.2 113.1 -2.6 -50.9 -9 1 1 251 02 37 45 02 38 25 --- 10 03 33 48.3 113.2 -2.6 -50.8 31 F 1 252 02 37 45 02 38 25 M87 10 03 33 50.0 114.2 -2.5 -50.5 -9 1 1 252 02 38 25 02 39 05 --- 10 04 13 50.1 114.3 -2.5 -50.4 31 F 1 254 02 38 25 02 39 05 M89 10 04 13 49.3 113.0 -2.5 -51.2 -8 1 1 254 02 39 05 02 39 45 --- 10 04 53 49.4 113.1 -2.5 -51.1 32 F 1 255 02 39 05 02 39 45 M87 10 04 53 50.2 114.5 -2.4 -50.3 -8 1 1 255 02 39 45 02 40 25 --- 10 05 33 50.3 114.7 -2.4 -50.2 32 F 1 256 02 39 45 Schedule for VLBA_PT (Code Pt ) Page 15 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 40 25 M58 10 05 33 48.7 113.7 -2.5 -50.6 -9 1 1 256 02 40 25 02 41 05 --- 10 06 13 48.8 113.8 -2.5 -50.5 31 F 1 257 02 40 25 02 41 05 M87 10 06 13 50.5 114.8 -2.4 -50.1 -9 1 1 257 02 41 05 02 41 45 --- 10 06 53 50.6 115.0 -2.4 -50.0 31 F 1 259 02 41 05 02 41 45 M89 10 06 53 49.8 113.6 -2.5 -50.8 -8 1 1 259 02 41 45 02 42 25 --- 10 07 33 49.9 113.8 -2.5 -50.7 32 F 1 260 02 41 45 02 42 25 M87 10 07 33 50.7 115.2 -2.4 -49.9 -8 1 1 260 02 42 25 02 43 05 --- 10 08 13 50.8 115.3 -2.4 -49.9 32 F 1 261 02 42 25 02 43 05 M58 10 08 13 49.2 114.3 -2.5 -50.3 -9 1 1 261 02 43 05 02 43 44 --- 10 08 53 49.3 114.5 -2.5 -50.2 31 F 1 263 02 43 05 02 43 44 M87 10 08 53 51.0 115.5 -2.4 -49.8 -9 1 1 263 02 43 44 02 44 24 --- 10 09 33 51.1 115.7 -2.4 -49.7 31 F 1 264 02 43 44 Next scan frequencies: 23789.49 23789.49 23797.49 23797.49 23805.49 23805.49 23813.49 23813.49 Next BBC frequencies: 789.49 789.49 797.49 797.49 805.49 805.49 813.49 813.49 02 44 24 M87 10 09 33 51.1 115.7 -2.4 -49.7 -4 1 1 264 02 44 24 02 45 04 --- 10 10 13 51.2 115.8 -2.4 -49.6 36 F 1 265 02 44 24 02 45 04 M89 10 10 13 50.4 114.4 -2.4 -50.4 -8 1 1 265 02 45 04 02 45 44 --- 10 10 53 50.5 114.6 -2.4 -50.3 32 F 1 266 02 45 04 02 45 44 M87 10 10 53 51.3 116.0 -2.3 -49.5 -8 1 1 266 02 45 44 02 46 24 --- 10 11 33 51.5 116.2 -2.3 -49.4 32 F 1 268 02 45 44 02 46 24 M58 10 11 33 49.8 115.1 -2.4 -49.8 -9 1 1 268 02 46 24 02 47 04 --- 10 12 13 49.9 115.3 -2.4 -49.7 31 F 1 269 02 46 24 02 47 04 M87 10 12 13 51.6 116.3 -2.3 -49.3 -9 1 1 269 02 47 04 02 47 44 --- 10 12 53 51.7 116.5 -2.3 -49.2 31 F 1 270 02 47 04 02 47 44 M89 10 12 53 50.9 115.1 -2.4 -50.0 -8 1 1 270 02 47 44 02 48 24 --- 10 13 33 51.0 115.2 -2.4 -49.9 32 F 1 272 02 47 44 02 48 24 M87 10 13 33 51.8 116.7 -2.3 -49.1 -8 1 1 272 02 48 24 02 49 04 --- 10 14 13 51.9 116.8 -2.3 -49.0 32 F 1 273 02 48 24 Schedule for VLBA_PT (Code Pt ) Page 16 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 49 04 M58 10 14 13 50.3 115.8 -2.4 -49.4 -9 1 1 273 02 49 04 02 49 43 --- 10 14 53 50.4 115.9 -2.4 -49.4 31 F 1 274 02 49 04 02 49 43 M87 10 14 53 52.1 117.0 -2.3 -48.9 -9 1 1 274 02 49 43 02 50 23 --- 10 15 33 52.2 117.2 -2.3 -48.8 31 F 1 275 02 49 43 02 50 23 M89 10 15 33 51.4 115.7 -2.3 -49.7 -8 1 1 275 02 50 23 02 51 03 --- 10 16 13 51.5 115.9 -2.3 -49.6 32 F 1 277 02 50 23 02 51 03 M87 10 16 13 52.3 117.4 -2.3 -48.7 -8 1 1 277 02 51 03 02 51 43 --- 10 16 53 52.4 117.5 -2.2 -48.6 32 F 1 278 02 51 03 02 51 43 M58 10 16 53 50.8 116.5 -2.4 -49.1 -9 1 1 278 02 51 43 02 52 23 --- 10 17 33 50.9 116.6 -2.3 -49.0 31 F 1 279 02 51 43 02 52 23 M87 10 17 33 52.6 117.7 -2.2 -48.5 -9 1 1 279 02 52 23 02 53 03 --- 10 18 13 52.7 117.9 -2.2 -48.4 31 F 1 281 02 52 23 02 53 03 M89 10 18 13 51.9 116.4 -2.3 -49.3 -8 1 1 281 02 53 03 02 53 43 --- 10 18 53 52.0 116.6 -2.3 -49.2 32 F 1 282 02 53 03 02 53 43 M87 10 18 53 52.8 118.1 -2.2 -48.3 -8 1 1 282 02 53 43 02 54 23 --- 10 19 33 52.9 118.3 -2.2 -48.1 32 F 1 283 02 53 43 02 54 23 M58 10 19 33 51.3 117.1 -2.3 -48.7 -9 1 1 283 02 54 23 02 55 03 --- 10 20 13 51.4 117.3 -2.3 -48.6 31 F 1 284 02 54 23 02 55 03 M87 10 20 13 53.0 118.4 -2.2 -48.0 -9 1 1 284 02 55 03 02 55 42 --- 10 20 53 53.2 118.6 -2.2 -47.9 31 F 1 286 02 55 03 02 55 42 M89 10 20 53 52.4 117.1 -2.3 -48.9 -8 1 1 286 02 55 42 02 56 22 --- 10 21 33 52.5 117.3 -2.2 -48.8 32 F 1 287 02 55 42 02 56 22 M87 10 21 33 53.3 118.8 -2.2 -47.8 -8 1 1 287 02 56 22 02 57 02 --- 10 22 13 53.4 119.0 -2.2 -47.7 32 F 1 288 02 56 22 02 57 02 M58 10 22 13 51.8 117.8 -2.3 -48.3 -9 1 1 288 02 57 02 02 57 42 --- 10 22 53 51.9 118.0 -2.3 -48.2 31 F 1 290 02 57 02 02 57 42 M87 10 22 53 53.5 119.2 -2.1 -47.6 -9 1 1 290 02 57 42 02 58 22 --- 10 23 33 53.6 119.4 -2.1 -47.5 31 F 1 291 02 57 42 Schedule for VLBA_PT (Code Pt ) Page 17 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 58 22 M89 10 23 33 52.9 117.8 -2.2 -48.4 -8 1 1 291 02 58 22 02 59 02 --- 10 24 13 53.0 118.0 -2.2 -48.3 32 F 1 292 02 58 22 02 59 02 M87 10 24 13 53.8 119.5 -2.1 -47.4 -7 1 1 292 02 59 02 02 59 42 --- 10 24 53 53.9 119.7 -2.1 -47.2 32 F 1 293 02 59 02 02 59 42 M58 10 24 53 52.3 118.5 -2.2 -47.8 -9 1 1 293 02 59 42 03 00 22 --- 10 25 33 52.4 118.7 -2.2 -47.7 31 F 1 295 02 59 42 03 00 22 M87 10 25 33 54.0 119.9 -2.1 -47.1 -9 1 1 295 03 00 22 03 01 02 --- 10 26 13 54.1 120.1 -2.1 -47.0 31 F 1 296 03 00 22 03 01 02 M89 10 26 13 53.4 118.6 -2.2 -48.0 -7 1 1 296 03 01 02 03 01 41 --- 10 26 53 53.5 118.7 -2.2 -47.9 32 F 1 297 03 01 02 03 01 41 M87 10 26 53 54.2 120.3 -2.1 -46.9 -7 1 1 297 03 01 41 03 02 21 --- 10 27 33 54.4 120.5 -2.1 -46.8 32 F 1 299 03 01 41 03 02 21 M58 10 27 33 52.7 119.3 -2.2 -47.4 -9 1 1 299 03 02 21 03 03 01 --- 10 28 13 52.9 119.4 -2.2 -47.3 31 F 1 300 03 02 21 03 03 01 M87 10 28 13 54.5 120.7 -2.1 -46.7 -9 1 1 300 03 03 01 03 03 41 --- 10 28 53 54.6 120.9 -2.0 -46.5 31 F 1 301 03 03 01 03 03 41 M89 10 28 53 53.8 119.3 -2.1 -47.6 -7 1 1 301 03 03 41 03 04 21 --- 10 29 33 54.0 119.5 -2.1 -47.4 32 F 1 302 03 03 41 03 04 21 M87 10 29 33 54.7 121.1 -2.0 -46.4 -7 1 1 302 03 04 21 03 05 01 --- 10 30 13 54.8 121.3 -2.0 -46.3 32 F 1 304 03 04 21 03 05 01 M58 10 30 13 53.2 120.0 -2.1 -47.0 -9 1 1 304 03 05 01 03 05 41 --- 10 30 53 53.3 120.2 -2.1 -46.8 31 F 1 305 03 05 01 03 05 41 M87 10 30 53 55.0 121.5 -2.0 -46.2 -9 1 1 305 03 05 41 03 06 21 --- 10 31 33 55.1 121.7 -2.0 -46.0 31 F 1 306 03 05 41 03 06 21 M89 10 31 33 54.3 120.0 -2.1 -47.1 -7 1 1 306 03 06 21 03 07 01 --- 10 32 13 54.4 120.2 -2.1 -47.0 32 F 1 308 03 06 21 03 07 01 M87 10 32 13 55.2 121.9 -2.0 -45.9 -7 1 1 308 03 07 01 03 07 41 --- 10 32 53 55.3 122.1 -2.0 -45.8 32 F 1 309 03 07 01 Schedule for VLBA_PT (Code Pt ) Page 18 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 07 41 M58 10 32 53 53.7 120.7 -2.1 -46.5 -9 1 1 309 03 07 41 03 08 20 --- 10 33 33 53.8 120.9 -2.1 -46.4 31 F 1 310 03 07 41 03 08 20 M87 10 33 33 55.4 122.3 -2.0 -45.7 -9 1 1 310 03 08 20 03 09 00 --- 10 34 13 55.5 122.5 -2.0 -45.5 31 F 1 312 03 08 20 03 09 00 M89 10 34 13 54.8 120.8 -2.0 -46.6 -7 1 1 312 03 09 00 03 09 40 --- 10 34 53 54.9 121.0 -2.0 -46.5 32 F 1 313 03 09 00 03 09 40 M87 10 34 53 55.7 122.7 -1.9 -45.4 -7 1 1 313 03 09 40 03 10 20 --- 10 35 33 55.8 122.9 -1.9 -45.3 32 F 1 314 03 09 40 03 10 20 M58 10 35 33 54.2 121.5 -2.0 -46.0 -9 1 1 314 03 10 20 03 11 00 --- 10 36 13 54.3 121.7 -2.0 -45.9 31 F 1 315 03 10 20 03 11 00 M87 10 36 13 55.9 123.1 -1.9 -45.1 -9 1 1 315 03 11 00 03 11 40 --- 10 36 53 56.0 123.3 -1.9 -45.0 31 F 1 317 03 11 00 03 11 40 M89 10 36 53 55.3 121.6 -2.0 -46.1 -7 1 1 317 03 11 40 03 12 20 --- 10 37 33 55.4 121.8 -2.0 -46.0 32 F 1 318 03 11 40 03 12 20 M87 10 37 33 56.1 123.5 -1.9 -44.9 -7 1 1 318 03 12 20 03 13 00 --- 10 38 13 56.2 123.7 -1.9 -44.7 32 F 1 319 03 12 20 03 13 00 M58 10 38 13 54.6 122.3 -2.0 -45.5 -9 1 1 319 03 13 00 03 13 40 --- 10 38 53 54.7 122.5 -2.0 -45.4 31 F 1 321 03 13 00 03 13 40 M87 10 38 53 56.3 123.9 -1.9 -44.6 -9 1 1 321 03 13 40 03 14 19 --- 10 39 33 56.5 124.1 -1.9 -44.4 31 F 1 322 03 13 40 03 14 19 M89 10 39 33 55.7 122.4 -1.9 -45.6 -7 1 1 322 03 14 19 03 14 59 --- 10 40 13 55.9 122.6 -1.9 -45.5 32 F 1 323 03 14 19 03 14 59 M87 10 40 13 56.6 124.3 -1.9 -44.3 -7 1 1 323 03 14 59 03 15 39 --- 10 40 53 56.7 124.5 -1.8 -44.2 33 F 1 324 03 14 59 03 15 39 M58 10 40 53 55.1 123.1 -2.0 -45.0 -9 1 1 324 03 15 39 03 16 19 --- 10 41 33 55.2 123.3 -1.9 -44.9 31 F 1 326 03 15 39 03 16 19 M87 10 41 33 56.8 124.7 -1.8 -44.0 -9 1 1 326 03 16 19 03 16 59 --- 10 42 13 56.9 125.0 -1.8 -43.9 31 F 1 327 03 16 19 Schedule for VLBA_PT (Code Pt ) Page 19 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 16 59 M89 10 42 13 56.2 123.2 -1.9 -45.1 -7 1 1 327 03 16 59 03 17 39 --- 10 42 53 56.3 123.4 -1.9 -44.9 33 F 1 328 03 16 59 03 17 39 M87 10 42 53 57.0 125.2 -1.8 -43.7 -7 1 1 328 03 17 39 03 18 19 --- 10 43 33 57.1 125.4 -1.8 -43.6 33 F 1 330 03 17 39 03 18 19 M58 10 43 33 55.5 123.9 -1.9 -44.5 -9 1 1 330 03 18 19 03 18 59 --- 10 44 13 55.7 124.1 -1.9 -44.3 31 F 1 331 03 18 19 03 18 59 M87 10 44 13 57.2 125.6 -1.8 -43.4 -9 1 1 331 03 18 59 03 19 39 --- 10 44 53 57.4 125.8 -1.8 -43.3 31 F 1 332 03 18 59 03 19 39 M89 10 44 53 56.7 124.0 -1.9 -44.5 -7 1 1 332 03 19 39 03 20 18 --- 10 45 33 56.8 124.3 -1.8 -44.4 33 F 1 333 03 19 39 03 20 18 M87 10 45 33 57.5 126.0 -1.8 -43.1 -7 1 1 333 03 20 18 03 20 58 --- 10 46 13 57.6 126.3 -1.8 -43.0 33 F 1 335 03 20 18 03 20 58 M58 10 46 13 56.0 124.7 -1.9 -43.9 -9 1 1 335 03 20 58 03 21 38 --- 10 46 53 56.1 125.0 -1.9 -43.8 31 F 1 336 03 20 58 03 21 38 M87 10 46 53 57.7 126.5 -1.7 -42.8 -9 1 1 336 03 21 38 03 22 18 --- 10 47 33 57.8 126.7 -1.7 -42.7 31 F 1 337 03 21 38 03 22 18 M89 10 47 33 57.1 124.9 -1.8 -43.9 -7 1 1 337 03 22 18 03 22 58 --- 10 48 13 57.2 125.1 -1.8 -43.8 33 F 1 339 03 22 18 03 22 58 M87 10 48 13 57.9 126.9 -1.7 -42.5 -7 1 1 339 03 22 58 03 23 38 --- 10 48 53 58.0 127.2 -1.7 -42.4 33 F 1 340 03 22 58 03 23 38 M58 10 48 53 56.5 125.6 -1.8 -43.3 -9 1 1 340 03 23 38 03 24 18 --- 10 49 33 56.6 125.8 -1.8 -43.2 31 F 1 341 03 23 38 03 24 18 M87 10 49 33 58.1 127.4 -1.7 -42.2 -9 1 1 341 03 24 18 03 24 58 --- 10 50 13 58.2 127.6 -1.7 -42.1 31 F 1 342 03 24 18 03 24 58 M89 10 50 13 57.6 125.8 -1.8 -43.4 -7 1 1 342 03 24 58 03 25 38 --- 10 50 53 57.7 126.0 -1.8 -43.2 33 F 1 344 03 24 58 03 25 38 M87 10 50 53 58.3 127.8 -1.7 -41.9 -7 1 1 344 03 25 38 03 26 17 --- 10 51 33 58.5 128.1 -1.7 -41.7 33 F 1 345 03 25 38 Schedule for VLBA_PT (Code Pt ) Page 20 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 26 17 M58 10 51 33 56.9 126.5 -1.8 -42.7 -9 1 1 345 03 26 17 03 26 57 --- 10 52 13 57.0 126.7 -1.8 -42.6 31 F 1 346 03 26 17 03 26 57 M87 10 52 13 58.6 128.3 -1.7 -41.6 -9 1 1 346 03 26 57 03 27 37 --- 10 52 53 58.7 128.5 -1.6 -41.4 31 F 1 348 03 26 57 03 27 37 M89 10 52 53 58.0 126.7 -1.7 -42.7 -7 1 1 348 03 27 37 03 28 17 --- 10 53 33 58.1 126.9 -1.7 -42.6 33 F 1 349 03 27 37 03 28 17 M87 10 53 33 58.8 128.8 -1.6 -41.2 -7 1 1 349 03 28 17 03 28 57 --- 10 54 13 58.9 129.0 -1.6 -41.1 33 F 1 350 03 28 17 03 28 57 M58 10 54 13 57.3 127.3 -1.7 -42.1 -9 1 1 350 03 28 57 03 29 37 --- 10 54 53 57.4 127.6 -1.7 -42.0 31 F 1 351 03 28 57 03 29 37 M87 10 54 53 59.0 129.3 -1.6 -40.9 -9 1 1 351 03 29 37 03 30 17 --- 10 55 33 59.1 129.5 -1.6 -40.7 31 F 1 353 03 29 37 03 30 17 M89 10 55 33 58.4 127.6 -1.7 -42.1 -7 1 1 353 03 30 17 03 30 57 --- 10 56 13 58.6 127.8 -1.7 -42.0 33 F 1 354 03 30 17 03 30 57 M87 10 56 13 59.2 129.7 -1.6 -40.6 -7 1 1 354 03 30 57 03 31 37 --- 10 56 53 59.3 130.0 -1.6 -40.4 33 F 1 355 03 30 57 03 31 37 M58 10 56 53 57.8 128.3 -1.7 -41.5 -9 1 1 355 03 31 37 03 32 16 --- 10 57 33 57.9 128.5 -1.7 -41.3 31 F 1 357 03 31 37 03 32 16 M87 10 57 33 59.4 130.2 -1.6 -40.2 -9 1 1 357 03 32 16 03 32 56 --- 10 58 13 59.5 130.5 -1.6 -40.0 31 F 1 358 03 32 16 03 32 56 M89 10 58 13 58.9 128.5 -1.6 -41.5 -7 1 1 358 03 32 56 03 33 36 --- 10 58 53 59.0 128.7 -1.6 -41.3 33 F 1 359 03 32 56 03 33 36 M87 10 58 53 59.6 130.7 -1.5 -39.9 -7 1 1 359 03 33 36 03 34 16 --- 10 59 33 59.7 131.0 -1.5 -39.7 33 F 1 360 03 33 36 03 34 16 M58 10 59 33 58.2 129.2 -1.6 -40.8 -9 1 1 360 03 34 16 03 34 56 --- 11 00 13 58.3 129.4 -1.6 -40.7 31 F 1 362 03 34 16 03 34 56 M87 11 00 13 59.8 131.2 -1.5 -39.5 -9 1 1 362 03 34 56 03 35 36 --- 11 00 53 59.9 131.5 -1.5 -39.3 31 F 1 363 03 34 56 Schedule for VLBA_PT (Code Pt ) Page 21 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 35 36 M89 11 00 53 59.3 129.5 -1.6 -40.8 -7 1 1 363 03 35 36 03 36 16 --- 11 01 33 59.4 129.7 -1.6 -40.6 33 F 1 364 03 35 36 03 36 16 M87 11 01 33 60.0 131.7 -1.5 -39.1 -7 1 1 364 03 36 16 03 36 56 --- 11 02 13 60.1 132.0 -1.5 -39.0 33 F 1 366 03 36 16 03 36 56 M58 11 02 13 58.6 130.1 -1.6 -40.2 -9 1 1 366 03 36 56 03 37 36 --- 11 02 53 58.7 130.4 -1.6 -40.0 31 F 1 367 03 36 56 03 37 36 M87 11 02 53 60.2 132.2 -1.5 -38.8 -9 1 1 367 03 37 36 03 38 15 --- 11 03 33 60.3 132.5 -1.5 -38.6 31 F 1 368 03 37 36 03 38 15 M89 11 03 33 59.7 130.4 -1.5 -40.1 -7 1 1 368 03 38 15 03 38 55 --- 11 04 13 59.8 130.7 -1.5 -39.9 33 F 1 369 03 38 15 03 38 55 M87 11 04 13 60.5 132.7 -1.5 -38.4 -7 1 1 369 03 38 55 03 39 35 --- 11 04 53 60.6 133.0 -1.4 -38.2 33 F 1 371 03 38 55 03 39 35 M58 11 04 53 59.0 131.1 -1.6 -39.5 -9 1 1 371 03 39 35 03 40 15 --- 11 05 33 59.2 131.3 -1.5 -39.3 31 F 1 372 03 39 35 03 40 15 M87 11 05 33 60.7 133.3 -1.4 -38.0 -9 1 1 372 03 40 15 03 40 55 --- 11 06 13 60.8 133.5 -1.4 -37.8 31 F 1 373 03 40 15 03 40 55 M89 11 06 13 60.1 131.4 -1.5 -39.4 -7 1 1 373 03 40 55 03 41 35 --- 11 06 53 60.2 131.7 -1.5 -39.2 33 F 1 375 03 40 55 03 41 35 M87 11 06 53 60.9 133.8 -1.4 -37.6 -7 1 1 375 03 41 35 03 42 15 --- 11 07 33 61.0 134.0 -1.4 -37.4 33 F 1 376 03 41 35 03 42 15 M58 11 07 33 59.5 132.1 -1.5 -38.8 -9 1 1 376 03 42 15 03 42 55 --- 11 08 13 59.6 132.3 -1.5 -38.6 31 F 1 377 03 42 15 03 42 55 M87 11 08 13 61.0 134.3 -1.4 -37.2 -9 1 1 377 03 42 55 03 43 35 --- 11 08 53 61.1 134.6 -1.4 -37.0 31 F 1 378 03 42 55 03 43 35 M89 11 08 53 60.6 132.5 -1.5 -38.6 -7 1 1 378 03 43 35 03 44 14 --- 11 09 33 60.7 132.7 -1.4 -38.4 33 F 1 380 03 43 35 03 44 14 M87 11 09 33 61.2 134.9 -1.4 -36.8 -7 1 1 380 03 44 14 03 44 54 --- 11 10 13 61.3 135.1 -1.4 -36.6 33 F 1 381 03 44 14 Schedule for VLBA_PT (Code Pt ) Page 22 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 44 54 M58 11 10 13 59.9 133.1 -1.5 -38.0 -9 1 1 381 03 44 54 03 45 34 --- 11 10 53 60.0 133.4 -1.5 -37.8 31 F 1 382 03 44 54 03 45 34 M87 11 10 53 61.4 135.4 -1.3 -36.4 -9 1 1 382 03 45 34 03 46 14 --- 11 11 33 61.5 135.7 -1.3 -36.2 31 F 1 384 03 45 34 03 46 14 M89 11 11 33 61.0 133.5 -1.4 -37.9 -7 1 1 384 03 46 14 03 46 54 --- 11 12 13 61.1 133.8 -1.4 -37.7 32 F 1 385 03 46 14 03 46 54 M87 11 12 13 61.6 136.0 -1.3 -36.0 -7 1 1 385 03 46 54 03 47 34 --- 11 12 53 61.7 136.2 -1.3 -35.8 32 F 1 386 03 46 54 03 47 34 M58 11 12 53 60.3 134.1 -1.4 -37.3 -9 1 1 386 03 47 34 03 48 14 --- 11 13 33 60.4 134.4 -1.4 -37.1 31 F 1 387 03 47 34 03 48 14 M87 11 13 33 61.8 136.5 -1.3 -35.6 -9 1 1 387 03 48 14 03 48 54 --- 11 14 13 61.9 136.8 -1.3 -35.4 31 F 1 389 03 48 14 03 48 54 M89 11 14 13 61.4 134.6 -1.4 -37.1 -7 1 1 389 03 48 54 03 49 34 --- 11 14 53 61.5 134.9 -1.4 -36.9 32 F 1 390 03 48 54 03 49 34 M87 11 14 53 62.0 137.1 -1.3 -35.2 -7 1 1 390 03 49 34 03 50 14 --- 11 15 33 62.1 137.4 -1.3 -34.9 32 F 1 391 03 49 34 03 50 14 M58 11 15 33 60.7 135.2 -1.4 -36.5 -9 1 1 391 03 50 14 03 50 53 --- 11 16 13 60.8 135.5 -1.4 -36.3 31 F 1 393 03 50 14 03 50 53 M87 11 16 13 62.2 137.6 -1.3 -34.7 -9 1 1 393 03 50 53 03 51 33 --- 11 16 53 62.3 137.9 -1.2 -34.5 31 F 1 394 03 50 53 03 51 33 M89 11 16 53 61.7 135.7 -1.3 -36.2 -7 1 1 394 03 51 33 03 52 13 --- 11 17 33 61.8 136.0 -1.3 -36.0 32 F 1 395 03 51 33 03 52 13 M87 11 17 33 62.4 138.2 -1.2 -34.3 -7 1 1 395 03 52 13 03 52 53 --- 11 18 13 62.5 138.5 -1.2 -34.1 32 F 1 396 03 52 13 03 52 53 M58 11 18 13 61.0 136.3 -1.3 -35.7 -9 1 1 396 03 52 53 03 53 33 --- 11 18 53 61.1 136.6 -1.3 -35.5 31 F 1 398 03 52 53 03 53 33 M87 11 18 53 62.6 138.8 -1.2 -33.8 -9 1 1 398 03 53 33 03 54 13 --- 11 19 33 62.7 139.1 -1.2 -33.6 31 F 1 399 03 53 33 Schedule for VLBA_PT (Code Pt ) Page 23 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 54 13 M89 11 19 33 62.1 136.8 -1.3 -35.4 -8 1 1 399 03 54 13 03 54 53 --- 11 20 13 62.2 137.1 -1.3 -35.2 32 F 1 400 03 54 13 03 54 53 M87 11 20 13 62.7 139.4 -1.2 -33.4 -8 1 1 400 03 54 53 03 55 33 --- 11 20 53 62.8 139.7 -1.2 -33.2 32 F 1 402 03 54 53 03 55 33 M58 11 20 53 61.4 137.4 -1.3 -34.8 -9 1 1 402 03 55 33 03 56 13 --- 11 21 33 61.5 137.7 -1.3 -34.6 31 F 1 403 03 55 33 03 56 13 M87 11 21 33 62.9 140.0 -1.2 -32.9 -9 1 1 403 03 56 13 03 56 52 --- 11 22 13 63.0 140.3 -1.2 -32.7 31 F 1 404 03 56 13 03 56 52 M89 11 22 13 62.5 137.9 -1.2 -34.5 -8 1 1 404 03 56 52 03 57 32 --- 11 22 53 62.6 138.2 -1.2 -34.3 32 F 1 405 03 56 52 03 57 32 M87 11 22 53 63.1 140.6 -1.1 -32.5 -8 1 1 405 03 57 32 03 58 12 --- 11 23 33 63.2 140.9 -1.1 -32.2 32 F 1 407 03 57 32 03 58 12 M58 11 23 33 61.8 138.5 -1.2 -34.0 -9 1 1 407 03 58 12 03 58 52 --- 11 24 13 61.9 138.8 -1.2 -33.8 31 F 1 408 03 58 12 03 58 52 M87 11 24 13 63.3 141.2 -1.1 -32.0 -9 1 1 408 03 58 52 03 59 32 --- 11 24 53 63.4 141.5 -1.1 -31.8 31 F 1 409 03 58 52 03 59 32 M89 11 24 53 62.9 139.1 -1.2 -33.6 -8 1 1 409 03 59 32 04 00 12 --- 11 25 33 62.9 139.4 -1.2 -33.4 32 F 1 411 03 59 32 04 00 12 M87 11 25 33 63.4 141.8 -1.1 -31.5 -8 1 1 411 04 00 12 04 00 52 --- 11 26 13 63.5 142.1 -1.1 -31.3 32 F 1 412 04 00 12 04 00 52 M58 11 26 13 62.1 139.7 -1.2 -33.1 -9 1 1 412 04 00 52 04 01 32 --- 11 26 53 62.2 140.0 -1.2 -32.9 31 F 1 413 04 00 52 04 01 32 M87 11 26 53 63.6 142.4 -1.1 -31.0 -9 1 1 413 04 01 32 04 02 12 --- 11 27 33 63.7 142.8 -1.1 -30.8 31 F 1 414 04 01 32 04 02 12 M89 11 27 33 63.2 140.3 -1.1 -32.7 -8 1 1 414 04 02 12 04 02 51 --- 11 28 13 63.3 140.6 -1.1 -32.5 32 F 1 416 04 02 12 04 02 51 M87 11 28 13 63.8 143.1 -1.1 -30.5 -8 1 1 416 04 02 51 04 03 31 --- 11 28 53 63.9 143.4 -1.0 -30.3 32 F 1 417 04 02 51 Schedule for VLBA_PT (Code Pt ) Page 24 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 04 03 31 M58 11 28 53 62.5 140.9 -1.2 -32.2 -9 1 1 417 04 03 31 04 04 11 --- 11 29 33 62.6 141.2 -1.1 -32.0 31 F 1 418 04 03 31 04 04 11 M87 11 29 33 63.9 143.7 -1.0 -30.0 -9 1 1 418 04 04 11 04 04 51 --- 11 30 13 64.0 144.0 -1.0 -29.8 31 F 1 420 04 04 11 Next scan frequencies: 8405.49 8405.49 8413.49 8413.49 8421.49 8421.49 8429.49 8429.49 Next BBC frequencies: 805.49 805.49 813.49 813.49 821.49 821.49 829.49 829.49 04 04 51 M87 11 30 13 64.0 144.0 -1.0 -29.8 -4 1 1 420 04 04 51 04 05 31 --- 11 30 53 64.1 144.4 -1.0 -29.5 36 F 1 421 04 04 51 04 05 31 M89 11 30 53 63.6 141.9 -1.1 -31.5 -8 1 1 421 04 05 31 04 06 11 --- 11 31 33 63.7 142.2 -1.1 -31.3 32 F 1 422 04 05 31 04 06 11 M87 11 31 33 64.2 144.7 -1.0 -29.3 -8 1 1 422 04 06 11 04 06 51 --- 11 32 13 64.3 145.0 -1.0 -29.0 32 F 1 423 04 06 11 04 06 51 M58 11 32 13 62.9 142.4 -1.1 -31.0 -9 1 1 423 04 06 51 04 07 31 --- 11 32 53 63.0 142.7 -1.1 -30.8 31 F 1 425 04 06 51 04 07 31 M87 11 32 53 64.3 145.3 -1.0 -28.7 -9 1 1 425 04 07 31 04 08 11 --- 11 33 33 64.4 145.7 -1.0 -28.5 31 F 1 426 04 07 31 04 08 11 M89 11 33 33 64.0 143.1 -1.0 -30.5 -8 1 1 426 04 08 11 04 08 50 --- 11 34 13 64.1 143.4 -1.0 -30.3 32 F 1 427 04 08 11 04 08 50 M87 11 34 13 64.5 146.0 -1.0 -28.2 -8 1 1 427 04 08 50 04 09 30 --- 11 34 53 64.6 146.3 -0.9 -27.9 32 F 1 429 04 08 50 04 09 30 M58 11 34 53 63.3 143.6 -1.1 -30.0 -9 1 1 429 04 09 30 04 10 10 --- 11 35 33 63.3 143.9 -1.0 -29.8 31 F 1 430 04 09 30 04 10 10 M87 11 35 33 64.7 146.7 -0.9 -27.7 -9 1 1 430 04 10 10 04 10 50 --- 11 36 13 64.7 147.0 -0.9 -27.4 31 F 1 431 04 10 10 04 10 50 M89 11 36 13 64.3 144.4 -1.0 -29.5 -8 1 1 431 04 10 50 04 11 30 --- 11 36 53 64.4 144.7 -1.0 -29.2 32 F 1 432 04 10 50 04 11 30 M87 11 36 53 64.8 147.4 -0.9 -27.1 -8 1 1 432 04 11 30 04 12 10 --- 11 37 33 64.9 147.7 -0.9 -26.9 32 F 1 434 04 11 30 Schedule for VLBA_PT (Code Pt ) Page 25 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 04 12 10 M58 11 37 33 63.6 144.9 -1.0 -29.0 -9 1 1 434 04 12 10 04 12 50 --- 11 38 13 63.7 145.2 -1.0 -28.8 31 F 1 435 04 12 10 04 12 50 M87 11 38 13 64.9 148.0 -0.9 -26.6 -9 1 1 435 04 12 50 04 13 30 --- 11 38 53 65.0 148.4 -0.9 -26.3 31 F 1 436 04 12 50 04 13 30 M89 11 38 53 64.6 145.7 -1.0 -28.4 -8 1 1 436 04 13 30 04 14 10 --- 11 39 33 64.7 146.1 -0.9 -28.2 32 F 1 438 04 13 30 04 14 10 M87 11 39 33 65.1 148.7 -0.9 -26.0 -8 1 1 438 04 14 10 04 14 49 --- 11 40 13 65.2 149.1 -0.9 -25.8 32 F 1 439 04 14 10 04 14 49 M58 11 40 13 63.9 146.2 -1.0 -28.0 -9 1 1 439 04 14 49 04 15 29 --- 11 40 53 64.0 146.5 -1.0 -27.8 31 F 1 440 04 14 49 04 15 29 M87 11 40 53 65.2 149.4 -0.8 -25.5 -9 1 1 440 04 15 29 04 16 09 --- 11 41 33 65.3 149.8 -0.8 -25.2 31 F 1 441 04 15 29 04 16 09 M89 11 41 33 64.9 147.1 -0.9 -27.4 -8 1 1 441 04 16 09 04 16 49 --- 11 42 13 65.0 147.4 -0.9 -27.1 32 F 1 443 04 16 09 04 16 49 M87 11 42 13 65.4 150.1 -0.8 -24.9 -8 1 1 443 04 16 49 04 17 29 --- 11 42 53 65.4 150.5 -0.8 -24.6 32 F 1 444 04 16 49 04 17 29 M58 11 42 53 64.2 147.5 -0.9 -27.0 -9 1 1 444 04 17 29 04 18 09 --- 11 43 33 64.3 147.8 -0.9 -26.7 31 F 1 445 04 17 29 04 18 09 M87 11 43 33 65.5 150.8 -0.8 -24.3 -8 1 1 445 04 18 09 04 18 49 --- 11 44 13 65.6 151.2 -0.8 -24.0 31 F 1 447 04 18 09 04 18 49 M89 11 44 13 65.2 148.5 -0.9 -26.3 -8 1 1 447 04 18 49 04 19 29 --- 11 44 53 65.3 148.8 -0.9 -26.0 32 F 1 448 04 18 49 04 19 29 M87 11 44 53 65.6 151.6 -0.8 -23.7 -8 1 1 448 04 19 29 04 20 09 --- 11 45 33 65.7 151.9 -0.8 -23.5 32 F 1 449 04 19 29 04 20 09 M58 11 45 33 64.5 148.9 -0.9 -25.9 -8 1 1 449 04 20 09 04 20 48 --- 11 46 13 64.6 149.2 -0.9 -25.6 31 F 1 450 04 20 09 04 20 48 M87 11 46 13 65.8 152.3 -0.8 -23.2 -8 1 1 450 04 20 48 04 21 28 --- 11 46 53 65.8 152.7 -0.7 -22.9 31 F 1 452 04 20 48 Schedule for VLBA_PT (Code Pt ) Page 26 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 04 21 28 M89 11 46 53 65.5 149.9 -0.8 -25.1 -8 1 1 452 04 21 28 04 22 08 --- 11 47 33 65.6 150.2 -0.8 -24.8 32 F 1 453 04 21 28 04 22 08 M87 11 47 33 65.9 153.0 -0.7 -22.6 -8 1 1 453 04 22 08 04 22 48 --- 11 48 13 66.0 153.4 -0.7 -22.3 32 F 1 454 04 22 08 04 22 48 M58 11 48 13 64.8 150.2 -0.8 -24.8 -8 1 1 454 04 22 48 04 23 28 --- 11 48 53 64.8 150.6 -0.8 -24.5 31 F 1 456 04 22 48 04 23 28 M87 11 48 53 66.0 153.8 -0.7 -22.0 -8 1 1 456 04 23 28 04 24 08 --- 11 49 33 66.1 154.1 -0.7 -21.6 32 F 1 457 04 23 28 04 24 08 M89 11 49 33 65.8 151.3 -0.8 -24.0 -8 1 1 457 04 24 08 04 24 48 --- 11 50 13 65.8 151.7 -0.8 -23.7 32 F 1 458 04 24 08 04 24 48 M87 11 50 13 66.1 154.5 -0.7 -21.3 -8 1 1 458 04 24 48 04 25 28 --- 11 50 53 66.2 154.9 -0.7 -21.0 32 F 1 459 04 24 48 04 25 28 M58 11 50 53 65.0 151.6 -0.8 -23.6 -8 1 1 459 04 25 28 04 26 08 --- 11 51 33 65.1 152.0 -0.8 -23.3 32 F 1 461 04 25 28 04 26 08 M87 11 51 33 66.3 155.3 -0.7 -20.7 -8 1 1 461 04 26 08 04 26 48 --- 11 52 13 66.3 155.6 -0.7 -20.4 32 F 1 462 04 26 08 04 26 48 M89 11 52 13 66.0 152.8 -0.7 -22.8 -8 1 1 462 04 26 48 04 27 27 --- 11 52 53 66.1 153.1 -0.7 -22.5 32 F 1 463 04 26 48 04 27 27 M87 11 52 53 66.4 156.0 -0.6 -20.1 -8 1 1 463 04 27 27 04 28 07 --- 11 53 33 66.4 156.4 -0.6 -19.8 32 F 1 465 04 27 27 04 28 07 M58 11 53 33 65.3 153.1 -0.7 -22.5 -8 1 1 465 04 28 07 04 28 47 --- 11 54 13 65.3 153.4 -0.7 -22.2 32 F 1 466 04 28 07 04 28 47 M87 11 54 13 66.5 156.8 -0.6 -19.5 -8 1 1 466 04 28 47 04 29 27 --- 11 54 53 66.5 157.2 -0.6 -19.1 32 F 1 467 04 28 47 04 29 27 M89 11 54 53 66.3 154.3 -0.7 -21.6 -8 1 1 467 04 29 27 04 30 07 --- 11 55 33 66.3 154.6 -0.7 -21.2 32 F 1 468 04 29 27 04 30 07 M87 11 55 33 66.6 157.6 -0.6 -18.8 -8 1 1 468 04 30 07 04 30 47 --- 11 56 13 66.6 158.0 -0.6 -18.5 32 F 1 470 04 30 07 Schedule for VLBA_PT (Code Pt ) Page 27 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 04 30 47 M58 11 56 13 65.5 154.5 -0.7 -21.3 -8 1 1 470 04 30 47 04 31 27 --- 11 56 53 65.6 154.9 -0.7 -21.0 32 F 1 471 04 30 47 04 31 27 M87 11 56 53 66.7 158.3 -0.6 -18.2 -8 1 1 471 04 31 27 04 32 07 --- 11 57 33 66.7 158.7 -0.6 -17.9 32 F 1 472 04 31 27 Next scan frequencies: 23020.49 23045.49 23107.99 23207.99 23370.49 23420.49 23457.99 23470.49 Next BBC frequencies: 520.49 545.49 607.99 707.99 870.49 920.49 957.99 970.49 04 34 12 1800+782 11 59 39 33.5 13.9 -6.0 -82.1 23 1 1 472 04 33 52 04 35 12 --- 12 00 39 33.5 13.9 -6.0 -82.3 60 F 1 475 04 34 10 04 36 44 0646+445 12 02 11 30.8 -54.0 5.3 70.6 40 1 1 475 04 36 24 04 37 44 --- 12 03 11 30.6 -54.0 5.3 70.4 60 F 1 477 04 36 42 04 41 30 0700+170 12 06 58 20.4 -82.7 5.1 59.0 200 1 1 477 04 41 10 04 42 30 --- 12 07 58 20.2 -82.6 5.1 59.0 60 F 1 480 04 41 28 04 46 17 0730-114 12 11 46 9.1 249.0 4.7 52.0 0 1 1 480 04 45 57 04 47 17 --- 12 12 46 8.9 249.1 4.7 52.0 60 F 1 483 04 46 15 04 48 55 0753+535 12 14 24 41.3 314.6 4.3 86.0 27 1 1 483 04 48 35 04 49 55 --- 12 15 24 41.1 314.6 4.4 85.8 60 F 1 485 04 48 53 04 50 25 0818+422 12 15 54 43.8 298.4 4.0 79.5 13 1 1 485 04 50 05 04 51 25 --- 12 16 54 43.6 298.5 4.0 79.3 60 F 1 488 04 50 23 04 51 55 0824+555 12 17 25 45.4 317.3 3.9 93.8 12 1 1 488 04 51 35 04 52 55 --- 12 18 25 45.3 317.3 3.9 93.5 60 F 1 490 04 51 53 04 53 33 0958+472 12 19 03 60.8 307.2 2.3 103.8 1 1 1 490 04 53 13 04 54 33 --- 12 20 03 60.6 307.2 2.4 103.5 60 F 1 493 04 53 31 04 55 29 1048+714 12 20 59 50.7 348.8 1.5 149.4 22 1 1 493 04 55 09 04 56 29 --- 12 21 59 50.7 348.7 1.5 149.1 60 F 1 496 04 55 27 04 59 09 1127-185 12 24 40 35.0 196.5 1.0 14.4 53 1 1 496 04 58 49 05 00 09 --- 12 25 40 34.9 196.8 1.0 14.6 60 F 1 498 04 59 07 05 02 12 1146+395 12 27 44 80.2 308.0 0.7 121.9 27 1 1 498 05 01 52 05 03 12 --- 12 28 44 80.0 307.4 0.7 121.2 60 F 1 501 05 02 10 Schedule for VLBA_PT (Code Pt ) Page 28 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 05 05 26 1159+291 12 30 58 81.7 234.3 0.5 50.2 79 1 1 501 05 05 06 05 06 26 --- 12 31 58 81.5 235.3 0.5 51.1 60 F 1 503 05 05 24 05 07 23 1222+041 12 32 55 59.8 185.0 0.2 4.1 8 1 1 503 05 07 03 05 08 23 --- 12 33 55 59.8 185.5 0.2 4.6 60 F 1 506 05 07 21 05 09 55 1310+322 12 35 28 82.3 102.7 -0.6 -72.5 31 1 1 506 05 09 35 05 10 55 --- 12 36 28 82.5 103.1 -0.6 -72.1 60 F 1 508 05 09 53 05 12 38 1357+764 12 38 11 46.7 6.6 -1.3 -155.7 25 1 1 508 05 12 18 05 13 38 --- 12 39 11 46.7 6.5 -1.3 -156.0 60 F 1 511 05 12 36 05 16 15 1550+052 12 41 48 37.7 112.5 -3.2 -50.1 81 1 1 511 05 15 55 05 17 15 --- 12 42 48 37.8 112.7 -3.1 -50.0 60 F 1 514 05 16 13 05 19 02 1638+572 12 44 36 45.0 40.6 -3.9 -94.8 53 1 1 514 05 18 42 05 20 02 --- 12 45 36 45.2 40.6 -3.9 -95.0 60 F 1 516 05 19 00 05 20 28 1740+521 12 46 02 36.0 46.6 -4.9 -78.4 2 1 1 516 05 20 02 05 21 28 --- 12 47 02 36.1 46.7 -4.9 -78.6 60 F 1 519 05 20 02 05 22 38 1743-035 12 48 12 10.9 102.3 -4.9 -54.0 13 1 1 519 05 22 18 05 23 37 --- 12 49 12 11.1 102.5 -4.9 -53.9 60 F 1 521 05 22 36 05 24 03 1751+093 12 49 38 17.3 90.0 -5.0 -56.9 8 1 1 521 05 23 37 05 25 03 --- 12 50 38 17.5 90.1 -5.0 -56.9 60 F 1 524 05 23 37 Next scan frequencies: 23789.49 23789.49 23797.49 23797.49 23805.49 23805.49 23813.49 23813.49 Next BBC frequencies: 789.49 789.49 797.49 797.49 805.49 805.49 813.49 813.49 05 25 03 M87 12 50 38 67.6 192.5 0.3 10.5 -106 1 1 524 05 25 03 05 27 43 --- 12 53 18 67.5 194.2 0.4 11.9 53 F 1 529 05 25 36 05 27 43 M89 12 53 18 67.9 191.2 0.3 9.5 -8 1 1 529 05 27 43 05 28 23 --- 12 53 58 67.8 191.6 0.3 9.8 32 F 1 531 05 27 43 05 28 23 M87 12 53 58 67.4 194.6 0.4 12.3 -8 1 1 531 05 28 23 05 29 03 --- 12 54 38 67.4 195.0 0.4 12.6 32 F 1 532 05 28 23 05 29 03 M58 12 54 38 67.2 190.4 0.3 8.8 -9 1 1 532 05 29 03 05 29 42 --- 12 55 18 67.1 190.8 0.3 9.1 31 F 1 533 05 29 03 Schedule for VLBA_PT (Code Pt ) Page 29 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 05 29 42 M87 12 55 18 67.4 195.4 0.4 13.0 -9 1 1 533 05 29 42 05 30 22 --- 12 55 58 67.3 195.8 0.4 13.3 31 F 1 535 05 29 42 05 30 22 M89 12 55 58 67.7 192.9 0.3 10.9 -8 1 1 535 05 30 22 05 31 02 --- 12 56 38 67.7 193.3 0.3 11.2 32 F 1 536 05 30 22 05 31 02 M87 12 56 38 67.3 196.2 0.4 13.7 -8 1 1 536 05 31 02 05 31 42 --- 12 57 18 67.3 196.6 0.4 14.0 32 F 1 537 05 31 02 05 31 42 M58 12 57 18 67.1 192.1 0.3 10.2 -9 1 1 537 05 31 42 05 32 22 --- 12 57 58 67.0 192.5 0.3 10.5 31 F 1 538 05 31 42 05 32 22 M87 12 57 58 67.2 197.1 0.4 14.4 -9 1 1 538 05 32 22 05 33 02 --- 12 58 38 67.2 197.5 0.5 14.7 31 F 1 540 05 32 22 05 33 02 M89 12 58 38 67.6 194.6 0.4 12.3 -8 1 1 540 05 33 02 05 33 42 --- 12 59 18 67.6 195.0 0.4 12.6 32 F 1 541 05 33 02 05 33 42 M87 12 59 18 67.1 197.9 0.5 15.0 -8 1 1 541 05 33 42 05 34 22 --- 12 59 58 67.1 198.3 0.5 15.4 32 F 1 542 05 33 42 05 34 22 M58 12 59 58 66.9 193.7 0.4 11.5 -9 1 1 542 05 34 22 05 35 02 --- 13 00 38 66.9 194.1 0.4 11.9 31 F 1 544 05 34 22 05 35 02 M87 13 00 38 67.0 198.7 0.5 15.7 -9 1 1 544 05 35 02 05 35 41 --- 13 01 18 67.0 199.1 0.5 16.0 31 F 1 545 05 35 02 05 35 41 M89 13 01 18 67.5 196.2 0.4 13.7 -8 1 1 545 05 35 41 05 36 21 --- 13 01 58 67.4 196.6 0.4 14.0 32 F 1 546 05 35 41 05 36 21 M87 13 01 58 67.0 199.5 0.5 16.4 -8 1 1 546 05 36 21 05 37 01 --- 13 02 38 66.9 199.9 0.5 16.7 32 F 1 547 05 36 21 05 37 01 M58 13 02 38 66.8 195.3 0.4 12.9 -9 1 1 547 05 37 01 05 37 41 --- 13 03 18 66.8 195.7 0.4 13.2 31 F 1 549 05 37 01 05 37 41 M87 13 03 18 66.9 200.3 0.5 17.0 -9 1 1 549 05 37 41 05 38 21 --- 13 03 58 66.8 200.7 0.5 17.4 31 F 1 550 05 37 41 05 38 21 M89 13 03 58 67.3 197.9 0.5 15.0 -8 1 1 550 05 38 21 05 39 01 --- 13 04 38 67.3 198.3 0.5 15.4 32 F 1 551 05 38 21 Schedule for VLBA_PT (Code Pt ) Page 30 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 05 39 01 M87 13 04 38 66.8 201.1 0.6 17.7 -8 1 1 551 05 39 01 05 39 41 --- 13 05 18 66.7 201.4 0.6 18.0 32 F 1 553 05 39 01 05 39 41 M58 13 05 18 66.6 197.0 0.5 14.2 -9 1 1 553 05 39 41 05 40 21 --- 13 05 58 66.6 197.3 0.5 14.6 31 F 1 554 05 39 41 05 40 21 M87 13 05 58 66.7 201.8 0.6 18.3 -9 1 1 554 05 40 21 05 41 01 --- 13 06 38 66.6 202.2 0.6 18.7 31 F 1 555 05 40 21 05 41 01 M89 13 06 38 67.1 199.5 0.5 16.4 -8 1 1 555 05 41 01 05 41 41 --- 13 07 18 67.1 199.9 0.5 16.7 32 F 1 556 05 41 01 05 41 41 M87 13 07 18 66.6 202.6 0.6 19.0 -8 1 1 556 05 41 41 05 42 20 --- 13 07 58 66.5 203.0 0.6 19.3 32 F 1 558 05 41 41 05 42 20 M58 13 07 58 66.5 198.5 0.5 15.6 -9 1 1 558 05 42 20 05 43 00 --- 13 08 38 66.4 198.9 0.5 15.9 31 F 1 559 05 42 20 05 43 00 M87 13 08 38 66.5 203.4 0.6 19.6 -9 1 1 559 05 43 00 05 43 40 --- 13 09 18 66.4 203.8 0.6 19.9 31 F 1 560 05 43 00 05 43 40 M89 13 09 18 66.9 201.1 0.6 17.7 -8 1 1 560 05 43 40 05 44 20 --- 13 09 58 66.9 201.5 0.6 18.0 32 F 1 562 05 43 40 05 44 20 M87 13 09 58 66.3 204.2 0.6 20.2 -8 1 1 562 05 44 20 05 45 00 --- 13 10 38 66.3 204.5 0.7 20.6 32 F 1 563 05 44 20 05 45 00 M58 13 10 38 66.3 200.1 0.5 16.9 -9 1 1 563 05 45 00 05 45 40 --- 13 11 18 66.2 200.5 0.6 17.2 31 F 1 564 05 45 00 05 45 40 M87 13 11 18 66.2 204.9 0.7 20.9 -9 1 1 564 05 45 40 05 46 20 --- 13 11 58 66.2 205.3 0.7 21.2 31 F 1 565 05 45 40 05 46 20 M89 13 11 58 66.7 202.7 0.6 19.0 -8 1 1 565 05 46 20 05 47 00 --- 13 12 38 66.7 203.0 0.6 19.3 32 F 1 567 05 46 20 05 47 00 M87 13 12 38 66.1 205.7 0.7 21.5 -8 1 1 567 05 47 00 05 47 40 --- 13 13 18 66.1 206.0 0.7 21.8 32 F 1 568 05 47 00 05 47 40 M58 13 13 18 66.1 201.6 0.6 18.1 -9 1 1 568 05 47 40 05 48 19 --- 13 13 58 66.0 202.0 0.6 18.4 31 F 1 569 05 47 40 Schedule for VLBA_PT (Code Pt ) Page 31 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 05 48 19 M87 13 13 58 66.0 206.4 0.7 22.1 -9 1 1 569 05 48 19 05 48 59 --- 13 14 38 65.9 206.8 0.7 22.4 31 F 1 571 05 48 19 05 48 59 M89 13 14 38 66.5 204.2 0.6 20.3 -8 1 1 571 05 48 59 05 49 39 --- 13 15 18 66.5 204.6 0.7 20.6 32 F 1 572 05 48 59 05 49 39 M87 13 15 18 65.9 207.1 0.7 22.7 -8 1 1 572 05 49 39 05 50 19 --- 13 15 58 65.8 207.5 0.7 23.0 32 F 1 573 05 49 39 05 50 19 M58 13 15 58 65.9 203.2 0.6 19.4 -9 1 1 573 05 50 19 05 50 59 --- 13 16 38 65.8 203.5 0.6 19.7 31 F 1 574 05 50 19 05 50 59 M87 13 16 38 65.7 207.9 0.8 23.3 -9 1 1 574 05 50 59 05 51 39 --- 13 17 18 65.7 208.2 0.8 23.6 31 F 1 576 05 50 59 05 51 39 M89 13 17 18 66.3 205.7 0.7 21.5 -8 1 1 576 05 51 39 05 52 19 --- 13 17 58 66.2 206.1 0.7 21.8 32 F 1 577 05 51 39 05 52 19 M87 13 17 58 65.6 208.6 0.8 23.9 -8 1 1 577 05 52 19 05 52 59 --- 13 18 38 65.5 209.0 0.8 24.2 32 F 1 578 05 52 19 05 52 59 M58 13 18 38 65.7 204.7 0.7 20.6 -9 1 1 578 05 52 59 05 53 39 --- 13 19 18 65.6 205.0 0.7 20.9 31 F 1 580 05 52 59 05 53 39 M87 13 19 18 65.5 209.3 0.8 24.5 -9 1 1 580 05 53 39 05 54 18 --- 13 19 58 65.4 209.7 0.8 24.7 31 F 1 581 05 53 39 05 54 18 M89 13 19 58 66.0 207.2 0.7 22.8 -8 1 1 581 05 54 18 05 54 58 --- 13 20 38 66.0 207.6 0.7 23.1 32 F 1 582 05 54 18 05 54 58 M87 13 20 38 65.3 210.0 0.8 25.0 -8 1 1 582 05 54 58 05 55 38 --- 13 21 18 65.3 210.4 0.8 25.3 32 F 1 583 05 54 58 05 55 38 M58 13 21 18 65.4 206.1 0.7 21.8 -9 1 1 583 05 55 38 05 56 18 --- 13 21 58 65.4 206.5 0.7 22.1 31 F 1 585 05 55 38 05 56 18 M87 13 21 58 65.2 210.7 0.8 25.6 -9 1 1 585 05 56 18 05 56 58 --- 13 22 38 65.1 211.1 0.9 25.9 31 F 1 586 05 56 18 05 56 58 M89 13 22 38 65.8 208.7 0.8 24.0 -8 1 1 586 05 56 58 05 57 38 --- 13 23 18 65.7 209.0 0.8 24.2 32 F 1 587 05 56 58 Schedule for VLBA_PT (Code Pt ) Page 32 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 05 57 38 M87 13 23 18 65.1 211.4 0.9 26.2 -8 1 1 587 05 57 38 05 58 18 --- 13 23 58 65.0 211.8 0.9 26.4 32 F 1 589 05 57 38 05 58 18 M58 13 23 58 65.2 207.6 0.8 23.0 -9 1 1 589 05 58 18 05 58 58 --- 13 24 38 65.1 207.9 0.8 23.3 31 F 1 590 05 58 18 05 58 58 M87 13 24 38 64.9 212.1 0.9 26.7 -9 1 1 590 05 58 58 05 59 38 --- 13 25 18 64.8 212.5 0.9 27.0 31 F 1 591 05 58 58 05 59 38 M89 13 25 18 65.5 210.1 0.8 25.1 -8 1 1 591 05 59 38 06 00 17 --- 13 25 58 65.4 210.5 0.8 25.4 32 F 1 592 05 59 38 06 00 17 M87 13 25 58 64.8 212.8 0.9 27.3 -8 1 1 592 06 00 17 06 00 57 --- 13 26 38 64.7 213.1 0.9 27.5 32 F 1 594 06 00 17 06 00 57 M58 13 26 38 64.9 209.0 0.8 24.1 -9 1 1 594 06 00 57 06 01 37 --- 13 27 18 64.8 209.3 0.8 24.4 31 F 1 595 06 00 57 06 01 37 M87 13 27 18 64.6 213.5 0.9 27.8 -9 1 1 595 06 01 37 06 02 17 --- 13 27 58 64.5 213.8 0.9 28.1 31 F 1 596 06 01 37 06 02 17 M89 13 27 58 65.2 211.5 0.9 26.3 -8 1 1 596 06 02 17 06 02 57 --- 13 28 38 65.2 211.9 0.9 26.5 32 F 1 598 06 02 17 06 02 57 M87 13 28 38 64.5 214.1 1.0 28.3 -7 1 1 598 06 02 57 06 03 37 --- 13 29 18 64.4 214.5 1.0 28.6 32 F 1 599 06 02 57 06 03 37 M58 13 29 18 64.6 210.4 0.9 25.3 -9 1 1 599 06 03 37 06 04 17 --- 13 29 58 64.6 210.7 0.9 25.5 31 F 1 600 06 03 37 06 04 17 M87 13 29 58 64.3 214.8 1.0 28.9 -9 1 1 600 06 04 17 06 04 57 --- 13 30 38 64.2 215.1 1.0 29.1 31 F 1 601 06 04 17 06 04 57 M89 13 30 38 64.9 212.9 0.9 27.4 -7 1 1 601 06 04 57 06 05 37 --- 13 31 18 64.9 213.2 0.9 27.6 32 F 1 603 06 04 57 06 05 37 M87 13 31 18 64.1 215.5 1.0 29.4 -7 1 1 603 06 05 37 06 06 16 --- 13 31 58 64.1 215.8 1.0 29.6 32 F 1 604 06 05 37 06 06 16 M58 13 31 58 64.4 211.7 0.9 26.4 -9 1 1 604 06 06 16 06 06 56 --- 13 32 38 64.3 212.1 0.9 26.6 31 F 1 605 06 06 16 Schedule for VLBA_PT (Code Pt ) Page 33 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 06 56 M87 13 32 38 64.0 216.1 1.0 29.9 -9 1 1 605 06 06 56 06 07 36 --- 13 33 18 63.9 216.4 1.0 30.1 31 F 1 607 06 06 56 06 07 36 M89 13 33 18 64.6 214.2 1.0 28.4 -7 1 1 607 06 07 36 06 08 16 --- 13 33 58 64.6 214.6 1.0 28.7 32 F 1 608 06 07 36 06 08 16 M87 13 33 58 63.8 216.7 1.0 30.4 -7 1 1 608 06 08 16 06 08 56 --- 13 34 38 63.7 217.1 1.1 30.6 32 F 1 609 06 08 16 06 08 56 M58 13 34 38 64.1 213.1 0.9 27.4 -9 1 1 609 06 08 56 06 09 36 --- 13 35 18 64.0 213.4 1.0 27.7 31 F 1 610 06 08 56 06 09 36 M87 13 35 18 63.7 217.4 1.1 30.9 -9 1 1 610 06 09 36 06 10 16 --- 13 35 58 63.6 217.7 1.1 31.1 31 F 1 612 06 09 36 06 10 16 M89 13 35 58 64.3 215.6 1.0 29.5 -7 1 1 612 06 10 16 06 10 56 --- 13 36 38 64.2 215.9 1.0 29.7 32 F 1 613 06 10 16 06 10 56 M87 13 36 38 63.5 218.0 1.1 31.4 -7 1 1 613 06 10 56 06 11 36 --- 13 37 18 63.4 218.3 1.1 31.6 32 F 1 614 06 10 56 06 11 36 M58 13 37 18 63.8 214.4 1.0 28.5 -9 1 1 614 06 11 36 06 12 15 --- 13 37 58 63.7 214.7 1.0 28.7 31 F 1 616 06 11 36 06 12 15 M87 13 37 58 63.3 218.6 1.1 31.9 -9 1 1 616 06 12 15 06 12 55 --- 13 38 38 63.2 218.9 1.1 32.1 31 F 1 617 06 12 15 06 12 55 M89 13 38 38 64.0 216.9 1.0 30.5 -7 1 1 617 06 12 55 06 13 35 --- 13 39 18 63.9 217.2 1.1 30.8 32 F 1 618 06 12 55 06 13 35 M87 13 39 18 63.1 219.2 1.1 32.3 -7 1 1 618 06 13 35 06 14 15 --- 13 39 58 63.1 219.5 1.1 32.6 32 F 1 619 06 13 35 06 14 15 M58 13 39 58 63.4 215.7 1.0 29.5 -9 1 1 619 06 14 15 06 14 55 --- 13 40 38 63.4 216.0 1.0 29.7 31 F 1 621 06 14 15 06 14 55 M87 13 40 38 63.0 219.8 1.2 32.8 -9 1 1 621 06 14 55 06 15 35 --- 13 41 18 62.9 220.1 1.2 33.0 31 F 1 622 06 14 55 06 15 35 M89 13 41 18 63.7 218.1 1.1 31.5 -8 1 1 622 06 15 35 06 16 15 --- 13 41 58 63.6 218.4 1.1 31.7 32 F 1 623 06 15 35 Schedule for VLBA_PT (Code Pt ) Page 34 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 16 15 M87 13 41 58 62.8 220.4 1.2 33.3 -8 1 1 623 06 16 15 06 16 55 --- 13 42 38 62.7 220.7 1.2 33.5 32 F 1 625 06 16 15 06 16 55 M58 13 42 38 63.1 216.9 1.1 30.5 -9 1 1 625 06 16 55 06 17 35 --- 13 43 18 63.0 217.2 1.1 30.7 31 F 1 626 06 16 55 06 17 35 M87 13 43 18 62.6 221.0 1.2 33.7 -9 1 1 626 06 17 35 06 18 15 --- 13 43 58 62.5 221.3 1.2 33.9 31 F 1 627 06 17 35 06 18 15 M89 13 43 58 63.3 219.4 1.1 32.5 -8 1 1 627 06 18 15 06 18 54 --- 13 44 38 63.2 219.7 1.1 32.7 32 F 1 628 06 18 15 06 18 54 M87 13 44 38 62.4 221.6 1.2 34.2 -8 1 1 628 06 18 54 06 19 34 --- 13 45 18 62.3 221.9 1.2 34.4 32 F 1 630 06 18 54 06 19 34 M58 13 45 18 62.8 218.2 1.1 31.4 -8 1 1 630 06 19 34 06 20 14 --- 13 45 58 62.7 218.5 1.1 31.7 31 F 1 631 06 19 34 06 20 14 M87 13 45 58 62.2 222.2 1.2 34.6 -8 1 1 631 06 20 14 06 20 54 --- 13 46 38 62.2 222.5 1.3 34.8 31 F 1 632 06 20 14 06 20 54 M89 13 46 38 63.0 220.6 1.2 33.4 -8 1 1 632 06 20 54 06 21 34 --- 13 47 18 62.9 220.9 1.2 33.6 32 F 1 634 06 20 54 06 21 34 M87 13 47 18 62.1 222.8 1.3 35.0 -8 1 1 634 06 21 34 06 22 14 --- 13 47 58 62.0 223.1 1.3 35.3 32 F 1 635 06 21 34 06 22 14 M58 13 47 58 62.4 219.4 1.2 32.4 -8 1 1 635 06 22 14 06 22 54 --- 13 48 38 62.3 219.7 1.2 32.6 31 F 1 636 06 22 14 06 22 54 M87 13 48 38 61.9 223.3 1.3 35.5 -8 1 1 636 06 22 54 06 23 34 --- 13 49 18 61.8 223.6 1.3 35.7 31 F 1 637 06 22 54 06 23 34 M89 13 49 18 62.6 221.7 1.2 34.3 -8 1 1 637 06 23 34 06 24 14 --- 13 49 58 62.5 222.0 1.2 34.5 32 F 1 639 06 23 34 06 24 14 M87 13 49 58 61.7 223.9 1.3 35.9 -8 1 1 639 06 24 14 06 24 53 --- 13 50 38 61.6 224.2 1.3 36.1 32 F 1 640 06 24 14 06 24 53 M58 13 50 38 62.1 220.5 1.2 33.3 -8 1 1 640 06 24 53 06 25 33 --- 13 51 18 62.0 220.8 1.2 33.5 31 F 1 641 06 24 53 Schedule for VLBA_PT (Code Pt ) Page 35 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 25 33 M87 13 51 18 61.5 224.5 1.3 36.3 -8 1 1 641 06 25 33 06 26 13 --- 13 51 58 61.4 224.7 1.3 36.5 31 F 1 643 06 25 33 06 26 13 M89 13 51 58 62.2 222.9 1.3 35.2 -8 1 1 643 06 26 13 06 26 53 --- 13 52 38 62.1 223.2 1.3 35.4 32 F 1 644 06 26 13 06 26 53 M87 13 52 38 61.3 225.0 1.4 36.7 -8 1 1 644 06 26 53 06 27 33 --- 13 53 18 61.2 225.3 1.4 36.9 32 F 1 645 06 26 53 06 27 33 M58 13 53 18 61.7 221.7 1.3 34.1 -8 1 1 645 06 27 33 06 28 13 --- 13 53 58 61.6 222.0 1.3 34.4 32 F 1 646 06 27 33 06 28 13 M87 13 53 58 61.1 225.5 1.4 37.1 -8 1 1 646 06 28 13 06 28 53 --- 13 54 38 61.0 225.8 1.4 37.3 32 F 1 648 06 28 13 06 28 53 M89 13 54 38 61.8 224.0 1.3 36.0 -8 1 1 648 06 28 53 06 29 33 --- 13 55 18 61.7 224.3 1.3 36.2 32 F 1 649 06 28 53 06 29 33 M87 13 55 18 60.9 226.1 1.4 37.5 -8 1 1 649 06 29 33 06 30 13 --- 13 55 58 60.8 226.3 1.4 37.7 32 F 1 650 06 29 33 06 30 13 M58 13 55 58 61.3 222.8 1.3 35.0 -8 1 1 650 06 30 13 06 30 52 --- 13 56 38 61.3 223.1 1.3 35.2 32 F 1 652 06 30 13 06 30 52 M87 13 56 38 60.7 226.6 1.4 37.9 -8 1 1 652 06 30 52 06 31 32 --- 13 57 18 60.6 226.9 1.4 38.1 32 F 1 653 06 30 52 06 31 32 M89 13 57 18 61.5 225.1 1.4 36.9 -8 1 1 653 06 31 32 06 32 12 --- 13 57 58 61.4 225.4 1.4 37.1 32 F 1 654 06 31 32 06 32 12 M87 13 57 58 60.5 227.1 1.4 38.3 -8 1 1 654 06 32 12 06 32 52 --- 13 58 38 60.4 227.4 1.5 38.5 32 F 1 655 06 32 12 06 32 52 M58 13 58 38 61.0 223.9 1.3 35.8 -8 1 1 655 06 32 52 06 33 32 --- 13 59 18 60.9 224.2 1.4 36.0 32 F 1 657 06 32 52 06 33 32 M87 13 59 18 60.3 227.6 1.5 38.7 -8 1 1 657 06 33 32 06 34 12 --- 13 59 58 60.2 227.9 1.5 38.9 32 F 1 658 06 33 32 06 34 12 M89 13 59 58 61.1 226.2 1.4 37.7 -8 1 1 658 06 34 12 06 34 52 --- 14 00 38 61.0 226.5 1.4 37.8 32 F 1 659 06 34 12 Schedule for VLBA_PT (Code Pt ) Page 36 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 34 52 M87 14 00 38 60.1 228.1 1.5 39.0 -8 1 1 659 06 34 52 06 35 32 --- 14 01 18 60.0 228.4 1.5 39.2 32 F 1 661 06 34 52 06 35 32 M58 14 01 18 60.6 225.0 1.4 36.6 -8 1 1 661 06 35 32 06 36 12 --- 14 01 58 60.5 225.3 1.4 36.8 32 F 1 662 06 35 32 06 36 12 M87 14 01 58 59.9 228.7 1.5 39.4 -8 1 1 662 06 36 12 06 36 51 --- 14 02 38 59.8 228.9 1.5 39.6 32 F 1 663 06 36 12 06 36 51 M89 14 02 38 60.7 227.3 1.4 38.4 -8 1 1 663 06 36 51 06 37 31 --- 14 03 18 60.6 227.5 1.5 38.6 32 F 1 665 06 36 51 06 37 31 M87 14 03 18 59.7 229.2 1.5 39.8 -8 1 1 665 06 37 31 06 38 11 --- 14 03 58 59.6 229.4 1.5 39.9 32 F 1 666 06 37 31 06 38 11 M58 14 03 58 60.2 226.1 1.4 37.4 -8 1 1 666 06 38 11 06 38 51 --- 14 04 38 60.1 226.3 1.4 37.6 32 F 1 667 06 38 11 06 38 51 M87 14 04 38 59.5 229.6 1.6 40.1 -8 1 1 667 06 38 51 06 39 31 --- 14 05 18 59.4 229.9 1.6 40.3 32 F 1 668 06 38 51 06 39 31 M89 14 05 18 60.3 228.3 1.5 39.2 -8 1 1 668 06 39 31 06 40 11 --- 14 05 58 60.2 228.5 1.5 39.4 32 F 1 670 06 39 31 06 40 11 M87 14 05 58 59.3 230.1 1.6 40.5 -8 1 1 670 06 40 11 06 40 51 --- 14 06 38 59.2 230.4 1.6 40.6 32 F 1 671 06 40 11 06 40 51 M58 14 06 38 59.8 227.1 1.5 38.2 -8 1 1 671 06 40 51 06 41 31 --- 14 07 18 59.7 227.3 1.5 38.4 32 F 1 672 06 40 51 06 41 31 M87 14 07 18 59.1 230.6 1.6 40.8 -8 1 1 672 06 41 31 06 42 11 --- 14 07 58 58.9 230.9 1.6 41.0 32 F 1 674 06 41 31 06 42 11 M89 14 07 58 59.8 229.3 1.5 39.9 -8 1 1 674 06 42 11 06 42 50 --- 14 08 38 59.7 229.5 1.5 40.1 32 F 1 675 06 42 11 06 42 50 M87 14 08 38 58.8 231.1 1.6 41.1 -8 1 1 675 06 42 50 06 43 30 --- 14 09 18 58.7 231.3 1.6 41.3 32 F 1 676 06 42 50 06 43 30 M58 14 09 18 59.4 228.1 1.5 38.9 -8 1 1 676 06 43 30 06 44 10 --- 14 09 58 59.3 228.3 1.5 39.1 32 F 1 677 06 43 30 Schedule for VLBA_PT (Code Pt ) Page 37 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 44 10 M87 14 09 58 58.6 231.6 1.6 41.5 -8 1 1 677 06 44 10 06 44 50 --- 14 10 38 58.5 231.8 1.7 41.6 32 F 1 679 06 44 10 06 44 50 M89 14 10 38 59.4 230.3 1.6 40.6 -8 1 1 679 06 44 50 06 45 30 --- 14 11 18 59.3 230.5 1.6 40.8 32 F 1 680 06 44 50 06 45 30 M87 14 11 18 58.4 232.0 1.7 41.8 -8 1 1 680 06 45 30 06 46 10 --- 14 11 58 58.3 232.3 1.7 42.0 32 F 1 681 06 45 30 06 46 10 M58 14 11 58 59.0 229.1 1.6 39.6 -8 1 1 681 06 46 10 06 46 50 --- 14 12 38 58.9 229.3 1.6 39.8 32 F 1 683 06 46 10 06 46 50 M87 14 12 38 58.2 232.5 1.7 42.1 -8 1 1 683 06 46 50 06 47 30 --- 14 13 18 58.1 232.7 1.7 42.3 32 F 1 684 06 46 50 Next scan frequencies: 8405.49 8405.49 8413.49 8413.49 8421.49 8421.49 8429.49 8429.49 Next BBC frequencies: 805.49 805.49 813.49 813.49 821.49 821.49 829.49 829.49 06 47 30 M87 14 13 18 58.1 232.7 1.7 42.3 -4 1 1 684 06 47 30 06 48 10 --- 14 13 58 58.0 232.9 1.7 42.4 36 F 1 685 06 47 30 06 48 10 M89 14 13 58 58.9 231.5 1.6 41.5 -8 1 1 685 06 48 10 06 48 49 --- 14 14 38 58.8 231.7 1.6 41.6 32 F 1 686 06 48 10 06 48 49 M87 14 14 38 57.9 233.2 1.7 42.6 -8 1 1 686 06 48 49 06 49 29 --- 14 15 18 57.8 233.4 1.7 42.8 32 F 1 688 06 48 49 06 49 29 M58 14 15 18 58.4 230.3 1.6 40.5 -8 1 1 688 06 49 29 06 50 09 --- 14 15 58 58.3 230.5 1.6 40.6 32 F 1 689 06 49 29 06 50 09 M87 14 15 58 57.6 233.6 1.7 42.9 -8 1 1 689 06 50 09 06 50 49 --- 14 16 38 57.5 233.8 1.8 43.1 32 F 1 690 06 50 09 06 50 49 M89 14 16 38 58.5 232.4 1.7 42.1 -8 1 1 690 06 50 49 06 51 29 --- 14 17 18 58.3 232.6 1.7 42.3 32 F 1 692 06 50 49 06 51 29 M87 14 17 18 57.4 234.1 1.8 43.2 -8 1 1 692 06 51 29 06 52 09 --- 14 17 58 57.3 234.3 1.8 43.4 32 F 1 693 06 51 29 06 52 09 M58 14 17 58 58.0 231.2 1.7 41.1 -8 1 1 693 06 52 09 06 52 49 --- 14 18 38 57.9 231.5 1.7 41.3 32 F 1 694 06 52 09 Schedule for VLBA_PT (Code Pt ) Page 38 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 52 49 M87 14 18 38 57.2 234.5 1.8 43.5 -8 1 1 694 06 52 49 06 53 29 --- 14 19 18 57.1 234.7 1.8 43.7 32 F 1 695 06 52 49 06 53 29 M89 14 19 18 58.0 233.3 1.7 42.7 -8 1 1 695 06 53 29 06 54 09 --- 14 19 58 57.9 233.5 1.7 42.9 32 F 1 697 06 53 29 06 54 09 M87 14 19 58 57.0 234.9 1.8 43.8 -8 1 1 697 06 54 09 06 54 48 --- 14 20 38 56.9 235.1 1.8 43.9 32 F 1 698 06 54 09 06 54 48 M58 14 20 38 57.6 232.1 1.7 41.8 -8 1 1 698 06 54 48 06 55 28 --- 14 21 18 57.5 232.4 1.7 41.9 32 F 1 699 06 54 48 06 55 28 M87 14 21 18 56.7 235.4 1.8 44.1 -8 1 1 699 06 55 28 06 56 08 --- 14 21 58 56.6 235.6 1.8 44.2 32 F 1 701 06 55 28 06 56 08 M89 14 21 58 57.6 234.2 1.8 43.3 -8 1 1 701 06 56 08 06 56 48 --- 14 22 38 57.5 234.4 1.8 43.5 32 F 1 702 06 56 08 06 56 48 M87 14 22 38 56.5 235.8 1.9 44.4 -8 1 1 702 06 56 48 06 57 28 --- 14 23 18 56.4 236.0 1.9 44.5 32 F 1 703 06 56 48 06 57 28 M58 14 23 18 57.1 233.0 1.8 42.4 -8 1 1 703 06 57 28 06 58 08 --- 14 23 58 57.0 233.3 1.8 42.6 32 F 1 704 06 57 28 06 58 08 M87 14 23 58 56.3 236.2 1.9 44.6 -8 1 1 704 06 58 08 06 58 48 --- 14 24 38 56.2 236.4 1.9 44.8 32 F 1 706 06 58 08 06 58 48 M89 14 24 38 57.1 235.1 1.8 43.9 -8 1 1 706 06 58 48 06 59 28 --- 14 25 18 57.0 235.3 1.8 44.1 32 F 1 707 06 58 48 06 59 28 M87 14 25 18 56.1 236.6 1.9 44.9 -8 1 1 707 06 59 28 07 00 08 --- 14 25 58 55.9 236.8 1.9 45.1 32 F 1 708 06 59 28 07 00 08 M58 14 25 58 56.7 233.9 1.8 43.0 -8 1 1 708 07 00 08 07 00 48 --- 14 26 38 56.6 234.1 1.8 43.1 32 F 1 710 07 00 08 07 00 48 M87 14 26 38 55.8 237.0 1.9 45.2 -8 1 1 710 07 00 48 07 01 27 --- 14 27 18 55.7 237.2 1.9 45.3 32 F 1 711 07 00 48 07 01 27 M89 14 27 18 56.7 235.9 1.9 44.5 -8 1 1